ADAM poinsett-hall PORTFOLIO
adam@poinsett-hall.com www.poinsett-hall.com
CONTENTS
HOTEL + OFFICE DEVELOPMENT
PART 1
PROPOSED AMENDMENT SCHEME
CARPARK + CONDOMINIUMS
PART 2
1 DALTON TOWER
CENTURY PLAZA TOWERS
PART 5
SUBVERSIVE URBANISM
PART 9
BUSINESS PARK AMENITY BUILDINGS
PERSPECTIVE LOOKING NORTH UP COLLINS AVENUE
PART 3
UCLA BUSINESS SCHOOL EXTENSION
PART 4
PART 6
FORDHAM PLAZA
PART 7
CROTON GOLF CLUBHOUSE
URBAN MAPPING IN 3 DISTRICTS
BRIGHTON ROAD URBAN FARMING
YOUTH PHOTOGRAPHY COURSE
PART 10
PART 11
PART 8
PART 12
HOTEL + OFFICE DEVELOPMENT Office Project Site: Santiago, Chile 2019 - Present Within an upscale neighborhood of Santiago, this project is designed to be able to function as either an upscale hotel, class A office building, or combination. The form of the building connects users to the natural surroundings, through the use of materials, access to fresh air, and daylighting throughout. Two separate angled wings with a central circulation space form an inviting western plaza for the public to enjoy. The building sets the glass line back from the face of the building, allowing columns, slabs, and vertical louvers to serve as natural shading devices for interior spaces. Each façade of the building is analyzed and the orientation of all columns and louvers are carefully calibrated based on their solar orientation to minimize afternoon summer solar insolation, while maximizing winter solar insolation. Operable louvers allow occupants to enjoy Santiago’s fresh mediterranean breezes. Local regulations allowing subterranean development create unique opportunities to bring light and air to occupiable basement spaces. A bicycle ramp on the western edge and light wells on the northern end of the property distribute light throughout the leasable basement space. Waterfall elements offer underground spaces with a unique visual and auditory element. I served as the senior architect on this project, leading design studies, zoning analyses, and preparation of all client presentations, from concept design through enhanced schematic design.
Setback Line (Linea Rasante method) and theoretical “Flan”
TWO CORNERS SLIGHTLY OUTSIDE OF FLAN
brandon haw architecture / Proyecto Francisco Aguirre / Schematic Design Progress
05 June 2020 / page 133
30% Lot Coverage Diagram
80% Excavation Limit Diagram
SITE AREA:
3,523.0 m2
SITE AREA:
3,523.0 m2
AREA COVERED 100%: 1,040.4 m2
AREA EXCAVATED:
2,534.4 m2
AREA COVERED 50%:
AREA NOT EXCAVATED: 988.6 m2
118.8 m2
TOTAL:
1,099.8 m2
PERCENTAGE:
29.87% (1,052.3 / 3,523)
71.9% (2,534.4 / 3,523.0)
PERCENTAGE:
PROYECTO:
FRANCISCO AGUIRRE CLIENTE: GRUPO PATIO ALONSO DE CORDOVA 3788, PISO 2, VITACURA, SANTIAGO, CHILE +(56) 2 2979-6600
ARQUITECTO DE DISEÑO:
DN
BRANDON HAW ARCHITECTURE, LLP 630 FLUSHING AVE, STUDIO 310 BROOKLYN, NY 11206 +1 (212) 300-8440
71.9 %
31.21 % 29.87
W EST SHADE PROJECTION 2.457,622 M 2
EAST SHADE PROJECTION 2.577,877 M 2
Shadow Projection method)
28.1 %
LINEA RASA BUILD ING NTE SLOP E LINE LINEA EDIFIC ACION BUILD ING LINE SETBA CK
PROYECTO:
FRANCISCO AGUIRRE CLIENTE:
SOUTH SHADE PROJECTION 175,074 M 2
GRUPO PATIO ALONSO DE CORDOVA 3788, PISO 2, VITACURA, SANTIAGO, CHILE +(56) 2 2979-6600
ARQUITECTO DE DISEÑO:
DN
BRANDON HAW ARCHITECTURE, LLP 630 FLUSHING AVE, STUDIO 310 BROOKLYN, NY 11206 +1 (212) 300-8440
2
FP_LEVEL ROOF_THEORETICAL SHADOW STUDY 1 : 400 CROQUIS DE LOCALIZACIÓN
W EST SHADE PROJECTION 2.457,622 M 2
EAST SHADE PROJECTION 2.577,877 M 2
ISCO DE FRANC
RE AGUIR
brandon haw architecture / Proyecto Francisco Aguirre / Schematic Design Progress
ALONSO DE CORDOVA
DN
05 June 2020 / page 135 ALO NS O DE
LINEA RASAN TE BUILDING SLOPE LINE LINEA EDIFIC ACION BUILDING LINE SETBA CK
EAST SHADE PROJECTION 2.577,305 M 2
W EST SHADE PROJECTION 2.057,783 M 2
MO NR OY
NORTE: 73 GRADOS
NO.
DESCRIPCIÓN
01
100% SCHEMATIC DESIGN
FECHA
05 JUN 2020
SOUTH SHADE PROJECTION 175,074 M 2
2
FP_LEVEL ROOF_THEORETICAL SHADOW STUDY 1 : 400 CROQUIS DE LOCALIZACIÓN
ISCO DE FRANC
LINEA RASA BUILD ING NTE SLOP E LINE LINEA EDIFIC ACION BUILD ING LINE SETBA CK
E AGUIRR
ALO NSO
EAST SHADE PROJECTION 2.577,305 M 2
W EST SHADE PROJECTION 2.057,783 M 2
ALONSO DE CORDOVA
DN
DE
SOUTH SHADE PROJECTION 105,370 M 2
MO NR OY
PROJECTSTUDY COMPLIES FP_LEVEL ROOF_PROPOSED SHADOW B_CURRENT PROPOSAL NORTE: 73 GRADOS
1
1 : 400
NO.
DESCRIPCIÓN
01
100% SCHEMATIC DESIGN
FECHA
NOTA: NO PARA CONSTRUCCIÓN - ESTE DOCUMENTO FUE PREPARADO PARA TEMAS DE COORDINACIÓN DE DISEÑO Y CONCEPTOS © brandon haw architecture LLP
05 JUN 2020
DATOS DEL PREDIO:
LINEA RASAN TE BUILDING SLOPE LINE LINEA EDIFIC ACION BUILDING LINE SETBA CK
DIFFERENCE THEORETICAL - PROJECTED
FP_LEVEL ROOF_PROPOSED SHADOW STUDY B_CURRENT PROPOSAL 1 : 400
THEORETICAL VOLUME
PROJECTED VOLUME
SOUTH SHADE
175,074 M 2
105,370 M 2
- 69,704 M 2
W ESTERN SHADE
2.457,622 M 2
2.057,783 M 2
- 399,839 M 2
EASTERN SHADE
2.577,877 M 2
2.577,305 M 2
- 0,572 M 2
FECHA:
TOTAL SHADE
5.210,573 M 2
4.740,458 M 2
- 470,115 M 2
A-004
NOTA: NO PARA CONSTRUCCIÓN - ESTE DOCUMENTO FUE PREPARADO PARA TEMAS DE COORDINACIÓN DE DISEÑO Y CONCEPTOS © brandon haw architecture LLP
THEORETICAL - PROJECTED
ÁREA CONSTRUIDA BAJO NNT: 12,209.00 m2 NUMERO NIVELS BAJO NNT: 05 ÁREA CONSTRUIDA SOBRE NNT: 8,673.48 m2 NUMERO NIVELES SOBRE NNT: 08 OCUPACIÓN SUELO: 1,095 m2 SUPERFICIE EDIFICADA TOTAL: 20,822.48 m2 PROYECTO:
NORMATIVIDAD: ALTURA MAX. PERMITIDA: SUPERFICIE CONSTRUIDA PERMITIDA SOBRE NNT:
30.625 m
SUPERFICIE TERRENO: ZONA: OCUPACIÓN SUELO: ÁREA LIBRE:
3,523 m2 E-Am5 .30 .40
05 June 2020 / page 134
DATOS DE LA CONSTRUCCIÓN:
SHADING SURFACE
THEORETICAL VOLUME
PROJECTED VOLUME
SOUTH SHADE
175,074 M 2
105,370 M 2
- 69,704 M 2
W ESTERN SHADE
2.457,622 M 2
2.057,783 M 2
- 399,839 M 2
EASTERN SHADE
2.577,877 M 2
2.577,305 M 2
- 0,572 M 2
FECHA:
TOTAL SHADE
5.210,573 M 2
4.740,458 M 2
- 470,115 M 2
A-004
ÁREA CONSTRUIDA BAJO NNT: 12,209.00 m2 NUMERO NIVELS BAJO NNT: 05 ÁREA CONSTRUIDA SOBRE NNT: 8,673.48 m2 NUMERO NIVELES SOBRE NNT: 08 OCUPACIÓN SUELO: 1,095 m2 SUPERFICIE EDIFICADA TOTAL: 20,822.48 m2 PROYECTO:
NORMATIVIDAD: ALTURA MAX. PERMITIDA: SUPERFICIE CONSTRUIDA PERMITIDA SOBRE NNT:
30.625 m
30.625 m
8,455.00 m2
8,673.48 m2
OCUPACIÓN SUELO PERMITIDO: 1,056.00 m2
1,095.50 m2
TITULO Y CLAVE
ESCALA: 1 : 400
30.625 m
8,455.00 m2
8,673.48 m2
OCUPACIÓN SUELO PERMITIDO: 1,056.00 m2
1,095.50 m2
ESCALA: 1 : 400
TITULO Y CLAVE
SHADOW CALCULATION METHOD
DATOS DEL PREDIO:
DIFFERENCE brandon haw architecture / Proyecto Francisco Aguirre / Schematic Design Progress
3,523 m2 E-Am5 .30 .40
DATOS DE LA CONSTRUCCIÓN:
SHADING SURFACE
SOUTH SHADE PROJECTION 105,370 M 2
1 ZONING STUDIES
SUPERFICIE TERRENO: ZONA: OCUPACIÓN SUELO: ÁREA LIBRE:
Office Layout Test Fits: Multi-Tenant (Six Offfices) Scale 1:250
04 60 m2
05
PROYECTO:
FRANCISCO AGUIRRE CLIENTE: GRUPO PATIO ALONSO DE CORDOVA 3788, PISO 2, VITACURA, SANTIAGO, CHILE +(56) 2 2979-6600
OFFICE 5 133 m2
WC
BRANDON HAW ARCHITECTURE, LLP 630 FLUSHING AVE, STUDIO 310 BROOKLYN, NY 11206 +1 (212) 300-8440
Scale 1:300
WC
ISCO AG
PE - 01
UIRRE
0,00
STONE BALUSTRADE
N
J
257 m²
0,00
%
I
Typical Plan: Levels 04 to 06: SH Guest Rooms CROQUIS DE LOCALIZACIÓN
8,10 OPEN TO BELOW
0,00
OFFICE LOBBY WATER FEATURE: REFLECTING POOL WITH WATERFALL
83 m² EGRESS DN FROM S1
SE - 01
4 m²
UP
3 m² WC 6 m²
OFFICE
WC
9 m²
7 m²
3,8 9 4,2 1 8,1 0
EGRESS FROM ABOVE
C
ALO
NS
OD
8,1 0
EM D
DE
SH Guest Roo SH Circulation
MO NR OY
OFFICE LAYOUT - MULTITENANT
1 : 250
21 MAYO 2020
ROOM
G
54 m² SE - 02 TO BE PROVIDED ONLY IF BUILDING CONTAINS HOTEL PROGRAM IN NORTH WING.
ROOM
F
06
Office: Circulation: Mech/Service: Vertical Circula
11 GUEST RO
36 m² ROOM
0,00
LINE OF BUILDING OVER HEAD
1,02 DN
45 m²
1,40
ROOM RAMP 10%
RO Y
30 m²
ROOM 38 m²
NOTA: NO PARA CONSTRUCCIÓN - ESTE DOCUMENTO FUE PREPARADO PARA TEMAS DE COORDINACIÓN DE DISEÑO Y CONCEPTOS
8,1 0
ROOM 36 m²
© brandon haw architecture LLP
DATOS DEL PREDIO:
2,2 3
sA105S
FECHA
SCHEMATIC DESIGN
NORTH VEHICLE ENTRY RAMP
E
SUPERFICIE TERRENO: ZONA: OCUPACIÓN SUELO: ÁREA LIBRE:
LEASABLE OFFICE
3,523 m2 E-Am5 .30 .40
DATOS DE LA CONSTRUCCIÓN:
0,8 0
ÁREA CONSTRUIDA BAJO NNT: 12,209.00 m2 NUMERO NIVELS BAJO NNT: 05 ÁREA CONSTRUIDA SOBRE NNT: 8,673.48 m2 NUMERO NIVELES SOBRE NNT: 08 OCUPACIÓN SUELO: 1,095 m2 SUPERFICIE EDIFICADA TOTAL: 20,822.48 m2
SOHO HOUSE CIRCULATION
N
brandon haw architecture / Proyecto Francisco Aguirre / Schematic Design Progress
NOTE: Plan shown as with PROGRAM one (1) service A e
NORTE: 73 GRADOS
01
70 m²
RAMP 20%
ON
ALON SO
NO. DESCRIPCIÓN
GF RECEIVING
0,00
IF SE - 02 IS NOT IN PROJECT - THIS AREA WOULD BECOME GF RECEIVING AREA
EXAMPLE OFFICE TEST-FIT
RRE DE AGUI
brandon haw architecture / Proyecto Francisco Aguirre / Schematic Design Progress FRANCISCO AGUIRRE
SE - 02
26 m²
EGRESS FROM ABOVE
B
163
m2
ELEV LOBBY
WC 8 m²
RESTAURANT TERRACE
8,10
58 m² PE - 04
8,10
RESTAURANT BOH PE - 03
PE - 02
H
ALONSO DE CORDOVA
319 m² DN
EGRESS FROM S1
FRANCISCO
RETAIL 44 m²
PE - 01
Scale 1:250
ALONSO DE CORDOVA
RAMP 15
E RASANTPE LINE LINEA NG SLO BUILDI
ERO MEDIAN LINEA TY LINE PROPER
UMBRE SERVID LINEA EASEMENT UTILITY
ACION EDIFIC SETBACK E LINEA NG LIN BUILDI
LINE OF BUILDING OVER HEAD
RETAIL
GROUND FLOOR PLAN
WC
RESTAURANT
47 7,
0,00
A
WC
STONE BENCH
0,00
2,4 0
DN
4,63
M
RAMP 5%
7,5 5
47 7,
8,10
2
3
06 154 m2
0 1,2
DN DN
02 129 m2
DN
6,35
9,7 5
L
OFFICE 2 129 m2
SE - 01
OFFICE 6 154 m2
POTENTIAL FUTURE BYCICLE PATH
DN
OPEN TO BELOW
-0,77
PE - 04
CIRCULATION 156 m2
DN
SOUTH VEHICLE ENTRY RAMP
PE - 03
PE - 02
K
0,8 5
1
0,8 5
OFFICE 3 65 m2
0,04
FR ANC
265 m2
OFFICE 1 265 m2
65 m2
OFFICE 4 60 m2
ARQUITECTO DE DISEÑO:
Ground Floor (Street Level) Plan
01
03
133 m2
6,65
9,15
0,85
1 6
5
4
FLOOR PLAN - LEVEL 01 1 : 150
ALTURA MAX. PERMITIDA:
30.625 m
30.625 m
SUPERFICIE CONSTRUIDA PERMITIDA SOBRE NNT:
8,455.00 m2
8,673.48 m2
OCUPACIÓN SUELO PERMITIDO: 1,056.00 m2
1,095.50 m2
05 June 2020 / page 28 FECHA:
79 m²
PROYECTO:
NORMATIVIDAD:
0,85 4,00
ROOM 36 m² ROOM
ESCALA: 1 : 150
TITULO Y CLAVE
30 m²
A-101 PLAN - LEVEL 1 OFFICE
MECH 17 m²
ROOM 34 m²
ROOM 43 m²
ROOM 31 m²
EXAMPLE HOTEL TEST-FIT
Sc brandon haw architecture / Proyecto Francisco Aguirre / 100% Concept Design Update
Facade Shading Study: N Wing: North Facade Summer
N
Winter
PROYECTO:
FRANCISCO AGUIRRE CLIENTE: GRUPO PATIO ALONSO DE CORDOVA 3788, PISO 2, VITACURA, SANTIAGO, CHILE +(56) 2 2979-6600
ARQUITECTO DE DISEÑO: BRANDON HAW ARCHITECTURE, LLP 375 PARK AVE, SUITE 3308 NEW YORK, NY 10152 +1 (212) 300-8440
June 21
5:40 PM
July 21
7:47 AM
5:55 PM
7:42 AM
6:16 PM
7:14 AM
August 21
DN
W
6:36 PM
6:34 AM
6:58 PM
5:55 AM UP
1
EL_01_DEC 21_9 AM 1 : 50
5
EL_01_MAR/SEP 21_9 AM 1 : 50
9
EL_01_JUNE 21_9 AM
7:26 PM
September 21
E
October 21
5:29 AM
7:50 PM
5:30 AM
1 : 50
November 21 December 21
S
CROQUIS DE LOCALIZACIÓN
1 : 50
6
EL_01_MAR/SEP 21_12 PM 1 : 50
10
EL_01_JUNE 21_12 PM 1 : 50
1
CO DE FRANCIS
SOLAR ANALYSIS
AGUIRRE
1 : 250
ALO NS O DE
ALONSO DE CORDOVA
2
EL_01_DEC 21_12 PM
MO NR OY
NORTE: 73 GRADOS
NO. DESCRIPCIÓN
XX
FECHA
ENTREGA
DD MMM AAAA
NOTA: NO PARA CONSTRUCCIÓN - ESTE DOCUMENTO FUE PREPARADO PARA TEMAS DE COORDINACIÓN DE DISEÑO Y CONCEPTOS
DATOS DEL PROPIETARIO:
3
EL_01_DEC 21_3 PM 1 : 50
7
EL_01_MAR/SEP 21_3 PM 1 : 50
11
EL_01_JUNE 21_3 PM 1 : 50
DATOS DEL PREDIO: CLAVE CATASTRAL:
USO:
ÁREA: 3,523 m2
TIPO DE TRAMITE:
DIRECCIÓN:
DATOS DE LA CONSTRUCCIÓN: ÁREA CONSTRUIDA B.N.B: NUMERO DE NIVELS B.N.B: ÁREA CONSTRUIDA S.N.B.: NUMERO DE NIVELES S.N.B.: ÁREA DE DESPLANTE: ÁREA TOTAL CONSTRUIDA:
4
EL_01_DEC 21_6 PM 1 : 50
8
EL_01_MAR/SEP 21_6 PM 1 : 50
12
EL_01_JUNE 21_6 PM 1 : 50
X m2 X X m2 X X m2 X m2 X
PROYECTO Xm
X m2
X m2
DESPLANTE MAX. PERMITIDO: X m2
X m2
NORMATIVIDAD: ALTURA MAX. PERMITIDA: SUPERFICIE CONSTRUIDA PERMITIDA S.N.B.:
FECHA:
ESCALA: 1 : 50
TITULO Y CLAVE
A-614
brandon haw architecture / Proyecto Francisco Aguirre / Schematic Design Progress
EXAMPLE FACADE SOLAR EXPOSURE STUDIES
EL-SOLAR STUDY 01
05 June 2020 / page 102
PROYECTO:
FRANCISC CLIENTE:
G
4
GRUPO PA ALONSO D SANTIAGO +(56) 2 297
H 3
0,45
BRANDON 630 FLUSH BROOKLY +1 (212) 30
0,20 0,05
0,25
0,35
ARQUITECTO DE DISEÑO
A-655
0,05 0,30
LEVEL 4 11,80
0,30
0,60
0,59
0,20 0,40
0,08 0,07
CEILING ZONE (ALIGN W ITH FURRED COLUMN)
INSULATED GLASS UNIT (IGU)
WINDOW UNIT
CLEAR
COLUMN COVER BEYOND
3,10
2,67
W OOD FIN
W OOD IGU FRAME
1
1
A-655
A-655
W OOD COVER CONCRETE CURB
LEVEL 3 8,15
0,30
0,20 0,60
0,59
0,25
0,20 0,05
FINISH FLOOR
0,40
CROQUIS DE LOCALIZAC
0,08
CEILING ZONE (ALIGN W ITH FURRED COLUMN)
FRANC
BLOCKING OPERABLE VENT BEAM COVER
ALO NS OD EM O
STANDARD W ALL MODULE SECTION
2
1 : 25
STANDARD W ALL MODULE ELEVATION 1 : 25
G
NO.
