FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
TENTATIVE WORK PROGRAM REPORT
DRAFT
July 1, 2015 Through June 30, 2020
POLK COUNTY
Tentative Work Program Fiscal Years 2016 - 2020 FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Run Date: 11/24/2014
Page: 1
SnapShot Date: 11/12/2014
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
TENTATIVE WORK PROGRAM REPORT
DRAFT
July 1, 2015 Through June 30, 2020
POLK COUNTY
MISSION STATEMENT The Department will provide a safe, interconnected statewide transportation system for Florida's citizens and visitors that ensures the mobility of people and goods, while enhancing economic prosperity and sustaining the quality of our environment.
Robin Stublen Communications Specialist District One Headquarters 801 North Broadway P.O. Box 1249 Bartow, FL 33831 (863) 519-2362
Debbie Tower Communications Director Southwest Area Office 10041 Daniels Parkway Fort Myers, FL 33913 (239) 461-4300
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Run Date: 11/24/2014
Page: 2
SnapShot Date: 11/12/2014
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
TENTATIVE WORK PROGRAM REPORT
DRAFT
July 1, 2015 Through June 30, 2020 CURRENTLY REPORTED ACTIVE FUND CODES ACSU BRRP CIGP CM DDR DI DIH DITS DPTO DS DU DWS FAA FTA FTAT HSP LF LFP PKYI PKYR PL RHH SA SL SU TRIP ACBZ ACNP ACTU NHRE TALT TALU
PHASE CODES
POLK COUNTY
Advance Construction (SU) State Bridge Repair And Rehab County Incentive Grant Program Congestion Mitigation – ACQ District Dedicated Revenue State-Statewide Inter/Intrastate Highway State In-house Product Support Statewide ITS - State 100% State PTO State Primary Highways and PTO State Primary/Federal Reimbursement Weigh Stations - State 100% Federal Aviation Administration Federal Transit Administration FHWA Transfer to FTA (non-bud) Highway Safety Program Local Funds Local Fund for Participating Tpk Improvement Tpk Maintenance Reserve Metro Plan (85% FA; 15% other) Rail-Highway Xings – Hazard STP, Any Area STP, Areas < 200k STP, Urban Areas > 200k Trans Regional Incentive Prog Advance Construction BRTZ Advance Construction NHPP Advance Construction TALU NAT HWY Perform Resurfacing Transportation ALTS ANY AREA Transportation ALTS >200K
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Run Date: 11/14/2014
Page: 3
SnapShot Date: 11/12/2014
DRAFT
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT July 1, 2015 Through June 30, 2020
POLK COUNTY
HIGHWAYS FPN: Desc:
4136441
Project/Location: AUBURNDALE TRAFFIC SIGNALS REIMBURSEMENT
TRAFFIC SIGNALS
Project Length:
0.820
Begin Mile Post:
10.690
End Mile Post:
11.510
Phase
Fund
OPS
DDR
2015/16
$25,536
2016/17
$26,303
2017/18
$27,092
2018/19
$27,904
2019/20
$28,741
Project Total:
$25,536
$26,303
$27,092
$27,904
$28,741
Comments: FPN:
4328091
Desc:
RAIL SAFETY PROJECT
Project Length:
Project/Location: BAKER ST FROM N VAN FLEET DR TO BRITTS LANE-XING #624503-T 0.201
Begin Mile Post:
0.000
End Mile Post:
0.201
Phase
Fund
2015/16
RRU
RHH
$270,600
Project Total:
$270,600
2016/17
2017/18
2018/19
2019/20
2016/17
2017/18
2018/19
2019/20
2018/19
2019/20
Comments: FPN: Desc:
4367951
Project/Location: BARTOW ADAPTIVE DBOM US 98 FROM MANOR DR TO US 17
ATMS - ARTERIAL TRAFFIC MGMT
Project Length:
1.111
Begin Mile Post:
1.194
End Mile Post:
1.994
Comments:
Phase
Fund
PE
DI
$75,000
DSB
DI
$793,046
DSB
DIH
$25,675
OPS
DI
Project Total: FPN:
4313521
Desc:
NEW ROAD CONSTRUCTION
Project Length:
Project/Location: BARTOW NORTHERN CONNECTOR PHASE II FROM US 17 TO SR 60 2.000
Begin Mile Post:
2.062
End Mile Post:
4.062
Comments:
FPN: Desc:
4136451
Project/Location: BARTOW TRAFFIC SIGNALS REIMBURSEMENT
TRAFFIC SIGNALS
Project Length:
1.002
Begin Mile Post:
16.896
End Mile Post:
17.898
2015/16
$893,721 2015/16
$109,334
$109,334
$109,334
$109,334
Phase
Fund
CST
CIGP
$467,864
CST
LFP
$9,819,995
CST
TRIP
$2,998,420
Project Total:
$13,286,279 2015/16
2016/17
2016/17
2017/18
Phase
Fund
OPS
DDR
$36,480
$37,575
2017/18
$38,702
2018/19
$39,863
2019/20
$41,059
Project Total:
$36,480
$37,575
$38,702
$39,863
$41,059
Comments: FPN:
4332571
Desc:
BIKE PATH/TRAIL
Project Length:
Project/Location: BELLA VISTA FROM MLK JR AVE TO LAKE PARKER DRIVE 0.000
Begin Mile Post:
0.000
End Mile Post:
0.000
Phase
Fund
2015/16
LAR
ACTU
$320,287
Project Total:
$320,287
2016/17
2017/18
2018/19
2019/20
Comments:
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Run Date: 11/24/2014
Page: 4
SnapShot Date: 11/12/2014
DRAFT
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT July 1, 2015 Through June 30, 2020 FPN: Desc:
4345081
Project/Location: BOMBER ROAD AT SPRUCE ROAD AND GERBER ROAD
INTERSECTION IMPROVEMENT
Project Length:
1.000
Begin Mile Post:
0.000
End Mile Post:
1.000
Comments:
Phase
Fund
ENV
SA
CST
HSP
CST
SA
Project Total: FPN: Desc:
4351071
Project/Location: BRUNNELL PARKWAY FROM MEMORIAL BLVD TO TENTH STREET
SIDEWALK
Project Length:
0.556
Begin Mile Post:
0.844
End Mile Post:
1.400
Phase
Fund
CST
SU
2015/16 $10,000
POLK COUNTY 2016/17
2017/18
2018/19
2019/20
2017/18
2018/19
2019/20
2017/18
2018/19
2019/20
$20,000
$661,193 $10,530 $10,000 2015/16
$691,723 2016/17 $151,090
Project Total:
$151,090
Comments: FPN:
4316411
Desc:
NEW ROAD CONSTRUCTION
Project Length:
Project/Location: CENTRAL POLK PWKY FROM POLK PWKY (SR 540) TO SR 35 (US 17) 7.103
Begin Mile Post:
0.000
End Mile Post:
7.103
Desc:
4316412
Project/Location: CENTRAL POLK PWKY FROM SR 35 (US 17) TO LOGISTICS PARKWAY
NEW ROAD CONSTRUCTION
Project Length:
5.794
Begin Mile Post:
7.103
End Mile Post:
12.897
4316418
Desc:
NEW ROAD CONSTRUCTION
Project Length:
Project/Location: CENTRAL POLK PWKY FROM US 17/US 92 TO I4 0.001
Begin Mile Post:
0.000
End Mile Post:
0.001
Desc:
1976204
Project/Location: CITY OF LAKELAND LEASE OF FIBER OPTIC NETWORK
TRAFFIC CONTROL DEVICES/SYSTEM
Project Length:
0.000
Begin Mile Post:
0.000
End Mile Post:
ROW
DDR
$1,966,740
$1,985,083
ROW
DIH
$151,944
$136,943
$2,118,684
$2,122,026
Phase
Fund
ROW
DDR
ROW
DIH
2015/16
2016/17
2016/17
2017/18
Phase
Fund
PE
DDR
PE
DIH
0.000
Phase
Fund
OPS
SL
Project Total:
2018/19
$4,611,162
2015/16
2016/17
2019/20
$3,479,790
$506,479
$456,479
$5,117,641
$3,936,269
2017/18
2018/19
2019/20
2017/18
2018/19
2019/20
$9,212,000 $110,000
Project Total:
Comments: FPN:
2015/16
Project Total:
Comments: FPN:
Fund
Project Total:
Comments: FPN:
Phase
$9,322,000 2015/16
2016/17
$20,278
$20,278
$20,278
$20,278
$20,278
$20,278
$20,278
$20,278
$20,278
$20,278
Comments: FPN:
4367891
Desc:
RAIL SAFETY PROJECT
Project Length:
Project/Location: COLEMAN RD RECKER HWY TO 26TH ST X-ING # 625397R 0.122
Begin Mile Post:
1.021
End Mile Post:
1.143
Phase
Fund
2015/16
RRU
RHH
$276,600
Project Total:
$276,600
2016/17
2017/18
2018/19
2019/20
Comments:
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Run Date: 11/24/2014
Page: 5
SnapShot Date: 11/12/2014
DRAFT
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT July 1, 2015 Through June 30, 2020 FPN: Desc:
4317721
Project/Location: COW CAMP ROAD BRIDGE NO. 160400 OVER ROSALIE/ZIPPRER CANAL
BRIDGE REPLACEMENT
Project Length:
0.001
Begin Mile Post:
0.000
End Mile Post:
0.001
2015/16
POLK COUNTY
Phase
Fund
CST
ACBZ
2016/17 $1,668,600
2017/18
2018/19
2019/20
Project Total:
$1,668,600
2016/17
2017/18
2018/19
2019/20
2016/17
2017/18
2018/19
2019/20
2016/17
2017/18
2018/19
2019/20
2016/17
2017/18
2018/19
2019/20
2016/17
2017/18
2018/19
2019/20
2017/18
2018/19
2019/20
Comments: FPN: Desc:
4367871
Project/Location: CR 542 OLD TAMPA HWY FROM GAY RD TO DOC GAY RD X-ING #624214S
RAIL SAFETY PROJECT
Project Length:
0.199
Begin Mile Post:
2.659
End Mile Post:
2.858
Phase
Fund
RRU
RHH
2015/16
$119,671
Project Total:
$119,671
Comments: FPN:
4367911
Desc:
RAIL SAFETY PROJECT
Project Length:
Project/Location: CR 542 OLD TAMPA HWY FROM GAY RD TO GAY RDX-ING #624215Y 0.034
Begin Mile Post:
2.625
End Mile Post:
2.659
Phase
Fund
2015/16
RRU
RHH
$119,671
Project Total:
$119,671
Comments: FPN: Desc:
4332721
Project/Location: CR 544 AT SR 17
INTERSECTION IMPROVEMENT
Project Length:
0.001
Begin Mile Post:
0.000
End Mile Post:
0.001
4332741
Desc:
SIDEWALK
Project Length:
Project/Location: CR 655 (RIFLE RANGEROAD) FROM 10TH STREET E TO BOMBER ROAD 0.865
Begin Mile Post:
9.645
End Mile Post:
Fund
CST
LF
$70,485
CST
SU
$1,000,182
Project Total:
Comments: FPN:
Phase
10.510
Phase
Fund
CST
SU
Project Total:
2015/16
$1,070,667 2015/16
$295,146 $295,146
Comments: FPN: Desc:
4349421
Project/Location: CREWS LAKE RD FROM LAKELAND HIGHLANDS RD TO KITTY FOX
TRAFFIC OPS IMPROVEMENT
Project Length:
2.770
Begin Mile Post:
0.000
End Mile Post:
2.770
4350691
Desc:
SIDEWALK
Project Length:
Project/Location: CRYSTAL LAKE DR FROM US 98 TO NEW JERSEY RD 0.343
Begin Mile Post:
Comments:
PHASE CODES
0.326
End Mile Post:
Fund
CST
HSP
2015/16
$1,483,046
CST
SA
$8,424
Project Total:
Comments: FPN:
Phase
0.669
Phase
Fund
CST
ACSU
CST
SU
Project Total:
$1,491,470 2015/16
2016/17
$550,159 $1,000 $551,159
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Run Date: 11/24/2014
Page: 6
SnapShot Date: 11/12/2014
DRAFT
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT July 1, 2015 Through June 30, 2020 FPN: Desc:
4350941
Project/Location: DAVENPORT COMPLETE STREET PHASE I AND PHASE II
SIDEWALK
Project Length:
0.001
Begin Mile Post:
0.000
End Mile Post:
0.001
2015/16
POLK COUNTY
Phase
Fund
PE
TALU
2016/17
2017/18
2018/19 $225,000
Project Total:
$225,000
2019/20
Comments: FPN: Desc:
4136461
Project/Location: DAVENPORT TRAFFIC SIGNALS REIMBURSEMENT
TRAFFIC SIGNALS
Project Length:
0.094
Begin Mile Post:
3.768
End Mile Post:
3.862
Phase
Fund
OPS
DDR
2015/16
$3,040
2016/17
$3,132
2017/18
$3,226
2018/19
$3,322
2019/20
$3,422
Project Total:
$3,040
$3,132
$3,226
$3,322
$3,422
Comments: FPN:
4361451
Desc:
DRAINAGE IMPROVEMENTS
Project Length:
Project/Location: DRAINAGE IMPROVEMENT CTY OF LAKE ALFRED FROM E HOFFMAN ST TO E ORANGE ST 0.199
Begin Mile Post:
15.215
End Mile Post:
15.414
Comments:
Phase
Fund
CST
DIH
$5,135
CST
DS
$374,757
CST
LF
$51,350
Project Total: FPN: Desc:
4136471
Project/Location: DUNDEE TRAFFIC SIGNALS REIMBURSEMENT
TRAFFIC SIGNALS
Project Length:
1.065
Begin Mile Post:
28.850
End Mile Post:
29.915
2015/16
2016/17
2017/18
2018/19
2019/20
2016/17
2017/18
2018/19
2019/20
$431,242
Phase
Fund
OPS
DDR
