SANCHEZ FFER ER NANDA SANC HEZ ARCHITECTURE AND URBAN DESIGN PORTFOLIO
EMPOWERING BELEN COMMUNITY THROUGH NETWORKED INFRASTRUCTURE
MASTER OF URBAN DESIGN THESIS (SCAD MUD THESIS AWARD 19’) DESIGN RESEARCH AND MAPPING BELEN - IQUITOS, PERU.
TOURISM AND CONSERVATION URBAN PROPOSAL
DESIGN RESEARCH AND MAPPING GALAPAGOS ISLANDS, ECUADOR.
MILLEDGEVILLE MASTER PLAN
REACTIVATION OF THE CENTRAL STATE HOSPITAL CAMPUS (CSH) FACTOR’S WALK - SAVANNAH, GA.
SAVANNAH URBAN TYPOLOGIES DESIGN RESEARCH SAVANNAH, GA.
SAVANNAH HISTORIC EVOLUTION AND URBAN LAYERS DESIGN RESEARCH SAVANNAH, GA.
URBAN FRAGMENT
URBAN INTERVENTION AND INFILL PROPOSAL FACTOR’S WALK - SAVANNAH, GA.
SAVANNAH HISTORIC EVOLUTION AND URBAN LAYERS DESIGN RESEARCH SAVANNAH, GA.
MIX USED_URBAN HOUSING PROJECT BACHELOR DEGREE THESIS LIMA, PERU.
E M POWE R ING B E L E N T HROUGH NE TWO R KE D INFR AST R UC TURE EXPANDING THE RHIZOME
For a long time native communities have been living in sparse, often isolated, settlements. Adapting to the mutable conditions of the river, they created a system based on mobility, economic diversification and ‘multisited territorial appropriation’. Such use and production of space was and still is disarticulated from any single master principle of spatial organization and from usual dichotomies such as rural/urban and public/private. The lower area of Belen has been considered high risk and not suitable for urban development, which is why this settlement has been labeled as marginal, and their population has been classified as poor. This classification of urban poverty and marginality is based on traditional measurement methodologies and development discourses, which rarely take into account the environmental and socio-cultural context of non-traditional communities like those located in the Amazonia. The relocation site of New Belen is located at the edge of the future expansion of the city of Iquitos, next to the conservation area of Allpahuayo-Mishana, and approximately 25 kilometers from the current site. The choice of the new site location was driven by factors related to land value and cost, ownership and size. The land was privately owned and sold to the government for that purpose. It is surrounded by the rainforest, relatively isolated from other settlements,and has poorly involved the local community. With this project I will explore and empower the existing Belen network by using the Asset Based Community Development (ABCD) design method resulting in new opportunities for remain in place.
RIVER MOVEMENT AND CITY EVOLUTION The Amazon River is traditionally known as “The water snake”, due to the way it moves. In this sense, its meaning comes to life. That is, the river is a living being and its presence is very important to the collective imagination of the rainforest populations. Amazonian towns express in their oral traditions the importance and duality between forest and river, thus showing the close interdependence of their asymmetric elements. If this ancestral knowledge that reflects the flooding and dry seasons is considered, the importance of the forest´s seasonal flooding would be understood. Thanks to this phenomenon, fluvial systems are originated. Moreover, it is the main mechanism
that
determines
seasonal
BELEN
changes in the Amazonian environment, as well as the development of aquatic and terrestrial organisms intrinsic to the area.
NUEVO BELEN
LEGEND AMAZON RIVER 1984
1996
2008
1988
2000
2012
1992
2004
2016
URBAN GROWTH 1984
1996
2008
1988
2000
2012
1992
2004
2016
DEFORESTATION
ts
structure
ents
ITAYA RIVER CYCLE
OCTOBER
DECEMBER
FEBRUARY
MARCH
APRIL
MAY
JUNE
AUGUST
URBAN POVERTY Extremely Poor Poor Not Poor
DENSITY
LEGEND Low Density Medium Density
LEGEND
LEGEND Low Density Medium Density
Pre - urban unconsolidated
High Density Port Service Area Military Barracks Airport Infrastructure
URBAN POVERTY
LEGEND Extremely Poor Poor
High Density Port Service Area Military Barracks Airport Infrastructure
0 - 143 Peruvian Soles per month (0 - $44) 143 - 225 Peruvian Soles per month ($44 - $68) 225 or more Peruvian Soles per month ($68 or +)
Not Poor
0 - 143 Peruvian Soles per month (0 - $44) 143 - 225 Peruvian Soles per month ($44 - $68) 225 or more Peruvian Soles per month ($68 or +)
LEGEND Extremely Poor Poor Not Poor
0 - 143 Peruvian Soles per month (0 - $44) 143 - 225 Peruvian Soles per month ($44 - $68) 225 or more Peruvian Soles per month ($68 or +)
Pre - urban unconsolidated
LEGEND Informal commercial streets Informal commercial houses
LAND USE
LAND COVER
LEGEND
LEGEND Residential Military Area Commerce Ports and airports Industrial Goverment Infrastructure Education Medical Recreation Informal settlements
Flooded forest with low intervention Not flooded forest with low intervention Secondary forest Agriculture Wetland Urban populated center Rural populaetd center
BelenLEGEND Port Flooded forest with low intervention Not flooded forest with low intervention Secondary forest Agriculture Wetland Urban populated center Rural populaetd center
INFORMAL USES LEGEND Informal commercial streets Informal commercial houses Belen Port
AMAZONIA
IQUITOS
In the rainforest, the river and its serpentine movement has always been the most important linking element of
Through the connections that occur naturally through the river to supply the population’s daily needs, the system extends to the city creating new permanent and complementary nodes for existing networks.
the Amazonian reality. Through it life flows, food comes, and hunters and merchants navigate. This vehicle has enabled exchange, and has favored the creation of small cities in the dense forest.
NANAY RIVER
IQUITOS
The development of human culture in the Amazonian territory originated from their productive management, in which they recognized the diversity of species, and recorded the climate and seasonal cycles of the river in the surroundings.
PADRE COCHA
In this way, an internal and hierarchical network is created so that the productive and commercial system works at different levels inside and outside the city.
BELLAVISTA MANACAMIRI
ITAYA RIVER
The understanding of the cyclic dynamics in constant movement of the rainforest territory pushed its dwellers not to have a fixed place of residence but stationary occupations as they searched for resources and productive land.
This is where the network system behaves like a “rhizome”, a descriptive model in which the organization of the elements does not follow lines of hierarchical subordination, giving rise to multiple branches, in which any element can affect or influence any other to improve it.
PAMPACHICA
BELEN
PUCATE SANTA CLARA
ONIO SANTO TOMAS
MARANON RIVER NAUTA UCAYALI RIVER
BELEN NETWORK EXPANDING THE RHIZOME
VIEW PLATFORM / MIRADOR
Considering the existing Belen network as the rhizome, all the nodes make the structure better at the same time. Every network is part of a bigger system of nodes and connections that resist chronology and organization, instead favoring a nomadic system of growth and propagation.
- Strategic viewpoints with the natural environment and Belen area.
If we think about the rhizome as a map, it could be something that is always open and can be interveined in any point. Moreover, we can also say that it doesn’t need a start and end point, because everything is happening in the middle, between things. There is no logical pattern for its growth or central route.
- Walkability - Make the experience of the river more attractive. - Pedestrian and cyclist friendly area is created. - Green atmosphere gives the city a different look. - Increase the value of real estate activating the edge of the river.
The rhizome can be broken off at any point and will start over again with new connections making a resilient network or system.
PROMENADE EXTENSION
ACTIVATE GROUND FLOOR
LEGEND Secondary nodes Promenade - existing pedestrian circulation Promenade pedestrian expansion Activate ground floor - mix use Street market Floating streets - elevated structures Belen Plaza
- Buildings’ plinth contribute to the activity of the public space. - Cultural, commercial and leisure activities make the street the place to be, giving the feeling of a safe space.
PERMANENT INFRASTRUCTURE
- Upgrade existing infrastructure making them part of the daily street life and adaptable for dry and wet season. - Reinforce Belenials unique character by making it permanent.
NEW ROUTES
- Complete the network for pedestrians with secondary access to/from the nodes. (River level and formal streets level) - Activate new areas. - As a flexible structure, users can experience different type of activities along the corridor. - Creation of a new public corridor that integrates other areas of Belen. - People closer to the water level, especially in these areas where they can be expected to make use of the public space.
LEVEL OF SOLUTIONS
The proposal is divided into different levels according to the magnitude of the intervention, influence, scale, direct impact on the community and investment. IQUITOS PROMENADE
IQUITOS PROMENADE
IQUITOS PROMENADE
IQUITOS PROMENADE
IQUITOS PROMENADE
IQUITOS PROMENADE
1
NETWORKS
1. PROMENADE 2. MARKET
1 IQUITOS
IQUITOS PROMENADE
PROMENADE
1
1 1
3
3
BELEN PORT
3
BELEN MARKET
WASTE UP-CYCLE WASTE UP-CYCLE PUBLIC RESIDENCES WASTE NETWORK PUBLIC WASTE NETWORK FOR FLOATING RESIDENCES FOR FLOATING RECYCLING STATIONS RECYCLING STATIONS
PORT PROMENADE MARKET PLAZA
DOMESTIC WASTE NETWORKDOMESTIC WASTE NETWORK
WASTE PICKING CIRCUIT FOR FLOATING WASTERESIDENCES UP-CYCLE -
WASTE PICKING CIRCUIT FOR FLOATING RESIDENCES WASTE UP-CYCLE RECYCLING STATIONS
WASTE PICKING CIRCUIT WASTE PICKING CIRCUIT FOR FLOATING RESIDENCES FOR FLOATING RESIDENCES
2 4
BELEN BELEN PLAZA MARKET
2 2
BELEN BELEN PORT PLAZA
PUBLIC WASTE NETWORK WASTE UP-CYCLE -
WASTE MANAGEMENT WASTE MANAGEMENT WASTE PICKING CIRCUIT WASTE PICKING CIRCUIT
