Case Studies in Grid Edge Technologies

Electric Power Industry Conference - University of Pittsburgh John Vernacchia, Segment Manager, Renewable Energy

Š 2018 Eaton. All rights reserved..


Dedicated to improving people’s lives and the environment

Providing power management technologies that are more reliable, efficient and safe

Š 2018 Eaton. All Rights Reserved..

2


The move is on from central power plants to “grid edge� distributed energy resources

Š 2018 Eaton. All rights reserved..

3


Enabling grid edge / microgrid technologies Grid edge / microgrid technologies:

Switching and protection equipment

Microgrid controller

Advanced power electronics

High-speed communication networks

DER analytics, DERMS

© 2018 Eaton. All rights reserved..

Distributed Energy Resource (DER)

Distributed Energy Resource Management Systems (DERMS)

Energy Management Systems

4


Linking today’s technical program sessions to active grid edge projects EPIC Technical Program Sessions Grid Edge Case Studies Latest developments in power electronics

Dual purpose UPS for critical load back up and grid services

Equipment for grid modernization

Utility-grade metering and control in residential circuit breakers

Unique power engineering applications

HIL testing for microgrid control systems

Š 2018 Eaton. All rights reserved..

5


Case Study 1

Eaton demonstration of a dual purpose UPS for critical back up + grid services Business outcome: New revenue stream with UPS: lowering overall energy costs + foundational backup power • •

• •

© 2018 Eaton. All Rights Reserved..

6


Energy costs in the data center • Energy costs are emerging as the second highest operating cost (behind labor) in 70% of data centers worldwide* • 1MW data center consumes 160M kWhrs of energy over 10 years – Equivalent to energy consumed by 1,400 typical U.S. households in that same amount of time – UPS electrical losses typically account for 5-10% of energy usage**

• 80% of CEOs view sustainability as impacting brand value***

*Source: (Gartner) **Source: “The Invisible Crisis in the Data Center: The Economic Meltdown of Moore’s Law,” Uptime Institute

***Source: (McKinsey) © 2018 Eaton. All rights reserved..

7


Data centers have large battery banks that often sit unused • The UPS is vital technology for any data center, providing critical backup power to ensure business continuity in the event of an outage • Outages are infrequent, which often renders the battery an underutilized asset

Š 2018 Eaton. All rights reserved..

8


The adoption of lithium has created the opportunity for the UPS to serve dual purposes 1. Traditional critical power backup • Customer defines the minimum backup time required to protect critical loads • With a longer life and 8x the cycle rate compared to traditional VRLA batteries, lithium enables new ways to use the UPS and batteries

© 2018 Eaton. All rights reserved..

Power Xpert 9395 UPS

Lithium

+

9


The adoption of lithium has created the opportunity for the UPS to serve dual purposes 2. Grid-aware energy storage device • Peak shaving discharges at times of peak demand to help avoid or reduce demand charges • Time-of-use optimization shifts energy consumption to avoid peak time usage • Grid support services, such as frequency regulation, further help grid operators meet the explosive growth in demand from data centers

Wave 1

Wave 2

• Data center has control of their energy, choosing how much capacity to offer and when

© 2018 Eaton. All rights reserved..

10


Eaton conducted a technology demonstration of a UPS as a DER for PJM* Technology demonstration goals • Provide frequency regulation (WAVE II) using the UPS AND demonstrate protection of the load in presence of a utility outage

UPS PJM RegD

• Self-score the UPS as a DER providing frequency regulation

*PJM is a regional transmission organization serving 13 states and the District of Columbia.

© 2018 Eaton. All rights reserved..

11


The UPS self-score was 90 percent in PJM’s tests for accuracy, response time and precision, exceeding the operator’s requirements for viable DER solutions and proving the technology’s ability to serve this function *PJM is a regional transmission organization serving 13 states and the District of Columbia.

© 2018 Eaton. All rights reserved..

12


Implications of dual-purpose UPS are enormous for the grid and data center •

Lower demand and peak time charges utilizing existing asset and further clean energy goals

Create new revenue stream, lower overall energy costs and still serve as foundational backup power solution

Help reshape power generation with large battery banks that can dispatch instantaneously to better meet short-term spikes in demand

Estimated payback period is 3-7 years for the customer

© 2018 Eaton. All rights reserved..

13


Case Study 2

Intelligent circuit breakers provide utilitygrade metering and control Business outcome: Next frontier at the grid edge: intelligent circuit breakers support metering, DERs and load control • • •

• •

© 2018 Eaton. All Rights Reserved..

14


Š 2018 Eaton. All rights reserved..