2015/16
$9,728
$10,020
$10,321
$10,631
$10,949
Project Total:
$9,728
$10,020
$10,321
$10,631
$10,949
Comments: FPN:
4136481
Desc:
TRAFFIC SIGNALS
Project Length:
Project/Location: EAGLE LAKE TRAFFIC SIGNALS REIMBURSEMENT 0.440
Begin Mile Post:
25.390
End Mile Post:
25.830
Phase
Fund
2015/16
2016/17
2017/18
2018/19
2019/20
OPS
DDR
$9,120
$9,394
$9,676
$9,966
$10,265
Project Total:
$9,120
$9,394
$9,676
$9,966
$10,265
Comments: FPN: Desc:
4332291
Project/Location: EAST LAKE HOWARD TRAIL
BIKE PATH/TRAIL
Project Length:
0.000
Begin Mile Post:
0.000
End Mile Post:
0.000
Comments: FPN:
4309181
Desc:
SIDEWALK
Project Length:
Project/Location: EASTSIDE ELEMENTARY SCHOOL SAFETY SIDEWALKS 0.000
Begin Mile Post:
0.000
End Mile Post:
0.000
Phase
Fund
CST
TALT
2015/16
$342,360
CST
TALU
$256,475
Project Total:
$598,835
Phase
Fund
2015/16
CST
TALT
$174,758
Project Total:
$174,758
2016/17
2017/18
2018/19
2019/20
2016/17
2017/18
2018/19
2019/20
Comments:
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Run Date: 11/24/2014
Page: 7
SnapShot Date: 11/12/2014
DRAFT
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT July 1, 2015 Through June 30, 2020 FPN: Desc:
4345021
Project/Location: EWELL ROAD AT LUNN RD
SKID HAZARD OVERLAY
Project Length:
5.000
Begin Mile Post:
0.000
End Mile Post:
5.000
Comments:
Phase
Fund
PE
HSP
CST
HSP
CST
SA
Project Total: FPN: Desc:
4136491
Project/Location: FROSTPROOF TRAFFIC SIGNALS REIMBURSEMENT
TRAFFIC SIGNALS
Project Length:
1.443
Begin Mile Post:
4.750
End Mile Post:
6.193
2015/16
POLK COUNTY 2016/17
2017/18
2018/19
2019/20
2017/18
2018/19
2019/20
$96,293
$463,342 $10,530 $96,293 2015/16
$473,872
Phase
Fund
OPS
DDR
$7,752
2016/17 $7,985
$8,225
$8,471
$8,725
Project Total:
$7,752
$7,985
$8,225
$8,471
$8,725
Comments: FPN:
4136501
Desc:
TRAFFIC SIGNALS
Project Length:
Project/Location: FT MEADE TRAFFIC SIGNALS REIMBURSEMENT 0.700
Begin Mile Post:
7.000
End Mile Post:
7.700
Phase
Fund
2015/16
2016/17
2017/18
2018/19
2019/20
OPS
DDR
$8,360
$8,611
$8,870
$9,136
$9,410
Project Total:
$8,360
$8,611
$8,870
$9,136
$9,410
Comments: FPN: Desc:
4136511
Project/Location: HAINES CITY TRAFFIC SIGNALS REIMBURSEMENT
TRAFFIC SIGNALS
Project Length:
1.270
Begin Mile Post:
21.500
End Mile Post:
22.770
Phase
Fund
OPS
DDR
2015/16
$38,912
2016/17
$40,080
2017/18
$41,282
2018/19
$42,521
2019/20
$43,796
Project Total:
$38,912
$40,080
$41,282
$42,521
$43,796
Comments: FPN:
4301853
Desc:
INTERCHANGE IMPROVEMENT
Project Length:
Project/Location: I-4 @ SR 33 INTERCHANGE MODIFICATION 0.650
Begin Mile Post:
12.032
End Mile Post:
Phase
12.682
Comments:
Fund
2015/16
2016/17
Desc:
2012178
Project/Location: I-4 AT CSX RAILROAD
REPLACE RAILROAD BRIDGE
Project Length:
0.004
Begin Mile Post:
4.887
End Mile Post:
4.891
2018/19
ENV
SA
ROW
DIH
$271,270
ROW
DS
$33,489
ROW
SA
2019/20
$1,300,000
$2,483,295
Project Total: FPN:
2017/18
$1,300,000
Phase
Fund
PE
ACNP
2015/16
$1,690,000
Project Total:
$1,690,000
2016/17
2017/18
$2,788,054 2018/19
2019/20
Comments:
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Run Date: 11/24/2014
Page: 8
SnapShot Date: 11/12/2014
DRAFT
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT July 1, 2015 Through June 30, 2020 FPN: Desc:
2012153
Project/Location: I-4 AT SR 557
INTERCHANGE IMPROVEMENT
Project Length:
1.610
Begin Mile Post:
21.767
End Mile Post:
22.878
Comments:
2015/16
POLK COUNTY
Phase
Fund
ENV
DI
2016/17
4273152
Desc:
ITS FREEWAY MANAGEMENT
Project Length:
Project/Location: I-4 FROM EAST OF POLK PARKWAY TO OSCEOLA COUNTY LINE
RRU
ACNP
$4,500,000
CST
ACNP
$54,664,218
CST
DIH
16.235
Begin Mile Post:
15.787
End Mile Post:
32.022
Comments:
Phase
Fund
FPN: Desc:
4328041
Project/Location: INTERLACHEN PKWY FROM FERN RD TO E GARY RD-XING# 624155-S
RAIL SAFETY PROJECT
Project Length:
0.091
Begin Mile Post:
0.168
End Mile Post:
0.259
2019/20
$508,099 $100,000 2015/16
PE
HSP
DSB
DIH
$23,621
DSB
HSP
$3,635,366
Project Total:
2018/19
$100,000
Project Total: FPN:
2017/18
$59,672,317
2016/17
2017/18
2018/19
2019/20
2016/17
2017/18
2018/19
2019/20
2016/17
2017/18
2018/19
2019/20
$75,000
$3,733,987
Phase
Fund
RRU
RHH
2015/16 $281,300
Project Total:
$281,300
Comments: FPN:
4136521
Desc:
TRAFFIC SIGNALS
Project Length:
Project/Location: LAKE ALFRED TRAFFIC SIGNALS REIMBURSEMENT 0.010
Begin Mile Post:
15.590
End Mile Post:
15.600
Phase
Fund
2015/16
OPS
DDR
$10,336
$10,647
$10,966
$11,294
$11,634
Project Total:
$10,336
$10,647
$10,966
$11,294
$11,634
Comments: FPN: Desc:
4351091
Project/Location: LAKE HOWARD DR FROM AVE D SW TO 15TH ST SW
BIKE PATH/TRAIL
Project Length:
0.001
Begin Mile Post:
0.000
End Mile Post:
0.001
Comments:
Phase
Fund
PE
LF
CST
TALT
CST
TALU
2015/16
4136531
Desc:
TRAFFIC SIGNALS
Project Length:
Project/Location: LAKE WALES TRAFFIC SIGNALS REIMBURSEMENT 1.017
Begin Mile Post:
18.968
End Mile Post:
19.985
2017/18
2018/19
2019/20
$155,000 $83,773 $344,752
Project Total: FPN:
2016/17
$155,000 2015/16
2016/17
$428,525
Phase
Fund
2017/18
2018/19
2019/20
OPS
DDR
$33,440
$34,444
$35,477
$36,541
$37,638
Project Total:
$33,440
$34,444
$35,477
$36,541
$37,638
Comments:
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Run Date: 11/24/2014
Page: 9
SnapShot Date: 11/12/2014
DRAFT
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT July 1, 2015 Through June 30, 2020 FPN: Desc:
4371071
Project/Location: LAKELAND TMC OPS FUND CITY WIDE
OTHER ITS
Project Length:
0.001
Begin Mile Post:
0.000
End Mile Post:
0.001
Phase
Fund
OPS
DS
Project Total:
2015/16
POLK COUNTY 2016/17
$159,000
$159,000
$159,000
$159,000
2017/18
2018/19
2019/20
2017/18
2018/19
2019/20
Comments: FPN: Desc:
4136541
Project/Location: LAKELAND TRAFFIC SIGNALS REIMBURSEMENT
TRAFFIC SIGNALS
Project Length:
4.770
Begin Mile Post:
23.830
End Mile Post:
28.600
Comments: FPN:
4367901
Desc:
RAIL SAFETY PROJECT
Project Length:
Project/Location: LEM CARNES RD CR 547N TO SR 600/US 17 X-ING #622960T 0.010
Begin Mile Post:
0.000
End Mile Post:
0.010
Phase
Fund
OPS
DDR
2015/16
OPS
DITS
$335,312
Project Total:
$335,312
Phase
Fund
2015/16
RRU
RHH
$270,600
Project Total:
$270,600
2016/17
$345,372
$355,733
$369,727
$380,819
$345,372
$355,733
$369,727
$380,819
2016/17
2017/18
2018/19
2019/20
2016/17
2017/18
2018/19
2019/20
2016/17
2017/18
2018/19
2019/20
2016/17
2017/18
2018/19
2019/20
Comments: FPN: Desc:
4350611
Project/Location: LINCOLN AVE SIDEWALKS
SIDEWALK
Project Length:
0.498
Begin Mile Post:
1.226
End Mile Post:
1.724
4298831
Desc:
PEDESTRIAN/WILDLIFE OVERPASS
Project Length:
Project/Location: LK ALFRED TR AT US 17/92 BRIDGE
0.100
Begin Mile Post:
14.406
End Mile Post:
Fund
CST
ACSU
CST
SU
Project Total:
Comments: FPN:
Phase
14.506
Comments:
Desc:
4136551
Project/Location: MULBERRY TRAFFIC SIGNALS REIMBURSEMENT
TRAFFIC SIGNALS
Project Length:
2.500
Begin Mile Post:
18.450
End Mile Post:
20.950
$231,540 $1,000 $232,540
Phase
Fund
ENV
TALT
CST
CM
$1,524,600
CST
DDR
$48,444
CST
SA
Project Total: FPN:
2015/16
2015/16
$50,000
$214,087 $1,837,131
Phase
Fund
OPS
DDR
2015/16
$18,240
$18,788
$19,351
$19,932
$20,530
Project Total:
$18,240
$18,788
$19,351
$19,932
$20,530
Comments:
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Run Date: 11/24/2014
Page: 10
SnapShot Date: 11/12/2014
DRAFT
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT July 1, 2015 Through June 30, 2020 FPN: Desc:
4332581
Project/Location: NEW JERSEY TRAIL FROM CRYSTAL LAKE DRIVE TO EDGEWOOD DRIVE
BIKE PATH/TRAIL
Project Length:
0.000
Begin Mile Post:
0.000
End Mile Post:
0.000
Phase
Fund
LAR
ACSU
2015/16 $269,314
Project Total:
$269,314
POLK COUNTY 2016/17
2017/18
2018/19
2019/20
2016/17
2017/18
2018/19
2019/20
2017/18
2018/19
2019/20
2017/18
2018/19
2019/20
2016/17
2017/18
2018/19
2019/20
2016/17
2017/18
2018/19
2019/20
2016/17
2017/18
2018/19
2019/20
Comments: FPN: Desc:
4332601
Project/Location: NEW YORK CYCLE TRACK (LIME STREET) FROM SIKES BLVD TO NEW YORK AVENUE
BIKE PATH/TRAIL
Project Length:
0.000
Begin Mile Post:
0.000
End Mile Post:
0.000
Comments:
Phase
Fund
PE
LF
PE
TALU
CST
TALU
2015/16
$115,307 $1,000 $532,500
Project Total: FPN:
4344891
Desc:
SIDEWALK
Project Length:
Project/Location: OLD DIXIE HIGHWAY/ SADDLE CREEK ROAD 0.500
Begin Mile Post:
0.000
End Mile Post:
0.500
Desc:
4353911
Project/Location: OLD DIXIE TRAIL FROM AUBURNDALE TO HAINES CITY
PD&E/EMO STUDY
Project Length:
0.001
Begin Mile Post:
0.000
End Mile Post:
Phase
Fund
2015/16
CST
HSP
$679,483
CST
SA
$10,530
Project Total:
Comments: FPN:
$116,307
0.001
Phase
Fund
PDE
SU
2016/17
$532,500
$690,013 2015/16
2016/17
$1,048,752
Project Total:
$1,048,752
Comments: FPN:
4367881
Desc:
RAIL SAFETY PROJECT
Project Length:
Project/Location: PAYNE ST SR 600/US92 - BLUE JAY AVE X-ING #623084U 0.001
Begin Mile Post:
0.000
End Mile Post:
0.001
Phase
Fund
2015/16
RRU
RHH
$255,600
Project Total:
$255,600
Comments: FPN: Desc:
4350461
Project/Location: POLK COUNTY SCOUR COUNTERMEASURE AT VARIOUS LOCATIONS
BRIDGE-REPAIR/REHABILITATION
Project Length:
4.484
Begin Mile Post:
25.276
End Mile Post:
25.298
4126751
Desc:
TRAFFIC SIGNALS
Project Length:
Project/Location: POLK COUNTY TRAFFICSIGNALS REIMBURSEMENT 12.175
Begin Mile Post:
Comments:
PHASE CODES
2.300
End Mile Post:
Fund
CST
BRRP
$163,791
CST
DIH
$24,488
Project Total:
Comments: FPN:
Phase
Phase
14.475
Fund
2015/16
$188,279 2015/16
OPS
DDR
OPS
DITS
$363,736
Project Total:
$363,736
$374,649
$385,888
$400,787
$412,810
$374,649
$385,888
$400,787
$412,810
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Run Date: 11/24/2014
Page: 11
SnapShot Date: 11/12/2014
DRAFT
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT July 1, 2015 Through June 30, 2020 FPN: Desc:
4125301
Project/Location: POLK TPO IDENTIFIED OPERATIONAL IMPROVEMENTS- FUNDING
TRAFFIC OPS IMPROVEMENT
Project Length:
0.000
Begin Mile Post:
0.000
End Mile Post:
0.000
Comments:
2015/16
Phase
Fund
PE
SU
$220
ROW
SU
$220
CST
SU
Project Total: FPN: Desc:
4351041
Project/Location: ROSE STREET SIDEWALKS AT VARIOUS LOCATIONS
SIDEWALK
Project Length:
0.533
Begin Mile Post:
0.144
End Mile Post:
0.677
Comments:
Phase
Fund
PE
LF
4333791
Desc:
ROUNDABOUT
Project Length:
Project/Location: SR 17 AT HUNT BROTHERS ROAD
0.296
Begin Mile Post:
17.203
End Mile Post:
17.499
2015/16
2016/17
2017/18
2018/19
2019/20
$3,059,726
$5,952,956
$4,987,260