DESCRIPCI
01
100% SCHEMA
H 8,10
0,65
0,40
1,29
0,15
1,29
0,15
1,29
0,15
1,29
0,15
1,29
0,65
0,40
FURRED-OUT W ALL CHAMFERED CONCRETE COLUMN W OOD IGU FRAME
3 A-655
VERTICAL W OOD FIN FRAME
0,05 0,30
0,75
30° SLOPE
60° SLOPE
1,00
0,05
1,00
EXTERIOR
4
0,35 0,45
0,05 0,05
0,05 0,05
INTERIOR
0,75
3
0,05
NOTA: NO PARA CONST FUE PREPARADO PARA DISEÑO Y CONCEPTOS
© brandon haw architectur DATOS DEL PREDIO:
W OOD CLADDING
SUPERFICIE TERRENO: ZONA: OCUPACIÓN SUELO: ÁREA LIBRE:
GFRC CLADDING
DATOS DE LA CONSTRUC
ÁREA CONSTRUIDA BAJO NUMERO NIVELS BAJO N ÁREA CONSTRUIDA SOBR NUMERO NIVELES SOBRE OCUPACIÓN SUELO: SUPERFICIE EDIFICADA T
VERTICAL W OOD FIN W OOD COLUMN COVER
NORMATIVIDAD:
GFRC COLUMN COVER
ALTURA MAX. PERMITIDA SUPERFICIE CONSTRUID PERMITIDA SOBRE NNT:
OCUPACIÓN SUELO PERM
1
STANDARD W ALL MODULE PLAN 1 : 25
PLAN SECTION ELEVATION DETAILS
FECHA:
TITULO Y CLAVE
A-655
TYP EW S 110 CLADDING
ALO NS OD EM ON RO Y
BIKE RAMP AXON_SE
2
NORTE: 73 GRADOS
NO. DESCRIPCIÓN
01
FECHA
SCHEMATIC DESIGN
21 MAYO 2020
WATER THROUGH CNC MILLED STONE WATERFALL - STONE VENEER @ 2 DEGREES REFLECTING POOL
LANDING SUPPORTED BY "C" SHAPED PILASTER
4
BIKE RAMP AXON_SE MID
BIKE RAMP AXON_SE
2
GLASS RAILING W/ STL. CAP NOTA: NO PARA CONSTRUCCIÓN - ESTE DOCUMENTO FUE PREPARADO PARA TEMAS DE COORDINACIÓN DE DISEÑO Y CONCEPTOS
CENTER RAMP W/ 50 MM SPEED BUMPS
© brandon haw architecture LLP
DATOS DEL PREDIO: SUPERFICIE TERRENO: ZONA: OCUPACIÓN SUELO: ÁREA LIBRE:
3,523 m2 E-Am5 .30 .40
DATOS DE LA CONSTRUCCIÓN:
WOOD SLATS
ÁREA CONSTRUIDA BAJO NNT: 12,209.00 m2 NUMERO NIVELS BAJO NNT: 05 ÁREA CONSTRUIDA SOBRE NNT: 8,673.48 m2 NUMERO NIVELES SOBRE NNT: 08 OCUPACIÓN SUELO: 1,095 m2 SUPERFICIE EDIFICADA TOTAL: 20,822.48 m2 PROYECTO:
NORMATIVIDAD:
BIKE RAMP AXON_NE
NE AXONOMETRIC 3D VIEW
1
ALTURA MAX. PERMITIDA:
30.625 m
30.625 m
SUPERFICIE CONSTRUIDA PERMITIDA SOBRE NNT:
8,455.00 m2
8,673.48 m2
OCUPACIÓN SUELO PERMITIDO: 1,056.00 m2
1,095.50 m2
FECHA:
ESCALA:
TITULO Y CLAVE
sA-065
brandon haw architecture / Proyecto Francisco Aguirre / External Works Update
16 July 2020 / page 62
BICYCLE/SCOOTER ENTRY RAMP
NW 3D VIEW
3
BIKE RAMP AXON_NW MID
BIKE RAMP AXON_NE
1
SE 3D VIEW
BIKE RAMP BICYCLE RAMP AXONOMETRICS 4
brandon haw architecture / Proyecto Francisco Aguirre / External Works Update
AXON_SE MID 16 July 2020 / page 64
2
BIKE RAMP AXON_SE
brandon haw architecture / Proyecto Francisco Aguirre / External Works Update
RESTAURANT WATERFALL DESIGN AND INSPIRATIONS
16 July 2020 / page 46
CLIENTE: GRUPO PATIO ALONSO DE CORDOVA 3788, PISO 2, VITACURA, SANTIAGO, CHILE +(56) 2 2979-6600
4
PROYECTO:
FRANCISCO AGUIRRE
4
UNDERGROUND SETBACK
FRANCISCO AGUIRRE
CLIENTE:
WATER SPILS FROM SLOT
PROYECTO:
GRUPO PATIO PIN W/ GROUT ALONSO DE CORDOVA 3788, PISO 2, VITACURA, SANTIAGO, CHILE +(56) 2 2979-6600
PROPERTY LINE
STONE PAVERS 220 X 1200
SETTING BED
GROUND COVER
T.O BEAM BEYOND
CONCRETE WATERPROOFING PLANTER LINER ROOT BALL IN SOIL
ARQUITECTO DE DISEÑO:
WATER THROUGH CNC-MILLED STONE
ARQUITECTO DE DISEÑO:
PROJECT LVL +0,00
CONCRETE STRIP TO MATCH PLANTER
LEVEL 2
BRANDON HAW ARCHITECTURE, LLP 630 FLUSHING AVE, STUDIO 310 BROOKLYN, NY 11206 +1 (212) 300-8440
SIDEWALK (HT. VARIES) DRAINAGE MAT GRAVEL
4,50
0,06
STONE VENEER @ 2 DEGREES
0,20 STRUCTURAL SLAB
WATER SUPPLY NOZZLE
LIGHTWEIGHT CONCRETE
50 mm Ø WATER SUPPLY PIPE
0,30
OPEN SLAT CEILING
0,30 0,20
0,20
3.00 M AFF
0,30
0,80
0,30
0,04
DRAIN
0,30
BRANDON HAW ARCHITECTURE, LLP 630 FLUSHING AVE, STUDIO 310 BROOKLYN, NY 11206 +1 (212) 300-8440
0,80
GRUPO PATIO ALONSO DE CORDOVA 3788, PISO 2, VITACURA, SANTIAGO, CHILE +(56) 2 2979-6600
0,20
CLIENTE:
COPING STONE
150 mm STRUCTURAL WALL W/ WATERPROOFING
2.70 M AFF
1,20
BEAM RUNNING BEYOND
0,45
2,15
0,45
LEVEL 1
CROQUIS DE LOCALIZACIÓN
0,00
NOTE: SPOT HEIGHTS/DATUMS OF PLANTERS/WALLS ARE FOR INFORMATION ONLY. CODE MINIMUM GUARDRAIL HEIGHTS ARE TO BE MAINTAINED. ALL SPOT ELEVATIONS SHOULD BE VERIFIED IN FIELD (VIF).
CROQUIS DE LOCALIZACIÓN
4
STONE PAVERS 220 X 1200
SETTING BED
OPEN SLAT CEILING
50 mm Ø WATER SUPPLY PIPE
CLIENTE:
0,30
3.00 M AFF
LEVEL 1 CONCRETE STRIP TO MATCH PLANTER 0,00
ARQUITECTO DE DISEÑO:
4,50 TO STL. EMBEDS/ANGLES
500 mm RETAINING WALL
2.70 M AFF
UNDERGOUND SETBACK MINIMUM
1 : 50
F
METAL GUARDRAIL OF SAME 0,00 HEIGHT AND DESIGN AS GUARDRAIL SURROUNDING 1:50 NORTH RAMP (SEE
02. DETAIL @ WATERFALL/LIGHTWELL 4
4,85
DN
LEVEL S1
LEVEL 2 4,50
+0,00 - APZ
16 July 2020 / page 47
-3,50
PROPERTY LINE
OPEN SLAT CEILING
PROYECTO:
4
SUPERFICIE CONSTRUIDA PERMITIDA SOBRE NNT:
8,455.00 m2
8,673.48 m2
OCUPACIÓN SUELO PERMITIDO: 1,056.00 m2
1,095.50 m2
1 LIGHT WELL DESIGN FECHA:
30.625 m
+0,00 - APZ
NORTH TERRACE, PLANTERS & LIGHTWELLS 3 A-064
-3,50 - APZ
LIGHTWELLS/TREE PLANTERS LINE ABOVE
REFLECTING POOL
2,01
4,06
4
A-064
NO. DESCRIPCIÓN
01
100% SCHEMATIC DESIGN
FECHA
05 JUN 2020
0,00
FLOOR PLAN - LEVEL 01
2,03
2,03
4,06
PAVED PLATFORM
brandon haw architecture / Proyecto Francisco Aguirre / External Works Update
METAL GUARDRAIL OF SAME 4 1 3 2 HEIGHT AND DESIGN AS sA-068 sA-068 A-063 A-063 GUARDRAIL SURROUNDING
2,03 3,00
ALO NS OD EM ON RO Y
4
LEVEL S1 -3,50
F
PAVED PLATFO
DN
NOTA: N FUE PRE DISEÑO
PROPERTY LINE
© brando
SECTION @ LIGHTWELL SECTION1:100 - WEST THROUGH LIGHT WELL 1 : 50
REFLECTING P
DN
UNDERGOUND SETBACK MINIMUM
4
WATERFALL W FEATURE BEYO
1 : 100
J O DE AGUIRRE ISC FRANC
I
NORTE: 73 GRADOS
RESTAURANT OUTDOOR SEATING AREA WATERFALL FEATURE OPEN TO ABOVE
2,03
ALO NS OD EM ON RO Y
PAVED PLATFORM
A-063
4,06 -3,50 - APZ
ESCALA: As indicated
TITULO Y CLAVE
REFLECTING POOL H
G
2,01
J
LEASABLE SPACE SUNKEN PATIO 30.625 m
2
RE AGUIR ISCO DE FRANC
3,02
I
F
16 July 2020 / page 45
A-064
0,80
3 2
1
LEVEL 1
CROQUIS DE LOCALIZACIÓN
WATERFALL FEATURE
CROQUIS DE LOCALIZACIÓN
DATOS DE LA CONSTRUCCIÓN:
A-063 sA-068
01
CONCRETE TR PLANTER RESTAURANT TERRACE
UP
ÁREA CONSTRUIDA BAJO NNT: 12,209.00 m2 NUMERO NIVELS BAJO NNT: 05 ÁREA CONSTRUIDA SOBRE NNT: 8,673.48 m2 NUMERO NIVELES SOBRE NNT: 08 OCUPACIÓN SUELO: 1,095 m2 SUPERFICIE EDIFICADA TOTAL: 20,822.48 m2
ALTURA MAX. PERMITIDA:
5
DN
3,523 m2 E-Am5 .30 .40
NORMATIVIDAD:
NO. D
4
A-064
A-064
TREE PLANTER BEYOND NORTH TERRACE,
2
UNDERGOUND SETBACK MINIMUM
SUPERFICIE TERRENO: ZONA: OCUPACIÓN SUELO: ÁREA LIBRE:
3
02
J
ALONSO DE CORDOVA
TREE PLANTER
CROQUIS
DN
2,68
3,00
DATOS DEL PREDIO:
4 1
sA-068
1:100
1 : 50
A-064
VIEW @ LOWER TERRACE LOOKING WEST PLANTER SECTION - WEST THROUGH PLANTER 3 1 : 50 sA-068 A-063
3
4
RESTAURANT TERRACE
ALONSO DE CORDOVA
PAVED PLATFORM
H
3,523 m2 E-Am5 .30 .40
PROPERTY LINE
01 PLANTER PLANTERSECTION SECTION@ - WEST THROUGH PLANTER
PLANTERS & LIGHTWELLS
© brandon haw architecture LLP
5
SUPERFICIE TERRENO: ZONA: OCUPACIÓN SUELO: ÁREA LIBRE:
DATOS DE LA CONSTRUCCIÓN: NOTE: ÁREA 4 CONSTRUIDA BAJO 1 3 NNT: 12,209.00 m2 2 NUMERO NIVELS BAJO NNT: 05 SPOT sA-068 A-063 A-063 NNT: 8,673.48 m2 sA-068 ÁREA CONSTRUIDA SOBRE H HEIGHTS/DATUMS I NUMERO NIVELES SOBRE NNT: 08 OF PLANTERS/WALLS OCUPACIÓN SUELO: 1,095 m2 SUPERFICIE EDIFICADA TOTAL: 20,822.48 m2 ARE FOR INFORMATION NORMATIVIDAD: PROYECTO: ONLY. CODE MINIMUM30.625 m 30.625 m ALTURA MAX. PERMITIDA: GUARDRAIL HEIGHTS SUPERFICIE CONSTRUIDA 8,455.00 m2 8,673.48 m2 SOBRE NNT: ARE TOPERMITIDA BE MAINTAINED. OCUPACIÓN SUELO PERMITIDO: 1,056.00 m2 1,095.50 m2 ALL SPOT ELEVATIONS FECHA: ESCALA: 1 : 25 SHOULDTITULO BE VERIFIED IN Y CLAVE 3 FIELD (VIF).
LIGHT WELLS OPEN TO BELOW, TYP
NOTA: NO PARA CONSTRUCCIÓN - ESTE DOCUMENTO FUE PREPARADO PARA TEMAS DE COORDINACIÓN DE DISEÑO Y CONCEPTOS
A-064
DATOS DEL PREDIO:
G
REFLECTING POOL
WELL
UNDERGOUND SETBACK MINIMUM
© brandon haw architecture LLP
RESTAURANT TERRACE
4
-3,50
STONE VENEER WALL PROPERTY LINE @ 2 DEGREE ANGLE
SECTION - WEST THROUGH LIGHT WELL
LEVEL 1
1 : 25
LEVEL S1
3,00
NOTA: NO PARA CONSTRUCCIÓN - ESTE DOCUMENTO FUE PREPARADO PARA TEMAS DE COORDINACIÓN DE DISEÑO Y CONCEPTOS
DN
4
WATERFALL WATER FEATURE BEYOND brandon haw architecture / Proyecto Francisco Aguirre / External Works Update
A-064
PAVED PLATFORM
CAVITY
2,15
0,45
SECTION - WEST THROUGH LIGHT WELL
DN
REFLECTING POOL
LEVEL S1
REVEAL
0,45
DN
3,00
PAVED PLATFORM
0,00
-3,50
WATERFALL WATER FEATURE BEYOND
WATERPROOFING MEMBRANES
REFLECTING POOL
LEVEL 1
LEVEL S1
0,00
LEVEL 2
WATERFALL FEATURE GLASS STRUCTURALLY GLAZED
1,20
1
LEVEL 1
SIDEWALK (HT. VARIES)
BRANDON HAW ARCHITECTURE, LLP 630 FLUSHING AVE, STUDIO 310 BROOKLYN, NY 11206 +1 (212) 300-8440
-3,50
W/ WATERPROOFING
RESTAURANT TERRACE
RESTAURANT TERRACE
150 mm STRUCTURAL WALL W/
GRUPO PATIO WATER PROOFING ALONSO DE CORDOVA 3788, PISO 2, VITACURA, SANTIAGO, CHILE +(56) 2 2979-6600
0,20
5 A-064
CONCRETE TREE 150 PLANTER mm STRUCTURAL WALL
05 JUN 2020
CONCRETE TREE PLANTER
COPING STONE W/ MILLED CHAMFER
FECHA
50 mm Ø WATER SUPPLY PIPE 01 100% SCHEMATIC DESIGN
4,50
21 MAYO 2020
PROPERTY LINE PROYECTO:
0,20
NO. DESCRIPCIÓN 4 A-064
FECHA
SCHEMATIC DESIGN
UNDERGROUND SETBACK
0,20
NORTE: 73 GRADOS
0,20
0,80
0,30
WATER SUPPLY NOZZLE
NO. DESCRIPCIÓN
01
OPEN SLAT CEILING 50 mm. GAP
0,30 0,20
4,50
LEVEL 2
4,50
15 mm. LAM. GLASS RAILING
0,04
ALO NS OD EM ON RO Y
CLIENTE
ARQUITE
STL. OR ALUM. CAP
0,06
ALONSO DE CORDOVA
WATER THROUGH CNC-MILLED STONE
PROYEC
1FRA
4
NORTE: 73 GRADOS
FRANCISCO AGUIRREWATER THROUGH CNC-MILLED STONE
PROJECT LVL +0,00
DETAIL @ WATERFALL T.O. WALL
DT_WATERFALL
LEVEL 2
RESTAURANT TERRACE
RE AGUIR ISCO DE FRANC
IRRE DE AGU
ALO NS OD EM ON RO Y
TREE PLANTER BEYOND
PIN W/ GROUT
LEVEL 2
3
4
4
H PLANTER
1:50
1 : 25
LEVEL S1
COPING STONE
SCO FRANCI
ALONSO DE CORDOVA
2
-3,50
01. DETAIL @ PLANTER
PLANTER SECTION - WEST THROUGH PLANTER
G
4
A-064
DATOS DE
VIEW @ LOW
SUPERFIC ZONA: OCUPACI ÁREA LIB
DATOS D
ÁREA CO NUMERO ÁREA CO NUMERO OCUPAC SUPERFI
5 A-064
H
1
4 1 sA-068 A-063
NORMAT
LE
A sA
ALTURA M
SUPERFI PERMITID
OCUPAC
FECHA:
TITUL
FLO O R PLAN - L
400 COLLINS CARPARK + CONDOMINIUMS Office Project Site: Miami Beach, Florida, USA 2018 - 2020 Located in a primarily residential section of South Beach, 400 Collins is a mixed-use development, consisting of ground-floor retail, 3 levels of car parking, and 3 levels of residential condominiums. Serving as a primaryuse carpark permits the project to increase its development area, yet special care was taken to integrate the project into the existing fabric of the historic neighborhood. Based on analyses of the color and architectural palette established by the Miami Beach Preservation League to preserve and promote the art deco heritage of the area, 400 Collins is a contemporary response to the rich architectural fabric of the neighborhood. The prime focus of the building is a unique, vertical cladding system enclosing the parking garage. The distinctive, double-fin design features white outside fins coupled with interior fins painted a different color on each level to match the pastel palette of the surrounding neighborhood. The interior color reflects color from within to offer a hint of color without overtly expressing it. Fins are spaced to prevent people from seeing headlights of the cars within the parking garage while still allowing the parking garage to be completely naturally ventilated. I served as the senior architect on this project, leading design studies, zoning analyses, as well as preparing all presentations for zoning board approvals. I was proud to present this project which received unanimous approval from the Miami Beach Planning Board as well as the Miami Beach Historic Preservation Board.
