ARCHITECTURE PORTFOLIO UNDERGRADUATE SELECTED WORKS | 2017-20
PERSONAL INFORMATION
Pranav Ashish Chaubal
Residential address :
G-8 / 14, Jankalyaan CHS, Bangur Nagar, Goregaon(w), Mumbai - 400104.
Date of Birth:
3rd December 1999.
Email ID:
pranavc17@aoamumbai.in pranavchaubal1999@gmail.com
Contact no. :
+91 9820988227
EDUCATION 2003-2015 :
I am Pranav Ashish Chaubal, currently studying in fourth year in Rachana Sansad's Academy of Architecture. In my opnion, Architecture is something that plays an important role in creating experiences affecting the lifestyle of users on varying scales while simultaneously impacting its context in many ways. This portfolio is a curation of selected projects from the past three years. Working on these projects allowed me to develop different individual and team-work skills. I aspire to contribute with my skill set, to develop it and learn further.
+91 9820988227 pranavc17@aoamumbai.in @pranavchaubal 2
Dr.Sarvepalli Radhakrishnan Vidyalaya ,Malad(w),Mumbai. Elementary Grade Examination Grade A (State Rank 53rd) S.S.C - 94.20%
2015-2017:
S.S. & L.S. Patkar College of Arts and Science, Goregaon(w),Mumbai. H.S.C - 89.08%
2017-2022:
Rachana Sansad's Academy of Architecture (Aided), Mumbai. C.G.P.I - 8.2
ACHIEVEMENTS AND EXTRA CURRICULUM COMPETITIONS NASA :
Louis I. Kahn trophy (2017-18) Documentation of Cooch Behar, West Bengal
Volume Zero :
Aquatecture (2018)
INSDAG:
International Cricket Stadium design in steel (2019-20) Shortlisted -(Top16 Nationals)
AAD Competition :
Sai Baba Temple Design (2020)
DOCUMENTATIONS Windows to Vernacular 7.0 :
Documentation of Saur Village, Uttarakhand. (2019)
Study Tour : (First year)
Raghurajpur, Orissa (2017) Documentation of the Artist village of Raghurajpur.
Study Tour : (Second year)
Panchavati, Nashik (2019) Documentation of the Heritage precinct of Panchavati.
INSTALLATIONS Kala Ghoda Arts Festival :
Visual Arts Installation (2018-19) Theme - A measure of time.
Bombay Stock Branding of the Event (2019) Exhcange : Theme - Water Conservation (Reusing of waste plastic bottles to make the installation.)
SKILL SET Autodesk AutoCAD Adobe Photoshop Adobe Indesign Google Sketchup Rhinocerous 3d Chaos Vray Twinmotion Microsoft Office Sketching Model Making 3
4
CONTENTS ACADEMIC WORK 1.
Skill Development centre
Architectural Design | Semester 6
6
2. Celebrations and Business Functions Hub
14
3. Panchavati Anecdotes
22
4. Solo Pad Design
28
Architectural Design | Semester 5
Architectural Design | Semester 4 Interior Design | Semester 3
5. Technical Drawings
32
A. Working Drawings | Semester 6 For Architectural Design project of Semester 4
34
B. Building Construction | Semester 4 Warehouse in structural steel
38
EXTRA CIRRICULAR WORK
DOCUMENTATION | COMPETITION | INSTALLATION
1.
Louis I. Kahn Trophy
42
2.
Windows to Vernacular 7.0
46
3.
Kala Ghoda Arts Festival
48
Documentation | Competition - NASA (2017-18)
Documentation - (2019)
Installation | Competition - Visual Arts (2019)
4. Cricket Stadium Design in steel
50
5.
Aquatecture
58
6.
Sai Baba Temple Design
59
Competition - INSDAG (2019-20) Shortlisted TOP 16
Competition - Volume Zero (2018) Competition - AADcompetitions (2020)
5
1. SKILL DEVELOPMENT CENTRE ARCHITECTURAL DESIGN SEM 6
GUIDED BY - AR. MAHESH NILAKH SITE - JODHPUR, RAJASTHAN The Skill Development centre aims to produce skilled, self-supporting professionals contributing to national progress with individual expertise. This centre intends to promote 'Gandhian Principles' , advocate it further at various national and international levels for it to spread into the world order. Thus when designing this sensitive and intensive piece of architecture, the challenge was to understand the direct and indirect attributes of Gandhian philosophy and their relevance in the current scenario. Then acknowledging these attributes by balancing them in the architecture presented.
6
1. CREATING A FOCAL POINT
2. SEGREGATION OF PUBLIC AND PRIVATE FUNCTIONS
Source - Google Maps
SITE AND SITE CONTEXT The site is located in Jodhpur,Rajasthan. It is along National Highway in vicinity with other centres of learning. Some of the centres along the highway are IIT Jodhpur, NIFT Jodhpur.
PR I
P P
There is a stone crusher and numerous brick kilns within 2km radius.
PR
P
GANDIAN PHILOSOPHY One of the main agendas of this institution related to Gandhian principles is to promote one’s skills, producing self -supporting professionals, who contribute to the national progress.
3. CREATING ALLEYS FOR WIND PASSAGE AND FURTHER SEGREGATION
4. ZONING OF PUBLIC (P), INSTITUTION (I) AND PRIVATE (PR) FUNCTIONS
5. ESTABLISHING INTERNAL CONNECTIVITY
6. FINAL FORM- FLUID NATURE OF PUBLIC STRUCTURED NATURE OF PRIVATE
Understanding the direct and indirect attributes of Gandhian Philosophy and its relevance in the current scenario and balancing of these attributes in the architectural sense.
POROSITY
SELF RELIANCE
Visual and Physical
Material within close vicinity
connectivity
8
TRANSPARENCY
SUSTAINABILITY
True nature of material
Passive cooling techniques
N A
22 21 23
12
20 18 10 A’
9
11
8
17
19
R O O F P LAN 7 14 1
16
5 6
LEGEND
2
3
4
PUBLIC ZONE
13 15
G R O U N D P LAN
N CUT @ +3.00M
0
5
10
15
25m
1.Entrance Foyer 2.Reception 3.Back Office 4.Common Toilet 5.Conference Room 6.Library 7.Exhibtion Space 8.Amphitheatre 9.Cafeteria 10.Auditorium 11.Museum 12.Auditorium drop-off
INSTITUTION ZONE 13.Institute Entry 14.Public Avenue 15.Gem Art 16.Jewellery Making 17.Dance zone 18.E-Commerce 19.Culinary Arts
ACCOMODATIONS
20.Boys accomodation 21.Girls accomodartion 22.Dean accomodation 23.Faculty accomodation
9
SECTIONAL VIEWS
ENTERANCE TO INSTITUTE ZONE
10
CENTRAL OPEN SPACE
180MM THK 3 LAYERED BRICK TILE VAULT
(EACH LAYER BRICKS 40MM THK
180MM THK 3 LAYERED BRICK TILE VAULT
PERPENDICULAR TO ADJACENT)
(EACH LAYER BRICKS 40MM THK , PERPENDICULAR TO
CURVED ROOF USING RADIANT COOLING TECHNOLOGY.
ADJACENT)
(EXTERNAL CONVEX SCATTERS HEAT. INTERNAL CONCAVE HELPS CONCENTRATE THE COOLING.)
CURVED ROOF USING RADIANT COOLING TECHNOLOGY.
(EXTERNAL CONVEX SCATTERS HEAT. INTERNAL CONCAVE HELPS CONCENTRATE THE COOLING.)
100MM THK HOLLOW BRICK LAYER ALLOWS RADIANT COOLING PIPES TO PASS THROUGH 900MM CHAJJA PROTECTS UPPER WINDOWS FROM SUNLIGHT ALSO ACTS AS A GUTTER PIVOT WINDOWS AT TOP FOR VENTILLATION
R.C.C. PEDESTAL RECIEVING THE CATALAN VAULTS
TRAPEZOIDAL RCC FINS SHADE THE BIGGER WINDOWS. SUPPORT THE CHAJJA EFFECTIVELY TAKING LOAD OF THE BRICK VAULTS
ANCHOR REBARS 16MM DIA (TO ANCHOR BRICK REINFORCED VAULT INTO PEDESTAL.)
END WALL DETAIL
(CLIMATE RESPONSE, VAULT SYSTEM-BEAM JUNCTION, CHAJJA AND GUTTER)
R.C.C. PEDESTAL DETAIL
(CATALAN VAULT FOUNDATION JUNCTION)
SECTION
+11.5m +8.5m
+0.0m
MAIN
ACCOMODATION
ENTRY
CAFETARIA
AXONOMETRIC
R
BRICK REINFORCED ROOF THE INSTITUTE ZONE FOLLOWS A FORMAL LANGUAGE WITH STARK HORIZONTALS AND VERTICALS IN THE FORM OF TRAPEZOIDAL BEAMS AND COLUMNS. PUBLIC ZONE FOLLOWS A FLUID LANGUAGE DEFINED BY THE USAGE OF CATALAN VAULTS
G
FUNCTIONS CENTRAL PUBLIC AVENUE SEGRERATING THE PUBLIC AND PRIVATE FUNCTIONS. INSTITUTE FUNCTIONS IN CLOSE VICINITY TO PUBLIC AND PRIVATE FUNCTIONS. PUBLIC FUNCTIONS NEAR THE MAIN ENTRY. ACCOMODATIONS AT THE FAR ENDS
CELEBRATION AND BUSINESS FUNCTIONS HUB ARCHITECTURAL DESIGN SEM 5
GUIDED BY - AR. MAHESH KHANOLKAR SITE - QUEENS LAWN, BORIVALI, MUMBAI The project, intensive in its approach, with varied styles, themes, conceptions and planning ideas, demanded dynamic spaces filled with aura and elegance stimulating the right environment for 'celebrating' memories and moments. This was to be achieved by employing inspiration and spirit of architrectural style/ concept drawn out of the design language, features and overall reflections of a famous architects practice. It was expected that the project be approached in two stages Stage 1 : This stage demanded the study of the works of some of the famous architects and lasting influences of their innovative and individualistic architectural styles. Stage 2 : Designing the project incorporating the language of a selected architect and improvising on the philosophies while simultaneously planning and creating the same spirit as that of the studied architect.
14
15
1. CONE OF VISION AFTER ENTERING THE SITE
2. ESTABLISHING AXIS BASED ON CONE OF VISION
3. GENERATING A GRID BASED ON THE VISION AXIS
4. ARTICULATION OF THE FUNCTIONS INTO THE GIRD
5. ALIGNING THE FIRST SMALL HALL TO THE AXIS OF ENTRY
6.VOLUMETRIC INCREASE ALONG THE AXIS OF VISION
Source - Google Maps
SITE AND SITE CONTEXT Queens Lawn is located in Borivali,Mumbai. It is located along the linking road. It is in vicinity to other resorts and banquet halls . It has Eskay Resorts to its north-west, Saffron Banquets to its north-east ,Rani Laxmibai Joggers Park to the east.
SELECTED ARCHITECT Ar. Charles Correa Studying the works of Sir Charles Correa , his ideology, design approach and principles were understood which became the source of inspiration for the concept of this Celebration space. Some elements from his ideology that were translated into this design are as follows COURTYARDS
HORIZONTALITY
For interaction
Using architectural elements for visual connectivity
GRID
LEVELS
Breaking the grid to create spaces
Using the dynamics of levels for interactions
B'
G R O U N D P LAN
A'
CUT @ +3.00M 0
2
4
6
10m
N 10 9 11 12
8 6
4
7 5
3 2
B
1
A LEGEND 1.Main Entry 2.Small Hall drop-off 3.Small Hall 1 4.Small Hall 2 5.Fine Dine drop-off 6.Fine Dine
7.Medium, Large Hall drop-off 8.Medium, Large Hall Foyer 9.Ground Parking 10.Loading - Unloading 11.Central Kitchen 12.Back Office
17
SECTIONS
+18.1 m +15.2 m
+10.1 m
+ 4.1 m + 0.0 m
- 3.6 m
SECTION AA’
+17.6 m +15.2 m +12.1 m
+ 4.8 m
+ 0.0 m
- 3.6 m
SECTION BB’
B'
F I R S T F LO O R P LAN
A'
CUT @ +7.20M 0
2
4
6
10m
N
7
4
3 6 2 8 5 1
B
A LEGEND 1.Medium, Large Hall drop-off 2.Common Lift lobby 3.Large Hall foyer 4.Large Hall
5.Medium Hall foyer 6.Medium Hall 7.Common Courtyard 8.Open space - Medium Hall
19
E LE VATI O N
20
COMMON COURTYARD
VIEW OF POND FROM LARGE HALL TERRACE
The Horizontal structural members are integrated in the Gutter and Chajjas forming Elevation Bands. These stark Bands allow the viewer to get a sense of the horizontality regardless of the large volumes formed.
AXONOMETRIC
1
There is a volumetric increase in the Hall space with respect to the capacity.
MEDIUM HALL (FOR 500) LARGE HALL (FOR 1000)
SKYLIGHTS
TO ENSURE LIGHT AND PROVIDE A LARGE VOLUME
This volumetric progression of the Hall spaces allows for an unobstructed view of the adjacent pond from the open space of each hall.
G
SMALL HALLS (FOR 100-150) FINE DINE (FOR 150) BACK OFFICE
B
PARKING
21
PANCHAVATI ANECDOTES ARCHITECTURAL DESIGN SEM 4
GUIDED BY - AR. ROHIT KAREKAR SITE - PANCHAVATI, NASHIK The mapping and documentation of the heritage precinct of Panchavati unfolds how a community functions with multiple layers of socio-economic, climate and natural settings, built-unbuilt, tangible and intangible aspects. The program deals with the re-designing/re-working existing functions on the site along with individual additional programmatic interventions which stem from each students' observations, understandings, and take away from the study.
22
23
Source - Google Maps
SITE AND SITE CONTEXT
1. ALLOWING PUBLIC THOROUGHFARE
2. ACTIVATING STREET EDGES
3. SHOP FRONT AND INTERNAL SEMI-PUBLIC FUNCTIONS
4. MASK MAKING WORKSHOPS AND PERFORMANCE AREA
5. PRIVATE FUNCTIONS AT TOP-MOST LEVEL
6. FINAL ZONING OF FUNCTIONS
The site is located in Panchavati, Nashik. It is an Ancient Holy city in the northwest region of Maharasthra famous as a pilgrimage destination. Situated along the banks of River Godavari, it is known for its wadas, temples and ghats along the river. The city’s tropical location and high altitude combine to give a relatively mild version of wet and dry climate. The sloping roofs, courtyards, timber framing as a structural system are some of the typical features of the wadas in Panchavati.
The unique characteristic of the given site is that, it is adjacent to a busy market street with a centrally placed temple within. Bhandi Baazar Street
Site Laxminarayan Temple
LEGEND: PUBLIC
STREET SEATING
MASK MAKING
MASK DANCING
RECEPTION
JEWELLERY MAKING
REST
SEMI-PUBLIC PRIVATE ADJACENT ROADS
SHOP
SEATING RESPONDING TO THE BUSY STREET
P LAN S
0
2
4
PANTRY AND INFORMAL SEATING FOR PANTRY
6
STEPPED SEATING
EXHIBITION SPACE
MINI AMPHITHEATRE
10m
2
3
1
4
2
3
1
5
4
1
2
1
1
6
11
5
1 2
1
7
2 2
GROUND FLOOR PLAN
9
CUT @ +2.10M
8
N
LEGEND
1
1.Main Entry 2.Shops 3.Exhibition space 4.Pantry 5.Pantry Seating 6.Secondary Entry 7.Stepped Seating 8.Reception 9Common Toilet
1
7
7
LEGEND
6
2
FIRST FLOOR PLAN
CUT @ +5.60M
1.Workshop 2.WS Toilet 3.Exhibition space 4.Way to Amphi 5.Amphitheatre 6.Back Room 7.Rented Rooms
N 25
SECTIONS +13.8m +12.7m
+10.3m
FROM WORKSHOP CORRIDOR
+4.8m
+1.05m +0.0m
SECTION AA’
+17.2m
CENTRAL COURTYARD
+12.6m
+8.7m
+4.8m
+0.0m
26
SECTION BB’
BACK ELEVATION
AXONOMETRIC
R FROM APPARTMENT CORRIDOR
AMPHITHEATRE
FRONT ELEVATION
2
PRIVATE
RESIDENCE RENTED ACCOMODATIONS
1
SEMI PUBLIC
G
PUBLIC
WORKSHOPS EXHIBITION AMPHITHEATRE RENTED ACCOMODATIONS
SHOPS EXHIBITION RECEPTION
SOLO PAD DESIGN INTERIOR DESIGN SEM 3
GUIDED BY - AR. SONIA GEHLOT SITE - BANDRA, MUMBAI The project aimed at designing a bachelor pad representing the user who lives in it. The area is not just a living but a working space as well for a creative personality (musician). Hobbies, preferences in terms of art, ways of entertaining guests, style, colors, and furniture, all of these plus tonnes of other details were considered to outline the owner's personality.
28
USER PROFILE USER NAME - KAMAL , bachelor creative person looking for a small place in Bandra 1. IS A MUSICIAN 2. SPECIALIZES IN PLAYING THE PIANO 3. CONDUCTS PIANO CLASSES 4. COMPOSES DIGITAL MUSIC 5. LOVES GAMING 6. FREQUENT VISITORS STUDENTS COLLEAGUES EVENT MANAGERS
29
LIVING AREA -0.6M
UP
+0.15M
UP STEPPED SEATING
DINING AREA +0.3M
UP
UP
+0.3M
A
A'
VERANDAH +0.3M
SUNKEN SEATING
B'
MAIN ENTRY
UP
WORKSPACE
BACKYARD
+0.3M
+0.0M
BOWLING ALLEY HALF LENGTH
Asian Paints Brushing texture Steel Grey
+0.0M
KITCHEN
B
200 x 1200MM Kajaria tiles Gres tough plank Nicobar Cedar
PIANO
UP
DRUMMING +0.45M
DIGITAL MUSIC ROOM +0.3M
OPEN LAWN +0.0M
1:1 CHESS +0.3M
TOILET SHOWER +0.3M
+0.3M
STORAGE +0.3M
UP
LIVING ROOM AND WORKSPACE
GROUND FLOOR PLAN
600 x 600 MM AGL tiles Porcelain Matte Midget slate
150 x 210 MM AGL tiles Ceramic Gloss Metro White brick
1200 x 600 MM AGL tiles Porcelain Gloss Piatra Grey
(GROUND LEVEL)
300 x 300 MM AGL tiles Porcelain Matte Sandstone Grey
A'
A B
B'
BEDROOM +3.3M
WALK IN CLOSET +3.3M
SHOWER TOILET +3.3M
UP
30
MEZZANINE FLOOR PLAN
SHOWER AREA, BATH TUB
(MEZZANINE LEVEL)
1220 x 2440 MM Green Lam Seude Zephyr Blue
200 x 1200MM Kajaria tiles Gres tough plank Nicobar Cedar
Asian Paints Brushing texture Steel Grey
Century Ply Monocore Dacota Codoak
BEDROOM
KITCHEN
LIVING AREA
DINING AREA
BACKYARD
KITCHEN
SECTION AA'
(GROUND LEVEL)
Asian Paints Brushing texture Steel Grey
Century Ply Monocore Dacota Codoak
STEPPED SEATING
200 x 1200MM Kajaria tiles Gres tough plank Nicobar Cedar
BEDROOM
KITCHEN STORAGE WORKSPACE
BACKYARD
OPEN LAWN SUNKEN SEATING
BEDROOM
(MEZZANINE LEVEL)
SECTION BB'
STEEL TRUSS RESTING ON R.C.C. COLUMN ANGLE STRUTS ISA 5555 (8MM THK) (ANGLE CLEAT NUT-BOLTED TO M.S. PLATE) ON EITHER SIDE ALTERNATIVELY ATTACHED
PLACED ON TOP CHORD O
PRODUCED BY AN AUTODESK STUDENT VER
OF GUSSET PLATE
TECHNICAL DRAWINGS K
SQUARE BOX SECTIO COM
B60
PRODUCED BY AN AUTODESK STUDENT VER
TOP CHORD ISA 656
M P Q R.C.C. BEAM (230x450MM) M.S GUSSET PLATE (10MM THK)
25°
=6050
B103
2150
8
A