1
2 4
BELEN PLAZA
PUBLIC WASTE NETWORK WASTE UP-CYCLE -
WASTE WASTE PICKINGNETWORK CIRCUIT PUBLIC PUBLIC PICKING WASTE NETWORK WASTE CIRCUIT WASTE UP-CYCLE WASTE UP-CYCLE FOR FLOATING RESIDENCES FOR FLOATING RESIDENCES RECYCLINGWASTE STATIONS NETWORK DOMESTIC NETWORK DOMESTIC RECYCLINGWASTE STATIONS
RECYCLING STATIONS
1
4 BELEN BELEN PLAZA MARKET
1.PORT PROMENADE 2.PROMENADE MARKET 3.MARKET PLAZA 4.PLAZA PORT
PUBLIC WASTE NETWORK
WASTE NETWORK WASTE NETWORK WASTEDOMESTIC MANAGEMENT WASTEDOMESTIC MANAGEMENT RECYCLING STATIONS RECYCLING STATIONS WASTE DOMESTIC MANAGEMENT WASTEDOMESTIC MANAGEMENT WASTE NETWORK WASTE NETWORK
4
BELEN MARKET
2
PROMENADE MARKET MARKET PORT 1. PORT PROMENADE PORT 4. PLAZA PLAZA PROMENADE 2. MARKET PROMENADE MARKET 3. PLAZA NETWORKS NETWORKSMARKET PLAZA PLAZA 4. PORT 1. PROMENADE 2. MARKET 3. PLAZA 4. PORT
PUBLIC WASTE NETWORK
PORT PROMENADE MARKET PLAZA PORT
PLAZA 4. 1. PORT PROMENADE PORT
4
BELEN MARKET
4 BELEN MARKET
2. MARKET PROMENADE NETWORKS 3. PLAZA
3. PLAZA 1. 4.PROMENADE PORT 2. MARKET 3. PLAZA 4. PORT
1 4
BELEN MARKET
PORT 1. PROMENADE PROMENADE 2. MARKET
NETWORKS MARKET 3. PLAZA
4. 1. PORT PROMENADE
WASTE MANAGEMENT WASTE MANAGEMENT
NETWORKS
NETWORKS 3. PLAZA 2. MARKET NETWORKS
BELEN PLAZA
2
3
BELEN BELEN PORT PLAZA 2
3
BELEN PORT
3
BELEN PLAZA
4
BELEN MARKET
BELEN 3 PORT
BELEN PORT BELEN PORT
D1 2
PROMENADE VIEW PLATFORM
BELEN PLAZA
3 BELEN PORT
WATER LEVEL CORRIDOR FLOATING STRUCTURE ACCESSIBILITY
WATER FACILITIES
ACCESSIBILITY
UPGRADE DRAINAGE SYSTEM UPGRADE DRAINAGE SYSTEM
WATER FACILITIES
RAIN WATER HARVESTING RAIN WATER HARVESTING SYSTEM - NEW TECHNOLOGIESSYSTEM - NEW TECHNOLOGIES
ACCESSIBILITY ACCESSIBILITY PERMEABLE SURFACE FOR PERMEABLE SURFACE FOR
WATER FACILITIES
ACCESSIBILITY
- NEW TECHNOLOGIESSYSTEM - NEW TECHNOLOGIES WATER SYSTEM FACILITIES WATER FACILITIES
WATER FACILITIES
STREET LEVEL CORRIDOR
WATER STORAGE AND WATER STORAGE AND RAIN WATER HARVESTING RAIN WATER HARVESTING PUBLIC SANITARY FACILITIES PUBLIC SANITARY FACILITIES
HIGH PUBLIC CIRCULATION PUBLIC CIRCULATION UPGRADE DRAINAGE SYSTEM UPGRADE DRAINAGE SYSTEM HIGH
ACCESSIBILITY
PERMEABLE SURFACE FOR PERMEABLE SURFACE FOR ACCESSIBILITY ACCESSIBILITY UPGRADE DRAINAGE SYSTEM HIGH UPGRADE DRAINAGE SYSTEM PUBLIC CIRCULATION HIGH PUBLIC CIRCULATION
WATER STORAGE AND WATER STORAGE AND WATER FACILITIES WATER FACILITIES RAIN WATER HARVESTING RAIN WATER HARVESTING
UPGRADE DRAINAGE SYSTEMUPGRADE DRAINAGE SYSTEM
PUBLIC SANITARY FACILITIES PUBLIC SANITARY FACILITIES SYSTEM -RAIN NEWWATER TECHNOLOGIES SYSTEM - NEW TECHNOLOGIES HARVESTING RAIN WATER HARVESTING
HIGH PUBLIC CIRCULATION HIGH PUBLIC CIRCULATION
WATER STORAGE AND WATER STORAGE AND WATER STORAGE AND PUBLIC WATER STORAGE AND PUBLIC SANITARY FACILITIES SANITARY FACILITIES
PERMEABLE SURFACE FOR PERMEABLE SURFACE FOR PERMEABLEHIGH SURFACE FORCIRCULATION PERMEABLE SURFACE FOR HIGH PUBLIC CIRCULATION PUBLIC
SYSTEM - NEW TECHNOLOGIES SYSTEM - NEW TECHNOLOGIES
D3
PUBLIC SANITARY FACILITIES PUBLIC SANITARY FACILITIES
D2
PROMENADE EXPANSION
RE CONNECT AND INTEGRATE SECONDARY NODES TO THE NETWORK
STREET MARKET EXPANSION
STRUCTURES UPGRADE STRUCTURES UPGRADE IQUITOS PROMENADE
NEW STRUCTURES
IQUITOS PROMENADE
INTEGRATION OF THE STREET MARKET WITH THE PRODUCTIVE AND WHOLE SALE AREA
NEW STRUCTURES
PROMENADE LEVEL CORRIDORPROMENADE LEVEL CORRIDOR
STRUCTURES UPGRADE STRUCTURES UPGRADE STREET MARKET STREET MARKET
NEW STRUCTURES NEW STRUCTURES GROUND LEVEL CORRIDOR GROUND LEVEL CORRIDOR
STRUCTURES UPGRADE STRUCTURES IQUITOS PROMENADE UPGRADE IQUITOS PROMENADE
NEW STRUCTURES NEW STRUCTURES PROMENADE LEVEL CORRIDOR PROMENADE LEVEL CORRIDOR
LOWER BELEN FLOATING STREETS LOWER BELEN FLOATING STREETS IQUITOS PROMENADE IQUITOS PROMENADE STRUCTURES UPGRADE STRUCTURES UPGRADE STREET MARKET
PROMENADENEW LEVEL CORRIDOR PROMENADE LEVEL CORRIDOR NEW STRUCTURES STRUCTURES
STREET MARKET IQUITOS PROMENADE IQUITOS PROMENADE STREET MARKET STREET MARKET LOWER BELEN FLOATING STREETS LOWER BELEN FLOATING STREETS STREET MARKET STREET MARKET LOWER BELEN FLOATING STREETS LOWER BELEN FLOATING STREETS
GROUND LEVEL CORRIDOR GROUND LEVEL CORRIDOR PROMENADE LEVEL CORRIDOR PROMENADE GROUND LEVEL CORRIDOR GROUNDLEVEL LEVEL CORRIDOR CORRIDOR GROUND LEVEL CORRIDOR
GATHERING SPACES
GROUND LEVEL CORRIDOR
LOWER BELEN FLOATING STREETS LOWER BELEN FLOATING STREETS
NEW WEST - EAST CONNECTIONS
[D4/D5]
EXPANSION OF ELEVATED SIDEWALKS CONDITION TO DECREASE OVERCROWDING
PROMENADE PERMANENT CONDITION
D1 PROMENADE VIEW PLATFORM
FLOATING STREETS PERMANENT INFRASTRUCTURE
[D4] PROMENADE EXTENSION
D2 PROMENADE EXTENSION
NEW ROUTES PERMANENT CONDITION
[D3] STREET MARKET
D3 STREET MARKET
PERMANENT CONDITION INFRASTRUCTURE UPGRADE
NEW CONNECTION WITH BELEN EXPANSION
[D1/D2] FLOATING STREETS DRY SEASON (MAY - JAN) D4 FLOATING STREETS
WET SEASON (FEB - APR) D5 FLOATING STREETS
The purpose of the intervention
The floating streets suffer the
is to activate Belen´s streets,
highest impact during the flood
bringing locals and consumers
seasons modifying their way of
into the sector to live and play.
living and activities. The main
The scenario will try to address
intention is to reduce the risk
the current lack of security by
during the wet season with
introducing a mix of recreational
functional
and cultural activities that will
infrastructure for circulation and
attract a wider public to the zone.
street life, which is adaptable
It will also invest in making the
and also used during the dry
area more livable, by providing
season.
improved public services and
Moreover,
upgrading
space.
infrastructure can be used not
The floating streets typology
only as circulation (elevated
WET SEASON
DRY SEASON
the
public
is the best application and demonstration of the design
and
this
permanent
SECTION H_Proposal SECTION H_Proposal Street T3 Street T3 Dry Season Dry Season
permanent
sidewalks) adding street lights, SECTION H_Proposal SECTION H_Proposal Street T3 Street T3 Dry Season Dry Season
SECTION H_Proposal SECTION H_Proposal Street T3 Street T3 Wet Season Wet Season
concept.
vertical gardens, and urban furniture that complement their daily activities.
SECTION I_ProposalSECTION I_Proposal Street T4 Street T4 Dry Season Dry Season
SECTION I_ProposalSECTION I_Proposal Street T4 Street T4 Wet Season Wet Season
SECTION H_Proposal SECTION H_Proposal Street T3 Street T3 Dry Season Dry Season
SECTION H_Proposal SECTION H_Proposal Street T3 Street T3 Wet Season Wet Season
SECTION H_Proposal Street T3 Dry Season
SECTION I_Proposal SECTION I_Proposal
SECTION I_Proposal SECTION I_Proposal
(2 )
(1 )
(1) INFRASTRUCTURE UPGRADE: ALLOWS TO IMPROVE THE RELATIONSHIP AND EXISTING NETWORK BETWEEN THE FLOATING MARKET AND THE RESIDENTIAL AREA. (2)FLOATING STREETS - DRY SEASON: INFRASTRUCTURE ACTIVATES THE STREET REDUCING THE OVERCROWDING AND ALSO AS A COMPLEMENT OF THE EXISTING NETWORK. (3) FLOATING STREETS - WET SEASON: INFRASTRUCTURE UPGRADE GIVES THE COMUNITY THE OPTION TO CIRCULATE SAFELY AND MANTAIN THE STREET LIFE DURING THE WET SEASON.
(3 )
(4) BELEN MARKET: INFRASTRUCTURE UPGRADE INTERVENTION AS AN EXPANSION OF THE MAIN BUILDING. (5)STREET MARKET: MODULES UPGRADE IMPROVE THE SAFETY CONDITIONS OF THE CURRENT STREETSCAPE THROUGH COMPLEMENTARY ACTIVITIES. (6) THE LOCATION OF THE MODULES ACTIVATE INSECURE AREAS TRANSFORMING THEM INTO NEW GATHERING SPACES.
GAL APAGO S ISL AND S TOURISM AND CONSERVATION
Mapping the Galapagos extends design research into the real of geography and critical cartography. Maps and the act of mapmaking are understood as spatial representations of geo-spacial conccerns as well as an exercise in design as an extra large scale enterprise. The maps that were created describe aspects of the galapagos pertinent to tourism and conservation. The studio project address interventions and proposals at differing territorial scales, which include the entire territory of the Galapagos Islands and surrounding marine environment. The Galapagos Islands possess an extraordinary range of ecological, environmental, geological, oceanographic, social, and infrastructural elements that were expressed visually through maps.
AGRICU LTU RE A ND CO NS E RVAT I O N
SANTA C R UZ C RO P T Y P E
CROP TYPE
ISLA SANTIAGO
CLIMATE
MICONIA
VERY HUMID
PISONIA
HUMID
PASPALUM CONJUGATUM
DRY
PANICUM MAXIMUM
VERY DRY
PALO SANTO, CHAMOMILE
ARID
SCALECIA PEDUNCULATA
BUFFER
GUAVA, BANANA, CITRUS, YUCA COFFEE HERBACEA
ISLA FERNANDINA ISLA RABIDA ISLA BARTRA
ISLA SANTA CRUZ ISLA PINZON
ISLA ISABELA
PUERTO AYORA
ISLA SANTIAGO
ISLA SANTIAGO
ISLA SANTA FE ISLA DE SAN CRISTOBAL
PUERTO BAQUERIZO MORENO
ISLA FERNANDINA
ROCKY OUTCROPS
ROCKY OUTCROPS WATER
ISLA RABIDA
ISLA FERNANDINA
ISLA RABIDA
WATER
ISLA BARTRA
ISLA BARTRA
BUSHY PLANTS
BUSHY PLANTS
ARBOREAL PLANTS
ARBOREAL PLANTS
CULTIVATED LAND
CULTIVATED LAND
INVASIVE ESPECIES
PUERTO VILLAMIL ISLA SANTA CRUZ
INVASIVE ESPECIES
ISLA PINZON
ISLA SANTA CRUZ
HERBACEOUS PLANTS ISLA PINZON
INFRASTRUCTURE
ISLA ISABELA
HERBACEOUS PLANTS MANGROVES
INFRASTRUCTURE
ISLA ISABELA
PIONEER PLANTS
MANGROVES
PUERTO AYORA
UNTREATED LAND
PIONEER PLANTS
CONSERVATION AND RESTAURATION AREA
UNTREATED LAND
ABSOLUTE PROTECTION
ISLA SANTA FE
PUERTO AYORA
BUFFER CONSERVATION AND RESTAURATION AREA
ISLA DE SAN CRISTOBAL
ISLA SANTA FE
AGRICULTURAL AREA
PUERTO BAQUERIZO MORENO
ISLA DE SAN CRISTOBAL
ABSOLUTE PROTECTION BUFFER
URBAN AREA
PUERTO PUERTO ISLA FLOREANA VELAZCO VILLAMIL IBARRA
AGRICULTURAL AREA URBAN AREA
1 0
PUERTO BAQUERIZO MORENO
PUERTO VILLAMIL
10 5
20
MILES
CLIMATE
PUERTO VELAZCO IBARRA
10
5
20
ISLA FLOREANA
LOC A L KN OW L E D G E AND P RAC T I C ES I N IS L AN D FA R MI NG ISLA SANTIAGO
ISLA FERNANDINA
ROCKY OUTCROPS
MANGROVES
WATER
PIONEER PLANTS
BUSHY PLANTS
UNTREATED LAND
ARBOREAL PLANTS
CONSERVATION AND RESTAURATION AREA
CULTIVATED LAND
ABSOLUTE PROTECTION
INVASIVE ESPECIES
BUFFER
HERBACEOUS PLANTS
AGRICULTURAL AREA
INFRASTRUCTURE
