District 1 Community Meeting Wednesday January 24, 2018


Accomplishments for 2017-2018

January 24, 2018

El Paso Water

2


Reduced Flooding on I-10 Pollard Pond

65

Gateway East Pond Other Ponds

Morenci Pond

Gateway West Pond

27 Million Gallons 38 Million Gallons

Austin Pond

US-54

MILLION GALLONS CAPACITY CREATED FOR FLOOD CONTROL

Gateway East Pond Magnolia PS & FM

January 24, 2018

El Paso Water

3


Stormwater Operations: High Productivity Ponds

Channels & Levees

243 acres maintained

25 miles cleaned

Drains

15 miles maintained

Storm Drains

3 miles of conduits cleaned

Inlets

616 inlets cleaned

Dams

239 acres maintained

January 24, 2018

El Paso Water

4


Securing our Future Water Supply Design started

Completed major purchases of land and water rights in Dell City: About 57,000 acres now under EPWater ownership

Advanced Purification

Importation

Desalination Expansion

Aquifer Storage & Recovery

Dell City

Capitan Reef Farms

Feasibility study completed

Feasibility study started

January 24, 2018

El Paso Water

5


New Infrastructure Supporting Rehabilitation, Growth, Resiliency

New water storage: ‒  ‒  ‒  ‒

Memphis Ventanas Americas #2 Airport

Water transmission mains: –  –  –  –

Edgemere Montana East Vista Del Sol Resler (North of Transmountain)

January 24, 2018

El Paso Water

6


PSB Adopts a New Budget §  New budget adopted on Jan. 10, 2018. §  Goes into effect March 1, 2018. §  This included a –  2-percent increase in the stormwater fee; –  8-percent increase in the water and wastewater rate.

§  Average monthly increase: $4.06. January 24, 2018

El Paso Water

7


New and Continuing Priorities for FY2018-19 Water Supply

Customer Service

Reliability, Efficiency & Resilience

Infrastructure Rehabilitation

January 24, 2018

City Growth Requirements

El Paso Water

8


FY 2018-19 Current and Adopted 2% Fee Increase Current Fee

Adopted Increase 2%

Small

$2.09

$2.13

$0.04

Typical

$4.17

$4.25

$0.08

Large

$8.34

$8.51

$0.17

$4.25

$4.34

$0.09

Residential

Difference

Non-Residential Each 2,000 sq. ft. Impervious Area

January 10, 2018

El Paso Water

9


Stormwater Fees - Texas Cities City

Residential Average Fee

Fee Range Based on 1,200 – 3,000 Sq. Ft.

Austin

$13.80

$9.20 – $18.40

Lubbock

$11.14

$8.80 – $13.48

Arlington

$9.38

$6.25 – $12.50

Fort Worth

$6.75

$5.40 – $8.10

Houston

$5.33

Grand Prairie

$4.68

$4.34 – $5.02

Dallas

$4.63

$3.57 – $5.68

El Paso (2% Increase)

$4.25

San Antonio

$4.17

El Paso (Current)

$4.17

Plano

$4.15

$4.15 – $4.15

Abilene

$2.70

$2.70 – $2.89

Amarillo

$2.51

$2.51 – $2.89

$3.60 – $4.17

Note: Average residential fee based on a typical EPWater square footage between 1,200 to 3,000 impervious area.

January 24, 2018

El Paso Water

10


What does this mean to me? Examples of Residential & Commercial Bill Impacts with a 8% Rate Increase Monthly Water & Wastewater Bill

Current

Adopted 8%

Change

Residential 3 ccfs

$25.96

$28.03

$2.07

Residential 11 ccfs

49.72

53.70

3.98

Commercial 14 ccfs

76.04

82.12

6.08

Wastewater rates based on class Average Winter Consumption (AWC)

January 10, 2018

El Paso Water

11


ACRE-FEET PER YEAR

New water sources needed to meet demands of increasing population 350000

1600000

300000

1400000 1200000

250000

1000000

200000

800000 150000

600000

100000

400000

50000

200000

0

0 2020

2030 2040 Current Existing Supply

2050 Additional

2060 2070 Population

January 24, 2018

El Paso Water

12


Typical Bill Comparisons for El Paso $160 $140 $120 $100 $80 $60 $40 $20 $0 Cell Phone

Cable

Electric

Water & Wastewater

Internet

January 24, 2018

Gas

El Paso Water

13


El Paso’s water rates remain comparatively low $140

$140 U.S. Average Residential Monthly Water Bill

$120

$120

$100

$100

$80

$80

$60

$60

$40

$40

$20

$20

$0

$0 Austin

Corpus Houston San Fort Christi Antonio Worth Water Sewer

Plano

Dallas Arlington El Paso El Paso El Paso FY2020 FY2019 FY2018 Max to Meet 2% Affordability Index

January 24, 2018 El Paso Water

12


District 1 Projects

January 24, 2018

El Paso Water

15


Water Projects §  Strahan Water Line –  Funded in part by the U.S. Army Corps of Engineers –  Phase I complete; Phase II upcoming

§  Mesa Street Water Line Replacement

January 24, 2018

El Paso Water

16


Stormwater Projects §  §  §  §

Bear Ridge Channel West Hills Unit 23 Robinson Street Drainage Improvements La Placita Storm System Repairs

January 24, 2018

El Paso Water

17


La Placita Storm System Repairs

January 24, 2018

El Paso Water

18


La Placita Storm System Repairs

January 24, 2018

El Paso Water

19


La Placita Storm System Repairs

January 24, 2018

El Paso Water

20


Open Space Projects §  Hunt Arroyos –  Nearly 100 acres in NW El Paso –  Will remain as open space with stormwater functions. January 24, 2018

El Paso Water

21


Open Space Projects §  Cement Lake –  In negotiations to purchase from TXDOT –  Will be preserved as open space January 24, 2018

El Paso Water

22


Thank you for your time. Questions or Comments?

January 24, 2018

El Paso Water

23


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.