It’s common to think of horizontal directional drilling (HDD) spreads in terms of rig size, but the true workhorse is in fact the mud pumps – a high effi ciency positive displacement piston pump. Without it, drilling fl uid cannot be pumped into the bore to the jet or motor drill, and the bore would not have any stability.
If the pumps are down, the drilling stops
In the Australian HDD sector there is a limited number of available maxi-rigs and powerful mud pumps. Having ready access to additional maxi-rigs and powerful mud pumps is a key means to maintaining project productivity and mitigating the impact of unscheduled repairs. If the pumps are down, the drilling stops.
Mud pressure is lost as it moves through the surface piping and a lot more as it moves down the drill string. Most of the pressure is expended in a jet stream at the drill bit and as it passes through the stages of a downhole motor if being used. At this point the mud pump needs to provide additional pressure to push the mud back along the annulus to the surface, while maintaining an operational long term duty cycle.
It is also important that the mud pump is sized appropriately to adequately cope with the volumes of drilling uid required and to maintain adequate annular velocity in the borehole to ensure cuttings remain in suspension in the drilling uid until the uid exits the borehole. e capacity of the mud pumps is commonly misunderstood and misrepresented. It is common for people to promote their mud pumps as having a 500gpm (1,892lpm) capacity and a 500 psi pressure rating. While both numbers may be on the spec sheet, promoting the pumps as a 500 gpm pump at 5000 psi is almost certainly incorrect. For example: A common HDD pump such as the EWECO 446 – a good all-round pump for smaller projects – is often quoted as having an output of 56 5gpm with pressure rating of 5000 psi. While both numbers are true, they are not true together. e spec sheets show that the pump will do 565 gpm at 1200 psi at 440 rpm max with 6-inch diameter liners.
Or, if the liners are changed to 3-inch diameter, the pump will output 5000 psi, but even at a max of 440 rpm, the ow output is only 141 gpm.
For a long duration longevity on a project, it is good drilling practice to limit the operation to 60 per cent – 70 per cent of the capacity,
Gardner Denver PZ8.
particularly pressure capacity.
Assuming for small HDD projects where ow is more important than pressure, the minimum pump in the example above with the largest liners which should be considered is a 565 gpm x 65 per cent = 367gpm pump. Applying the same logic to the pressure rating 1200 psi x 65 per cent = 780 psi
While there are many contributing factors to pressure such as choke points, valves, drill pipe joint ID, pipe internal roughness, jet nozzle diameter and number to name a few, it would not be uncommon to see 500psi of pressure on a 1000 m jetting hole running 3 x #16 jets at a ow rate of 360 gpm ow rate.
If a downhole motor forms part of the bottomhole assembly (BHA) where the formation is rock, it would not be unreasonable to add 150 – 200 psi to the pressure to operate the motor e ectively on bottom i.e. 200 psi + 500 psi =700psi. For long term operation, the pump is e ectively at maximum capacity.
In general terms, additional pumps can be coupled together to increase ow rate but not increase pressure.
A longer bore or a higher ow motor would break a single pump in a short time. Double pumps don’t provide additional pressure.
To solve the problem, the pump liner diameter must be reduced, which in turn increases pressure output but decreases ow output. So to drill a longer bore (>1500 m) with large downhole motors (>8-inch), triple or quadruple pumps would be required to provided operational longevity.
Or get bigger pumps Maxibor has a eet four of the largest pumps in the HDD industry: two Gardner Denver PZ9 pumps with 1000 HP engines and two Gardner Denver PZ8 pumps with 750 HP engines. ese are 100 per cent duty rated oil well servicing pumps, primarily due to the lowspeed design (130 rpm stroke rate compared to the 440 rpm in the previous example). ey have proven project after project to operate at high ow AND high pressure all day every day for months on end.
From an HDD perspective, dual PZ 8 / 9 pumps have delivered bores in Australia at lengths of 2,500 m in the civil industry and at lengths of 4,000 m in the gas drainage industry. ese pumps allow very long bores to be drilled to solve infrastructure installation challenges or they allow forward motor reaming. is is another technique to solve particular requirements where exit site sensitivities exist, or it is not possible to drill a mud return line. It is these types of pumps that allow high-performance, cutting-edge HDD bore designs to be achieved.
Pumps of this capacity are invaluable, if not a prerequisite, on long bore (+1000 m) and large diameter hole (+800 mm) projects requiring larger maxi-rigs such as the Gallagher 660e, Gallagher 600, American Auger 660 and the Vermeer D330x500, which are a key part of the Maxibor HDD eet. ey are most often required in Australia on river and harbour crossings and long and deep water and sewer projects.
Maxibor will be using its Gardner Denver mud pumps on two landmark projects requiring a total of seven bores each averaging over 2.2 km in length. Availability of the pumps has been one of the key factors in the selection of Maxibor as the HDD provider on these projects.
A HDD provider like Maxibor, with its sizable eet of powerful pumps and maxi and other rigs, provides added comfort to project stakeholders that these key plant items will be available to enable the construction schedule to be maintained.
For more information, please visit www.maxibor.com.au or contact David Turner on 00499 375 511.
WE HELP YOU MANAGE EVERY STEP OF THE WATER CYCLE.
Compliant and innovative water management and network solutions.
Network data capturing & conditions assessment
Network operation & maintenance
Network rehabilitation
Network replacement & capital works
Smart digital solutions
Asset management
Sludge management
Water & wastewater treatment