$5,951,368
$3,059,726
$5,952,956
$4,987,260
$5,951,808
2016/17
2017/18
2018/19
2019/20
2016/17
2017/18
2018/19
2019/20
2016/17
2017/18
2018/19
2019/20
2016/17
2017/18
2018/19
2019/20
2016/17
2017/18
2018/19
2019/20
$70,000
CST
TALT
$13,542
CST
TALU
$256,576
Project Total: FPN:
POLK COUNTY
$70,000
Phase
Fund
2015/16
INC
DDR
$40,000
Project Total:
$40,000
$270,118
Comments: FPN: Desc:
4344881
Project/Location: SR 33 (LAKELAND HILLS BLVD) AT N SOCRUM LOOP RD
INTERSECTION IMPROVEMENT
Project Length:
0.206
Begin Mile Post:
3.510
End Mile Post:
3.716
Comments:
Phase
Fund
CST
DDR
4333961
Desc:
ROUNDABOUT
Project Length:
Project/Location: SR 33 AT DEEN STILL ROAD
0.285
Begin Mile Post:
19.580
End Mile Post:
19.865
$6,967
CST
DIH
$25,816
CST
HSP
$168,366
$6,318
$201,149
$6,318
Project Total: FPN:
2015/16
Phase
Fund
2015/16
INC
DDR
$32,000
Project Total:
$32,000
Comments: FPN: Desc:
4312911
Project/Location: SR 33 FROM HAYNES CIRCLE TO WITHLACOOCHEE BRIDGE
RESURFACING
Project Length:
12.535
Begin Mile Post:
Comments:
14.603
End Mile Post:
27.138
Phase
Fund
ENV
DS
CST
DDR
CST
DIH
$154,050
CST
DS
$3,602,942
Project Total:
PHASE CODES
2015/16 $50,000 $3,561,825
$7,368,817
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Run Date: 11/24/2014
Page: 12
SnapShot Date: 11/12/2014
DRAFT
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT July 1, 2015 Through June 30, 2020 FPN: Desc:
4366731
Project/Location: SR 35/700 (US 98) FROM N. OF WEST SOCRUM LOOP RD TO SR 471
PD&E/EMO STUDY
Project Length:
7.531
Begin Mile Post:
9.005
End Mile Post:
16.536
Desc:
1975624
Project/Location: SR 35/700 (US98) FROM EDGEWOOD DRIVE TO E MAIN STREET
ADD LANES & RECONSTRUCT
Project Length:
3.033
Begin Mile Post:
9.189
End Mile Post:
12.222
4312781
Desc:
RESURFACING
Project Length:
Project/Location: SR 35/SR 555/US 17 FROM BARTOW RD TO BEAR CREEK APTS 3.050
Begin Mile Post:
15.969
End Mile Post:
Fund
PDE
DIH
18.511
Comments:
$200,000
PDE
DS
$2,100,000
4345071
Desc:
INTERSECTION IMPROVEMENT
Project Length:
Project/Location: SR 37 AT LAKE HARRIS DRIVE
0.285
Begin Mile Post:
23.436
End Mile Post:
23.721
Comments:
Desc:
4349371
Project/Location: SR 37 FROM CR 630 TO CR 640 (PINECREST RD)
RESURFACING
Project Length:
7.571
Begin Mile Post:
7.386
End Mile Post:
14.957
Comments:
4366011
Desc:
RESURFACING
Project Length:
Project/Location: SR 37 FROM SR 60 TO N OF VIRGINIA ST 0.796
Begin Mile Post:
Comments:
PHASE CODES
18.209
End Mile Post:
19.005
2019/20
Fund
ROW
CM
$1,723,607
$1,723,454
ROW
SA
$1,522,651
$4,242,750
$3,246,258
$5,966,204
Phase
Fund
2015/16
2015/16
ENV
DS
$50,000
CST
DDR
$154,050
CST
DIH
$107,835
CST
SA
$5,040,708
2016/17
2017/18
2018/19
2019/20
2016/17
2017/18
2018/19
2019/20
2017/18
2018/19
2019/20
2017/18
2018/19
2019/20
$5,352,593
CST
DDR
$31,982
CST
HSP
$641,240
CST
SA
$10,530
Fund
RRU
DS
CST
DIH
CST
DS
Phase
Fund
PE
DIH
CST
SA
Project Total:
2019/20
2017/18
Fund
Phase
2018/19
2016/17
Phase
Project Total: FPN:
2018/19
$2,300,000
2015/16
Project Total: FPN:
2017/18
Phase
Project Total: FPN:
2016/17
Project Total:
Comments: FPN:
Phase
Project Total:
Comments: FPN:
2015/16
POLK COUNTY
$683,752 2015/16
2016/17
$100,000 $95,536 $6,522,511 $100,000 2015/16
$6,618,047 2016/17
$100,000 $1,818,211
$100,000
$1,818,211
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Run Date: 11/24/2014
Page: 13
SnapShot Date: 11/12/2014
DRAFT
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT July 1, 2015 Through June 30, 2020 FPN: Desc:
4106662
Project/Location: SR 542 FROM 1ST STREET TO BUCKEYE LOOP RD
ADD LANES & RECONSTRUCT
Project Length:
2.305
Begin Mile Post:
0.380
End Mile Post:
2.685
Comments:
Phase
Fund
ENV
DS
RRU
DDR
RRU
LF
ROW
SU
CST
DDR
CST
DIH
Project Total: FPN: Desc:
4106664
Project/Location: SR 542 FROM 1ST STREET TO BUCKEYE LOOP ROAD
LANDSCAPING
Project Length:
2.476
Begin Mile Post:
0.000
End Mile Post:
2.476
Desc:
4106663
Project/Location: SR 542 FROM BUCKEYE LOOP ROAD TO US 27
WIDEN/RESURFACE EXIST LANES
Project Length:
3.648
Begin Mile Post:
2.779
End Mile Post:
6.427
Desc:
4352841
Project/Location: SR 546 (MEMORIAL) FROM CHESTNUT RD E TO BRUNNELL PKWY
BIKE PATH/TRAIL
Project Length:
0.856
Begin Mile Post:
3.876
End Mile Post:
4.732
Comments:
4365691
Desc:
RIGID PAVEMENT REHABILITATION
Project Length:
Project/Location: SR 546 (US 92) FROM WABASH AVENUE TO N. INGRAHAM AVENUE 3.311
Begin Mile Post:
1.738
End Mile Post:
5.049
Comments:
Desc:
4350711
Project/Location: SR 555 (US 17) FROM AVENUE G SW TO AVENUE A SW
RESURFACING
Project Length:
0.497
Begin Mile Post:
Comments:
PHASE CODES
0.000
End Mile Post:
2018/19
0.497
2019/20
$1,000,000 $2,951,628 $5,241,467
$1,221,060 $15,736,323 $331,800
$5,281,467 2015/16
$1,421,060 2016/17
$20,019,751
Fund
DIH
$5,670
CST
DS
$234,396
2017/18
2018/19
Fund
ROW
DDR
$5,402,004
$6,810,022
ROW
DIH
$477,405
$477,405
$5,879,409
$7,287,427
2015/16
Phase
Fund
PE
DIH
CST
DIH
$15,405
CST
DS
$883,672
Phase
Fund
PE
DIH
CST
NHRE
CST
SA
Phase
Fund
CST
DDR
CST
DIH
Project Total:
2019/20
$240,066
Phase
Project Total: FPN:
2017/18
$200,000
CST
Project Total: FPN:
2016/17
Phase
Project Total:
Comments: FPN:
$40,000
Project Total:
Comments: FPN:
2015/16
POLK COUNTY
2015/16
2016/17
2017/18
2018/19
2019/20
2016/17
2017/18
2018/19
2019/20
2016/17
2017/18
2018/19
2019/20
2018/19
2019/20
$10,000
$909,077 2015/16
$10,000 $3,696,305 $4,839,609 $10,000 2015/16
$8,535,914 2016/17
2017/18
$2,084,013 $17,646 $2,101,659
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Run Date: 11/24/2014
Page: 14
SnapShot Date: 11/12/2014
DRAFT
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT July 1, 2015 Through June 30, 2020 FPN: Desc:
4350851
Project/Location: SR 563 (SIKES BLVD)FROM LIME ST TO SR 539 (MLK JR BLVD)
RIGID PAVEMENT REHABILITATION
Project Length:
0.417
Begin Mile Post:
0.006
End Mile Post:
0.423
Comments:
Phase
Fund
PE
DIH
CST
DDR
CST
DIH
2015/16
POLK COUNTY 2016/17
Desc:
4345091
Project/Location: SR 60 AT BAILEY RD
INTERSECTION IMPROVEMENT
Project Length:
0.303
Begin Mile Post:
2.848
End Mile Post:
3.151
Comments:
4312941
Desc:
RESURFACING
Project Length:
Project/Location: SR 60 FROM CR 630 TO KISSIMMEE RIVER BR 5.876
Begin Mile Post:
18.634
End Mile Post:
24.510
Comments:
$111,290 $10,000
Phase
Fund
CST
DDR
$25,300
CST
HSP
$596,354
CST
SA
2015/16
FPN: Desc:
4356061
Project/Location: SR 60 HILLSBOROUGH C/L DIESEL RD
CST
DDR
$803,563
CST
DIH
$205,400
CST
DS
$4,549,309
RESURFACING
Project Length:
5.281
Begin Mile Post:
0.000
End Mile Post:
5.281
Comments:
Fund
RRU
DS
Desc:
4349381
Project/Location: SR 600 (US 92) FROM W OF THOMPSON RD TO E OF FISH HATCHERY RD
RAIL SAFETY PROJECT
Project Length:
0.164
Begin Mile Post:
3.859
End Mile Post:
4.023
Comments:
4350751
Desc:
RESURFACING
Project Length:
Project/Location: SR 600 (US 92) FROM E OF WALKER RD TO SR 544 1.868
Begin Mile Post:
Comments:
PHASE CODES
9.236
End Mile Post:
11.104
2019/20
2015/16
2016/17
2017/18
2018/19
2019/20
2016/17
2017/18
2018/19
2019/20
2017/18
2018/19
2019/20
2017/18
2018/19
2019/20
$5,558,272 2015/16 $275,000
DDR
$3,425,710
CST
NHRE
$5,966,364
CST
SA
Phase
Fund
RRU
DS
CST
DIH
CST
DS
Project Total: FPN:
2018/19
CST
Project Total: FPN:
2017/18
$54,963
Fund
Phase
2016/17
Phase
Fund
CST
DDR
CST
DIH
Project Total:
$1,091,820
$676,617
Phase
Project Total:
2019/20
$980,530
Project Total: FPN:
2018/19
$10,000
Project Total: FPN:
2017/18
$105,300 $275,000
2015/16
$9,497,374
2016/17
$75,000 $130,536 $996,463 $75,000
2015/16
$1,126,999
2016/17
$4,626,710 $28,756 $4,655,466
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Run Date: 11/24/2014
Page: 15
SnapShot Date: 11/12/2014
DRAFT
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT July 1, 2015 Through June 30, 2020 FPN: Desc:
4350761
Project/Location: SR 600 (US 92) FROM E OF SR 544 TO W OF JERSEY RD
RESURFACING
Project Length:
0.824
Begin Mile Post:
11.104
End Mile Post:
11.928
Desc:
4366721
Project/Location: SR35/700 US 98 FROM WEST DAUGHTERY ROAD TO NORTH OF WEST SOCRUM LOOP RD
PD&E/EMO STUDY
Project Length:
3.382
Begin Mile Post:
5.623
End Mile Post:
9.005
4347621
Desc:
RIGID PAVEMENT RECONSTRUCTION
Project Length:
Project/Location: SR546 (MEMORIAL BLVD) FROM I-4 TO WABASH AVE 1.412
Begin Mile Post:
0.300
End Mile Post:
1.712
Comments:
FPN: Desc:
4350781
Project/Location: US 17 AND 544 BUS STOP IMPROVEMENTS
PUBLIC TRANSPORTATION SHELTER
Project Length:
0.000
Begin Mile Post:
0.000
End Mile Post:
0.000
Desc:
4313511
Project/Location: US 17/92 HINSON AVE FROM SR 17 (10TH STREET) TO 17TH STREET
PD&E/EMO STUDY
Project Length:
0.310
Begin Mile Post:
22.460
End Mile Post:
22.770
4313512
Desc:
ADD LANES & RECONSTRUCT
Project Length:
Project/Location: US 17/92 HINSON AVE FROM SR 17 (10TH STREET) TO 17TH STREET 0.310
Begin Mile Post:
Comments:
PHASE CODES
22.460
End Mile Post:
CST
DIH
$16,432
2015/16
2016/17
2017/18
2018/19
2019/20
2016/17
2017/18
2018/19
2019/20
$1,221,402
Phase
Fund
PDE
DIH
$150,000
PDE
SA
$1,500,000
2015/16
22.770
$1,650,000
Phase
Fund
ENV
DDR
$75,000
CST
DDR
$9,620,274
CST
DIH
$46,831
CST
DS
$1,667,620
INC
DDR
2015/16
2016/17
2017/18
2018/19
2019/20
2016/17
2017/18
2018/19
2019/20
2016/17
2017/18
2018/19
2019/20
2017/18
2018/19
2019/20
$480,000
Project Total:
$11,409,725
Phase
Fund
2015/16
CST
FTAT
$49,661
CST
SU
$49,661
$480,000
$99,322
Phase
Fund
PDE
DIH
$20,000
PDE
DS
$150,998
$800,000
$170,998
$800,000
Project Total:
Comments: FPN:
$1,204,970
Project Total:
Comments: FPN:
DDR
Project Total:
Comments: FPN:
Fund
CST
Project Total:
Comments: FPN:
Phase
POLK COUNTY
2015/16
Phase
Fund
PE
DIH
$3,000
PE
DS
$1,350,000
Project Total:
2015/16
2016/17
$1,353,000
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Run Date: 11/24/2014
Page: 16
SnapShot Date: 11/12/2014
DRAFT
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT July 1, 2015 Through June 30, 2020 FPN: Desc:
4345061
Project/Location: US 27 AT MAIN ST/CRUMP RD
LIGHTING
Project Length:
0.379
Begin Mile Post:
10.303
End Mile Post:
10.682
Comments:
Phase
Fund
PE
HSP
CST
DDR
$12,925
CST
HSP
$264,801
CST
SA
Project Total: FPN:
4192434
Desc:
ADD LANES & RECONSTRUCT
Project Length:
Project/Location: US 27 FROM PRESIDENTS DRIVE TO SR 60 5.178
Begin Mile Post:
13.638
End Mile Post:
Phase
18.816
Comments:
Fund
2015/16
POLK COUNTY 2016/17
Desc:
4312061