BEDDED MONOPITCH RIDGE PRODUCED BY PIECE AN AUTODESK STUDENT VER DOUBLE ANGLE SECTIONS WITH 25MM EXTERNAL PLASTER PRODUCED BY AN AUTODESK STUDENT VER CONNECTS DIFFERENT MEMBER BY NUT-BOLT (270x520MM) 450 BEDDED MONOPITCH RIDGE PIECE K M P Q M P Q A MANGALORE TILE (260x540MM) (270x520MM) K M P Q 450 BY AN AUTODESK STUDENT VERS RESTING ON BOX SECTIONS BEDDED MONOPITCH RIDGE PIECE MANGALORE TILE PRODUCED (260x540MM) STEEL TRUSS RESTING ON R.C.C. COLUMN PERFORMING AREA B103 B60 ANGLE STRUTS ISA 5 BEDDED MONOPITCH RIDGE PIECE (270x520MM) A-403d SQUARE BOX SECTIONS (50x50MM @450MM c/c) RESTING ON BOX SECTIONS PRODUCED BY AN AUTODESK STUDENT VERS (ANGLE CLEAT NUT-BOLTED TO M.S. PLATE) K M P Q (270x520MM) PLACED ONBOX TOP TILE CHORD OF STEEL TRUSS MANGALORE (260x540MM) ALTERNATIVELY ATTACHE SQUARE SECTIONS (50x50MM @450MM c/c) SCALE 1:20 BEDDED MONOPITCH RIDGE PIECE 36 MANGALORE (260x540MM) RESTING ON BOXTILE SECTIONS K M P Q PLATE PLACED ON TOP CHORDOF OF GUSSET STEEL TRUSS (270x520MM) SPAN=6050 R.C.C. BEAM (230x450MM) RESTING ON BOX SECTIONS TOP CHORD ISA 6565 (10MM THK) SQUARE BOX SECTIONS (50x50MM @450MM c/c) BEDDED MONOPITCH RIDGE PIECE MANGALORE TILE (260x540MM) 0 4 5 MANGALORE (260x540MM) DOUBLE ANGLE SECTIONS BACK TOTRUSS BACK SQUARE SECTIONS (50x50MM c/c) M.S GUSSET PLATE ( (270x520MM) PLACED ONBOX TOPTILE CHORD OF STEEL 25MM EXTERNAL PLASTER TOP CHORD ISA 6565 (10MM THK) @450MM 450 RESTING ON TIMBERWITH BATTENS RESTING SECTIONS PLACED ON ON BOX TOPTILE CHORD OFBACK STEEL TRUSS M P Q A 0 DOUBLE ANGLE SECTIONS TO BACK K CONNECTS DIFFERENT ME MANGALORE (260x540MM) 0 5 4 45 SQUARE BOX SECTIONS (50x50MM @450MM c/c) TOP CHORD 6565 (10MM THK) RESTING ON BOX ISA SECTIONS ANGLE STRUTS ISA 5555 (8MM THK) 450 0 TOP CHORD ISA 6565 (10MMTO THK) PLACED ON TOP SECTIONS CHORD OFBACK STEEL TRUSS DOUBLE ANGLE BACK A-4 5 GUIDED BY AR. NAKUL KAMAT B93 ALTERNATIVELY ATTACHED ON EITHER SIDE SQUARE BOX SECTIONS (50x50MM @450MM c/c) 4 0 450 4 ANGLE ANGLE STRUTS 5555 (8MM THK) TRUSS RESTING ON 5 ISASTEEL DOUBLE SECTIONS BACK TO BACK B103 PLACED 50 OF GUSSET PLATE 0 4 ON TOP CHORD OF STEEL TRUSS SITE - PANCHAVATI, NASHIK 5 SCALE4 1:20 ALTERNATIVELY ATTACHED ON EITHER SIDE TOP CHORD ISA 6565 (10MM THK) 0 CLEAT NUT-BOLTE STEEL BOX SECTIONS (50x50MM @450MM c/c) 54 ANGLE STRUTS ISA(ANGLE 5555 (8MM THK) M.S GUSSET PLATE (10MM 450 OF GUSSET PLATE DOUBLE ANGLE SECTIONS BACKTHK) TO BACK 0 5 MANGALORE TILE (260x540MM) The Semester 4 Architectural Design project was carrried forward 4 TOP CHORD ISA 6565 (10MM THK) ANGLE STRUTS ISAMEMBER 5555 THK) 0 ALTERNATIVELY ATTACHED ON(8MM EITHER SIDE CONNECTS DIFFERENT BY NUT-BOLT PLACED ON TOP CHORD OF STEEL TRUSS 230 54 M.S GUSSET PLATE (10MM THK) DOUBLE ANGLE SECTIONS BACK TO BACK ALTERNATIVELY ATTACHED ON EITHER SIDE (230x450M OF GUSSET PLATE RESTING ON TIMBER BATTENS SPAN=6050(WELDED TO TOP CHORD) for the making of Working drawings and further 450 detailing. 450 CONNECTS DIFFERENT R.C.C. MEMBER BYBEAM NUT-BOLT K 0 B93 OF GUSSET PLATE ANGLE STRUTS ISA ON 5555 (8MM THK) STEEL TRUSS RESTING R.C.C. COLUMN PERFORMING AREA B103 54 M.S GUSSET PLATE (10MM THK) 0 5 4 WITH 25MM EXTERNAL PL 0 ALORE TILES (ANGLE CLEAT NUT-BOLTED TOEITHER M.S. PLATE) ALTERNATIVELY ATTACHED ON SIDE 54 B93 M.S GUSSET PLATE (10MM THK) CONNECTS DIFFERENT BY NUT-BOLT STEEL TRUSS RESTING ON R.C.C. COLUMN PERFORMING AREA M ANGLE STRUTS ISA MEMBER 5555 (8MM THK) B103 50 455 0 K P Q OF GUSSET PLATE 4 230 CONNECTS DIFFERENT MEMBER BY 5NUT-BOLT (ANGLE CLEAT NUT-BOLTED TOEITHER M.S. PLATE) TOP CHORD ISA 6565 (10MM THK) ALTERNATIVELY ATTACHED ON SIDE 0 80 SPAN=6050 R.C.C. BEAMRESTING (230x450MM) 54 B93 GUSSET PLATE (10MM THK) STEEL TRUSS ON R.C.C. COLUMN PERFORMING AREA B103 OF GUSSET PLATE 230 STEEL BOX SECTIONS (50x50MM @450MM M.S c/c) B93 DOUBLE ANGLE SECTIONS BACK TO BACK 0 WITH 25MM EXTERNAL PLASTER 8 (ANGLE CLEAT NUT-BOLTED TO M.S. PLATE) STEEL TRUSS RESTING ON R.C.C. SPAN=6050 CONNECTS DIFFERENT MEMBER BYCOLUMN NUT-BOLT PERFORMING AREA B103 0 R.C.C. BEAM (230x450MM) A-403a 5 54 M.S GUSSET PLATE (10MM PLACED ON TOP CHORD K M P QOF STEEL TRUSS (ANGLE CLEAT NUT-BOLTED TOTHK) M.S. PLATE)5 WITH 25MM EXTERNAL PLASTER B93 230 CONNECTS DIFFERENT MEMBER BY NUT-BOLT SCALE 1:20 ECTION SPAN=6050 R.C.C. BEAM (230x450MM) (WELDED TO TOP CHORD) STEEL TRUSS RESTING ON R.C.C. COLUMN DETAILED SECTION OF NORTH LIGHT TRUSS PERFORMING AREA B103 K M P Q 230 A-403a SPAN=6050 R.C.C. BEAM (230x450MM) (ANGLE CLEAT NUT-BOLTED TO M.S. PLATE) B93 WITH 25MM EXTERNAL PLASTER MANGALORE TILE (260 DETAILED OF NORTH LIGHTSCALE TRUSS STEEL TRUSS RESTING ON R.C.C. COLUMN 1:20 PERFORMING AREA B103 55 SECTION K M P Q WITH 25MM EXTERNAL PLASTER A-403a 230 (ANGLE CLEAT NUT-BOLTED TO M.S. PLATE) TOP CHORD ISA 6565 (10MM THK) RESTING ON TIMBER BATT 0 SPAN=6050 MANGALORE TILE (260x540MM) K M P Q R.C.C. BEAM (230x450MM) 8 SCALE HORD CHORD ISA1:20 6565 (10MM THK) DETAILED SECTIONK OFBOTTOM NORTH LIGHT TRUSS 230 RESTING ONEXTERNAL TIMBER BATTENS ANGLE SECTIONS BACK TO BACK A-403a DETAILED SECTION OF NORTH LIGHT DOUBLE WITH 25MM PLASTER 120 80 TRUSS MANGALORE TILE (260x540MM) SPAN=6050 R.C.C. BEAM (230x450MM) KDOUBLE ANGLE SECTIONS BACK TO BACK MANGALORE TILES A-403a SCALE 1:20 K M P Q MANGALORE TILES RESTING ON TIMBER BATTENS WITH 25MM EXTERNAL PLASTER 45500 SCALE 1:20 K (SPAN 5500MM) 4 MANGALORE TILE (260x540MM) DETAILED SECTION OF NORTH LIGHT TRUSS K M P Q MANGALORE TILES A-403a MANGALORE TILE (260x540MM) RESTING ON TIMBER BATTENS 0 45 STEEL BOX SECTIONS (50x50MM @450MM c/c) STEEL BOX SECTIONS SCALE 1:20 DETAILED SECTION OF KNORTH LIGHT TRUSS RESTING ON TIMBER BATTENS A-403e A-403a 10 PLACED ON TOP CHORD OF STEEL TRUSS MANGALORE TILES K 10 STEEL BOX SECTIONS (50x50MM @450MM c/c) M.S GUSSET PLATE (10MM THK) PLACED ON TOP CHORD O 0 TILE (260x540MM) BOTTOM SCALE 1:20 CHORD ISA 6565 (10MM THK) MANGALORE BOX SECTIONTILES 45 MANGALORE (WELDED TOTOP TOPCHORD CHORD)OF STEEL TRUSS 10 PLACED ON 120 SECTION BOX RESTING TIMBER BATTENS 450 CONNECTS DIFFERENT MEMBER BY NUT-BOLT DOUBLE ANGLE SECTIONS BACK TO BACK (WELDED TO TOP CHORD) MANGALORE TILE (260x540MM) K BOX SECTION STEEL SECTIONS 55 (WELDEDBOX TO TOP CHORD) (50x50MM @450MM c/c) MANGALORE TILES RESTING ON TIMBER BATTENS (SPAN 5500MM) 10 STEEL BOX SECTIONS (50x50MM @450MM c/c) TOP CHORD ISA 6565 THK) PLACED ON TOP CHORD OF(10MM STEEL TRUSS 5800 K TOP CHORD 55 4 55 10 BOX SECTION PLACED ON CHORD OF STEEL DOUBLE ANGLE SECTIONS BACK TOTRUSS BACK (WELDED TOTOP TOP CHORD) 80 MANGALORE TILES TOP CHORD ISA 6565 (10MM THK) 0 TOP CHORD ISA 6565 80 0 TOP SECTION CHORD STEEL BOX SECTIONS (50x50MM @450MM c/c) (WELDED TO TOP CHORD) BACK 458 TOP CHORDBOX DOUBLE ANGLE SECTIONS TO BACK 55 PLATE (10MM THK) 80 M.S GUSSET 50 DOUBLE ANGLE SECTIONS 10 0CLEATS ANGLE ISA 6565 (10MM THK) PLACED ON TOP CHORD OF STEEL TRUSS 0 8 TOP CHORD ISA 6565 (10MM THK) 5 0 55 STEEL BOX SECTIONS (50x50MM @450MM c/c) 8 5 TOP CHORD BOX SECTION ZINC-AL CONNECTS DIFFERENT MEMBER BY NUT-BOLT 0 (WELDED TO TOP CHORD) 5 TOP CHORD ISA 6565 (10MM THK) DOUBLE ANGLE SECTIONS BACK TO BACK 0 0 CONNECTS 10 8 TRUSS TO COLUMN 8 THE PLACED ON TOP CHORD OF STEEL TRUSS TOP CHORD B93 DOUBLE ANGLE SECTIONS BACK TO BACK BOTTOM CHORD ISA 6565 (10MM THK) 50 0 BOX SECTION 8 55 (WELDED TO TOP CHORD) SHEETS NUT BOLTED TO GUSSET PLATE 120 50 0 CHORD TOP 6565 (10MM THK) DOUBLE ANGLE ISA SECTIONS BACK TO BACK 0 1 8 BOTTOM CHORD ISA 6565 (10MM THK) TOP CHORD 50 NUT BOLTED ON M.S. PLATE 55 (SPAN 5500MM) DOUBLE ANGLE SECTIONS BACK TO BACK 120 80 DOUBLE ANGLEISA SECTIONS BACK TO BACK TOP CHORD 6565 (10MM THK) 200 0 8 ANGLE CLEATS ISA 6565 (10MM THK) MANGALORE TOP CHORD BOTTOM CHORD ISA 6565 (10MM THK) ZINC-AL BOTTOM CHORD ISA (SPAN 5500MM) DOUBLE ANGLE SECTIONS BACK TO BACK 0 M.S. BASE PLATE (280x500MM THK) 80 120 2005 CONNECTS THE20MM TRUSS TO COLUMN BOTTOM CHORD ISA 6565 (10MM THK) M.S GUSSET PLATE (10MM THK) 120 DOUBLE ANGLE SECTIONS BACK TO BACK TILES 0 DOUBLE ANGLE SECTIONS 5 120 5 SHEETS WELDED TO COLUMN REBARS 0 DOUBLE ANGLE SECTIONS BACKBY TONUT-BOLT BACK CONNECTS DIFFERENT MEMBER (SPAN 5500MM) 5 NUT BOLTED TO GUSSET PLATE M.S GUSSET PLATE (10MM THK) 200 B93 (SPAN 5500MM) (SPAN 5500MM) BOTTOM CHORD10ISA 6565 (10MM THK) 550 NUT BOLTED ON M.S. PLATE SELFCONNECTS DIFFERENT MEMBER BY NUT-BOLT 200 200 120 DOUBLE ANGLE SECTIONS BACKTHK) TO BACK B93 M.S GUSSET PLATE (10MM BOTTOM CHORD ISA 6565 (10MM THK) MANGALO 0 R.C.C. BEAM (230x450MM) 5 DRILLING 5 (SPAN 5500MM) M.S. BASE PLATE (280x500MM 20MM THK) DOUBLE 120 M.S GUSSET PLATE (10MM THK) ANGLE CLEATS ISAMEMBER 6565 (10MM THK) CONNECTS DIFFERENT BY BACK NUT-BOLT 200 ANGLE SECTIONS BACK TO 230 TILES (1 M.S GUSSET PLATE 550 B93 WITH 25MM EXTERNAL PLASTER CONNECTS DIFFERENT BY NUT-BOLT CONNECTS THE TRUSSMEMBER TO SCREWS COLUMN 0 WELDED TO COLUMN REBARS (SPAN 5500MM) 5 ANGLE CLEATS ISA 6565 (10MM THK) 5 B93 200 CONNECTS DIFFERENT M.S PLATE (10MM THK) NUTGUSSET BOLTED TO GUSSET PLATE 0 CONNECTS THE TRUSS TO COLUMN SELF- ME 55 B93 NUT BOLTED ON M.S.ISA PLATE CONNECTS DIFFERENT MEMBER BY NUT-BOLT HALF ROUND PVC PIPE GUTTER ANGLE CLEATS 6565 (10MM THK) NUT BOLTED TO GUSSET PLATE M.S GUSSET PLATE (10MM THK) R.C.C. BEAM (230x450MM) B93 DRILLING 550 ANGLE CLEATS ISA 6565 (10MM THK) CONNECTS THE TO COLUMN NUT BOLTED ON TRUSS M.S. PLATE M.S. BASE PLATE (280x500MM THK) CONNECTS DIFFERENT MEMBER BY20MM NUT-BOLT (200MMØ) 230 WITH 25MM EXTERNAL PLASTER CONNECTS TO COLUMN B93 NUT BOLTED TO TRUSS GUSSET PLATE SCREWS WELDED TO THE COLUMN REBARS SUPPORTED ON G.I. STRAP HELD ON BATTEN M.S. BASE PLATE (280x500MM 20MM THK) NUT BOLTED TO PLATE ON GUSSET M.S. PLATE ANGLE CLEATS ISA 6565 (10MM THK)
F NORTH LIGHT TRUSS
P
Q
450
M
25°
21502150 2150 2150 21502150 850 850 850850 850 850
K
DETA
A. WORKING DRAWINGS SEM 6 450
LED SECTION OF NORTH LIGHT TRUSS
25° 25°
0
65
65
65
DETAILED SECTION OF NORTH LIGHT TRUSS
10
450 450 450450 450 450
65
25° 25° 25°25°
PERFORMING AREA
65
20
65
DE
20
100
10
0
65
65 65
20
20 20
20 20
100 100 100100 100 100
100
2
M.S. BASE PLATE
10
BEDDED MONOPITCH RIDGE PIECE 230 (270x520MM) DETAIL OF 230 TRUSS END JUNCTION DETAIL OF TRUSS END JUNCTION MANGALORE TILE (260x540MM) SCALE 1:5 BEDDED MONOPITCH RIDGE PIECE
2 2 10 10
(200MMØ) SUPPORTED ON G.I. STRAP HELD ON BATTEN
ANGLE CLEATS ISA 6
WELDED TO COLUMN REBARS NUT BOLTED ONTRUSS M.S. PLATE CONNECTS THE TO COLUMN R.C.C. BEAM (230x450MM) M.S. BASE PLATE 20MM THK) TRUSS TO CONNECTS THE ANGLE CLEATS ISA(280x500MM 6565 (10MM THK) NUT BOLTED TO GUSSET PLATE M.S. BASE PLATE (280x500MM 20MM THK) WITH 25MM EXTERNAL PLASTER WELDED TO COLUMN REBARS CONNECTS THE TRUSS TO COLUMN R.C.C. BEAM (230x450MM) NUT BOLTED TO GUSSET P NUT BOLTED ON M.S. PLATE WELDED TO TO COLUMN REBARS NUT BOLTED GUSSET PLATE WITH 25MM EXTERNAL PLASTER HALF ROUND PVCPLATE PIPE GUTTER NUT BOLTED ON M.S. PLAT M.S. BASE PLATE (280x500MM 20MM THK) NUT BOLTED ON M.S. R.C.C. BEAM (230x450MM) (200MMØ)TO COLUMN REBARS WELDED HALF ROUND PVC(280x500MM PIPE GUTTER R.C.C. BEAM (230x450MM) WITH 25MM EXTERNAL PLASTER M.S. BASE PLATE 20MM THK) SUPPORTED ON G.I. STRAP HELD ON BATTEN (280 (200MMØ) WITH 25MM EXTERNAL PLASTER WELDED TO COLUMN REBARS HALF ROUND PVC PIPE GUTTER WELDED COLUMN REB SUPPORTED G.I. STRAP HELD ONTO BATTEN R.C.C. BEAMON(230x450MM) HALF ROUND PVC PIPE GUTTER (200MMØ) WITH 25MM EXTERNAL PLASTER R.C.C. BEAMON(230x450MM) (200MMØ) SUPPORTED G.I. STRAP HELD ON BATTEN
10 10
D AN BY AUTODESK AN AUTODESK STUDENT STUDENT VERSION VERSION STUDENT VERSION BYAUTODESK AN AUTODESK ODUCED PRODUCED PRODUCED BYPRODUCED BY AN AN AUTODESK BY AUTODESK AN STUDENT STUDENT STUDENT VERSION VERSION VERSION
40
2
10
A-403b
40
SCALE 1:5
230
10
DETAIL OF TRUSS END JUNCTION
2
20 20
65
SCALE 1:5
65 65
65
230
450 450 450450 450 450 450
230
65 65
65 65
450
A-403b
65
65 65
450
OF TRUSS END JUNCTION
HALF ROUND PVC PIPE GUTTER
B. BUILDING CONSTRUCTION SEM 4 GUIDED BY - AR. PRAFUL MHATRE SITE - PALGHAR, MAHARASHTRA Designing a Warehouse in structural steel to understand the possibilities of steel as a material.
33
2210
1600
2806900
1270
415
940 1000
1280
980
1650
2210 1600
620
7000 1290
1650
1010
3100
C27- 230x230
C28- 230x230
C29- 230x230
C30- 230x230
C31- 230x230
280
280
280
280
12
3900
1270
1270
990
08
4100
UP
3850
°
1620
6900
07 26300
C43- 230x230
C44- 230x230 C33- 230x230
3070
C34- 230x230
C35- 230x230
C36- 230x230
C37- 230x230
280
280
280
280
4.0 M WIDE ROAD LEVEL=+0.0M
5830
05
P
08
1010
05
940
450
W1
W1 1230
6900
TEMPLE PLINTH
940 1000
3070
5150 1600
40 23
1500
PROJECT NAME:
03
14
900
450
3140 24890
1080
W1
C27- 230x230
C
C28- 230x230
D
280
E
1270
C29- 230x230
F
280
1270
C30- 230x230
G
450
1380
C67- 230x500
280
990
C31- 230x230
H
280
450
01
6750
C68- 230x500
C69- 230x500
C70- 230x500
0
0
150 MM THICK BRICK WALL 08-04-2020 SEMESTER 6 230 MM THICK BRICK WALL ACADEMY OF ARCHITECTURE 500MM THICK BRICK WALL SIGN AND STAMP EXTERNAL FLOORING
NORTH
ROLL NO.
07
TILE DROP J
12
11
2260
A - 101
NAME : PRANAV ASHISH CHAUBAL
W1
02 02 A-301a A-301b
B
SHEET NUMBER:
LEGENDS :
W1
450
C66- 230x500
GROUND FLOOR ARCHITECTURAL PLAN
SCALE : 1:50
13
D6
500
C65- 230x500
02
UP 2490
660
W.C.
370 C25- 230x500
5150
350
D5 1200
D5 850 170
C24- 230x500
P
710 810 950
N
800
1300
CERAMIC TILING
1650
M
710
PANCHAVATI ANECDOTES SHEET TITLE:
1600
FFL=+0.15M SSL=-0.07M
D5 1290
380
W1
1290
W.C.
D5
370 1410
800 710
05
04
C60- 230x500
STONE TILING
3090 w.c.
HIS
SLATE TILING
710
06
GENERAL NOTES 1) All dimensions are in 'millimeters' unless specified 2) The drawing is not to be scaled. The REVISION TABLE dimensions are strictly to be followed. DATE DESCRIPTION 3) All levels areREVISION unfinished levels unless specified. 4) The contractor shall verify all on site dimensions including elevations prior to the commencement of work on site. 02 5) The contractor shall inform the architect and/or A-201 project engineer on site regarding any conditions/modifications required to be done prior to the commencement of work. 6) The contractor shall coordinate and verify the work indicated on the drawings between the architectural and various trade drawings, including but not limited to structural, electrical, plumbing, fire protection and exterior enclosure systems. 7) All work shall conform to relevant BIS codes and shall be best practice of each trade. 8) Any discrepancy is to be brought to the notice of the architect/ consultant before commencement of the site. 9) All work is to be completed to the satisfaction of site engineer/ project manager and architects
C53- 230x230
2190
12
280
01
FFL=+1.50M UFL=+1.46M
C14- 230x500
1220
D5
FFL=+0.15M SSL=-0.07M
C18- L230x230
1200
RECEPTION
C58- 230x500 C70- 230x500 C59- 230x500
C62- 230x500
280
D9
C52- 230x230
15 7000
09 10 11
3350
D6
02
C51- 230x500
C9- 230x500
13
C69230x500 1620
C13- 230x500
380
450
C44- 230x230
12050
FFL=+3.0M SSL=+2.96M
STONE TILING
PASSAGE
280
W.C.
C43- 230x230
16 C47- 230x500
2210
C46- 230x500
C50- 230x500
C57- 230x500
810
1410 370
C42- 500 DIA
135°
1010
1990
IPS FLOORING
6750
IPS FLOORING
1200
C64- 230x500
1610
C7- 230x500
15
50
14
(1.6M WIDE) FFL=+0.15M
FFL=+0.9MCERAMIC TILING 400 810 SSL=+0.86M 710 710 KC17- 230x230 IPS FLOORING
1110
5°
03
STEPS
1990
15
1070
C68- 230x500
07
17 13
D10
1650
14
11
SERVICE ALLEY
1010
1050
13
FFL=+1.35M SSL=+1.31M
1300
1290
12
08
1270
HER
C61- 230x500 280
11
06
06
FFL=+0.13M WAITING AREA SSL=-0.07M
C16- 230x230J
FFL=+1.35M
02
04
07
1300
UP
D4
D2
03
04
550
15 40
UP
C49- 500 DIA
W1 C54- 230x500 450
280
UP
550
45°
10
03
DN
02
1280
460 550
2190
02
C8- 230x500
1610
1050
2300
W1
2490
710 810SERVICE 620
6200
FFL=+1.05M
01
3100
FFL=+0.75M C63- 230x500 SSL=+0.65M
09
7190
CENTRAL COURTYARD
1150
990
C53- 230x230
C6- 230x500 01
09
C45- 230x500
1300
1800
08
C60- 230x500
05
1890
2200
2050
IPS FLOORING
1270
1800
1200
2300
980 1350 8060
IPS FLOORING
FFL=+0.60M SSL=+0.56M
2050 2050 1050
3620
D2
SHOP (3100x2200 MM) G FFL=+0.75M C15- 230x230 H 280 C23- 230x500 SSL=+0.71M
07
04
D6
PANTRY
06
01
CORRIDOR (11200x1100MM)
D2
660
3040
IPS FLOORING
1270
3900
N
1410
06 12050
M
415 1050
1050
FFL=+0.6M STORAGE UFL=+0.2M (3100x1150 MM) IPS FLOORING
350
950
1050
1480
1200
FFL=+0.6M STORAGE UFL=+0.2M (3100x1150 MM) IPS FLOORING
RS 1150 1250
UP
05
(6200x2940MM)
D2
1570
525 525
D1
C5- 230x500 C41- 230x500 04
C12- 230x500
3100
F
800
UP
D2
DISPLAY AREA
1800
C22- 230x500
L
C52- 230x230
STONE TILING
1300
3100
2940
525 525
550 230
500 RS
D8
E
K
FFL=+1.50M 10560 UFL=+1.46M
SHOP W.C. D5 (3100x2200 MM) FFL=+0.75M 370 SSL=+0.71M
850 170
D1
26
D
J
C51- 230x500
1150
IPS FLOORING
01
C21- 230x500
1650
2065
D3
2340
DN
C38- 230x500
PAVER BLOCKS
1350
C25- 230x500
2820
C42- 500 DIA
135
C47- 230x500
A FFL=+1.05M
2070
710 810
09
1010
2200 UP (3040x1570MM) 3140 1080 450 450 1380 24890 FFL=+0.15M1150 FFL=+0.9M D5 C55- 230x500 C66230x500 SSL=+0.86M W1IPS FLOORING C67- 230x500 C56- 230x500
1820
C32- 230x500
C24- 230x500
280
1670
1390 1110 2070
STEPS
FFL=+0.6M STORAGE UFL=+0.2M (3100x1150 MM) IPS FLOORING
40 3100
2050 1950
01
02
550
1330
06W1
1220 2050 1950
02
2830
11440
3350
03
07
450 04
25
C
525
800
24
800
900
08
03
230x500
710
525
UP
C65- 230x500
3090
CERAMIC TILING
550
23
W1
C48- 230x500
1330
03
800 710
05 1230
23
2730 1270
2080
380
C59IPS FLOORING
FFL=+0.15M SSL=-0.07M
550 230
450 22
1270
940
01
1290
02 A-201
4.0 M WIDE ROAD LEVEL=+0.0M
UP °
1390 1110
05 06
071160
08
UP
21
02
1410
11
135
3070
1720
550 550
2050
40
15
3600
45° 5900
26460
20
05
02B
19
1250
HIS
2050 1950
380
18
IPS FLOORING
C11- D5 230x500
W.C. 10280
370
D2
D3
13 1410
TEMPLE PLINTH
FFL=+0.6M
09 10 11
12 13 14
15
D5
07
W1
D5
10 990
1500
3100
1480
280
1270
280
7190
1350
280
14
710 810
3850
3350
6900 2300 1050
1050
1650
7000
1010
1290
11440
1050
SERVICE CORRIDOR (11200x1100MM)
2050
3620
IPS FLOORING
2300
5080
1050
FFL=+0.60M SSL=+0.56M
2050 1050
FFL=+0.6M STORAGE UFL=+0.2M (3100x1150 MM) IPS FLOORING
3100 525
800
940 1000
1280
980
1890
2050
2340
1050
FFL=+0.6M STORAGE UFL=+0.2M (3100x1150 MM) IPS FLOORING
3100
525
550
525
550 230 2050 1950
2730 1160
D3
RECEPTION C40- 230x500
IPS FLOORING
FFL=+0.6M UFL=+0.2M
D7 710
SHOP (3100x2200 MM) FFL=+0.75M SSL=+0.71M
C58- 230x500
PASSAGE
C62- 230x500
280
D1
RS FFL=+1.35M SSL=+1.31M2200
SLATE TILING
1300
D5
08
04 450
SERVICE CORRIDOR (11200x1100MM)
1410
C14- 230x500
D6
C37- 230x230
PAVER BLOCKS
TILE DROP COLUMN
w.c.