URBAN AREA
BUFFER AND AGRICULTURAL AREA
INTER ISLAND TRANSPORT SYSTEM
ISLA RABIDA ISLA BARTRA
BALTRA AIRPORT
ISLA SANTA CRUZ ISLA PINZON
ISLA ISABELA
PUERTO AYORA
LAS BACHAS
SANTA CRUZ FERRY TERMINAL 1
0
ISLA SANTA FE ISLA DE SAN CRISTOBAL
10
5
20 PUERTO BAQUERIZO MORENO
MILES
PUERTO VILLAMIL
PUERTO VELAZCO IBARRA
CERRO DRAGON
ISLA FLOREANA
SANTA CRUZ HWY
LEGEND
LEGENDURBAN AREA BUFFER
URBAN AREA
NATURAL VEGETATION
BUFFER
SECONDARY BUFFER / REACREATION AREA
NATURAL VEGETATION SECONDARY BUFFER / REACREATION AREA
SECONDARY BUFFER / REACREATION AREA
ROADS
SECONDARY BUFFER / REACREATION AREA ROADS
1 SANTA CRUZ HWY
1 0 MILES
5
BELLAVISTA TOWN
EL GARRAPATERO 1 0 MILES
Source: GIS Data + Google Earth
PUERTO AYORA
PLAYA PENINSULA
5
0 MILES
5
SANTA CRUZ HWY
LEGEND
FARMERS MARKET
BELLAVISTA TOWN SANTA CRUZ HWY
ROTATING STEER AND COW PASTURE
MAIN ROADS
ADOBE AQUACULTURE
AGRICULTURAL TRAIL (CYCLING, HIKING, RECREATION) GREEN STACKING
SECONDARY BUFFER AGRICULTURAL AREA (POLITICAL BOUNDARY) BARN AND RECREATION AREA
GOAT AND SHEEP PASTRURE GOAT AND SHEEP PEN
PERMACULTURE FARMER’S MARKET LAYOUT
HOUSE
VEGETABLE GARDEN ESPALIER AND CORDONING
CHICKEN PASTURE
BEES
FRUIT TREES
FRUIT TREES
CHICKEN COOP
HOUSE
SHED
PERMACULTURE
POTATOES
PATCHES - WOODED AREA (LANDSCAPE DESIGN ECOLOGY) DETAIL
BELLAVISTA TOWN
CORRIDOR (LANDSCAPE ECOLOGY)
ROTATING STEER AND COW PASTURE
LEGEND
SECONDARY BUFFER AND RECREATION AREA ADOBE GREEN HOUSE
STACKING
MAIN ROADS
COFFEE PERMACULTURE AREA
AQUACULTURE
BELLAVISTA TOWN SECONDARY BUFFER AND RECREATION AREA
BANANA FARMERS MARKET
NATURAL VEGETATION
CROP TYPE BARN
VEGETABLE GARDEN ESPALIER
BEES AND AGRICULTURAL TRAIL (CYCLING, HIKING, RECREATION) GOAT AND CHICKEN SHEEP
PASTURE
CORDONING
PASTRURE GOAT PISONIA AND AGRICULTURAL AREA (POLITICAL BOUNDARY) SHEEP PEN
FRUIT TREES
FRUIT TREES
FIFTH SOIL ZONE
PISONIA
FOURTH SOIL ZONE
CHICKEN PERMACULTURE HOUSE COOP PASPALUM CONJUGATUM
SHED
THIRD SOIL ZONE SECOND SOIL ZONE
+/- 700 m
FIRST SOIL ZONE
PASPALUM CONJUGATUM
PAMPA
PERMACULTURE
BUFFER
PANICUM MAXIMUM FARMER’S MARKET LAYOUT DESIGN DETAIL
VERY HUMID
500 m
HUMID
PANICUM MAXIMUM
DRY
400 m
AGRICULTURAL AREA
300 m
PALO SANTO, CHAMOMILE 180 m
PATCHES - WOODED AREA (LANDSCAPE ECOLOGY) SCALECIA PEDUNCULATA
CORRIDOR (LANDSCAPE ECOLOGY)
0m
GUAVA, BANANA, CITRUS, YUCA BELLAVISTA TOWN
MAIN ROADS
COFFEE
BANANA
GUAVA, BANANA, CITRUS, YUCA
SCALECIA PEDUNCULATA
LEGEND
100 m
POTATOES
PALO SANTO, CHAMOMILE
NATURAL VEGETATION
COFFEE
SECONDARY BUFFER AND RECREATION AREA
COFFEE
HERBACEA
AGRICULTURAL TRAIL (CYCLING, HIKING, RECREATION) +/- 700 m
FIFTH SOIL ZONE
AGRICULTURALHERBACEA AREA (POLITICAL BOUNDARY) 500 m
400 m
PERMACULTURE AREA 300 m
FARMERS MARKET
THIRD SOIL ZONE
FARMER’S MARKET LAYOUT
POTATOES SECOND SOIL ZONE
180 m
ROTATING STEER AND COW PASTURE
AQUACULTURE
SECONDARY BUFFER AND RECREATION AREA
STACKING BARN GOAT AND SHEEP PASTRURE GOAT AND SHEEP PEN
CHICKEN PASTURE
PAMPA
VEGETABLE GARDEN ESPALIER AND CORDONING
NATURAL VEGETATION
BEES
FRUIT TREES
CHICKEN COOP
+/- 700 m
FIRST SOIL ZONE
0m
CORRIDOR (LANDSCAPE ECOLOGY)
GREEN HOUSE
SECONDARY BUFFER AND RECREATION AREA NATURAL VEGETATION
SHED
FIFTH SOIL ZONE
THIRD SOIL ZONE
PERMACULTURE DESIGN DETAIL
SECOND SOIL ZONE
+/- 700 m
BUFFER
HUMID
PASTURE
COFFEE
DRY
FIRST SOIL ZONE
+/- 700 m
CROP TYPE
400 m
300 m 500 m 180 m
500 m
100 m
300 m
PISONIA
DRY
PISONIA
PASPALUM CONJUGATUM
AGRICULTURAL AREA
PASPALUM CONJUGATUM
PANICUM MAXIMUM
PANICUM MAXIMUM
PALO SANTO, CHAMOMILE
PALO SANTO, CHAMOMILE
SCALECIA PEDUNCULATA
SCALECIA PEDUNCULATA
GUAVA, BANANA, CITRUS, YUCA
GUAVA, BANANA, CITRUS, YUCA
COFFEE
COFFEE
HERBACEA
AGRICULTURAL AREA
HUMID
HERBACEA
0m
BELLAVISTA TOWN MAIN ROADS
COTTON
PAMPA VERY HUMID
400 m
BANANA
VERY HUMID
FOURTH SOIL ZONE
HOUSE
500 m
LEGEND
CORN
100 m PATCHES - WOODED AREA (LANDSCAPE ECOLOGY)
PERMACULTURE AREA
ADOBE
TOMATOES
FRUIT TREES FOURTH SOIL ZONE
PERMACULTURE
PERMACULTURE METHODOLOGY
180 m 100 m
400 m AGRICULTURAL TRAIL (CYCLING, HIKING, RECREATION)
0m
AGRICULTURAL AREA (POLITICAL BOUNDARY) PERMACULTURE
+/- 700 m
300 m
FRUIT TREES
FIFTH SOIL ZONE
500 m
400 m
400 m
THIRD SOIL ZONE
FARMER’S MARKET LAYOUT
PEOPLECARE
PATCHES - WOODED AREA (LANDSCAPE ECOLOGY)
180 m
SECOND SOIL ZONE
CORN
BANANA
VERY HUMID
100 m
COTTON
DRY 5
100 MILES
100 m
2.5
0
COFFEE
AGRICULTURAL AREA
PASTURE
PISONIA PISONIA
PASPALUM CONJUGATUM
PASPALUM CONJUGATUM
PANICUM MAXIMUM
PANICUM MAXIMUM
PALO SANTO, CHAMOMILE
PALO SANTO, CHAMOMILE
SCALECIA PEDUNCULATA
SCALECIA PEDUNCULATA
GUAVA, BANANA, CITRUS, YUCA
GUAVA, BANANA, CITRUS, YUCA
COFFEE
COFFEE
HERBACEA
HERBACEA
0m
300 m
180 m 100 m
0m
HUMID
NATURAL VEGETATION
Using the earth’s limited resources in ways that are equitable and wise
180 m
FIRST SOIL ZONE PAMPA
CORRIDOR (LANDSCAPE ECOLOGY)
FAIRSHARES
Helping each other and ourselves to live sustainably
300 m
POTATOES
SECONDARY BUFFER AND RECREATION AREA
+/- 700 m
500 m
FOURTH SOIL ZONE
0m
EARTHCARE Respecting The Earth, Gaia, as the source of all life
TOMATOES
0m
M IL L E D GE VIL L E
REACTIVATION OF THE CENTRAL STATE HOSPITAL Analysis of the former Central State Hospital in Milledgeville, Georgia. Design a plan that will re-activate and re-connect the site to the town center of Milledgeville. Assess the potential for the site based on historic and current survey information. Historic resources used- Sanborn maps, images and information from a site visit. To understand the potential for the site, a diachronic survey was undertaken. This gave an understanding of the development of the city of Milledgeville and the subject site. The master plan focuses on reinvigorating the southern, former hospital campus, section of Milledgeville and aims to provide a resilient part of the city that can connect to the historic downtown: a focus on a new educational/college facility, a mixture of single dwelling housing and multi-family blocks, adaptive preservation of some of the historic buildings within the campus to integrate in to the new educational facilities, and newly constructed road to connect to highways running to the east and west of Milledgeville.
- Milledgeville is a city located 30 miles to the northeast of Macon. - Formerly the Capital of Georgia (1804-1868) until after the American Civil War. - The new planned town, modeled after Savannah and Washington, D.C., stood on the edge of the frontier, where the Upper Coastal Plain gives rise to the foothills and plateau of the Piedmont.
GEORGIA
BALDWIN COUNTY
75 - N/S Chatanooga - Atlanta - Macon -Lake City
MILLEDGEVILLE CITY
441 - N/S Madison - Dublin
441 - N/S Madison - Dublin
441 - N/S Athens - Milledgeville - Lake City 20 - E/w Atlanta - Augusta
ATLANTA
AUGUSTA
MILLEDGEVILLE MACON
DOWNTOWN MILLEDGEVILLE
STUDY AREA
SAVANNAH
16 - E/W Macon - Savannah
540 - E/S Macon - Augusta
540 - E/S Macon - Augusta
RESEARCH AND ANALYSIS DIACHRONIC SURVEY
The diachronic survey focused on the development of the town of Milledgeville from its inception in 1804 with the four public spaces, and how these are used currently. This understanding of how the urban pattern developed is important in understanding how the subject site developed alongside the town.
BUILDING FOOTPRINTS AND GREEN SPACE
FIGURE GROUND
TRAFFIC
LANDUSE
1804 - 08
LEGEND
LEGEND
LEGEND
Study area
Study area
Study area
Green space
Built area
Built area
LEGEND Study area Main roads Secondary roads Water Traffic - Primary Water Traffic - Secondary
1804 - 08 RESEARCH AND ANALYSIS DIACHRONIC SURVEY
The development of the town grid and subsequent road network in Milledgeville was considered important as it illustrated a disconnect, both intentional and unintentional where a creek divided the town to the north and the south. Analysis of historic maps with Illustrator allows a hierarchy of transport and roads to be displayed,LEGEND which can then be integrated in to the proposal for the site. LEGEND LEGEND Study area
Study area
Study area
Green space
Built area
Built area
LEGEND Study area Main roads Secondary roads Water Traffic - Primary Water Traffic - Secondary
1840 - 65
LEGEND
LEGEND
LEGEND
Study area
Study area
Study area
Undeveloped area Green space
Built area
Institutional Religious Residential Mix use Commercial Green space Industrial
LEGEND Study area Main roads Secondary roads Water Traffic - Primary Water Traffic - Secondary Railroad Landmarks
1840 - 65 RESEARCH AND ANALYSIS DIACHRONIC SURVEY
The surveys outlined the establishment of green space within Milledgeville within the town center, and within the Central State Hospital Campus. Analysis of historic maps including Sanborn maps allowed the illustration of a historical traffic hierarchy in Milledgeville. LEGEND
LEGEND
LEGEND
Study area
Study area
Study area
Undeveloped area Green space
Built area
Institutional Religious Residential Mix use Commercial Green space Industrial
LEGEND Study area Main roads Secondary roads Water Traffic - Primary Water Traffic - Secondary Railroad Landmarks
1927
LEGEND
LEGEND
LEGEND
Study area
Study area
Study area
Undeveloped area Green space
Built area
Institutional Religious Residential Mix use Commercial Green space Industrial
LEGEND Study area Main roads Secondary roads Water Traffic - Primary Water Traffic - Secondary Railroad Landmarks
ct
ds Primary Secondary
RESEARCH AND ANALYSIS DIACHRONIC SURVEY
The Synchronic survey documented five aspects of Milledgeville: - Through analysis of Google maps, GIS data and plans from a field trip to Milledgeville the existing building footprints and green spaces were detailed. - A traffic hierarchy is represented, including the road network, railroads and water traffic. - Existing land uses were illustrated to outline the current pattern of land uses in the town. - A figure ground diagram was developed to understand the density across the town center and the subject site at the CSH. - Following a meeting with the town planning department a zoning diagram was produced.