Project/Location: US 92 (SR 600) FROM CHURCHILL AVE TO SLOAN AVE
RESURFACING
Project Length:
2.663
Begin Mile Post:
2.469
End Mile Post:
5.132
Comments:
Desc:
4312081
Project/Location: US 92 (SR 600) FROM REYNOLDS RD TO SCHALAMAR CREEK ENT
BRIDGE REPLACEMENT
Project Length:
1.250
Begin Mile Post:
4.327
End Mile Post:
5.577
Comments:
FPN: Desc:
4335582
Project/Location: US 92 FROM COUNTY LINE ROAD TO WABASH AVENUE
ADD LANES & RECONSTRUCT
Project Length:
4.131
Begin Mile Post:
0.000
End Mile Post:
4.131
2019/20
2015/16
2017/18
2018/19
2019/20
$288,256 2016/17
ENV
DI
CST
DDR
$52,843,410
CST
DIH
$941,628
Phase
Fund
ENV
DS
$195,000
$195,000 2015/16
DS
$5,000
CST
DIH
$82,160
CST
DS
$4,326,132
$500,000
$53,785,038
2016/17
2017/18
2018/19
2019/20
2016/17
2017/18
2018/19
2019/20
2017/18
2018/19
2019/20
$4,513,292
Phase
Fund
CST
DDR
$884,467
CST
DIH
$386,374
CST
DS
$10,635,796
INC
DS
2015/16
$392,000
Project Total:
$11,906,637
Phase
Fund
2015/16
PE
SA
Project Total:
$500,000
$100,000
RRU
Project Total: FPN:
2018/19
$10,530 $64,437
Project Total: FPN:
2017/18
$64,437
$392,000 2016/17
$4,450,000 $4,450,000
Comments:
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Run Date: 11/24/2014
Page: 17
SnapShot Date: 11/12/2014
DRAFT
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT July 1, 2015 Through June 30, 2020 FPN: Desc:
4351081
Project/Location: US 92 FROM HOLIDAY MPH ENTRANCE TO N CHESTNUT RD
SIDEWALK
Project Length:
1.504
Begin Mile Post:
2.486
End Mile Post:
3.990
Comments:
Phase
Fund
PE
SU
CST
DS
CST
SU
2015/16
Desc:
4298131
Project/Location: US 92 -NEW TAMPA HWY AT WABASH AVE
INTERSECTION IMPROVEMENT
Project Length:
0.200
Begin Mile Post:
4.031
End Mile Post:
4.231
Comments:
Phase
Fund
ENV
DDR
CST
DDR
CST
DIH
Project Total: FPN:
4348862
Desc:
BRIDGE REPLACEMENT
Project Length:
Project/Location: US 98 (PEACE RIVER-FT MEADE) AT BRIDGE NO 0064 (JOHN SINGLETARY BRIDGE) 0.103
Begin Mile Post:
1.189
End Mile Post:
1.292
Desc:
4313121
Project/Location: US 98 (SR 35) FROM LAKE BONNY PARK TO MAIN STREET
RESURFACING
Project Length:
0.893
Begin Mile Post:
11.329
End Mile Post:
12.222
4353421
Desc:
PD&E/EMO STUDY
Project Length:
Project/Location: US 98 (SR35 & SR700) VIRTUAL WEIGH STATION STUDY 8.745
Begin Mile Post:
9.005
End Mile Post:
2018/19
17.750
2019/20
$45,093 $965,076 $345,000 2015/16 $10,000
2016/17
$1,010,169 2017/18
2018/19
2019/20
2018/19
2019/20
$30,000 $818,466
$1,000 $10,000 2015/16
$30,000 2016/17
$819,466
Phase
Fund
PE
DIH
$100,000
PE
SA
$2,000,000
2017/18
$2,100,000
Phase
Fund
CST
DIH
$51,350
CST
SA
$1,860,303
Project Total:
Comments: FPN:
2017/18
Project Total:
Comments: FPN:
2016/17 $345,000
Project Total: FPN:
POLK COUNTY
2015/16
2016/17
2017/18
2018/19
2019/20
2016/17
2017/18
2018/19
2019/20
2018/19
2019/20
$1,911,653
Phase
Fund
2015/16
PDE
DWS
$1,000,000
Project Total:
$1,000,000
Comments: FPN: Desc:
4313531
Project/Location: WESTGATE-CENTRAL TRAIL FROM WEST BELMAR ST TO OAKHILL STREET
BIKE PATH/TRAIL
Project Length:
0.790
Begin Mile Post:
Comments:
PHASE CODES
0.000
End Mile Post:
0.790
Phase
Fund
CST
LF
2015/16
2016/17
$182,005
CST
SU
$127,595
CST
TALT
$97,851
CST
TALU
$333,722
Project Total:
$741,173
2017/18
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Run Date: 11/24/2014
Page: 18
SnapShot Date: 11/12/2014
DRAFT
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT July 1, 2015 Through June 30, 2020 FPN: Desc:
4371081
Project/Location: WINTER HAVEN TMC OPS CITY WIDE
OTHER ITS
Project Length:
0.001
Begin Mile Post:
0.000
End Mile Post:
0.001
Phase
Fund
OPS
DS
Project Total:
2015/16
POLK COUNTY 2016/17
$43,500
$43,500
$43,500
$43,500
2017/18
2018/19
2019/20
2017/18
2018/19
2019/20
Comments: FPN: Desc:
4136561
Project/Location: WINTER HAVEN TRAFFIC SIGNALS REIMBURSEMENT
TRAFFIC SIGNALS
Project Length:
2.880
Begin Mile Post:
27.760
End Mile Post:
30.640
Phase
Fund
OPS
DDR
2015/16
$89,832
2016/17
$92,527
$95,303
$98,162
$101,107
Project Total:
$89,832
$92,527
$95,303
$98,162
$101,107
Comments:
HIGHWAYS TOTAL
PHASE CODES
2015/16
2016/17
2017/18
2018/19
$82,415,719
$54,804,203
$19,625,560
$60,639,156
2019/20
$139,956,731
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Run Date: 11/24/2014
Page: 19
SnapShot Date: 11/12/2014
DRAFT
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT July 1, 2015 Through June 30, 2020
POLK COUNTY
TRANSPORTATION PLANNING FPN:
4348551
Desc:
TRANSPORTATION PLANNING
Project Length:
Project/Location: POLK COUNTY MPO 2018/2019 UPWP
0.000
Begin Mile Post:
0.000
End Mile Post:
0.000
Phase
Fund
PLN
PL
2015/16
2016/17
2017/18
Project Total:
2018/19
2019/20
$615,778
$615,778
$615,778
$615,778
Comments: FPN: Desc:
4256691
Project/Location: POLK COUNTY MPO FY 2015/2016 UPWP
TRANSPORTATION PLANNING
Project Length:
0.000
Begin Mile Post:
0.000
End Mile Post:
0.000
Phase
Fund
PLN
PL
Project Total:
2015/16
2016/17
2017/18
2018/19
2019/20
2016/17
2017/18
2018/19
2019/20
2018/19
2019/20
$615,778 $615,778
Comments: FPN:
4318091
Desc:
TRANSPORTATION PLANNING
Project Length:
Project/Location: POLK COUNTY MPO FY 2017/2018 UPWP 0.000
Begin Mile Post:
0.000
End Mile Post:
0.000
Phase
Fund
PLN
PL
2015/16
Project Total:
$615,778
$615,778
$615,778
$615,778
Comments: 2015/16
TRANSPORTATION PLANNING TOTAL
$615,778
PHASE CODES
2016/17 $615,778
2017/18 $615,778
$615,778
$615,778
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Run Date: 11/24/2014
Page: 20
SnapShot Date: 11/12/2014
DRAFT
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT July 1, 2015 Through June 30, 2020
POLK COUNTY
TURNPIKE FPN:
4289721
Desc:
BRIDGE - PAINTING
Project Length:
Project/Location: PAINT BRIDGES - POLK PKWY(160249,160250,160251 ,160252,160253,160254) 7.400
Begin Mile Post:
0.000
End Mile Post:
5.600
Desc:
4311232
Project/Location: PAINT BRIDGES - POLK PARKWAY (160267 & 160268)
BRIDGE - PAINTING
Project Length:
0.958
Begin Mile Post:
13.568
End Mile Post:
Fund
PE
PKYR
CST
PKYR
14.526
Comments:
4365201
Desc:
RESURFACING
Project Length:
Project/Location: RESURFACE POLK PKWY, MP 0.00-8.00 & 17.2418.09 18.090
Begin Mile Post:
0.000
End Mile Post:
18.090
Fund
$1,500
CST
PKYI
$1,541
CST
PKYR
Desc:
4365202
Project/Location: THERMOPLASTIC OF POLK PKWY RESURFACING FROM MP 0.00-8.00 & 17.24-18.09
SIGNING/PAVEMENT MARKINGS
Project Length:
18.090
Begin Mile Post:
0.000
End Mile Post:
PE
PKYR
CST
PKYR
2015/16
18.090
2018/19
2019/20
2016/17
2018/19
2019/20
2018/19
2019/20
2018/19
2019/20
$1,653,771 2017/18
$200,000 $403,276
$3,041 2015/16
$200,000 2016/17
$403,276 2017/18
$566,685 $6,375,211
Project Total:
Comments: FPN:
$218,419
PKYI
Fund
2017/18 $1,653,771
PE
Phase
2016/17 $218,419
Phase
Project Total: FPN:
2015/16
Project Total:
Comments: FPN:
Phase
$566,685 2015/16
2016/17
$6,375,211
Phase
Fund
CST
PKYR
2017/18
$303,440
Project Total:
$303,440
Comments: 2015/16
TURNPIKE TOTAL
$3,041
PHASE CODES
2016/17 $985,104
2017/18 $8,432,258
2018/19
2019/20
$303,440
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Run Date: 11/24/2014
Page: 21
SnapShot Date: 11/12/2014
DRAFT
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT July 1, 2015 Through June 30, 2020
POLK COUNTY
FLP: AVIATION FPN:
4363721
Desc:
AVIATION PRESERVATION PROJECT
Project Length:
Project/Location: AIRFIELD PAVEMENT MARKINGS AT BARTOW MUNICIPAL AIRPORT 0.000
Begin Mile Post:
0.000
End Mile Post:
0.000
Desc:
4370601
Project/Location: BARTOW MINICIPAL AIRPORT CAPITAL IMPROVEMENTS
AVIATION REVENUE/OPERATIONAL
Project Length:
0.000
Begin Mile Post:
0.000
End Mile Post:
0.000
4336461
Desc:
AVIATION PRESERVATION PROJECT
Project Length:
Project/Location: BARTOW MUNICIPAL AIRPORT
0.000
Begin Mile Post:
0.000
End Mile Post:
0.000
Desc:
4348191
Project/Location: BARTOW MUNICIPAL AIRPORT CAPITAL IMPROVEMENTS
AVIATION CAPACITY PROJECT
Project Length:
0.000
Begin Mile Post:
0.000
End Mile Post:
0.000
4336371
Desc:
AVIATION REVENUE/OPERATIONAL
Project Length:
Project/Location: LAKE WALES MUNICIPAL AIRPORT
0.000
Begin Mile Post:
0.000
End Mile Post:
0.000
Desc:
4204181
Project/Location: LAKELAND LINDER REGIONAL AIRPORT CAPITAL IMPROVEMENTS
AVIATION SECURITY PROJECT
Project Length:
0.000
Begin Mile Post:
Comments:
PHASE CODES
$266,308
LF
$66,577
2018/19
2019/20
2016/17
2017/18
2018/19
2019/20
2018/19
2019/20
2018/19
2019/20
$332,885
Phase
Fund
CAP
DDR
2015/16
$600,000
$600,000
CAP
LF
$150,000
$150,000
$750,000
$750,000
Phase
Fund
2015/16
2016/17
CAP
DDR
$640,000
CAP
LF
$160,000
0.000
End Mile Post:
2017/18
$800,000
Phase
Fund
CAP
DPTO
2015/16
2016/17
$405,000
CAP
LF
$101,250
2017/18
Phase
Fund
CAP
DDR
CAP
LF
$506,250 2015/16
2016/17
0.000
2018/19
2019/20
2018/19
2019/20
$49,498 $247,491
Phase
Fund
CAP
DPTO
$300,000
CAP
LF
$75,000
Project Total:
2017/18 $197,993
Project Total:
Comments: FPN:
DPTO
CAP
2017/18
Project Total:
Comments: FPN:
CAP
2016/17
Project Total:
Comments: FPN:
2015/16
Project Total:
Comments: FPN:
Fund
Project Total:
Comments: FPN:
Phase
2015/16
2016/17
2017/18
$375,000
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Run Date: 11/24/2014
Page: 22
SnapShot Date: 11/12/2014
DRAFT
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT July 1, 2015 Through June 30, 2020 FPN: Desc:
4204231
Project/Location: LAKELAND LINDER REGIONAL AIRPORT
AVIATION SAFETY PROJECT
Project Length:
0.000
Begin Mile Post:
0.000
End Mile Post:
0.000
Desc:
4309681
Project/Location: LAKELAND LINDER REGIONAL AIRPORT CAPITAL IMPROVEMENT
AVIATION REVENUE/OPERATIONAL
Project Length:
0.000
Begin Mile Post:
0.000
End Mile Post:
Phase
Fund
CAP
DDR
0.000
Comments:
$800,000
CAP
LF
$200,000
Phase
Fund
CAP
DDR
CAP
DPTO
CAP
LF
4313701
Desc:
AVIATION SAFETY PROJECT
Project Length:
Project/Location: LAKELAND LINDER REGIONAL AIRPORT CAPITAL IMPROVEMENTS 0.000
Begin Mile Post:
0.000
End Mile Post:
0.000
Comments:
Phase
Fund
2017/18
$1,000,000 2015/16
2016/17
2017/18
2018/19
$1,192,481 2018/19
2019/20
2018/19
2019/20
$354,442
2015/16
$88,610
$85,000
$443,052
$425,000
2016/17
2017/18
CAP
DDR
$41,742
CAP
DPTO
$208,258
CAP
FAA
CAP
LF
$4,500,000 $250,000
Project Total: FPN:
4336381
Desc:
AVIATION PRESERVATION PROJECT
Project Length:
Project/Location: LAKELAND LINDER REGIONAL AIRPORT 0.000
Begin Mile Post:
0.000
End Mile Post:
Phase
0.000
Comments:
Fund
CAP
DDR
CAP
DPTO
CAP
FAA
CAP
LF
Project Total: FPN: Desc:
4362011
