Brad heigel deleware river bridge presentation

Page 1

Emergency Repair to the Delaware River Turnpike Bridge

1


Delaware River Turnpike Bridge General Information:

Year Built:

1956

Designer:

George S. Richardson

Contractor:

American Bridge

Over:

PA US Route 13, Amtrak Mainline, 3 Local Roads (North Radcliffe, Wood Avenue, Palmer Avenue), Delaware River, River Road

Traffic:

Average Daily Traffic (2014) = 41,551 2


Delaware River Turnpike Bridge 14 Similar Deck Truss Spans of 31 Total Spans Bridge Length Potentially Affected: ⅔ Mile of 1¼ Miles Location of Critical Finding

PA Approach Deck Truss Spans:

NJ Approach Deck Truss Spans:

• 3 Span Continuous Unit: Piers 10 – 13 Total Length ≈ 647’

• 3 Span Continuous Unit: Piers 24 – 27 Total Length ≈ 647’

• 4 Span Continuous Unit: Piers 13 – 17 Total Length ≈ 1078’

• 4 Span Continuous Unit: Piers 20 – 24 Total Length ≈ 1078’ 3


Delaware River Turnpike Bridge New Jersey Turnpike Authority (NJTA) Allied Painting Inc. Cornell & Company Inc. Federal Highway Administration (FHWA) Greenman-Pedersen Inc. (GPI) HNTB Corp. Lehigh University MoreTrench American Corp. NJ Department of Transportation NJ State Police NJ Turnpike Authority (NJTA) Notre Dame PB Americas Inc. STV Inc. WSP /Parsons Brinckerhoff

PA Turnpike Commission (PTC) Federal Highway Administration (FHWA) Laboratory Testing Inc. (LTI) Michael Baker International (MBI) Modjeski & Masters Inc. (M&M) PA Department of Transportation (PennDOT) PA Emergency Management Association (PEMA) PA State Police (PSP) PA Turnpike Commission (PTC) Pennoni Consulting Engineers PKF Construction Purdue Urban Engineers

4


Delaware River Turnpike Bridge 4 Span Continuous Deck Truss Unit (Spans 14 to 17)

Location of Critical Finding

Span Length = 269’ 5


Delaware River Turnpike Bridge Location of Critical Finding

6


Delaware River Turnpike Bridge Critical Finding

7


Delaware River Turnpike Bridge Temporary Splice Installation

8


Delaware River Turnpike Bridge Alternatives:

Jack/Permanent Splice (Best Scenario) Jack/Retrofit / Repair / Replace Member Demo/Replace Four Span Continuous Deck Truss Unit Demo/Replace All Deck Truss Units

Forensic Analysis Long-Term Bridge Monitoring

9


Delaware River Turnpike Bridge Temporary Support/Jacking Towers

10


Delaware River Turnpike Bridge Micropile Foundations

11


Delaware River Turnpike Bridge Temporary Support/Jacking Towers

12


Delaware River Turnpike Bridge Micropile Foundations

13


Delaware River Turnpike Bridge Temporary Support/Jacking Towers

14


Delaware River Turnpike Bridge Truss Strengthening

15


Delaware River Turnpike Bridge Temporary Support/Jacking Towers

16


Delaware River Turnpike Bridge Instrumentation and Load Testing of NJ 4-Span

17


Delaware River Turnpike Bridge Instrumentation of PA 4-Span

18


Delaware River Turnpike Bridge Vertical Jacking Operations

19


Delaware River Turnpike Bridge Vertical Jacking Operations

20


Delaware River Turnpike Bridge Vertical Jacking Operations

21


Delaware River Turnpike Bridge Removal of Fractured Member/Post Tensioning

22


Delaware River Turnpike Bridge Post Tensioning

23


Delaware River Turnpike Bridge Final Splice

24


Delaware River Turnpike Bridge Lehigh – Material Testing of Fractured Member

25


Delaware River Turnpike Bridge Lehigh – Material Testing of Fractured Member

26


Delaware River Turnpike Bridge Lehigh – Material Testing of Fractured Member 90 Bridge

Absorbed Energy (ft-lbs)

80 70

1/2 in. FHWA

60

1 in. FHWA

50

2 in. FHWA

40

30 20 10 0 -150

-100

-50

0

50 Temperature-F

100

150

200

250

27


Delaware River Turnpike Bridge Lehigh – Material Testing of Fractured Member

28


Delaware River Turnpike Bridge Ultrasonic Testing (UT)

29


Delaware River Turnpike Bridge Ultrasonic Testing (UT)

U7-U9 Finding

30


Delaware River Turnpike Bridge Ultrasonic Testing (UT)

L6-L8 Finding

31


Delaware River Turnpike Bridge Hands-On Inspection

32


Delaware River Turnpike Bridge Hands-On Inspection

33


Delaware River Turnpike Bridge LIDAR Survey

34


Delaware River Turnpike Bridge Purdue - Material Testing

PA 4-span

NJ 4-span 35


Delaware River Turnpike Bridge Purdue - Material Testing

36


Delaware River Turnpike Bridge Truss Replacement

37


Delaware River Turnpike Bridge Best Scenario:

 No settlement and confirmation that this is an isolated finding  Material testing across entire structure does not show global issue  The structural members move as predicted during slow, regulated jacking  Sensors installed during instrumentation and analysis show that stresses shift in existing members to acceptable levels during jacking

 Permanent splice is installed  Complete repairs; load test

 Open the bridge to traffic 38