INTEGRATED DESIGN 6 9 8 , 3 3 C R O S S , 1 0 ‘A’ M A I N 4 B L O C K , J A Y A N A G A R B A N G A L O R E 5 6 0 0 1 1 , I N D I A T E L : 0 0 – 9 1 – 8 0 – 2 6 6 3 1 3 9 8 F A X : 0 0 – 9 1 – 8 0 ‐ 2 6 5 4 5 9 8 9 WEBSITE : www.inde‐design.org M A I L : integrateddesign@yahoo.co.in I n f o @ I n d e – d e s I g n . o r g
CONCEPTUAL LANDSCAPE PRESENTATION FOR SATTVA MYSORE FEEDS
Conceptual Landscape Presentation ‐ SATTVA MYSORE FEEDS
13th February 2014
Integrated Design
Conceptual Landscape Presentation ‐ SATTVA MYSORE FEEDS
13th February 2014
Integrated Design
SITE EDGE INTERFACE Adjacent buildings visually blocked off from the site Buffer space required to create a visual barrier Habitable space
Stilt floor 4m
The indicated edges of the site come in very close proximity to the dense residences present on the other side. Development on site needs to be shielded from view of these existing dwellings.
A landscaped buffer of 4m needs to left from the edge of the site to act as a physical and a visual barrier. This will maintain privacy along stilt area as well as the habitable spaces.
View of dense residences along the site edge
Buffer
Conceptual Landscape Presentation ‐ SATTVA MYSORE FEEDS
13th February 2014
Integrated Design
NATURAL FEATURES
Valley within the site
River at edge of site
The existing valley must not be used to store construction equipment. In order to sustain the adjoining river, the valley needs to be conserved and maintained. Construction of podium as well as basement to be limited to this edge
Valley side to be earmarked as conserved vegetation area, treatment and maintenance for which must begin along with building construction at early stage itself for it to be in a nurtured stage once the development is ready.
Valley
River Road
Site
Built up
Indicative site section
Conceptual Landscape Presentation ‐ SATTVA MYSORE FEEDS
Valley
River
13th February 2014
Integrated Design
MASTER PLAN – Land Use
Conceptual Landscape Presentation ‐ SATTVA MYSORE FEEDS
13th February 2014
Integrated Design
MASTER PLAN – OPEN SPACE DISTRIBUTION
Conceptual Landscape Presentation ‐ SATTVA MYSORE FEEDS
13th February 2014
Integrated Design
MASTER PLAN – GROUND FLOOR ACCESS PEDESTRIAN ACCESS ALONG THE EDGE TO BE TREATED WITH BIFFER PLANT AND HIGH COMPOUNDEDGE FOR SECURITY AND PRIVACY.
PARKING ACCESS SHOWN FROM UNDERNEATH RAMP. NEEDS TO BE CHECKED. DUE TO THE FIRE ACCESS MOVMENT POKCETS ON THE GROUND FLOOR ARE NOT EFFECTIVELY UTILIZED. LEAVING LARGE UNUSED SPACES
BASED ON FIRE REGUALTIONS IS THIS RAMP ACCEPTABLE OR WILL THIS NEED TO BE REWORKED ?