Project/Location: LAKELAND LINDER REGIONAL AIRPORT AIRSIDE CENTER ROOF
AVIATION PRESERVATION PROJECT
Project Length:
0.000
Begin Mile Post:
Comments:
0.000
End Mile Post:
0.000
$5,000,000 2015/16
2016/17
$5,000
2017/18
2018/19
$96,000
2019/20 $1,587,200
$32,200 $1,800,000 $1,100
$24,000
$396,800
$1,806,100
$152,200
$1,984,000
Phase
Fund
CAP
DDR
CAP
DPTO
$522,500
$522,500
CAP
LF
$522,500
$522,500
$200,000
$1,045,000
$1,045,000
$400,000
Project Total:
PHASE CODES
2019/20
$1,192,481
$340,000
Project Total: FPN:
2016/17
Project Total:
Comments: FPN:
2015/16
POLK COUNTY
2015/16
2016/17
2017/18
2018/19
2019/20
$200,000
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Run Date: 11/24/2014
Page: 23
SnapShot Date: 11/12/2014
DRAFT
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT July 1, 2015 Through June 30, 2020 FPN: Desc:
4369751
Project/Location: LAKELAND LINDER REGIONAL AIRPORT CAPITAL IMPROVEMENT
AVIATION PRESERVATION PROJECT
Project Length:
0.000
Begin Mile Post:
0.000
End Mile Post:
0.000
Comments:
Phase
Fund
CAP
DPTO
$37,500
CAP
FAA
$675,000
CAP
LF
Project Total: FPN: Desc:
4369771
Project/Location: LAKELAND LINDER REGIONAL AIRPORT CAPITAL IMPROVEMENT
AVIATION PRESERVATION PROJECT
Project Length:
0.000
Begin Mile Post:
0.000
End Mile Post:
0.000
Comments:
Phase
Fund
CAP
DPTO
CAP
FAA
CAP
LF
Project Total: FPN:
4369781
Desc:
AVIATION PRESERVATION PROJECT
Project Length:
Project/Location: LAKELAND LINDER REGIONAL AIRPORT CAPITAL IMPROVEMENT 0.000
Begin Mile Post:
0.000
End Mile Post:
0.000
Comments:
Phase
Fund
4370771
Desc:
AVIATION CAPACITY PROJECT
Project Length:
Project/Location: LAKELAND LINDER REGIONAL AIRPORT CAPITAL IMPROVEMENT 0.000
Begin Mile Post:
0.000
End Mile Post:
0.000
Desc:
4370781
Project/Location: LAKELAND LINDER REGIONAL AIRPORT CAPITAL IMPROVEMENTS
AVIATION REVENUE/OPERATIONAL
Project Length:
0.000
Begin Mile Post:
0.000
End Mile Post:
0.000
4370791
Desc:
AVIATION REVENUE/OPERATIONAL
Project Length:
Project/Location: LAKELAND LINDER REGIONAL AIRPORT CAPITAL IMPROVEMENT 0.000
Begin Mile Post:
Comments:
PHASE CODES
0.000
End Mile Post:
2019/20
2015/16
2016/17
2017/18
2018/19
2019/20
FAA
CAP
LF
2016/17
2017/18
2018/19
2019/20
$2,880,000
$160,000 $3,200,000 2015/16
$775,000 $258,333 $1,033,333
Phase
Fund
CAP
DDR
2015/16
2016/17
2017/18
$490,000
CAP
LF
$490,000
Project Total:
Comments: FPN:
2018/19
$63,750
CAP
LF
2017/18
$1,275,000
$13,410
DDR
2016/17
$1,147,500
$146,590
CAP
2019/20
$63,750
DDR
CAP
2018/19
Project Total:
Comments: FPN:
2015/16
DPTO
Fund
2017/18
$37,500
CAP
Phase
2016/17
$750,000
CAP
Project Total: FPN:
2015/16
POLK COUNTY
0.000
2018/19
$980,000
Phase
Fund
CAP
DPTO
$440,000
CAP
LF
$440,000
Project Total:
2019/20
2015/16
2016/17
2017/18
2018/19
2019/20
$880,000
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Run Date: 11/24/2014
Page: 24
SnapShot Date: 11/12/2014
DRAFT
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT July 1, 2015 Through June 30, 2020 2015/16
FLP: AVIATION TOTAL
$8,783,985
PHASE CODES
POLK COUNTY 2016/17 $2,238,052
2017/18 $3,774,691
2018/19 $4,592,064
2019/20 $6,984,000
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Run Date: 11/24/2014
Page: 25
SnapShot Date: 11/12/2014
DRAFT
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT July 1, 2015 Through June 30, 2020
POLK COUNTY
FLP: INTERMODAL FPN:
4309701
Desc:
AVIATION CAPACITY PROJECT
Project Length:
Project/Location: BARTOW MUNICIPAL AIRPORT CAPITAL IMPROVEMENTS 0.000
Begin Mile Post:
0.000
End Mile Post:
0.000
Comments:
Phase
Fund
CAP
DDR
$605,573
CAP
DPTO
$994,427
CAP
LF
Project Total: FPN: Desc:
4370591
Project/Location: BARTOW MUNICIPAL AIRPORT CAPITAL IMPROVEMENTS
AVIATION REVENUE/OPERATIONAL
Project Length:
0.000
Begin Mile Post:
0.000
End Mile Post:
0.000
4358231
Desc:
AVIATION CAPACITY PROJECT
Project Length:
Project/Location: LAKELAND LINDER REGIONAL AIRPORT FACILITY REHABILITATION 0.000
Begin Mile Post:
0.000
End Mile Post:
0.000
Desc:
4369901
Project/Location: LAKELAND LINDER REGIONAL AIRPORT CAPITAL IMPROVEMENT
AVIATION PRESERVATION PROJECT
Project Length:
0.000
Begin Mile Post:
Comments:
0.000
End Mile Post:
Fund
CAP
DPTO
CAP
LF
Phase
Fund
CAP
DDR
CAP
LF
Project Total:
Comments: FPN:
Phase
0.000
Phase
Fund
CAP
DDR
CAP
DPTO
CAP
LF
Project Total:
$400,000
$97,500 $487,500
2015/16
2017/18
2018/19
2019/20
2017/18
2018/19
2019/20
$390,000
$2,000,000
2016/17
$600,000 $600,000 $1,200,000 2015/16
2016/17
2017/18
2018/19
2019/20
2016/17
2017/18
2018/19
2019/20
$112,184 $28,046 $140,230 2015/16 $100,000
$1,140,000 $1,500,000
$1,500,000
$100,000
$1,500,000
$1,500,000
$1,140,000
$200,000
$3,000,000
$3,000,000
$2,280,000
2015/16
FLP: INTERMODAL TOTAL
$2,340,230
PHASE CODES
2016/17
Project Total:
Comments: FPN:
2015/16
2016/17 $3,487,500
2017/18 $3,000,000
2018/19 $2,280,000
2019/20 $1,200,000
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Run Date: 11/24/2014
Page: 26
SnapShot Date: 11/12/2014
DRAFT
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT July 1, 2015 Through June 30, 2020
POLK COUNTY
FLP: RAIL FPN:
4366561
Desc:
RAIL CAPACITY PROJECT
Project Length:
Project/Location: NEW YORK AVENUE PEDESTRIAN UNDERPASS 0.000
Begin Mile Post:
Comments:
0.000
End Mile Post:
0.000
Phase
Fund
2015/16
2016/17
PE
TRIP
$1,500,000
ENV
TRIP
$25,000 $30,000
2018/19
RRU
TRIP
ROW
DIH
$28,000
ROW
TRIP
$153,000
CST
DIH
$400,000
$2,036,500 2015/16
FLP: RAIL TOTAL
2019/20
$481,500
Project Total:
2016/17 $2,036,500
PHASE CODES
2017/18
$181,000 2017/18
2018/19 $181,000
$400,000 2019/20 $400,000
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Run Date: 11/24/2014
Page: 27
SnapShot Date: 11/12/2014
DRAFT
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT July 1, 2015 Through June 30, 2020
POLK COUNTY
FLP: TRANSIT FPN:
4101491
Desc:
CAPITAL FOR FIXED ROUTE
Project Length:
Project/Location: LAKELAND - LAMTD FTA 5307
0.000
Begin Mile Post:
0.000
End Mile Post:
0.000
Desc:
4101492
Project/Location: LAKELAND - LAMTD FTA SECTION 5307 OPERATING
OPERATING FOR FIXED ROUTE
Project Length:
0.000
Begin Mile Post:
0.000
End Mile Post:
0.000
4101421
Desc:
OPERATING FOR FIXED ROUTE
Project Length:
Project/Location: LAKELAND AREA MASS TRANSIT - OPERATING ASSISTANCE STATE BLOCK GRANT 0.000
Begin Mile Post:
0.000
End Mile Post:
0.000
Desc:
4140631
Project/Location: LAKELAND AREA MASS TRANSIT (LAMTD)OPERATING ASSISTANCE - CORRIDOR
URBAN CORRIDOR IMPROVEMENTS
Project Length:
0.000
Begin Mile Post:
0.000
End Mile Post:
0.000
4328381
Desc:
CAPITAL FOR FIXED ROUTE
Project Length:
Project/Location: LAKELAND AREA MASS TRANSIT DISTRICT CAPITAL IMPROVEMENT 0.000
Begin Mile Post:
0.000
End Mile Post:
0.000
Desc:
4101161
Project/Location: POLK COUNTY TPO TRANSIT PLANNING - FTA SECTION 5305 (D)
MODAL SYSTEMS PLANNING
Project Length:
$638,412
$638,412
$638,412
$638,412
$159,603
$159,603
$159,603
$159,603
$159,603
$798,015
$798,015
$798,015
$798,015
$798,015
0.000
Begin Mile Post:
Comments:
0.000
End Mile Post:
0.000
2015/16
2016/17
$1,915,235
$1,915,235
$1,915,235
$1,915,235
$1,915,235
OPS
LF
$1,915,235
$1,915,235
$1,915,235
$1,915,235
$1,915,235
$3,830,470
$3,830,470
$3,830,470
$3,830,470
$3,830,470
Fund
OPS
DPTO
$784,359
$783,999
$804,267
$830,819
OPS
LF
$784,359
$783,999
$804,267
$830,819
$872,359
$1,568,718
$1,567,998
$1,608,534
$1,661,638
$1,744,718
Fund DPTO
$452,852
$709,151
$762,481
$795,083
$818,945
OPS
LF
$452,852
$709,151
$762,481
$795,083
$818,945
$905,704
$1,418,302
$1,524,962
$1,590,166
$1,637,890
2015/16
CAP
DPTO
$50,000
CAP
LF
$12,500
2018/19
$872,359
OPS
Fund
2017/18
2019/20
Phase
Phase
2016/17
2018/19
2019/20
Phase
2015/16
2017/18
2018/19
2019/20
FTA
2016/17
2017/18
2018/19
Fund
2015/16
2016/17
2017/18
OPS
2019/20
2016/17
2017/18
2018/19
2019/20
2016/17
2017/18
2018/19
2019/20
$62,500
Phase
Fund
PLN
DPTO
$14,745
$14,745
$15,187
$15,187
$15,195
PLN
DU
$117,962
$117,962
$121,501
$121,501
$121,559
PLN
LF
Project Total:
PHASE CODES
2015/16
Phase
Project Total:
Comments: FPN:
$638,412
LF
Project Total:
Comments: FPN:
FTA
CAP
Project Total:
Comments: FPN:
CAP
Project Total:
Comments: FPN:
Fund
Project Total:
Comments: FPN:
Phase
2015/16
$14,745
$14,745
$15,187
$15,187
$15,195
$147,452
$147,452
$151,875
$151,875
$151,949
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Run Date: 11/24/2014
Page: 28
SnapShot Date: 11/12/2014
DRAFT
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT July 1, 2015 Through June 30, 2020 FPN: Desc:
4101281
Project/Location: POLK COUNTY TRANSIT OPERATING ASSISTANCE FTA SECTION 5311
OPERATING/ADMIN. ASSISTANCE
Project Length:
0.000
Begin Mile Post:
0.000
End Mile Post:
0.000
FPN: Desc:
4357711
Project/Location: POLK TRANSIT FTA SECT 5339 CAPITAL ASSIST LKLD/WH UZA
CAPITAL FOR FIXED ROUTE
Project Length:
0.000
Begin Mile Post:
0.000
End Mile Post:
0.000
4350771
Desc:
TRANSIT IMPROVEMENT
Project Length:
Project/Location: TRANSIT STOP IMPROVEMENTS @ VARIOUS LOCATIONS FTAT TRANSFER 0.000
Begin Mile Post:
0.000
End Mile Post:
0.000
Desc:
4101501
Project/Location: WINTER HAVEN AREA MASS TRANSIT FTA SECTION 5307 CAPITAL ASSISTANCE
CAPITAL FOR FIXED ROUTE
Project Length:
0.000
Begin Mile Post:
0.000
End Mile Post:
0.000
4101502
Desc:
OPERATING FOR FIXED ROUTE
Project Length:
Project/Location: WINTER HAVEN AREA MASS TRANSIT FTA SECTION 5307 OPERATING ASSISTANCE 0.000
Begin Mile Post:
0.000
End Mile Post:
0.000
Desc:
4101431
Project/Location: WINTER HAVEN AREA TRANSIT (WHAT) OPERATING STATE TRANSIT BLOCK GRANT
OPERATING FOR FIXED ROUTE
Project Length:
0.000
Begin Mile Post:
0.000
End Mile Post:
0.000
4328391
Desc:
CAPITAL FOR FIXED ROUTE
Project Length:
Project/Location: WINTER HAVEN AREA TRANSIT CAPITAL IMPROVEMENT 0.000
Begin Mile Post:
Comments:
PHASE CODES
0.000
End Mile Post:
$712,856
$712,856
$897,295
OPS
LF
$712,856
$712,856
$712,856
$712,856
$897,295
$1,425,712
$1,425,712
$1,425,712
$1,425,712
$1,794,590
0.000
2015/16
2016/17
FTA
$490,708
$490,708
$490,708
$490,708
$480,121
CAP
LF
$122,678
$122,678
$122,678
$122,678
$120,030
$613,386
$613,386
$613,386
$613,386
$600,151
2015/16
CAP
FTAT
$174,028
CAP
SU
$174,028
2018/19
2019/20
Fund
Fund
2017/18
2018/19
CAP
Phase
2016/17
2017/18
Phase
2019/20
2016/17
2017/18
2018/19
2019/20
2016/17
2017/18
2018/19
2019/20
$348,056
Phase
Fund
CAP
FTA
$500,743
$500,743
$500,743
$500,743
$515,092
CAP
LF