PROJECT
ARCH D 36"x24"
TORINO GARAGE 400 COLLINS AVE., MIAMI BEACH, FL 33139 Owner: Savoy Hotel Partners, LLC c/o Allied Partners 770 Lexington Ave 17th Floor New York, NY 10065-8165
ARCH D 36"x24"
PROJECT
TORIN
400 COLLIN FL 33139
Architect: Brandon Haw Architecture LLP 375 Park Avenue, Suite 3308 New York, NY 10152 License # AA26003249
Owner: Savoy Hote c/o Allied Pa 770 Lexingto 17th Floor New York, N
CONSULTANTS Structural Engineer: DeSimone 800 Brickell Avenue, 6th Floor Miami, FL 33131
Architect: Brandon Ha 375 Park Av New York, N License # A
MEP Engineer: Stantec 3915 Biscayne Blvd, Suite 401 Miami, FL 33137-3737
CONSULTANT
Structural E DeSimone 800 Brickell Miami, FL 3
Civil Engineer: VSN Engineering, Inc. 8660 W. Flagler Street, Suite 113 Miami, FL 33144
MEP Engine Stantec 3915 Biscay Miami, FL 3
Geo-tech Engineer: Langan 15150 NW 79th Court, Suite 200 Miami Lakes, FL 33016-5848
Civil Engine VSN Engine 8660 W. Fla Miami, FL 3
Life Safety Consultant: SLS Consulting, Inc. 260 Palermo Avenue Coral Gables, FL 33134
Geo-tech En Langan 15150 NW 7 Miami Lakes
Parking Consultant: Timothy Haahs & Associates, Inc. 40 NW 3rd Street, Suite 1102 Miami, FL 33128
Life Safety C SLS Consul 260 Palermo Coral Gable
Parking Con Timothy Haa 40 NW 3rd S Miami, FL 3
Elevator Consultant: Van Deusen & Associates, Inc. 8201 Peters Road, Suite 1000 Plantation, FL 33324
Elevator Co Van Deusen 8201 Peters Plantation, F
Acoustic Consultant: Electro-Media Design, Ltd. 973-C Russell Avenue Gaithersburg, MD 20879
Acoustic Co Electro-Med 973-C Russ Gaithersbur
Landscape Architect: Naturalficial, Inc. 6915 Red Road, Suite 224 Coral Gables, FL 33143 Contact: Andres Arcila O: 786.717.6564 / M: 305.321.2341 Firm Reg. No. LC26000548
NO. 1 2
DESCRIPTION
PLANNING BOARD FIRST SUBMITTAL PLANNING BOARD FINAL SUBMITTAL
DATE OF ISSUE 04/08/19 SCALE
Landscape Naturalficial 6915 Red R Coral Gable Contact: An O: 786.717. Firm Reg. N
DATE April 8, 2019 April 26, 2019
NO. 1 2
DRAWN BY
DESC
PLANNING BO PLANNING BO
DATE OF ISSUE
-
04/08/19
CHECKED BY -
SCALE PROJECT NO.
PROJECT NO. & TITLE
1507 TORINO
1507 TORINO GARAGE
PROJECT STAT PLANNING BO
PROJECT STATUS PLANNING BOARD FINAL SUBMITTAL
KEY PLAN
KEY PLAN
SCALE & ORIE
SCALE & ORIENTATION
TRUE NORTH: 10.78 DE
SCALE AS NOT
TRUE NORTH: 10.78 DEG
GRAPHIC SCALE (AS R
SCALE AS NOTED
SEAL & SIGNA
GRAPHIC SCALE (AS REQ'D)
This document has b purposes only. No wa adequacy for constru
© Brandon Haw Arch
SEAL & SIGNATURE This document has been prepared for creative, conceptual or planning purposes only. No warranties are made regarding the design or its adequacy for construction or other purposes. © Brandon Haw Architecture LLP 2019
DRAWING TITL
PB A-
HISTORICA
HISTORICAL CONTEXT - COLOR
DRAWING TITLE
PB A-072
HISTORICAL CONTEXT - COLOR HISTORICAL CONTEXT - COLOR
NOT FOR CONSTRUCTION
ARCHITECTURAL FEATURE AND COLOR STUDIES
NOT FOR CONSTRUCTION
WHITE OUTER FINS PROJECT COLORED SIDE AS SEEN FROM OF INNER FINS TORINO GARAGE STREET SIDE VISIBLE INNER FIN SPACING = 4-1/8" 400 COLLINS AVE., MIAMI BEACH,
WHITE OUTER FINS AS SEEN FROM STREET SIDE
COLORED SIDE OF INNER FINS VISIBLE
2.06"
4.13"
4.13"
4.13"
4.13"
4.13"
4.13"
4.13"
4.13"
4.13"
4.13"
4.13"
4.13"
4.13"
4.13"
4.13"
2.06"
TYPE A
0' - 1"
0' - 8"
0' - 3 1/2"
COLORED SIDE OF INNER FINS VISIBLE
2.06"
4.13"
4.13"
4.13"
4.13"
4.13"
4.13"
4.13"
4.13"
4.13"
4.13"
4.13"
4.13"
4.13"
4.13"
4.13"
CONSULTANTS Structural Engineer: DeSimone 800 Brickell Avenue, 6th Floor Miami, FL 33131 MEP Engineer: Stantec 3915 Biscayne Blvd, Suite 401 Miami, FL 33137-3737
2.06"
5' - 6"
1.6 3
. = 38.83%
1.6 3
"
1.6 3
"
1.6 3
"
1.6 3
"
1.6 3
"
1.6 3
"
1.6 3
"
1.6 3
"
1.6 3
"
1.6 3
"
1.6 3
"
1.6 3
"
1.6 3
"
Civil Engineer: VSN Engineering, Inc. 8660 W. Flagler Street, Suite 113 Miami, FL 33144
"
Geo-tech Engineer: Langan 15150 NW 79th Court, Suite 200 Miami Lakes, FL 33016-5848
OUTER FIN SPACING = 4-1/8"
TOTAL MIN. WIDTH AIR PASSAGES PER PANEL = 1.63" x 15 = 24.45" PANEL WIDTH = 66.00" OPEN AIR RATIO = 24.45 / 66 = 37.05%
ARCH D 36"x24"
1.6 3
"
Life Safety Consultant: SLS Consulting, Inc. 260 Palermo Avenue Coral Gables, FL 33134
ARCH D 36"x24"
3" = 1'-0"
. = 38.87%
4.71"
4.71"
4.71"
4.71"
4.71"
4.71"
4.71"
2.2 0"
2.2 0"
2.2 0"
2.2 0"
2.2 0"
2.2 0"
2.2 0"
2.2 0"
2.2 0"
2.2 0"
2.2 0"
2.2 0"
2.2 0"
4.71"
4.71"
4.71"
4.71"
4.71"
NO.
TYPE B
1 2
DESCRIPTION
CONSULTANTS DATE
HPB FIRST SUBMITTAL HPB FINAL SUBMITTAL
April 15, 2019 May 6, 2019
0' - 3 1/2"
0' - 8"
Architect: Brandon Haw 375 Park Ave New York, NY License # AA2
Landscape Architect: Naturalficial, Inc. 6915 Red Road, Suite 224 Coral Gables, FL 33143 Contact: Andres Arcila O: 786.717.6564 / M: 305.321.2341 Firm Reg. No. LC26000548
1.78"
0' - 1"
400 COLLINS FL 33139
Owner: Savoy Hotel P c/o Allied Part 770 Lexington 17th Floor New York, NY
Acoustic Consultant: Electro-Media Design, Ltd. 973-C Russell Avenue Gaithersburg, MD 20879
0.58"
0' - 3 1/2"
. = 38.80%
4.71"
TORIN
Elevator Consultant: Van Deusen & Associates, Inc. 8201 Peters Road, Suite 1000 Plantation, FL 33324
INNER FIN SPACING = 4-11/16" (4.71")
2.93"
PROJECT
Parking Consultant: Timothy Haahs & Associates, Inc. 40 NW 3rd Street, Suite 1102 Miami, FL 33128
FIN PANEL - TYPE A - DETAIL PLAN
1
COLORED SIDE OF INNER FINS VISIBLE
Architect: Brandon Haw Architecture LLP 375 Park Avenue, Suite 3308 New York, NY 10152 License # AA26003249
0' - 3 1/2"
ercent of the buted over
Owner: Savoy Hotel Partners, LLC c/o Allied Partners 770 Lexington Ave 17th Floor New York, NY 10065-8165
1.8 7"
1.8 7"
1.8 7"
1.8 7"
1.8 7"
1.8 7"
1.8 7"
1.8 7"
1.8 7"
1.8 7"
1.8 7"
1.8 7"
1.8 7"
1.8 7"
1.8 7"
FL 33139
shall have such he total nings nimum of 40 20 percent
ERED IN SE
2.36"
4.71"
4.71"
4.71"
4.71"
4.71"
4.71"
4.71"
4.71"
4.71"
4.71"
4.71"
4.71"
4.71"
OUTER WHITE FINS OUTER FINS INSIDE AS SEEN FACEFROM WITH COLOR STREET SIDE *NOTE THAT INNER FINS HAVE BEEN REMOVED FOR THIS PHOTO
WHITE OUTER FINS AS SEEN FROM STREET SIDE
2.36"
66.00"
2.1 1
2.1 1
"
2.1 1
"
2.1 1
"
2.1 1
"
2.1 1
"
2.1 1
"
2.1 1
"
2.1 1
"
2.1 1
"
2.1 1
"
2.1 1
"
2.1 1
"
DATE OF ISSUE
"
04/15/19
05,
FIN PANEL - TYPE B - DETAIL PLAN
2
MEP Enginee Stantec 3915 Biscayn Miami, FL 331
Civil Enginee VSN Enginee 8660 W. Flag Miami, FL 331
Geo-tech Eng Langan 15150 NW 79
DRAWN BY -
1 MOCK-UP MODELCHECKED PHOTO -PHOTO FRONT- VIEW FROMVIEW STREET 1 MOCK-UP MODEL PHOTO - FRONT VIEW FROM STREET 2 MOCK-UP MODEL DIAGONAL SCALE BY OUTER FIN SPACING = 4-11/16" (4.71") TOTAL MIN. WIDTH AIR PASSAGES PER PANEL = 2.11" x 13 = 27.43" As indicated WHITE OUTER FINS COLORED SIDE WHITE OUTER FINS COLORED SIDE PANEL WIDTH = 66.00" PROJECT NO. & TITLE AS SEEN FROM OF INNER FINS AS SEEN FROM OF INNER FINS OPEN AIR RATIO = 27.43 / 66 = 41.56% 1507 TORINO GARAGE STREET SIDE VISIBLE STREET SIDE VISIBLE PROJECT STATUS
OUVER
Structural En DeSimone 800 Brickell A Miami, FL 331
Miami Lakes, 23MOCK-UP VIEW MOCK-UPMODEL MODE MOCK-UPMODEL MODELPHOTO PHOTO--DIAGONAL REAR VIEW FROM 43MOCK-UP Life Safety Co SLS Consultin PARKING SIDE W/ PARKING SIDE W/ INNER FINS REMOVED OUTER FINS 260 Palermo A Coral Gables, W/ COLORED FACE Parking Cons Timothy Haah VISIBLE ON THE INTERIOR
40 NW 3rd St Miami, FL 331
PLANNING BOARD FINAL SUBMITTAL
3" = 1'-0"
Elevator Con Van Deusen & 8201 Peters R Plantation, FL
3.00"
4.00"
3.00"
4.00"
4.00"
3.00"
4.00"
4.00"
3.00"
4.00"
4.00"
3.00"
0.60"
4.00"
Landscape A Naturalficial, I 6915 Red Roa Coral Gables, Contact: Andr O: 786.717.65 Firm Reg. No.
1.7 9"
1.2 2"
1.7 9"
1.7 9"
1.2 2"
1.7 9"
1.7 9"
1.2 2"
1.7 9"
1.7 9"
1.2 2"
1.7 9"
1.7 9"
1.2 2"
4.00"
Acoustic Con Electro-Media 973-C Russel Gaithersburg,
INNER FINS VISIBLE
4.00"
3.00"
4.00"
2.17"
NO.
0' - 1"
TYPE C
1 2
SCALE & ORIENTATION
DESCR
PLANNING BOA PLANNING BOA
0' - 3 1/2"
R1
/4"
0' - 8"
0' -
01
/2"
0' - 3 1/2"
1.83"
INNER FIN SPACING = ... 3",COLORED 4", 4"... SIDE OF
COLORED SIDE OF INNER FINS VISIBLE
2.2 9"
2.2 9"
INNER FIN
1.7 2"
KEY PLAN
2.73"
0' - 5 1/2"
5.50"
5.50"
5.50"
5.50"
5.50"
5.50"
5.50"
5.50"
5.50"
5.50"
2.77"
5' - 6"
2.7 6
"
2.7 6
2.7 6
"
2.7 6
"
2.7 6
"
"
2.7 6
"
TRUE NORTH: 10.78 DEG 2.7 6
2.7 6
"
"
2.7 6
"
2.7 6
"
2.7 6
"
SCALE AS NOTED GRAPHIC SCALE (AS REQ'D)
OUTER FIN
TOTAL MIN. WIDTH AIR PASSAGES PER PANEL = 2.76" x 6 + 1.79" x 5 = 25.51" PANEL WIDTH = 66.00" OPEN AIR RATIO = 25.51 / 66 = 38.65%
OUTER FIN SPACING = 5 -1/2"
DATE OF ISSUE 04/08/19
SEAL & SIGNATURE
SCALE
This document has been prepared for creative, conceptual or planning purposes only. No warranties are made regarding the design or its adequacy for construction or other purposes. © Brandon Haw Architecture LLP 2019
3
FIN PANEL - TYPE C - DETAIL PLAN
0
3" = 1'-0"
3" = 1'-0"
3"
6"
PROJECT NO. &
1507 TORINO G
1'
PROJECT STATU PLANNING BOA KEY PLAN
LINE OF SIGHT AIR PASSAGE WHITE OUTER FINS
AS SEEN FROM MINIMUM AIR PASSAGE WIDTH PER FIN MODULE DIMENSIONED IN RED. STREET SIDE NOT FOR CONSTRUCTION
DRAWING TITLE
HPB A-670
ENCLOSURE DETAILS - FINS
OUTER FINS OUTER FINS WHITE INSIDEAS FACE WITH COLOR SEEN FROM STREET SIDE *NOTE THAT INNER FINS HAVE BEEN REMOVED FOR THIS PHOTO
OUTER FINS INSIDE FACE WITH COLOR *NOTE THAT INNER FINS HAVE BEEN REMOVED FOR THIS PHOTO
PARKING GARAGE ENCLOSURE - DOUBLE FIN EXTRUDED ALUMINUM SYSTEM 1 MOCK-UP MODEL PHOTO - FRONT VIEW FROM STREET1 MOCK-UP 2 MOCK-UP MODEL MODEL PHOTO PHOTO - FRONT - DIAGONAL VIEW FROM VIEWSTREET 3 MOCK-UP 2 MOCK-UP MODEL MODEL PHOTO PHOTO - REAR - DIAGONAL VIEW FROM VIEW PARKING SIDE W/ INNER FINS REMOVED
4 MOCK-UP 3 MOCK-UP MODEL MODEL PHOTO PHOTO - FROM - REAR TOPVIEW OF MODEL FROM PARKING SIDE W/ INNER FINS REMOVED
SCALE & ORIEN
4 MOCK-UP MODEL P
PARKING GARAGE FIN STUDIES TRUE NORTH: 10.78 DEG
SCALE AS NOTE
GRAPHIC SCALE (AS REQ
SEAL & SIGNAT
COLLINS AVENUE
PROPERTY LINE
5'-0" COMM. PEDESTAL AND TOWER REAR SETBACK
MAX. ALLOWED HEIGHT TO TOP OF BULKHEAD NGVD +109'-0"
PROPERTY LINE
COLLINS COURT
ARCH D 36"x24"
25' - 0"
5' - 0"
3' - 0"
MAX. ALLOWED ROOF HEIGHT WITH PROPOSED VARIANCE NGVD +87'-0" MAX. ALLOWED HEIGHT TO TOP OF RESIDENTIAL ROOF NGVD +84'-0"
MAX. ALLOWED HEIGHT TO TOP OF PARKING NGVD +59'-0"
50' - 0"
75' - 0"
NOTE: CONTEXT BUILDING HEIGHTS ESTIMATED FROM PHOTOGRAPHS TAKEN MARCH 12, 2019
1' - 10" 1' - 0"
+1'-0" FREE BOARD NGVD +9'-0" BASE FLOOD ELEVATION NGVD +8'-0"
PROPOSED SITE ELEVATION - SOUTH
MAX.CONSULTANTS ALLOWED HEIGHT TO TOP OF BULKHEAD NGVD +109'-0" Structural Engineer:
5' - 0"
3' - 1 1/2"
PROPERTY LINE
3' - 0"
MEP Engineer: Stantec
15' - 4"
13' - 0"
25' - 0"
25' - 0"
MAX. ALLOWED HEIGHT TO TOP OF RESIDENTIAL ROOF NGVD +84'-0"
3' - 9"
DeSimone 800 Brickell Avenue, 6th Floor Miami, FL 33131
MAX. ALLOWED HEIGHT 3915 BiscayneROOF Blvd, Suite 401 Miami, FL 33137-3737 WITH PROPOSED VARIANCE Civil Engineer: NGVD +87'-0"
3'-9" ALLOWED BALCONY PROJECTION
Architect: Brandon Haw Architecture LLP 375 Park Avenue, Suite 3308 New York, NY 10152 License # AA26003249
3' - 0"
MAX. ALLOWED ROOF HEIGHT WITH PROPOSED VARIANCE NGVD +87'-0"
4TH STREET
COLLINS AVENUE
PROPERTY LINE
Owner: Savoy Hotel Partners, LLC c/o Allied Partners 770 Lexington Ave 17th Floor New York, NY 10065-8165
PROPERTY LINE
400 COLLINS AVE., MIAMI BEACH, FL 33139
5'-0" COMM. PEDESTAL AND TOWER REAR SETBACK
MAX. ALLOWED HEIGHT TO TOP OF BULKHEAD NGVD +109'-0"
PROPERTY LINE
COLLINS COURT
TORINO GARAGE
15'-4" RES. TOWER INT. SIDE SETBACK
PROJECT
12'-10" RES. TOWER STREET SIDE SETBACK
1/16" = 1'-0"
3'-1 1/2" ALLOWED BALCONY PROJECTION
2
VSN Engineering, Inc. 8660 W. Flagler Street, Suite 113
MAX. ALLOWED HEIGHT TO TOP OF RESIDENTIAL ROOF Miami, FL 33144 NGVD +84'-0" Geo-tech Engineer: Langan 15150 NW 79th Court, Suite 200 Miami Lakes, FL 33016-5848 Life Safety Consultant: SLS Consulting, Inc. 260 Palermo Avenue Coral Gables, FL 33134 Parking Consultant: MAX. ALLOWED HEIGHT TO TOP OF PARKING Timothy Haahs & Associates, Inc. NGVD +59'-0" 40 NW 3rd Street, Suite 1102
50' - 0"
50' - 0"
2
Acoustic Consultant: Electro-Media Design, Ltd. 973-C Russell Avenue Gaithersburg, MD 20879 Landscape Architect: Naturalficial, Inc. 6915 Red Road, Suite 224 Coral Gables, FL 33143 Contact: Andres Arcila O: 786.717.6564 / M: 305.321.2341 FREE BOARD Firm Reg. No. LC26000548
+1'-0" NGVD +9'-0"
1' - 0"
BASE FLOOD ELEVATION NGVD +8'-0"
Elevator Consultant: Van Deusen & Associates, Inc. 8201 Peters Road, Suite 1000 Plantation, FL 33324
NOTE: CONTEXT BUILDING HEIGHTS ESTIMATED FROM PHOTOGRAPHS TAKEN MARCH 12, 2019
1' - 10"
+1'-0" FREE BOARD NGVD +9'-0"
75' - 0"
75' - 0"
Miami, FL 33128
NO.