2017 LANDUSE BUILDING FOOTPRINTS AND GREEN SPACE TRAFFIC
LEGEND LEGEND Historic District Institutional Main roads Religious Secondary roads Water Traffic - Primary Residential Water Traffic - Secondary Mix use Railroad Commercial Landmarks
FIGURE LANDUSE GROUND TRAFFIC
ZONINGLANDUSE FIGURE GROUND
LEGEND LEGENDLEGEND Historic District Study area Institutional
Built area Main roads Religious Secondary roads Water Traffic - Primary Residential Water Traffic - Secondary Mix use Railroad Commercial Landmarks
ZONING FIGU
LEGEND
LEGEND LEGEND
Agricultural Residential Heavy Industrial Office Institutional Commercial Multi-Family Residential
Study area Institutional Built area Religious Residential Mix use Commercial
Green space
Green space
Central Business Commercial
Green space
Industrial
Industrial
Single Family Residential
Industrial
0
0
MASTER PLAN
MASTER PLAN 2050
SCALE: 1/5000
SCALE: 1/5000
STREET STREET SECTIONS SECTIONS STREET SECTIONS SPINE SECTION SPINE SECTION SPINE SECTION Residential
Residential
Residential
Residential
Residential
Residential
Residential
Residential
Residential
Residential bike
Commercial Commercial
Residential
private property 5m set property back for commerce private
parallel parking parallel
sidewalk
parking
sidewalk
one way road one onelane way road
private property 5m set back for commerce
medium medium
one lane
sidewalk bike bike
bike
5m set back for commerce
Commercial
bike
parallel parking
sidewalk
one way road one lane
one way road oneroad lane one way one lane
medium
bike
one way road one lane
sidewalk parallel parking parallel parking
parallel parking
private property 5m set back for commerce private property
Residential
5m set back for commerce Commercial
sidewalk private property 5m set back for commerce
Commercial
Commercial
SCALE: 1/100 SCALE: 1/100 SCALE: 1/100
CONNECTOR SECTION CONNECTOR SECTION CONNECTOR SECTION
green buffer green buffer
SCALE: 1/100 SCALE: 1/100 SCALE: 1/100
RESIDENTIAL STREET SECTION RESIDENTIAL STREET SECTION RESIDENTIAL STREET SECTION
SCALE: 1/100 SCALE: 1/100 SCALE: 1/100
green buffer
SAVANNAH
HISTORIC EVOLUTION AND URBAN FORM This studio introduces to urban design concepts, strategies and representational tools through design research, documentation, analysis and projects based in the city of Savannah. Commencing with research and analysis to the historic district and its present situation in the 21st century, the project engaged with a range of issues central to the study and practice of urban design. The project will address the physical structure of Savannah’s historic district and its immediate surrounds, as well as human and experiential factors that are not easily understood using conventional maps and plans. In addition, it explores the city’s continuing ability to accommodate and adapt to a diverse mix of buildings, uses, public spaces, and infrastructures while considering the related concept of “urban design by adaptive reuse.” The project also focus attention at the street level to gain an understanding of how these essential urban elements effect the everyday world.
SAVANNAH HISTORIC EVOLUTION AND URBAN LAYERS SAVANNAH, GA
Portions of Savannah’s urban fabric have undergone radical, seemingly irreversible transformations during the twentieth century, and, as in all built environments, the continuity of change is inevitable, sometimes slow and subtle but often cataclysmic and dramatic. Nonetheless, the essential urban structure (the streets and open spaces) of the historic district remains intact. the structure has proven resilent and adaptable over the course of nearly three centuries, as buildings come and go, new
1916
1884
1733
DECKER WARD
DARBY WARD
REYNOLDS WARD
Source: Sanborn maps,Georgia Historical Socitey
DECKER WARD
DARBY WARD
REYNOLDS WARD
Source: Sanborn maps,Georgia Historical Socitey
1954
DARBY WARD
REYNOLDS WARD
DARBY WARD
REYNOLDS WARD
DECKER WARD
DARBY WARD
REYNOLDS WARD
2015
DECKER WARD
Source: Sanborn maps,Georgia Historical Socitey
DECKER WARD
Source: Sanborn maps,Georgia Historical Socitey
1973
DECKER WARD
Source: Sanborn maps,Georgia Historical Socitey
districts and uses emerge, and popular uses of public spaces shift and evolve. The historic development and transformation of the city, from 1733 through the present, was analized and representerd through maps, plans and views of the city. The goal was to capture and visualiza essential information about the city’s form and structure. Various levels of abstraction and reduction are to be used to achieve drawings that speak to the complexity of the urban fabric.
DARBY WARD
REYNOLDS WARD
Source: Sanborn maps,Georgia Historical Socitey
VACANT BUILDINGS
VACANT LOTS
BUS ROUTES
HISTORIC BUILDINGS
HISTORIC BUILDINGS
This map represents buildings classified as historic in the historic district. Historic buildings are considered all those that are protected by the government.
T OF SAVANNAH
TO BLACK SHEAR/PINE GARDENS/GORDONSTON/LIBERTY TERMINALS
LE/BEAVER VANNAH/WODVILLE BARSAVANNAH
TO GORDONSTON/VICTORY HEIGHTS
LEGEND
LEGEND Historic buildings
Bus routes Bus stops Dot Bus routes
TO HUNTER ARMY FIELDS
TO CLOVERDALE/BEAVER POND/CSX-SAVANNAH
TO VICTORY HEIGHTS
TO HUNTER ARMY FIELDS
Source: Chatam Metropolitan Planning Comission Vacant buildings
URBAN PATTERNS
BIKE ROUTES
URBAN PATTERNS
BRYAN STREET ST JULIAN STREET
ST JULIAN STREET
CONGRESS STREET
Savannah river BROAD STREET
BROUGHTON STREET PRICE STREET
HABERSHAM STREET
LINCOLN STREET
ABERCON STREET
DRAYTON STREET
WHITAKER STREET
BARNARD STREET
JEFFERSON STREET
MONTGOMERY STREET
MLK JR BLVD
This map represents the hydrology analysis of Savannah. How the water bodies affect the natural disaster on the low lying area.
BAY STREET
BAY STREET
BRYAN STREET
CONGRESS STREET
BROUGHTON STREET
HIDROLOGY
HYDROLOGY
This map represents the urban patterns present in the historic district according to the organization of plazas, blocks, lots and public spaces.
STATE STREET
STATE STREET
PRESIDENT STREET
PRESIDENT STREET
YORK STREET
YORK STREET
OGLETHORE AVE
OGLETHORE AVE
HULL STREET
HULL STREET
MC DONOUGH STREET
MC DONOUGH STREET
PERRY STREET
PERRY STREET
LIBERTY STREET
LIBERTY STREET
HARRIS STREET
HARRIS STREET
After math of Hurricane Matthew
MACON STREET
MACON STREET
CHARLTON STREET
CHARLTON STREET
JONES STREET
JONES STREET
LEGEND
LEGEND
Blocks and Squares
TAYLOR STREET
TAYLOR STREET
Bike routes
WAYNE STREET
WAYNE STREET
GORDON STREET
GORDON STREET
Zero Line Historic District Set back Historic District River front
GASTON STREET
GASTON STREET
Set back Victorian District Multifamily Housing
HARTRIDGE STREET
Others
Flood in Indian street
GWINNETT STREET
NICOLL STREET
Source: Google Maps, Google Earth
GWINNETT STREET
BROAD STREET
PRICE STREET
HABERSHAM STREET
LINCOLN STREET
ABERCON STREET
DRAYTON STREET
WHITAKER STREET
BARNARD STREET
TATTNALL STREET
JEFFERSON STREET
MONTGOMERY STREET
MLK JR BLVD
HUNTINGDON STREET
LEGEND Flood level 10m Hurricane cat 3 Hurricane cat 5 Water bodies Conduit lines
SAVANNAH URBAN TYPOLOGIES STREETS & SQUARES, BUILDINGS & BLOCKS SAVANNAH, GA JASPER WARD - MADISON SQUARE This assigment focuses on visual interpretation of essential urban elements - the streets and squares, buildings and blocks which could be considered irreducible parts of the city. students are asked to explore an Oglothorpe ward in comprenhensive detail and describe its built environment. In our understanding of how streets and squares together establish the public realm of the ward, of how buildings and blocks create the architectural fabric, what can be observe about about the relationships between these elements? Are there additional urban elements that bring architecture, infraestructure and open spaces into an interrelated whole?
LEGEND ROADS
LEGEND
LEGEND
VEHICULAR CIRCULATION
ROADS
STREETS
STREETS
SQUARE
SQUARE
LEGEND
LEGEND LEGEND LEGEND VEHICULAR CIRCULATION ROADS SERVICE STREET - T 1
LEGEND
LEGEND
VEHICULAR CIRCULATION
ROADS
STREETS SERVICE STREET - T 2 SQUARE BOULEVARD
STREETS
IN BETWEEEN ST - 1
SQUARE
IN BETWEEEN ST - 2 IN BETWEEEN ST - 3
SERVICE STREET - T 1 SERVICE STREET - T 2 BOULEVARD IN BETWEEEN ST - 1 IN BETWEEEN ST - 2 IN BETWEEEN ST - 3
LEGEND ROADS STREETS SQUARE
BUILDING TYPE ST JOHN’S EPISCOPAL CHURCH
DESOTO SAVANNAH HOTEL
SCAD’S POETTER HALL
SITE
SCALE
SITE
SCALE
SITE
ARCHITECTURAL ELEMENTS
MASSING
ARCHITECTURAL ELEMENTS
MASSING
ARCHITECTURAL ELEMENTS
LANDSCAPE
LANDSCAPE
LANDSCAPE
SCALE
MASSING
SECTIONS
SECTIONS
SECTIONS SECTIONS
HEM A PUBLIC SPACE CONCEPT
S A PLAZA
1: FACTOR’S WALK EXTENSION
SAVANNAH URBAN FRAGMENT - PEDESTRIAN CIRCULATION SHOULD BE CONTINUOS -FACTOR’S WALK EXTENSION WOUL CONNECT BOTH SIDES OF THE IN BETWEEN SPACE
CONTEXT PLAN
CITY FORM BETWEEN RIVER AND BLUFF: SECTION, INFRASTRUCTURE, TYPE - FLUID CIRCULATION
SAVANNAH, GA The site consists of the linear condition between Bay St and the buildings along River St from Bull St and City Hall to East CONCEPT 2: Broad St, with anPLAZA emphasis on the renovation/refinement of Factor´s Walk, emmet Park, and the northern edge of Bay MULTIFUNCTIONAL EXTENSION St, with a FOR key infill project BRIDGES NOT ONLY CIRCULATION - - - MAKE THEMlocated A PUBLIC SPACEat the east end of River St, at the juncture of Factor’s Walk and E Broad St ramp. The project formally addressed infrastructure and typological transformation. FACTOR’S WALK EXTENSION AS A PLAZA
CONCEPT 1: CONCEPTWALK 1: EXTENSION FACTOR’S
BAY ST LEVEL
FACTOR’S WALK EXTENSION
- PEDESTRIAN CIRCULATION BE CONTINUOS SERVICE ENTRANCESHOULD LEVEL
- PEDESTRIAN CIRCULATION SHOULD BE CONTINUOS
POSIBLE USE -FACTOR’S WALK EXTENSION WOUL CONNECT BOTH SERVICE LANE LEVEL SIDES OF THE IN BETWEEN SPACE
-FACTOR’S WALK EXTENSION - SITTINGWOUL PLACECONNECT BOTH
THE IN BETWEEN SPACE -SIDES FLUIDOF CIRCULATION FACTOR’S WALK EXTENSION AS A PLAZA
- COMMERCIAL EXTENSION - FLUID CIRCULATION - PUBLIC PLAZA
BAY ST LEVEL
-RESTING AREA
CONCEPT 2: SERVICE ENTRANCE LEVEL MULTIFUNCTIONAL PLAZA EXTENSION
CONCEPT 2: MULTIFUNCTIONAL PLAZA EXTENSION SERVICE LANE LEVEL
BRIDGES NOT ONLY FOR CIRCULATION - - - MAKE THEM A PUBLIC SPACE FACTOR’S WALK EXTENSION AS A PLAZA
BRIDGES NOT ONLY FOR CIRCULATION - - - MAKE THEM A PUBLIC SPACE FACTOR’S WALK EXTENSION AS A PLAZA BAY ST LEVEL
POSIBLE USE
SERVICE ENTRANCE LEVEL
BAY ST LEVEL
ERVICE CIRCULATION
SERVICE LANE LEVEL
- SITTING PLACE
SERVICE ENTRANCE LEVEL FACTOR’S WALK EXTENSION AS A PLAZA
- COMMERCIAL EXTENSION
SERVICE LANE LEVEL
- PUBLIC PLAZA FACTOR’S WALK EXTENSION AS A PLAZA BAY ST LEVEL
-RESTING AREA
SERVICE ENTRANCE LEVEL
BAY ST LEVEL
SERVICE LANE LEVEL
SERVICE ENTRANCE LEVEL
SERVICE LANE LEVEL
CONCEPT 3: NEW ACTIVIES PROPOSAL POSIBLE USE SERVICE ENTRANCE LEVEL
POSIBLE USE
- SITTING PLACE - SITTING PLACE SERVICE LANE NOT ONLY FOR VEHICULAR AND SERVICE CIRCULATION - COMMERCIAL EXTENSION - COMMERCIAL EXTENSION POSIBLE USE - MAKE THEM AN OUTDOOR PUBLIC SPACE - PUBLIC PLAZA - PUBLIC PLAZA - SITTING PLACE -RESTING AREA -RESTING AREA - COMMERCIAL EXTENSION BAY ST LEVEL
- PUBLIC PLAZA SERVICE LANE LEVEL
-RESTING AREA
CONCEPT 3: NEW ACTIVIES PROPOSAL CONCEPT 4: SERVICE ENTRANCE LEVEL
TERRACED PLAZA UNDER BRIDGE
SERVICE LANE NOT ONLY FOR VEHICULAR AND SERVICE CIRCULATION
CONCEPT 3: NEW ACTIVIES PROPOSAL SERVICE ENTRANCE LEVEL
- MAKE THEM AN OUTDOOR PUBLIC SPACE
BAY ST LEVEL LANE NOT ONLY FOR VEHICULAR AND SERVICE CIRCULATION SERVICE SERVICE LANE LEVEL - MAKE THEM AN OUTDOOR PUBLIC SPACE
BAY ST LEVEL
POSIBLE USE - SITTING PLACE - COMMERCIAL EXTENSION - PUBLIC PLAZA -RESTING AREA
SITE
OPOSAL WORKS LIKE A PARK - BUILDING – VIEWPOINT OF THE WEEN RIVER STREET AND FACTOR'S WALK
INFILL PROPOSAL - HYBRID PROJECT TYPOLOGY THAT USES THE SITE’S TOPOGRAPHY AS THE MAIN CONCEPT TO PLACE THE BUILDING BUILDING VIEWPOINT + PARK EXTENSION
B
OVER THE BUILDING’S ROOF MAKES THE EXPERIENCE BE MORE - THE BUILDING PROPOSAL WORKS LIKE A PARK - BUILDING – VIEWPOINT OF THE ONTANEOUS WHILE THE USERS MAKE USE OF IT
A
A
- Hybrid typology that uses the site’s topography as theFACTOR'S main concept to place the building. LINEAR CIRCUIT BETWEEN RIVER STREET AND WALK
B
- THE CIRCULATION OVERlike THE BUILDING’S ROOF MAKES EXPERIENCE BE MORE - The building proposal works a park - bilding - viewpoint of theTHE linear circuit between River St and Factor’s Walk.
