Issue 19/16
Paceville Master Plan PLANNING AUTHORITY OUTLINES STRATEGY TO TURN PACEVILLE INTO MALTA’S PRIME COASTAL LOCATION
Paceville is changing from a series of individual developments into a co-ordinated framework for the whole area: A Masterplan, developed MacDonald and Broadway Malyan. Read M ore
Fish Farms PLANNING BOARD REVOKES 10 FISH FARM DEVELOPMENT PERMITS The Planning Board unanimously revoked 10 fish farm development
by locals and tourists alike. Read M ore
SUSTAINABLE REGENERATION OF BUILT HERITAGE - A CASE STUDY OF SAN ANTON PALACE Anton Palace". Read M ore
Career Opportunity SECRETARIAL ASSISTANTS The Planning Authority is seeking to recruit secretarial assistants
-
definite period of three years, with the possibility of renewal. Read M ore
FOUNTAIN AND EXEDRA AT FORT ST ELMO naded exedra (semi-circular space) was erected at Lower Fort St Maltese architect Giorgio Pullicino
-
Read M ore
LIS T O F PLANNING APPLIC ATIONS, D ECISIONS AND EN FO RCEMEN T N OTICES taken by the Planning Board/Commissions are published on the locality in reference number order. One can also view the list of stop Read M ore To unsubscribe f rom receiving these emails click here
.