petroflame_brochure

Page 1

PetroFlame®

General Information 1 - 06

Grenland Group ASA is a full-service engineering, procurement and construction company aiming to strengthen the business of its clients. Grenland Group ASA is the result of a market-driven demand for complex solutions, providing technology and fabrication services. Locations in Norway Langesund, Asdalstrand, Drammen, Harstad, Notodden, Oslo, Porsgrunn, Sandefjord, Skudeneshavn, Vold, Stavanger and Tønsberg. International Locations Kuala Lumpur, Houston, Ningbo (China), Szczecin (Poland).

- Robust and Reliable Design

past with technical solutions of the future. Business areas • Field Development • Marine & Process Solutions • Maintenance & Modifications • Fabrication • Products Experience Grenland Group has extensive experience gained from engineering and fabrication of marine vessels and offshore installations. Shipbuilding and fabrication have been performed at our yards since the 18th century. Our engineers and yardworkers are known for their ability to combine technical advances of the

Grenland Group is ISO 9001:2000 certified by DNV, and has Achilles accreditation. Since 1983, Grenland Group has in close interaction with its clients, fabricated and delivered more than 30 burner booms - standard and customised. Grenland Group figures among the leading providers in the world. Goal Our main goal is to be recognized as the preferred supplier of burner booms for drillships and semi-submersible rigs as well as jack-ups.

Contact For further information on PetroFlame®, please contact our offices: Norway: +47 33 44 66 00 Kuala Lumpur: +60 3 2166 1313 Houston: +1 713 715 6971 e-mail: petroflame@grenlandgroup.com

One Team - All Winners

- your worldwide provider of customised and standard burner booms for fixed installations


Boom Attributes • Standard or customised design • Fixed or hinged to platform • Pedestal solution for drill ship installation • Cooling water curtain • Hydraulically or manually operated slewing and parking

• Boom rest in dedicated parking position with manually or hydraulic operated locking device • Swivels or hoses for process pipe interface • Burner head (normally not delivered by Grenland Group) • Grenland Group can also provide supervision during installation

General Boom Characteristics / Capacities

World-class Delivery Experience For more than 20 years, Grenland Group has established substantial knowledge regarding burner boom design. This gives us a unique understanding of the client’s needs that enable us to provide world class service to the largest players in the business.

Engineering and Project Management Grenland Group provides a highly skilled engineering team available for all its clients. Along with experience from numerous projects, we are able to deliver on time and on budget. Compatibility Our PetroFlame® booms are compatible with all major burner heads and flame arrestors on the market. Furthermore, our booms have been mounted on both new and old vessels by tailored interfaces.

Customised Boom Grenland Group has over the last three decades delivered more than 30 burner booms of various kinds. We can customise a boom to suit the exact specification given by the buyer, or develop a customised specification. Standard Boom By selecting one of our standard boom designs, price and delivery time can be reduced significantly, compared to having a completely new design engineered and fabri-cated. Normally, only small adjustments on the rig or the boom are required to utilise a standard boom. Specifications and Regulations All our booms are produced in accordance with offshore standards and DNV, ABS and IMO regulations.

Heat / Water Shield The water shield consists of two spray booms and one U-loop with totally 20 spray nozzles mounted. Required water capacity is approx. 45006000l/min at 7-10 bar. Surface Treatment We supply surface treatment and paint system in accordance with specifications on heat, corrosion and lifetime.

Fabrication Our PetroFlame® booms are produced at several sites around the world. Our booms have been produced in Korea, Singapore, China, Poland, Norway and Germany. Skilled personnel and HSE systems are essential in this process.

Turning mechanism

Positioning by crane intervention, hydraulic cylinders or by use of deck tuggers.

Piping

Up to 11 pipelines e.g. crude oil, HP gas, combustion air, LP water spray and sour gas options

Ambient Temperature

Min. -20˚C and upwards

Design Life

20 years

Maximum Wind Speed Operation and Extreme

38m/s Operation (70 knots) 54m/s boom stored position at boom cradle (100 knots)

Maximum Burner Head Design Weight

Approx. 1000 kg. All booms are compatible with all standard burner packages.

Heat / Water shield

The water shield consists of 2 spray booms and 1 U-loop with totally 20 spray nozzles mounted. Required water capacity approx. 4500-6000l/min at 7-10 bar.