A
NATURAL AND EXPONTANEOUS WHILE THE USERS MAKE USE OF IT
- The circulation over the building’s roof makes the experience be more natural and expontaneous while the users make use of it. B PROGRAM SECTIONS ARCHITECTURAL SECTIONS CAFE
ARCHITECTURAL SECTIONS
PROGRAM SECTIONS
MEETING ROOMS
CAFE
PARKINGMEETING ROOMS GALLERY/MULTIPLE USE TURIST SERVICES/FOOD GALLERY/MULTIPLE USE COURT
PARKING
TURIST SERVICES/FOOD COURT
SECTION A SECTION A
SECTION SECTION A
MEETING ROOMS
MEETING ROOMS
PARKING PARKING
GALLERY/MULTIPLE USEUSE GALLERY/MULTIPLE TURIST SERVICES/FOOD COURT COURT TURIST SERVICES/FOOD
SECTION B
B
A
A B
SECTION B
SECTION B
SECTION B
M IX USE _HO USING BACHELOR´S DEGREE THESIS PROJECT
In response to the lack of order, chaos and informality, which is born spontaneously a high density metropolitan area of commerce such as the Gamarra area in the district of La Victoria (Lima, Peru), is that this thesis seeks to support the development of an architectural project of Housing- Workshop and services, in order to strengthen the relationships that currently exist in the place between its inhabitants and the dynamics that occur in the place. The main objective of the project is to satisfy and improve the living conditions of those living in the workplace, as is the case of the vast majority of emerging merchants of Gamarra. In this way, the architectural project seeks to be a complement to what already happens in the place, satisfying infrastructure needs and lack of local equipment dedicated to cultural, commercial, and diffusion activities at the metropolitan level.
Exterior view_Public plaza, multipurpose gallery and housing complex main entrance.
GSPublisherEngine 0.0.100.100
A
NIV. +54.50
B
C
D
E
F
G
H
I
J
K
L
M
N
—
O
P
Q
R
S
T
U
3.00 NIV. +51.50
NIV. +48.50
6.00
NIV. +45.50
NIV. +42.50
NIV. +39.50
NIV. +36.50
NIV. +33.50
27.00 NIV. +30.50
NIV. +27.50
54.50
NIV. +24.50
NIV. +21.50
NIV. +18.50
TALLER DE CONFECCI”N NIV. +15.50
9.00 TALLER DE CONFECCI”N NIV. +12.50
TALLER DE CONFECCI”N
NIV. +9.50
4.75
NIVEL COMERCIAL comercio complementario
NIVEL COMERCIAL comercio complementario
NIVEL COMERCIAL comercio complementario
NIVEL COMERCIAL comercio complementario
PASARELA PUBLICA nivel comercial
NIV. +4.75
4.03 NIV. +0.72 NIV. 0.00
0.72
PLAZA P⁄BLICA EXTERIOR
PASARELA PUBLICA nivel comercial
PLAZA P⁄BLICA INTERIOR
PLAZA P⁄BLICA INTERIOR
3.25 PLAZA P⁄BLICA INTERIOR nivel de equipamiento y servicios
NIV. -3.25
COMERCIO comercio complementario
PLAZA P⁄BLICA INTERIOR nivel de equipamiento y servicios
PLAZA P⁄BLICA INTERIOR nivel de equipamiento y servicios
11.254.75
NIV. -8.00
ESTACIONAMIENTO segundo sotano
ESTACIONAMIENTO segundo sotano
ESTACIONAMIENTO segundo sotano
ESTACIONAMIENTO segundo sotano
ESTACIONAMIENTO segundo sotano
ESTACIONAMIENTO segundo sotano
3.25 NIV. -11.25
0
CORTE E - E'
5
UPC
SERVICES FLOOR PLAN
UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS
FACULTAD DE ARQUITECTURA DECANO Arq. Miguel Cruchaga Belaunde
DIRECTOR DE CARRERA Mario Segami Salazar
4.25
D
3.05
E
2.30
F
2.65
G
H
8.00
I
8.00
8.00
J
K
D
8.00
L
8.01
M 131.81 8.27
8.28
C
N
8.00
—
7.99
O
P
B
8.00
A
8.00
Q
8.00
R
4.15
S
6.30
T
6.30
PROYECTO PARA LA OBTENCI”N DEL TÕTULO PROFESIONAL
U
4.81
5.60
1
COMERCIO ZONAL npt: -3.50 hbt: 3.25
SSHH H npt: -3.50 hbt: 3.25
AULA TEORICA npt: -3.50 hbt: 3.25
COMERCIO ZONAL npt: -3.50 hbt: 3.25
AULA PRACTICA npt: -3.50 hbt: 3.25
AULA PRACTICA npt: -3.50 hbt: 3.25
LABORATORIO npt: -3.50 hbt: 3.25
2
AREA DE LOCKERS SALA DE PROFESORES npt: -3.50 hbt: 3.25
SSHH npt: -3.50 hbt: 3.25
SSHH M npt: -3.50 hbt: 3.25
DIRECCION npt: -3.50 hbt: 3.25
8.00
COMERCIO ZONAL npt: -3.50 hbt: 3.25
COMERCIO ZONAL npt: -3.50 hbt: 3.25
HALL npt: -3.50 hbt: 3.25
INFORMES npt: -3.50 hbt: 3.25 vestuarios
3 3.75
AREA COMERCIAL npt: -3.25 hbt: 3.00
vestuarios
4 CIRCULACION VERTICAL PUBLICA
CIRCULACION VERTICAL DE EMERGENCIA
CIRCULACION VERTICAL DE EMERGENCIA
CIRCULACION VERTICAL PARA VIVIENDA
CIRCULACION VERTICAL PARA VIVIENDA
VACIO
VACIO
H
CIRCULACION VERTICAL PARA ABASTECIMIENTO DE TALLERES
CIRCULACION VERTICAL PARA ABASTECIMIENTO DE TALLERES
SOTANO 1 npt: -3.25 hbt: 3.00
5 SOTANO 1 npt: -3.25 hbt: 3.00
PLAZA PUBLICA - COMERCIO npt: -3.25
AULA TEORICA npt: -3.50 hbt: 3.25
SSHH H npt: -3.50 hbt: 3.25
SSHH M npt: -3.50 hbt: 3.25
8.20
PLAZA PUBLICA - COMERCIO npt: -3.25
8.00
PABELLON DE EXPOSICIONES area multiusos npt: -3.25 hbt: 3.00 enchape de madera
OFICINA
CONTROL AUDIOVISUAL
CIRCULACION VERTICAL PUBLICA
PLAZA PUBLICA - CITE npt: -3.25
COMERCIO ZONAL npt: -3.50 hbt: 3.25
6 PLAZA PUBLICA - CITE npt: -3.25
E
5.60
COMERCIO ZONAL npt: -3.50 hbt: 3.25
CUARTO DE TABLEROS
MANTENIMIENTO npt: -3.50 hbt: 3.25
TALLER ANCIANOS npt: -3.50 hbt: 3.25
8.48
MANTENIMIENTO npt: -3.50 hbt: 3.25
CUARTO DE BOMBAS COMERCIO ZONAL npt: -3.50 hbt: 3.25
AULA PRACTICA npt: -3.50 hbt: 3.25
AULA PRACTICA npt: -3.50 hbt: 3.25
85.64
7 CASA DE FUERZA
AULA PRACTICA npt: -3.50 hbt: 3.25
8 COMERCIO ZONAL npt: -3.50 hbt: 3.25
DEPOSITO npt: -3.50 hbt: 3.25
5.23
COMERCIO ZONAL npt: -3.50 hbt: 3.25
CISTERNA CONSUMO
9 COMERCIO ZONAL npt: -3.50 hbt: 3.25 TALLER ANCIANOS npt: -3.50 hbt: 3.25
AULA PRACTICA npt: -3.50 hbt: 3.25
SOTANO 1 npt: -3.25 hbt: 3.00
8.20
COMERCIO ZONAL npt: -3.50 hbt: 3.25
SOTANO 1 npt: -3.25 hbt: 3.00
10
CIRCULACION VERTICAL PARA ABASTECIMIENTO DE TALLERES
CIRCULACION VERTICAL PARA ABASTECIMIENTO DE TALLERES
PLAZA PUBLICA - TALLERES npt: -3.25
TALLER ANCIANOS npt: -3.50 hbt: 3.25
CIRCULACION VERTICAL PUBLICA
AULA PRACTICA npt: -3.50 hbt: 3.25
8.00
PLAZA PUBLICA - TALLERES npt: -3.25
CIRCULACION VERTICAL PUBLICA
CIRCULACION VERTICAL DE EMERGENCIA
CIRCULACION VERTICAL DE EMERGENCIA
CIRCULACION VERTICAL PARA VIVIENDA
PLAZA PUBLICA - ESCUELA INICIAL npt: -3.25
11 ESPACIO MULTIUSOS npt: -3.50 hbt: 3.25
SALA DE PROFESORES npt: -3.50 hbt: 3.25 DIRECCION npt: -3.50 hbt: 3.25
TALLER ANCIANOS npt: -3.50 hbt: 3.25
INFORMES npt: -3.50 hbt: 3.25
COMERCIO ZONAL npt: -3.50 hbt: 3.25
COMERCIO ZONAL npt: -3.50 hbt: 3.25
COMERCIO ZONAL npt: -3.50 hbt: 3.25
COMERCIO ZONAL npt: -3.50 hbt: 3.25
SSHH M npt: -3.50 hbt: 3.25
SSHH H npt: -3.50 hbt: 3.25
NI—OS npt: -3.50 hbt: 3.25
NI—OS npt: -3.50 hbt: 3.25
Fernanda Pierina Sanchez kong
ASESOR MANTENIMIENTO npt: -3.50 hbt: 3.25
SSHH npt: -3.50 hbt: 3.25 NI—OS npt: -3.50 hbt: 3.25
ALUMNA
12
AREA DE SERVICIO npt: -3.50 hbt: 3.25
Arq. Jorge Burga Bartra
8.00
TOPICO npt: -3.50 hbt: 3.25
MANTENIMIENTO npt: -3.50 hbt: 3.25
TOPICO npt: -3.50 hbt: 3.25
F
3.73
COMERCIO ZONAL npt: -3.50 hbt: 3.25
CIRCULACION VERTICAL PARA VIVIENDA
OBSERVACIONES
G
FECHA
SSHH NI—OS npt: -3.50 hbt: 3.25 AREA DE LOCKERS
13
Agosto 2016
ORIENTACION
4.86
CISTERNA ACI
LA VICTORIA - DEPARTAMENTO DE LIMA
1.46
C
VIVIENDA TALLER Y SERVICIOS PARA EL EMPORIO COMERCIAL GAMARRA
A B
14 1.46
4.25
3.05
2.30
2.65
8.00
8.00
8.00
8.00
8.01
8.28
8.27
8.00
7.99
8.00
8.00
8.00
4.15
6.30
6.30
N
4.81
131.81
A B
C
D
E
F
G
H
I
J
D
K
L
M
C
N
—
O
B
P
A
SECTORES Y UBICACI”N
Q
R
S
T
U
TÕTULO
SOTANO 1 ESCALA
#1/250
LAMINA
A.03
1
2
3
4
5
6
7
8
9
10
11
12
13
14
NIV. +54.50
3.00 NIV. +51.50
NIV. +48.50
vivienda tipo b
espacio comun vivienda
NIV. +45.50
vivienda tipo b
NIV. +42.50
vivienda tipo a
espacio comun vivienda
NIV. +39.50
espacio comun vivienda
espacio comun vivienda
NIV. +36.50
33.00
vivienda tipo a
vivienda tipo a
NIV. +33.50
NIV. +30.50
espacio comun vivienda NIV. +27.50
vivienda tipo a
vivienda tipo b
vivienda tipo b
54.50
NIV. +24.50
vivienda tipo a NIV. +21.50
espacio comun vivienda
espacio comun vivienda
NIV. +18.50
vivienda tipo a
espacio comun vivienda
vivienda tipo a
NIV. +15.50
9.00
espacio comun vivienda
NIV. +9.5
vivienda tipo a
vivienda tipo b
vivienda tipo b
4.75
NIV. +4.75
NIVEL COMERCIAL comercio complementario
NIVEL COMERCIAL comercio complementario
NIVEL COMERCIAL comercio complementario
NIVEL COMERCIAL comercio complementario
4.03 NIV. +0.72 NIV. 0.00
0.72
3.25 HALL DE ESPERA - CITE equipamiento
NIV. -3.25
PLAZA P⁄BLICA INTERIOR nivel de equipamiento y servicios
AULA - ESCUELA INICIAL equipamiento
PLAZA P⁄BLICA INTERIOR nivel de equipamiento y servicios
SSHH equipamiento
11.254.75
NIV. -8.00
ESTACIONAMIENTO segundo sotano
ESTACIONAMIENTO segundo sotano
ESTACIONAMIENTO segundo sotano
ESTACIONAMIENTO segundo sotano
ESTACIONAMIENTO segundo sotano
ESTACIONAMIENTO segundo sotano
3.25 NIV. -11.25