DESCRIPTION
DATE
1 HPB FIRST SUBMITTAL BASE FLOOD ELEVATION 2 HPB FINAL SUBMITTAL NGVD +8'-0"
1
PROPOSED SITE ELEVATION - SOUTH
PROPOSED SITE ELEVATION - EAST
0
1/16" = 1'-0"
1/16" = 1'-0"
8'
April 15, 2019 May 6, 2019
16'
1' - 0"
MAX. ALLOWED HEIGHT TO TOP OF PARKING NGVD +59'-0" NOTE: CONTEXT BUILDING HEIGHTS ESTIMATED FROM PHOTOGRAPHS TAKEN MARCH 12, 2019
32'
1/16" = 1'-0"
MAX. ALLOWED HEIGHT TO TOP OF BULKHEAD NGVD +109'-0"
PROPERTY LINE
3'-9" ALLOWED BALCONY PROJECTION
04/15/19 SCALE 1/16" = 1'-0"
NOT FOR CON
DRAWN BY CHECKED BY -
SITE ELEVATION - EAST PROJECT NO. & TITLE
1507 TORINO GARAGE
PROJECT STATUS PLANNING BOARD FINAL SUBMITTAL KEY PLAN
3' - 9" 3' - 1 1/2"
15' - 4"
25' - 0"
13' - 0"
3' - 0"
MAX. ALLOWED ROOF HEIGHT WITH PROPOSED VARIANCE NGVD +87'-0"
15'-4" RES. TOWER INT. SIDE SETBACK
12'-10" RES. TOWER STREET SIDE SETBACK
3'-1 1/2" ALLOWED BALCONY PROJECTION
SITE ELEVATION - SOUTH
PROPERTY LINE
4TH STREET
DATE OF ISSUE
MAX. ALLOWED HEIGHT TO TOP OF RESIDENTIAL ROOF NGVD +84'-0"
SCALE & ORIENTATION
MAX. ALLOWED HEIGHT TO TOP OF PARKING NGVD +59'-0" 75' - 0"
TRUE NORTH: 10.78 DEG
NOTE: CONTEXT BUILDING HEIGHTS ESTIMATED FROM PHOTOGRAPHS TAKEN MARCH 12, 2019
SCALE AS NOTED
50' - 0"
GRAPHIC SCALE (AS REQ'D)
SEAL & SIGNATURE This document has been prepared for creative, conceptual or planning purposes only . No warranties are made regarding t he design or its adequacy for construction or other purposes. © Brandon Haw Architecture LLP 2019
1' - 0"
+1'-0" FREE BOARD NGVD +9'-0" BASE FLOOD ELEVATION NGVD +8'-0"
DRAWING TITLE
1
PROPOSED SITE ELEVATION - EAST
0
1/16" = 1'-0"
1/16" = 1'-0"
8'
16'
HPB A-060
32'
NOT FOR CONSTRUCTION
PROPOSED SITE ELEVATION SOUTH & EAST
SITE ELEVATIONS
ALUMINUM EXTRUSION BALUSTRADE
EXTERIOR & INTERIOR TERRAZZO FLOORING EXTERIOR & INTERIOR TERRAZZO FLOORING
ALUMINUM EXTRUSION BALUSTRADE
SATIN WHITE & MULTI-COLORED ALUMINUM FIN WHITE FACADE SATIN & MULTI-COLORED ALUMINUM FIN FACADE
PROJECT B
CONCRETE WALL ALUMINUM EXTRUSION SCREEN W/ 2-COAT MASONRY
TORINO GARAGE
INT
1
COATING SYSTEM
STRUCTURAL COLUMN
ALUMINUM EXTRUSION SCREEN
HALFEN CHANNEL OR APPROVED EQUIV. INTERMITTENTLY SPACED AS REQ'D PAINTED TO MATCH MASONRY COAT TINTING
TRM-102
DECO. LOUVER LINE OF BTM FRAME (BELOW)
5
DETAIL - EWS-302 - LOUVER PLAN
0
3" = 1'-0"
3" = 1'-0"
3"
6"
INFILL LOUVERS AND CONDOMINIUM RAIL DETAIL TRUDED ALUMINUM FINS
1'
EWS-302
0' - 5" 0' - 1"
CAVITY
EXT
6
CAVITY
400 COLLINS AVE., MIAMI BEACH, FL 33139
ENCLOSURE KEYNOTE LEGEND EXTRUDED ALUMINUM LOUVER SYSTEM, PAINTED STUCCO F REVEAL MOLDING
TERMINATION CHANNEL FIXED TO MASONRY WALL BEHIND BY INTERMITTENLY SPACED ANCHORS
1' - 9 1/2"
DETAIL - EWS-302 @ VERT TERMINATION CHANNEL
0
1 1/2" = 1'-0"
1 1/2" = 1'-0"
3"
6"
12"
Owner: Savoy Hotel Partners, LLC c/o Allied Partners 770 Lexington Ave 17th Floor New York, NY 10065-8165 Architect: Brandon Haw Architecture LLP 375 Park Avenue, Suite 3308 New York, NY 10152 License # AA26003249
CONSULTANTS Structural Engineer: DeSimone 800 Brickell Avenue, 6th Floor Miami, FL 33131 MEP Engineer: Stantec 3915 Biscayne Blvd, Suite 401 Miami, FL 33137-3737 Civil Engineer: VSN Engineering, Inc. 8660 W. Flagler Street, Suite 113 Miami, FL 33144
2'
1
Geo-tech Engineer: Langan 15150 NW 79th Court, Suite 200 Miami Lakes, FL 33016-5848 Life Safety Consultant: SLS Consulting, Inc. 260 Palermo Avenue Coral Gables, FL 33134
BUSINESS PARK AMENITY BUILDINGS Office Project Site: Irvine, California, USA 2017 - 2018 Consisting of a three-phase business park development in Irvine, I served as Project Architect for the exterior envelope of four destination amenity buildings within the development: a cafe, fitness center, conference center, and food hall with various vendors. The Cafe and Fitness Center, in Phase I, follow a similar language to adjacent office buildings of curtain wall construction with minimal frame profiles and low-e glass. However, they both introduces operable walls and refined mechanical wells to hide all site mechanicals for the project due to their visibility from adjacent offices. Phase II’s amenity, a Conference Center, is based off a pinwheel concept, where the main, dividable conference space is in the center and affiliated services radiate outwards. Both outside walls of the conference center are designed to open up similar to garage doors, uniting the interiors with adjacent cantilevered patio overhangs. Wood-like flooring continues from the inside out to the surrounding patios. Phase III consists of an expressed concrete structure, with shear walls anchoring 2 corners and supporting a 2-way concrete slab. The concrete is expressed wherever possible, giving the building a more industrial, lived-in feel. Inside, individual pods house various food vendors as well as WCs and mechanicals. I served throughout all phases of design, working with the associate architect for the interiors, as well as consultants, and the client.
SHIMMING AS NECESSARY
9"
WEEP HOLE
SLOPE 1/8" PER 1'-0"
3/4"
3 5/8"
AL-3
f. 949. 260.1190 e. lpa@lpainc.com
SLOPE 1/8" PER 1'-0"
1' - 9"
S-5
PARAPET 19' - 0"
3 5/8"
WEEP HOLE
ROOFING DETAILS BY OTHERS
2' - 3"
2' - 3"
ROOFING DETAILS BY OTHERS
2' - 3"
3/4"
D.1
1' - 1" 9"
3 5/8"
SLOPE 1/8" PER 1'-0"
AL-3
3/4"
WEEP HOLE
5"
AL-3
1' - 9"
9"
p. 949. 261.1001 w. lpainc.com
5
E 1' - 9"
STRUCTURAL BEAM REFER TO STRUCTURAL DWGS FOR DETAILS 88 Pine Street New York, NY 10005 (212) 751-3122
STRUCTURAL STEEL BEAM REFER TO STRUCTURAL DWGS FOR DETAILS INTERIORS BY OTHERS
AL-3
AL-3
3/8" 3/8"
3/8" 3/8"
STRUCTURAL BEAM REFER TO STRUCTURAL DWGS FOR DETAILS
1 3/4"
1 3/4"
AL-1
ML 1 3/4"
ML
ML
THERMAL INSULATION
3/8" 3/8"
AL-3
AL-1
AL-1
AL-2 GL-6.1
STRUCTURAL STEEL COLUMN REFER TO STRUCTURAL DWGS FOR DETAILS
GL-6.1
GL-6.1
INTERIORS BY OTHERS
AL-2
INTERIORS BY OTHERS
1/2"
ML
1 1/8" 7/16" 3 15/16"
4"
6"
6"
1/2"
ML
11"
1 1/8"1 21/32"
4"
2 23/32"
1/2"
6"
11"
1 1/8"
7/16"
6 1/2"
7 15/16" 10"
11"
ML 3" = 1'-0" REF: 1 / 2E-A811
3" = 1'-0" REF: 1 / 2E-A816
2E-A871
ML
ML
4"
1/2"
6"
ML
11"
2E-A871
ML
4"
1/2"
1 1/8"
SECTION DETAIL
6" 1 1/8" 1 21/32"
11"
3" = 1'-0" REF: 1 / 2E-A814
ML
6 1/2"
2 23/32"
1/2"
GL-6.1
10" 1 1/8"
10 15/16"
8 3/8"
AL-2
12' - 0" TO GROUND
AL-2
1 5/8" 6 1/2" 1/4" 1/4"
AL-1
GL-6.1
Date
GL-6.2
3/8"
ML 12' - 0" TO GROUND
1 5/8"
1 3/4"
ML
AL-2
1 5/8"
ML 12' - 0" TO GROUND
4' - 2" TO ML
7"
3/8"
1/4" 1/4"
3/8" 3/8"
NOTCH VERTICAL, BEYOND
AL-2
6 1/4"
AL-2
3/8" 3/8"
7"
6 1/4"
6 1/2"
7"
6 1/4"
AL-2
NOTCH VERTICAL, BEYOND
AL-1
1 3/4"
3/8" 3/8"
3/8" 3/8"
ML
AL-2 AL-2
AL-2
AL-1
1/4" 1/4"
ML
1/4" 1/4"
3/8" 3/8"
INTERIORS BY OTHERS
AL-1
1 3/4"
1/16"
ML
4' - 2" TO ML
AL-1
DRAIN TO VERTICAL EXTRUSIONS
1 3/4"
AL-2
1 5/8"
1 3/4"
4' - 2" TO ML
GL-6.1 GL-6.1
DRAIN TO VERTICAL EXTRUSIONS
Developed for:
2E-A871
8
SECTION DETAIL
17400 - 17600 LAGUNA CANYON RD. IRVINE, CA
6
SECTION DETAIL
SPECTRUM TERRACE PHASE 2
3
7/16"
ML
11"
7 15/16"
1/16"
2E-A871
10" 7 7/32"
11" 2 23/32"
SECTION DETAIL 3" = 1'-0" REF: 1 / 2E-A814
MATERIAL LEGEND
TYPE
DESCRIPTION
AL-1 AL-2 AL-3 GL-6.1
ALUMINUM EXTRUSION, POLISHED, ANODIZED ALUMINUM EXTRUSION, PAINTED ALUMINUM SHEET, PAINTED LOW IRON, LOW-E, FT-FT INSULATED GLASS UNIT (SAFETY), VZRE13-54, U-VALUE 0.29, SHGC 0.26, VT 42% LOW IRON, LOW-E, FT-FT INSULATED GLASS UNIT (SAFETY), VZRE13-54, U-VALUE 0.29, SHGC 0.19, VT 28%, WITH OPAQUE CERAMIC FRIT (PATTERN TBD) STEEL BAR GRATING, GALVANIZED
GL-6.2 S-5
07.30.18
10" 1 1/8"
3" = 1'-0" REF: 1 / 2E-A816
1ST AGENCY SUBMITTAL
ML
7
SECTION DETAIL
Description
2E-A871
Revision
3" = 1'-0" REF: 1 / 2E-A811
11"
Date
5
SECTION DETAIL
1/2"
2 23/32" 10"
03.16.18
2 2E-A871
7 7/32"
11"
05.04.18
10"
SD SUBMITTAL
1/16"
1 1/8"
DD SUBMITTAL
1/2"
GL-6.1 AL-2
AL-2
1 5/8"
3/4"
1/8"
3/4" 1 3/4"
1 3/4"
3/8"
7"
2B
1' - 0"
1
SECTION DETAIL 3" = 1'-0" REF: 1 / 2E-A811
2E
STEEL EMBED
1 5/8"
1/4" x 9" LONG SMOOTH SS DOWEL
3/8"
7"
1' - 0"
2A
17520
Scale
C
3" =
SECTION DETAI
2C
17600
17400
4 2E-A871
SECTION DETAIL 3" = 1'-0" REF: 1 / 2E-A816
KEY PLAN
SAMPLE DETAILS
Job. No. Checked by
17500
1/4" x 9" LONG SMOOTH SS DOWEL
2E-A871
2D 17540
1 3/4"
INTERIOR FINISH BY OTHERS STEEL EMBED
INTERIOR FINISH BY OTHERS
Submittal
1/4" WIDE EXPANSION FOAM WITH SANDED SEALANT
1/8"
1/4" WIDE EXPANSION FOAM WITH SANDED SEALANT
4 3/8"
CONTINUOUS SS FLASHING & CURB WATERPROOFING
4 3/8"
AL-2
CONTINUOUS SS FLASHING & CURB WATERPROOFING
N
AL-1
2E-A871
1/2"
1 1/8"
3 11/16"
SPECTRUM TERRAC LAGUNA CANYON RD 00733169-CN
2 11/16"
C MATERIAL LEGEND
TYPE
DESCRIPTION
AL-1 GL-2.1 GL-4.2
ALUMINUM EXTRUSION, POLISHED, ANODIZED LOW IRON, LOW-E, FT-FT LAMINATED GLASS UNIT (SAFETY), VE13-85, U-VALUE 0.97, SHGC 0.65 LOW IRON, LOW-E, FT-FT INSULATED GLASS UNIT (SAFETY), VRE13-54, WITH OPAQUE CERAMIC FRIT (PATTERN TBD) LOW IRON, LOW-E, FT-FT INSULATED GLASS UNIT (SAFETY), VUE1-50, WITH 40% OPAQUE CERAMIC FRIT (PATTERN TBD) STAINLESS STEEL SHEET, #6 FINISH. LONG GRAIN STAINLESS STEEL SHEET, #6 FINISH, ANGEL HAIR GRAY GRANITE, HONED, WALL AND THRESHOLD STONE
GL-7.2 SS-6 SS-7 ST-3
Design Architect
PEI COBB FREED & PARTNERS Archite 88 Pine Street | New York, NY 10005 (212) 751-3122
Associate Architect
LPA, Inc. 5161 California Ave., Suite 100 | Irvine, C (949) 261-1001
Landscape Architect
BURTON LANDSCAPE ARCHITECTURE 307 S. Cedros Avenue | Solana Beach, C (858) 794-7204
Civil Engineer STANTEC 38 Technology Drive, Suite 100 | Irvine, (949) 923-6000
Structural Engineer
NABIH YOUSSEF ASSOCIATES 550 South Hope Street, Suite 1700 | Los (213) 362-0707
MEP / Lighting Design / Tel
TK1SC COLLABORATIVE / STUDIO K1 15231 Laguna Canyon Road, Suite 100 | (949) 751-5800
Signage / Graphics
DAVIES ASSOCIATES, INC. 9424 Dayton Way, Suite 217 | Beverly H (310) 247-9572
Acoustics Consultant 5 5/16"
SS-7
GOOSENECK BY CURTAIN WALL MANUFACTURER
GL-2.1
Facade Access
OLYMPIQUE 26429 Rancho Parkway South #145 | La (973) 763-3222
Vertical Transportation 5' - 0" TO FACE OF BUILDING CL
EDGETT WILLIAMS CONSULTING GRO 102 East Blithedale Avenue, Suite 1 | Mi (415) 388-1880
GL-7.2
CL
Waterproofing Consultant
SIMPSON GUMPERTZ & HEGER, INC. 1055 West 7th Street, Suite 2500 | Los A (213) 271-2000
5"
CL
Geotechnical Engineering
1/8" 1 3/4"
AL-1
NMG GEOTECHNICAL, INC. 17991 Fitch | Irvine, CA 92614 (949) 442-2442
ML
1/8"
10' - 0" TO MODULE LINE
1/8"
ML
JENSEN HUGHES 2099 S. State College Boulevard, Suite 54 (714) 450-1700
SS-7
Entitlement & Transportation
PIRZADEH & ASSOCIATES, INC. 30 Executive Park, Suite 270 | Irvine, CA (949) 851-1367
Dry Utility Provider Coordina
9 7/8"
1/16" 1/4"
3/8" 3/8"
CL
Code Consultant
4' - 6" TO MODULE LINE
AL-1
GL-4.2
VENEKLASEN ASSOCIATES, INC. 1711 Sixteenth Street | Santa Monica, C (310) 450-1733
10' - 0" TO MODULE LINE
3 11/16"
4' - 6" TO MODULE LINE
1/2"1 1/8"
C
SS-7
MORAN UTILITY SERVICES, INC. 27127 Calle Arroyo, Suite 1907 | San Ju (949) 429-5566
SS-6
Owner/Developer IRVINE COMPANY 111 Innovation Drive | Irvine, CA 92617 (949) 720-2473
No. GL-2.1
Date
Submittal/ R
06/06/17
SCHEMATIC DES
09/06/17
DESIGN DEVELO
11/03/17
4 3/4" 13/16"
2
4 7/16"
4 1/8"
10"
DOOR SECTION DETAIL
4
1D-A861 3" = 1'-0"
2"
10"
2ND AGENCY SUB
1' - 8" 1' - 8"
10"
4 1/8"
4 1/2"
4' - 6" TO MODULE LINE
13/16"
1ST AGENCY SUB
02/26/18
3 7/8"
DOOR SECTION DETAIL
1D-A861 3" = 1'-0"
4 3/4"
50% CD SUBMITT
12/15/17
2"
3 7/8"
STAMP
SS-6
GL-2.1
7"
3 1/2"
CL
CL
10' - 0" TO MODULE LINE
ML
GL-2.1
DRAWING TITLE
EXTERIOR WAL DETAIL SECT
SS-6
9 13/16"
ST-3
SS-7
1 1/2" 2 1/2"
DRAWN
1/2" 1/8" 3 5/8"
CHEC
Author
Chec
SCALE
1 1/2" 1 1/2"
3 7/8"
3/16"
1/2" 1/8"
ST-3
INTERIOR FINISH BY OTHERS
1' - 8"
PRO
3" = 1'-0"
PCF-17
REV.
