Planning MT News letter 19/16

Page 1

Issue 19/16

Paceville Master Plan PLANNING AUTHORITY OUTLINES STRATEGY TO TURN PACEVILLE INTO MALTA’S PRIME COASTAL LOCATION

Paceville is changing from a series of individual developments into a co-ordinated framework for the whole area: A Masterplan, developed MacDonald and Broadway Malyan. Read M ore

Fish Farms PLANNING BOARD REVOKES 10 FISH FARM DEVELOPMENT PERMITS The Planning Board unanimously revoked 10 fish farm development

by locals and tourists alike. Read M ore

SUSTAINABLE REGENERATION OF BUILT HERITAGE - A CASE STUDY OF SAN ANTON PALACE Anton Palace". Read M ore

Career Opportunity SECRETARIAL ASSISTANTS The Planning Authority is seeking to recruit secretarial assistants

-

definite period of three years, with the possibility of renewal. Read M ore

FOUNTAIN AND EXEDRA AT FORT ST ELMO naded exedra (semi-circular space) was erected at Lower Fort St Maltese architect Giorgio Pullicino

-

Read M ore

LIS T O F PLANNING APPLIC ATIONS, D ECISIONS AND EN FO RCEMEN T N OTICES taken by the Planning Board/Commissions are published on the locality in reference number order. One can also view the list of stop Read M ore To unsubscribe f rom receiving these emails click here

.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.