0
CORTE A - A'
5
UPC
PLUBLIC SPACE FLOOR PLAN
UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS
FACULTAD DE ARQUITECTURA DECANO Arq. Miguel Cruchaga Belaunde
DIRECTOR DE CARRERA Mario Segami Salazar
A B
C
D
E
F
G
H
I
J
D
K
L
M
N
C
—
O
P
B
A
Q
R
S
T
PROYECTO PARA LA OBTENCI”N DEL TÕTULO PROFESIONAL
U
131.81 3.05
2.30
2.65
8.00
8.00
8.00
8.00
8.01
8.28
8.27
8.00
7.99
8.00
8.00
8.00
4.15
6.30
6.30
4.81
5.60
5.60
1
2
2 COMERCIO ZONAL npt: +0.72 hbt: 4.50
COMERCIO ZONAL npt: +0.72 hbt: 4.50
COMERCIO ZONAL npt: +0.72 hbt: 4.50
COMERCIO ZONAL npt: +0.72 hbt: 4.50
COMERCIO ZONAL npt: +0.72 hbt: 4.50
8.00
SSHH h npt: +0.72 hbt: 4.50
COMERCIO ZONAL npt: +0.72 hbt: 4.50
COMERCIO ZONAL npt: +0.72 hbt: 4.50
COMERCIO ZONAL npt: +0.72 hbt: 4.50
SSHH M npt: +0.72 hbt: 4.50
8.00
COMERCIO ZONAL npt: +0.72 hbt: 4.50
3
3 ZONA COMERCIAL npt: +0.72 hbt: variable
3.75
3.75
ZONA COMERCIAL npt: +0.72 hbt: variable
4
4 CIRCULACION VERTICAL PUBLICA
PABELLON DE EXPOSICIONES area multiusos npt: -3.25 hbt: 3.00 porcelanato 60 x 60
CIRCULACION VERTICAL PUBLICA
CIRCULACION VERTICAL DE EMERGENCIA
CIRCULACION VERTICAL PARA VIVIENDA
CIRCULACION VERTICAL DE EMERGENCIA
8.00
CIRCULACION VERTICAL PARA VIVIENDA
8.00
H
3.00
ESTRUCTURA DE CONCRETO ARMADO
CIRCULACION VERTICAL PARA ABASTECIMIENTO DE TALLERES
5
H
3.00 7.00
CIRCULACION VERTICAL PARA ABASTECIMIENTO DE TALLERES
5
8.20
8.20
PROYECCION DE COPA DE ARBOL
ZONA DE JUEGOS npt: +0.00 cemento piedra natural
6
6
E
5.60
FERIA ITINERANTE npt: +0.00 cemento piedra natural
5.60
E
PLAZA PUBLICA INTERIOR npt: +0.72 hbt: variable
proyecciÛn de copa de arbol
7
7 85.64
8.48
PLAZA PUBLICA INTERIOR npt: +0.72 hbt: variable
ZONA DE DESCANSO npt: +0.00 cemento piedra natural
8.48
85.64
ZONA DE DESCANSO npt: +0.00 cemento piedra natural
PLAZA PUBLICA INTERIOR npt: +0.72 hbt: variable
8
8 ZONA DE DESCANSO npt: +0.00 cemento piedra natural
ZONA DE JUEGOS npt: +0.00 cemento piedra natural
5.23
5.23
PLAZA PUBLICA INTERIOR npt: +0.72 hbt: variable
9
COMERCIO ZONAL npt: +0.72 hbt: 4.50
ZONA DE JUEGOS npt: +0.00 cemento piedra natural
0
COMERCIO ZONAL npt: +0.72 hbt: 4.50
npt: +0.00 hbt: variable cemento estampado natural con bruÒas c/ 90cm
CIRCULACION VERTICAL PUBLICA
CIRCULACION VERTICAL PUBLICA CIRCULACION VERTICAL DE EMERGENCIA
CIRCULACION VERTICAL PARA VIVIENDA
F
CIRCULACION VERTICAL DE EMERGENCIA
CIRCULACION VERTICAL PARA VIVIENDA
ZONA COMERCIAL npt: +0.72 hbt: variable
3.73
8.00
8.00
F
ZONA DE DESCANSO npt: +0.00 cemento piedra natural
PLAZA PUBLICA EXTERIOR
1
OBSERVACIONES
G 10
CIRCULACION VERTICAL PARA ABASTECIMIENTO DE TALLERES
CIRCULACION VERTICAL PARA ABASTECIMIENTO DE TALLERES
8.20
ZONA DE DESCANSO npt: +0.00 cemento piedra natural
11 ZONA COMERCIAL npt: +0.72 hbt: variable
3.73
G
8.20
9
LA VICTORIA - DEPARTAMENTO DE LIMA
4.25
VIVIENDA TALLER Y SERVICIOS PARA EL EMPORIO COMERCIAL GAMARRA
1.46
1
2
ALUMNA
12
Fernanda Pierina Sanchez kong
COMERCIO ZONAL npt: +0.72 hbt: 4.50
SSHH M npt: +0.72 hbt: 4.50 COMERCIO ZONAL npt: +0.72 hbt: 4.50
COMERCIO ZONAL npt: +0.72 hbt: 4.50
COMERCIO ZONAL npt: +0.72 hbt: 4.50
COMERCIO ZONAL npt: +0.72 hbt: 4.50
COMERCIO ZONAL npt: +0.72 hbt: 4.50
COMERCIO ZONAL npt: +0.72 hbt: 4.50
COMERCIO ZONAL npt: +0.72 hbt: 4.50
COMERCIO ZONAL npt: +0.72 hbt: 4.50
COMERCIO ZONAL npt: +0.72 hbt: 4.50
COMERCIO ZONAL npt: +0.72 hbt: 4.50
Arq. Jorge Burga Bartra
8.00
8.00
ASESOR SSHH h npt: +0.72 hbt: 4.50
FECHA
13
4
Agosto 2016
ORIENTACION
4.86
4.86
3
14 1.46
4.25
3.05
2.30
2.65
8.00
8.00
8.00
8.00
8.01
8.28
8.27
8.00
7.99
8.00
8.00
8.00
4.15
6.30
6.30
N
4.81
131.81
A B
C
D
E
F
G
H
I
J
D
K
L
M
C
N
—
O
B
P
A
SECTORES Y UBICACI”N
Q
R
S
T
U
TÕTULO
NIVEL 1 ESCALA
#1/250
LAMINA
A.04
HOUSING MODULES A
13
12
4
0.25
0.25
5
6
7
0.80 - dintel proyeccion
P 03
2.70
0.80
-
tablero terrazo pulido negro h= 0.90
P 05
2.70
0.75
-
11
10
16
9
15
14
13
12
11
10
-
2.70
0.80
-
piso laminado 12 cm x largo variable
proyeccion ventana alta
proyeccion dintel
0.80
0.30 2.20
proyeccion ventana alta
0.30 2.20
0.80
V 02
ducha pendiente 3 %
8.00
7.40
8.00
-
COMEDOR
tablero de granito con estructura metalica e:12 cm
1.64
1.10
1.10
1.64
1.10
2.70
0.90
-
0.60
0.60
0.60
0.60
V 02
2.70
0.90
-
0.80
0.30 2.20
V 02 0.80
tablero cuarz 0.90
0.30 2.20
BA—O TALLER piso porcelanato gris 30 x 60
proyeccion ventana alta
1.00
proyeccion mueble alto
0.60
2.25
0.60
2.84 proyeccion dintel
tablero de granito con estructura metalica e:12 cm
COMEDOR
closet con puertas de MDF pintado con poliuretano
clos p
COMEDOR
piso laminado 12 cm x largo variable
DORMITORIO 1 piso laminado 12 cm x largo variable
TALLER
piso PORCELANATO GRIS 60 X 60
piso PORCELANATO GRIS 60 X 60
cristal templado incoloro
piso laminado 12 cm x largo variable
1.10
1.64
proyeccion doble altura
proyeccion doble altura
proyeccion mueble alto con repisas para almacenar prendas
closet con puertas de MDF pintado con poliuretano
3.15
CL 1
cristal templado incoloro
M 02 2.70 -
TALLER CL 1
M 02 2.70 3.15
-
3.40
TALLER
proyeccion mueble alto con repisas para almacenar prendas
3.85
SALA
SALA
piso laminado 12 cm x largo variable
piso laminado 12 cm x largo variable
proyeccion almacena
BALCON DORMITORIO 1
BALCON DORMITORIO 1
piso cemento pulido sol
piso cemento pulido sol
1.50
proyeccion mueble alto con repisas para almacenar prendas
3.73
3.73
0.60
0.60
2
0.60
0.60
2 2
0.60
0.60
2
0.60
0.60
2
0.60
22
0.60
2
cristal templado incoloro
-
0.60
M 01 2.70
cristal templado incoloro
-
0.60
M 01 2.70
M 01 2.70 3.73
parapeto h=0.90
M 01 2.70
cristal templado incoloro
-
3.73
2
cristal templado incoloro
-
22
2
parapeto h=0.90
parapeto h=0.90
BALCON AREA SOCIAL
piso cemento pulido sol
piso cemento pulido sol
BALCON AREA SOCIAL
BALCON AREA SOCIAL
piso cemento pulido sol
piso cemento pulido sol
2.00
BALCON AREA SOCIAL
2.00
parapeto h=0.90
P 04
2.25
4.30
4.30
SALA piso laminado 12 cm x largo variable
0.60
0.60
1.50
piso cemento pulido sol
2
0.60
0.60
2
3.85
BALCON DORMITORIO 1
piso cemento pulido sol
proyeccion espejo suspendido
proyeccion ventana alta
proyeccion dintel proyeccion mueble alto
tablero de granito con estructura metalica e:12 cm
3.85
SALA piso laminado 12 cm x largo variable
0.60
3.85
BALCON DORMITORIO 1
-
1.00 proyeccion dintel
2.10
DORMITORIO 1
proyeccion mueble alto con repisas para almacenar prendas
3.40
-
0.60
3.15
2.70
0.80
piso PORCELANATO GRIS
CL 1
M 02 2.70
0.60
CL 1
0.60
-
proyeccion de campana
1.50
3.15
closet con puertas de MDF pintado con poliuretano
cristal templado incoloro
M 02 2.70
proyeccion segunda tramo escalera
4.30
proyeccion mueble alto con repisas para almacenar prendas
4.30
4.30
4.30
proyeccion doble altura
4.30
4.30
1.40
4.30
4.30
cristal templado incoloro
P 03
porcelanato blanco mate 30x60
closet con puertas de MDF pintado con poliuretano closet con puertas de MDF pintado con poliuretano
piso porcelanato gris 30 x 60
P 02b 2.70 0.80 - dintel proyeccion
P 04
repisas de melam ancho y alto vari
repisas de melamine blanco ancho y alto variable
piso laminado 12 cm x largo variable
1.40
DUPLEX
proyeccion doble altura
-
proyección de mueble bajo
piso laminado 12 cm x largo variable
DORMITORIO 1 piso laminado 12 cm x largo variable
2.70
0.80
1
COCINA
COMEDOR
piso laminado 12 cm x largo variable
1.10
DORMITORIO 1 piso laminado 12 cm x largo variable
P 03
closet con puertas de MDF pintado con poliuretano
1.40
tablero de granito con estructura metalica e:12 cm
2.10
pared de drywall
proyeccion de campana
BA—O 1
proyeccion ventana porcelanato blanco mate 30x60 alta
proyección de mueble bajo
0.15
1.00 CL 3
7.40
7.40
8.00
7.40
2.84
piso porcelanato gris 30 x 60
P 02b 2.70 0.80
BA—Opendiente 1ducha3 %
2.10 2.10
-
piso laminado piso laminado 12 cmtablero x largo variable 12 cm x largo variable cuarzo blanco h= 0.90 V 02 0.30 cristal templado con lamina de tablero de cuarzo cristal templado con lamina de tablero de cuarzo color color 0.80 2.20 h= 90 cm h= 90 cm
tablero cuarzo blanco h= 0.90
0.30 2.20
11
8
8.00
1.00 CL 3
closet con puertas de MDF pintado con poliuretano
0.80
proyeccion ventana alta
0.15
0.60
proyeccion dintel
7.40
-
2.70
0.75
proyeccion segunda tramo proyeccion espejo suspendido escalera
0.15
V 02 V 02
8.00
2.70
0.90
P 02
-
rejilla acero inox
proyeccion espejo suspendido
7
DEPOSITO TALLER
COCINA
ESTAR piso laminado 12 cm x largo variable V 02 0.30 0.80 2.20
0.15
2.25
2.84 P 04