DATE 02/26/18
DRAWING NO.
1/4" X 9" LONG SMOOTH SS DOWEL
1/4" X 9" LONG SMOOTH SS DOWEL
SAMPLE DETAILS 1 DOOR SECTION DETAIL 1D-A861 3" = 1'-0"
5
DOOR SECTION DETAIL
1D-A861 3" = 1'-0"
3
1D-A86
DOOR SECTION DETAIL
1D-A861 3" = 1'-0"
Architects
LLP
f. 949. 260.1190 e. lpa@lpainc.com p. 949. 261.1001 w. lpainc.com
F
E.8
E.5
E.2
E
D
C
B.2
B
A.8
A.5
A
GL-6.1
88 Pine Street New York, NY 10005 (212) 751-3122
10' - 6"
14' - 2"
C-2
2' - 0"
1' - 8"
PARAPET 14' - 2"
LEVEL 1 0' - 0"
1 3E-A811
1 3E-A301
SS-7
GL-6.1
GL-6.1
AL-1
1 3E-A812
GL-6.1
GL-5.3
GL-5.3
WD-2
AL-1
AL-1
WD-2
1 3E-A813
GL-5.3
GL-5.3
AL-1
AL-1
1 3E-A814
SOUTH ELEVATION 1/4" = 1'-0"
A
A.5
A.8
B
B.2
C
D
E
E.2
E.5
E.8
F
AL-1
C-2
SPECTRUM TERRACE PHASE 3
10' - 6"
14' - 2"
2' - 0"
1' - 8"
PARAPET 14' - 2"
17700 - 17900 LAGUNA CANYON RD.
AL-1
GL-6.1
LEVEL 1 0' - 0" GL-6.1
C-2
NORTH ELEVATION 1/4" = 1'-0"
GL-6.1
PARAPET 14' - 2"
MATERIAL LEGEND
TYPE
DESCRIPTION
AL-1 AL-2.3
ALUMINUM EXTRUSION, POLISHED, ANODIZED ALUMINUM EXTRUSION, PAINTED (PPG DURANAR UC109170F SUNSTORM PEARLESCENT WHITE) CONCRETE, POLISHED AND SEALED LOW IRON, LOW-E, FT-FT LAMINATED GLASS UNIT (SAFETY), VLE13-70 LOW IRON, LOW-E, FT-FT INSULATED GLASS UNIT (SAFETY), VZRE13-54, U-VALUE 0.29, SHGC 0.26, VT 42% STAINLESS STEEL SHEET, #6 FINISH, ANGEL HAIR HARDWOOD, CLEAR FINISH
AL-1
AL-1 GL-6.1
14' - 2"
GL-6.1
C-2 GL-5.3
10' - 6"
WD-2
10' - 6"
WD-2
GL-6.1 AL-1
AL-1
1 3E-A816
AL-2.3
GL-6.1
GL-6.1
AL-1
GL-5.3
GL-6.1
GL-6.1
AL-1
AL-1
AL-1
AL-1
AL-1
SS-7
3 3E-A301
EAST ELEVATION 1/4" = 1'-0"
4 3E-A301
SS-7 WD-2
Submittal
LEVEL 1 0' - 0"
LEVEL 1 0' - 0"
WEST ELEVATION
3D 17840
1/4" = 1'-0"
3B
17800
09.28.18
C-2
DD SUBMITTAL
PARAPET 14' - 2"
4
Date
3.2
Description
3
Revision
2.8
Date
GL-6.1
2
08.31.18
C-2
1.2
08.03.18
1
1
DD 50% SUBMITTAL - BLDG 3E
1.2
SD SUBMITTAL
2
1' - 8"
2.8
2' - 0"
3
14' - 2"
3.2
1' - 8"
4
2' - 0"
2
GL-6.1
1 3E-A815
SS-7
3E-A301
AL-1
WD-2
AL-2.3
Job. No. Checked by
3E
Scale
17820
3C
3A PHASE III AMENITY BUILDING ELEVATIONS 17900
17700
AME BUI EXT ELEV
N
KEY PLAN
3E-
UCLA BUSINESS SCHOOL EXTENSION Office Project Site: Los Angeles, California, USA 2017 As part of an extension of the Anderson School of Management, UCLA hired Pei Cobb Freed & Partners to design an extension to their 1990 brick and precast concrete school. Pei Cobb Freed & Partners came up with a unique solution of building the extension on top of an existing concrete parking structure nestled in a valley. To counteract the inward-facing design of the original school, the extension was designed to look out and connect with the rest of UCLA’s campus while mirroring the material elements of the original building. Programming included a central atrium that connected one side of parking with the other side facing the central campus. Public areas opened to terraces and green roofs and offices featured operable windows. I served as a façade designer for the Design Development and Construction Documents phase of the project, cataloguing and detailing all exterior conditions of the building and site. Challenges included seismic isolation of corners using a steel truss system to allow corner masonry zones to move independently of the main walls during an earthquake. Precast concrete, located throughout the building, had to have gravity and lateral loads accounted for in structural steel. Waterproofing conditions were numerous, including at stone ballast roofs, green roofs, paved terraces, and at the existing parking garage, upon which the addition was constructed.
SHADOW STUDY WITH NEW ADDITION HIGHLIGHTED
WESTERN APPROACH RENDERING
3"
5/8"
6"
5/8"
E
3 1/2"
110 WESTWO LOS ANG
3" INVERTED STRIP OF SASM AIR BARRIER, TYP
3 5/8"
1/4"
2"
ANDERSON OF MANA ADDI CONTINUOUS SILICONE SEAL TO SASM, TYP
1' - 10"
1/2" 1 3/4"
PROVIDE 1/4" THICK GLAZING TAPE SHIM, OR SOLID SHIM SET IN WEATHER BARRIER SEALANT AT ATTACHMENTS, TYP
9 1/8"
PRE-FORMED SILICONE SHEET SET IN SILICONE WEATHER BARRIER SEALANT ADHERED TO FRAME ALL AROUND, TYP. 1/2"
C
1/4"
6"
1/4"
3 1/2"
2 1/8"
3"
5/8"
1' - 0 1/2"
1' - 0 1/2"
5/8"
3"
2 1/8"
3 1/2"
VENTED CAVITY, TYP
5/8"
CONTINUOUS SILICONE SEAL TO SASM, TYP
3" 3 1/2"
PRE-FORMED SILICONE SHEET SET IN SILICONE WEATHER BARRIER SEALANT ADHERED TO FRAME ALL AROUND, TYP.
1/4" 3/8" 1/4"
1/4" 1/2" 1 3/4"
3' - 6"
1"
3"X3" STEEL TUBE VERTICAL TRUSS SEISMIC CORNER FRAME, TYP @ CORNERS.
1 3/4"
1/2"
1/4"
8 7/8"
3" MINERAL WOOL INSULATION, TYP BK
5/8"
1' - 8"
EXTERIOR GRADE SHEATHING, TYP
9 1/8"
1' - 11 3/4"
SASM AIR BARRIER, TYP
1"
3"
1/4"
PRECAST CONCRETE SILL
1' - 10"
1' - 10"
A6.603
Issue Descrip 50% CONS PLAN CHE PERMIT SU FINAL PER
13
MODULE LINE, TYP
3
Date 05/26/17 09/01/17 09/29/17 10/20/17
BK
1/4"
1/4"
6 1/2"
3 1/2"
1/8" 1/4"
Issue 4 6 7 8
3" INVERTED STRIP OF SASM AIR BARRIER, TYP
PLAN DETAIL
3" = 1'-0" REF: 1 / A6.104
13
3"
5/8"
1 3/4"
1' - 1"
5/8"
3"
2 1/8"
3 1/2" 1/4"
2 5/8"
1/2"
1' - 10"
CONTINUOUS SILICONE SEAL TO SASM, TYP
6 1/8"
3"X3" STEEL TUBE VERTICAL TRUSS SEISMIC CORNER FRAME, TYP @ CORNERS.
3 1/2"
3"
5/8"
1' - 0 1/2" Seal / Signature
1 1/2"
VENTED CAVITY, TYP 3" MINERAL WOOL INSULATION, TYP
3/8" 1/4"
1/4" 1/2" 1 3/4"
SASM AIR BARRIER, TYP
SILICONE SEALANT WITH BACKER ROD, TYP. CUSTOM COLORS TO BE SELECTED BY ARCHITECT, TYP
EXTERIOR GRADE SHEATHING, TYP
1' - 11 3/4"
PRECAST CONCRETE SILL
PLAN DETAIL
3" = 1'-0" REF: 1 / A6.104
PLAN DETAILS
1' - 10"
MODULE LINE, TYP
09/29/17 PERMIT SUBMISSION PLAN DETAILS Scale
3" = 1'-0" 1/4"
1/4"
3 1/2"
2
11 17/32" 11 15/32" BRICK BELOW
1' - 10"
A6.603
Project Number
942513.01
Description
MODULE LINE, TYP
SASM AIR BARRIER, TYP
2' - 8"
Project Name
ANDERSON SCHOOL OF MANAG
3 1/2"
PROVIDE 1/4" THICK GLAZING TAPE SHIM, OR SOLID SHIM SET IN WEATHER BARRIER SEALANT AT ATTACHMENTS, TYP
1° 10
1/4"
3"
PRECAST CONCRETE SILL
BK
1' - 8"
5/8"
6"
1' - 11 3/4"
3"
1/4" 1/2" 1 3/4"
1/4"
3"
1/2"
1/2"
PRE-FORMED SILICONE SHEET SET IN SILICONE WEATHER BARRIER SEALANT ADHERED TO FRAME ALL AROUND, TYP.
PROVIDE 1/4" THICK GLAZING TAPE SHIM, OR SOLID SHIM SET IN WEATHER BARRIER SEALANT AT ATTACHMENTS, TYP
11 17/32 "
2 1/8"
BELOW
2' - 9" 1/4" 3 1/2"
1' - 0 1/3 2" BRICK
1/2"
5/8"
1 3/4"
3' - 6"
2 5/8"
CONTINUOUS SILICONE SEAL AT HEAD AND SILL, TYP
1 A6.603
PLAN DETAIL
3" = 1'-0" REF: 1 / A6.104
GENERAL NOTES 1. FOR TYPICAL PLAN DETAIL NOTES, REFER TO SHEETS A6.603 AND A6.607 2. FOR TYPICAL PRECAST PLAN CONNECTION DETAILS, REFER TO SHEET A6.616 3. ALL BRICKS ARE 11 1/2", 7 1/2", OR 3 1/2" LONG UNLESS OTHERWISE NOTED
A6.603 c 2016 Gensler
1/8" 1/4"
E
2' - 3" 1"
1/4"
C
D
9 1/8"
CONTINOUS SLOT FOR SHADE POCKET ABOVE 3/8" REVEAL
10"
10"
EVENT SPACE
10"
GALLERY 10"
3 1/2"
110 WESTWO LOS ANG
BREAK FORMED 1/8" ALUMINUM CORNER, HEAD TO SILL
3/8" 3/8"
3/8" 3/8"
3"
9 1/8"
12.5
1"
3"
1' - 5 3/4"
1 1/8"
3/8" 1 3/4"
1/2" 5 1/8" 1' - 9" 1' - 10"
1/2"
1 1/8" 1/4"
1/4"
1 1/8"
1/4" 1"
3/8" 3/8"
1/8" 1/4"
1/4" 3/8" 3/8"
1"
1" 2' - 2"
1/8" 1/4"
5 1/8"
1/8" 1/4"
1/4"
4"
5 1/8"
1"
9 1/8"
9 1/8"
9 1/8"
1" 5 1/8" 1 1/8"1/2" 1/4"
1/2"
1/4" 1" 1/8" 1/4"
3/8" REVEAL
3/8" REVEAL
1 1/8" 3/8" 1 3/4"
4"
1 1/8"
1/4"
ANDERSON OF MANA ADDI
1' - 6"
3/8" 3/8"
3/8" 1 3/4"
3 1/2"
3/8" 3/8"
3/8" 1 3/4"
3 1/2"
3/8" 1 3/4"
3/4"
3"
1' - 5"
3/8" 1 3/4"
3' - 1"
3/8" REVEAL 1' - 2 1/8"
COORDINATE DISTANCE BETWEEN WINDOW FRAME AND 3/4" PREFINISHED VENEERED PANEL WITH WINDOW SHADE SLOT REQUIREMENT, TYP AROUND EVENT SPACE
3 1/2"
1 1/8"
3/8" REVEAL
3"
1 1/8"
1"
5 1/8"
3/8"
3/4"
1 3/4" 3/4" 1 3/4"
3/8"
4"
3/8" REVEAL
3" MINERAL WOOL INSULATION, TYP
6 A6.611
PAINTED ALUMINUM SHADOW BOX PANEL
PLAN DETAIL
5
3" = 1'-0" REF: 1 / A6.105
A6.611
B
A6.611
3 1/2"
3"
5/8"
Issue 4 6 7 8
B
1' - 10"
1/4" 1/4"
PLAN DETAIL
3" = 1'-0" REF: 1 / A6.105
Date 05/26/17 09/01/17 09/29/17 10/20/17
Issue Descrip 50% CONS PLAN CHE PERMIT SU FINAL PER
6"
1' - 10"
5/8"
1"
2 1/4"
1/4"
9 1/8"
1 3/4" 1/2"
4
PLAN DETAIL
3" = 1'-0" REF: 1 / A6.105
6"
1/8" 1/4"
1/4" 1/4" 3/8"
3"
5/8"
Seal / Signature
1/2" 1 3/4"
3 1/2"
7 15/32"
1/4"
Project Number
942513.01
1/8" 1/4"
BK
PRECAST TERRACE PAVER BK
5/8"
6"
1' - 10"
3 A6.611
PLAN DETAIL
3" = 1'-0" REF: 3 / A6.105
PLAN DETAILS
2 A6.611
PLAN DETAIL
3" = 1'-0" REF: 5 / A6.105
12.5
Description
09/29/17 PERMIT SUBMISSION PLAN DETAILS Scale
3" = 1'-0"
3 1/2"
3"
1/4"
3 1/2"
1/4"
1/4" 1/4"
1/4"
3/4"
7 15/32" BRICK BELOW 11 17/32 "
PRECAST TERRACE PAVER
1"
3"
5/8"
9 1/8"
6"
1/8" MAX PAVER JOINT SPACING, TYP
Project Name
ANDERSON SCHOOL OF MANAG
1° 10
11 17/32" BRICK BELOW
PRECAST TERRACE PAVER
12.5 1 A6.611
PLAN DETAIL
3" = 1'-0" REF: 5 / A6.105
GENERAL NOTES 1. FOR TYPICAL PLAN DETAIL NOTES, REFER TO SHEETS A6.603 AND A6.607 2. FOR TYPICAL PRECAST PLAN CONNECTION DETAILS, REFER TO SHEET A6.616 3. ALL BRICKS ARE 11 1/2", 7 1/2", OR 3 1/2" LONG UNLESS OTHERWISE NOTED
A6.611 c 2016 Gensler
13
3' - 6" 1' - 8" 1' - 6"
1/8" 1/4" 1 3/4"
1/4"
13
3' - 6"
1' - 10" 1"
1' - 8"
9 1/8"
1/4"
1/8" 1/4" 1 3/4"
1' - 6"
1' - 10" 1"
1/4"
9 1/8"
3"
1"
1/4"
FACE OF COLUMN BEYOND
5"
9"
FACE OF COLUMN BEYOND
110 WESTWO LOS ANG
AL-3
ANDERSON OF MANA ADDI
10 1/8"
1' - 0"
1' - 0"
11 1/4"
9 7/8"
ASMA LEVEL 4 / PS-5 LEVEL 6 455' - 0"
1 3/4" 1/2"
3 1/8"
1/2"
3 1/8"
1 3/4" 3/4" 1 3/4"
3/4"
1"
1/4"
1' - 10 1/2"
1/2"
5"
3"
3/8"
1"
3/8"
1/2" 1/2" 1/2" 3/8"
AL-3
PC-1
6' - 0"
6' - 6"
3' - 0 1/2"
3"
1"
1' - 5"
1' - 3 7/8"
1' - 7"
BK
3 1/2"
3"
5/8"
Issue 4 6 7 8
6"
Date 05/26/17 09/01/17 09/29/17 10/20/17
Issue Descrip 50% CONS PLAN CHE PERMIT SU FINAL PER
3' - 8 3/4"
5' - 3 3/8"
1' - 5"
1/4"
1"
BK
3"
PC-1
1/4"
5" 3"
1' - 5 1/2"
5/8"
6"
1" INCREASED DEPTH FOR PRECAST WITH SAND BLASTED LETTERING
3' - 5 1/2"
1/4"
1/4"
Seal / Signature
1/2"
1/4"
1/2"
1/2"
5/8"
4"
SAND BLASTED LETTERING
1 3/4" 1 1/2"
1/2" 1/2" 1/2" 3/8"
3' - 6"
FOR CANOPY CONSTRUCTION REFER TO SHEET A6.720
Project Name
ANDERSON SCHOOL OF MANAG Project Number
942513.01
Description
09/29/17 PERMIT SUBMISSION SECTION DETAILS Scale
3" = 1'-0"
2 A6.710
SECTION DETAIL
3" = 1'-0" REF: 1 / A6.104
SECTION DETAILS
1 A6.710
SECTION DETAIL
3" = 1'-0" REF: 1 / A6.104
GENERAL NOTES 1. FOR TYPICAL SECTION DETAIL NOTES, REFER TO SHEET A6.702 2. FOR TYPICAL PRECAST PLAN CONNECTION DETAILS, REFER TO SHEET A6.616 3. FOR PARAPET AND ROOF CONSTRUCTION REFER TO DETAIL 4/A6.802
A6.710 c 2016 Gensler
1/4"
3 1/2"
3"
5/8"
6"
ASMA LEVEL 5 468' - 6"
DEMO AND REPLACE BRICK
1' - 6"
1' - 6"
1' - 5 1/2"
1/4"
110 WESTWO LOS ANGE
WRAP FLASHING AND WATERPROOFING UP AGAINST BRICK COURSES
PC-1
1/4"
EXISTING BUILDING
1/4"
5 1/2"
ADD 2 COURSES OF BRICKS IN LOCATION OF PREVIOUS PRECAST BAND
BK
1/2"
PC-1 BK
ANDERSON OF MANA ADDI
1/4" 1/4"
1' - 5 1/2"
NEW CONSTRUCTION
3"
5/8"
6"
5/8"
SECTION DETAIL 3 1/2"
3"
5/8"
6"
2
FOR GREEN ROOF CONSTRUCTION REFER TO LANDSCAPE
3" = 1'-0" REF: 1 / A6.104
1/4"
RAMP/PASSAGE
5/8"
A6.716
11
1/4" 3/8" 1/4"
1"
1/4"
9 1/8"
1/4" 3/8" 1/4"
1"
1/4"
9 1/8"
SECTION DETAIL
3" = 1'-0" REF: 6 / A6.105
2' - 6" 1/4"
1' - 5 1/2"
Issue 4 6 7 8
1/2" 1 3/4"
4 A6.716
3 1/2"
EXISTING BUILDING
Date 05/26/17 09/01/17 09/29/17 10/20/17
Issue Descript 50% CONS PLAN CHE PERMIT SU FINAL PER
1/2" 1/2" 1/2" 1 3/4"
1/4"
1 3/4"
1 3/4" 3/4"
1' - 5 1/2"
PC-1
1/4"
RAMP/PASSAGE
PC-1
1/2"
6 1/2"
5 1/2"
RAMP. REFER TO INTERIORS AND STRUCTURAL.
1/4" 1/4"
3 1/2"
BK
Seal / Signature
BK
1/4"
3 1/2"
3"
5/8"
RIGID INSULATION AT BASE, TYP
EXISTING PAVERS, INSULATION, AND CONCRETE DECK
Project Name
4"
ANDERSON SCHOOL OF MANAG Project Number
942513.01
Description
8"
09/29/17 PERMIT SUBMISSION SECTION DETAILS Scale
3" = 1'-0"
3 A6.716
SECTION DETAIL
3" = 1'-0" REF: 6 / A6.105
1 A6.716
SECTION DETAIL
3" = 1'-0" REF: 6 / A6.105
GENERAL NOTES 1. FOR TYPICAL SECTION DETAIL NOTES, REFER TO SHEET A6.702 2. FOR TYPICAL PRECAST PLAN CONNECTION DETAILS, REFER TO SHEET A6.616 3. FOR PARAPET AND ROOF CONSTRUCTION REFER TO DETAIL 4/A6.802
A6.716 c 2016 Gensler
SECTION DETAILS
1 DALTON TOWER Office Project Site: Boston, Massachusetts, USA 2014 - 2017 In order to raise capital funds, the Church of Christ, Scientist sold two plots of land previously belonging to the mother church complex to private developers. A triangular plot received city approval for the construction of a 700-foot tower. In response to the triangular site, an adapted reuleaux triangle rises 61 stories. A complex program of a hotel, condo, and ground-floor retail is achieved within a small footprint. Hotel and Condo access and movement through the building are carefully choreographed. Wrapped in a low, stone base, the podium ties the building in to the low-rise nature of surrounding buildings. The high performance glass of the curtain wall relates the tower to other high-rise developments of Back Bay. Striations emphasise verticality and serve as locations to conceal operable windows to allow natural ventilation. Striations give way to balconies towards the top of the tower. I was a core member of the team throughout Design Development, Construction Documents, as well as Construction Administration. My role was on the design and development of core, penthouse, mechanical, roof levels, vertical transportation as well as faรงade maintenance. I coordinated with the associate architect in Boston as well as MEP, Structural, and Interior Design consultants. I oversaw the construction of the marketing model used for condo sales.
1-7 DALTON HOTEL & RESIDENCES 3' - 0 5/8"
3' - 7 3/8"
4 1/2"
LEVEL 65 PARAPET 763' - 5"
2
CL BD LLC
c/o Carpenter & Company, Inc. Charles Square 20 University Road Cambridge, MA 02138 617.864.2800
2 STEEL STRUCTURE
6 1/2"
12' - 6 5/8"
12' - 2 3/8"
16' - 2"
15' - 3"
ISSUED FOR CONSTRUCTION
MECH 64
UNIT ANCHORED TO VERTICAL SUPPORT
12' - 2 3/8"
15' - 3"
14' - 0"
3' - 0 5/8"
8"
747' - 3"
MECHANICAL ROOM / STORAGE; REFER TO PLANS
MECH 63
3' - 0 5/8"
8 1/2"
733' - 3"
S.S. WINDOW WASHER PIN
12' - 4"
AL-2.3
AL-1.1
12' - 2 3/8"
15' - 3"
16' - 2"
AL-1.1
MECHANICAL ROOM
3' - 10"
5' - 0"
2 1/2"
MECH 62
UPTURNED BEAM
COLD FORMED METAL FRAMING, SHEATHING, AIR/VAPOR BARRIER, INSULATION
2' - 5"
717' - 1"
2 1 No.
BULLETIN 3 BULLETIN 2
07.01.15 05.01.15 Date
Description
INTERIOR FINISH
9' - 7"
AL-2.3
Cambridge Seven Associates, Inc.
RESIDENTIAL PENTHOUSE
Architecture Planning Design
11' - 0"
13' - 5"
13' - 5"
SPRINKLERS LINE
1050 Massachusetts Ave, Cambridge, MA 02138 t: 617. 492.7000 w: www.c7a.com Ar ch i tects
IPE WOOD DECKING, FLUID APPLIED MEMBRANE, RIGID INSULATION 3' - 10"
8" CONC. FILL ON DEPRESSED SLAB CONCEALED PRIMARY & OVERFLOW DRAINS
J ob #
2' - 5"
2 1/2"
LEVEL 61 703' - 8"
88 Pine Street New York, NY 10005 USA Tel.: 212 751-3122 Fax: 212 872-5443
3' - 6"
S.S. WINDOW WASHER PIN
1214
P rojec t
1-7 DALTON
Dr a wn B y
Author
Da te
19 DECEMBER 2014
S c a le
C hec ked
Checker
1/2" = 1'-0"
PENTHOUSE TERRACE SECTION 2
A-335.1
SECTION 1/2" = 1'-0"
9'-11" TO F.F.E.
Dr a win g Title
EXTERIOR WALL SYSTEM SECTION, ELEVATION PENTHOUSE ROOF DECK
A-335.1
LLP
1-7 DAL HOTEL & RE CL BD LLC
c/o Carpenter & Company, Charles Square 20 University Road Cambridge, MA 02138 617.864.2800
OUTDOOR FIREPLACE
CC1
CHELMSFORD, FLUSH W/DECKING
CR1
CR2
CR0
CR1
CR2
CR0
ISSUED CONSTRU
C8
C8 DR2
UPTURNED CONCRETE BEAM 12"x60"
4' - 10 9/16"
DR2
2 1 No.
BULLETIN 3 BULLETIN 2
Descrip
IPE WOOD DECKING
4' - 6 13/16"
PRIMARY AND OVERFLOW DRAINS BELOW
Cambridge Seven
1' - 9"
Architecture Planni
1050 Massachusetts Av t: 617. 492.7000 w: ww
88 Pine Street New York, NY 10005 USA Tel.: 212 751-3122 Fax: 212 872-5443
7' - 6"
4' - 6 13/16"
ACCESS DOOR
7/14/2015 2:36:56 PM
DR1
DR1
B4.5
DR0
1 A-335.2
D2 2
PLAN AT LEVEL 61
1/2" = 1'-0" REF: 1 / A-335.1
A-335.2
CC1
CR1
CR2
1-7 DALTON
Dr a wn B y
Author
Da te
19 DECEMBER 1/2" = 1'-0"
Dr a win g Title
EXTERIOR WAL ENLARGED PLA PENTHOUSE RO
STEEL SUPPORT BEHIND MULLION, TYP.
D1
1214
P rojec t
S c a le
B4.5
DR0 D2
J ob #
PLAN AT LEVEL 62
1/2" = 1'-0" REF: 1 / A-335.1
STEEL SUPPORT BEHIND MULLION, TYP.
D1 CC1
B4.5
CR1
CR2
A-335.
CR0
CR0
SPRINKLERS
1' - 6"
EX13
EX13 EQ
EQ
EX13
EQ
EQ
EQ EQ
EQ
C8
C8 DR2
EX13 EQ
COLD FORMED METAL FRAMING, SHEATHING, AIR/VAPOR BARRIER, INSULATION
EQ
EQ
EQ
EX13
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
1' - 6"
DR2
EQ
CARBON MONOXIDE DETECTOR
AL-2.3
1 No.
AL-2.3
BULLETIN 3
Descript
Cambridge Seven
Architecture Plannin
1050 Massachusetts Ave t: 617. 492.7000 w: www
DR1
DR1 B4.5
DR0
B4.5 DR0
STEEL SUPPORT BEHIND MULLION, TYP.
STEEL SUPPORT BEHIND MULLION, TYP.
88 Pine Street New York, NY 10005 USA Tel.: 212 751-3122 Fax: 212 872-5443
Job #
1214
Project
1-7 DALTON
Drawn By
Author
Date
19 DECEMBER 2
Scale
7/14/2015 2:37:10 PM
D2
1 A-335.4
REFLECTED SOFFIT PLAN AT LEVEL 61
1/2" = 1'-0" REF: 12 / A-313.2
D1
D2
2 A-335.4
REFLECTED SOFFIT PLAN AT LEVEL 62
1/2" = 1'-0" REF: 1 / A-201
1/2" = 1'-0"
Drawing Title
D1
PENTHOUSE TERRACE PLANS
EXTERIOR WALL REFLECTED SO PENTHOUSE RO
A-335.
1 A-201
B5
B4.5
B4
B3
B2
B1
B6
B7
B8 CR0 CR1
1
CC1
A-230
CR3
A-231
MECHANICAL
S4R2
3' - 7
FLUID APPLIED WATERPROOFING MEMBRANE ON INSIDE FACE OF TANK, TYP.
1/8"
25' - 3"
7' - 3"
M8R2
S4R2
M8R2
H.P. +733'-3"
C1
ROOF ACCESS LADDER 7' - 7"
BC1
1' - 9"
11"
F4
MTL. GUARDRAIL W/ GATE ACCESS LADDER DN TO LEVEL 62
6322
FIRE TANK ACCESS LADDERS
11' - 8 1/16"
UP
DN 63ST1A
BR2
6322 MECHANICAL
FIRE TANK
SH2R2
M8R2
ST-1A
D8
FLOOR DRAIN
M8R2
S4R2 F4
MECHANICAL 26' - 9"
6301
7 A-571.5
FIRE TANK PIPING THRU WALL. RE: F SERIES DWGs.
DAMPER LOWER TANK
MECHANICAL
6302
FIRE TANK ACCESS LADDERS
11' - 7 15/16"
1
S4R2
BR0 BR1
FIRE TANK
WATERTIGHT SIDE HATCH W/ ACCESS LADDER TO SLOSH DAMPER LOWER TANK
6302B
CR2
2
S1
BR3
FUEL OIL CONTAINMENT PIPE TO EMER. GEN. H.P. +733'-3"
R.D.
O.D. L.P. +746'-9" MTL. PANEL CLADDING OVER INSULATION
R1/R2 & R5/R6 VENT LOUVERS
T.O.FIN. ROOF (GENERATOR)
H.P. +733'-3"
FLUID APPLIED MEMBRANE OVER INSULATION
10"
SERVICE LOBBY
EMR
R.D.
6384
O.D. TRASH CHUTE VENT
5 A-410.1
FIRE LOBBY
9
A-410.1
DN
UP
R.D. O.D.
L.P. +746'-9" 14
A-410.1
FLUID APPLIED MEMBRANE OVER INSULATION
H.P. +733'-3"
SL MIN OP . T E 1/4 YP " . PE R 10
1 A-563
A-410.1
ROOF ACCESS LADDER 2
2
C4.5 FT .
C5
FLUID APPLIED MEMBRANE OVER INSULATION
MECHANICAL 6320A
6320
6320B
C6
D3 DR3
D2
C4
FOLD OF 1/A-230
L.P. +746'-9"
H.P. +733'-3"
H.P. +733'-3"
C7
DR2 DC1
D4.87 D1
D4.88 C8 DR1 DR0
LEVEL 63 ROOFTOP PLAN
MAINTAIN 3' - 0" MIN BETWEEN BUTTRESSES AND COOLING TOWERS
O.D.
EXHAUST FAN ABOVE
D4
C3
T.O.FIN. ROOF (COOLING TOWERS) 733' - 3"
COOLING TOWER R.D.
A-230
H.P. +733'-3"
FLUID APPLIED MEMBRANE OVER CONC. PERIMETER WALLS, TYP.
H.P. +733'-3"
2
D4.5
INT AIN 0" M IN
L.P. +746'-9 1/4"
MTL. PANEL CLADDING OVER INSULATION
ST-2
6381
L.P. +746'-9 7/16" FLUID APPLIED GENERATOR MEMBRANE OVER CONC. PERIMETER WALLS, TYP. H.P. +733'-3"
D5
3' -
O.D.
O.D.
FT . SL MIN OPE . TY 1/4" P. PER
GALV. STL. GRATING PLATFORM, STAIRS, HANDRAILS & GUARDRAILS. EXACT LOCATIONS TO BE COORDINATED IN FIELD. ALSO REFER TO S SERIES, M SERIES & E SERIES DWGs.
C2
MA
L.P. +746'-9"
H.P. +733'-3"
R.D. R.D.
A-410.1
COOLING TOWER
2
733' - 3"
D6
1
EXHAUST FAN
6380
4 A-410.1
D7
6322
2
FLUID APPLIED MEMBRANE OVER INSULATION
10"
6302A
1-7 DALTO HOTEL & RESI MEMBRANE FLASHING
COVER
ROOFING SEALANT TYP. @ ALL MEMBRANE TERMINATION PTS.
LATCH
HOLD OPEN ARM
4" MIN. 1/2"
FLUID APPLIED ROOFING MEMBRANE 1/2" COVERBOARD
1/2" COVERBOARD
1' - 0"
CONT. 4" WIDE STRIP OF MEMBRANE @ WALL TO FLOOR TRANSITION
2"
4" MIN.
1' - 0"
2"
MTL COUNTER FLASHING
WATER PROOFING MEMBRANE
2"
CONT. 4" WIDE STRIP OF MEMBRANE @ WALL TO FLOOR TRANSITION
2"
2"
756' - 6"
6" SEMI RIGID INSULATION AL-1.0
ROOFING MEMBRANE 1/2" COVER BOARD
2"
2"
ISSUED F CONSTRUC
ML
T.O. ROOF SLAB
T.O. OF ROOF SLAB 164' - 9"
c/o Carpenter & Company, Inc Charles Square 20 University Road Cambridge, MA 02138 617.864.2800
IN-3.0
CONC. CURB
SPRING/HINGE ASSEMBLY
6" MIN.
FLUID APPLIED ROOFING MEMBRANE
IN-3.0
ACCEESS HATCH T.B.D. BY XXX
ML
CL BD LLC
CONT. 4" WIDE STRIP OF MEMBRANE @ WALL TO FLOOR TRANSITION
CONC. ROOF SLAB
5"x2" CONT. ANGLE
IN-3.0
5"x4" CONT. ANGLE
CONC. STRUCT. SLAB 2"
3"x3/16" WEEP COMPOSITE METAL SPLINE ML COLD FORMED METAL FRAME
3' - 1" OPENING
AL-1.0
EXTERIOR GRADE SHEATHING
SLOSH DAMPER TANKS CONC. WALL
AIR/VAPOR BARRIER
6 A-430.2
ROOF ACCESS HATCH DETAIL
3" = 1'-0" REF: 1 / A-231
ML
MTL. COPING
MTL. GUARDRAIL, MOUNTED ON FACE OF CURB
4 A-430.2
MEMBRANE FLASHING
2
SECTION DETAIL @ ACP
3" = 1'-0" REF: 3 / A-410.1
A-430.2
SECTION DETAIL @ ACP
3" = 1'-0" REF: 8 / A-410.1
SCHEDULED GWB PARTITION MEMBRANE FLASHING EXTEND THRU TO INSIDE OF OPENING
FLUID APPLIED ROOFING MEMBRANE
ROOFING SEALANT TYP. @ ALL MEMBRANE TERMINATION PTS.
1/2" COVERBOARD
CONC. WALL
FLUID APPLIED ROOFING MEMBRANE
SCUPPER, T.B.D. BY GENERAL CONTRANCTOR
1/2" COVERBOARD
6" SEMI RIGID INSULATION EXTERIOR GRADE SHEATHING
2" MIN.
CONT. 4" WIDE STRIP OF MEMBRANE @ WALL TO FLOOR TRANSITION
5"x2" CONT. ANGLE 5"x4" CONT. ANGLE 3"x3/16" WEEP
ML
COMPOSITE METAL SPLINE 1/2"
ML
AIR/VAPOR BARRIER VAPOR PERMEABLE WATER PROOFING MEMBRANE
AL-1.0 CONC. ROOF SLAB
AL-1.0 2 1 No.
MEMBRANE FLASHING
ROOFING SEALANT TYP. @ ALL MEMBRANE TERMINATION PTS. CONT. 4" WIDE STRIP OF MEMBRANE @ WALL TO FLOOR TRANSITION
CONT. MTL. FLASHING CONT. 4" WIDE STRIP OF MEMBRANE @ WALL TO FLOOR TRANSITION
FLUID APPLIED ROOFING MEMBRANE CONT. MTL. FLASHING
MECH 64
MECH 63
747' - 3"
733' - 3"
Architecture Planning D
1/2" COVERBOARD
1/2" COVERBOARD
IN-3.0
Cambridge Seven As
FLUID APPLIED ROOFING MEMBRANE
FLUID APPLIED ROOFING MEMBRANE
1/2" COVERBOARD
Description
COLD FORMED METAL FRAME
CONC. STRUC. WALL
CONT. 4" WIDE STRIP OF MEMBRANE @ WALL TO FLOOR TRANSITION
BULLETIN 3 BULLETIN 2
1050 Massachusetts Ave, Ca t: 617. 492.7000 w: www.c7a
IN-3.0
MECH 64 747' - 3" 2"
2"
2"
88 Pine Street New York, NY 10005 USA Tel.: 212 751-3122 Fax: 212 872-5443
2"
J ob #
1214
P rojec t
1-7 DALTON
Dr a wn B y
Author
Da te
19 DECEMBER 2014
S c a le
Ch
3" = 1'-0"
7/14/2015 5:19:36 PM
Dr a win g Title
EXTERIOR WALL ENLARGED SECTIO ROOF 5 A-430.2
SECTION DETAIL @ FLUID APPLIED MEMBRANE OVER INSULATION
3" = 1'-0" REF: 1 / A-410.1
3 A-430.2
SECTION DETAIL @ ACP
3" = 1'-0" REF: 3 / A-410.1
1 A-430.2
SECTION DETAIL @ ACP
3" = 1'-0" REF: 8 / A-410.1
ROOFTOP DETAILS
A-430.2
CENTURY PLAZA TOWERS Office Project Site: Century City, Los Angeles, California, USA 2015 - 2016 As part of a redevelopment of the Century Plaza Hotel, twin 46-story condo towers as well as a retail plaza will be constructed behind the existing hotel. Relating to Minoru Yamasaki’s twin triangular towers across the street the condo towers are designed in the form of adapted reuleaux triangles. Structural bays house window walls that lead to generous-sized balconies framed in curved glass balustrades, giving the building an iridescent, undulating quality. I worked on the project during Design Development as well as coordination with the Architect of Record during Construction Administration. My role was in the design and development of canopies, tower storefronts, as well as the architectural design of interior spaces. My work involved coordination with the architect of record in Los Angeles as well as MEP, Structural, and Interior Design consultants.
