www.portwings.in
Lily line
July 8th - 14th Issue
Offers
LCL & FCL Services Ex.Tuticorin, Cochin, Krishnapatnam, chennai to
SANCO TRANS LTD
MALDIVES For Bookings: Raja Agencies
Mobile: 96009 40230, 96009 40240 Phone: +91-461-4200001, 2352275 Fax: +91-461-2353100 E-mai: liner@rajaagencies.in
Published from Chennai and Circulated among the trade across the country RNI TNENG/2014/59741
Wednesday, July 8, 2020
8 Pages
Nitin Gadkari Chairs Group on Infrastructure Meeting New Delhi Port Wings News Network nion Minister for Road Transport & Highways and MSMEs Shri Nitin Gadkari chaired a Group on Infrastructure meeting in New Delhi via webcast on 7 July 2020. Union Minister for Railways and Commerce Shri Piyush Goyal, Union Minister for Environment, Forests and Climate Change, Information & Broadcasting and Heavy Industries & Public Enterprises Shri Prakash Javadekar, and Union Minister of State for Road Transport & Highways Gen (Retd) V K Singh participated in the meeting. Senior officers of the Ministries of Road Transport & Highways, Railways, Power, Environment and Forests, Railway Board, NHAI and representatives from the States of Maharashtra, Gujarat, Tamil Nadu, Kerala and Karnataka attended the same. PENDING INFRASTRUCTURE PROJECTS The meeting considered several issues, in respect of pending infrastructure projects, for resolution. A major issue raised in the meeting pertained top outstanding forest clearance for 187 highway projects. It was also noted that many projects had not yet applied for Stage II forest clearance. The concerned officers were directed to initiate the process for the same immediately. It was stressed in the meeting that level crossings on National
U
Highways need to be removed, as they constitute major accident spots. It was pointed out that while their designs had been approved at 167
locations, but the work has not yet started. MoUs were signed in this respect over 5 years ago, and there is need to improve performance. In this direction, it was agreed to monitor the projects under Setubharatam programme on monthly basis. It also was underlined that 30 road projects are pending with Railways. However, the Railway Minister assured to resolve these within two days. A major issue before infrastructure projects is tree cutting, however, there are ambiguities over inclusion of certain local breeds of shrubs and plants in forest cover. An example of Babool or Kikar was presented in the meeting. This being an exotic Arabian shrub, its inclusion in the definition of trees is causing hindrance while considering forest clearance for several projects. In Delhi, an ambitious project monitored by PMO, the Dwarka Expressway, is facing such 1939
Babool shrubs in a total of 6364 trees. It was pointed out that many States like Maharashtra and Madhya Pradesh do not cover this shrub in land revenue code as tree. Shri Nitin Gadkari expressed his satisfaction over progress on outstanding issues by way of meetings between senior level officers of various ministries. He said, he always feels that instead of wasting time and energy on written communications, it is always worthy to sit together and thrash out issues before each other. He directed that henceforth a joint meeting be held between Chairman Railway Board, Director General Forests and Director General Roads. He said, a meeting every month will solve many issues. Environment Minister Shri Javadekar was requested to direct the Forest officers posted in States to follow and implement the circulars and orders issued by MoE&F and CC. Special High Powered committees on forest issues can be conducted as is being done in Jharkhand, Maharashtra and Arunachal Pradesh. It was felt that this step will remove many hindrances in the way of infrastructure projects, which will save both time and money. Shri Piyush Goyal lauded the idea of this meeting, and said this is a good initiative of Shri Gadkari. He said, he also got to learn a lot from this experiment of all stakeholders sitting together for thrashing out the issues before them. He requested Shri Nitin Gadkari to guide the Contd. on page -2
`12
Wing 6 Feather 47
Authorized Economic Operator
Mob : 9884085285
Exports recovering fast after setbacks in first 2 months of this fiscal due to COVID-19: Piyush Goyal New Delhi Port Wings News Network mid India-China standoff along the Line of Actual Control (LAC) in East Ladakh, Union Commerce Ministry Piyush Goyal on July 3 held a very important meeting with leading exporters and Export Promotion Council officials to discuss and address the issues being faced by exporters amid COVID-19 pandemic, according to a report in Zee News. Piyush Goyal said the exports after setbacks in the first two months of this financial year due to COVID-19 lockdown are recovering fast. The Union Minister said that the data of June 2020 will reflect the gains with the merchandise export
A
consequences. Exhorting the exporters to adopt Make in India, use indigenous resources and skilled manpower,
produce quality products, and use the economies of scale to deliver affordable products, Piyush Goyal asked them to be more competitive, be focused, and play on their strengths. Talking about the spirit of File Photo
figures touching almost 88% of the corresponding period of the last year. As Unlock 2 has come with more permissions, it is expected that the things will further improve in the future, Goyal said, while urging the industry to shun over-dependence on imports and certain geographies as it would lead to long-term dire
FUMIGATION SERVICES PVT LTD.,
36
partnership and cooperation, the Union Minister assured the exporters and the industry of the government's full support. He also announced that action is being taken on the Baba Kalyani committee recommendations of the Special Economic Zones (SEZ). The meeting was attended by representatives of FIEO, APEC, SRTEPC, GJEPC, CLE, CEPC, Shefexil, Pharmexil, ECSEPC, ISEPC, SEPC, EEPC, EPCH, PEPC, TEXPROCIL, Telecom EPC, Cashew EPC, Chemexcil, CEPEXIL, IOPEPC, and PLEXCONCIL. Contd. on page -2
Follow us in twitter @portwingsnews Visit
www.portwings.in • India’s 1st fumigation company to be accredited with NSPM 12 Standards • Fumigation of wooden packing material as per ISPM 15 standards
Experts in wooden pallet fumigation and Heat Treatment
• Disinfestation of Vessels
Please Contact for your requirements: FUMIGATION SERVICES No.1, Buddu Street, 3rd Floor, Chennai - 600 001 For Booking : 4242 7777, 2521 3409, 2522 1241 booking@fumi.in For PQ Arrangements : 2521 7488, 2224 2175 pqfumigation@fumi.in For New Enquires : 2522 0626, 2522 5061, 2524 0672 fumi@fumi.in Branches: Bangalore, Cochin, Coimbatore, Delhi, Guntur, Hosur, Hyderabad, Kakinada, Krishnapatnam, Mangalore, Mumbai, Mundra/Gandhidham, Tuticorin, Vizag
• All Type of Residential & Commercial Pest Control Services
www.fumigationservice.com
• Heat treatment for wooden packing material • AFAS accredited fumigation agency (Australian Quarantine) • Phyto Sanitary Certificate Arrangements • Container Fumigation • Ship holds Fumigation • Ware House Fumigation
for Latest News
Inside Adani-Gateway Distriparks... APM Terminal Pipavav Sets... Adani Group eyes Colombo... Paradip Port Becomes "Numero...
Pg-2 Pg-3 Pg-4 Pg-5
Vessel Position at Terminals and Ports... Pg-6 Latest Customs Exchange Rates... Pg-7 India Has No ‘Jurisdiction’ To Try... Pg-7 DP World Reaches Milestone... Pg-8
RNI No. TNENG/2014/59741 Postal Registration No. TN/CNIGPO/067/2018-2020 Posted at Pathrika Channel, Egmore, RMS, Chennai-8. Date of Publication - Wednesday, Posted on Tuesday / Wednesday