Cantilever

Swan Neck

King Post Mounted

Burner Boom Outline Height: 5m – 8m Width: 1.8m – 3m Length: 30m – 32m Total weight: 22 - 33 tonnes incl. foundation package and reaction forces

Burner Boom Outline Height: 16m – 25m Width: 2m – 3m Length: 25m – 27m Total weight: 55 - 65 tonnes incl. foundation package and reaction forces

Burner Boom Outline Height: approx. 12m (incl. wire support structure) Width: Approx. 3.2m Length: Approx. 28m Weight: Approx. 17 tonnes (dry weight)

Commissioning of Burner Boom Deepwater Discoverer in Korea

2

3


Cantilever PetroFlame®

Swan Neck PetroFlame®

Control Cabinet

The cantilever PetroFlame® is tailormade for semi-submersible rigs. Its design is adjustable to fit any existing hull structure, where it is hinged on the platform foundation. This attribute, along with its simple fastening concept, makes it ideal for use on semi-submersible rigs.

Burner head platform

3D principle sketch of Swan Neck Burner Boom for DrillMax I and II

Stairway to burner head platform

Pedestal Boom rest and access platform 3D principle sketch of A.P.Moeller Maersk Explorer

Boom structure

Installed cantilever Burner Boom on Global Santa Fe Development Driller without pipe lines

Slewing system

King Post Mounted PetroFlame® The King Post Mounted PetroFlame® is customised for Jack-ups. The boom can be delivered with pivot rotation (manually or hydraulically) or fixed position. Grenland Group has delivered this type of boom to A.P. Moeller - Maersk Contractors.

With its pedestal, the Swan Neck PetroFlame® boom safely relocates the flame from the vessel’s deck and away from sea surface.

The King Post Mounted PetroFlame® is installed on a purpose built pedestal and hung off on excisting jack-up structure.

Grenland Group has delivered several booms of this design for e.g. Stena Drilling. The boom is installed on a purpose- built fixed pedestal.

Operation envelop for parking and operation positions

4

5


Reference List

Some of our suppliers

Installation

Client

Type

BoomType

No./Length

West Polaris**

Seadrill Deepwater Units Pte Lt

DS

SN

One (off) 25.0 m

Stena Drill MAX III**

Stena Drilling Ltd, UK

DS

SN

One (off) 21.0 m

Stena Drill MAX II*

Stena Drilling Ltd, UK

DS

SN

One (off) 21.0 m

Stena Drill MAX I

Stena Drilling Ltd, UK

DS

SN

One (off) 21.0 m

Maersk Innovator

Maersk Contractors, Denmark

JU

KPM

Two (off) 30.5 m

Maersk Explorer

Maersk Contractors, Denmark

Semi

Cant

Two (off) 30.5 m

Developm. Driller 3*

GlobalSantaFe Inc., USA

Semi

Cant

Two (off) 30.5 m

Developm. Driller 2

GlobalSantaFe Inc., USA

Semi

Cant

Two (off) 30.5 m

Developm. Driller 1

GlobalSantaFe Inc., USA

Semi

Cant

Two (off) 30.5 m

Stena Don

Kvaerner Warnow, Germany

Semi

Cant

Two (off) 25.0 m

Deepwater Discov.

Reading & Bates, USA

DS

SN

One (off) 25.0 m

Glomar C.R. Luigs

Global Marine Inc., USA

DS

SN

One (off) 27.0 m

Glomar Jack Ryan

Global Marine Inc., USA

DS

SN

One (off) 27.0 m

West Navigator

Smedvig ASA, Norway

DS

SN

One (off) 27.0 m

West Venture

Hitachi Zosen Heavy Ind., Japan

Semi

Cant

Two (off) 27.0 m

Bideford Dolphin

Dolphin AS, Norway

Semi

Cant

Two (off) 27.0 m

Ekofisk 2/4X

Phillips Petroleum Comp. Norway

Fixed

KPM

One (off) 26.1 m

Transocean Leader

Hyundai Heavy Ind., South Korea

Semi

Cant

Two (off) 27.0 m

Norjarl

Hyundai Heavy Ind, South Korea

Semi

Cant

Two (off) 27.0 m

Bow Drill III

Bow Valley Offshore Ltd., Canada

Semi

Cant

Two (off) 27.0 m

Bow Drill II

Framnæs mek. Værksted, Norway

Semi

Cant

Two (off) 27.0 m

Semi: Semi-submersible rig

KPM: King Post Mounted

* Under construction

JU:

Jack-up

Cant: Cantilever

** Contract awarded

DS:

Drillship

Fixed: Fixed Platform

SN:

Swan Neck

Stavanger tlf: 51 64 86 00 • Bergen tlf: 56 31 54 00 • Kristiansund tlf: 71 58 07 00 • Hammerfest tlf: 78 41 31 40

TESS 9 outlets in Telemark and Vestfold

Complete motion control program. Components, Systems and Services within: HYDRAULICS, PNEUMATICS, PLAIN BEARINGS. Servi Group

www.servi.no www.hydraulikkatalogen.no

www.tess.no

6

7


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.