6
piso porcelanato gris 60 x 60
pared de drywall
1.40
0.90
ESTAR
0.90
P 03
0.25
5
proyeccion dintel
2.70
0.75
rejilla acero inox
1.40
2.70
0.80
proyeccion ventana alta
0.15
0.60
0.15
1.00
0.15
2.25
proyeccion dintel
8.00
-
7.40
2.70
0.90
8.00
P 04
7.40
7.40
8.00
1.00
proyección de mueble bajo
0.60
P 02
9
0.15 P 03
CL 2
LAVANDERIA piso porcelanato gris 60 x 60 proyeccion dintel
proyeccion dintel
1.40
1.40
1.40
BA—O TALLER piso porcelanato gris 30 x 60 proyeccion dintel
proyeccion ventana alta
8.00
0.15
0.15 7.40
8.00
proyección de mueble bajo
tablero terrazo pulido CL 2 negro h= 0.90
LAVANDERIA piso porcelanato gris 60 x 60
0.15
porcelanato blanco mate 30x60
proyeccion mueble alto
2.20
0.80
0.25
4
4.30
piso porcelanato gris 30 x 60
P 02b 2.70
BA—O TALLER piso porcelanato gris 30 x 60
3
0.60
-
0.80
proyeccion ventana alta
0.60
0.60
0.60
8
proyeccion dintel
tablero cuarzo blanco h= 0.90
2
0.55
3
0.25
1
escalones de tablones de madera
1
0.60
2.70
0.80
0.80
tablero cuarzo blanco h= 0.90 V 02 0.30
0.30 2.20
8
0.60
P 03
proyeccion ventana porcelanato blanco mate 30x60 alta
proyeccion ventana alta proyeccion dintel proyeccion mueble alto
V 02
7
0.10
2
proyeccion espejo suspendido
0.95
BA—O 1
0.30 2.20
6
0.60
-
0.80
V 02
cristal templado con lamina de color
0.25
escalones de tablones de madera
5
0.55
1
0.50
0.80
0.30 2.20
0.25
-
4
0.10
8
0.50
piso porcelanato gris 30 x 60
P 02b 2.70 proyeccion ventana alta
BA—Opendiente 1ducha3 %
V 02
1.40
0.80
piso laminado 12 cm x largo variable
cristal templado con lamina de tablero de cuarzo color h= 90 cm
tablero de cuarzo h= 90 cm
0.60
ducha pendiente 3 %
proyeccion espejo suspendido
COCINA
piso laminado 12 cmtablero x largo variable cuarzo blanco h= 0.90
tablero cuarzo blanco h= 0.90
0.30 2.20
0.60
0.80
V 02
1.40
1.40
0.30 2.20
0.95
COCINA V 02
3
8.00
14
2.70
1.00
2
8.00
15
2.70
P 01
1
0.75
16 P 02
proyeccion0.75 dintel -
0.30 2.20
0.15
-
1.50
1.40
2.70
0.75
C2
0.40
0.15
P 05
V 01
-
7.40
repisas de melamine blanco ancho y alto variable proyeccion dintel
2.70
1.00
8.00
-
P 01
0.75
repisas de melamine blanco ancho y alto variable 2.70
7
0.15
proyeccion de campana
0.15
proyeccion segunda tramo escalera
0.15
proyeccion de campana
0.15
proyeccion segunda tramo proyeccion espejo suspendido escalera
rejilla acero inox
proyeccion espejo suspendido
1.40
0.15
0.15
rejilla acero inox
0.30 2.20
0.60
deposito taller piso porcelanato gris 60 x 60
0.75
0.60
0.60
0.60
0.60
0.60
0.60
0.60
deposito taller piso porcelanato gris 60 x 60
P 02
6
repisas de melamine blanco ancho y alto variable
0.15
0.60
pared de drywall
5
1.50
0.15
-
0.25
V 01
0.95
2.70
0.75
4
0.25
1
1.40
P 02 pared de drywall
3
0.25
1 1
4.30
-
2
1
escalones de tablones de madera
0.60
proyeccion dintel
2.70
0.75
1 repisas de melamine blanco ancho y alto variable
C2
2.73
1.50
P 02
8
A
0.40
0.40
1.40
proyeccion dintel
7
A
0.40
C2
2.70
1.00 escalones de tablones de madera
0.15
6
0.40
7.40
5
B 0.40
0.40 3.43
8.00
4
C1
0.30
0.60
3
0.15 3.43
0.95
0.25
C1
7.61
3.73 0.30
0.60
2
0.25
P 01
B 0.40
8.00
7.61 0.15
1.40
1
-
3.73 0.40
0.15
8
2.70
1.00
A 0.40
0.40
1.40
7
C2
C1
P 01
A 0.40
0.15
6
3.73 0.15
7.40
5
1
1.00
1.40
4
0.15
C1
11
1.40
3
1
B 0.40 0.40
8.00
7.61
1.00 2.58 0.15
escalones de tablones de madera
B 0.40 0.40 3.73
8.00
7.61 0.15
0.40
C2
escalones de tablones de madera
1.40
0.25
-
0.55
2
0.25
0.40 3.43
C2
2.70
1.00
piso porcelanato gris 60 x 60
1.40
1.40
piso porcelanato gris 60 x 60
1
CL 2
LAVANDERIA
0.30
P 01
0.10
tablero terrazo pulido CL 2 negro h= 0.90
LAVANDERIA
0.15 3.43
C1
0.30 2.20
0.75
1.50
0.60
V 01
-
0.60
2.70
1.00
0.55
3.73 0.30
P 01
0.10
tablero terrazo pulido negro h= 0.90
0.15
C1
0.30 2.20
1.50
0.75
V 01
0.40 0.40
2.58
0.60
A 0.40 0.40
0.60
B 0.40
0.60
0.60
0.60
0.60
3.73 0.40
1
0.60
0.40
1
8.00 7.61
1.40
B 0.40
8.00 8.00 7.61
0.60
A 0.40
1.40
A 0.40
cristal templado incoloro
0.40
A
A
3.88
4
0.25
0.25
5
6
tablero cuarzo blanco h= 0.90
0.80
-
0.30 2.20
V 02
0.30 2.20
0.80
0.80
0.30 2.20
V 02 0.80
C1 3.88
1.40
P 02
-
0.75
repisas de melamine blanco P 05 2.70 P 05 2.70 32 ancho y alto variable 0.75 0.75 P 02 - 2.70 2.70 proyeccion dintel proyeccion dintel 0.75 proyeccion dintel proyeccion dintel
0.15
V 02 0.80
BA—O TALLER BA—O TALLER
0.80
piso porcelanato pisogris porcelanato gris 30 x 60 30 x 60 P 03 2.70 0.80 -
18 20
19 21
20 22
21 23
22 24
23
24
17
18
19
C2
20
21
22
0.40
1
23
24
26
25
1
0.60
1
0.60
0.60
0.60
0.60
2.79
escalones de tablones de madera
0.25 0.25 0.25 0.25
0.25
0.25
0.25
0.25
31
32 30
31 29
30 28
29 27
28 26
P 05 2.70 27 25 26 0.75
proyeccion dintel
25
32
31
0.30 2.20
V 02
30
tablero cuarzo blanco h= 0.90
piso porcelanato 30 x 60 2.70 proyeccion dintel proyeccion dintel -
0.80
28
27
1.90
V 02
BA—O TALLER
2.20
P 03
29
-
proyeccion dintel
1.90
0.80
0.80
gris P 03
2.70
0.80
-
0.30 2.20
V 02
proyeccion ventana proyeccion ventana alta alta
proyeccion dintel
0.80
0.30 2.20
proyeccion ventana alta
proyeccion ventana alta
7.40
8.00
mesa de coser
8.00
mesa de coser mesa de coser
7.40
mesa de coser
8.00
mesa de coser mesa de coser
7.40
0.75
0.75
8.00
0.75
0.15
ESTAR piso laminado 12 cm x largo variable proyeccion dintel
0.15
ESTAR
piso laminado piso laminado 12 cm x largo variable 12 cm x largo variable 0.80 P 03 2.70
0.15
ESTAR
17 19
proyeccion espejo suspendido
tablero cuarzo blanco tableroh= cuarzo blanco h= 0.90 0.90 V 02 0.30
0.30 2.20
7.40
proyeccion dintel -proyeccion dintel 2.70
CL 3
0.80
1.16
1.16
2.00
1.84
1.84
1.16
4.45
1.84
3.20
3.20
TALLER
piso PORCELANATO GRIS 60deXmaquinaria 60 ubicacion ubicacion de maquinaria
ubicacion de maquinaria
0.80
0.80
3.20
4.30
0.80
1.00
4.45
2.00
4.45
2.00
TALLER TALLER PORCELANATO piso PORCELANATO GRIS 60 X 60 GRIS 60 X 60 ubicacion de piso maquinaria
0.80
piso laminado 12 cm x largo variable
1.84
0.80
1.00
0.80
1.00
4.30
4.30
4.30 piso laminado piso laminado 12 cm x largo variable 12 cm x largo variable
1.84
0.80
0.80 1.00
1.84
ubicacion de maquinaria ubicacion de maquinaria
DORMITORIO 2
0.65
DORMITORIO DORMITORIO 2 2
piso cemento pulido sol
C2 3.73
C2
3.73
7.61
7.61
8.00
8.00
A
-
3.72
-
BALCON DORMITORIO 2
piso cemento pulido piso cemento sol pulido sol
piso cemento pulido sol
C1
C1
C2
C2
0.40
0.40
0.40
0.40
7.61
7.61
7.61
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
7.61
7.61
7.61
0.40
0.40
0.40
8.00
8.00
8.00
B
A
A
A
B
B
B
0.40
A
0.40
A
C1
C2
7.61
7.61
7.61
8.00
8.00
8.00
C2
A
DV03DV03 DV03 DETALLE DETALLE DE MODULO DE MODULO DE VIVIENDA DETALLE DE VIVIENDA -DE MODULO MODULO - MODULO B DEBVIVIENDA - MODULO B
DV03DV03 DV03 DETALLE DETALLE DE MODULO DE MODULO DE VIVIENDA DETALLE DE VIVIENDA -DE MODULO MODULO - MODULO B DEBVIVIENDA - MODULO B
DV03DV03 DV03 DETALLE DETALLE DE MODULO DE MODULO DE VIVIENDA DETALLE DE VIVIENDA -DE MODULO MODULO - MODULO B DEBVIVIENDA - MODULO B
PLANTA PLANTA H1 H1
PLANTA H1
PLANTA PLANTA H2 H2
PLANTA H2
PLANTA PLANTA H3 H3
PLANTA H3
esc. 1/25 esc. 1/25
esc. 1/25
esc. 1/25 esc. 1/25
esc. 1/25
esc. 1/25 esc. 1/25
esc. 1/25
2
C2 0.40
0.40
0.40
B
B
B
0.60
2
0.60
0.60
0.60
cristal templado incoloro
0.60
0.80 0.80
0.80
0.80 0.80
0.80
C1
0.40
0.60
0.60
0.60
0.60
cristal templadocristal templado incoloro incoloro
C1
0.40 3.73
0.40
B
2
C2
0.40
B
2 2
0.60
2
0.60
2
0.60
2
0.60
0.60
0.60
cristal templado incoloro
BALCON DORMITORIO BALCON DORMITORIO 2 2
C1
C2
M 04 2.70
0.60
M 04 templado 2.70 cristal cristal templado incoloro 3.72 incoloro -
0.60
M 04 2.70
0.91
2
0.60
2
0.60
2
0.60
0.91
1.00
1.00
1.00
0.91
2
2.00
BALCON AREA SOCIAL
piso cemento pulido piso cemento sol pulido sol
8.00
2
3.72
BALCON AREA BALCON SOCIAL AREA SOCIAL
7.61
2
-
2.00
3.73
0.60
M 01 2.70
-
0.60
3.73
-
0.60
M 01 2.70
3.73
0.60
M 01 2.70
C1
0.40 3.88 0.40
2.70
0.75
proyeccion ventana proyeccion ventana alta alta
8.00
0.80 P 03
CL 3
18
piso porcelanato gris 60 x 60
P 02
proyeccion espejo proyeccion espejo suspendido suspendido
0.30 2.20
0.40
escalonesescalones de de tablones de tablones maderade madera
DEPOSITO TALLER
piso porcelanato pisogris porcelanato 60 x 60 gris 60 x 60
1.40
1.40
1.40 V 02
0.40
0.60 17
proyeccion ventana alta
B
0.40
repisas de melamine blanco ancho y alto variable
0.25
proyeccion ventana proyeccion ventana alta dintel alta proyeccion
B
0.40
0.60
7
1.90
V 02
2.70
0.80
0.19
B
0.40
1.40
3
0.25
7.40
2.70
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
2
1.00
P 03
C2
esc.