C18- 230x230
IPS FLOORING 280
FFL=+1.05M
1800
1350 8060 550 1300 1610 5080
1300
IPS FLOORING
1050 2300
FFL=+0.6M STORAGE UFL=+0.2M (3100x1150 MM) IPS FLOORING
3100
2050 1950
525
550 1330 550
1650 1200 460
LEVEL=+0.0M
IPS FLOORING
FFL=+0.60M SSL=+0.56M
2300
1050 2300
SERVICE CORRIDOR (11200x1100MM)
10501890 18901050 2300
W.C.
C4- 230x500
1620
FFL=+0.15M SSL=-0.07M 950
16 1200 17
02 152002 A-301a A-301b
1050
FFL=+0.75M
EXTERNAL FLOORING
1600
FFL=+0.9M 11 SSL=+0.86M C17- 230x230
1290
C35- 230x230 SSL=+0.65M C36- 230x230
C34- 230x230
280
1800
CENTRAL COURTYARD C33- 230x230
C16- 230x230
280
UP
1150 1250
D9
IPS FLOORING
C13- 230x500
C15- 230x230
C23- 230x500
1620
(1.6M WIDE) FFL=+0.15M
WAITING AREA
1670
1390 1110
C22- 230x500
500MM THICK BRICK WALL 15
SERVICE ALLEY 12
230 MM THICK BRICK WALL
1990
K
L
M
N
P
COLUMN
PRODUCED BY AN
34
280
IPS FLOORING
LEGENDS : 150 MM THICK BRICK WALL
1990
FFL=+3.0M SSL=+2.96M C9- 230x500
C12- 230x500
D8
1410
UP
D5
IPS FLOORING
990
C7- 230x500
15
C32- 230x500
H 3350
D2
24890
IPS FLOORING
10 1200 09
06
FFL=+0.60M SSL=+0.56M
2050 1050 2050
FFL=+0.6M STORAGE UFL=+0.2M (3100x1150 MM) IPS FLOORING
2050 1050 1050 2050 2050 1050
1330
1270
3070
IPS FLOORING
FFL=+0.6M
1050
415
C26- 230x500
FFL=+0.15M
1800
D2
1610
C39- 230x500 G C50- 230x500
F
C3- 230x500
FFL=-0.55M SSL=-0.84M
HER
415
3100 525
FFL=+0.6M STORAGE UFL=+0.2M FFL=+0.6M STORAGE (3100x1150 MM) IPS FLOORING UFL=+0.2M (3100x1150 MM) IPS FLOORING
3100 3100 3100
IPS FLOORING
D2 800
FFL=+0.6M STORAGE UFL=+0.2M (3100x1150 MM) IPS FLOORING
525 525 525525 525 525
RS
SHOP (3100x2200 MM) FFL=+0.75M SSL=+0.71M
2050
525525
1330 780 550 550 230 2050 1950 2050 1950 800 1330 550 550 2050 1950 550
1330 550 230
2050 1950
D1
1160
UP
2730
2200
PANTRY
280
280 IPS FLOORING 1270
01
26
C21- 230x500
14
1270
UP
3
C46- 230x500
FFL=+1.35M SSL=+1.31M
UP
CERAMIC TILING 400 810 11 710 15 710
370
C20- 230x500
1010
2
50
E
PUMP ROOM
01
1150
1050
3100 525 3100
2050 1950
2080 1270 2830 2830 1270 2080
10280
1270
IPS FLOORING
C19- 230x500
280
13
135°
A
FFL=+1.35M
02
STONE TILING
FFL=+0.13M 3100 SSL=-0.07M 14
12
C61- 230x500
D2
DN 021270
25
12
C8- 230x500
C30- 230x230 C31- 230x230 (3040x1570MM)
FFL=+0.9M SSL=+0.86M
03
1410 24
11
135°
FFL=+0.6M UFL=+0.2M
D2
D
810
13
06
03
UP
04
11
C57- 230x500
1070
C64- 230x500
C29- 230x230 UP
04
23
6200
135°
IPS FLOORING
07
04
10
20 23
D1
UP
C
C2- 230x500
1110
05
C28- 230x230
22
135°
UP
SHOP (3100x2200 MM) FFL=+0.75M SSL=+0.71M RS
06
D4
1150 1150
C63- 230x500
DN
280
5830
2200
C49- 500 DIA
C54- 230x500
05
DISPLAY AREA
3040
135°
1820
B
1110
D2
21
D10
P
D2
2200
01
U
IPS FLOORING
C10- 230x500
02
06
°
RS
07
20
°
D1
19
06
17
09
10
05
C56- 230x500
D2
03
03
08
C6- 230x500
08
UP
135
D2
07
C20- 230x500
P
16
C25- 230x500
C11- 230x500 03
UP
07
(6200x2940MM)
08
C27- 230x230
06
UP
D7
18
1520
20
UP
2200
SHOP (3100x2200 SHOP MM) FFL=+0.75M (3100x2200 MM) SSL=+0.71M RS FFL=+0.75M IPS FLOORING SSL=+0.71M
D1
1250 C24- 230x500
950
05
13
IPS FLOORING
1290
17
03
04
10560
02
04
1150 1150
16
02
N
C5- 230x500 D5
FFL=+1.35M SSL=+1.31M
08
23
UP
2200
C55- 230x500
01
°
4
10
04
M
2260
FFL=+1.05M
01
135
3
02
°
2
01
135
C1- 230x500 1
N T R C45- 230x500 Y
10
15
w.c.
C4- 230x500
°
IPS FLOORING
UP
E C41- 230x500
01 A-201
09 D2
C26- 230x500
1
C40- 230x500
11
05
L
135
SHOP (3100x2200 MM) FFL=+0.75M SSL=+0.71M
RS
D2
SHOP (3100x2200 MM) FFL=+0.75M SSL=+0.71M
3100 14
01
D2
280
1410
12
09
K
14
IPS FLOORING
1410 13
D2
J
1410
A-301b 01
11
D1
1290
H
C14- 230x500
D6
PRODUCED BYRSAN AUTODESK STUDENT VERSION IPS FLOORING D2
01 A-301a
G
24890
C3- 230x500
C18- 230x230
PUMP ROOM
135
10280
A D1
FFL=+0.6M STORAGE UFL=+0.2M (3100x1150 MM) IPS FLOORING
550
1330 550 230
1270
D2
UP
D3
F
FFL=-0.55M SSL=-0.84M
1150
2200
C38- 230x500
1150
C48- 230x500
C19- 230x500
IPS FLOORING
UP
12
C13- 230x500
P
IPS FLOORING
D1
D2
FFL=+0.6M UFL=+0.2M
U
525
2200
FFL=+0.6M UFL=+0.2M
STORAGE
IPS FLOORING
RS
UFL=+0.2M BHAANDI BAZAAR (3100x1150 MM)
525
800 2050 1950
D1
SHOP (3100x2200 MM) FFL=+0.75M SSL=+0.71M RS
2820
7.5 M WIDE ROAD 1050
2065
1390 1110
STREET
1160 2730
UP
SHOP (3100x2200 MM) FFL=+0.75M SSL=+0.71M
TEMPLE PLINTH
IPS FLOORING 280
280 1110
1150
IPS FLOORING
UP
D2
C10- 230x500
525
1270
UP
FFL=+0.6M
C39- 230x500
D2
PAVER BLOCKS
6900
2050 1950
1390 1110
14
13
UP
SHOP1800
(3100x2200 MM) D1 CENTRAL FFL=+0.75M SSL=+0.71M COURTYARD RS IPS FLOORING
FFL=+1.05M 2200
D3
E
1600
SSL=+0.86M C17- 230x230
C16- 230x230
2801150
FFL=+0.75M SSL=+0.65M
15
D
3620 1150 1250
2830
UP
C32- 230x500
1720
UP
780
3350
16
C
C2230x500 FFL=+0.9M
C15- 230x230
C23- 230x500 2200
D2
3
2050
3600
5900
26460
2
4
3
C22- 230x500
2260 1
2
1
C21- 230x500
D9
IPS FLOORING
WAITING AREA
1800
D8 C1- 230x500
C20- 230x500
(1.6M WIDE) FFL=+0.15M
B
C12- 230x500
26
11440
17
D5
IPS FLOORING
710 810
01
(3040x1570MM) FFL=+0.15M
IPS FLOORING
7190
25
UP FFL=+0.9M SSL=+0.86M A
DN
15
SERVICE ALLEY
4100
02
3040
PANTRY
26300
03
24
1990
C9- 230x500
2340
04
23
IPS FLOORING
1500
22
UP
1990
FFL=+3.0M SSL=+2.96M
1650
01
05
C7- 230x500
15
2940
06
21
14
1570
20
05
620
06
13
1270
710 810
07
02
2940
1480
19
525
IPS FLOORING
07
12
C8- 230x500
1570
5080
1050 1050
03 02
03
2070
UP
08
11
UP
6200
C11- 230x500
18
04
16
10
(6200x2940MM)
of the architect/ consultant before commencement of the site. 9) All work is to be completed to the satisfaction of site engineer/ project manager and architects
PRODUCED BY AN AUTODESK STUDENT VERSION
1160
C26- 230x500
17
D10
PANCHAVATI ANECDOTES (SEMESTER 4 ARCHITECTURAL DESIGN)
DISPLAY AREA
D7
2080
525
D2 800
2300
2050 1050 2050
IPS FLOORING
1250
950
10280
RS
DRAWINGS-
1350
3100
D1
1050
UP
SHOP (3100x2200 MM) FFL=+0.75M SSL=+0.71M
16
1520
D2
FFL=+0.6M STORAGE UFL=+0.2M (3100x1150 MM) IPS FLOORING
2730
2050 1950
2200
10
01
1150
525
550 230
1270
1330
IPS FLOORING
C19- 230x500
15
1670
550
525
D2
FFL=+0.60M SSL=+0.56M
FFL=+0.6M STORAGE UFL=+0.2M (3100x1150 MM) IPS FLOORING
3100
IPS FLOORING
FFL=+0.6M UFL=+0.2M
3100 14
11
08
2300
525
550 2050 1950
2080
10280
2200
12
09
D2
1150
525
550
1270
1330
C10- 230x500
SHOP (3100x2200 MM) FFL=+0.75M SSL=+0.71M RS
D1
13
SERVICE CORRIDOR (11200x1100MM)
IPS FLOORING
D2
UP
1890
2050
SHOP (3100x2200 MM) FFL=+0.75M SSL=+0.71M
1050
RS
UP
IPS FLOORING
IPS FLOORING
415
D1
1050
3100
2050 1950
2830
A. W O R K I N G
10560
FFL=+1.35M SSL=+1.31M
FFL=-0.55M SSL=-0.84M
PRODUCED BY AN AUTODESK STUDENT VERSION
UP
PUMP ROOM
FFL=+0.6M STORAGE UFL=+0.2M (3100x1150 MM) IPS FLOORING
52
2200
PB61
PB53
65
65
20
65
40
65
SIGN AND STAMP
B17
A-403c
DETAIL OF MIDLANDING SKYLIGHT FFL=+2.70M SSL=+2.66M
FIRST FLOOR LEVEL +4.80M
SCALE 1:5
13
3660
12 11
B3
10 09 08 07 06 05 04 03 02 01
230
PUMP ROOM FFL=-0.55M 230 SSL=-0.51M
GROUND LEVEL PB38
PB26
PB22
SW2
UNDERGROUND TANK
SW1
150 1050
1050
850 100 450
450
50 850
1050
65
65
07
ACADEMY OF ARCHITECTURE B93
100
120
3390
390
190
55
100
M.S GUSSET PLATE (10MM CHORDS AND ANGLE STRUTS BYTHK) NUT BOLTS M.S GUSSET PLATECONNECTS (10MM THK)DIFFERENT MEMBER BY NUT-BOLT CONNECTS DIFFERENT MEMBERKEY BYPLAN NUT-BOLT
ROLL NO.
580
SIGN AND STAMP
07
150
1500
1340
1040
920
ACADEMY OF ARCHITECTURE
50
150
50
100
100
120
190
2150
2150 70
40
33 32 31
29 28 27
PROJECT NAME: ANGLE CLEATS ISA 6565 (10MM THK) ANGLE CLEATS ISACONNECTS 6565ANECDOTES (10MM THK) THE TRUSS TO COLUMN PANCHAVATI NUTCOLUMN BOLTED TO GUSSET PLATE CONNECTS THE TRUSS TO SHEET NUMBER: SHEET TITLE: NUT BOLTED ON M.S. PLATE NUT BOLTED TO GUSSET PLATE SECTIONS 10 A - 301a NUT BOLTED ON M.S. PLATE M.S. BASE PLATE (280x500MM 20MM THK) M.S. BASE PLATE (280x500MM 20MM THK) REBARS WELDED TO COLUMN SCALE : 1:50 WELDED TO COLUMN REBARS NORTH R.C.C. BEAM (230x450MM) NAME : PRANAV ASHISH CHAUBAL R.C.C. BEAM (230x450MM) WITH 25MM EXTERNAL PLASTER 08-04-2020 SEMESTER 6 ROLL NO. WITH 25MM EXTERNAL PLASTER
B22
ZIN SH
MA TIL
GROUND PLINTH LEVEL +0.75M
PUMP ROOM FLOOR LEVEL DETAIL OF TRUSS END JUNCTION -0.55M A-403b DETAIL OF TRUSS END JUNCTION SCALE 1:5
HALF ROUND PVC07 PIPE GUTTER HALF ROUND SIGN PVC PIPE GUTTER (200MMØ) AND STAMP ACADEMY OF ARCHITECTURE
SUPPORTED ON G.I. STRAP HELD ON BATTEN (200MMØ) SUPPORTED ON G.I. STRAP HELD ON BATTEN
PB2
T.W MIDDLE RAIL
A-403b
T.W MIDDLE RAIL T.W.
850
20
65
400
120920
390
850 190 55
750
55
400
08-04-2020
SEMESTER 6
60
850 2150
100
450
40 610 2550
40
580 2030 0 PB47
PUMP ROOM FLOOR LEVEL 08-04-2020 ROLL NO. -0.55M
UP
39
38
37
36 35
30
B93
70
PB56 PB68
SEMESTER 6
55 120
NORTH
NAME : PRANAV ASHISH CHAUBAL
70
GROUND LEVEL
PB73
70 450
2020
PUMP ROOM FLOOR LEVEL -0.55M
PB2
2830
2420
GROUND LEVEL
NORTH
SECOND FLOOR LEVEL +8.70M
NAME : PRANAV ASHISH B3 CHAUBAL 34
540
450
3660
580 2940
2030
2980
07
PB2
GROUND PLINTH LEVEL +0.75M
0
2420 560
2420
2090
1520
17 16
TOILET FFL=+0.75M SSL=+0.71M
GROUND PLINTH LEVEL 550 +0.75M
SCALE : 1:50
1250
70 580 3140
2150
3660
ARCHITECTURAL SECTION SECTION THROUGH STAIRCASE FLIGHTS AND TOILET SCALE 1:50
ROLL NO.
B46
450
1340 4540
1040
1250
PUMP ROOM FLOOR LEVEL -0.55M
PRODUCED BY AN AUTODESK STUDENT VERSION
02 A-301a
1500
2030
PB2
ACADEMY OF ARCHITECTURE
SIGN AND STAMP
SW1
SW1
A - 301a
SCALE : 1:50 FFL=+6.60M 120 SSL=+6.56M
550
SCALE 1:5
BEDDED MONOPITCH RIDGE PIECE BEDDED MONOPITCH RIDGE PIECE (270x520MM) (270x520MM) MANGALORE TILE (260x540MM) MANGALORE TILE (260x540MM) RESTING ON TIMBER BATTENS RESTING ON TIMBER BATTENS
40
2940 2420
580 SW1
0
1500
SW2
1240
2150 2420 560 2420
1520
2830
2940
1250 2830
2420
2090
2090
2150 2420 560
2420
3660 PB22
UNDERGROUND TANK 08-04-2020 SEMESTER 6 SW2
22 21 20 19 18
SECTIONS
80
VERTICAL STRUTS ISA 5555 (8MM THK) STEEL @ 4200MMBOX c/c SECTIONS (50x50MM @450MM c/c) STEEL BOX SECTIONS (50x50MM @450MM c/c) PLACED ONTO TOP CHORD OF BY STEEL TRUSS ATTACHED TOP CHORDS GUSSET PLATE PLACED ON TOP CHORD(WELDED OF STEELTO TRUSS TOP CHORD) (WELDED TO TOP CHORD) 28MM THK DOUBLE GLAZED UNIT TOP 02CHORD ISA 6565 (10MM THK) FIXED INTO T.W. FRAME TOP CHORD ISA 6565 (10MM THK) SECTIONS BACK TO BACK DOUBLE ANGLE DOUBLE ANGLE SECTIONS BACK TO BACK T.W. SKYLIGHT FRAME (150MM THK) 01 FIXED ONTO THE TRUSS BY NUT BOLTING BOTTOM CHORD ISA 6565 (10MM THK) BOTTOM CHORD ISA 6565 ANGLE (10MM THK) DOUBLE SECTIONS BACK TO BACK (SPAN 5500MM) DOUBLE ANGLE SECTIONS BACK TO BACK M.S GUSSET PLATE (10MM THK) (SPAN 5500MM) CONNECTS VERTICAL STRUTS TO TOP
10
PB26
GROUND PLINTH LEVEL +0.75M
PB22
B41
24
SHEET TITLE:
MIDLANDING
FLOOR LANDING FFL=+4.80M SSL=+4.72M
RESTING ON TIMBER BATTENS
10
GROUND LEVEL
PB26
UNDERGROUND TANK
B14
MANGALORE TILE (260x540MM) RESTING ON TIMBER BATTENS DOUBLE ANGLE SECTIONS BACK TO BACK
40
PB61
UNDERGROUND TANK
PB38
26 25
WORKSHOP ROOF TOP 55 +10.00M
0 855
PANCHAVATI 80 ANECDOTES 80 80 SHEET NUMBER:
TE
A
MANGALORE TILE (260x540MM) TOP CHORD ISA 6565 (10MM THK)
2
01
PB68
PB73
PB47
SW2 23
NORTH
NAME : PRANAV ASHISHB51'CHAUBAL
PB53
PB22
50
(ANGLE CLEAT NUT-BOLTED TO M.S.TO PLATE) NUT BOLTED MS PLATE THROUGH T.W. R.C.C. (230x450MM) FRAME TOBEAM FIX SKYLIGHT PANEL ON TRUSS REVISION TABLE R.C.C. BEAM (230x450MM) WITH 25MM EXTERNAL PLASTER DATE REVISION DESCRIPTION WITH 25MM EXTERNAL PLASTER M.S. PLATE (5MM THK) FIX T.W. FRAME ON ANGLE SECTION BY NUT BOLTING THROUGH FRAME
2
PB56
2980
3140 1520
01
PRODUCED BY AN AUTODESK STUDENT VERSION
06 05 04
B51
SCALE : 1:50
PUMP ROOM FFL=-0.55M SSL=-0.51M
12
57
56
55
54
53
200 A - 301a
GROUND LEVEL
13
PROJECT NAME:
TOP CHORD
B22
A-403g
65
PB68
01
FFL=-0.55M PB26 SSL=-0.51M
59 58
+4.80M
SHEET NUMBER:
SHEET TITLE:
200SECTIONS
B3
PUMP ROOM A - 301a
02
09 08
13 12
11
04
61
450
B3
PB73
10
B56 03
PUMP ROOM FFL=-0.55M SSL=-0.51M
07 06 05
03
B3
60
PANCHAVATI ANECDOTES
B3
02
10
09 08
PB38
05
PB61
41 40
KEY PLAN
450
12
PB47
12
11 10 09
08
B41
SHEET NUMBER: 07 06
PB53
B32
04
SHEET TITLE:
PB56
44 43 42
39
B46'
PANCHAVATI ANECDOTES SECTIONS
07
PB38
PROJECT NAME:
45
MIDLANDING FFL=+2.70M SSL=+2.66M
Q
A
UP
FIRST FLOOR LEVEL +4.80M
13
03
B46
KEY PLAN
B17
GROUND LEVEL
11
50
65 64 63 62
PROJECT NAME:
13
450
65
MIDLANDING FFL=+2.70M SSL=+2.66M
FIRST FLOOR LEVEL +4.80M
450
65
19 18
02
49 48
OF GUSSET PLATE M.S GUSSET PLATE (10MM THK) M.S GUSSET PLATE (10MM THK) M.S GUSSET PLATE (10MM THK)DIFFERENT CONNECTS MEMBER BY NUT-BOLT DIFFERENT CONNECTS DIFFERENTCONNECTS MEMBER BY NUT-BOLTMEMBER BY NUT-BOLT B22 STEEL TRUSS ON R.C.C. COLUMN B103 ISA 5555 (8MMRESTING THK) (ANGLE CLEAT NUT-BOLTED TO M.S. PLATE) B60 STEEL TRUSS RESTINGWELDED ON R.C.C. COLUMN TO TRUSS
TERRACE FLOOR LEVEL +12.7M 100
UP
SSL=+2.66M
65
TOILET FFL=+0.75M SSL=+0.71M
BOX SECTION FIRST FLOOR LEVEL
KEY PLAN
30
47
19
MIDLANDING K FFL=+2.70M
BOX SECTION
B25
29
46
18
OHT TOP LEVEL +17.2M
TOP CHORD
28
B41
23 22 21
GROUND LEVEL
MIDLANDING FFL=+2.70M SSL=+2.66M
27
17
FFL=+8.70M SSL=+8.66M
B3
B17
B51
17
TOILET FFL=+0.75M SSL=+0.71M
33
UP
17
100MM THK BRICK BAT COBA TO PROVIDE SLOPE TO TERRACE
20
27
39 38 37 36
34 UP
16
24
31 30
UP
35
18
B46
28
(10MM THK)
RESTING ON TIMBER BATTENS CHORDS AND ANGLE STRUTS BYSIDE NUT BOLTS OF GUSSET PLATE ALTERNATIVELY ATTACHED ON EITHER
PERFORMING AREA DETAIL OF SKYLIGHT
10
10
27
26
16
UGH STAIRCASE FLIGHTS AND TOILET SCALE 1:50
B3
31 30 29
32
16
B18
32
MIDLANDING FFL=+6.60M SSL=+6.56M
@ 4200MM c/c
(270x520MM)
MANGALORE TILES K MANGALORE TILES FLOOR LANDING
B3
01
31
25
B17
HITECTURAL SECTION
B51'
37
36 35
MANGLORE TILE ROOF TILE SIZE(250MM x540MM)
35
29
B46
B41
23 22 21
34 33 32
28
B51'
26 25 24
02
50
39
38
B26 34
19
38
37 36
13
FFL=+6.60M SSL=+6.56M SECOND FLOOR LEVEL +8.70M
FLOOR LANDING FFL=+4.80M SSL=+4.72M
B38
01 FLOOR LANDING FFL=+4.80M SSL=+4.72M
20
39
12
02
33
12
MIDLANDING B51 FFL=+6.60M SSL=+6.56M
B56
53
B25
UP
41 40
B41
FLOOR LANDING FFL=+4.80M SSL=+4.72M
59 58 57 56
13
39
B46'
K
55
43 42
55
53
WORKSHOP ROOF TOP +10.00M MIDLANDING
Q
1
M.S. BASE PLATE (280x500MM 20MM THK) PRODUCED AN AUTODESK STUDENT VERSIO VERTICAL STRUTS ISA 5555BY(8MM THK) WELDED TO COLUMN REBARS PRODUCED BY AN AUTODESK VERSION VERTICAL STRUTS ISA 5555 (8MM STUDENT THK) @ 4200MM c/c
M.S GUSSET CONNECTS PLATE THK) ISA VERTICAL STRUTS TOPTHK) ANGLE(10MM STRUTS 5555TO (8MM MANGALORE TILE (260x540MM) CONNECTS TO TOPSTRUTS CHORDS ANDTHK) ANGLE BYEITHER NUT BOLTS ANGLE STRUTSVERTICAL ISA 5555STRUTS (8MM ALTERNATIVELY ATTACHED ON SIDE
B14
B3
B14
DESCRIPTION
T.W. BEEDING B93 PATTI
P
Q
B1
230
54
B25
0
54
A-403b
80
P
A-403c PERFORMING AREA B103 DETAIL OF SKYLIGHT GLASS230 A-403c SCALE 1:5 WORKSHOP ROOF TOP SCALE 1:5 SPAN=6050 PANELS +10.00M 02 SPAN=6050 AIR SPACE K M P DESSICANT SECOND FLOOR LEVEL M P Q DETAILED SECTION OF NORTH LIGHT TRUSS SEALANT +8.70M TERRACE PARAPET LEVEL A-403a DETAILED SECTION OF NORTH LIGHT TRUSS +13.8M 01 SCALE 1:20 A-403a SCALE 1:20
60
59 58 57
T.W MIDDLE RAIL
450
450 80
TERRACE FLOOR LEVEL +12.7M 14 15
REVISION
56
65
FOLDED RCC STAIRCASE 150MM THK
44
B14
B3
63
62
B14
SECOND FLOOR LEVEL +8.70M
B93
64
TERRACE FLOOR LEVEL +12.7M
13
DATE
65
54
COPING STONE 150 MM THK WITH 25MM EXTERNAL PLASTER AND PAINT
12
0
54
61
63
1240
B41
B32
46 45
B25
WORKSHOP ROOF TOP +10.00M
450 REVISION TABLE
MIDLANDING 10 11 FFL=+2.70M SSL=+2.66M
09
2980
3140 47
B46
08
TERRACE PARAPET LEVEL +13.8M
GROUND PLINTH LEVEL +0.75M
GROUND LEVEL
PB152 TERRACE PARAPET LEVEL +13.8M 450
64
3390
70 580
45
B46'
49 48
07
FLOOR LANDING FFL=+8.70M SSL=+8.66M
62
PARAPET WALL 1050MM HIGH (230MM THK BRICK MASONRY)
44
PB139
100
UP
54
06
MIDLANDING FFL=+2.70M SSL=+2.66M
43 42 41 40
PB137
B18
61
B32
39
53
B51
1050
1340 4540
1040
1050
3390
B3
63 62 61 60 59
56 55
05
60
46
58
B56
RCC OVERHEAD TANK (1500MM DEEP)
FLOOR LANDING FFL=+8.70M SSL=+8.66M
47
B46
04
DESCRIPTION
49
65 64
REVISION
B18
48
57
1240
B25
TERRACE FLOOR LEVEL +12.7M
B26 MIDLANDING FFL=+2.70M SSL=+2.66M
MANGLORE TILE ROOF TILE SIZE(250MM x540MM)
B51
03
B25 B1
OHT TOP LEVEL +17.2M
PB132
FIX T.W. FRAME NUT ON ANGLE SECTION BY FRAME BOLTING THROUGH ANGLE CLEATS ISA 6565 (10MM THK) NUT BOLTING THROUGH FRAME CONNECTS THE TRUSS TO COLUMN TOP CHORD ISA 6565 (10MM THK) TO GUSSET PLATE TOP CHORDNUT ISABOLTED 6565 (10MM THK) DOUBLE ANGLE SECTIONS BACK TO BACK NUT BOLTED ON M.S. PLATE DOUBLE ANGLE SECTIONS BACK TO BACK
100
25°
TERRACE PARAPET LEVEL +13.8M
B51
B25
02
B26
DATE
B1 B14
PB113
25°
01 REVISION TABLE
FLOOR LANDING 100MM THK BRICK BAT COBA FFL=+8.70M TO PROVIDE SLOPE TO TERRACE SSL=+8.66M
100MM THK BRICK BAT COBA TO PROVIDE SLOPE TO TERRACE
19
PB111
PB89
B1
B38
MANGLORE TILE ROOF TILE SIZE(250MM x540MM)
B18
18
02 01
PB105
B14
B38
FOLDED RCC STAIRCASE 150MM THK
03
17
25°
B25
16
1500
OHT TOP LEVEL PB82 +17.2M
FOLDED RCC STAIRCASE 150MM THK
COPING STONE 150 MM THK WITH 25MM EXTERNAL PLASTER AND PAINT
14 15
13
70
12 GROUND LEVEL
COPING STONE 150 MM THK WITH 25MM EXTERNAL PLASTER AND PAINT
PARAPET WALL 1050MM HIGH (230MM THK BRICK MASONRY)
11
PB96
PARAPET WALL 1050MM HIGH (230MM THK BRICK MASONRY)
B14
10
1010
09
19
70
08
18
1500
RCC OVERHEAD TANK (1500MM DEEP)
07
17
PRODUCED BY AN AUTODESK STUDENT VERSION
06
PRODUCED BY AN AUTODESK STUDENT VERSION
05
16
M.S. PLATE M.S. PLATE (5MM THK)FRAME ON ANGLE SECTION BY FIX T.W.