15


Electric Power Research Institute (EPRI) Field Trial Eaton innovated an intelligent residential circuit breaker: the UL-listed device enables smart energy management across the home’s many connected devices

EPRI is in the process of completing a field trial (Phase 1) with 12 electric utilities across the U.S.

The field trial includes the demonstration of nearly 300 EMCB devices installed in residences and commercial businesses.

All project objectives of Phase 1 were satisfied, which completes requirements of the field test.

Key findings from the Phase 1 test included hardware and software changes to improve performance and scalability, are being incorporated into the commercial release.

© 2018 Eaton. All rights reserved..

16


Intelligent circuit protection and connectivity

Š 2018 Eaton. All rights reserved..

17


Eaton and Sonnen booths at Solar Power International with Eaton’s intelligent circuit protection

Sonnen booth Eaton booth Š 2018 Eaton. All rights reserved..

18


Intelligent circuit breakers enable home energy storage systems and the VVP concept

Š 2018 Eaton. All rights reserved..

19


Intelligent circuit breakers provide granular data, enable dynamic load shedding •

Leap in circuit protection: new way to protect, monitor, manage and optimize electrical systems

EPRI field test demonstrates residential and small commercial application

Eaton new Power Defense technology: intelligent molded case circuit breakers for large commercial and industrial applications

© 2018 Eaton. All rights reserved..

20


Case Study 3

Hardware in the Loop (HIL) testing for microgrid systems Business outcome: Understand the system as if it were already connected, enabling optimization out of the gate • • •

• •

© 2018 Eaton. All Rights Reserved..

21


Microgrid feasibility studies and virtual modeling

Š 2018 Eaton. All rights reserved..

22


Eaton Microgrid Projects Combining Eaton’s and U.S. Gov. investments to test scalable applications Off-Grid

On-Grid

Force Provider

MV Microgrids Energy Transactions

Fort Custer Microgrid

Fuel Sav ings Digital Quality Pow er

Renew able Integration

SHINES DoE

AFCEC BSLIM

Utility Industrial

Fort Sill

SCADA, Islanding

Commercial

Energy Surety E-Storage Optimization

Load, DG & RE Integration

Virtual National Renewable Energy Lab Flexible & Secure Architecture

MIT-Lincoln Lab and MASS CEC Scalable & Modular Architecture © 2018 Eaton. All rights reserved..

PSEC Warrendale Eaton Pune PGE 5MW India Feeder Island Demand Reliability, PV & Wind Support

Management

Renew able Optimization

Wadeville S. Africa Peak Demand Reduction

23


Fort Custer Microgrid: strategic controls for closely sited military facilities •

Microgrid control framework creates dispatchable generation hub as power base of robust network of utility feeder interconnected facilities

Demonstrates autonomous microgrid management to respond to grid conditions or control signals with planned energy storage

Results: connection of two closely sited facilities and ability to actively share resources

Active participation by commercial and military team members

Team: Electricore, Inc. in teaming with Eaton and CERL

© 2018 Eaton. All rights reserved..

24


Fort Custer Microgrid Control Architecture and Single Line Diagram PCC With Utility Feeder

Power Xpert Energy Optimizer (PXeO)

Point of Common Coupling

Metering, Protection

27kV, 3ph

Fort Custer Interconnection

ES Inverter Local Controller

GEN

Generator

500 kW

Local Controller

BMS

400 kW 130 kWh Power Storage Batteries

Local Controller

GEN

Generator

Fort Custer Feeder

Utility (Consumers Energy) 24.9kV Substation

720 kW PV Inverters

750 kW

Existing PV + Expansion

Cummins Controller

Building 2900

Diesel Generator 500kW 480Vac, Cummins

Woodward Controller Building 22295

T-2790 750kVA 480Vac

PV Inverters 720kW Solar Array Š 2018 Eaton. All rights reserved..

Energy Storage Inverter

Diesel Generator 750kW 480Vac, Caterpillar Inverter Controller

ESS 400kW 128kWhr

Battery Management System

25


Fort Custer Microgrid Modeled in Typhoon-HIL as virtual validation example SMP 4250G

SMP 4DP

Š 2018 Eaton. All rights reserved..

26


Visit a working microgrid Eaton Power System Experience Center in Warrendale, PA

Š 2018 Eaton. All rights reserved..

27


Thank you • John Vernacchia, Segment Manager, Renewable Energy •

johnvernacchia@eaton.com

Additional information: •

www.eaton.com/powerquality

www.eaton.com/EMCB

www.eaton.com/microgrids

© 2018 Eaton. All rights reserved..

28


Š 2018 Eaton. All rights reserved..

29


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.