0.15
-
2.79 1.90 C2 2.79
0.15
PLA
esc. 1/25
1.40
2.70
0.75
0.19 C1
0.19
PLANTA H2
1.40
1
repisas de melamine repisas blanco de melamine blanco ancho y alto variable ancho y alto variable P 02
1.902.58 1.90
repisas de melamine repisas blanco de melamine blanco ancho y alto variable ancho y alto variable
1.00 0.50
0.15
0.60
7.40
0.80
0.15
8.00 7.61
1.40
7
BA—O 1
P 03
0.15 C1
8.00 7.61
0.15
6
proyeccion dintel
-
DUCHA
0.40 C1
2.58
8.00
0.15
57
0.25
1.40
proyeccion dintel proyeccion dintel repisas de melamine blanco ancho y alto variable 2.70
DV02 DV DETALLE DE MODULO DE DE
1.40
0.25 0.25 0.25 0.25
piso porcelanato pisogris porcelanato gris piso porcelanato gris pendiente 3 % 30 x 60 30 x 60 30 x 60 P 03 2.70 P 03 2.70 0.80 -proyeccion dintel 0.80 proyeccion dintel proyeccion ventana porcelanato blanco alta mate 30x60
CL 3
A
1.40
46
2.58
1
DEPOSITODEPOSITO TALLER TALLER
tablero cuarzo blanco tableroh= cuarzo blanco h= 0.90 0.90 0.30
2.20 BA—O 0.80 1 BA—O 1
A
0.74
1.00
8.00 0.74
0.74
1.00 0.65
0.40
0.40
35
1 1
piso entablado de madera 12 cm x largo variable
2.00
0.60
piso cemento pulido sol
SALA
piso entabladopiso de madera entablado de madera 12 cm x largo variable 12 cm x largo variable
3.85
BALCON DORMITORIO 1
SALA
0.60
3.85
piso cemento pulido piso cemento sol pulido sol
C1 0.40
24
1
1.40
0.75
B
7.61
7.40
P 02
-
0.40
B
-
0.60
3.15
BALCON DORMITORIO BALCON DORMITORIO 1 1
0.60
0.60
2
0.60
2
0.60
2
13
1
0.15
2.70
0.75
3.73 0.40
0.40
CL 1
M 02 2.70
0.60
CL 1
SALA 3.85
DUCHA
0.40
0.40
1
closet con puertas de MDF pintado con poliuretano
CL 1
-
0.60
3.15
-
V 02
DUCHA
pendiente 3 % pendiente 3 %
4.30
proyeccion doble altura
0.60
M 02 2.70
3.15
0.30 2.20
7.40
7.40
8.00
8.00
8.00
7.40
COMEDOR piso laminado 12 cm x largo variable
0.60
M 02 2.70
0.80
0.65
tablero de granito con estructura metalica e:12 cm
COMEDORCOMEDOR
piso laminado piso laminado 12 cm x largo variable 12 cm x largo variable
proyeccion doble proyeccion altura doble altura
closet con puertas closet de MDF con puertas pintadode con MDF pintado con poliuretano poliuretano
V 02
0.40
C2
1.40
0.30 2.20
1.40
1.40
1.40
1.40
0.60
0.15
2.25
0.15
0.60
0.60
4.30
piso laminado 12 cm x largo variable
0.15
0.15
0.15
0.15
0.15
0.15 0.95
1.40
1.40
0.80
0.40 3.73
proyeccion ventana proyeccion ventana porcelanato blanco porcelanato blanco alta alta mate 30x60 mate 30x60
0.15
0.60
V 02
0.30 2.20
0.40
0.60 P 02
0.40
0.40
2.86
escalones de tablones de madera
rejilla acero inox
proyeccion dintel
tablero de granito tablero con estructura de granitometalica con estructura metalica e:12 cm e:12 cm
DORMITORIO 1
1.00
0.80
0.60
-
V 02
proyeccion ventana alta proyeccion mueble alto
0.60
2.70
0.90
cristal templado con lamina de color
0.15
2.25
P 04
0.30 2.20
0.15
2.25
-
V 02
4.30
1.40
1.00
2.70 proyeccion dintel proyeccion dintel
0.30
8.00
0.90
piso laminado 12 cm x largo variable V 02
0.80de 2.20 tablero cuarzo 0.80 h= 90 cm proyeccion ventana proyeccion ventana alta alta proyeccion dintel proyeccion mueble alto
7.40
P 04
-
proyeccion mueble alto
7.40
2.70
0.90
2.70
0.80
8.00
P 04
0.95
0.95
1.00
proyección de mueble bajo
rejilla acero inoxrejilla acero inox
A
0.40
repisas de melamine blanco ancho y alto variable
COCINA
P 03
porcelanato blanco mate 30x60
4.30
4.30
COCINA
0.80 -proyeccion dintel proyeccion dintel
4.30
8.00
2.70
0.80
proyeccion de campana
4.30
0.15
0.15 7.40
7.40
8.00
8.00
COCINA
-
2.10
DORMITORIO DORMITORIO 1 1
4.30
0.80
2.10
piso laminado piso laminado 12 cm x largo variable 12 cm x largo variable
GSPublisherEngine 0.0.100.100
0.60
GSPublisherEngine 0.0.100.100
-
tablero de cuarzo tablero BA—O 1 de cuarzo h= 90 cm h= 90 cm piso porcelanato gris P 02b 2.70 30 x 60
DUCHA
0.80 ventana proyeccion alta porcelanato blanco porcelanato mate 30x60 blanco mate 30x60
proyección de mueble proyección bajo de mueble bajo
2.10
TRIPLEX
0.80
piso laminado piso laminado 12 cm x largo variable 12tablero cm x largo cuarzovariable blanco cristal templadocristal templado h= 0.90 con lamina de color con lamina de color
tablero cuarzo blanco tablero cuarzo blanco h= 0.90 h= 0.90 0.30
2.20 BA—O 0.80 1 BA—O 1
piso porcelanato pisogris porcelanato gris pendiente 3 % x 60 2.70 30 x 60 P 02b P 02b 2.70 30 P 03 2.70 P 03
0.60
DUCHA
0.60
V 02
DUCHA
pendiente 3 % pendiente 3 %
proyeccion segunda tramo proyeccion de proyeccion de escalera campana campana
2
0.25
DEPOSITO 1 piso entablado de madera 12 cm x largo variable
repisas de melamine repisas blanco de melamine blanco ancho y alto variable ancho y alto variable
1.40
0.30 2.20
proyeccion ventana proyeccion ventana alta alta
1.40
0.80
1.40
V 02
0.15
0.30 2.20
7.40
0.80
0.15
0.15
0.15 1.40
1.40
V 02
proyeccion segunda proyeccion tramo segunda tramo escaleraespejo escalera proyeccion suspendido
rejilla acero inox
proyeccion espejo proyeccion espejo suspendido suspendido
A
0.40
1.40
0.60
0.60
0.60
0.60
1 repisas de melamine repisas blanco de melamine blanco ancho y alto variable ancho y alto variable
DEPOSITODEPOSITO 1 1 piso entabladopiso de madera entablado de madera 12 cm x largo variable 12 cm x largo variable
1.00 rejilla acero inoxrejilla acero inox
A
0.40
0.15
0.60
pared de drywall
B
1.10
-
0.40
0.40
0.40
H1
0.40
7.40
2.70
0.75
8
0.10
proyeccion dintel
P 02 pared de drywallpared de drywall
C2
PLANTA esc. 1/25 esc. 1/25
8.00
-
7
8.00
3.35
2.70
0.75
6
0.15 3.73 C2
3.73
H1
8.00
P 02
-
5
8.00
B
3.35
2.70
0.75
C1
0.15 3.73
escalones de tablones escalones de madera de tablones de madera
0.25
0.10
1.40
piso porcelanato gris 60 x 60 proyeccion dintel proyeccion dintel
P 02
4
0.25
C2
2.86 7.61
0.40
0.15
3
0.25
C2
4.75 7.61
B
0.15
2
A
C1
4.75
0.40
1.40
1
8.00 7.61
0.15
A
1.10
8
C1
8.00 7.61
7.40
7
3.73 0.40 C1
3.73
1
0.40
3.35
68
1
8.00
0.50
57
0.25
1
0.40
0.40
1.85
46
0.40
1
0.40
PLANTA esc. 1/25 esc. 1/25
1.10
35
B
7.61
1.40
24
0.25 0.25 0.25 0.25
0.40
0.40
1
1
1.40
13
0.40
DV01 DV01 DV02 DV02 DETALLE DE MODULO DE DETALLE VIVIENDA DE -MODULO MODULODEA VIVIENDA - MODULO A DETALLE DE MODULO DE DETALLE VIVIENDA DE -MODULO MODULODEA VIVIENDA - MODULO A PLANTA H1 PLANTA H1
escalones de tablones de madera
1.40
2 CL 2 0.25
LAVANDERIA
piso porcelanato pisogris porcelanato gris 60 x 60 60 x 60
1.40
1.40
tablero terrazo pulido CL negro 2 h= 0.90
CL 2
LAVANDERIA LAVANDERIA
0.403.43
escalones de tablones escalones de madera de tablones de madera
0.55
1 tablero terrazo pulido tablero terrazo pulido negro h= 0.90 negro h= 0.90
0.40
2.70
1.00
0.60
P 01
A
0.40
0.60
3.43 0.153.43 0.30
0.30 2.20
A
0.40
0.55
- 1.50
A
0.40
0.10
2.70V 01
1.00
B
0.40
0.75
0.30 0.15 3.730.30
0.60
P 01
-
0.60
2.70
1.00
0.30 2.20
0.60
P 01
1.50
C2
0.60
0.15
V 01
B
0.40
0.55
3.73 0.40
0.30 2.20
B
0.40
0.75
1.50
8.00 7.61
0.60
0.60
V 01
0.60
3.73
1
C2 C2
8.00 7.61
0.75
0.40
C1 8.00 7.61
0.60
0.40
0.60
A C1 C1 0.40
8.00
0.40
0.40
1.40
PLANTA H2 esc. 1/25
0.60
0.60
0.60
1
PLANTA H2 esc. 1/25
A
8.00
0.40
DV01 DV01 DETALLE DE MODULO DE DETALLE VIVIENDA DE -MODULO MODULODEA VIVIENDA - MODULO A
PLANTA H1 esc. 1/25
0.40
4.78 7.61
B
PLANTA H1
A
4.78
7.61
A
esc. 1/25
0.40
C2
C2
2.82
0.40
A
DV01 DV01 DETALLE DE MODULO DE DETALLE VIVIENDA DE -MODULO MODULODEA VIVIENDA - MODULO A
1
0.40
0.15
B
B
2.82
8.00
A
A
0.40
0.40
1.40
0.40
0.40
7.40
8.00
0.40
8.00
7.61
8.00
C1 C1
C1
2.86
0.50
7.61
0.40
1.85
0.40
cristal templado incoloro
C2
2.86
1.85
4.75
0.60
0.40
C2
C1
4.75
0.60
0.40
1.40
cristal templado incoloro
C1 0.40
2
954.297.3803 pierinasanchezkong@hotmail.com fsanch20@student.scad.edu