$125,186
$125,186
$125,186
$125,186
$128,773
$625,929
$625,929
$625,929
$625,929
$643,865
2015/16
Phase
Fund
OPS
FTA
$1,502,230
$1,502,230
$1,502,230
$1,502,230
$1,545,276
OPS
LF
$1,502,230
$1,502,230
$1,502,230
$1,502,230
$1,545,276
$3,004,460
$3,004,460
$3,004,460
$3,004,460
$3,090,552
2015/16
2015/16
2016/17
Fund
$711,773
$711,446
$729,838
$753,933
$791,629
OPS
LF
$711,773
$711,446
$729,838
$753,933
$791,629
$1,423,546
$1,422,892
$1,459,676
$1,507,866
$1,583,258
CAP
DDR
$50,000
CAP
LF
$12,500
Project Total:
2015/16
2016/17
2017/18
2018/19
2019/20
DPTO
Fund
2017/18
2018/19
OPS
Phase
2016/17
2017/18
Phase
Project Total:
Comments: FPN:
$712,856
Project Total:
Comments: FPN:
$712,856
Project Total:
Comments: FPN:
DU
Project Total:
Comments: FPN:
Fund
OPS
Project Total:
Comments: FPN:
Phase
Project Total:
Comments:
2015/16
POLK COUNTY
2018/19
2019/20
2019/20
$62,500
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Run Date: 11/24/2014
Page: 29
SnapShot Date: 11/12/2014
DRAFT
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT July 1, 2015 Through June 30, 2020 FLP: TRANSIT TOTAL
PHASE CODES
POLK COUNTY
2015/16
2016/17
2017/18
2018/19
2019/20
$14,816,448
$14,854,616
$15,043,019
$15,209,517
$15,875,458
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Run Date: 11/24/2014
Page: 30
SnapShot Date: 11/12/2014
DRAFT
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT July 1, 2015 Through June 30, 2020
POLK COUNTY
FLORIDA RAIL ENTERPRISE FPN:
4366501
Desc:
RAIL CAPACITY PROJECT
Project Length:
Project/Location: ITS IMPROVEMENT TO TRAFFIC OPERATIONS IN THE DOWNTOWN AREA 0.000
Begin Mile Post:
0.000
End Mile Post:
0.000
Comments:
FPN: Desc:
4366531
Project/Location: KENTUCKY AVENUE PEDESTRIAN OVERPASS
RAIL CAPACITY PROJECT
Project Length:
0.000
Begin Mile Post:
0.000
End Mile Post:
0.000
Comments:
Phase
Fund
PE
DIH
PE
TRIP
4365601
Desc:
RAIL CAPACITY PROJECT
Project Length:
Project/Location: RECKER HIGHWAY CONSTRUCT A BRIDGE SPANNING THE CSX RR TRACK IN POLK CO 0.000
Begin Mile Post:
0.000
End Mile Post:
0.000
Comments:
2016/17
DIH
$179,273
TRIP
$1,842,225
RRU
DPTO
$300,000
Project Total:
$350,000
Fund
PE
TRIP
ENV
DPTO
4365591
Desc:
RAIL CAPACITY PROJECT
Project Length:
Project/Location: SR60 GRADE SEPARATION OVER CSX RAILROAD 0.000
Begin Mile Post:
Comments:
0.000
End Mile Post:
2015/16
2016/17
2018/19
2019/20
$20,000
RRU
TRIP DIH
$54,000
ROW
TRIP
$88,000
CST
DIH
Phase
Fund
$30,000
$400,000
$258,000 $20,000
2015/16
$1,288,000
2016/17
$142,000
2017/18
PE
TRIP
$2,700,000
ENV
TRIP
$25,000
RRU
TRIP
$30,000
2018/19
$400,000
2019/20
ROW
DIH
$70,000
ROW
TRIP
$3,517,000
Fund
ENV
TRIP
RRU
DPTO
CST
DPTO
CST
TRIP
$2,755,000
2015/16
2017/18
2018/19
2019/20
2018/19
2019/20
$75,000 $24,739,633 $2,300,000 $500,000
2015/16
FLORIDA RAIL ENTERPRISE TOTAL
2016/17
$3,587,000
$500,000
Project Total:
$370,000
PHASE CODES
2017/18
$1,000,000
ROW
Phase
0.000
2019/20
$2,096,498
Project Total: FPN:
2018/19
$75,000
DSB
Phase
2017/18
$50,000
DSB
Project Total: FPN:
2015/16
2016/17 $3,884,498
$27,114,633
2017/18 $29,869,633
$142,000
$3,987,000
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Run Date: 11/24/2014
Page: 31
SnapShot Date: 11/12/2014
DRAFT
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT July 1, 2015 Through June 30, 2020
POLK COUNTY
POLK COUNTY TOTALS
Phase
Fund
COUNTY Total:
PHASE CODES
2015/16 $109,345,201
2016/17 $82,906,251
2017/18 $80,360,939
2018/19 $83,962,955
2019/20 $169,018,967
Total $525,594,313
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Run Date: 11/24/2014
Page: 32
SnapShot Date: 11/12/2014
Parker
RD
563
L a ke l a n d Lin der Regional A i rp o r t
Miles
POLK COUNTY
µ
RESURFACING PROJECTS
LEGEND
Resurfacing Projects Interstate Highways State Roads and US Highways City/County Roads
60 Æ Ü
35 Ü
Æ6
544
Ü
Æ5 37 Ü
Ü 674
Miles Disclaimer: This map is for reference purposes only. FDOT assumes no responsibility for errors or omissions in the data.
(
Ü
® 17 q ( ( Bartow
17 Ü
Bartow Municipal Airport
Lake Shipp
R D
G AA RR DD EE NN SS CC YY PP RR EE SS SS G
BB LL VV DD
7 6 5 4
DD RR
Cypress Ga rde ns
Lake Hatchineha
® q
Lake Pierce
Lake Wales
® q
Lake Wales Municipal Airport Crooked Lake Park
6 7 5 4 17 ( 98 ( 640
35 Ü
W W II NN TT EE RR LL AA KK EE RR DD
O O VV EE RR LL O OO O KK
550
Lake Rosalie
60 Ü
Fort Meade
Æ9 ( 17
DD UU NN DD EE EE RR DD
® q
Dundee
17 (
98
542
Ü
Lake Marion
Lake Hamilton 27
Cypress 540 G a r d e n s
Æ4
DRAFT TENTATIVE WORK PROGRAM 0FY 2015/2016 - FY 2019/2020 10 Map Source: FDOT Roads/Linear Referencing System,
Ü 542
540
Lake Hancock
Ü 540
Æ7
Ü
Haines City
92 17 ( (
Winter Haven
655
Mulberry
Hillsborough Co\L
5
12 12 Æ
1
® q
540
Ü
Lake Hamilton
11 SS TT SS TT
RD
COMBEE
® q
AA VV EE NN UU EE G G
W i n t e r 655 Haven
Lake Fa nnie
540
Lake Alfred
544
570
544
27 (
CC EE RR NN EE PP AA RR KK
AA VV EE TT
557
Ü Ü Ü
Ü Ü
Ü
544
7 6 4 5
W i n t er H a v en M u n i c i p al A i rp o r t
92 (
542
LL UU
® ( Ü q
Wint er Ha ven VE Mu n i c i p a l ND AL Ai r p o r t E BB LL VV DD
44 22 NN DD SS TT
LAKE
570
572
® q
17
Lake Henry
66 TT HH SS TT
AIRPORT
33 Ü ( Ü Ü Ü
659
Davenport
559
Ü
Ü
Lakeland
4 % ( ' & 92
Revision #
Ü
570
Lake
0
4 % ( ' &
98 (
37 Ü
( ( 17
7 6 5 4
LL AA KK EE LL AA NN DD RR DD
Lake Haines
33 RR DD SS TT
33 Ü
92
O O LL DD
\L
98 (
® q
Lakeland-Linder Reg io nal A irp or t
Polk City
35 Ü
HA
92
17 ( (
Lake Rochelle
Auburnda le
HH W W YY
Co
7 6Ü 5 4 33A
92 ( 13 13 Æ
a
Æ
35
Lake Marianna
14 14 Æ
DD EE RR BB YY AA VV EE RR EE CC KK EE RR
Æ3
98 (
Ü
559
ol
POLK PKWY
EDGEWOOD DR
7 6 5 4 546
ce
2
DD
563
27 (
Lake Alfred
Lake Alfred
Ü Lake Ariana
Green Swamp
659
RR
Ü
Æ
Ü 570
Os
ST
WW
16 16 Æ
ARIANA
10 10
Lake Bo nny OO
572
600
(
471
Pasco Co\L
TT
Ü Ü
Ü
Orange Co\L
Ü
17 17 Æ
RR
OLD TAMPA HWY
92 (
7 6 5 4 655
192
33 Ü
AA
542
Lakeland
Lake Co\L
BB
PA TAM NEW HWY
Lake Parker PARKER AVE
MEMORIAL BLVD
Ü 546
' % ( & 92 7 6 4 5 ( 570
539
HARDEN
4
8 ÜÆ
10th ST
FLORIDA AVE
Æ
ST
WABASH AVE
15 15
BLVD
GALLOWAY RD
BELLA VISTA
33 Ü
RD
LAKELAND HILLS BLVD
GRIFFIN 582
7 6 5 4
Sumter Co\L
LEEN KATH RD
7 6 5 4 542A
35 Ü
Lake Buf fum
98
Ü( 700
Crooked Lake
27 (
Tiger Lake
Lake Weohyakapka
11 11 Æ
17 Ü
Frostproof Reedy Lake
L
17 (
60 Ü
Lake Kissimmee
ak
Avon Park Bombing Range e
A
rb
u
c kl
e
Hardee Co\L 11/20/2014
# 1
FPN
Facility
4345021 EWELL ROAD AT LUNN RD
Description: SKID HAZARD OVERLAY
Phase
Fund
CST
HSP
$0
$463,342
$0
$0
$0
CST
SA
$0
$10,530
$0
$0
$0
PE
HSP
$96,293
$0
$0
$0
$0
$96,293
$473,872
$0
$0
$0
Project Total:
2015/16
2016/17
2017/18
2018/19
2019/20
# 14
4365201 RESURFACE POLK PKWY, MP 0.00-8.00 & 17.24-18.09
Description: RESURFACING
3
4312911 SR 33 FROM HAYNES CIRCLE TO WITHLACOOCHEE BRIDGE
Description: RESURFACING
CST
PKYR
$0
$0
$6,375,211
$0
$0
PE
PKYR
$0
$566,685
$0
$0
$0
Project Total:
4312781 SR 35/SR 555/US 17 FROM BARTOW RD TO BEAR CREEK APTS
Description: RESURFACING
4349371 SR 37 FROM CR 630 TO CR 640 (PINECREST RD)
Description: RESURFACING
4366011 SR 37 FROM SR 60 TO N OF VIRGINIA ST
Description: RESURFACING
7
4106663 SR 542 FROM BUCKEYE LOOP ROAD TO US 27
Description: WIDEN/RESURFACE EXIST LANES
8
4365691 SR 546 (US 92) FROM WABASH AVENUE TO N. INGRAHAM AVENUE
Description: RIGID PAVEMENT REHABILITATION
4350711 SR 555 (US 17) FROM AVENUE G SW TO AVENUE A SW
Description: RESURFACING
10
4350851 SR 563 (SIKES BLVD)FROM LIME ST TO SR 539 (MLK JR BLVD)
Description: RIGID PAVEMENT REHABILITATION
$0
$0
$0
CST
DIH
$154,050
$0
$0
$0
$0
4312941 SR 60 FROM CR 630 TO KISSIMMEE RIVER BR
Description: RESURFACING
CST
DS
$3,602,942
$0
$0
$0
$0
ENV
DS
$50,000
$0
$0
$0
$0
4356061 SR 60 HILLSBOROUGH C/L DIESEL RD
Description: RESURFACING
4350751 SR 600 (US 92) FROM E OF WALKER RD TO SR 544
Description: RESURFACING
$0
$0
$0
$0
DDR
$154,050
$0
$0
$0
$0
CST
DIH
$107,835
$0
$0
$0
$0
Description: RIGID PAVEMENT RECONSTRUCTION
Fund
CST
DDR
$1,204,970
$0
$0
$0
$0
CST
DIH
$16,432
$0
$0
$0
$0
$1,221,402
$0
$0
$0
$0
Project Total:
CST
SA
$5,040,708
$0
$0
$0
$0
ENV
DS
$50,000
$0
$0
$0
$0
$5,352,593
$0
$0
$0
$0
16
4312061 US 92 (SR 600) FROM CHURCHILL AVE TO SLOAN AVE
Description: RESURFACING
CST
DIH
$0
$95,536
$0
$0
$0
CST
DS
$0
$6,522,511
$0
$0
$0
RRU
DS
$100,000
$0
$0
$0
$0
$100,000
$6,618,047
$0
$0
$0
CST
SA
$0
$1,818,211
$0
$0
$0
PE
DIH
$100,000
$0
$0
$0
$0
$100,000
$1,818,211
$0
$0
$0
Project Total: ROW
DDR
$5,402,004
$6,810,022
$0
$0
$0
ROW
DIH
$477,405
$477,405
$0
$0
$0
$5,879,409
$7,287,427
$0
$0
$0
Project Total: CST
NHRE
$0
$0
$3,696,305
$0
$0
CST
SA
$0
$0
$4,839,609
$0
$0
PE
DIH
$10,000
$0
$0
$0
$0
$10,000
$0
$8,535,914
$0
$0
CST
DDR
$0
$2,084,013
$0
$0
$0
CST
DIH
$0
$17,646
$0
$0
$0
$0
$2,101,659
$0
$0
$0
Project Total: CST
DDR
$0
$0
$0
$0
$980,530
CST
DIH
$0
$0
$0
$0
$111,290
PE
DIH
$0
$0
$10,000
$0
$0
$0
$0
$10,000
$0
$1,091,820
CST
DDR
$803,563
$0
$0
$0
$0
CST
DIH
$205,400
$0
$0
$0
$0
CST
DS
$4,549,309
$0
$0
$0
$0
$5,558,272
$0
$0
$0
$0
CST
DDR
$0
$3,425,710
$0
$0
$0
CST
NHRE
$0
$5,966,364
$0
$0
$0
CST
SA
$0
$105,300
$0
$0
$0
RRU
DS
$275,000
$0
$0
$0
$0
$275,000
$9,497,374
$0
$0
$0
CST
DDR
$4,626,710
$0
$0
$0
$0
CST
DIH
$28,756
$0
$0
$0
$0
$4,655,466
$0
$0
$0
$0
Project Total:
17
4313121 US 98 (SR 35) FROM LAKE BONNY PARK TO MAIN STREET
Description: RESURFACING
2015/16
2016/17
2017/18
2018/19
2019/20
CST
DDR
$9,620,274
$0
$0
$0
$0
CST
DIH
$46,831
$0
$0
$0
$0
CST
DS
$1,667,620
$0
$0
$0
$0
ENV
DDR
$75,000
$0
$0
$0
$0
INC
DDR
$0
$480,000
$0
$0
$0
$11,409,725
$480,000
$0
$0
$0
CST
DIH
$82,160
$0
$0
$0
$0
CST
DS
$4,326,132
$0
$0
$0
$0
ENV
DS
$100,000
$0
$0
$0
$0
RRU
DS
$5,000
$0
$0
$0
$0
$4,513,292
$0
$0
$0
$0
Project Total:
Project Total:
13
$7,368,817
CST
Project Total:
12
4347621 SR546 (MEMORIAL BLVD) FROM I-4 TO WABASH AVE
Phase
Project Total:
Project Total:
11
4350761 SR 600 (US 92) FROM E OF SR 544 TO W OF JERSEY RD
$0
$0
Project Total:
9
$0
$3,561,825
Project Total:
6
$6,375,211
DDR
Project Total:
5
$566,685
CST
Project Total:
4
$0
Facility
Description: RESURFACING
15
2
FPN
CST
DIH
$51,350
$0
$0
$0
$0
CST
SA
$1,860,303
$0
$0
$0
$0
$1,911,653
$0
$0
$0
$0
Project Total:
Green Swamp
FL OR ID A AV E
BLVD
33A
35
33 Ü
Ü 98 (
4 % ( ' & 8 9 D :
13 13 Æ 559
Lake Alfred 570
Ü 20 20 Æ
659
W i n t e r H av e n Mu n icipal A i rp o r t
21 21
0
µ
12.5
60 Ü 8 9 D :
POLK COUNTY City/County Roads
ITS Freeway Management
e
8 9 : l 8 9 : D 8 m O ½ !