PRODUCED BY AN AUTODESK STUDENT VERSION
04
65
03
14 15
WELDED TO TRUSS NUT BOLTED TO MS PLATE THROUGH T.W. NUT BOLTED TOFRAME MS PLATE THROUGH T.W. TO FIX SKYLIGHT PANEL ON TRUSS M.S GUSSET PLATE (10MM THK) FRAME TO FIX SKYLIGHT PANEL ON TRUSS CONNECTS DIFFERENT MEMBER BY NUT-BOLT (5MM THK)
ATTACHED TO TOP CHORDS BY GUSSET PLATE R.C.C. BEAM (230x450MM) RIDGE PIECE BEDDED ATTACHED TO TOP CHORDSMONOPITCH BY GUSSET PLATE WITH 25MM EXTERNAL PLASTER BEDDED MONOPITCH RIDGE (270x520MM) 28MM THKPIECE DOUBLE GLAZED UNIT (270x520MM) MANGALORE TILE (260x540MM) 28MM THK DOUBLE GLAZED UNIT HALF ROUND PIPE GUTTER FIXED INTO T.W.PVC FRAME MANGALORE TILE (260x540MM) RESTING FIXED INTO T.W.(200MMØ) FRAME ON BOX SECTIONS RESTING ON BOX SECTIONS SQUARE BOX (50x50MM @450MM c/c) SUPPORTED ON G.I.SECTIONS STRAP HELD ON BATTEN SQUARE BOX SECTIONS (50x50MM c/c)(STEEL ARCHITECTURAL SECTION T.W. SKYLIGHT FRAME 150MMTRUSS THK) PLACED ON TOP@450MM CHORD OF 01 REVISION TABLE DETAIL OF TRUSS END JUNCTION T.W. SKYLIGHT FRAME (THE 150MM THK)BY NUT BOLTING 55 FIXED ONTOTRUSS TRUSS A-301a SECTION OF STEEL THROUGH WORKSHOP AND PERFORMING AREAPLACED ON TOP CHORD DATE 55 FIXED ONTO THETOP TRUSS BY NUT BOLTING REVISION DESCRIPTION CHORD ISA 6565 (10MM THK) SCALE 1:5 SCALE 1:50 TOP CHORD ISA 6565 (10MM THK) SECTIONS BACK TO BACK DOUBLE ANGLE BEDDED MONOPITCH RIDGE PIECE DOUBLE ANGLE SECTIONS TO BACK M.SBACK GUSSET PLATE 230
65
02
13
M
M
1050
05 04
01
12
K
1010
07 06
580
2110
D3
B93
FIRST FLOOR LEVEL +4.80M
OHT TOP LEVEL +17.2M
K
70
09 08
2550
ANTISKID GRIP ON RAMP
RCC OVERHEAD TANK (1500MM DEEP)
1500
12 11 10
1500
PB152
14 15 16 18 19 SECTION THROUGH WORKSHOP AND17PERFORMING AREA SCALE 1:50
13
1340
12
PB152
3390
12MM THK NEERU FINISHED INTERNAL PLASTER
PB139
139
4540
750
03 04 05 06 07 08 ARCHITECTURAL SECTION
1250
PB137
SECTION THROUGH WORKSHOP AND PERFORMING AREA SCALE 1:50
1240
750
02 PB132
B114
PRODUCED BY AN AUTODESK STUDENT VERSION
01
01 A-301a
PB113
50
B111
B121
50
M.S GUSSET PLATE M.S GUSSET CONNECTS PLATE (10MM THK) DIFFERENT MEMBER BY NUT-BOLT BOTTOM CHORD ISA 6565 (10MM THK) CONNECTS DIFFERENT MEMBER BY NUT-BOLT ISA 5555 (8MM THK) DOUBLE ANGLE SECTIONS BACK TO BACK ISA 5555 (8MM THK)5500MM) WELDED TO TRUSS (SPAN
120
10
PB111
SECOND FLOOR LEVEL +8.70M
PRODUCED BY AN AUTODESK STUDENT VERSION
GROUND PLINTH LEVEL +0.75M GROUND LEVEL
ARCHITECTURAL SECTION
01 A-301a 13
PRODUCED BY AN AUTODESK STUDENT VERSION
PB105
B91
1040
B82
GROUNDCORRIDOR PLINTH LEVEL FFL=+0.60M +0.75M SSL=+0.56M 09 GROUND LEVEL 10 11 IPS FLOORING
1050
B74
70
70
01
450
B109
55
80
80
c/c)
2
B66
02 01
3980
04 03
PB96
1010
450
02
PB152
29 28
1010
600 150
600
30
06 05
IPS FLOORING
STEEL BOX SECTIONS
BEDDED MONOPITCH RIDGE PIECE BEDDED MONOPITCH RIDGE PIECE TOP CHORD ISA 6565 MANGALORE TILE MANGALORE TILE
B103
1440
440
03
31
40
1150
GROUND LEVEL
34 33 32
90
25 MM THK EXTERNAL PLASTER WITH WHITE PAINT
07
36 35
PB139
1240
BRICK MASONRY WALL(230MM THK)
08
38 37
D10
IPS FLOORING
PB137 920
09
PB132
RCC SILL (125MM THK)
2550
PB89
10
PB113
2550
PB111
GROUND PLINTH LEVEL +0.75M
39
TOP CHORD
WORKSHOP ROOF TOP +10.00M
450
11
PB105
IPS FLOORING
various trade drawings, including but not limited to structural, (50x50MM @450MM electrical, plumbing, fire protection exterior enclosureOF STEEL TRUSS PLACED ONandTOP CHORD systems. (WELDED TO TOP CHORD) 7) All work shall conform to relevant BIS codes and shall be (270x520MM) best practice of each trade. (270x520MM) (10MM THK) 8) Any discrepancy is to be brought to the notice (260x540MM) of the DOUBLE ANGLE SECTIONS BACK TO BACK (260x540MM) RESTING ON TIMBER BATTENS architect/ consultant before commencement of RESTING the ONsite. TIMBER BATTENS 9) All work is to be completed to the satisfaction of site (10MM THK) engineer/ project manager and architects
SCALE 1:5
GLASS 200 GLASS PANELS PERFORMING PANELS AREA AIR SPACE 550 FFL=+5.40M SSL=+4.75 M AIR SPACE ARCHITECTURAL SECTION DESSICANT 01 DESSICANT SEALANT A-301a SECTION THROUGH WORKSHOP AND PERFORMING AREA SEALANT SCALE 1:50 B93
CORRIDOR FFL=+4.80M SSL=+4.76M
2080
610
3980
W2
PB96
2550
450
300
COMBINED WORKSHOP 1 (3070x4020 MM) FFL=+4.80M SSL=+4.76 M
01
13
FIRST FLOOR LEVEL B68 B76 +4.80M
139
RCC CHAJJA (75MM THK)
02
600
B121 B60
engineer on site regarding any WITH 25MM EXTERNAL PLASTER
shall coordinate and verify the (200MMØ)6) The contractor SUPPORTED ON G.I. STRAP HELD ON BATTEN work indicated SUPPORTED G.I. between STRAP ON and BATTEN on theON drawings theHELD architectural
50
PERFORMING AREA ROOF TOP +10.28M
1
conditions/modifications HALF ROUNDTILE PVC(260x540MM) PIPE GUTTER MANGALORE required to be done prior to the commencement HALF ROUND PVC PIPE GUTTER (200MMØ) of work. RESTING ON TIMBER BATTENS
K
BOX SECTION
T.W. BEEDING PATTI
T.W. BEEDING PATTI
site. R.C.C. BEAM (230x450MM) 5) The contractor shall inform the architect and/or R.C.C. BEAM (230x450MM) project WITH 25MM EXTERNAL PLASTER
DETAIL OF TRUSS4 END JUNCTION DETAIL OF TRUSS END JUNCTION SCALE 1:5
A-403b
50
Q
SCALE 1:20
PRODUCED BY AN AUTODESK STUDENT VERSION
610
01
05
IPS FLOORING
2110
55
04
PB82
58 57
54
450
2110
07 06
03
12
2550
60 59
56
STEEL TRUSS TO SUPPORT ROOF (NUT BOLTED VIA STEEL PLATE TO RCC BEAM) RCC B111 BEAM 230MM x 600MM B114
08
D3
T.W MIDDLE RAIL
T.W MIDDLE RAIL
70
1440 B109
09
FIRST FLOOR LEVEL +4.80M
2020
450
300
FIRST FLOOR LEVEL +4.80M
139
62 61
GUSSET PLATE CONNECTING DIFFERENT MEMBERS
440 11 10
D3
63
02
300
1240 90
29
B121 B91
CORRIDOR 139 FFL=+0.60M SSL=+0.56M
GROUND LEVEL
B114
13 12
28
ANTISKID GRIP ON RAMP
B114
B121 64
B111
03
31 30
B82
B111
01
1010
33
IPS FLOORING
BOX SECTIONS (50MM x 50MM)
IPS FLOORING
36 35 34
32
01
B109
B103
PERFORMING AREA FFL=+5.40M SSL=+4.75 M
610
38 37
RIDGE PIECE MANGLORE TILE (250MM x540MM)
2020
B91
2350
B82
CORRIDOR FFL=+0.60M SSL=+0.56M
750
450
B93
28
02
65
B74
39
3980
2080
NORTH LIGHT STEEL TRUSS NUT BOLTED ON RCC BEAMS. (FOR PERFORMING AREA)
B103 B66
2350
600 150
600
B76
INTERNAL PLASTER
30 29
90
25 MM THK EXTERNAL PLASTER B68 WITH WHITE PAINT
CORRIDOR FFL=+4.80M INED WORKSHOP 1 PERFORMING AREA SSL=+4.76M 070x4020 MM) FFL=+5.40M IPS FLOORING FFL=+4.80M SSL=+4.75 M SSL=+4.76 M IPS FLOORING 12MM THK NEERU FINISHED D10
03
450
1240
32 31
10
1010
34 33
230
230
MANGALORE TILES
2350
37 36 35
920
BRICK MASONRY WALL(230MM THK)
39 38
P
65
RCC SILL (125MM THK)
1440
IPS FLOORING
D10
SECOND FLOOR LEVEL +8.70M
1010
IPS FLOORING
B103
B103
DETAILED SECTION OF NORTH LIGHT TRUSS
440
1150
55 54
450
57 56
2080
300
WORKSHOP ROOF COMBINED WORKSHOP 1 TOP +10.00M (3070x4020 MM) FFL=+4.80M SSL=+4.76 M
60 59 58
W2
COPING STONE 150 MM THK WITH 25MM EXTERNAL PLASTER AND PAINT
CORRIDOR FFL=+4.80M SSL=+4.76M
SECOND FLOOR LEVEL +8.70M
100
600 150
62 61
B93
450
450
63
B76
450
600
600
64
RCC CHAJJA (75MM THK)
B68
PERFORMING AREA ROOF TOP +10.28M
65
PERFORMING AREA
engineer on site regarding any conditions/modifications OHT TOP LEVEL required to be done prior to the commencement +17.2M of work. 6) The contractor shall coordinate 230 and verify the work indicated on the drawings between the architectural and various trade drawings, including but not limited toKstructural, electrical, plumbing, fire protection and exterior enclosure A-403a systems. 7) All work shall conform to relevant BIS codes and shall be best practice of each trade. 8) Any discrepancy is to be brought to the notice TERRACE PARAPET LEVEL of the +13.8M architect/ consultant before commencement of the site. 9) All work is to be completed to the satisfaction TERRACE FLOOR LEVEL of site +12.7MA-403b engineer/ project manager and architects
CONNECTS DIFFERENT MEMBER BY NUT-BOLT M.S GUSSET PLATE (10MM THK) CONNECTS GENERAL NOTES DIFFERENT MEMBER BY NUT-BOLT ANGLE CLEATS ISA 6565 (10MM THK) All dimensionsISA are in6565 'millimeters' unless THK) ANGLE 1)CLEATS (10MM CONNECTS THE TRUSS TO R.C.C. COLUMN specified STEEL TRUSS RESTING ON COLUMN CONNECTS THE TRUSS TO 2) The drawing isBOLTED not CLEAT to be COLUMN scaled. The NUT TO GUSSET PLATE (ANGLE NUT-BOLTED TO M.S. PLATE) dimensions are strictly PLATE NUT BOLTED TONUT GUSSET BOLTED ON M.S. PLATE to be followed. 10 NUT BOLTED ON M.S. PLATE 3) All levels are unfinished levels unless R.C.C. BEAM (230x450MM) specified. M.S. BASE PLATE (280x500MM 20MM THK) M.S. BASE (280x500MM THK) WITH 25MM PLASTER 4) ThePLATE contractor shall verify all on site20MM WELDED TOEXTERNAL COLUMN REBARS dimensions including WELDED TO COLUMN REBARS elevations prior to the commencement of work on 10
B60
B93
B93
10
RCC OVERHEAD TANK
450
56 55 54
RCC BEAM 230MM x 600MM
IPS FLOORING
58 57
B93
DOUBLE ANGLE (SPAN SECTIONS BACK TO BACK 5500MM) (SPAN 5500MM)
ANGLE STRUTS ISA 5555 (8MM THK) M.S GUSSET PLATE (10MM ALTERNATIVELY ATTACHED ONTHK) EITHER SIDE M.S GUSSET CONNECTS PLATE (10MM THK) MEMBER BY NUT-BOLT OF GUSSETDIFFERENT PLATE
2
GUSSET PLATE CONNECTING DIFFERENT MEMBERS
59
WORKSHOP ROOF TOP +10.00M
PLACED ON TOP CHORD OF STEEL TRUSS
TOP CHORD ISA 6565 (10MM(10MM THK) THK) BOTTOM CHORD ISA 6565 BOTTOM CHORD ISA 6565SECTIONS (10MM THK) DOUBLE ANGLE BACK TO BACK
2
60
TERRACE FLOOR LEVEL +12.7M
PERFORMING AREA ROOF TOP +10.28M
work indicated on the drawings between the architectural and TERRACE FLOOR LEVEL various trade +12.7M drawings, including but not limited to structural, electrical, plumbing, fire protection and exterior enclosure systems. 7) All work shall conform to relevant BIS codes and shall be best practice of each trade. PERFORMING AREA ROOF TOP 8) Any discrepancy is to be brought to the notice +10.28M of the PERFORMING AREA of WORKSHOP ROOF consultant TOP architect/ before commencement FFL=+5.40M the site. +10.00M SSL=+4.75 9) All work is to be completed to theM satisfaction IPS FLOORING of site engineer/ project manager and architects SECOND FLOOR LEVEL +8.70M
MANGALORE TILE6565 (260x540MM) TOP CHORD ISA (10MM THK) TOP CHORD DOUBLE ISA 6565 THK) RESTING ON(10MM BOX SECTIONS ANGLE SECTIONS BACK TO BACK DOUBLE ANGLE SECTIONS BACK SQUARE BACK BOX TO SECTIONS (50x50MM @450MM c/c)
40
RIDGE PIECE
H
55
55
54
STEEL BOX SECTIONS (50x50MM @450MM c/c) STEEL BOX SECTIONS (50x50MM @450MM c/c) TRUSS PLACED ON TOP CHORD OF STEEL PLACED ON TOPBEDDED CHORD OF STEEL TRUSS RIDGE PIECE MONOPITCH (WELDED TO TOP CHORD) (270x520MM) (WELDED TO TOP CHORD)
Q
450
62
BOX SECTIONS (50MM x 50MM)
G
engineer on site regarding any conditions/modifications required to be done prior to the commencement TERRACE PARAPET LEVEL of work. +13.8M shall coordinate and verify the 6) The contractor
65 64 63
61
MANGLORE TILE (250MM x540MM)
F
550
450
TERRACE PARAPET LEVEL +13.8M
TERRACE FLOOR LEVEL +12.7M
450
25°
A NORTH LIGHT STEEL TRUSS NUT BOLTED ON RCC BEAMS. (FOR PERFORMING AREA)
TERRACE PARAPET LEVEL +13.8M
3) All levels are unfinished levels unless specified. 4) The contractor shall verify all on site dimensions including elevations prior to the commencement of work on site. 5) The contractor shall inform the architect and/or B C D E project
40
OHT TOP LEVEL +17.2M
1) All dimensions are in 'millimeters' unless specified 2) The drawing is not to be scaled. The 200 dimensions are strictly 450 to be followed. 200 3) All levels are unfinished levels unless specified. 4) The contractor shall verify all on site 550 PRODUCED BY AN AUTODESK STUDENT VERSION dimensions including 0 elevations prior to the 54commencement of work on site. 5) The contractor shall inform the architect and/or J K L M N P Q project
2350
1) All dimensions are in 'millimeters' unless specified 2) The drawing is not to be scaled. The OHT TOP LEVEL dimensions are strictly +17.2M to be followed.
100 400
Q
920
P
390
N
100
M
100
L
70
K
10
J
PRODUCED BY AN AUTODESK STUDENT VERSION
H
1010
G
300
F
PRODUCED BY AN AUTODESK STUDENT VERSION
E
PRODUCED BY AN AUTODESK STUDENT VERSION
D
PRODUCED BY AN AUTODESK STUDENT VERSION
C
COPING STONE 150 MM THK WITH 25MM EXTERNAL PLASTER AND PAINT
STEEL TRUSS TO SUPPORT ROOF (NUT BOLTED VIA STEEL PLATE TO RCC BEAM)
50 GENERAL NOTES
GENERAL NOTES
Q
450
P
B
2550
N
300
M
50
P
65
PRODUCED BY AN AUTODESK STUDENT VERSION
RCC OVERHEAD TANK
L
TOP CHORD
TOP CHORD
SK STUDENT VERSION
PRODUCED BY AN AUTODESK STUDENT VERSION
M 1) All dimensions are in 'millimeters' unless specified 2) The drawing is not to be scaled. The dimensions are strictly to be followed. 3) All levels are unfinished levels unless 80 specified. 80 80 4) The contractor shall verify all on site 80 dimensions including elevations prior to the commencement of work on site. 5) The contractor shall inform the architect and/or project engineer on site regarding any 120 conditions/modifications 120 required to be done prior to the commencement of work. 6) The contractor shall coordinate and verify the work indicated on the drawings between the architectural and various trade drawings, including but not limited to structural, electrical, plumbing, fire protection and exterior enclosure systems. 7) All work shall conform to relevant BIS codes and shall be best practice of each trade. 8) Any discrepancy is to be brought to the notice of the architect/ consultant before commencement of SPAN=6050 the site. 9) All work is to be completed to the satisfaction of site M engineer/ project manager and architects
BOX SECTION BOX SECTION
65
OHT TOP LEVEL +17.2M
K
10
10
20
Q
20
P
65
N
4540
M
70
L
580
K
2030
J
0
H
20
G
2980
F
850
E
1500
D
RODUCED BY AN AUTODESK STUDENT VERSION
C
RESTING ON TIMBER BATTENS
450
50
GENERAL NOTES4
PRODUCED BY AN AUTODESK STUDENT VERSION ODUCED BY AN AUTODESK STUDENT VERSION
B
MANGALORE TILE (260x540MM) MANGALORERESTING TILE (260x540MM) ON TIMBER BATTENS
100
MANGALORE TILES K MANGALORE TILES
PRODUCED BY AN AUTODESK STUDENT VERSION
A
SCALE 1:20
SCALE 1:20 K
450
A-403a
M.S GUSSET PLATE (10MM THK)
35
SE DR SC
PRODUCED BY AN AU
300
04
03
02
08
01
07
UP
300
300
300
05
04
SCALE 1:20 3910 1200
310
UP
02
Ø120
Ø120
80
25
Ø120
80
150
20
150
20
80
20
25
180
150
25
25 20
80
20
80
150
150
20
25
25
25
20
150
150
15
80 25
Ø120
80
15
20
15
25
30
25
8
150
140 150 140
140 150
140 140
8
8
150150 25
12MM THICK MIDLANDING TILING
150
220
150MM ANCHOR THK300 PCCFASTENERS IN PLINTH USED 10 10 10 10 10 30 TO FIX THE BASE PLATE TO 220 8MM TOR LINKS TIEING MAIN STEEL IN TREAD 10 10 10 10 10 30 STEPS12MM FORMING THE FOLDED STAIRCASE RISER TILE- RESTILE
70 70
300 12MM TREAD TILE- RESTILE BETWEEN TILING AND RCC STAIRS 12MM RISER TILE- RESTILE STEP-UP TILE BULL-NOSE EDGESTEEL STEP-UP TILETOR MAIN 10MM 220 FINISH WITH MATTE (1520x310MM) MATTE FINISH TO PREVENT INJURIES 10MM TOR(1520x150MM) MAIN STEEL REINFORCEMENTS REVISION TABLE REINFORCEMENTS 10 10 10 10 10 30 BULL-NOSE EDGE DATE 80MM THICK PAVER BLOCKS REVISION DESCRIPTION 25MM THICK SCREEDING ANTI SKID GRIP SELF TO PREVENT INJURIES ANTI SKID GRIP SELF FLOORING IN CENTRAL COURTYARD BETWEEN TILING AND RCC STAIRS EMBOSSED PROJECTIONS 300 PROJECTIONS EMBOSSED 25MM THICK SCREEDING ON TREAD 25MM THK SCREEDING APPLIED ON P.C.C. ON TREAD 140 150
10 10 10 10 10
25
25
70
STEP-UP TILE 150MM (1520x150MM) R.C.C. FOLDED SLAB FOR MATTE FINISH STAIRCASE
8MM TOR LINKS TIEING 25MM THICK EXTERNAL NEERU FINISH MAIN STEEL IN STEPS PLASTER 150MM R.C.C. FOLDED SLAB FOR STAIRCASE
140 150
20
20
80 15
20
150
20
25
200
100
25MM THICK SCREEDING
140 150
15
20
25 150
3380
1000
01
140 150
Ø120
150
80
140
8
80
13 12 113910 10 09 08 07 06 05 04 03 13 12 11 10 09 08 07 06 05 04 03 02 01 DETAILED SECTION 01 310 300 STAIRCASE 300 300 300 300 300 300 300 300 300 300 300 OF
A-402b
20
150
3380
01
UP
300
120
1100
3380
1110
1100
02
EXTERNAL PLASTER) SUPPORTING THE STAIRCASE STAINLESS STEEL(WITH 25MM C21- 230x500
(WITH 25MM EXTERNAL PLASTER) 12MM THICK MIDLANDING TILING SECTION SSL=+0.65M HOLLOW CIRCULAR
26
ANCHOR FASTENERS USED REINFORCEMENTS
DATE EMBOSSED PROJECTIONS ANTI SKID GRIP SELFTILE- RESTILE 12MM RISER ON TREAD EMBOSSED PROJECTIONS STEP-UP TILE ON TREAD ANCHOR FASTENERS (1520x150MM) MATTE FINISHUSED TOFASTENERS FIX THE BASE PLATE TO ANCHOR USED TO FIXTREAD THE BASE PLATE TIEING TO 8MM TOR LINKS TREAD12MM RISER TILERESTILE MAIN STEEL IN STEPS 12MM RISER TILERESTILE STEP-UP TILE 150MM R.C.C. FOLDED SLAB STEP-UP TILE (1520x150MM) MATTE FINISH FOR STAIRCASE
RESTILE SLABS TILE DETAIL EDGE BEAM AND HANDRAIL 60MM ØTECHNO HANDRAIL CENTRAL 25MMTOR THICK EXTERNAL NEERU FINISH PLASTER A-402c 60MM Ø HANDRAIL 8MM LINKS TIEING MATTE FINISHED(1520x600MM) STAINLESS STEEL SCALE 1:58MM TOR LINKS TIEINGPLASTER NEERU FINISH STAINLESS STEEL COURTYARD80MM THICK PAVER BLOCKS MAIN STEEL IN STEPS E DETAIL OF TREAD AND RISER HOLLOW CIRCULAR SECTION MAIN STEEL IN STEPS E HOLLOW CIRCULAR SECTION A-402d TILING IN CENTRAL COURTYARD C21- 230x500 FFL=+0.75M 150MM R.C.C. FOLDED SLAB C21- 230x500 DETAIL OF TREAD AND RISER SCALE 1:2 150MM R.C.C. FOLDED SLAB 80MM Ø NEWEL POST A-402d SSL=+0.65M FOR STAIRCASE 110 12MM1:2 TREAD TILE- RESTILE FOR STAIRCASE 12MM THICK MIDLANDING TILING SCALE THICK MIDLANDING TILING 40 STAINLESS STEEL 80MM Ø12MM NEWEL POST 600x230MM RCC PLINTH RESTILE TECHNO SLABS TILE STEP-UP TILE KEY PLAN -SCALE-1:500 RESTILE TECHNO SLABS TILE HOLLOW CIRCULAR SECTION CENTRAL 460MM THK BRICK MASONRY WALL CENTRAL 25MM EXTERNAL THICK EXTERNAL 25MM THICK Ø60 STAINLESS STEEL BEAM (ON 100MMMATTE THK PCC BED) (1520x310MM) MATTE FINISH FINISHED(1520x600MM) MATTE FINISHED(1520x600MM) 1100MM TALL 70 Ø60 70 PLASTER NEERUNEERU FINISH FINISH PLASTER 60MMØ HANDRAIL - STAINLESS COURTYARD COURTYARD HOLLOW CIRCULAR SECTION 460MM THK BRICK MASONRY WALL BULL-NOSE EDGE 12MM TREAD TILING STEEL, HOLLOW CIRCULARØ60 1100MM TALL PANCHAVATI ANECDOTES FFL=+0.75M FFL=+0.75M Ø60 70 DETAIL OF TREAD AND RISER TO PREVENT INJURIES DETAIL OF TREAD RISER 60MMØ HANDRAIL -AND STAINLESS RESTILE STEP UP TILE SECTION (WELDED TO STEEL PLATE) A-402d A-402d UNDERGROUND R.C.C. WATER TANK 160 SSL=+0.65M WITH MATTE FINISH,ANTI-SKID 20 SSL=+0.65M 12MM TREAD TILING STEEL, HOLLOW CIRCULAR SCALE 1:2 1:2 STAIRCASE DETAILS SCALE
01
14 14
UP
3910 C20-300 230x500 300 300 300 300 300 300 300 300 300 300 300
B
Ø NEWEL (3200x3900x1500MM) AND BULL-NOSE NOSING 80MM Ø80MM NEWEL POSTPOST RESTILECAPACITY=15M³ STEP UP TILE (1520x310MM) STAINLESS STEEL WITH MATTE FINISH,ANTI-SKID STAINLESS STEEL HOLLOW CIRCULAR SECTION AND BULL-NOSE NOSING HOLLOW CIRCULAR 1100MM TALLSECTION
60MM Ø HANDRAIL
STAINLESS STEEL HOLLOW CIRCULAR SECTION FIXED ON WALL
C22- 230x500
(1520x310MM) 1100MM TALL
12MM TREAD TILING
460 12MM TREAD TILING RESTILE STEP UP TILE MATTE FINISH,ANTI-SKID RESTILE STEP UP TILE 60MM ØWITH HANDRAIL
AND BULL-NOSE NOSING 230MM THICK BRICK MASONRY WALL WITH MATTE FINISH,ANTI-SKID STAINLESS STEEL
(1520x310MM) (WITH 12MM THK INTERNAL PLASTER AND BULL-NOSE NOSING HOLLOW CIRCULAR SECTION 25MM THICK EXTERNAL NEERU FINISH PLASTER) (1520x310MM)
PROJECT NAME:
SHEET TITLE:
5MM THICK STEEL PLATE
(WELDED TO HANDRAIL 160AND SOLID 20 MEMBER CONNECTING BOTH) Ø60
SECTION 20 (WELDED TO STEEL PLATE) 300
460MM BRICK MASONRY WALL 5MMTHK THICK STEEL PLATE
SHEET NUMBER:
25MM THICK SCREEDING
A - 402
BETWEEN TILING AND RCC STAIRS SCALE : 1:20 / 1:5
460MM THK BRICK MASONRY WALL 10MMØ60 1:2 TOR70MAIN NORTH 20STEEL 220 60MMØ (WELDED TO HANDRAIL AND SOLID REVISION TABLE HANDRAIL - STAINLESS Ø60 70 15MMØ STAINLESS STEEL 70 60MMØ HANDRAIL - STAINLESS REINFORCEMENTS NAME : PRANAV ASHISH CHAUBAL MEMBERHOLLOW CONNECTING STEEL, 10 10 10CIRCULAR 30 10 10 BOTH) DATE REVISION SOLID MEMBER HOLDING HANDRAIL STEEL, HOLLOW CIRCULAR 18-03-2020 SEMESTER 6 ROLL NO. ANTI SKID GRIP SELF 460 SECTION(WELDED TO STEEL PLATE) ( WELDED TO STEEL PLATE) 160 20 SECTION (WELDED TO STEEL STEEL PLATE) EMBOSSED PROJECTIONS 15MMØ STAINLESS ACADEMY OF ARCHITECTURE 07 5MM THICK STEEL PLATE 160 20 ANCHOR FASTENERS 460 ON TREAD20 SIGN AND STAMP SOLID MEMBER HOLDING HANDRAIL (WELDED TO HANDRAIL SOLID (USED TO FIX THE BASE PLATE TO 5MM THICK STEELAND PLATE 460 ( WELDED TO STEEL PLATE) Ø60
WALL)
MEMBER CONNECTING BOTH)
DATE
20 ANCHOR FASTENERS USED
REVISIO
REVISION TABLE
10MM TO TORFIX MAIN STEEL THE BASE PLATE TO ANTI SKID GRIP SELF REVISION TABLE REINFORCEMENTS TREAD
(1520x150MM) MATTE FINISH
25MM THICK EXTERNAL
REVISION TABLE
10MM MAIN STEEL BETWEEN TILINGTOR AND RCC STAIRS
UP
25
PB22
Ø800
03
F
1000
SW2
Ø800 06
70
1:5 12MMSCALE TREAD TILE- RESTILE STEP-UP TILE 25MM THICK SCREEDING
BULL-NOSE EDGE 12MM TREAD TILE- RESTILE STEP-UP TILE
TO PREVENT INJURIES WITH MATTE FINISH,ANTI-SKID AND BULL-NOSE NOSING (1520x310MM)
25 25
19
300
SCALE 1:5
BULL-NOSE EDGE DETAIL EDGE BEAM AND HANDRAIL
180
300
22
18
40
70220
20MM THK STAINLESS STEEL BASE PLATE 12MM TREAD TILERESTILE
(ANCHORSTEP-UP FASTENEDTILE TO STAIRCASE TREAD THROUGH TILE AND SCREEDING) (1520x310MM) MATTE FINISH A-402c
180
18
300
21
17
UNDERGROUND TANK
600 4200
1200
300
20
150
01
110 110 40
on the drawings between the architectural and various trade drawings, including but not limited to structural, electrical, plumbing, fire protection and exterior enclosure (1520x310MM) MATTE FINISH systems. 7) All work shall conform to relevant BIS codes and shall be best practice of each trade. Any discrepancy is to be brought to the notice TO 8)PREVENT INJURIES of the architect/ consultant before commencement of the site. 9) All work is to be completed to the satisfaction of site (1520x310MM) MATTE BETWEEN TILING ANDFINISH RCC STAIRS engineer/ project manager and architects
12MM TREAD TILE- RESTILE DETAIL EDGE BEAM AND HANDRAIL STEP-UP TILE
PLASTER
15
16
04
08Ø800 07
07
APPLIED ON P.C.C.
15
19
05
WITH25MM MATTE THK FINISHSCREEDING (1520x150MM)
(MATTE FINISH WELDED TO BASE PLATE)
300
70110
1090MM TALL
RESTILE TECHNO SLABS TILE TALL 1100MM MATTE FINISHED(1520x600MM)
DETAIL OF HANDRAIL TO WALL
A-402c
0
15
06
CENTRALDN 03COURTYARD 02 01 06 05 04 03 02 FFL=+0.75M 23SSL=+0.65M 24 25 26 20 21 22 23 24
WITH MATTE FINISH,ANTI-SKID AND BULL-NOSE 80MM THICK PAVER BLOCKS NOSING (1520x310MM)
FLOORING IN CENTRAL COURTYARD
150
120
18
07
01DN
1000
20
18-03-2020
A-402e 25MM THK SCREEDING APPLIED ON P.C.C. 8MM TORINLINKS TIEING MAIN STEEL IN FLOORING CENTRAL COURTYARD 200 SCALE 1:5 12MM RISERFORMING TILE- RESTILE STEPS THESTEP-UP FOLDEDTILE STAIRCASE 150MM THK PCC IN PLINTH 100
25
14
19
04 300 03 300 02 330 01 300 2130 300 300 300 300 C21- 230x500 FFL=+0.75M 21 22 02 23 24 2130 25 26 03300
01
SEMESTER 6
12MM RISER TILE- RESTILE ACADEMY STEP-UP TILE OF ARCHITECTURE 25MM THK SCREEDING APPLIED ON P.C.C. WITH MATTE FINISH (1520x150MM)
SIGN AND STAMP 12MM TREAD TILERESTILE STEP-UP TILE 150MM THK PCC IN PLINTH
work indicated 8) Any discrepancy is on the drawings between the architectura of the various trade architect/ consultant b drawings, including but not limited to struc NORTH the site. electrical, 9) All work is to beencl com plumbing, fire protection and exterior CHAUBAL systems. of site 7)ROLL All work to relevant BIS engineer/ project man NO. shall conform and shall be best practice of each trade. 8) Any discrepancy is to be brought to the of the architect/ consultant before commenceme the site. 9) All work is to be completed to the satisf of site engineer/ project manager and architects
150MM R.C.C. FOLDED SLABdimensions FOR including 25MM THICK EXTERNAL NEERU FINISH 40MMØ BALUSTERS - 8MM STAINLESS STEEL TOR LINKS TIEING MAIN STEEL IN prior to the commencement of work on elevations STAIRCASE PLASTER site. HOLLOW CIRCULAR SECTIONS 150 STEPS FORMING THE FOLDED STAIRCASE 5) The contractor shall inform the architect and/or (@300MM C/C) (WELDED ONDETAIL BASE PLATE) EDGE BEAM project AND HANDRAIL 25MM THICK EXTERNAL NEERU FINISH A-402c engineer on site regarding any 80 150MM R.C.C. FOLDED SLAB FOR conditions/modifications PLASTER SCALE 1:5 required to be done prior to the commencement STAIRCASE DETAIL EDGE 80MMØ BEAMNEWEL AND POST HANDRAIL of work. A-402c - STAINLESS STEEL 6) The contractor shall coordinate and verify the SCALE 1:5 work indicated HOLLOW CIRCULAR SECTION 25MM THICK EXTERNAL NEERU FINISH
20
1450 06 05
17
04
14
A - 402 6) The contractor best shall practice coordinate vert ofand each
8MM TOR LINKS TIEING MAIN STEEL IN THK PCC IN PLINTH 150MM R.C.C. FOLDED SLABGENERAL FOR NOTES 80MM THICK PAVER BLOCKS STEPS FORMING THE FOLDED STAIRCASE STAIRCASE 1) All dimensions are in 'millimeters' unless FLOORING INSTEEL CENTRAL COURTYARD 80MMØ HANDRAIL- STAINLESS specified 8MM TOR LINKS TIEING MAIN STEEL INto be scaled. The 2) The drawing is not HOLLOW SECTION 150MM R.C.C. FOLDED SLAB CIRCULAR FOR dimensions are strictly 25MM EXTERNAL NEERU FINISH 25MM THK THICK SCREEDING APPLIED ON P.C.C. STEPS FORMING THE FOLDED STAIRCASE to be followed. (MATTE FINISH WELDED TO BALUSTERS) STAIRCASE 3) All levels are unfinished levels unless PLASTER 150MM THK PCC IN PLINTH specified.
70
80
CAPACITY=15M³
1600
07
16
05 300
300
25124026
1600
1570
08
15
1000
08
600
600
14
18
01 05 06
1600
17
Ø800
24
WALL)
STEP UP(WITH TILE 12MM (WITH 25MM EXTERNALRESTILE PLASTER) 25MM THK EXTERNAL PLASTER) INTERNAL PLASTER 230MM THICK BRICK MASONRY WALL WITH MATTE FINISH,ANTI-SKID 25MM THICK EXTERNAL NEERU FINISH PLASTER) C22- 230x500 AND BULL-NOSE NOSING (WITH 12MM THK INTERNAL PLASTER F 25MM THICK EXTERNAL NEERU FINISH PLASTER) C22- 230x500 60MM Ø HANDRAIL(1520x310MM) 60MM Ø HANDRAIL CENTRAL F STAINLESS STEEL 230x500MM RCC COLUMN STAINLESS STEEL COURTYARD E HOLLOW CIRCULAR SECTION RCC COLUMN SUPPORTING THE STAIRCASE 300 330 80MM Ø NEWEL POST230x500MM E HOLLOW CIRCULAR SECTION
1600
16
06
07 300
02
70
230x500MM RCC COLUMN 230x500MM RCC 14COLUMN TREAD TILING SUPPORTING THE12MM STAIRCASE SUPPORTING STAIRCASE 230MM THICK THE BRICK MASONRY WALL
SCALE 1:20
DN
1380
15
23
02
14
460 AND SCREEDING) THROUGH TILE
100 ANCHOR FASTENERS 110 PLATE 80MM THICK (USED TO FIX THE BASE TO PAVER BLOCKS
110 40
(WITH 12MM THK INTERNAL PLASTER 14 STAINLESS STEEL25MM THICK EXTERNAL NEERU FINISH PLASTER) C22- 230x500 25MM THICK EXTERNAL NEERU FINISH PLASTER) HOLLOW CIRCULAR SECTION
F
01
engineer/ project manager and architects STAINLESS STEEL 20MM THK THICK STAINLESS STEEL BASE PLATE 80MM PAVER BLOCKS NAME : PRANAV ASHISH NOSING (1520x310MM) (ANCHOR FASTENED TO STAIRCASE TREAD SOLID02 MEMBER12MM HOLDING HANDRAIL RISER TILE- RESTILE STEP-UP TILE FLOORING IN CENTRAL COURTYARD
UNDERGROUND R.C.C. WATER TANK 230MM(3200x3900x1500MM) THICK BRICK MASONRY WALL CAPACITY=15M³ 230MM THICK BRICK MASONRY WALL 80MM Ø NEWEL POST (WITH 12MM THK INTERNAL PLASTER
330
300
1380
14
22
08
300 300 2130
(3200x3900x1500MM) WITH NEERU FINISH PLASTER
STAIRCASE DETAILS 80MMØ NEWEL 8) POST - STAINLESS Any discrepancy is to be broughtSTEEL to the notice
200
80 200 ( WELDED TO STEELWITH PLATE) MATTE FINISH (1520x150MM) 300
40
150
600x230MM RCC PLINTH 150MM THK FOLDED BEAM (ON 100MM THK PCC BED) UNDERGROUND R.C.C. WATER TANK R.C.C STAIRCASE
14
1110
21
07
PB22 14
SCALE SECTION OF 1:20 STAIRCASE
1500
20
600
300 18
SW2
SCALE 141:20
DN
3910
300
B17
14
12MM TREAD TILE- RESTILE STEP-UP TILE 20MM THK STAINLESS STEEL BASE PLATE
4) The contractor shall verify all on site
UNDERGROUND R.C.C. WATER TANK 80MM THICK PAVER BLOCKS PB22 600x230MM PLINTH TILINGRCC IN CENTRAL COURTYARD 230 x WATER 450MM PERIPHERAL (3200x3900x1500MM) CAPACITY=15M³ UNDERGROUND R.C.C. TANK BEAM (ON 100MM THK PCC BED) FLOOR LANDING R.C.C BEAM (3200x3900x1500MM) CAPACITY=15M³
SW2
1600
19
03
MIDLANDING MIDLANDING 450 11 13 12 10 09 FFL=+2.70M FFL=+2.70M SSL=+2.66M SSL=+2.66M 300
26
UNDERGROUND TANK
1380
18
04
1240
1000
05
600
2980
09
THK SCREEDING ON BEAM (ON 100MM THK25MM PCC BED) TILING IN CENTRAL COURTYARD 70 R.C.C SLAB
OF STAIRCASE
300
15MMØ 200
70
25
22
21
1000
1000
1000
06
600
600600
01 A-402
10
27
25
23
DETAILED 330 300 300 300
30001 300 300 1240 A-402b 10 18 2130 09 08
1500
1450 SW1
12MM THICK TILING 04 1100MM TALL COURTYARD TILING IN CENTRAL COURTYARD 80MM Ø NEWEL POST RESTILE TECHNO SLABS TILE 03LANDING FLOORSW2 PB22 FFL=+0.75M 600x230MM RCCSTEEL PLINTH MATTE FINISHED(1520x600MM) 02 STAINLESS 110 FFL=+4.80M 01 SSL=+0.65M BEAM (ON 100MM THK PCC BED) HOLLOW CIRCULAR 40SECTION 80MM THICK PAVER BLOCKS 600x230MM RCC PLINTH SSL=+4.76M 1100MM TALL
PB22
28
01
01
5MM THICK STEEL PLATE
8
1570
SW1
18
07
00
300
11
29
CENTRAL COURTYARD FFL=+0.75M SSL=+0.65M 80MM Ø NEWEL POST (1520x310MM) 1100MM TALL 12MM TREAD TILING STAINLESS STEEL CENTRAL RESTILE STEP UP TILE HOLLOW CIRCULAR SECTION COURTYARD40MM Ø BALUSTERS WITH MATTE FINISH,ANTI-SKID 1100MM TALL 80MM THICK ØAND NEWEL POST STAINLESS STEEL80MM BULL-NOSE NOSING PAVER BLOCKS FFL=+0.75M HOLLOW CIRCULAR STAINLESS STEEL SECTION TILING IN(1520x310MM) CENTRAL COURTYARD CENTRAL SSL=+0.65M HOLLOW CIRCULAR SECTION 03 80MM THICK PAVER BLOCKS 3380
32
UP
20MM THK STAINLESS STEEL BASE PLATE 80MMØ NEWEL POST - STAINLESS STEEL HOLLOW CIRCULAR SECTION
12MMCIRCULAR RISER TILERESTILE STEP-UP TILE of the 300 20 HOLLOW SECTION (WELDED TO HANDRAIL ANDTREAD SOLID TILE12MM 100 RESTILE STEP-UP TILE architect/ consultant before commencement of WITH MATTE FINISH (1520x150MM) FINISH WELDED MEMBER CONNECTING BOTH) the site.TO BASE PLATE) SCALE : 1:20 / 1:5 110 WITH MATTE FINISH,ANTI-SKID AND BULL-NOSE (MATTE 12MM TREAD TILE- RESTILE STEP-UP TILE 9) All work is to be completed to the satisfaction1:2 NOSING (1520x310MM) of site WITH MATTE FINISH,ANTI-SKID AND BULL-NOSE
RESTILE 150MM STEP UPTHK TILEFOLDED STAINLESS STEEL WITH MATTE FINISH,ANTI-SKID R.C.C STAIRCASE HOLLOW CIRCULAR SECTION AND BULL-NOSE NOSING WITH NEERU FINISH PLASTER 1090MM TALL (1520x310MM)
15
1570
720
1090
310
17
05
UNDERGROUND24TANK
08
1500 1450
600 600 600 4200
PB2
16
02
06
31 UNDERGROUND TANK
SW2
12MM TREAD TILING 80MM Ø NEWEL POST
RESTILE STEP UP TILE WITH MATTE FINISH,ANTI-SKID 80MM Ø NEWEL POST 12MM TREAD TILING AND BULL-NOSE NOSING STAINLESS STEEL 80MM ØHOLLOW NEWEL POSTSECTION (1520x310MM) RESTILE STEP UPCIRCULAR TILE 40MM Ø HANDRAIL WITH MATTE FINISH,ANTI-SKID STAINLESS STEELSTAINLESS STEEL 1090MM TALL AND BULL-NOSE NOSING HOLLOW CIRCULAR SECTION HOLLOW CIRCULAR SECTION
DETAILED SECTION OF STAIRCASE C22- 230x500
300 11300
19
03
07
100
PRODUCED BY AN AUTODESK STUDENT VERSION
12MM TREAD TILING
CENTRAL 02 COURTYARD 01 FFL=+0.75M SSL=+0.65M
04
08
30
14
16
15
01 12 A-402b
05
STAINLESS STEEL HOLLOW CIRCULAR SECTION 1090MM TALL
1500
1090
33
1500
2030
2980 1570
34
24
03
20
01 03
25MM THK SCREEDING ON B FIXED ON WALL 150MM THK FOLDED SLAB 80MM ØR.C.C NEWEL POST 26 R.C.C STAIRCASE 150MM THK FOLDED STAINLESS STEEL C20- 230x500WITH NEERU FINISH PLASTER HOLLOW CIRCULAR SECTION R.C.C STAIRCASE 230 x 450MM PERIPHERAL 25 1090MM TALL FINISH WITH NEERU PLASTER FLOOR LANDING R.C.C BEAM 80MM Ø NEWEL B17 POST 14 27
02
70
1110
02
04
160 300 110
150MM RESTILE THK FOLDED 230 x 450MM PERIPHERAL TECHNO SLABS TILE FLOOR LANDING FLOOR LANDING R.C.C BEAM MATTE FINISHED(1520x600MM) R.C.C STAIRCASE 230 x 450MM PERIPHERAL FFL=+4.80M 60MM Ø HANDRAIL WITH NEERU FINISH PLASTER STAINLESS STEELFLOOR LANDING R.C.C BEAM 460 B17 SSL=+4.76M HOLLOW CIRCULAR SECTION
1110
10 06 09 01
28
1500
07
11
03
36
450
MIDLANDING FFL=+2.70M C3- 230x500 SSL=+2.66M
13 160 12
19
08
12
04
05
1500
580
300
2980 2980
1570
720 300
600 600 600
15
600 600
2030 720
600 4200 600
E
19
01 A-402
09
06
Ø60
25MM THK SCREEDING ON AND BULL-NOSE NOSING HOLLOW CIRCULAR SECTION R.C.C SLAB (1520x310MM) 12MM THICK TILING
02
80MMØ POST- -STAINLESS STAINLESSSTEEL STEEL 40MMØ NEWEL BALUSTERS HOLLOW CIRCULAR CIRCULAR SECTIONS SECTION HOLLOW (@300MM C/C)
DATE
REVISIO
REVISION
DESCRIP
UP
KEY PLA UP
UP
UP
600
C4- 230x500
600 600 4200
1450
1200
13 05
16
15
14
03
ON
DETAIL OF TREAD AND RISER
70
40MMØ BALUSTERS - STAINLESS STEEL 80MMØ HANDRAIL- STAINLESS STEEL HOLLOW CIRCULAR SECTIONS HOLLOW CIRCULAR SECTION (@300MM C/C)
PRODUCED BY AN AUTODESK STUDENT VERSION
600
1240
600
600
720 3690
2170 580
1819
MIDLANDING FFL=+2.70M C3- SSL=+2.66M 230x500
01 A-402
37
10
20
19
18
17
12MM R.C.CTHICK SLAB TILING
GENERAL NOT
ANCHOR FASTENERS USED 80MMØ HANDRAILSTAINLESS STEEL TO FIX THE BASE PLATE TO HOLLOW CIRCULAR SECTION TREAD (MATTE FINISH WELDED TO BALUSTERS) 12MM RISER TILE- RESTILE STEP-UP TILE
UP
E
18 14
13
C3- 230x500
GL
38
SW1
160
14
1000 1100
07
03
SCREEDING STAINLESS STEEL STAINLESS STEEL25MM THK
R.C.C SLAB
29
A-402d
12MM THICK TILING HOLLOW CIRCULAR SECTION HOLLOW CIRCULAR SECTION
26
23
22
21
40
Ø NEWEL POST 40MM Ø HANDRAIL HOLLOW CIRCULAR SECTION
RESTILE TECHNO SLABS TILE
3380
08
18 160 20 MIDLANDING SECTION 01 DETAILED 19 450 FFL=+2.70M OF STAIRCASE 19 01 DETAILED 18SECTION A-402b 18 PB2 A-402b SSL=+2.66M 17 SCALE 1:20
E
26
HOLLOW CIRCULAR SECTION 80MM
1100MM TALL RESTILE TECHNO SLABS TILE FLOOR LANDING MATTE FINISHED(1520x600MM) MATTE FINISHED(1520x600MM) 12MM TREAD TILING 230 x 450MM PERIPHERAL FFL=+4.80M 70 02 40MM Ø BALUSTERS RESTILE STEP UP TILE 25MM THK SCREEDING ON FLOORSTAINLESS LANDING R.C.C BEAM 80 STEEL SSL=+4.76M WITH MATTE FINISH,ANTI-SKID B17
1600
1380
930
1090
2030 300
930
2030
2980 PRODUCED BY AN AUTODESK STUDENT VERSION
720
1500
SSL=+4.76M
28
22
1110
09
450
PUMP ROOM FFL=+0.55M 1500 SSL=+0.25M F
C4- 230x500
29
SCALE 1:20
10
UNDERGROUND TANK
19
600
F
160
06
SW1
19
C4- 230x500 B3
30
03
25
33
CIRCULAR SECTION RESTILE TECHNO HOLLOW SLABS TILE HOLLOW CIRCULAR 14 SECTION CENTRAL MATTE FINISHED(1520x600MM) 12MM THICK TILING COURTYARD RESTILE TECHNO SLABS TILE FLOOR LANDING FFL=+0.75M 40MM Ø BALUSTERS 40MM FINISHED(1520x600MM) Ø BALUSTERS MATTE FFL=+4.80M STAINLESS STEEL SSL=+0.65M STAINLESS STEEL
3690
2170
1090
300
580
11 16
MIDLANDING
19
600
C4- 230x500
31
40MM C21- 230x500 40MM Ø Ø BALUSTERS HANDRAIL 40MM Ø HANDRAIL STAINLESS STEEL PRODUCED BY AN AUTODESK STUDENT VERSION STAINLESS STEEL STAINLESS STEEL 12MM THICK MIDLANDING TILINGSECTION HOLLOW CIRCULAR
26
120
600 4200
15
450
18
32
21
PUMP ROOM35 FFL=+0.55M SSL=+0.25M
GL
18
25
Ø800
16
15
12
PB2
PB2
24
1100
34
300 2030
PRODUCED BY AN AUTODESK PRODUCED STUDENT BY AN AUTODESK VERSIONSTUDENT VERSION
SW1
160
19
PRODUCED BY AN AUTODESK STUDENT VERSION
20
A-402a
18
PUMP ROOM B3 39 FFL=+0.55M SSL=+0.25M
B3
19
140
33
23
STAINLESS STEEL HOLLOW CIRCULAR SECTION
E
DESCRIPTION
PRODUCED BY AN AUTODESK STUDENT VERSION
GL
C2- 230x500
300
19
SSL=+6.56M
GL
F
36
35
22
STAINLESS STEEL HOLLOW CIRCULAR SECTION
60MM Ø HANDRAIL
01
27 32 39 32 10 0931 08 07 06 05 04 FLOOR 03 02 LANDING 01 38 31 30 37 FFL=+4.80M 30 29 24 36 25 SSL=+4.76M 28 23 29 35 UP 28 27 22 34 27 3910 21 26 33 20 300 300 300 30032 300 300 300 30024 300 300 31 19 25 23 24 30 18 B17 25 22 23 17 21
14 FFL=+2.70M 18 PUMP11ROOM 13 10 12 FFL=+0.55M 09 SSL=+2.66M MIDLANDING 11 FFL=+6.60M B3 08 SSL=+0.25M PUMP ROOM 07
PB2
B
3690
600 1090
14
19
FFL=+0.55M SSL=+0.25M
01 A-402
11
300
580
140
580
B3
19
B3
C3- 230x500
33
12
36
21
02
20 MIDLANDING 18 14 19 17 13 FFL=+2.70M 18 16 12 SSL=+2.66M DETAILED PLAN OF STAIRCASE 15 17
13
E
13
1200 310 MIDLANDING FFL=+2.70M SSL=+2.66M
2170
MIDLANDING FFL=+2.70M SSL=+2.66M C2- 230x500
B
3690
600
2170
600
930
930 3690
2170
01 A-402
B3
20
34
03
REVISION
UP
MIDLANDING MIDLANDING 37 37 FFL=+6.60M FFL=+2.70M 36 SSL=+2.66M 35 SSL=+6.56M 34
19
35
18
38
38
3618
17
04
40MM Ø HANDRAIL (WITH 25MM EXTERNAL PLASTER)
2250
16
05
1380
15
06
2250
37
07
THE VERSION STAIRCASE PRODUCED SUPPORTING BY AN AUTODESK STUDENT
14
1600
14
39 19
08
14
2250
38
230x500MM RCC COLUMN PRODUCED BY AN AUTODESK STUDENT VERSION
330
300
DN
1600
1450
300 300 2130
2250
930
39
B3
B3
MIDLANDING 39 1500 FFL=+6.60M SSL=+6.56M
600
C3- 230x500
300
300
1600
E
600
B3 MIDLANDING FFL=+6.60M SSL=+6.56M
300
1240
18
DATE
1) All dimensions are specified 2) The drawing is not dimensions are strictly to be followed. 3) All levels are unfinis specified. GENERAL NOT 4) The contractor sha (1520x150MM) MATTE FINISH GENERAL NOTES dimensions including 1) All dimensions are elevations specified prior to the 1) All dimensions are in 'millimeters' unless site. 80MMØ HANDRAIL- STAINLESS STEEL 2) The drawing is not specified 5) The contractor shal 8MM TOR LINKS TIEING 2) The drawing is not to be scaled. The dimensions are strictly HOLLOW CIRCULAR SECTION (WELDED project dimensions are strictly ON BASE PLATE) to be followed. MAIN STEEL IN WELDED STEPS (MATTE FINISH TO BALUSTERS) engineer on are siteunfinis regar to be followed. (MATTE FINISH WELDED TO BALUSTERS) 3) All levels 40 80 conditions/modificatio levels are unfinished 150MM R.C.C.3) All FOLDED SLABlevels unless specified. specified. required to be done pr 4) The contractor sha FOR STAIRCASE 4) The contractor shall verify all on site of work. dimensions including dimensions including 6) The contractor 40MMØ BALUSTERS - STAINLESS STEEL elevations prior toshal the prior to the commencement of work on GENERAL NOTES work indicated 25MM THICKelevations EXTERNAL site. site. HOLLOW CIRCULAR SECTIONS on The the drawings contractorbetwe shal 5) The contractor shall the PLATE) architect and/or NEERU PLASTER 1) All dimensions 5) are in 'millimeters' unles (MATTE FINISH FINISH WELDED TO inform BASE various trade (WELDED ON STEEL BASE PLATE) (@300MM C/C) (WELDED ON BASE PLATE) 80MMØ HANDRAILproject project STAINLESS specified drawings, including bu engineer on site regarding any 2) The drawing is engineer not to be scaled. on siteThe regar 80 40 HOLLOW CIRCULAR SECTION 80 electrical, conditions/modifications dimensions are strictly conditions/modificatio plumbing,tofire required to be BALUSTERS) done prior to the commencement to be followed. required be protecti done pr (MATTE FINISH WELDED TO systems. of work. 3) All levels are unfinished of work. levels unless 80MMØ NEWEL SCALE POST - 1:2 STAINLESS STEEL (ANCHOR FASTENED TO STAIRCASE TREAD 6) The contractor shall coordinate and verify the 7) All work shall confo specified. 6) The contractor shal 80 workAND indicated 4) The contractor and shallshall verifybe all on site THROUGH TILE SCREEDING) HOLLOW CIRCULAR SECTION work indicated on the drawings between the architectural and dimensions including best practice of each t 40MMØ BALUSTERS - STAINLESS STEEL KEY PLAN -SCALE-1:500 elevations on the drawings betwe WELDED TO BASE PLATE) 300 FINISHWALL various trade 460MM THK BRICK (MATTE MASONRY prior to8) the commencement of Any discrepancy is (MATTE FINISH WELDED TO BASE PLATE) various trade drawings,SECTIONS including but not limited to structural, site. HOLLOW CIRCULAR of the Ø60 70 bu electrical, 5) The contractor drawings, shall informincluding the architec 60MMØ HANDRAIL110 - STAINLESS PROJECT NAME: architect/ consultant b electrical, plumbing, fireON protection andPLATE) exterior enclosure (@300MM C/C) (WELDED BASE project 20MM THK STAINLESS STEEL BASE PLATE the site. any WITH MATTE FINISH,ANTI-SKID AND BULL-NOSE STEEL, HOLLOW CIRCULAR systems. plumbing, fire protecti PANCHAVATI ANECDOTES engineer on site regarding 40 (ANCHOR FASTENED TO STAIRCASE TREAD 80 9) All work is to be com 7) All work shall conform to relevant BIS codes conditions/modifications systems. NOSING (1520x310MM) SECTION(WELDEDTHROUGH TO STEEL TILE PLATE) (ANCHOR FASTENED TREAD of prior site and shall be TO STAIRCASE AND SCREEDING) required to be done to theshall commenc SHEET NUMBER: SHEET TITLE: 7) All work confo 80 engineer/ project man best AND practiceSCREEDING) of each trade. of work. and shall be THROUGH TILE
F
2250
18
(WITH 12MM THK INTERNAL PLASTER 25MM THICK EXTERNAL NEERU FINISH PLASTER)
C22- 230x500
REVISION TABLE
ANTI SKID GRIP SELF EMBOSSED PROJECTIONS ON TREAD
230MM THICK BRICK MASONRY WALL
14
1000
19 19
600
C4- 230x500
30
PRODUCED BY AN AUTODESK STUDENT VERSION
18
MIDLANDING FFL=+6.60M SSL=+6.56M
10 10 10 10 10
PRODUCED BY AN AUTODESK STUDENT VERSION
F
SCALE 1:20
10MM TOR MAIN STEEL REINFORCEMENTS
220
70
14
1100
19
14
DETAILED SECTION OF STAIRCASE
20
01 A-402b
18
1600
18
19
F
BETWEEN TILING AND RCC STAIRS
300 19
GL
25MM THICK SCREEDING
ERSION
PRODU
(3200x3900x1500MM) CAPACITY=15M³
PROJECT NAME:
PANCHAVATI A SHEET TITLE:
KEY STAIRCASE PLAN -SCALE-1:500 DETAILS PROJECT NAME:
KEY PLA
SCALE : 1:20 / 1 1:2 A PANCHAVATI PROJECT NAME:
PANCHAVATI ANECDOTES
DESCRIPTION
SHEET TITLE:
SHEET NUMBER
STAIRCASE DETAILS SHEET TITLE: NAME : PRANAV
A - 40
STAIRCASE DETAILS 18 SEMESTER 6
SCALE : 1:20 / 1:5
15 A-401c
15 A-401c
270 02
15 02 A-401d
15 A-401d
250 270
F F
D D
250 PB93 PB93
03
PB86 PB86 04
03
05
04
05
DETAILED SECTION SECTION OF OF TOILET-02 TOILET-02 DETAILED PLAN OFOF TOILET DETAILED DETAILED PLAN TOILET A-401a SCALE 1:25 1:25
B87 F
06
D
320 320
400 400
300 300 250 250 200 1620 1620
300 250
300
9 35
35
650 1100
1000 1000 900 900
300 300
25
400 25 9
320 400
160MM BBCBBC ON ON RCCRCC SLAB 160MM SLAB FORFOR SLOPING SLOPING 150MM THKTHK RCCRCC SLAB 150MM SLAB RUBBLE SOLING RUBBLE SOLING COMPACT MURUM COMPACT MURUM
25MM THK SCREEDING ONTHK INTERNAL DETAILED OFOF TILE DROP CERA WASH BASINS-OVAL (WITH (WITH 12MM 12MM THK INTERNAL PLASTERSECTION PLASTER DETAILED SECTION TILE DROP CERA WASH BASINS-OVAL A-401b A-401b NEERU WHITE)(560x470MM) 25MM 25MM THICK THICK EXTERNAL EXTERNAL NEERU (SNOW WHITE)(560x470MM) SCALE 1:101:10 BBC(SNOW SCALE CODE-S2030104 FINISH PLASTER) FINISH PLASTER) CODE-S2030104 B102 B102 9MM 9MM THK FLOOR TILING THICK FLOOR TILING 9MM THICK FLOOR TILING FALSE CEILING HANGER
18
1200
1200 BASIN FAUCETBASIN FAUCET65MMØ WASTE WATERCERA PIPE QUARTER TURN FAUCET
WASH BASINCOUNTER TOPTOP WASH BASINCOUNTER UP
1620
BELGIAN BELGIAN GLASS GLASS MIRROR MIRROR TILE DROP 9MM 1620
DADO CLADDING DADO CLADDING
SILVER FINISH(1650x650MM) FINISH(1650x650MM) SILVER
UP
CERA WASH BASINS-OVAL CERA WASH BASINS-OVAL (SNOW WHITE)(560x470MM) (SNOW WHITE)(560x470MM) CODE-S2030104 CODE-S2030104
300
SOMANY TILES (POLO BIANCO) TILE LAYOUT START SOMANY TILES (POLO BIANCO) KEY PLAN- SCALE 1:500 (GLOSSY WHITE)(450x450x12.5MM) KEY PLAN- SCALE 1:500 (GLOSSY WHITE)(450x450x12.5MM) WASH BOTTLE TRAP WASH BASINBASIN- COUNTER COUNTER TOP TOP HEIGHT-2400MM BOTTLE TRAP HEIGHT-2400MM CERA WASH WASH BASINS-OVAL BASINS-OVAL CERA AUXILLARIES BOTTLE TRAP CERA PROJECT NAME: CERA AUXILLARIES BOTTLE TRAP PROJECT NAME: (SNOW WHITE)(560x470MM) WHITE)(560x470MM) CODE-1880 REVISION TABLE (SNOW PANCHAVATI ANECDOTES TWO PIECE WALL HUNG WC WC CODE-1880 PANCHAVATI ANECDOTES CODE-S2030104 TWO PIECE WALL HUNG CODE-S2030104 160MM BBCBBC ON ON RCCRCC SLAB CERA CALLAGHAN WC 160MM SLAB SHEET NUMBER: SHEET TITLE: CERA CALLAGHAN WC SHEET NUMBER: SHEET TITLE: FOR SLOPING 9MM THICK FLOOR TILING (SNOW WHITE)(630x405x730MM) DATE REVISION DESCRIPTION 9MM THICK FLOOR TILING TOILET DETAIL FOR SLOPING (SNOW WHITE)(630x405x730MM) TOILET DETAIL A -- 401 401 CODE-S1031104 P TRAP A B52 RESTILE GRANAMTIE GRANAMTIE COLLECTION COLLECTION CODE-S1031104 P TRAP RESTILE B52 (STEEL GREY)(300x300MM) GREY)(300x300MM) (STEEL 25MM THK SCREEDING ON 300
2980
D4
1000 900 1000 900
16
D4
SCALE 1:10
BELGIAN GLASS MIRROR BELGIAN GLASS MIRROR SILVER FINISH(800x650MM) SILVER FINISH(800x650MM) 25MMØ WATER SUPPLY PIPE
CERA QUARTER TURN FAUCET CODE-F2002461 SOMANY TILES TILES (POLO (POLO BIANCO) BIANCO) SOMANY 50MMØ FLUSHING PIPE CODE-F2002461 (GLOSSY (GLOSSY WHITE)(450x450x12.5MM) WHITE)(450x450x12.5MM) GRANITE COUNTER TOPTOP GRANITE COUNTER HEIGHT-2400MM GYPSUM BOARD PANELS HEIGHT-2400MM FINISH)(20MM THK) GYPSUM BOARD PANELS 100MMØ SOIL PIPE (GLOSSY (GLOSSY FINISH)(20MM THK) 1640 (600x600MM) 10MM THK 1640 (600x600MM) 10MM THK
17
1100 1100 2400 650 650 1000 1000 2400 2980 200 200
450 450
17 16
2420 2420 2870 2870
280
280 2370
2830
D5
2830
D5
18
B46
FALSE CEILING HANGER FALSE CEILING HANGER WIRE (1200MM LONG) WIRE (1200MM LONG) DADO CLADDING DADO CLADDING
SUNK SLAB FILLED 25MM 200MM SUNK SLAB FILLED 230MM THICK BRICK 200MM 25MM THK THK SCREEDING SCREEDING WITH BBCBBC WITH MASONRY WALL 200MM SUNK SLAB FILLED 200MM SUNK SLAB FILLED
25MM THK SCREEDING ON SCALE BBCBBC SCALE :: 1:25, 1:25, 1:10 1:10 NORTH NORTH 9MM9MM THK FLOOR TILING THK FLOOR TILING NAME PRANAV ASHISH CHAUBAL NAME :: PRANAV ASHISH CHAUBAL
25MM THKTHK SCREEDING 08-04-2020 SEMESTER 6 ROLL NO. 25MM SCREEDING (WITH LEGENDS WITH BBC BBC PB102 K 12MM THK INTERNAL PLASTER PB112 LEG WITH DETAILED SECTION OFOF BASIN COUNTER ACADEMY OF ARCHITECTURE PB102 PB112 07 K DETAILED SECTION BASIN COUNTER ACADEMY OF ARCHITECTURE A-401b 07 25MMØ25MM WA A-401b 25MM THICKPB68 EXTERNAL NEERU 02 SIGN AND STAMP PB68 SCALE 1:101:10 PB73 SIGN AND STAMP 02 SCALE PB73 65MMØ W 03 65M 03 FINISH PLASTER) DETAILED SECTION SECTION OF OF TOILET-03 TOILET-03 DETAILED 50MMØ FL A-401d 01 DETAILED SECTION OF TOILET-01 50M A-401d DETAILED SECTION OF1:25 TOILET-01 A-401b SCALE A-401b 100MMØ S SCALE SCALE 1:25 1:25 B102 100M D D
PB94 PB94
SCALE 1:25
B
1000
2420 2870
230MM 230MM THICK THICK BRICK BRICK WASH BASINCOUNTER TOPTOP WALL MASONRY WALL MASONRY WASH BASINCOUNTER
4500 4500
B46
B51'
400
800 400
HEIGHT-2400MM
25MM THK SCREEDING
4500 4500 4290
4290
800
41
FALSE CEILING HANGER RESTILE GRANAMTIE COLLECTION RESTILE GRANAMTIE COLLECTION (STEEL GREY)(300x300MM) WIRE WIRE (1200MM (1200MM LONG) LONG) (STEEL GREY)(300x300MM)
2370
B94' B94' B51'
2530 01
B
99
25 25
450
4500
4500
1620
300
600
600 1000 200
3180
3180
2100 1410 450
2410 2410 2850 2850
06
SCALE 1:10 35MM THKTHK SCREEDING EXTERNAL SCALE 1:10 35MM SCREEDING EXTERNAL
320
300 250 2400 2400
1000 900
400 400
800 C C
GENERAL GENE
1) All dimensio 1) All di specified specifie 2) The drawing 2) The d dimensions ar dimensi to be followed. to be fo 3) All levels ar 3) All le specified. LEGENDS : specifie LEGENDS : 4) The contrac 4) The c dimensions inc 25MMØ WATER SUPPLY PIPE dimensi 25MMØ WATER SUPPLY PIPE elevations prio elevatio 65MMØ WASTE WATER PIPE site. 65MMØ WASTE WATER PIPE site. 5) The contrac 5) The c 50MMØ FLUSHING PIPE project 50MMØ FLUSHING PIPE project engineer on si enginee 100MMØ SOIL PIPE conditions/mod 100MMØ SOIL PIPE conditio required to be required TILE DROP 9MM of work. TILE DROP 9MM of work. 6) The contrac TILE LAYOUT START 6) The c TILE LAYOUT START work indicated work ind on the drawing on the d various trade REVISION TABLE various (230MM THK) REVISION TABLE drawings, inclu (230MM THK) drawing electrical, DATE REVISION DESCRIPTION electrica DATE REVISION DESCRIPTION plumbing, fire plumbin systems. systems 7) All work sh 7) All w and shall be and sha best practice o best pra 8) Any discrep 8) Any d of the of the architect/ cons architec the site. the site. 9) All work is to 9) All w of site of site engineer/ proje enginee
25MM THK SCREEDING ON BBC
40
B51
B98 D
35 35
320
1000
280 280 2830 2830
2530 2530
2370 2370
4290 4290
450 450
1520 1520
800 800
B
B98 B98
ACADEMY OF ARCHITECT SIGN AND STAMP
25MM THK SCREEDING ON BBC OF OF BASIN BASIN COUNTER COUNTER TILETILE DROP 9MM9MM DROP
DADO CLADDING 160MM BBC ON RCC SLAB DADO CLADDING SOMANY TILES (POLO BIANCO) SOMANY TILES (POLO BIANCO) (GLOSSY WHITE)(300x300x12.5MM) FOR SLOPING (GLOSSY WHITE)(300x300x12.5MM) HEIGHT-2400MM
08-04-2
SEMESTER 6
25MM 25MM THK THK SCREEDING SCREEDING ON ON BBC BBC 9MM THK THK FLOOR FLOOR TILING TILING 9MM
250
35
9
25 400 600
2410 2850
200
800 800
2100 1000 200
400 800
2980
PVC NAHANI RESTILE GRANAMTIE GRANAMTIE COLLECTION COLLECTION RESTILE (STEEL GREY)(300x300MM) GREY)(300x300MM) (STEEL
SCALE 1:251:25 SCALE
B94 F
H 9MM TILING 9MM THICK THICK FLOOR FLOOR TILING H PVC NAHANI TRAP (100MMØ) TRAP PB87(100MMØ) B PB87
B B
W1
1520
400 400 800 800
350 350
400 400 800 800
OLYMPUS STANDARD STANDARD URINAL URINAL OLYMPUS
HINDWARE WASH BASINCOUNTER TOPTOP HINDWARE URINALS URINALS WASH BASINCOUNTER (STAR CERA WASH BASINS-OVAL (STAR WHITE)(460x300x710) WHITE)(460x300x710) CERA WASH BASINS-OVAL (SNOW WHITE)(560x470MM) (SNOW WHITE)(560x470MM) CODE-S2030104 HEALTH CODE-S2030104 HEALTH FAUCET FAUCET BELGIAN GLASS MIRROR BELGIAN GLASS MIRROR CERA FAUCETS FAUCETS (POM (POM FAUCET) FAUCET) CERA SILVER FINISH(1650x650MM) GL GL SILVER FINISH(1650x650MM) WITH 1.2M BRAIDED HOSE WITH 1.2M BRAIDED HOSE PIPE PIPE CODE-F8030401AB CODE-F8030401AB
W1
B52
B41
NAME : PRANAV AS
FILLED
160MM BBC BBC ON ON RCC RCC SLAB SLAB 160MM FOR FOR SLOPING SLOPING
(600x600MM) (600x600MM) 10MM 10MM THK THK
450
200 200
600 600 4300 4300
1520 1520
SOMANY TILES (POLO BIANCO) LARGE URINAL DIVISION PARRYWARE PARRYWARE LARGE URINAL DIVISION (GLOSSY (GLOSSY WHITE)(300x300x12.5MM) WHITE)(300x300x12.5MM) (WHITE)(450x675x60MM) (WHITE)(450x675x60MM) HEIGHT-2400MM HEIGHT-2400MM C0507 K CODECODE- C0507
C59-C59230x500 230x500
A-401a SCALE
OLYMPUS STANDARD URINAL
WINDOWS(600x500MM) (STAR WHITE)(460x300x710) WINDOWS(600x500MM) (STAR WHITE)(460x300x710) DADO CLADDING CLADDING DADO URINAL PARTITION URINAL PARTITION SOMANY TILES (POLO BIANCO)
B41
B46'
SCALE : 1:25, 1:10
25MM THK SCREEDING LEGENDS : DETAILED SECTION OF160MM BASIN COUNTER GYPSUM BOARD BOARD PANELS PANELS BBCBBC FORFOR SLOPING GYPSUM 160MM SLOPING
F
210
1620
210
70
B46'
B51
A-401b
F (150MMØ) (150MMØ) USHA USHA CRISP CRISP AIR AIR EXHAUST EXHAUST FAN FAN (IVORY) CODECODE- B009ZBD3KO B009ZBD3KO (IVORY)
39
D5
B56
(600x600MM) 10MM 10MM THK THK B87' PLASTER (600x600MM) WITH 12MM THK INTERNAL WITH 12MM THK B87' INTERNAL PLASTER
05
D
350 350
C
D5
40 39
1520
06 05
BBCBBC FORFOR SLOPING 100MM SLOPING CERA 100MM AUXILLARIES BOTTLE TRAP CODE-1880
K K
B94 B94 B56
OLYMPUS STANDARD URINAL OPERABLE LOUVERED SCALE 1:25LOUVERED HINDWARE URINALS OPERABLE HINDWARE URINALS
1520 1520
1520 1520
660 100 100
870
8001620
D5
710 800
1300 1300 D5
200 200
920
920
770
660
D D
1410
260
260 450 450
450 450
PB68
BOTTLE TRAP 41
C C
FALSE CEILING CEILING(GLOSSY HANGER WHITE)(300x300x12.5MM) FALSE HANGER (GLOSSY WHITE)(300x300x12.5MM) HEIGHT-2400MM WIRE WIRE (1200MM (1200MM LONG) LONG) HEIGHT-2400MM GYPSUM BOARD PANELS GYPSUM BOARD PANELS 150MM INTERNAL WALL 150MM INTERNAL WALL
500 500
PORCELAIN TILING
770
1680
HIS
200 1000 1000 200
1410 1410
1520
400 800
2400
TWO PIECE WALL HUNG WC WC TWO PIECE WALL HUNG
200MM SUNK SLAB FILLED WITH BBC
400 400
800 800
1600
1600
03
07 06
CERA WASH BASINS-OVAL
03
SCALE 1:25 1:25 SCALE
CERAPIECE CALLAGHANWALL WC TWO HUNG WC CERA CALLAGHAN WC (SNOW WHITE)(630x405x730MM)
B52 B52
25MM THK THK SCREEDING SCREEDING (SNOWSADDLE WHITE)(560x470MM) 25MM BACK STONE DETAILED SADDLE BACK STONE SECTION DETAILED SECTION A-401b CODE-S2030104 COPING (150MM THK) A-401b COPING (150MM THK) 25MM THKTHK SCREEDING 25MM SCREEDING
(GLOSSY WHITE)(450x450x12.5MM) 03 03 B46 B51 B46 DETAILED SECTION OF TOILET-01 TOILET-01 B51 HEIGHT-2400MM DETAILED SECTION OF
25MM THK SCREEDING SOMANY TILES (POLO BIANCO) SOMANY TILES (POLO BIANCO)
08
GRANITE COUNTER TOP SCALE 1:25
WASH BASIN- COUNTER TOP
02
TOILET DETAIL
CERA CERA AUXILLARIES AUXILLARIES BOTTLE BOTTLE TRAP TRAP CODE-1880 CODE-1880
200MM SUNK SUNK SLAB SLAB FILLED FILLED 200MM WITH BBC WITH 03 BBC
PB68 PB68
HEALTH FAUCET RESTILE GRANAMTIE GRANAMTIE COLLECTION COLLECTION RESTILE CERA FAUCETS (POM FAUCET) CERA FAUCETS (POM FAUCET) D (STEEL GREY)(300x300MM) GREY)(300x300MM) (STEEL D WITH 1.2M BRAIDED HOSE PIPE WITH 1.2M BRAIDED HOSE PIPE 25MM THK THK SCREEDING SCREEDING CODE-F8030401AB B87 25MM CODE-F8030401AB B87
09
02
02 02
B86 C49-B86 500 DIA C49500 DIA 160MM BBC BBC FOR FOR SLOPING DADO CLADDING 160MM SLOPING DADO CLADDING 08
250
01
(SNOW WHITE)(630x405x730MM) (SNOW WHITE)(560x470MM) C45-C45230x500 (SNOW WHITE)(560x470MM) CODE-S1031104 P TRAP 230x500 CODE-S1031104 P CODE-S2030104 TRAP CODE-S2030104
10
07
250
D4
600 600
3180 3180
2100 2100
450
4300
600
1520 350
280
1100
720
720 2560 870
250
280
280
300
2370 1100
2830
710
710
2530
800
2560 870
800
800
710
710
800
710 800
DN
CERA CALLAGHAN WC
S
SHEET TITLE:
BOTTLE TRAP TRAP BOTTLE
(GLOSSY FINISH)(20MM THK)
01
PB73 (WITH 12MM THK INTERNAL PLASTER PB73PLASTER B (WITH 12MM THK INTERNAL WITH 15MM DADO CLADDING WITH 15MM DADO01CLADDING 01 NEERU 25MM THICK EXTERNAL 25MM THICK EXTERNAL NEERUA-401b A-401b FINISH PLASTER) FINISH PLASTER)
BASIN FAUCET-
SOMANY TILES TILES (POLO (POLO BIANCO) BIANCO) SOMANY PB94 PB102 K (GLOSSY (GLOSSY WHITE)(450x450x12.5MM) WHITE)(450x450x12.5MM) HEIGHT-2400MM HEIGHT-2400MM
(SNOW WHITE)(630x405x730MM) CODE-S1031104 P P TRAP TRAP CODE-S1031104
(SNOW WHITE)(630x405x730MM) CERA CALLAGHAN CODE-S1031104 P TRAP WC BB CODE-S1031104 P TRAP WHITE)(630x405x730MM) TWO PIECE PIECE(SNOW WALL HUNG WC COUNTER TOP C TWO WALL WC C HUNG WASH BASINCERA CALLAGHAN CALLAGHAN WC WC WASH BASIN- COUNTER TOP 440 CERA CODE-S1031104 P TRAP CERA WASH BASINS-OVAL 440 WHITE)(630x405x730MM) CERA WASH BASINS-OVAL (SNOW
B B
2980 2980
400
450
200
260 260
1520
200
1100 1100 900
1100
430
4290
710 800
1200 710
300 400
710 1680 840
840
840 1100 1100 340
250
340 430 430 1200 900 900 1200 710
400 400 800 800
11 10
C58-C58230x500 230x500
250 01
12 11
09
HIS FFL=+0.15M FFL=+0.15M SSL=-0.07M SSL=-0.07M PORCELAIN TILING 870
PB102 PB102 01
A-401c A-401c
DN
01
DADO CLADDING CLADDING DADO
D
PANCHAVATI ANEC
25MM THK SCREEDING WASH WASH BASINBASIN- COUNTER COUNTER TOP TOP
CERA WASH WASH BASINS-OVAL BASINS-OVAL CERA (SNOW WHITE)(560x470MM) 200MM SUNK SLAB (SNOW WHITE)(560x470MM) CODE-S2030104 CODE-S2030104 WITH BBC
CERA CALLAGHAN WC PRODUCED BY AN AUTODESK STUDENT VERSION PRODUCED BY AN AUTODESK STUDENT VERSION(SNOW WHITE)(630x405x730MM)
9MM THICK THICK FLOOR FLOOR TILING 9MM TILING HEALTH FAUCET
SLATE TILING
D4
840
2870 2870
2420 2420 1520 1520 350 350
PRODUCED BY AN AUTODESK STUDENT VERSION
H
13 12
01 02
(600x600MM) (600x600MM) 10MM 10MM THK THK
FINISH(800x650MM)
PROJECT NAME:
UP
W1
C67-C67230x500 230x500
14 13
02 03
B
1200 1200
PB112 CERA QUARTER TURN FAUCET CODE-F2002461 DETAILED SECTION OFWC TOILET-03 TWO PIECE PIECE WALL HUNG HUNG WC A-401d TWO WALL
C
DADO CLADDING
EXHAUST EXHAUST FAN FAN DETAILED SECTION OF TOILET-01 A-401b
70
H
02
15
C57- 230x500
FFL=+0.15M SSL=-0.07M SSL=-0.07M SLATE TILING
1150 1150
200 200
4500 4500
D5
B
W1
14
PASSAGEWAY PASSAGEWAY FFL=+0.15M 1100 1100 1000 1000
450 450
250 250
F
PB73
D4
03 04
1000 1000
B93 B93 C57- 230x500
C62-C62230x500 230x500
04 05
C54-C54230x500 230x500
2100 2100
B98 B98
05 06
D PORCELAIN TILING
15
300
D4
FFL=+0.15M SSL=+0.01M SSL=+0.01M PORCELAIN TILING D
06
GYPSUM SILVER GYPSUM BOARD BOARD PANELS PANELS
KEY PLAN- SC
SILVER FINISH(800x650MM) CERA WASH BASINS-OVAL (SNOW WHITE)(560x470MM) BASIN FAUCETBASIN FAUCETCODE-S2030104 CERA QUARTER QUARTER TURN TURN FAUCET FAUCET CERA 9MM THICK FLOOR TILING CODE-F2002461 CODE-F2002461 RESTILE GRANAMTIE COLLECTION GRANITE COUNTER GRANITE COUNTER TOP TOP (STEEL GREY)(300x300MM) (GLOSSY FINISH)(20MM FINISH)(20MM THK) THK) (GLOSSY
BELGIAN GLASS MIRROR
16 16
B
engineer/ project manager and architects
BELGIAN GLASS GLASS MIRROR MIRROR BELGIAN WASH BASIN- COUNTER TOP SILVER FINISH(800x650MM)
UP
PRODUCED BY AN AUTODESK STUDENT VERSION
D5
300
D5
01 C66-C66230x500 230x500
STILE GRANAMTIE COLLECTION EEL GREY)(300x300MM)
0MM BBC FOR SLOPING
340 1200
800 1600
W1
C66C66 (230x500MM) (230x500MM) F
WO PIECE WALL HUNG WC
MM THK SCREEDING
D5
1600
W1
PB112 PB112 M THICK FLOOR TILING
F F
1000 1000
TRAP(100MMØ)
RA CALLAGHAN WC OW WHITE)(630x405x730MM) DE-S1031104 P TRAP
D5
HER HER FFL=+0.15M
D5 D5 PB87
PVC 230MM THICK BRICK PVC NAHANI NAHANI TRAP TRAP(100MMØ) (100MMØ) 230MM THICK BRICK SOMANY TILES (POLO BIANCO) MASONRY WALL MASONRY WALL
06 06
SCALE SCALE 1:25 1:25
D
C65-C65230x500 230x500
250 250
D5
270
260
D4
10MM THK
18 18 17 17
UP
SILVER FINISH(1650x650MM)
PRODUCED BY AN AUTODESK STUDENT VERSION
W1
D
05 05
GL GL
1640
25MM SCREEDING 25MM THK THK SCREEDING 160MM BBC BBC FOR FOR SLOPING SLOPING 160MM FALSE CEILING CEILING HANGER HANGER FALSE WIRE (1200MM LONG) WIRE (1200MM LONG)
1200 D4 D4
GYPSUM BOARD PANELS
06 SILVER FINISH(1650x650MM) 05 06 SILVER FINISH(1650x650MM)
A-401b A-401b
SCALE 1:10
RESTILE GRANAMTIE GRANAMTIE COLLECTION COLLECTION RESTILE (STEEL GREY)(300x300MM) GREY)(300x300MM) (STEEL
B46 B46
CERA FAUCETS (POM FAUCET)
(600x600MM) BELGIAN GLASS GLASS MIRROR MIRROR BELGIAN
05
04
C56-C56230x500 230x500
C61- 230x500
250
340
270
260
GL
350
250 450
200
2870
1600 1600 2420
400 800
210 210
04 04
C
W1
04
03
B51' B51'
WITH 1.2M BRAIDED HOSE PIPE FALSECODE-F8030401AB CEILING HANGER 9MM THICK FLOOR WIRE (1200MM LONG)TILING
WASH BASINBASIN- COUNTER COUNTER TOP TOP WASH
CERA WASH WASH BASINS-OVAL BASINS-OVAL CERA (SNOW (SNOW WHITE)(560x470MM) WHITE)(560x470MM) CODE-S2030104 CODE-S2030104
H H
D5 C61- 230x500
03 03
W1
-A-401b
25MM THK SCREEDING HEALTH 160MM BBCFAUCET FOR SLOPING
COLLECTION 17 PARRYWARE LARGE URINAL DIVISION RESTILE GRANAMTIE PB86 W1 B DIVISION PARRYWARE LARGE URINAL W1 (STEEL GREY)(300x300MM) (WHITE)(450x675x60MM) 16 (WHITE)(450x675x60MM) CODECODE- C0507 C0507
C59- 230x500 230x500 C59-
250 250
270 270
03
02
B51 B51
HINDWARE URINALS WITH WITH 12MM 12MM THK THK INTERNAL INTERNAL PLASTER PLASTER (STAR WHITE)(460x300x710)
18 URINAL PARTITION PARTITION URINAL
B46
PB93
D
DETAILED 1000 OF DETAILED PLAN PLAN OF TOILET TOILET 1000
1520
-A-401b
W1
9MM THICK FLOOR TILING SOMANY TILES (POLO BIANCO)
150MM INTERNAL WALL
F F
SCALE 1:25
A-401a 1300 A-401a 1300
B102 B102
05 05
CERA CERA WASH WASH BASINS-OVAL BASINS-OVAL (SNOW WHITE)(560x470MM) WHITE)(560x470MM) (SNOW CODE-S2030104 CODE-S2030104
9MM 9MM THICK THICK FLOOR FLOOR TILING TILING
RESTILE GRANAMTIE COLLECTION (GLOSSY WHITE)(300x300x12.5MM) (STEELHEIGHT-2400MM GREY)(300x300MM) OLYMPUS STANDARD URINAL 150MM INTERNAL WALL
1410
8001620 1620 450
15 02B 15 02 A-401d B A-401d
C
50x650MM)
06 06
WASH BASIN- COUNTER TOP DETAILED DETAILED SECTION OF TILE DETAILED DROP B94' WASH BASIN- COUNTER TOP
A-401b
OPERABLE LOUVERED WINDOWS(600x500MM) B56 DADO CLADDING B56
SOMANY SOMANY TILES TILES (POLO (POLO BIANCO) BIANCO) (GLOSSY (GLOSSY WHITE)(300x300x12.5MM) WHITE)(300x300x12.5MM) HEIGHT-2400MM HEIGHT-2400MM
DETAILED SECTION OF TOILET-02
02
250 250
W1
NS-OVAL 0x470MM)
SS MIRROR
100
PB102 F B51'
01
C63-C63230x500 230x500
COUNTER TOP
07 07
WASH(600x600MM) BASINCOUNTER TOP 10MM THK B87'
CODE-F8030401AB
DADO CLADDING CLADDING DADO
SOMANY SOMANY TILES TILES (POLO (POLO BIANCO) BIANCO) (GLOSSY (GLOSSY WHITE)(300x300x12.5MM) WHITE)(300x300x12.5MM) HEIGHT-2400MM HEIGHT-2400MM
39 39
B41 B41
CERA WASH BASINS-OVAL EXHAUST FAN(150MMØ) CRISP AIR EXHAUST FAN CERA FAUCETS (POM FAUCET) (SNOWUSHA WHITE)(560x470MM) D CERA FAUCETS (POM FAUCET) D (IVORY) CODE- B009ZBD3KO WITH 1.2M BRAIDED HOSE PIPE WITH 1.2M BRAIDED HOSE PIPE CODE-S2030104 CODE-F8030401AB
500
COMPACT MURUM
DADO CLADDING CLADDING DADO
41 41 40 40
B46' B46'
(230MM B98 THK)
B94
2530
800
710 710
1520
920 920
01
15 15 A-401c A-401c
(SNOW (SNOW WHITE)(560x470MM) WHITE)(560x470MM) CODE-S2030104 CODE-S2030104
HEALTH HEALTH FAUCET FAUCET
09 09
B51
660 660
770 770
800 800
70 70
GE URINAL DIVISION0101 60MM)
C45- 230x500 230x500 C45-
OLYMPUS STANDARD STANDARD URINAL URINAL OLYMPUS
PORCELAIN TILING PORCELAIN TILING
710 710
1200 1200
340 340 PRODUCED PRODUCEDBY BYAN ANAUTODESK AUTODESKSTUDENT STUDENTVERSION VERSION
H H
FALSE CEILING HANGER D5 D5 WASH BASINBASIN- COUNTER COUNTER TOP TOP WIRE (1200MM LONG) WASH CERA WASH WASH BASINS-OVAL BASINS-OVAL CERA GYPSUM BOARD PANELS
C C
RUBBLE SOLING
100MM 100MM BBC BBC FOR FOR SLOPING SLOPING
PRODUCED PRODUCEDBY BYAN ANAUTODESK AUTODESKSTUDENT STUDENTVERSION VERSION
NDARD URINAL
10 10
B87
(GLOSSY WHITE)(300x300x12.5MM) 160MM BBC FOR SLOPING HEIGHT-2400MM
440 440
C49C49- 500 500 DIA DIA
11 11
150MM THK RCC SLAB
39 THK SCREEDING SOMANY TILES (POLO BIANCO) TWO WC TWO PIECE PIECE WALL WALL HUNG HUNG WC 25MM
B41
K
SADDLE SADDLE BACK BACK STONE STONE COPING(150MM (150MM THK) THK) COPING 25MM THK 25MM THK SCREEDING SCREEDING
B86 CERA CERA CALLAGHAN CALLAGHAN WC WC (SNOW WHITE)(630x405x730MM) WHITE)(630x405x730MM) (SNOW CODE-S1031104 P P TRAP TRAP CODE-S1031104
DN B93 DN
160MM BBC ON RCC SLAB FOR SLOPING
D
DADO CLADDING
HINDWARE HINDWARE URINALS URINALS (STAR WHITE)(460x300x710) WHITE)(460x300x710) (STAR
A-401c
W1 W1
01 01
B98
08 08
870 870
D5 D5
02 02
03 03
4) The contractor shall verify all on site 50MMØ FLUSHING PIP dimensions including 100MMØ SOIL PIPE elevations prior to the commencement of work on TILE DROP 9MM site. GENERAL NOTES NOTES GENERAL TILE LAYOUT START 5) The contractor shall inform the architect and/or 1) All dimensions are in 'millimeters' unless 1) All dimensions are in 'millimeters' unless specified project specified REVISION TABLE 2) The drawing is not to be scaled. The 2) The drawing is not to be scaled. The engineer on site regarding any dimensions are strictly dimensions are strictly DATE REVISION to be followed. to be followed. conditions/modifications 3) All levels are unfinished levels unless 3) All levels are unfinished levels unless 25MM SCREEDING ON BBC 25MM THK THK SCREEDING ONprior BBC specified. required be done specified. 230MMtoTHICK BRICK to the commencement 4) The contractor shall verify all on site 4) The contractor shall verify all on site TILE DROP 9MM of work. dimensions including TILE DROPMASONRY 9MM WALL dimensions including elevations prior to the commencement of work on elevations prior to the commencement of work on 35MM THK THK SCREEDING EXTERNAL 6)(WITH The 12MM contractor shall coordinate and THK EXTERNAL INTERNAL PLASTER 35MM SCREEDING site. verify the site. 5) The contractor shall inform the architect and/or 25MMindicated THICK EXTERNAL NEERU work 5) The contractor shall inform the architect and/or project project 160MM BBC ON RCC SLAB FINISH PLASTER) 160MM BBC ON drawings RCC SLAB engineer on and site regarding any on the between the architectural engineer on site regarding any conditions/modifications FOR B102 SLOPING conditions/modifications FOR SLOPING various trade required to be done prior to the commencement required to be done prior to the commencement of drawings, including HANGER but not limited 6) towork. structural, FALSE CEILING of work. The contractor shall coordinate and verify the 150MM THK RCC SLAB 6) The contractor shall coordinate and verify the 150MM THK RCC(1200MM SLAB LONG) work indicated electrical, WIRE work indicated on the drawings between the architectural and RUBBLE on the drawings between the architectural and plumbing, fire protection and exterior enclosure RUBBLE SOLING SOLING various trade various trade (230MM THK) THK) drawings, including but not limited to structural, (230MM systems. drawings, including but not limited to structural, electrical, electrical, GYPSUM BOARD PANELS COMPACT MURUM plumbing, protection and exterior enclosure All work shall conform to relevant BIS fire codes COMPACT7)(600x600MM) MURUM plumbing, fire protection and exterior enclosure systems. 10MM THK systems. and shall be 7) All work shall conform to relevant BIS codes 7) All work shall conform to relevant BIS codes and shall be best practice of each trade. and shall be best practice of each trade. best practice of each trade. 8) to Any discrepancy be brought to the notice CLADDING 8)DADO Any discrepancy is to be brought8) noticeisis toto be Anythe discrepancy brought to the notice SECTION TILE DROP SECTION OF OF TILE DROP of the of the TILES (POLO BIANCO) ofSOMANY the architect/ consultant before commencement of architect/ consultant before commencement of SCALE 1:10 (GLOSSY WHITE)(450x450x12.5MM) the site. SCALE 1:10 before commencement the site. architect/ consultant of 9) All work is to be completed to the satisfaction HEIGHT-2400MM 9) All work is to be completed to the satisfaction of site the site. of site engineer/ project manager and architects engineer/ project manager and architects 9) All work is to be completed to the satisfaction BELGIAN GLASS MIRROR of site
35MM THK SCREEDING EXTERNAL
C
(WITH 12MM 12MM THK THK INTERNAL INTERNAL PLASTER PLASTER (WITH 9MM THICK FLOOR TILING WITH 15MM 15MM DADO DADO CLADDING CLADDING WITH 41 B46 B51 RESTILE GRANAMTIE COLLECTIONB46 25MM B51 25MM THICK THICK EXTERNAL EXTERNAL NEERU NEERU (STEEL GREY)(300x300MM) 40 FINISH PLASTER) FINISH PLASTER)
HIS
PB112
1300 1300
03 03
B B
02 02
SCALE 1:25
CERA CALLAGHAN WC (SNOW WHITE)(630x405x730MM) CODE-S1031104 P TRAP
230MM THICK THICK BRICK BRICK 230MM MASONRY MASONRY WALL WALL
HIS FFL=+0.15M FFL=+0.15M SSL=-0.07M SSL=-0.07M
1680 1680 840 840
NTERNAL PLASTER
12 12
250 250
D4 D4
NAL WALL
13 13
C58- 230x500 230x500 C58-
1100 1100 1000 1000
840 840
C66- 230x500
14 14
SLATE TILING SLATE TILING
350
B56
04 04
C54- 230x500 230x500 C54-
C57- 230x500 230x500 C57-
FFL=+0.15M SSL=-0.07M SSL=-0.07M
1150 1150
LS C67- 230x500 230x500 C67x300x710)
B
100MM BBC FOR TWO PIECE WALL SLOPING HUNG WC
B46'
15 15
PASSAGEWAY PASSAGEWAY FFL=+0.15M
800 800
710 710
1600 1600
C62- 230x500 230x500 C62-
D5 D5
C66(230x500MM) (230x500MM) OLO BIANCO) C66 F F 300x300x12.5MM) C66- 230x500
720 720 600
870 870 250 250
2100 2100
1000 1000
W1 W1
TION
B
DETAILED SECTION OF TOILET-01 TILE DROP 9MM
UP
POM FAUCET) C65- 230x500 230x500 C65ED HOSE PIPE B
05 05
1000 1000
10004500200
800 800
300 300
PORCELAIN TILING
250
280 280
300 300
710 710
D5 D5
W1 W1
D4 D4
SSL=+0.01M SSL=+0.01M PORCELAIN TILING
2100
C C
06 06
HER HER FFL=+0.15M D5 FFL=+0.15M
800 800
270 270
3180
B102 D5 D5
2560 2560
1200 1200
W1 W1
710 710
340 340
1000 1000
1300 1300
D D
NG
D
B B
260 260
ET
06 06
C56- 230x500 230x500 C56-
C61- 230x500 230x500 C61-
COUNTER TOP
NS-OVAL 0x470MM)
05 05
F
PRODUCED BY AN AUTODESK STUDENT VERSION PRODUCED BY AN AUTODESK STUDENT VERSION
--A-401b A-401b
04 04
01 01
ALL HUNG WC C63- 230x500 230x500 C63-
N WC 0x405x730MM) TRAP
B46
03 03
A-401b
800
02 02
01
PRODUCED BY AN AUTODESK STUDENT VERSION PRODUCED BY AN AUTODESK STUDENT VERSION
600 600
B51
SCALE 1:25
200 200
NTERNAL PLASTER CLADDING 01 01 RNAL NEERU
SADDLE BACK STONE COPING(150MM THK) 25MM THK SCREEDING
DETAILED PLAN OF TOILET
1000 1000
PRODUCED BY A
A-401a
PRODUCED BY AN AUTODESK STUDENT VERSION
LL
B
B
C
FALSE CEILING HANGER WIRE (1200MM LONG)
C
D
D
K
K
SEMESTER 6
08-04-2020
ROLL NO.