P5
P4
P6
P7
P8
P9
P10
P13
P12
P11
P14
P16
P15
P19
P18
P17
P20
MATCHLINE SEE P- A1.202F
P3
P2
MATCHLINE SEE P- A1.202E
P1
DN DN
PA
PA
DN DN
SCREENING ROOM (FIXED SEATING)
SCREENING ROOM (FIXED SEATING)
PB
PB DN UP
PC
PC
OPEN TO BELOW
YOGA STUDIO
PD
PROPERTY LINE
PD
YOGA STUDIO
123
FITNESS STUDIO
FITNESS STUDIO
PILATES STUDIO
PILATES STUDIO
PE
PE
PF
PG 1
3
2
6
5
4
7
9
8
10
11
12
15
14
13
16
17
18
19
20
21
PF 22
23
24
25
26
27
28
29
PG 30
31
PH
PH
PI
PI N
N
PK 12
13
14 PL
F
3
F
4 E
E
D
D
C
C
B
B A
A
G1E
G2E
G3E
G4E
G5E
G6E
G7E
G8E
G10E
G11E
G12E
G13E
G14
G15
G16
PM
WINDOW WALL TYPE 1
LEVEL 3 348' - 1"
WINDOW WALL TYPE 1
LEVEL 3 348' - 1"
FINISH CEILING
6' - 9"
6' - 9"
FINISH CEILING
ST 1.1
11' - 9"
11' - 9"
9' - 10 7/16"
9' - 10 7/16"
INTERIOR FINISH BY OTHERS
4' - 10"
4' - 10"
SS 50.1
1"
2"
CL 1' - 0"
STRUCTURAL STEEL BEAM ST 1.1
1' - 6"
1' - 0"
LEVEL 2 336' - 4"
1' - 0"
1' - 10 9/16"
SS 50.1
STRUCTURAL STEEL BEAM
CL
2"
LEVEL 2 336' - 4"
SS 50.1 1' - 0"
1' - 10 9/16"
SS 50.1
INTERIOR SCOPE BY OTHERS
SS 50.1
4' - 10"
4' - 10"
SS 50.1
GL 6.12
FINISH CEILING 4' - 4"
SS 50.1
COLUMN NOSING
COLUMN NOSING AL 40.1
AL 40.1
ST 1.1
SS 50.1 CLADDING 6"
ST 1.1
CLADDING ST 1.1
?
8' - 0"
4' - 10"
14' - 3"
14' - 4"
4' - 10"
14' - 4"
SS 50.1 GL 1.11
INTERIOR SCOPE BY OTHERS
4' - 10"
4' - 10"
SS 50.1
GL 1.11 EXTERIOR PAVING REFER TO LANDSCAPE DRAWINGS
LEVEL 1 322' - 0"
STOREFRONT SECTIONS
EXTERIOR PAVING REFER TO LANDSCAPE DRAWINGS
SS 50.1 FINISH FLOOR
LEVEL 1 322' - 0"
FINISH FLOOR
N1D
N1J
HSS BEAM EXTENTS
N1F
5"
° 1.5625
1.5625° 1.5625°
1.5625°
1.5625° 1.5625°
1.5625°
1.5625°
1.5625°
1.5625°
1.5625°
1.5625°
1.5625°
68 .9 6°
68 .96°
68 .96 °
68. 96 °
68 .9 6°
68.9 6°
GUTTER BEND POINTS
45.21°
47/64"
45.21°
45.21°
45.21°
8' - 11
° 96
6° .9 68
68.
° .96 68
.96° 68 45.21°
6° .9 68
6° 68.9 45.21°
68 .9 6°
6° .9 68
6° 68.9
68 .9 6°
1.5625°
68.9 6°
1.5625°
6°
45.21°
8"
1.5625° 1.5625°
45.21°
42.08°
42.08°
67 .40°
67 .4 0°
70 .5 2°
2°
70 .52°
70 .52 °
° .52 70
70 .52 °
42.08°
2°
70 .5
.5 70
° .52 70
.52° 70
42.08°
70 .52°
2° .5 70
.52° 70
42.08°
42.08°
70.5 2°
67 .40 °
67 .40 °
67 .4 0°
0° .4 67
° .40 67
° .40 67
.40° 67
2° 70.5
70 .5 2°
42.08°
42.08°
0° .4 67
42.08°
67.4 0°
42.08°
42.08°
0° .4 67
0° 67.4
67 .4 0°
42.08°
2° .5 70
42.08°
67.4 0°
42.08°
19' - 4"
0° 67.4
42.08°
1' - 7"
° 1.5625 1.5625 °
3' - 0"
1' - 9"
N1G 1.5625 °
.9 68
NR1
N1E
N1H
NR1
42.08°
42.08°
10"
141.04°
141.04°
10 7.9 2°
2° 7.9 10
10 7.9 2°
7.9 10
2°
7.9 10
10 7.92 °
2°
2° 10 7.9
141.04°
38.96°
107. 92°
10 7.9
141.04°
141.04°
141.04°
141.04°
2° 7.9 10
2°
2°
38.96°
141.04°
10 7.9
38.96°
141.04°
° 7.92 10
38.96°
141.04°
2°
38.96°
141.04°
10 7.9
141.04°
92° 107.
38.96°
141.04°
2° 7.9 10
38.96°
141.04°
92° 107.
141.04°
2° 7.9 10
38.96°
141.04°
° 141.04
141.04 °
42.08°
107. 92°
N1J
NR1 N1D
N1H
NR1
N1E
N1G
N1F
1 RN-A6.415
1 RN-A6.421
2 RN-A6.421
DRAIN HP
8"
2 RN-A6.431
DRAIN HP
DRAIN HP
DRAIN HP DRAIN HP
4 RN-A6.431
19' - 4"
AESS 1.1 GL 2.63
3 RN-A6.421 6 RN-A6.431 1 RN-A6.431 5 RN-A6.431
10"
3 RN-A6.431
N1D NR1
N1E
N1J N1H N1F
3' - 0"
NR1 N1G
5" AESS 1.1
AL40.1 FRAMING MEMBERS AL40.2 TUBES
7" 19' GL 2.63
10"
CANOPY GEOMETRIES AND PLANS
RECONSTRUCTION OF FORDHAM PLAZA Site: Fordham Plaza, Bronx, New York, USA 2013 - 2014 Fordham Plaza is the center of a vibrant shopping district, the principal public entrance to Fordham University and a regional transportation hub. A redesign of the existing, paved plaza looked to make the plaza a more friendly and inviting place to be within the city. The program called for a café, green market, food kiosks of varying size and green spaces in which to relax. Challenges included a train tunnel running the length of the entire plaza upon which construction could not occur, numerous public utilities that couldn’t be altered, as well as many public agencies’ input and concerns. The design solution calls for a café straddling the edge of the tunnel foundations and a rooftop canopy arching over the tunnel, providing shade and rain protection for the stairwells to the train platforms. A green market canopy follows the edge of another secion of the tunnel and planters are arranged around the perimeter of the plaza and designed to be moved with a forklift to conduct bridge maintenance and inspections. I participated throughout the process of Design Development as well as Construction Documents. My roles included drafting, coordination with consultants, as well as meetings with the client.
TAPERED GIRDER; 2'-5 81" DEEP AT COLUMN JUNCTION
INSULATION ROOF DECK
+20'-0"
TAPERED GIRDER; 2'-2 21" DEEP AT COLUMN JUNCTION
TO STEEL GIRDER 1'-0"
+21'-0" VIF TO STEEL GIRDER TAPERED GIRDER; 2'-2 21" DEEP AT COLUMN JUNCTION
2'-221"
2'-321"
1'-0" ALL PAINTED BLACK
GALV STL OUTRIGGER
TAPERED PLATE GIRDER
ST STL TUBE AND AESS COLUMN WELDED TO ST STL PLATE
V-COLUMN WELDED TO STEEL PLATE " 4'-0
ST STL TUBE TAPERED IN LINE WITH AESS COLUMN +18'-10 34" WP 2
ST STL TUBE TAPERED IN LINE WITH AESS COLUMN
1 A-318
+18'-10 34" WP X
3 +17'-0 16 " WP 3
STRUCT STEEL R634" GALV STL OUTRIGGER
ST STL TUBE AND AESS COLUMN WELDED TO ST STL PLATE ST STL TUBE TAPERED IN LINE WITH AESS COLUMN
WOOD SOFFIT EXTENTS OF VISIBLE AREAS OF V-COLUMN
VISIBLE AREAS OF V-COLUMN WELDED, BLENDED, & GROUND SMOOTH; REMOVE MILL MARKS & OTHER IMPERFECTIONS PER AESS FINISH STANDARDS
VISIBLE AREAS OF V-COLUMN WELDED, BLENDED, & GROUND SMOOTH; REMOVE MILL MARKS & OTHER IMPERFECTIONS PER AESS FINISH STANDARDS
2 A-318
R1078"
5 +2'-8 16 "
R8
CL OF GUARDRAIL
CL OF GUARDRAIL
2" Ø WRAP-AROUND ST STL ROD
2'-3"
2'-3"
+0'-0"
11 -0'-1 16 "
11 -0'-1 16 "
TO SLAB AT V-COLUMN
1'-0"
TO SLAB AT V-COLUMN
5 +2'-1 16 "
EL 63.00' TO BRIDGE DECK 13 " 3'-9 16
7 3'-1016 "
+0'-0" EL 63.00' TO BRIDGE DECK
-1'-1
BEGINNING OF COLUMN SADDLE 2" Ø WRAP-AROUND ST STL ROD GUARDRAIL
1 16 "
START OF COL CURVE 5 +2'-1 16 "
1'-0"
ITEM 9.60B1
VISIBLE AREAS OF V-COLUMN WELDED, BLENDED, & GROUND SMOOTH; REMOVE MILL MARKS & OTHER IMPERFECTIONS PER AESS FINISH STANDARDS
AESS COLUMN WELDED TO BASE PLATE
11 16"
BO V-COLUMN
ITEM 9.60B1
INGROUND LIGHT (AGI)
SITE WORK
11 16"
-1'-1 WP
11 -1'-1 16 " WP
AESS COLUMN WELDED TO BASE PLATE FOR PILE CAP AND STRUCTURAL COMPONENTS, REFER TO STRUCTURAL DWGS
ITEM 9.60B1 SITE WORK
2" Ø ST STL GUARDRAIL
AESS COLUMN
V-COLUMN DETAILING 3
SECTION SCALE: 1/2" = 1'-0"
2'-2"
SECTION
VISIBLE AREAS OF V-COLUMN WELDED, BLENDED, & GROUND SMOOTH; REMOVE MILL MARKS & OTHER IMPERFECTIONS PER AESS FINISH STANDARDS
SCALE: 1/2" = 1'-0"
AESS COLUMN FILLED WITH CONCRETE
-1'-1 WP
11 16"
6'-0"
6'-0"
RDRAIL WITH GLASS AESS V-COLUMN WELDED 55SRGP TO MTL BASE PLATE
B1
'-3
GE STGROUT STL GLASS GLES
9 16 "
9 5'-216 "
GLASS MOUNTED FROM STRUCTURAL POSTS
YP
5 1'-216 "
R1
4"
5'-0"
STRUCTURAL COMPONENTS, REFER TO
TL FASCIA PLATE STRUCTURAL DWGS
NEW PLAZA FINISH; SIDEWALK ITEM
B; SIDEWALK ITEM ℄
℄
℄
ST STL ROD WELDED TO STRUCTURAL POSTS; ITEM 7.55SS9
LEVEL OF FINISHED GRADE
INGROUND LIGHT (AGI) NEW CONCRETE CURB; SIDEWALK ITEM NEW ST STL FASCIA AND GUARDRAIL ATTACHMENTS (ALL SIDES); ITEM 7.55SS10 VISIBLE AREAS OF
3'-0"
FOR PILE CAP AND RENT OPENING
GUARDRAIL
2" Ø ST STL GUARDRAIL
NEW WOOD-PLANK BENCH (BEYOND); ITEM 7.50WS
℄
NEW ST STL CABLE TENSION MESH; ITEM 7.55SS9
8 A-340
V-COLUMN WELDED, BLENDED, & GROUND SMOOTH; REMOVE MILL TO PLAZA MARKS & OTHER IMPERFECTIONS PER AESS EL +63.00' VIF FINISH STANDARDS
NEW WOOD-PLANK BENCH (BEYOND); ITEM 7.50WS NEW ST STL FASCIA AND GUARDRAIL ATTACHMENTS (ALL SIDES); ITEM 7.55SS10
5'-0"
4'-434"
°T
4'-141"
45
5 4'-916 "
GALV STL ANCHOR BOLTS
NK BENCH; ITEM 7.50WS
NEW ST STL GUARDRAIL WITH GLASS PANELS; ITEM 7.55SRGP
EXTENTS OF SADDLE COVERING; SADDLE COVERING WELDED, BLENDED, & GROUND SMOOTH TO STRUCTURAL V-COLUMN
NEW ST STL HANDRAIL; ITEM 7.55SS3
5'-0"
WORK
MOCK-UP AREA
GUARDRAIL SUPPORTS
NEW 21" X 3" ST STL GUARDRAIL PLATE
6
3D VIEW OF COLUMN BASE SADDLE
NEW CONCRETE CURB; SIDEWALK ITEMS NEW PLAZA FINISH; SIDEWALK ITEMS
ITEM 9.60B1
NTS; FOR ILLUSTRATIVE PURPOSES ONLY
TO PLAZA EL +63.00' VIF
WP
4
PLAN
ITEM 9.60B1
SCALE: 1/2" = 1'-0"
EXISTING BRIDGE DECK
CONC TREADS, RISERS & POWER-WASHED & URBISH ANY UNEVEN ETY TREAD INSERTS; ITEM
EXISTING BRIDGE DECK
EXISTING APPROACH SLAB
D FROM STRUCTURAL
℄
℄
℄
℄
℄
PROJECT ID: HWXFPLZA
10/16/2013
EXISTING ABUTMENT SHEET: 032 OF 122
NO.: A-318
CONSULTANT DESIGN
EXISTING STAIR STRUCTURE, HANGERS, POSTS, STRINGERS TO BE STRIPPED, PRIMED & REPAINTED; ITEM 7.04S EXISTING BRIDGE STRUCTURE
EXISTING REIN. CONC TREADS, RISERS & LANDINGS TO BE POWER-WASHED & RE-SEALED, REFURBISH ANY UNEVEN SURFACE & SAFETY TREAD INSERTS; ITEM 8.53SMR EXISTING GUARD RAIL TO BE STRIPPED, PRIMED & REPAINTED; ITEM 7.04S
9 DATE: A-340
NOT FOR CONSTRUCTION
EXISTING STAIR STRUCTURE, HANGERS, POSTS, STRINGERS TO BE STRIPPED, PRIMED & REPAINTED; ITEM 7.04S EXISTING BRIDGE STRUCTURE
GE ST STL GLASS GLES
EXISTING APPROACH SLAB
FORDHAM PLAZA
DEPARTMENT OF DESIGN + CONSTRUCTION EXISTING ABUTMENT DIVISION OF INFRASTRUCTURE BUREAU OF DESIGN
3'-0"
1 2" Ø ST STL GUARDRAIL SUPPORTS WELDED TO GUARDRAIL AND COLUMN
5
AERIAL VIEW
EXISTING REIN. CONC TREADS, RISERS & LANDINGS TO BE POWER-WASHED & RE-SEALED, REFURBISH ANY UNEVEN SURFACE & SAFETY TREAD INSERTS; ITEM 8.53SMR EXISTING GUARD RAIL TO BE STRIPPED, PRIMED & REPAINTED; ITEM 7.04S
TO TRACK PLATFORM EL +43.80' VIF
EXISTING PLATFORM
EXISTING RETAINING WALL
EXISTING RETAINING WALL
STAIRWELL TO METRO-NORTH RAILROAD TRAIN STATION 2
MNR STAIR SECTION 1 SCALE: 1/4" = 1'-0"
TO TRACK PLATFORM EL +43.80' VIF
EXISTING PLATFORM
3
MNR STAIR SECTION 2 SCALE: 1/4" = 1'-0"
FACE OF BUILDING
LUM LOUVER ASSEMBLY, GH PERFORMANCE FINISH
LUMINUM COPING MILL FINISH LUMINUM FLASHING ATERPROOFING MEMBRANE RDPROOFING
T STL FLASHING
EALANT AND BACKER EMBRANE R BARRIER (BLACK)
METAL PANELS AT SOFFIT SHALL INCLUDE UPPER AND LOWER PANELS, SNOW STOPS, LIGHT COVE, AND ALL CLIPS, ANCHORS, GIRTS, ETC.
LIP ASSEMBLY ANCHOR TO CONCRETE
NOTE: ROOFTOP SAFETY EQUIPMENT PER SPECIFICATION TYP TOP OF ROOF BEYOND MEMBRANE ROOFING DRAIN TRENCH ROOF DRAIN EXT SHEATHING TAPERED RIGID INSULATION
LUM PANEL HIGH ERFORMANCE COATING VARIES
ETAL WALL PANEL ASSEMBLY CLUDES ITEMS DELINEATED BY THE ASHED LINE. INCLUDE FINISHED ETAL PANELS, CLIPS, SUPPORT AND NCHORAGE TO BUILDING STRUCTURE. CLUDE BASE TRIM, ETC
PROVIDE INDEPENDENT MOVEMENT BETWEEN CANOPY AND MARKET SHED SEE DWG 7 SHT S-331 FOR MORE INFORMATION
SNOW STOPS
WORKPOINT LOCATION SEE S-310 DRAWING 5 FOR MARKET CANOPY COLUMN WP GEOMETRY
ONCRETE WALL
WORKPOINT LOCATION SEE S-310 DRAWING 5 FOR MARKET CANOPY COLUMN WP GEOMETRY
CEILING BEYOND GALV STEEL STANCHION LOUVER MTL FLASHING ALUM COPING W/ MILL FIN ELECTRICAL TAPE MTL FLASHING SEALANT AND BACKER
+8'-4" TO CMU WALL
GALV SHELF ANGLE
+8'-2" TO PANEL
COLUMN WITH HIGH PERFORMANCE COATING, TYP. VISIBLE SECTIONS OF COLUMN AESS
2 THIS SHEET
ONTINUOUS ST STL TRIM ANGLE BER CEMENT PANEL PTD BLACK T STL FLASHING
EBAR AS SCHEDULED EE STRUCTURAL
LUMINAIRE STRUCT STEEL
LUMINAIRE WOOD SLAT SOFFIT CEILING BATTEN
CL STRUCT STEEL
LUM PANEL HIGH ERFORMANCE COATING
ONC PAVING OMPRESSIBLE FILLER EALANT AND BACKER
CLIP ALUM MTL PANEL STRUCT STEEL GALV ANGLE FRAME ALUM MTL PANEL
+/-
CL OF JOINT
T STL CLIP EALANT AND BACKER
SNOW STOPS
CL
R BARRIER (BLACK)
LIP ASSEMBLY NCHOR TO ONCRETE
EXTERIOR
BOLLARD PART OF MARKET CANOPY NO SEPARATE PAY ITEM TYP DRAWING 15 SHT A-380
EXT SHEATHING CLIP ICE SHIELD SUPPORTED ON EXT SHEATHING TYP
EXT SHEATHING CLIP ICE SHIELD SUPPORTED ON EXT SHEATHING TYP
+11' 2-3/16"
EMBRANE ATERPROOFING
SEALANT AND BACKER ALUM FLASHING MEMBRANE ROOFING
METAL WALL PANEL ASSEMBLY INCLUDES ITEMS DELINEATED BY THE DASHED LINE. INCLUDE FINISHED METAL PANELS, CLIPS, SUPPORT AND ANCHORAGE TO BUILDING STRUCTURE. INCLUDE BASE TRIM, ETC
CL
CLIP ASSEMBLY CMU WALL WATER, VAPOR BARRIER AIR BARRIER (BLACK)
MARKET SHED
METAL WALL PANEL ASSEMBLY +2'-3" CL RAIL RAIL
3
CONCRETE SLAB COLUMN BEYOND VAPORBARRIER GRAVEL FILL COMPACTED SUBGRADE
THIS SHEET
ST STL CLIP ST STL ANGLE, MILL FINISH GALV MTL FLASHING SEALANT AND BACKER PAVEMENT AS SCHEDULED
+0'-0"
RAIL ELEVATION OF GRIDLINE
ELEV 60.5 GRIDLINE ELEVATION
ITEM 9.60B2
ITEM 9.60B2 WORKPOINT LOCATION SEE S-310 DRAWING 5 FOR MARKET CANOPY COLUMN WP GEOMETRY
SECTION THROUGH FARMER’S MARKET STORAGE
WALL SECTION
WORKPOINT LOCATION SEE S-310 DRAWING 5 FOR MARKET CANOPY COLUMN WP GEOMETRY
FARMER’S MARKET CANOPY AND STORAGE
PLANTERS WITH REMOVABLE BENCHES
ALTERNATIVE LOCATION OF BENCH; SEE 1/A-100
WEEP HOLES, 1" Ø, 3 PER MTL PLANTER COMPONENT
4
WEEP HOLES, 4'-0" OC 4 A-350
5 A-350
GALV STL FIN SUPPORT
3 A-350
6" X 12" GALV STL TUBES BELOW PLANTER BED TOP VARIES
OUTLINE OF WOOD PLANKS BOLTED TO GALV STL PLATE FROM BELOW THERMALLY MODIFIED WOOD PLANK BENCH; ITEM 7.50WSSA
℄
℄
℄
TO PAVEME
℄
+0'-0"
6 A-350
PLAN
1
6"
SCALE: 3/4" = 1'-0"
FOR SOIL AND PLANTS, REFER TO LANDSCAPE DRAWINGS MOLDED GALV STL ANGLE WELDED TO GALV STL PLATE MOLDED GALV STL ANGLES WELDED TO PLANTER WALL WP TERMINATION BAR
2'-10"
6.00°
2°
.0
92
1'-5"
GALV STL PLANTER WALL GALV STL SUPPORTS WELDED TO FRAME 2" RIGID INSUL ON STICK PIN, TYP WATERPROOFING ROOT BARRIER WOOD PLANKS BOLTED TO GALV STL FROM UNDERSIDE REMOVABLE BENCH AND GALV STL T BOLTED TO GALV STL ANGLES; ITEM 7.50WSSA GALV STL ANGLES WELDED TO GALV STL PLANTER WALL FILTER LAYER
6"
DRAINAGE LAYER TO PAVEMENT +0'-0"
2
SECTION DETAIL
GALV STL PLANTER BED WELDED TO 6"x12" GALV STL TUBE REMOVABLE GALV STL MESH PLATE BOLTED TO GALV STL TABS
SCALE: 1 1/2" = 1'-0"
SECTION THROUGH TRANSPORTABLE PLANTERS WITH REMOVABLE BENCHES TOP VARIES
TOP VARIES
TO PAVEME +0'-0"
CROTON GOLF COURSE CLUBHOUSE Site: Van Cortlandt Park, Bronx, New York, USA 2013 As part of the city’s infrastructure development, a new water treatment plant was to be constructed in Van Cortlandt Park in the Bronx, at the confluence of the Croton Watershed. Due to its location within a public park and on the site of an existing golf course, the treatment plant was designed with a green roof driving range. Package 4 included the design of a clubhouse wrapping the perimeter of the treatment plant. In order to illustrate the process of natural water filtration, a series of water cells filters greywater on site to be used for irrigation on the golf course and driving range. The clubhouse incorporates class curtain walls and wood paneling and mullions to accentuate connections between the indoors and nature. As the building peels away from the treatment plant, corridors, joint lines, and lighting follow the layers created. My roles in this project were on Construction Documents, drafting and coordinating with lighting, MEP, and landscape consultants.
MATER AESS-4 ROOF MEMBRANE
FB-01
7'-2 1/2"
GR-01
DRIVING RANGE LIGHTING AESS MEMBRANE PLATE TO A-142FIXTURE REFER WITH GALVANIZED A-148 FORSTEEL LOCATION FITTINGSAF4 AESS-4
PV-01 STEEL LIGHTING POLE AESS-4
PVC COATED WIRE EDGE ROPE REFER TO STRUCTURAL DWGS FOR SCHEDULE
STEEL LIGHTING POLE AESS-4
PRECAST CONC PLINTH TO SUPPORT SPORTS LIGHTING POLE PV-04
AESS BALE RING
9'-9 1/2"
DRIVING RANGE LIGHTING FIXTURE REFER TO A-142A-148 FOR LOCATION AF4 PRECAST CONC PLINTH TO SUPPORT SPORTS LIGHTING POLE
C.I.P. CONCRETE PV-01 PLANKS TEE BOX SST. HANDRAIL GR-01 DOWNLIGHT REFER TO DWG AD7 A-887
NYLON IMPACT NETTING AESS-4 SECURED WITHIN A GALVANIZED ANGLE FRAME AND SECURED TEE BOX BETWEEN DOWN LIGHT PRECAST PANELS AD6
T.O.DRIVING WALL RANGE EL. LIGHTING VARIES AF4 T.O.F. 196'-0" H.P.
LIGHT WEIGHT METAL MESH SURFACE MOUNT AND CANTILEVERED FRAME LINEAR FLORESCENT FOR FALL PROTECTION AL6
PV-04 PRECAST CONC TEE BOX FLOOR
CONDUITS FASTENED TO SLAB 7'-0"
PV-04 NYLON IMPACT NETTING SECURED WITHIN A GALVANIZED ANGLE FRAME AND SECURED BETWEEN PRECAST PANELS
FITTINGS BOLTED IN FIELD
LIGHT WEIGHT GOLF PAINTED AESS TEE BOX CANOPY NETTING FOR BALL STRUCTURE REFER TO STRUCTURAL COLLECTION AND PROTECTION DRAWINGS OF WETLAND CELL 7 BELOW AESS-4 07-07
LIGHT WEIGHT METAL MESH AND CANTILEVERED FRAME FOR FALL PROTECTION
PRECAST CONC TEE REFER TO RADIANTBOX GAS FLOOR HEATING STRUCTURAL SUSPENDED BETWEEN DRAWINGS TEE BOX STRUCTURES
LIGHT WEIGHT GOLF NETTING FOR BALL COLLECTION AND PROTECTION OF WETLAND CELL 7 BELOW 07-07
MOUNT ROOF DRAIN SCUPPER AND LEADER TO TEE BOX STRUCTURE. DRAIN TO LIGHT WEIGHT GOLF CELL 7 NETTING FOR BALL COLLECTION AND PROTECTION STL. BASE PLATE AESS FINISH OF WETLAND CELL 7 BELOW 07-07
1-1/2" GUTTER (OPEN TO BELOW) CONCEALED CONDUIT FROM PLINTH BELOW
NYLON IMPACT SYNTHETIC MATS NETTING PROVIDED BY PARTITIONS CONCESSIONAIRE
PRECAST CONC PLINTH PV-04 NYLON IMPACT NETTING PRECASTSECURED CONC. WITHIN A GALVANIZED TEE BOX ANGLE FLOOR FRAME AND SECURED PV-04 BETWEEN PRECAST PANELS
3 -
FALL-SAFE SHELF T.O. WALL EL. VARIES
LIGHT WEIGHT METAL MESH AND CANTILEVERED FRAME FOR FALL PROTECTION
LIGHT WEIGHT GOLF NETTING FOR BALL COLLECTION AND PROTECTION OF CELL 7
2 -
07-07 ENLARGED PLAN
SCALE : 1/4" = 1'-0"
REF. 1/A-128
T.O. WALL EL. VARIES
3 -
DRIVING RANGE LIGHTING FIXTURE REFER TO A-142A-148 FOR LOCATION AF4
GRIMSHAW 637 West 27th Street New York NY10001 T +1 646 293 3600
PV-03 PV-04
MATCH LINE REFER TO A-201
1 A-300
KEY PLAN
1 A-301
SST GUARD RAIL, TYP. STAIR #1, REFER TO A-650, A-651
GFRC ROOF EAVE PANEL, TYP.
CLUBHOUSE T.O. ROOF EAVE EL. 212'-6"
GL-02
W1
GL-02
GL-02
GL-02
GL-02
GL-02
GL-02
AF-3 GL-02
GL-02
GL-02
GL-02
GL-02
GL-02
AF-3 GL-02
GL-02
GL-02
GL-02
GL-02
GL-07
AF-3
GL-07
GL-07
GL-07
GL-02
GL-02
GL-02
GL-07
GL-07
AF-3 GL-02
GL-07
GL-07
GENERAL NO
B.O. SOFFIT EL. 208'-0"
1. FOR CURTAIN W GLAZING JOINT LO
2. FOR EQUIPMEN
3. FOR FINISHES M REFER TO DWG. A
AF-3
4. STONE SHELF T BELOW GRADE
7'-10"
5. FOR FOOTING L DWGS. 8'-0"
STL COLUMN, TYP. REFER TO STRUCT. DWGS FOR ADD'L INFO
GL-02
AF-3 GL-04
W1
4'-0 1/2"
GL-02 AF-3
W1
W1
T.O.S. ROOF EL. 210'-10"
1 1/2"
4'-0"
GFRC ROOF SOFFIT
4'-0" TYP
GF-01
T.O.F. 1ST FLOOR EL. 196'-0"
WOOD CLAD MULLION
EAST ELEVATION (UNFOLDED W/O SITE WALL)
WD-06
REFER TO DWG 1/A-010
1
1
A-300
A-301
REFER TO A-201
SCALE : 1/4" = 1'-0"
MATCH LINE
2 --
T.O. ROOF EAVE EL. 212'-6" T.O.S. ROOF EL. 210'-10"
SUBVERSIVE URBANISM Site: Hong Kong Partner: Chris Cornelissen 2011 - 2012 Hong Kong owes much of its success to its position as the world’s freest economy, maintaining this status through coordinated actions by the power elite of government, finance and media. However, increasing vulnerability to financial turbulence and rising poverty levels necessitate a reevaluation of traditional power within Hong Kong. Approaching this project from the framework of a social movement, parasitic analogies are used to harness the strengths of people to instigate change within the city. By operating outside legal boundaries, residents organise around a series of crowd-driven, “underground� nighttime events. These initiatives lead to an overnight occupation of empty lands with demountable structures and a popular appeal for support through mass self-communication. Owing to the interests and strengths of neighbourhood residents, local development represents the community through peer-to-peer lending and open-source methods of determining built forms and functions. Increased involvement and confidence by citizens in their abilities to construct the city encourages further investment in similar developments elsewhere. Reparasitisation and alteration continues to align the city towards economic and social sustainability.
NATURAL SYSTEMS RESEARCH PARASITES
1
3
2
1
2
3
XY
.25µm
XX The wasp lays up to 80 eggs beneath the cuticle of the caterpillar as well as injecting the polydnavirus.
The Sacculina Barnacle swims through the ocean until it reaches a crab. It releases its own shell and burrows through a joint on the crab. The Sacculina burrows to the crab’s abdomen. From there, it grows ciliary branches through the crab’s body. These are used to feast off the crab and to release chemicals to affect the crab’s neuromodulators.
6
About one day before emerging from the cuticle, the larvae secrete compounds which prevent the caterpillar’s ability to feed and move while the larvae chew their way out of the cuticle.
5
4
Neuromodular alteration now makes the caterpillar aggressive towards other parasitic animals that may try to parasitize the pupating wasps.
With the alteration of the host’s central nervous system now complete, the caterpillar spins silk cocoons around the wasp pupa instead of for itself, cementing its own fate towards death.
4
Once ready to hatch, the male or female crab will fan its claws to ensure that the newly-hatched Sacculina disperse, much as it would for its own young. The mother Sacculina will remain in the crab to await further fertilization.
After about 4-5 days, the wasps moult from their cocoons. Since the caterpillar’s neuromodulators have prevented it from foraging for food it eventually dies from starvation. Sources http://en.wikipedia.org/wiki/Sacculina http://www.springerlink.com/content/l6nhecf68jb192j8/fulltext.pdf http://nucleodecenio.blogspot.com/2008/02/horrid-phenotypic-integration.html
SACCULINA BARNACLE
The microsopic male Sacculina will enter through a crevice in the enlarged female to fertilize it. From the site of the female crab’s eggsac or the male’s reshaped abdomen, the crab will brood Sacculina eggs as if they were its own.
GLYPTAPANTELES
Sources http://www.ppls.ed.ac.uk/ppig/documents/parasitic_manipulation.pdf http://www.plosone.org/article/info:doi/10.1371/journal.pone.0002276 http://en.wikipedia.org/wiki/Glyptapanteles
5
If the Sacculina infects a male crab, it will reshape the crab’s abdomen to match a female’s. Neuromodulator modification will also convince the male crab to perform actions equal to that of a female. If the Sacculina infects a female crab, it will sterilize it.
The wasp larvae hatch and develop beneath the caterpillar’s cuticle, being sure not to damage any internal organs or touch the central nervous system. During the larval stage, the wasps release chemicals that alter neuromodulators released by the caterpillar.
WEAK SPOTS
2. FAILURE OF INSTITUTIONS WEAK SPOTS + AGENTS FOR SUBVERSION
ISOLATED DEVELOPMENTS
HIGHWAYS
LAND RECLAMATIONS
SUBVERSION AGENTS
PROXIMITY TO PROBLEMS
POTENTIAL FOR SUBVERSION
UNAATRACTIVE LAND FOR POWER TRIANGLE
SUBVERSION TIMELINE THE EIGHT STAGES OF SUCCESSFUL SOCIAL MOVEMENTS
3. RIPENING CONDITIONS
3. RIPENING CONDITIONS SECRET CINEMA, FOOD CARTS AND ART GALLERY UNDER THE HIGHWAY
4. TAKE OFF
4. TAKE OFF VISIBLE OCCUPATION OF CAR PARK TO THE WEST OF THE HIGHWAY
DIGITAL CONTENT
CROWD-SOURCED FUNDRAISING
PEER-TO-PEER FUNDRAISING
BUILDING WIKI: DOWNLOAD, EDIT, PRINT
PLANNING WIKI
6. MAJORITY PUBLIC SUPPORT
6. MAJORITY PUBLIC SUPPORT RE-INTRODUCTION OF MANUFACTURING IN HONG KONG
7. SUCCESS
7. SUCCESS OFFICIAL ADOPTION OF ALTERNATIVE FORMS OF URBAN DEVELOPMENT COLLECTIVE FUNDING AND CONSTRUCTION ON A LARGE SCALE
PROGRAMMING
PROGRAMME DISTRIBUTION
PLANNING WIKI
CONSTRUCTION #41 HOUSING INITIATED BY CITY OF HONG KONG
CO HO
INITI YAU SEN
CONSTRUCTION #62 HOUSING
INITIATED BY HONG KONG PLANNING DEPARTMENT
CONSTRUCTION #23 SPORTS
CONSTRUCTION #29 HOUSING
INITIATED BY COMMUNITY COLLEGE
INITIATED BY PROSTITUES
REPARASITISATION CONSTRUCTION #12 HOUSING INITIATED BY P2P DEVELOPMENT GROUP
REPARASITISATION CONSTRUCTION #52 GALLERY
REPARASITISATION
INITIATED BY M+
CONSTRUCTION #8 GOVERNANCE
INITIATED BY GRASSROOTS MOVEMENT
CONSTRUCTION #34 SCHOOL INITIATED BY YAU MA TEI COUNSIL
REPARASITISATION CONSTRUCTION #51 MUSIC VENUE INITIATED BY XIQU ORGANISATION
CONSTRUCTION #22 MANUFACTURING
INITIATED BY FRUIT MARKET WORKERS
CONSTRUCTION #9 MANUFACTURING INITIATED BY WIKIHOUSE
CONSTRUCTION #7 OFFICE INITIATED BY DESIGNERS
CONSTRUCTION #21 MANUFACTURING INITIATED BY YAU MA TEI CAMERA
REPARASITISATION
CONSTRUCTION #7 MANUFACTURING
REPARASITISATION
CINEMA
INITIATED BY YAU MA TEI DESIGN & MAKE
CONSTRUCTION SHOPS
FRUIT MARKET
INITIATED BY SHANHAI STREET SHOP OWNERS
REPARASITISATION
URBAN MAPPING IN 3 DISTRICTS Office Project Site: San Juan Bautista, Misiones, Paraguay Site: Villarrica, Guairá, Paraguay Site: Limpio, Central, Paraguay 2009 - 2010 Two regional cities (San Juan Bautista and Villarrica) and a suburb of Asunción (Limpio) were selected to participate in a development program to establish urban planning programs within each district’s city hall. The projects consisted of surveying the existing urban infrastructure of the cities and subsequent graphic and numerical introduction into computer systems within the respective city halls. Collected data would be used for accurate property tax collection corresponding to land value as well as the economic and historic value of constructions within the property. Data would also be applied to planning practices to effectively deliver city services to different neighborhoods and develop informed guidelines for subsequent city growth.
SURVEYED AREA OF VILLARRICA WITH LOTS AND CONSTRUCTIONS
COMPUTER APPLICATION LESSONS
LEGAL DOCUMENT DEDUCTION
PROPERTY MEASUREMENT
PROPERTY DOCUMENT INSPECTION
DISTRICT PLAN OF LIMPIO
SAN JUAN BAUTISTA WITH LOTS AND CONSTRUCTIONS
SAN JUAN BAUTISTA WITH NEIGHBOURHOOD DIVISIONS
BRIGHTON ROAD URBAN FARMING School Project Site: Brighton Road, Pittsburgh, Pennsylvania, United States Partners: Nina Marie Barbuto and Jenna Kappelt 2006 Joining dense urban planning with strategically-located urban farmland, this design creates a unique identity for the people that live in the three neighborhoods that border Brighton Road. Redevelopment would be supported by urban farming and an adjoining food cooperative to sell the locally-grown food. Materials of demolished buildings would be reused in the construction of infill development and existing structures would be adapted to farming use on the southern slopes of the site. Pedestrian paths would connect urban farming and new commercial, centered around a Food Cooperative, with elements such as benches and parks constructed from the materials of demolished buildings.
Green Spaces
Analysis of Abandoned Buildings
SITE FORCES
Summer Shadows
Good/Marginal Physical & Architectural Condition Community Priority Buildings Poor Physical & Architectural Condition
Buildings
Roads
Winter Shadows
Parking
Green Spaces
Watershed
Slope Severity STANDING WATER slope <1% COMFORTABLE ACTIVITY 4%<slope<10% NEED RUNOFF PROTECTION 20%<slope NEEDS TERRACING or REGRADING 50%<slope
Analysis of Abandoned Buildings Good/Marginal Physical & Architectural Condition Community Priority Buildings Poor Physical & Architectural Condition
YOUTH PHOTOGRAPHY COURSE Volunteering Activity Site: Emboscada, Cordillera, Paraguay 2008 Beginning with the formation of an organizational comittee, strategic planning and fundraising activities were successful in securing the purchase of five digital cameras. A program was established to teach adolescent youth from an underserved city in Paraguay technical and creative skills of photography as a means of selfexpression and exploration. Seminars encouraged students to compare and contrast their own photographs with those of their peers as well as photographs from famous photographers from throughout the world. Included are examples of results from the class.
SENCILLO Y VACÍO BY KARINA LEZCANO
PREVIOUS PAGE: CULTURA GUARANI BY JUNIOR ORTIZ
A KAÑY BY RODRIGO DELACRUZ
AT RIGHT: ASAYE BY RODRIGO DELACRUZ
MOKAYA RATÎ BY RODRIGO DELACRUZ
AT LEFT: CUMPLEAÑERO BY SONIA VALDEZ
ITA ARI AGUATA BY RODRIGO DELACRUZ