Bike Path
Ï !
Intersection
ADD
à ¾ "
Sidewalks
Õ !
Lighting
Public Transportation Shelter
8 9 Z : ! C
Landscaping Add Turn Lane
Pedestrian/Wildlife Overpass
Traffic Ops Improvement Rail Safety Project
26 26
Æ
23 23 Æ
9
Æ1
2 Æ
Lake Hancock
Bartow
Õ !
Ü 544
Lake Ham ilton
Eagle Lake
17 ( 8 9 D 8 : ® q 9 m Æ8 : 17 (
Ü 540
! C
674
Ü
Map Source: FDOT Roads/Linear Referencing System, Disclaimer: This map is for reference purposes only. FDOT assumes no responsibility for errors or omissions in the data.
542
35 Ü
98 Ü( 700
L a k e 544 Cannon
AVENUE G
R D
CERNE PARK LL UU C
Lake Fannie
AA VV EE TT
La ke Howar d
WINTER LAKE RD
La ke Shipp
Lake Hamilton
O
542
CYPRESS GARDENS
La ke Lulu
BLVD
DUNDEE RD OVERLOOK
550
DR
Cypress Gard ens
Lake Mar io n
Lake Hatchineha
Lake Rosalie Tiger Lake
Crooked Lake
Lake Weoh yakap ka
Lake Kissimmee
60 Ü
17 Ü
Frostproof Reedy Lake
L
17 (
544
27 (
540
Lake Wales Municipal Airport
Fort Meade
La ke Rochelle
Õ !
Winter Haven VE M u n i c ip a l ND AL Airport E BLVD
655
® q
27 (
La ke Henry
Ü
Lake Wales
60 Ü
La ke Haines
Lake Pierce
17 Ü
Bartow Municipal Airport
92
17 ( (
City
8 9 D :
Lake Bu ffu m
37 Ü
OLD
540
17 ( 98 (
DRAFT TENTATIVE WORK PROGRAM FY 2015/2016 - FY 2019/2020 Revision #
35 Ü
8 9 m : 92 Haines ( ! C 16 16 Æ
HWY
LAKELAND RD
Ü
540
8 9 ZÆ ( : 98
31 31 Æ
Hills borough Co\L
State Roads and US Highways
8 9 D :
Mulberry
TRAFFIC OPERATIONS AND OTHER PROJECTS
Interstate Highways
570
563
Lakelan dLinder Reg io nal Airpo rt
Miles
LEGEND
572
17 (
12 12 Æ
HA
DERBY AVE RECKER
540
Æ7 ® q Lake Winter 544 H a m ܽ 29 29 i l t o n ! Haven O 27 Æ ( 542 655 Dundee Ü Ü Ï ! ! C8 9 l :
Parker
570
Davenport
Ü
Ü 8 9 m : 8 9 l8 : 9 m ! : 92 ! ( C C ! C 8 9 D : Æ 8 9 l : 9 2 9 m : (8 ! C 8 9 l8 : 9 m : Ü mÜ33 8 : Ü Ü9 Ü Ü ® Lakeland q Lake
4 % ( ' &
La ke Mari anna
Auburndale
\L
37 Ü 8 9 D :
Polk City
92 ( 17 (
559
18 18 Æ 17 92 ® ( Ü q ( 28 28 Æ ½ ! Ü 24 24 7 6 5 4 Æ 11 11 Winter ÏÆ ! Ü Ü 8 9 l17 : C 8 Haven 4 ! : 9 l ( 7 6 5 4 15 15 Ü Æ Æ
7 6 5 4 546
Co
HARDEN
RD
(
a
AIRPORT
98
Ü Lake Ariana
! C
ol
EDGEWOOD DR
Ü
ce
659
DD
Regi onal Airport
RR
PKWY
WW
POLK
OO
ST
563
572
: 8 9 m Os
AR IA NA
TT
570
Pasco Co\L
La k e Bon n y
RR
OLD TAMPA HWY
(
AA
542
600
471
Ü
27
BB
PA TAM NEW HWY
33 Ü
570
Lake Alfred
La ke Alfred
1ST ST
WABASH AVE
546
MEMORIAL BLVD
7 6 5 4
(
655
6TH ST
3 1 0 t h539 ST
Orange Co\L
192
33 RR DD SS TT
ST
LAKE PARKER AVE
Lakeland 25 25 Æ Ü Æ 27 27 92 14 14 Æ ( Æ 8 9 l8 : 9 m : Ü C ! C ! 4 ' ( & 30 30 % Ü 8 Æ 8 9 D : 9 l : 10 10 Æ 9 m : 92 8 7 6 5 ( C4 ! 8 9 l : 19 19 Æ 31 31 8 9 m Ü : Æ 5 6 ÆÆ 32 32 Ü8 9 m : 35 Æ Ü Ü 7 6 5 4 17 17 Æ Ü 98 ( ®d - L i n d e r L a k e l a nq BELLA VISTA
Lake Co\L
44 22 NN DD SS TT
22 22 Æ
RD
RD
COMBEE
33 Ü
LA KE LA ND H IL L S BLVD
GALLOWAY RD
GR IF FIN 582
7 6 4 5
8 9 D :
35 Ü
Sumter Co\L
542A
L EEN KATH RD
7 6 5 4
ak
Avon Park Bombing Range e
A
rb
u
ck
le
Hardee Co\L 11/20/2014
# 1
FPN
Facility
4328091 BAKER ST FROM N VAN FLEET DR TO BRITTS LANEXING #624503-T
Phase
Fund
RRU
RHH
Project Total:
2015/16
2016/17
2017/18
2018/19
2019/20
$270,600
$0
$0
$0
$0
$270,600
$0
$0
$0
$0
Description: RAIL SAFETY PROJECT
2
$661,193
$0
$0
$0
SA
$0
$10,530
$0
$0
$0
SA
$10,000
$20,000
$0
$0
$0
Project Total:
$10,000
$691,723
$0
$0
$0
CST SU 4351071 BRUNNELL PARKWAY FROM MEMORIAL BLVD TO TENTH STREET Project Total:
$0
$151,090
$0
$0
$0
$0
$151,090
$0
$0
$0
Description: INTERSECTION IMPROVEMENT
3
17
CST
HSP
4367891 COLEMAN RD RECKER HWY TO 26TH ST X-ING # 625397R
CST ENV
RRU
RHH
$276,600 $276,600
$0 $0
$0 $0
$0 $0
$0
4298831 LK ALFRED TR AT US 17/92 BRIDGE
Phase
Fund
CST
ACSU
CST
SU
Project Total: CST
CM
2015/16
2016/17
2017/18
2018/19
2019/20
$231,540
$0
$0
$0
$0
$1,000
$0
$0
$0
$0
$232,540
$0
$0
$0
$0
$1,524,600
$0
$0
$0
$0
CST CST
DDR
$48,444
$0
$0
$0
$0
SA
$214,087
$0
$0
$0
$0
ENV
TALT
$50,000
$0
$0
$0
$0
$1,837,131
$0
$0
$0
$0
Project Total:
19
4332601 NEW YORK CYCLE TRACK (LIME STREET) FROM SIKES BLVD TO NEW YORK AVENUE
Description: BIKE PATH/TRAIL
CST
TALU
$0
$0
$532,500
$0
$0
PE
LF
$0
$115,307
$0
$0
$0
PE
TALU
$0
$1,000
$0
$0
$0
Project Total:
$0
$0
$116,307
$532,500
$0
$0
20 RRU
RHH
Project Total:
$119,671
$0
$0
$0
$0
$119,671
$0
$0
$0
$0
$119,671
$0
$0
$0
$0
$119,671
$0
$0
$0
$0
4344891 OLD DIXIE HIGHWAY/ SADDLE CREEK ROAD
Description: SIDEWALK
CST
HSP
$0
$679,483
$0
$0
$0
CST
SA
$0
$10,530
$0
$0
$0
$0
$690,013
$0
$0
$0
$255,600
$0
$0
$0
$0
$255,600
$0
$0
$0
$0
Project Total:
Description: RAIL SAFETY PROJECT
21 6
4367911 CR 542 OLD TAMPA HWY FROM GAY RD TO GAY RDXING #624215Y
RRU
RHH
Project Total:
4367881 PAYNE ST SR 600/US92 BLUE JAY AVE X-ING #623084U
RRU
RHH
Project Total:
Description: RAIL SAFETY PROJECT
Description: RAIL SAFETY PROJECT
22 7
4332721 CR 544 AT SR 17
CST
LF
$70,485
$0
$0
$0
$0
CST
SU
$1,000,182
$0
$0
$0
$0
$1,070,667
$0
$0
$0
$0
$295,146
$0
$0
$0
$0
$295,146
$0
$0
$0
$0
4344881 SR 33 (LAKELAND HILLS BLVD) AT N SOCRUM LOOP RD
Description: INTERSECTION IMPROVEMENT Description: INTERSECTION IMPROVEMENT
8
4332741 CR 655 (RIFLE RANGEROAD) FROM 10TH STREET E TO BOMBER ROAD
Project Total: CST
SU
Project Total:
Description: SIDEWALK
9
4349421 CREWS LAKE RD FROM LAKELAND HIGHLANDS RD TO KITTY FOX
Description: TRAFFIC OPS IMPROVEMENT
10
4350691 CRYSTAL LAKE DR FROM US 98 TO NEW JERSEY RD
23
11
4332291 EAST LAKE HOWARD TRAIL
Description: BIKE PATH/TRAIL
12
4309181 EASTSIDE ELEMENTARY SCHOOL SAFETY SIDEWALKS
4345071 SR 37 AT LAKE HARRIS DRIVE
Description: INTERSECTION IMPROVEMENT
CST
HSP
$0
$1,483,046
$0
$0
$0
CST
SA
$0
$8,424
$0
$0
$0
$0
$1,491,470
$0
$0
$0
$550,159
$0
$0
$0
$0
$1,000
$0
$0
$0
$0
$551,159
$0
$0
$0
$0
CST
ACSU
CST
SU
Project Total: CST
TALT
$342,360
$0
$0
$0
$0
CST
TALU
$256,475
$0
$0
$0
$0
$598,835
$0
$0
$0
$0
$174,758
$0
$0
$0
$0
Project Total: CST
TALT
Project Total:
$174,758
$0
$0
$0
$0
4106664 SR 542 FROM 1ST STREET TO BUCKEYE LOOP ROAD
Description: LANDSCAPING
4352841 SR 546 (MEMORIAL) FROM CHESTNUT RD E TO BRUNNELL PKWY
Description: BIKE PATH/TRAIL
4273152 I-4 FROM EAST OF POLK PARKWAY TO OSCEOLA COUNTY LINE
Description: ITS FREEWAY MANAGEMENT
4328041 INTERLACHEN PKWY FROM FERN RD TO E GARY RDXING# 624155-S
DSB
DIH
$23,621
$0
$0
$0
$0
DSB
HSP
$3,635,366
$0
$0
$0
$0
PE
HSP
$75,000
$0
$0
$0
$0
$3,733,987
$0
$0
$0
$0
$281,300
$0
$0
$0
$0
RRU
RHH
Project Total:
$281,300
$0
$0
$0
$0
Description: RAIL SAFETY PROJECT
15
4351091 LAKE HOWARD DR FROM AVE D SW TO 15TH ST SW
Description: BIKE PATH/TRAIL
26
4345091 SR 60 AT BAILEY RD
Description: INTERSECTION IMPROVEMENT
4367901 LEM CARNES RD CR 547N TO SR 600/US 17 X-ING #622960T
Description: RAIL SAFETY PROJECT
27
4349381 SR 600 (US 92) FROM W OF THOMPSON RD TO E OF FISH HATCHERY RD
Description: RAIL SAFETY PROJECT
$0
$0
$0
$0
$0
$0
$0
CST
HSP
$168,366
$6,318
$0
$0
$0
$201,149
$6,318
$0
$0
$0
CST
DDR
$0
$31,982
$0
$0
$0
CST
HSP
$0
$641,240
$0
$0
$0
CST
SA
$0
$10,530
$0
$0
$0
$0
$683,752
$0
$0
$0
CST
DIH
$0
$0
$0
$0
$5,670
CST
DS
$0
$0
$0
$0
$234,396
$0
$0
$0
$0
$240,066
Project Total: CST
DIH
$15,405
$0
$0
$0
$0
CST
DS
$883,672
$0
$0
$0
$0
PE
DIH
$10,000
$0
$0
$0
$0
$909,077
$0
$0
$0
$0
CST
DDR
$0
$25,300
$0
$0
$0
CST
HSP
$0
$596,354
$0
$0
$0
CST
SA
$0
$54,963
$0
$0
$0
$0
$676,617
$0
$0
$0
TALT
$0
$0
$0
$83,773
$0
CST
TALU
$0
$0
$0
$344,752
$0
PE
LF
$0
$155,000
$0
$0
$0
$0
$155,000
$0
$428,525
$0