37
TILE DROP TILE TILE LAYO TILE
REVISION TAB REVISIO
B. B U I L D I N G C O N S T R U C T I O N - WAREHOUSE IN STRUCTURAL STEEL (SEMESTER 4)
CROSS SECTION THROUGH MEZZANINE
GROUND FLOOR PLAN
CUT @+2.5M
LONGITUDINAL SECTION THROUGH MEZZANINE AND STAIRCASE 38
EXPLODED ISOMETRIC - STAIRCASE
FRONT ELEVATION
MEZZANINE FLOOR PLAN
CUT @+5.7M
EXPLODED ISOMETRIC - BINDER STANCION
SIDE ELEVATION
EXPLODED ISOMETRIC - LOUVRES
EXPLODED ISOMETRIC - STEP 39
EXTRA CURRICULAR WORKS
DOCUMENTATION | COMPETITION | INSTALLATION
40
1. LOUIS I. KAHN TROPHY
DOCUMENTATION | COMPETITION - NASA (2017-18)
2. WINDOWS TO VERNACULAR 7.0 DOCUMENTATION - (2019)
3. KALA GHODA ARTS FESTIVAL
INSTALLATION | COMPETITION - VISUAL ARTS (2019)
4. CRICKET STADIUM DESIGN IN STEEL COMPETITION - INSDAG (2019-20)
5. AQUATECTURE
COMPETITION - Volume Zero (2018)
6. SAI BABA TEMPLE DESIGN COMPETITION - AADcompetitions (2020)
41
LOUIS I.KAHN TROPHY NASA 2017-18
(DOCUMENTATION)
SITE - SAGAR DIGHI, COOCH BEHAR THEME - Heritage and democracy The aim of the 2017-18 Louis I. Kahn Trophy was to document buildings / complexes/ sites which are symbols of democracy. The structures which play an important role in the smooth functioning of the government. It was expected to document such administrative structures of any era, pre Mughal, Mughal, pre-colonial, colonial, post-independence but not built later than 1967.
TEAM STRENGTH - 19
INTRODUCTION
SITE SECTION SITE PLAN COOCH BEHAR IS THE LARGEST TOWN AND DISTRICT HEADQUARTER OF NORTHERN BENGAL. IT LIES AT THE FOOTHILLS OF EASTERN HIMALAYAS UNDER THE ADMINISTRATIVE DIVISION OF JALPAIGURI. IT IS THE ONLY PLANNED TOWN IN THIS REGION WITH THE REMNANTS OF ROYAL HERITAGE. IT FOLLOWS THE GRID IRON PATTERN, THE TOWN ROADS HAVE BEEN PLANNED ACCORIDNGLY MEETING AT RIGHT ANGLES. IN THE SOUTH-SOUTH-EAST END THE GRID ALLIGNS ITSELF WITH THE RIVER. THIS GRID IRON DIVIDES THE TOWN INTO 4 PRIMARY ZONES, DEMARCATING DIFFERENT TYPOLOGIES OF PUBLIC AND WELFARE BUILDINGS. EACH SECTOR ENCOMPASSES A DIGHI (TANK). THE INTER RELATIONSHIP OF DIGHIS IS IN HIERARCHIAL ORDER WITH RESPECT TO PROPORTION OF ITS ZONE. LOCATED AT THE SOUTH-WEST CORNER OF THE TOWN COOCH BEHAR, SAGAR DIGHI IS THE LARGEST OF ITS KIND IN THE TOWN. IT HAS BEEN PRECISELY ALLIGNED TO THE CARDINAL AXIS. SOME OF THE MAJOR ARCHITECTURAL AND ADMINISTRATIVE DEVELOPMENTS THAT COOCH BEHAR BOASTS OF ARE SITUATED AROUND THIS TANK.
CONTEXT PLAN
NEED FOR DIGHIS
THE DIGHIS WERE ORIGINALLY CONSTRUCTED TO PROVIDE FOR SUFFICIENT HYGENIC AND POTABLE WATER. THIS WAS TO REDUCE THE HASSLE OF TRAVEL FOR THE KING'S SUBJECTS.
SITE AND CONTEXT
AXONOMETRIC VIEW
TREASURY
A 147 YEAR OLD STRUCTURE, THE TREASURY HOUSES MULTIPLE GOVERNMENT DEPARTMENTS OF COOCH BEHAR. EACH OF THE DEPARTMENTS ARE DEMARCATED BY HIGHLIGHTING PORCHES.
GROUND FLOOR PLAN
TERRACOTTA BRICKS WERE USED AS THE BUILDING MATERIAL ,LAKE SIDE ORIENTATION OF THE FRONT FACADE ENSURES GOOD LIGHTING AND VENTILATION AND A FRONTYARD LANDSCAPED BY BAMBOO WEAVED FENCES , SHOWCASE THEIR DEEP ROOTEDNESS IN TRADITIONAL KNOWLEDGE SYSTEMS ALSO HIGHLIGHTING THE IMPORTANCE OF THE BUILDING.
WEST ELEVATION DETAILS
TREASURY OFFICE
OVER THE COURSE OF TIME, PARTITIONS HAVE BEEN ADDED TO FACILITATE CONVENIENT SEPERATION OF FUNCTIONS OWING OT THE FURTHER ORGANISATION OF GOVERNMENT RENDERED PUBLIC SERVICE DEPARTMENTS. NECESSARY ALTERATIONS HAVE BEEN MADE IN THE PRE EXISTING HERITAGE STRUCTURAL BUILT OWING TO THE CHANGES IN THE SYSTEM OF FUNTIONING OF OFFICES, TECHNOLOGICAL ADVANCEMENTS, ADVANCED RESOURCES, SYSTEMIZED IMPLEMENTATION OF ORDINANCES.
VICTOR PALACE
THIS STRUCTURE IS A ROYAL PRIVATE RESIDENCE. IT HOLDS A SIGNIFICANT POSITION FOR ACCOMODATING THE DISTINGUISHED AUTHORATATIVE PERSONNEL OF THE STATE. ORIGINALLY A GUEST HOUSE ,THE STRUCTURE HAS EVOLVED TO HOUSE THE RAJBHONGSHI ACADEMY AND CURRENTLY HOSTS THE OFFICE OF DISTRICT INFORMATION AND CULTURAL OFFICER. THE STRUCTURE IS PLANNED WITH THE COLONIAL BUILDING STRATERGY OF ADMINISTRATIVE BUILDINGS DECORATED WITH A GRAND FACADE, ELEVATIONS LACED WITH ORNAMENTED COLONADES, PARAPET WALLS AND DETAILED FENESTRATIONS.
GROUND FLOOR PLAN AXONOMETRIC VIEW
EAST ELEVATION
VICTOR PALACE
2019
and guarded by the green around. But often in the final quarter of the year, the greens seem to disappear. With the white taking over, the villagers tried to stand still, as they waddled and struggled to move past the white. The hill would be engulfed in the smell of pine and burning embers as they would struggle once again to survive the frosty winter. With the ground floor covered in snow and nowhere to go, with very little to eat; man and animal longed for a morsel to sleep.
WINDOWS TO VERNACULAR 7.0 SAUR,UTTARAKHAND SITE - SAUR VILLAGE, UTTARAKHAND
A solution was must, the struggle and hope to survive they couldn’t trust. In search for a life without struggle, they took upon a journey down. Losing men and animals on the way in search of the ne3w land was condemned, “Somewhere in-betweenoften the start of the but the journey continue. Through treachourous terrains and pine forest, they settled in climb and the point you reach the summit a place that “suited what they thought would work, a lies the mystery as to why we climb. “Somewhere in-between the start of thewinter without snow as the hardscape.
(DOCUMENTATION)
SAUR
lies the mystery as to why we climb. “ UTTARAKHAND SAUR
climb and the point you reach the summit My story is about this between. Once upon a time, a long
Down below but still to a land where summers and
time ago there was a dainty village nestled amongst winters werebelow warm. A concern that continued. The new the mighty Himalayas, overlooking the valley and guarded by the green around.location But oftenproved in the final as a challenge against the heat this time quarter of the year, the greens seem to disappear. again, and it With was time to move away from Rishikesh My story is about this between. Once upon a time, a long the white taking over, the villagers tried to stand still, thepast location in the hills that they once moved away time ago there was a dainty village nestled amongst as they waddled and struggled toto move the white. from. The for a perfect balance and an apt setting The hill would engulfed in the smell of need pine and the mighty Himalayas, overlooking thebe valley below burning embers as they would struggle onceback again to to the place that they one startred from. got them and guarded by the green around. But often in the final survive the frosty winter. With theThe floor covered unsatisfied human mind made them move up and quarter of the year, the greens seem to disappear. Withground in snow and nowhere to go, with very little to eat; man the white taking over, the and villagers tried to still, animal longed forstand a morsel todown, sleep. down and up. A search for a land that provided
In W.T.V. 7.0, there is a focus on documenting and learning the tangible and intangible 2019 aspects of the village of Saur ,with the help of traditional artisans and families.
UTTARAKHAND 2019
This was achieved by understanding the basic elements and spaces of the built fabric and the underlying principles that it originates from in the form of climate, material and knowledge systems that is available. as they waddled and struggled to move past the white.them with it all, not too cold nor too hot, where the soil must, struggle to survive The hill would be engulfed in the was smell ofthe pine andisand so hope fertile; food is never not enough, water as pure Understanding the role of history, context and culture in structuring and shaping the practiceAtheysolution couldn’t trust. In search forto aas lifespring without struggle, burning embers as they would struggle once again water, air as fresh as the scent of a newly they took upon a journey down. Losing men and and processes of building structures. survive the frosty winter. With the ground floor covered blossomed rose. animals on the way in search of the ne3w land wasAccidentally finding what they hoped
SAUR VILLAGE DRONE SHOTS
in snow and nowhere to go,often withcondemned, very little but to eat; manfor;continue. searching lengths and breadths of the Himalayas, the journey Through and animal longed for a morsel to sleep. treachourous terrains and pine forest, they settled in and there I was sitting and wondering. a place that suited what they thought would work, a
TEAM STRENGTH - 19
M y n a m e i s S a u r a n d t h i s i s my sto r y. . . . My rugged terrain was altered to create places to sow the first seeds to build the first house. In a series of firsts, a year received rainfall like no other, A sudden downpour, that destroyed anything in its path. Crumbling to regain the strength and stability the terrain was wiped of its glory, with flatter terraces, shallower slopes and suddenly created meadows. Providing my new inhabitants with land so fertile, that a variety grew through the year, reducing their dependency to the world beyond me. Years passed by the land continue to yield, sometimes even more than what they need. They finally found a place they called home. Growing and living through the summers and winters. The produce was often sold in the markets of Chamba and Mussorie. A journey uphill that sometimes wouldn’t be worth the fruit it reaped. Secluded and sitting away from the hustle bustle of the development around, what was once sought after was no longer profound. Some moved out some remained. Some new villages like me came into existence like of Jaadipaani, Sunngaon, Khurait, Pujaldi, Khakwadi. I was the seed that branched out into these settlements, with their genesis still lying here with me.
My n am e is S au r an d t h is is my sto r y. . . .
winter without snow astothe hardscape. A solution was must, the struggle and hope survive My rugged terrain was altered to create places to sow the first seeds to build the first house. In a series of firsts, a year received rainfall like no other, A sudden downpour, they couldn’t trust. In search for a life without struggle, Down below but still to a land where summers and that destroyed anything in its path. Crumbling to regain the strength and stability the they took upon a journey down. men and winters wereLosing warm. A concern that continued. The new terrain was wiped of its glory, with flatter terraces, shallower slopes and suddenly animals on the way in search ofproved the ne3w land was location as a challenge against the heat this time created meadows. Providing my new inhabitants with land so fertile, that a variety and it was time Through to move away from Rishikesh often condemned, but theagain, journey continue. grew through the year, reducing their dependency to the world beyond me. Years the location the hills that they treachourous terrains and topine forest, in they settled in once moved away passed by the land continue to yield, sometimes even more than what they need. from. The need for a perfect balance and an apt setting They finally found a place they called home. Growing and living through the summers a place that suited what they thought would work, a got them back to the place that they one startred from. and winters. The produce was often sold in the markets of Chamba and Mussorie. A winter without snow as theThe hardscape. unsatisfied human mind made them up and Mymove rugged terrainjourney was altered tosometimes create places to sow the first seeds to build first uphill that wouldn’t be worth it reaped. Saur sits in the bottom ofthe afruit valley or athe bowl, down, down and up. A search for a Geographically land that provided house. In a series of firsts, a year received rainfall like no other, A sudden downpour, it all, not too cold nor hot, where the soil by hills on all four sides and a narrow stream Down below but still to athem landwith where summers andtoo surrounded Secluded and sitting away from the hustle bustle of the development around, what destroyed is so that fertile; food is never enough,that water as pure anything in its path. Crumbling to regain the strength and stability the winters were warm. A concern continued. Thenot new was once sought after was no longer profound. Some moved out some remained. the of flatter the hills. The hills slopes are transformed terrain wiped of bottom its glory, with terraces, shallower and suddenly as spring water, air as fresh as thedelineating scent of awas newly Some new villages like me came into existence like of Jaadipaani, Sunngaon, Khurait, location proved as a challenge againstrose. theAccidentally heat this time blossomed findinginto what they hoped created meadows. Providing my newtheinhabitants withthe land so these fertile, that a variety terraced farming lands, however, primary Pujaldi, Khakwadi. I was seed that branched out into settlements, with their again, and it was time to for; move awaylengths from Rishikesh searching and breadths ofgrew the Himalayas, through the year, reducing their dependency to the world beyond me. Years genesis still lying here with me. occupation of the people of the village is shepherding. and there sitting and wondering. to the location in the hills that theyI was once moved away passed by the land continue to yield, sometimes even more than what they need. from. The need for a perfect balance and an apt setting They finally found a place they called home. Growing and living through the summers got them back to the place that they one startred from. and winters. The produce was often sold in the markets of Chamba and Mussorie. A The unsatisfied human mind made them move up and journey uphill that sometimes wouldn’t be worth the fruit it reaped. down, down and up. A search for a land that provided them with it all, not too cold nor too hot, where the soil Secluded and sitting away from the hustle bustle of the development around, what is so fertile; food is never not enough, water as pure was once sought after was no longer profound. Some moved out some remained. as spring water, air as fresh as the scent of a newly Some new villages like me came into existence like of Jaadipaani, Sunngaon, Khurait, blossomed rose. Accidentally finding what they hoped Pujaldi, Khakwadi. I was the seed that branched out into these settlements, with their for; searching lengths and breadths of the Himalayas, genesis still lying here with me. and there I was sitting and wondering.
My nam e is S aur and t his is my story....
KEY SI TE P LAN
TYPICAL SAUR HOUSE (PARAMLALJI'S HOUSE) KEY S IT
ANATOMY OF A TYPICAL SAUR HOUSE (PARAMLALJI’S HOUSE)
Believed to be of the Garhwali descent, a region encompassing the north-west of present-day Uttarakhand Saur is a village nestled amongst the Himalayas with a style borrowed from the region has variations to suit the need and adapt to the valley. Common planning principals followed through the region with alterations as per needs where animals shared a common dwelling. The rooms in the ground floor are used for keeping their cattle or as storage rooms. The upper floor is used by the people as their habitable area. The frontyard is used as feeding area for cattle and for various other daily activities like cooking, washing clothes and vessels.The typical elements of a Saur house are small openings , small verandah prjection supported on brackets, verandah posts to support roof and allow for semi-open space, small roof overhang projections.The small windows allow for minimum transfer for heat thus maintain a comfortable temperature.
PLAN
SMALL ROOF OVERHANG
VERANDAH POSTS
BRACKETS
SMALL WINDOW OPENINGS
SECTION
ELEMENTS OF A SAUR HOUSE
EXPLODED ISOMETRIC VIEW
47
KALA GHODA ARTS FESTIVAL VISUAL ARTS
TEAM STRENGTH - 17
(INSTALLATION)
MATERIALS
SITE - KALAGHODA PRECINCT, MUMBAI THEME - A measure of time
PVC DRAINAGE PIPES - 6” DIA
The installation expresses the importance of time defining and capturing events that can never be created in the exact same manner.
(AS A CONNECTOR)
PVC WATER SUPPLY PIPES - 1” DIA (AS FRAMEWORK)
PLASTIC TIES
ACRYLIC SHEETS
STEEL RODS
9” LONG (TO TIE FRAMEWORK AND CONNECTORS)
-2MM THK (AS COLOUR FILTERS)
-10MM THK (AS COLUMN AND BASIC WING SUPPORT)
A union of space and time creates an event. Event cannot individually exist without time. This pavillion is a pause in the event. The change of time transforms the space and this idea is amplified through the play of light and shadow within the pavillion and in a manner that the pavillion gets inhabited by the people. The perception of this break in the event through the passage of time is unique for each individual, thereby getting inscribed in ones memory as a moment in time.
THE IDEA
The light passing through the colours of the pavillion to create patterns on the ground that would create interest among the visitors and making them pause to take a glimpse of it.
48
Further working on the physical manifestation of the idea the form of the pavillion was resloved into the simpler triangular shape. Inclusion of the voids
EXPECTED RESPONSE TO THE PAVILLION
PROCESS
The process begins with a PVC drainage pipe
Drilling holes to house further members
Cutting into seperate rings
This ring is the junction joining different triangles
A smaller diameter pipe is placed concentric to restrict unnecessary movement
Inserting PVC water supply pipes into the larger ring, tieing it to the inner ring with plastic ties.
Connecting multiple such junctions resulting into forming multiple triangles. These multiple triangles form one basic unit.
The columns are place on site.
Making of the exoskeleton. Steel rod is passed through the PVC pipes framework
The wing units are installed on the columns.
Tying the internal unit arrangment with the PVC pipe framework on the exoskeleton
The coloured acrylic sheets are tied to the triangular units with the help of plastic ties.
49
INSDAG
CRICKET STADIUM DESIGN IN STEEL SHORTLISTED - (TOP 16 NATIONALS) SITE - GHAZIABAD, UTTAR PRADESH The aim of INSDAG brief is to create interest about structural steel for architectural expression by exploiting and exploring steel as a material. To achieve this the design brief of 2019-20 was to use steel, for designing an international cricket stadium cum academy for a capacity of 45000 people in the city of Ghaziabad in Uttar Pradesh. Our intent of the design was to make steel iconic but simultaneously optimizing the use of steel to make the roof structurally and visually lighter and breaking away from conventional column beam grid and creating a columnless facade by the use of arch as an element.
50
TEAM STRENGTH - 4
(COMPETITION)
51
SITE PLAN
SITE AND CONTEXT The given site is located in Morti region of Ghaziabad, Uttar Pradesh. Sitting on a plot area of 33 acres the site is in close proximity to multiple modes of transpotation. By road - National Highway By railway - Ghaziabad Railway Station By metro - Shaheed sthal metro Station Airbase - Hindon Airbase
CONTEXTUAL RESPONSE
Char Bagh system has been incorporated for better circulation
SITE PLANNING
Arch as a prominent element
Raised Plinth segregates the pedestrian and vehicular circulation.
The scale and gradeur of the arch has been incorporated.
N
INTRODUCTION Originating from the impression of mughal architecture (Indigenous to the region of North India), The International Cricket Stadium carries a significant mark of the Mughal style. The Arch representing the grandeur, the monumental scale and artistic exploration of the project aspires to invite global attention to the city of Ghaziabad. The Jaalis take care of the ornamentation and natural ventillation. The Char Bagh, has been incorporated in the overall planning of the site. The arches not only form the structural system but are an integral part of the skin of the project.
GROUND TIER PLAN CUT @ +7.5
N
SECTION AA’
FIRST TIER PLAN CUT @ +13.5
N
WEST SIDE ELEVATION
STRUCTURAL SYSTEM
HOGGING AND SAGGING IN MEMBERS
DETAIL - SPLICING
ISOMETRIC- RING,TRUSS AND FACADE
LOAD TRANSFER
DETAIL - ARCH PENCIL END FOUNDATION
DETAIL - STRUCTURAL FACADE FOUNDATION
54
STRUCTURAL ARCHES HOLDING THE ROOF TRUSSES
DETAIL- ARCH RING AND TENSION CABLE
ARCHITECTURAL MEMBRANE ON ROOF TRUSSES
EXTERNAL AND INTERNAL RINGS TIEING THE TRUSSES TOGETHER
TRUSSES HELD BY ARCHES AND STRUCTURAL FACADE
THE STRUCTURAL FACADE
DETAIL- TRUSS AND TENSION CABLE
THE ARCHITECTURAL MEMBRANE ON THE FACADE WOOD COMPOSITE PLASTIC JAALI GLASS FACADE
ARCHITECTURAL MEMBRANE CANOPY
EXPLODED AXONOMETRIC 55
CONSTRUCTION STAGES
1. The lower stands are built
2. The facade starts building up
3. The facade completes
6. The trusses are in place
7. The inner ring ties the trusses
8. The tension cables hold the trusses
PHYSICAL MODEL SCALE 1:500
STRUCTURAL SYSTEM -3D PRINTING (SLS TECHNOLOGY) STADIUM STANDS - LASER CUT (AMERICAN MOUNTBOARD) STADIUM SITE -LASER CUT (MDF) TREES PIN AND PAPER STREET LIGHTS -LASER CUT (FILE CARD) CARS -READILY AVAILABLE
56
4. The external ring ties the facade
9. The architectural membrane shelters the stands
5. The grand arch begins
10. The glass and jaali complete the facade
VIEWS
PEDESTRIAN ENTRANCE
FROM SPECTATOR STANDS
SPECTATOR STAND ENTRANCE
FROM PLAYERS' DRESSING ROOM
57
58
59
THANK YOU Pranav Ashish Chaubal Academy of Architecture