Conceptual Landscape Presentation ‐ SATTVA MYSORE FEEDS
13th February 2014
Integrated Design
MASTER PLAN – BUFFER LANDSCAPE FOR PRIVACY
BUFFEER SPACE LIMITED DUE TO RAMP ALONG THIS BUILDING EDGE
Conceptual Landscape Presentation ‐ SATTVA MYSORE FEEDS
13th February 2014
Integrated Design
CONCEPTUAL LANDSCAPE MASTER PLAN ENTRANCE PLAZA EXTENDING THE PUBLIC MOVEMENT BUFFER PLANTING WITH PEDESTRIAN PATHWAY. EDGE TO BE DENSELY PLANTED FOR VISUAL PRIVACY SWIMMING POOL WITH DECK AS AN EXTENSION OF THE CLUBHOUSE MULTIPURPOSE HALL TERRACED LANDSCAPE SPACE
LANDSCAPE ENTRY FEATURE TO THE RESIDENTIAL PARCEL EDGE TO BE TREATED AS FEATURE WALL TO DEFINE THE ENTRY AS WELL AS LIMIT MOVEMENT ACROSS THE TWO PARCEL OF LAND MULTIPURPOSE OUTDOOR PLAY COURT CHILDRENS PLAY AREAS WITH SAND PIT
BUFFER PLANTING WITH PEDESTRIAN PATHWAY. EDGE TO BE DENSELY PLANTED FOR VISUAL PRIVACY
Conceptual Landscape Presentation ‐ SATTVA MYSORE FEEDS
13th February 2014
Integrated Design
Conceptual Landscape Presentation ‐ SATTVA MYSORE FEEDS
13th February 2014
Integrated Design
Sattva Driveway options
Sattva Lobby views
Sattva Podium aerial view
Sattva Podium options views
Oxygen Excel Concepts/Renders/Compilation
CONCEPTUAL LANDSCAPE PRESENTATION ‐ OXIGEN EXCEL
Conceptual Landscape Presentation ‐ OXIGEN EXCEL
14th February 2014
INTEGRATED DESIGN 6 9 8 , 3 3 C R O S S , 1 0 ‘A’ M A I N 4 B L O C K , J A Y A N A G A R B A N G A L O R E 5 6 0 0 1 1 , I N D I A T E L : 0 0 – 9 1 – 8 0 – 2 6 6 3 1 3 9 8 F A X : 0 0 – 9 1 – 8 0 ‐ 2 6 5 4 5 9 8 9 WEBSITE : www.inde‐design.org M A I L : integrateddesign@yahoo.co.in I n f o @ I n d e – d e s I g n . o r g
Integrated Design
NATURAL WATERSHED PATTERN OF SITE
Conceptual Landscape Presentation ‐ OXIGEN EXCEL
WATER MANAGMENT
14th February 2014
Integrated Design
WATERSHED DISTRIBUTION OF THE PROPOSED MASTER PLAN
Conceptual Landscape Presentation ‐ OXIGEN EXCEL
WATER MANAGMENT
14th February 2014
Integrated Design
WATER DRAINAGE FLOW ALONG THE PROPOSED ROAD LAYOUT
Conceptual Landscape Presentation ‐ OXIGEN EXCEL
WATER MANAGMENT
14th February 2014
Integrated Design
INTEGRATED HYBRID WATER MANAGEMENT SCHEME
Conceptual Landscape Presentation ‐ OXIGEN EXCEL
WATER MANAGMENT
14th February 2014
Integrated Design
VEGETATION CHARACTER
Conceptual Landscape Presentation ‐ OXIGEN EXCEL
14th February 2014
Integrated Design
LANDSCAPE MASTER PLAN
Conceptual Landscape Presentation ‐ OXIGEN EXCEL
14th February 2014
Integrated Design
ENTRANCE EXPERIENCE SEGMENTS The entire driveway is categorized into 4 distinct yet inter‐related segments. These segments are derived based on the contour profile as well as the visual axis and expanse created due to the curvilinear profile of the road
GM E S
G SE
G SE
G SE
M
M
M
The final section towards the termination of the frontage experience is treated with visually strong landscape elements such as planter beds and pergola members shading pedestrian plazas and also terrace landscape seating space overlooking the existing valley. This section is treated with a combination of active and passive spaces to enhance user interface with the landscape. (REFER VIEW 4)
T D N E
T C EN
This section is a transitional phase in the driveway with dense edge vegetation on either side and framed members spanning the road width to enhance the driveway experience and increase the human scale perception. (REFER VIEW 3)
T B N E
T A N E
This section of the road from where the site is first perceived is treated with accentuating landscape elements such as water features, planting beds and tall posts to enhance the expanse of the site. (REFER VIEW 2) v5 v4
v3 This Segment is designed as a Ceremonious entry to the development with large frames defining the transition between the Highway Road and the access to the development. (REFER VIEW 1) v1
PLAN of Frontage Driveway Conceptual Landscape Presentation ‐ OXIGEN EXCEL
v2
14th February 2014
View Nodes Integrated Design
VIEW 1 ‐ From Highway edge towards the Frontage Driveway treated with large frames
Conceptual Landscape Presentation ‐ OXIGEN EXCEL
14th February 2014
Integrated Design
VIEW 2 ‐ At Segment 2 looking into the site. Water Features , Planter Beds and posts to accentuate the site expanse
Conceptual Landscape Presentation ‐ OXIGEN EXCEL
14th February 2014
Integrated Design
VIEW 3 ‐ Space Frames along Segment 3 defining the Transitional phase of the driveway.
Conceptual Landscape Presentation ‐ OXIGEN EXCEL
14th February 2014
Integrated Design
VIEW 4 – From the termination of the driveway looking toward Segment 3 . Treated with Landscape elements such as pergolas with creepers to shade the plazas with the stepped plaza as a passive recreational space along one edge.
Conceptual Landscape Presentation ‐ OXIGEN EXCEL
14th February 2014
Integrated Design
AERIAL VIEW LOOKING TOWARDS THE HIGHWAY EDGE AT THE BACKGROUND
Conceptual Landscape Presentation ‐ OXIGEN EXCEL
14th February 2014
Integrated Design
ENTRNACE EXPERIENCE VOLUMES The driveway is treated with two distinct set of volumes. The first half from the Main Highway edge is treated as an intimate space with directional features and constricted view while the second half is contrastingly altered with large expanse of greens , shaded pedestrian plazas as one moves into the development.
VO
VO
M LU
M LU
E B
E A In this section the volume of the driveway is broadened with the use of landscape elements as well as with the softscape usage that is only treated as low ground covers. Pergola shaded spaces are introduced along the driveway to enhance the pedestrian interface as well a few parking is accomodated along one edge. The driveway is terminated with terraced landscape spaces overlooking the valley.
v5 v4
v3
The edges along the road in the section is treated with high walls with large green mounds that not only make the space intimate but also act as guiding landscape element for the user. This pattern is continued with the interplay of softscape and hardscape till the volumetric expanse is broadened. v1
PLAN of Frontage Driveway Conceptual Landscape Presentation ‐ OXIGEN EXCEL
v2
14th February 2014
View Nodes Integrated Design
VIEW 1 ‐ From Highway edge towards the Frontage Driveway treated with a feature wall
Conceptual Landscape Presentation ‐ OXIGEN EXCEL
14th February 2014
Integrated Design
VIEW 2 ‐ Shaded driveway with berms on either side to induce a sence of anticipation to the user
Conceptual Landscape Presentation ‐ OXIGEN EXCEL
14th February 2014
Integrated Design
VIEW 3 ‐ Feature walls frame the perception of the site
Conceptual Landscape Presentation ‐ OXIGEN EXCEL
14th February 2014
Integrated Design
VIEW 4 ‐ The amphitheatre that becomes an active culmination and a resting place for the entrance stretch
Conceptual Landscape Presentation ‐ OXIGEN EXCEL
14th February 2014
Integrated Design
AERIAL VIEW LOOKING TOWARDS THE HIGHWAY EDGE AT THE BACKGROUND
Conceptual Landscape Presentation ‐ OXIGEN EXCEL
14th February 2014
Integrated Design
NEIGHBOURHOOD LEVEL PARK
Conceptual Landscape Presentation ‐ OXIGEN EXCEL
14th February 2014
Integrated Design
12 m 7.20 m
0.90 m
2.40 m
Ramp Access
Plot Edge Sloped according Contour Profile
Pathway with Undergrou nd Services
PLOT LINE
Pathway with Undergrou nd Services
Saucer Drain – 150 mm wide
PLOT LINE
1.50 m
Pathway Green
7.20 m WIDE Carriageway
Entrance to Plot
12 m WIDE ROW ROAD CROSS SECTIONS Conceptual Landscape Presentation ‐ OXIGEN EXCEL
14th February 2014
Integrated Design
12.0 m
12.0 m 2.40 m
7.20 m
2.40 m
7.20 m
Underground Service lines along the Property Edge
Ramp Access to Individual plot
Tactile Flooring for the differently ‐ abled
Service Chambers integrated with the Pathway hardscape Planting Buffer along the Road Edge
SPATIAL LEVEL PLAN
SURFACE DRAINAGE PLAN
SERVICES INTEGRATION (suggested) ROAD CROSS SECTIONS
Conceptual Landscape Presentation ‐ OXIGEN EXCEL
14th February 2014
Integrated Design
Conceptual Landscape Presentation ‐ OXIGEN EXCEL
14th February 2014
Integrated Design
12 m Plot Edge Sloped according Contour Profile
1.50 m
0.90 m
7.20 m
Pathway with Undergrou nd Services
Pathway Green
2.40 m
Ramp Access
7.20 m WIDE Carriageway
Plot Edge Sloped according Contour Profile
Pathway with Undergrou nd Services
Entrance to Plot
12 m WIDE ROW ROAD CROSS SECTIONS Conceptual Landscape Presentation ‐ OXIGEN EXCEL
14th February 2014
Integrated Design
12.0 m
12.0 m 2.40 m
7.20 m
2.40 m
7.20 m
Underground Service lines along the Property Edge Ramp Access to Individual plot
Plot Edge Sloped to Contour Profile
Tactile Flooring for the differently ‐ abled
Planting Buffer along the Road Edge
SPATIAL LEVEL PLAN
Service Chambers integrated with the Pathway hardscape
SURFACE DRAINAGE PLAN
SERVICES INTEGRATION (suggested) ROAD CROSS SECTIONS
Conceptual Landscape Presentation ‐ OXIGEN EXCEL
14th February 2014
Integrated Design
Conceptual Landscape Presentation ‐ OXIGEN EXCEL
14th February 2014
Integrated Design
12 m 7.20 m
0.90 m
Pathway with Undergrou nd Services
Pathway Green
2.40 m
Extension to the Landscape Open Space
Saucer Drain – 150 mm wide
1.50 m
Saucer Drain – 150 mm wide
Plot Edge Sloped according Contour Profile
7.20 m WIDE Carriageway
Planting
12 m WIDE ROW ROAD CROSS SECTIONS Conceptual Landscape Presentation ‐ OXIGEN EXCEL
14th February 2014
Integrated Design
12.0 m
12.0 m 2.40 m
7.20 m
2.40 m
7.20 m
Underground Service lines along the Property Edge
Swale Ramp Access to Individual plot Extension to the Landscape Open Space
Tactile Flooring for the differently ‐ abled
Service Chambers integrated with the Pathway hardscape
Planting Buffer along the Road Edge
SPATIAL LEVEL PLAN
Conceptual Landscape Presentation ‐ OXIGEN EXCEL
Swale system
SURFACE DRAINAGE PLAN
14th February 2014
SERVICES INTEGRATION (suggested)
Integrated Design
Conceptual Landscape Presentation ‐ OXIGEN EXCEL
14th February 2014
Integrated Design
12 m 7.20 m
Planting
2.40 m
Extension to the Landscape Open Space
Saucer Drain – 150 mm wide
2.40 m
Saucer Drain – 150 mm wide
Extension to the Landscape Open Space
7.20 m WIDE Carriageway
Planting
12 m WIDE ROW Conceptual Landscape Presentation ‐ OXIGEN EXCEL
14th February 2014
Integrated Design
12.0 m
12.0 m 2.40 m
7.20 m
2.40 m
7.20 m
Swale system Swale
Extension to the Landscape Open Space
Planting Buffer along the Road Edge
SPATIAL LEVEL PLAN
Conceptual Landscape Presentation ‐ OXIGEN EXCEL
SURFACE DRAINAGE PLAN
14th February 2014
SERVICES INTEGRATION (suggested)
Integrated Design
Conceptual Landscape Presentation ‐ OXIGEN EXCEL
14th February 2014
Integrated Design
18 m 9 m
4.50 m
Pathway
PLOT LINE
Ramp Access
Underground Services
1.50 m
Saucer Drain – 150 mm wide
1.50 m
Underground Services
PLOT LINE
1.50 m
Buffer
Pathway
Green
9 m WIDE Carriageway
Entrance to Plot
18 m WIDE ROW Conceptual Landscape Presentation ‐ OXIGEN EXCEL
14th February 2014
Integrated Design
18.0 m
18.0 m 4.50 m
9.00 m
4.50m
9.00 m
Underground Service lines along the Property Edge Tactile Flooring for the differently ‐ abled Ramp Access to Individual plot
Planting Buffer along the Road Edge Service Chambers integrated with the Pathway hardscape
SPATIAL LEVEL PLAN
SURFACE DRAINAGE PLAN
SERVICES INTEGRATION (suggested) ROAD CROSS SECTIONS
Conceptual Landscape Presentation ‐ OXIGEN EXCEL
14th February 2014
Integrated Design
Conceptual Landscape Presentation ‐ OXIGEN EXCEL
14th February 2014
Integrated Design
18 m 9 m
4.50 m
Pathway
PLOT LINE
Ramp Access
Plot Edge Sloped according Contour Profile Underground Services
1.50 m
Saucer Drain – 150 mm wide
1.50 m
Underground Services
PLOT LINE
1.50 m
Buffer
Pathway
Green
9 m WIDE Carriageway
Entrance to Plot
18 m WIDE ROW ROAD CROSS SECTIONS Conceptual Landscape Presentation ‐ OXIGEN EXCEL
14th February 2014
Integrated Design
18.0 m
18.0 m 4.50 m
9.00 m
4.50m
9.00 m
Underground Service lines along the Property Edge Tactile Flooring for the differently – abled/
Plot Edge Sloped to Contour Profile
Ramp Access to Individual plot
Planting Buffer along the Road Edge
SPATIAL LEVEL PLAN
Service Chambers integrated with the Pathway hardscape
SURFACE DRAINAGE PLAN
SERVICES INTEGRATION (suggested) ROAD CROSS SECTIONS
Conceptual Landscape Presentation ‐ OXIGEN EXCEL
14th February 2014
Integrated Design
Conceptual Landscape Presentation ‐ OXIGEN EXCEL
14th February 2014
Integrated Design
1.50 m
1.50 m
18 m
1.50 m
Buffer
Pathway
Green
4.50 m
Extension to the Landscape Open Space
Saucer Drain – 150 mm wide
Saucer Drain – 150 mm wide
Underground Services
PLOT LINE
9 m
9 m WIDE Carriageway
Open Space Integration
18 m WIDE ROW ROAD CROSS SECTIONS Conceptual Landscape Presentation ‐ OXIGEN EXCEL
14th February 2014
Integrated Design
18.0 m
18.0 m 4.50 m
9.00 m
4.50m
9.00 m
Underground Service lines along the Property Edge Tactile Flooring for the differently – abled/ Extension to the Landscape Open Space
Ramp Access to Individual plot
Swale Service Chambers integrated with the Pathway hardscape Planting Buffer along the Road Edge
SPATIAL LEVEL PLAN
Swale system
SURFACE DRAINAGE PLAN
SERVICES INTEGRATION (suggested) ROAD CROSS SECTIONS
Conceptual Landscape Presentation ‐ OXIGEN EXCEL
14th February 2014
Integrated Design
Conceptual Landscape Presentation ‐ OXIGEN EXCEL
14th February 2014
Integrated Design
18 m 4.50 m
Open Space Integration
4.50 m
Extension to the Landscape Open Space
Saucer Drain – 150 mm wide
Saucer Drain – 150 mm wide
9 m
9 m WIDE Carriageway
Open Space Integration
18 m WIDE ROW ROAD CROSS SECTIONS Conceptual Landscape Presentation ‐ OXIGEN EXCEL
14th February 2014
Integrated Design
18.0 m
18.0 m
9.00 m
4.50 m
9.00 m
4.50m
Swale system
Swale
Extension to the Landscape Open Space Planting Buffer along the Road Edge
SPATIAL LEVEL PLAN
SURFACE DRAINAGE PLAN
SERVICES INTEGRATION (suggested) ROAD CROSS SECTIONS
Conceptual Landscape Presentation ‐ OXIGEN EXCEL
14th February 2014
Integrated Design
Conceptual Landscape Presentation ‐ OXIGEN EXCEL
14th February 2014
Integrated Design
18M CARRIAGEWAY CEREMONIAL EXPRESSION
Conceptual Landscape Presentation ‐ OXIGEN EXCEL
14th February 2014
Integrated Design
18M CARRIAGEWAY CEREMONIAL EXPRESSION
Conceptual Landscape Presentation ‐ OXIGEN EXCEL
14th February 2014
Integrated Design
JSW Vasind Renders/Compilation
Apodis Working Drawings
Infosys Jaipur Concepts
False ceiling system Internal spatial features : columns? Light shelf system with jaali pattern to better the micro climate??
The fins acting as a sunlight as the vertical shadings and The full length sliding door system with optional glass door or fixed jaali? The external jali to add to filtration of natural sunlight The planter boxes with vegetation to maintain the heat and light?
BUILT RESPONSES (SPATIAL AND CLIMATIC)
TYPICAL ROAD SECTIONS
TYPICAL ROAD SECTIONS
Chemizol Renders/Drawings
Chemizol Driveway views
Chemizol Aerial view
Chemizol Internal Courtyard
Chemizol External Court views
Case Study Analysis/Statistics
CASE STUDY : Commercial complex at Jayanagar
AREAS
LOCATION
WEST ELEVATION
SOUTH ELEVATION