28
4350781 US 17 AND 544 BUS STOP IMPROVEMENTS
$270,600
$0
$0
$0
$0
$270,600
$0
$0
$0
$0
29
4345061 US 27 AT MAIN ST/CRUMP RD
Description: LIGHTING
RRU
RHH
Project Total:
CST
DIH
$0
$130,536
$0
$0
$0
CST
DS
$0
$996,463
$0
$0
$0
RRU
DS
$75,000
$0
$0
$0
$0
$75,000
$1,126,999
$0
$0
$0
Project Total:
Description: PUBLIC TRANSPORTATION SHELTER CST
Project Total:
16
$0
$25,816
Project Total:
Project Total:
14
$6,967
DIH
Project Total:
Description: SIDEWALK
13
DDR
CST
Project Total:
24 Project Total:
CST
Project Total:
25 Description: SIDEWALK
# 30
FPN
Facility
4351081 US 92 FROM HOLIDAY MPH ENTRANCE TO N CHESTNUT RD
Description: SIDEWALK
Phase
Fund
CST
DS
$0
$0
$0
$45,093
$0
CST
SU
$0
$0
$0
$965,076
$0
PE
SU
$0
$345,000
$0
$0
$0
$0
$345,000
$0
$1,010,169
$0
31
4298131 US 92 -NEW TAMPA HWY AT WABASH AVE
Description: INTERSECTION IMPROVEMENT
4313531 WESTGATE-CENTRAL TRAIL FROM WEST BELMAR ST TO OAKHILL STREET
Description: BIKE PATH/TRAIL
CST
FTAT
$49,661
$0
$0
$0
$0
CST
SU
$49,661
$0
$0
$0
$0
$99,322
$0
$0
$0
$0
Project Total: CST
DDR
$0
$12,925
$0
$0
$0
CST
HSP
$0
$264,801
$0
$0
$0
CST
SA
$0
$10,530
$0
$0
$0
PE
HSP
$64,437
$0
$0
$0
$0
$64,437
$288,256
$0
$0
$0
Project Total:
2016/17
2017/18
2018/19
2019/20
DDR
$0
$0
$818,466
$0
$0
CST
DIH
$0
$0
$1,000
$0
$0
ENV
DDR
$10,000
$30,000
$0
$0
$0
$10,000
$30,000
$819,466
$0
$0
Project Total:
32
2015/16
CST
CST
LF
$0
$182,005
$0
$0
$0
CST
SU
$0
$127,595
$0
$0
$0
CST
TALT
$0
$97,851
$0
$0
$0
CST
TALU
$0
$333,722
$0
$0
$0
$0
$741,173
$0
$0
$0
Project Total:
Description: RAIL SAFETY PROJECT
4367871 CR 542 OLD TAMPA HWY FROM GAY RD TO DOC GAY RD X-ING #624214S
4350611 LINCOLN AVE SIDEWALKS
Description: PEDESTRIAN/WILDLIFE OVERPASS
Project Total:
5
Facility
Project Total:
18
Description: SIDEWALK
4
FPN
Description: SIDEWALK
$0
4345081 BOMBER ROAD AT SPRUCE ROAD AND GERBER ROAD
#
Sumter Co\L
Lake Co\L
Orange Co\L
( 192
33 Ü
Ü 471
27 (
Pasco Co\L
Green Swamp
Os
12 12 Æ
Æ6 570
L a k e l a n dÜ Lake
659
Parker
92 ( 33 16 16 Ü Æ Ü Ü Ü 570
572
563
® q
µ
L a ke l a n d Lin der Regional A i rp o r t 0
5
60 Ü
Miles
POLK COUNTY CAPACITY PROJECTS Capacity - PD&E Phase
Capacity - Design Phase
Capacity - Right-of-Way Phase Capacity - Construction Phase
à
Bridge Projects
Interstate Highways
State Roads and US Highways
570
544
655
540
540
35 Ü 98 (
Æ2
(
13 13 Æ
Ü
Ü 542
(
Cypress Gardens
Dundee
Ü 540
17 (
® (q
Bartow Municipal Airport
17
37 Ü
Ü 674
DRAFT TENTATIVE WORK PROGRAM FY 2015/2016 - FY 2019/2020 Map Source: FDOT Roads/Linear Referencing System, Disclaimer: This map is for reference purposes only. FDOT assumes no responsibility for errors or omissions in the data.
Fort Meade
Lake Wales
® q
14 14 Æ
Crooked Lake Park
35 Ü
à Æ 5
Lake Rosalie
Lake Wales Municipal Airport
17 17 Æ
à
Lake Hatchineha Lake Pierce
17 Ü
Æ3
60 Ü
Æ1
Lake Marion
544
Lake Lake W i n t eHra m i l t o nH a m i l t o n H a v e n 27
Ü Ü 10 10 Ü Æ
Ü
Haines City
92
10 10 Æ 98 Ü( 700
Crooked Lake
27 (
Lake Buf fum
City/County Roads
Revision #
Ü
Lake Alfred
® q
92 (
17 ( 98 (
Hillsborough Co\L
LEGEND
àÆ 9
17 (
W i n t er H a v en M u n i c i p al A i rp o r t
15 15 Æ
Bartow
Mulberry
Davenport
559
Ü
\L
11 11 Æ 4 ( ' & %
Ü
Co
33 Ü
4 % ( ' & Æ4
Æ7
a
35 Ü
Polk City
92 ( 17 (
ol
Æ8
ce
98 (
Tiger Lake
Lake Weohyakapka
60 Ü
17 Ü
Frostproof Reedy Lake
L
17 (
Lake Kissimmee
ak
Avon Park Bombing Range e
A
rb
u
c kl
e
Hardee Co\L 11/20/2014
# 1
FPN
Facility
4313521 BARTOW NORTHERN CONNECTOR PHASE II FROM US 17 TO SR 60
Description: NEW ROAD CONSTRUCTION
Phase
Fund
CST
CIGP
$0
$0
$0
$467,864
$0
CST
LFP
$0
$0
$0
$9,819,995
$0
CST
TRIP
$0
$0
$0
$2,998,420
$0
$0
$0
$0
$13,286,279
$0
Project Total:
2
4316411 CENTRAL POLK PWKY FROM POLK PWKY (SR 540) TO SR 35 (US 17)
Description: NEW ROAD CONSTRUCTION
3
4316412 CENTRAL POLK PWKY FROM SR 35 (US 17) TO LOGISTICS PARKWAY
Description: NEW ROAD CONSTRUCTION
4
4316418 CENTRAL POLK PWKY FROM US 17/US 92 TO I-4
Description: NEW ROAD CONSTRUCTION
5
4317721 COW CAMP ROAD BRIDGE NO. 160400 OVER ROSALIE/ZIPPRER CANAL
2015/16
2016/17
2017/18
2018/19
2019/20
ROW
DDR
$0
$0
$0
$1,966,740
$1,985,083
ROW
DIH
$0
$0
$0
$151,944
$136,943
Project Total:
$0
$0
$0
$2,118,684
$2,122,026
ROW
DDR
$0
$0
$0
$4,611,162
$3,479,790
ROW
DIH
$0
$0
$0
$506,479
$456,479
$0
$0
$0
$5,117,641
$3,936,269
$0
$9,212,000
$0
$0
$0
4301853 I-4 @ SR 33 INTERCHANGE MODIFICATION
Description: INTERCHANGE IMPROVEMENT
Project Total: PE
DDR
2012153 I-4 AT SR 557
Description: INTERCHANGE IMPROVEMENT
PE
DIH
Project Total: CST
ACBZ
Project Total:
$0
$110,000
$0
$0
$0
$0
$9,322,000
$0
$0
$0
$0
$1,668,600
$0
$0
$0
$0
$1,668,600
$0
$0
$0
ENV
SA
$0
$0
$1,300,000
$0
$0
ROW
DIH
$0
$0
$0
$271,270
$0
ROW
DS
$0
$0
$0
$33,489
$0
ROW
SA
$0
$0
$0
$2,483,295
$0
$0
$0
$1,300,000
$2,788,054
$0
CST
ACNP
$0
$0
$0
$0
$54,664,218
CST
DIH
$0
$0
$0
$0
$508,099
ENV
DI
$0
$0
$100,000
$0
$0
RRU
ACNP
$0
$0
$0
$0
$4,500,000
$0
$0
$100,000
$0
$59,672,317
Project Total:
8
4366731 SR 35/700 (US 98) FROM N. OF WEST SOCRUM LOOP RD TO SR 471
Description: PD&E/EMO STUDY
9
1975624 SR 35/700 (US98) FROM EDGEWOOD DRIVE TO E MAIN STREET
Description: ADD LANES & RECONSTRUCT
10
4106662 SR 542 FROM 1ST STREET TO BUCKEYE LOOP RD
Description: ADD LANES & RECONSTRUCT
PDE
DIH
$0
$0
$0
$0
$200,000
PDE
DS
$0
$0
$0
$0
$2,100,000
$0
$0
$0
$0
$2,300,000
Project Total: ROW
CM
$0
$0
$0
$1,723,607
$1,723,454
ROW
SA
$0
$0
$0
$1,522,651
$4,242,750
$0
$0
$0
$3,246,258
$5,966,204
Project Total: CST
DDR
$0
$0
$0
$15,736,323
$0
CST
DIH
$0
$0
$0
$331,800
$0
ENV
DS
$40,000
$200,000
$0
$0
$0
ROW
SU
$5,241,467
$1,221,060
$0
$0
$0
RRU
DDR
$0
$0
$0
$1,000,000
$0
RRU
LF
$0
$0
$0
$2,951,628
$0
$5,281,467
$1,421,060
$0
$20,019,751
$0
Project Total:
11
4366721 SR35/700 US 98 FROM WEST DAUGHTERY ROAD TO NORTH OF WEST SOCRUM LOOP RD
PDE
DIH
$0
$0
$0
$0
$150,000
PDE
SA
$0
$0
$0
$0
$1,500,000
$0
$0
$0
$0
$1,650,000
Project Total:
Description: PD&E/EMO STUDY
12
4313511 US 17/92 HINSON AVE FROM SR 17 (10TH STREET) TO 17TH STREET
Description: PD&E/EMO STUDY
13
4313512 US 17/92 HINSON AVE FROM SR 17 (10TH STREET) TO 17TH STREET
Description: ADD LANES & RECONSTRUCT
Facility
4192434 US 27 FROM PRESIDENTS DRIVE TO SR 60
Description: ADD LANES & RECONSTRUCT
Phase
Fund
CST
DDR
$0
$0
$0
$0
$52,843,410
CST
DIH
$0
$0
$0
$0
$941,628
ENV
DI
$0
$0
$195,000
$500,000
$0
$0
$0
$195,000
$500,000
$53,785,038
Project Total:
15
4312081 US 92 (SR 600) FROM REYNOLDS RD TO SCHALAMAR CREEK ENT
Description: BRIDGE REPLACEMENT
16
4335582 US 92 FROM COUNTY LINE ROAD TO WABASH AVENUE
2015/16
2016/17
2017/18
2018/19
2019/20
CST
DDR
$884,467
$0
$0
$0
$0
CST
DIH
$386,374
$0
$0
$0
$0
CST
DS
$10,635,796
$0
$0
$0
$0
INC
DS
$0
$392,000
$0
$0
$0
$11,906,637
$392,000
$0
$0
$0
$0
$0
$0
$4,450,000
$0
$0
$0
$0
$4,450,000
$0
PE
SA
Project Total:
Description: ADD LANES & RECONSTRUCT
Project Total:
7
14
FPN
Project Total:
Description: BRIDGE REPLACEMENT
6
#
PDE
DIH
$20,000
$0
$0
$0
$0
PDE
DS
$150,998
$800,000
$0
$0
$0
$170,998
$800,000
$0
$0
$0
Project Total: PE
DIH
$0
$0
$0
$3,000
$0
PE
DS
$0
$0
$0
$1,350,000
$0
$0
$0
$0
$1,353,000
$0
Project Total:
17
4348862 US 98 (PEACE RIVER-FT MEADE) AT BRIDGE NO 0064 (JOHN SINGLETARY BRIDGE)
Description: BRIDGE REPLACEMENT
PE
DIH
$0
$0
$0
$0
$100,000
PE
SA
$0
$0
$0
$0
$2,000,000
$0
$0
$0
$0
$2,100,000
Project Total: