Masters of Architecture Graduation Project

Page 1

INTRODUCTION

SITE SELECTION PARKADE 900bays (350m - 7min)

URBAN ANALYSIS

for Sun City

2 OK SUPERMARKET (100m)

BANKS (550m - 11min)

The project is located in Harare's central business district. Harare is the capital city of Zimbabwe. The city has been rapidly urbanizing in the past 20 years. With more than 16 percent of Zimbabwe’s total population living in its urban district by 2012, it is not only the most populous city in the country but also the heart of its economy and administration.

m

m 7 7

m q s

OK Supermarket - Nelson Mandela Ave

DEMOGRAPHIC SURVEY

1

95

26

CRESTA HOTEL (450m - 9min)

According to ZimStat's Census published that on August 17/18, 2012 the population of Harare was 2123132 people.

UNITY SQUARE PARK (420m - 8min)

35

Harare Gaderns (650m - 13min)

3

L E D

Harare from Kopje

N O S

A

FORTH STREET TERMINAL (1.2km - 24m)

FI

E V A

RS T

ST

MEIKLES HOTEL (510 m - 10.2m)

RE

AN

ET

M

L E N

PROJECT BACKGROUND Cities are designed for people; walking provides the most basic and engaging way for people to experience a city’s public realm. In urban areas, streets occupy between a little over 25% of all developed land; it is in the nature of our streets that we can classify city as being friendly or hostile to its users. Streets and their sidewalks, the main public spaces of a city are its most vital organs. (Jacobs, 1993). Improving the condition of our pedestrian domains has a proven theoretical potential to sustain a city's growth. Pedestrian oriented developments maybe the engine that will drive solutions of congestion and a general poor urban experience that exists in Harare. This project will be a laboratory for praxis of emerging pedestrianism and new urbanism theories which will consequently foster sustainable city development.

Angwa City - Angwa Street

10 km

OK SUPERMARKET (100m) SI

RR TE

SITE

CBD

E V A

E AC

E G R O GE

LU I S

ST

STERKINERKOR CINEMA (600m - 12min)

MOTIVATION & JUSTIFICATION

COPPACABANNA Parkade (approx. 1200 cars) - Julius Nyerere Way TERMINAL (630m - 13min)

N 330º

30º

300º

As the city advances towards inter-city pedestrianization and its vast bene ts, mixed use developments have not reached their highest potential in the city of Harare. This thesis project will exhibit the applicability, potential complementary bene ts of mixed use developments to inner-city pedestrianization.

W

18

60º

17

15

16

14

13

12

11

10

9

240º

7

E

PARKADE 1200bays (300m - 6min)

120º

210º

PROJECT AIM

8

150º

S

The project aims to improve the quality of the urban experience in the city of Harare along George Silundika Ave. This will create a thriving cultural hub centred around pedestrian needs. Harare through two main objectives: 1. the reconditioning portion of George Silundika in front of the site, and 2. the design of a pedestrian oriented mixed use complex in the city.

TRANSIT NODES Inner city mobility in the city is mainly walking and the vehicle. The main public transit service o ered by the city is in the form of privately owned taxis and commuter minibuses (kombis). However plans for inner city trams are under development.

PROJECT SCOPE The project is located in Harare, as such targets the users of the CBD, The accommodation component targets the workforce that transits in and out of the the city, also back packing tourists that wish to experience the cultured society that can only be found in the heart of the city. The retail component will supplant and expand the existing retail units with rentable retail units. O ces will cater for businesses that need o ce space in an area with high pedestrian volumes.

SURVEY AREA 2 RETAIL OUTLET COUNT

The site is located adjacent to Angwa Street Bus Terminus. It is currently occupied by buildings falling below the city's bulk factor. It is located in an area with very high pedestrian ows.

I D N

TE

EZ IN

3.4km

KA

SITE OPTION 1

INFORMAL TRADERS Most street space and corners have been claimed by informal traders. However being viewed by the majority as a public ill, this industry has proved to be self sustaining element of the city's urban fabric. Against the legal odds, the number of informal traders continues to increase in Harare's inner city.

Mans Shop Building - Angwa Street

HARARE SHOW GROUNDS (1.98km - 39min)

RAILWAY (650m - 13min) CAR PARK 50bays (300m - 6min)

JOINA CITY 600bays (300m - 6min)

INFERENCES ◉ high pedestrian ow as it is near Angwa Street Terminal ◉ zoned for mixed use ◉ located within city's central business district ◉ full block 360deg views ◉ noise from Angwa Street Terminal across Robson Manyika Street ◉ bound by one way streets ◉ not very ideal for full or partial pedestrianisation ◉ no future expansion

SITE OPTION 2 Located diagonally across the former Ximex Mall along Angwa Street. This is the heart of the up-town pedestrian zone in the city. This is a corner lot occupied by Angwa House among a few other two level buildings which fall below the city's recommended bulk factor. The buildings on the site are not under the protection of the National Museums and Monuments Act of Zimbabwe.

INFERENCES ◉ high pedestrian ow as it is near Angwa Street Terminal ◉ site is generally at, however having low water table the can

WALKABILITY INDEX

take on up to three basement levels (Kasiyamhuru, 2015) ◉ zoned for mixed use, located around complementary developments ◉ located within city's central business district ◉ decent orientation ◉ Ideally located to extent First Street pedestrian zone to George Silundika Avenue ◉ has direct access to a service lane for deliveries ◉ site has access to potentially great views at higher levels (+7 storeys) ◉ quiete serene environment, no noise pollution. ◉ proposed site is a quarter of a block, possibility of future expansion exists ◉ adjacent a high tra c vehicular one way street (Angwa Street) ◉ not very ideal for full or partial pedestrianisation

Barclays Building - Jason Moyo

THE CLIENT The project is located in Harare, as such targets the users of the CBD, The accommodation component targets the workforce that transits in and out of the the city, also back packing tourists that wish to experience the cultured society that can only be found in the heart of the city. The retail component will supplant and expand the existing retail units with rentable retail units. O ces will cater for businesses that need o ce space in an area with high pedestrian volumes.

PUBLIC PERCEPTION PEDESTRIAN GATE COUNTS

An emerging trend is the CAR BOOT SALES that has started in the city, especially along Inez Terrace and Angwa Street near the post o ce. This new strand of informal trading needs to be considered as we the city adapts to the emerging urban dynamics. Topics - Crn. First St. & Geroge Silundika Ave

SITE OPTION 3 Located on 1200car parked across the Post O ce. This site is ideally located for a public open space the complements the informal traders and transit activity currently surrounding the site. In line with the theoretical results of the research stage of this thesis project and city's vision 2040 packages and vehicle hotspots will be moved to the fringe of the CBD to make way for pedestrian transit oriented modes of inner city movement.

SITE 3D MODEL IN CITY CONTEX

CLIENT'S BRIEF Harare City planners have shown the intention to advance First Street pedestrian zone by partially pedestrianising George Silundika Ave. and Speke Ave. to Inez Terrace Street. Building on the city's vision, Spring Mutual purchased and consolidated lot 851 to 857 in the CBD for the development of a pedestrian oriented mixed use complex after the reconditioning of the adjacent George Silundika Ave. into a partially pedestrianised street. The complex's building program should intergrate shopping, leisure, living and working.

Prince James Mpande Ncube - N01417597D

LITERATURE REVIEW

CAR BOOT SALES - common sight on London

The term mixed-use development refers to the integration of di erent uses within residential areas to place opportunities within close proximity to its inhabitants and it will thus lead to areas which create more sustainable lifestyles, which are more attractive, viable and safer to live and work in. Embraced in the various aspects of mixed-use development: ◉ Grain

Shared Premises Dimension

◉ Better a ordable service provision Horizontal Dimension

◉ Location ◉ Approach

M.Arch

◉ Increased accessibility ◉ E ective public transport

◉ Setting

◉ Time Dimension

Mixed-use development can serve as an instrument to accomplish a thriving economy in a sustainable liveable city. The usefulness of mixed-use development is a ected by:

Vertical Dimension

OVERVIEW Pedestrian malls, or pedestrianized streets or zones are streets that are almost exclusively closed to vehicular tra c and are primarily reserved for pedestrian use.

Joina City - Jason Moyo Ave.

INFERENCES The only automotive vehicles generally permitted to enter pedestrian mall areas are for delivery, waste removal, and emergencies (Zegeer, 1997). In some cases, other automotive vehicular tra c is permitted to enter pedestrian mall areas at speci c times. In addition, there are some pedestrian malls, particularly in Europe and some larger cities in the US, that include mass transit, such as buses or street cars. These types of pedestrian malls are often referred to as transit malls (Robertson, 1993)

Ms. V. Madiro - Mr. T. Nyamande - Mr. I Ahmed

T h e r e a r e fo u r p r i m a r y t y p e s o f pedestrian malls: a) Modi ed Street – One block of a conventional street is closed to vehicular tra c and reserved for exclusive pedestrian use; b) Plaza or Interrupted Mall – Several blocks of a retail street are exclusively reserved for pedestrian use and cross streets remain open to vehicular tra c; c) Continuous or Exclusive Mall – A multiblock area, including cross streets - is exclusively reserved for pedestrians.

◉ high pedestrian ow as it is near Angwa Street Terminal ◉ zoned for high-rise mixed use developments (Gwenure, 2015)

CHOSEN SITE Site Option 2 has been chosen as the site for the project as it possesses the most opportunities for a successful mixed use development. Of note in its selection as the chosen site is its strategic location to First Street pedestrian zone. Building onto the lessons learnt in the research stage of this thesis project, pedestrian zones should extend from existing pedestrian.

Mixed Use Complex : PEDESTRIAN ORIENTED DESIGN FOSTERING AN ENHANCED CITY EXPERIENCE

◉ good 360deg view and ideal north south orientation ◉ Ideally located to extent First Street pedestrian zone to George Silundika Avenue storeys) ◉ proposed site is a quarter of a block, possibility of future expansion exists ◉ noisy as it is near a terminus and high informal trader zone ◉ adjacent a high tra c vehicular one way street (Angwa Street) ◉ not very ideal for full or partial pedestrianisation, no continuity with Fisrt Street eyestrain zone

National University of Science and Technology

page

1


SITE STUDIES

SITE SPECIFICATIONS : Synergy Group : Harare, Zimbabwe : (77mx35m) 2905sqm - 0.71a : 4(5) : shops (P) : o ces (+1 storey) : residential (+1 storey) : public activity (P) Building Lines : Nil Set-back Proximity : Railway (0.9km) : Supermarket (0.2km) : Forth St Terminal (0.8km) : Copacabana (1.3km) : Unity Square Park (0.9km) : Airport (13km) Vegetation : Hardscape + few Trees along First Street Topography : Gentle NE to SE slope (1:40) Climate : Subtropical Highland / Annual Temp 17.95deg Orientation : East - West Sun Hours : 73% Site Dimension: Client Location Area Bulk Factor Zoning

POOR PEDESTRIAN CROSSING AMENITIES

in

)

13 s(

e

ar r a

H

G12

G12

35 Rubbish, Sorjourning

T WA S ANG

6

UE

VEN A A NDIK U L I S RGE O E G

19

35

REET

19

0

Shadow Solstice - June 20

100

Images showing the condition of the darker sides of the city of Harare

The site is located in First Street pedestrian zone, the block to which the site is located is bound by two high tra c - four lane streets; Angwa Street and Nelson Mandela Avenue. The block is also bound by a pedestrian street: First Street and George Silundika. The site is located on the South - Western corner of the block. The site also has a dedicated serve lane accessible from Angwa Street. George Silundika is the access for the service lane for the adjacent block across the strewt.

SOUT EASTERLY TRADE WINDS

137

50

OK Supermarket - Nelson Mandela

7

3

The average daily wind speed in Harare have been around 11 km/h, that’s the equivalent to about 7 mph, or 6 knots

150

11

Topics - First Street

10

4

quare

S Unity

CLIMATIC ANALYSIS

9

2

O S L E N

12

30º

SERVICES SURROUNDING FACILITIES

First Street - Undesignated Parking

The site ideally located for a pedestrian oriented mixed use development as it is in close proximity to banks, supermarkets, o ce buildings, food-courts and multi-story parkades (see SITE CONTEXT).

REET

20º

The site is located in the CBD. As such, it is fully serviced: water, electricity, water, telecommunication networks, drainage and sewer, refuse collection.

min)

ND A M N

1

Harare CBD one way street distribution

(5 Park

28m above ground

E V A A EL

T ST FIRS

There are three main seasons: a warm, wet season from November to March/April; a cool, dry season from May to August (corresponding to winter in the Southern Hemisphere); and a hot, dry season in September/October. Daily temperature ranges are about 7–22 °C (45–72 °F).

10º

T WA S ANG

average temperatures (ºC)

ACCESIBILITY

n

de r Ga

19

180

SITE INFLUENCES 120

◉ informal traders ◉ con-men and criminals ◉ rubbish dumping ◉ poor maintenance ◉ high pedestrian volumes

60

J F MA MJ J A S O N D

7

STOP

N

W

NO THROUGH ROAD

30º

300º

4

60º

17

8

X

330º

18

The chosen site currently accommodates Angwa House. The buildings on the site are not under the protection of the National Monuments and Museums Act of Zimbabwe.

6

ILU S E G R O E G

3

15

16

VE A A NDIK

13

STOP

SOCIOLOGICAL ATTRIBUTES The project has a number of socio-economic and bio-physical impacts to the micro and macro environment of the site. These impacts may be during and after the completion of the project as explored in the table below.

HISTORY OF SITE

X

REET

average rainfall (mm)

View of George Silundika showing vehicular volumes

m

77 19

First Street across Nalson Mandela Ave

6

2

SUN STUDY

Site is located along Angwa Street which is one of the most tra cked by vehicles and pedestrians. The chosen site's longest facade is along George Silundika which is an extension of the First Street pedestrian zone. This guarantees the site large pedestrian patronage which is important for a mixed use development.

5

1

First Street Pedestrian Zone

alk w

VISIBILITY

14

12

13

11

10

9

240º

8

7

ve aA k i d

5

slope 1:40

e

rg

o Ge

un Sil

view of Angwa House on the site

E

120º

210º

150º

pa

Co ca

Joina City - Jason Moyo Ave.

SITE SECTION X-X | 1:500

a

n ba

SITE CONTEXT in)

m

(15

13

Joina City - Jason Moyo Ave.

12

11

Mans Shops Building

10

Nelson Mandela Ave - aerial view

9

George Silundika Street

Angwa House - Angwa Street

8

Joina City - view from site

WALKABILITY STUDIES

S

PEDESTRIAN GATE COUNTS

Railways (25min)

Prince James Mpande Ncube - N01417597D

M.Arch

Ms. V. Madiro - Mr. T. Nyamande - Mr. I Ahmed

Mixed Use Complex : PEDESTRIAN ORIENTED DESIGN FOSTERING AN ENHANCED CITY EXPERIENCE

National University of Science and Technology

page

2


CASE STUDIES BEIRUT | LEBANON

TWELVE WEST | USA

CASABLANCA | MOROCCO

JOINA CITY | HARARE

ANGWA CITY | HARARE

DESCRIPTION Location Area Cost Completed Materials

DESCRIPTION Location Gross Area Cost Completed Materials

DESCRIPTION Location Gross Area Architect Floors

: Beirut, Lebanon : 11,000 sqm : Elie ABS : 27- oor

DESCRIPTION Location Gross Area Cost Completed Materials

Twelve|West is a mixed-use building designed with sustainability and ongoing learning as integral goals.. The building has street-level retail space, four oors of o ce space leased to a national architectural rm, 17 oors of apartments, and ve levels of belowgrade parking along with three roof-level terraces and gardens.

This design negotiates issues of scale, unit diversity, views and zoning regulations.

Adjacent to a central transportation artery of Beirut. This design negotiates issues of scale, unit diversity, views and zoning regulations.

Typical Layouts

: Portland, Oregon : 552,00 ft2 (51,300 m2) : $138 million : July 2009 : Concrete, Aluminum

: Jason Moyo Ave, Harare : approx. 7.720sqm : $53 million : July 2009 : Concrete, Glass

deliver & services

INFERENCES

: Casablanca, Morocco : 552,00 ft2 (51,300 m2) : $138 million : July 2009 : Concrete, Aluminum

◉ creating of a secure lobby for o ce ◉ access ◉ utilising roof space as parking ◉ inclusion of bars and food outlets ◉ wide internal pedestrian circulation

The project was featured in the Moroccan Pavilion in the 2014 Venice Biennale. This project integrates a multi-program building with nature in a way that has seen it receiving awards of design excellence.

retail secure lobby retail

◉ well designed atrium letting light into

re escape stair

the building ◉ large enough to accommodate multi-

SELECTION

level shopping (Edgars) ◉ basement parking is not friendly to shoppers ◉ west facade not pedestrian friendly

◉ mixed use development ◉ vertical program dimension ◉ live + work complex ◉ intermediate vertical transition bu ers Site Section

work

work

◉ mixed use development ◉ vertical program dimension ◉ live + shop complex ◉ separation of access points

LESSONS

re escape stair

SELECTION ◉ mixed use development ◉ vertical program dimension ◉ live + work complex ◉ vertical dimension development

retail + leisure

deliver & services

Typical O ce Floor

SELECTION

carpark retail + leisure main entrance

atrium main entrance

◉ creating of a secure lobby for o ce ◉ access ◉ utilising roof space as parking ◉ inclusion of bars and food outlets ◉ including parking as part of the program ◉ west facade not pedestrian freindly

Site Plan

INFERENCES Transverse Section

Full Floor Unit

North Elevation

◉ orientation in a restricted site ◉ maximising views from half the site ◉ vertical resolution of mixed use ◉ vertical dimension scheme ◉ diverse living programme giving ◉ separation of public and private access ◉ creating of repeating dynamics that enhance the scheme ◉ no adequate space for transitions from street ◉ lack of enough communal facilities to be shared by residents i.e . laundry

INFERANCES ◉ Good section allowing light into building interior ◉ good orientation of residential units ◉ internal courtyard for relaxation and social interaction ◉ however, its a horizontal program ◉ not the most secure scheme.

SELECTION

Typical Apartment Floor

secure lobby

◉ mixed use development ◉ vertical program dimension ◉ shop + live + work complex ◉ vertical dimension development

INFERENCES ◉ orientation on a vertical dimension ◉ on-going learning from the roof turbines ◉ harnesses wind power from roof turbines ◉ roof level terraces ◉ transit location, connects three di erent districts ◉ used recycled material in construction ◉ pedestrian oriented, lower car use ◉ site di erent form project site

Two Unit Floor

◉ some orientation and climate ideas not compatible with African terrain Section

DESCRIPTION This building entrance is a local personi cation of successful pedestrian conscious design. The setback allows for an important physical and psychological transition form the street into the building. A seamless transition with minimal changes in level among many other things assures the pleasant use of the building by pedestrians. Also to be noted on this brilliant design is the use of light on the ground oor access to create a scenic view on a shaded (southern) constricted site.

general ground level layout

INFERENCES

view of pleasantly landscaped building

building setback to allow for pedestrian ow

LIVINGSTONE HOUSE! Prince James Mpande Ncube - N01417597D

M.Arch

◉ set back allowing more street space for pedestrians ◉ vegetation in front of the site allowing for a good scenic entrance ◉ water feature cools the entrance lobby, relaxing the users of the building as that enter. ◉ large overhanging cantilever canopy, nice architectural feature ◉ good resolution to a constricted site ◉ white material on the building allows for a bright scheme on a shaded site (south facing) ◉ non-mixed use development (o ce block) ◉ rather dark viewless stairwells

Ms. V. Madiro - Mr. T. Nyamande - Mr. I Ahmed

COMPARATIVE ANALYSIS

Upper Ground Floor Layout

SECURITY INTERNAL ENVIRONMENT SUSTAINABLE CONCEPTS PEDESTRIAN ACCESSIBILITY CIRCULATION PLANNING PROGRAM DIVERSITY

Mixed Use Complex : PEDESTRIAN ORIENTED DESIGN FOSTERING AN ENHANCED CITY EXPERIENCE

National University of Science and Technology

page

3


DATA SYNTHESIS DATA APPLICATION - SITE ANALYSIS

SITE SELECTION

average temperatures (ºC)

Rentable Retail (large) Shopping Floor Manager's O ce Kitchenette Rentable Retail (small) Shopping Floor Wet Area Financial/Banking Outlet Reception and Waiting Area Transactions/Cashiers O ces Sta Room Ablution Facilities Storage and Strong Room ATM Machines

Unit Area (m)

Units

98.0 7.2 5.2

12 12 12

52.0 6.0

21 21

36.0 24.0 12.4 24.0 18.0 8.6 11.6

1 1 1 1 1 1 1

Occupancy

Total Area (m)

VEGETATION Concentrate vegetation on the south western extreme of the site. Design will allow this section to enjoy the longest day hours. This will be important in the creation of a sustainable mico-ecosystem that will complement the design

STOP

9

80.0 24.0 12.4 24.0 18.0 8.6 11.6 11.6

1 1 1 1 1 1 1 1

85.0 8.6 40.0 3.6 12.0

1 1 1 1 1

ATM Carosel ATM Booths (3 booths) Service

21.0 26.0

1 1

Reception and Waiting Area Meeting Spaces Break Away Rooms Copier and Stationery Room Files and Archives Enclosed O ces Open Plan O ces

3

STOP

SHOPPING

OVERAL BUILDING RATIOS

18

48.0 80.0 12.4 24.0 18.0 16.0 230.0

10 10 10 5 5 90 5

18.0 59.2

5 5

2081

20 12

60º

17

15

16

14

13

12

11

10

9

240º

8

7

E

First Street across Nalson Mandela Ave

120º

Angwa House - Angwa Street

150º

from Solar Control...

ORIENTATION

The orientation and the site is equator facing (north), there will be need to employ xed solar devices to the north and optionally movable solar devices to the east and north east of the building. Plumtree has a maximum of 9.5 hours of sunshine per day from May to October and a minimum of 5.5 hours in December when cloud cover is maximum.

The site is located on the shaded side of the block. This in not ideal for vegetation as it will be shaded a better part of the day. As for retail spaces, the success and failure of a mall greatly hinges on the amount of natural light that enters the retail space. The design will integrate strategies to allow light in parts of the building.

MOVEMENT PATTERN ANALYSIS

WORKING

20 8 8

3 5 6

Duplex Apartments 3 Bedroom Apartment 4 Bedroom Apartment

60 73.0

36 12

6 7

59.2 18.0

1 1

4590

STOP

TOTAL

M.Arch

9

1

110

300.0 83.6 24.0 59.2 128.6 6.4 8.0

alley

to Solar Harvesting! OUTDOOR SPACE

3093.8

Vehicular Circulaiton Pedestrian Circulaiton

5211.2

1 20 22 3 3 1 3 TOTAL

Prince James Mpande Ncube - N01417597D

E G R O GE

S

48.5 61.0 80.0

Main Concource Vertical Circulation Lobby Fire Escape Staircase and Lobby Public Ablution Facilities Delivery Bay/Service Lobby Information Desk Security O ce

S

D N U L SI

30º

300º

W

8

Housing Suite Condominiums 2 Bedroom Apartment 3 Bedroom Apartment 5 Bedroom Apartment

Luandromat Deck Recreational Area

The full length of George Silundika between First Street and Angwa Street will be fully pedestrianised. Tra c accessing the service alley from this level will be redirected to alley access along Jason Moyo and Angwa Street.

NO THROUGH ROAD

330º

Employ pedestrian safety crossing measures to improve the walkability of the busy Angwa Street.

E T I

A K I

PEDESTRINISE

CROSSING

TOTAL

LIVE 35%

sunlight

E V A

X

N

Restaurant Dining Area Bar Kitchen and Storage Delivery Receiving Ablution and Changing Facilities

Service Spaces Tea Preparation Ablution Facilities

WORK 30%

views

ST

SHOP 14%

19

X

PROGRAM SCHEDULING Head Room (m)

150

views

E AC RR

AMENITIES 21%

100

sunlight

TE

The site accommodates more Residential units than any other program followed by the Work then Retail

REET

High Tra c Road Treatment

TOTAL

ACCOMMODATION SUMMARY

T WA S ANG

J F MA MJ J A S O N D

50

allow views across site

210º

60

19

EZ

120

137

ANTHROPOMETRIC DATA

Bank Banking Hall Counselling and Interviews Transaction Counters Back O ce Sta Room Security O ce Strong Room ATM Machines

180

19

10º

1

IN

20º

site nto

30º

Typical Internal Spacial Arrangement

35

eo

Safe Pedestrian Crossing Design

◉ however existing, future expansion would be di cult ◉ adjacent a high tra c vehicular one way street (Angwa Street) ◉ not very ideal for full or partial pedestrianisation ◉ constricted site

The site experiences high rainfall during the rainy season. It is advisable to harvest rain water for appropriate residential use in the facility i.e. car washing bays. Good ventilation will be needed as the site experiences relatively higher than lower temperatures.

right to views

UE

AVEN A IK UND L I S RGE GEO

0

SITE THREATHS

CLIMATIC ANALYSIS

6

d sha

110 Seater Restuarant Layout

◉ high pedestrian ow as it is near Angwa Street Terminal ◉ site is generally at, however having low water table the can

existing building has o ce views cutting across the site. As such the is need to accommodate this site feature as the design is being developed

35

19

RESTRICTIVE CAVEATS

SITE OPPOTUNITIES

average rainfall (mm)

77

O ce Structural Layout

The site is locate diagonally across the former Ximex Mall along Angwa Street. This is the heart of the up-town pedestrian zone in the city. This is a corner lot occupied by Angwa House among a few other two level buildings which fall below the city's recommended bulk factor. The buildings on the site are not under the protection of the National Museums and Monuments Act of Zimbabwe.

take on up to three basement levels (Kasiyamhuru, 2015) ◉ zoned for mixed use, located around complementary developments ◉ located within city's central business district ◉ decent orientation ◉ Ideally located to extent First Street pedestrian zone to George Silundika Avenue ◉ has direct access to a service lane for deliveries ◉ site has access to potentially great views at higher levels (+7 storeys) ◉ quiete serene environment, no noise pollution.

SITE DIMENTIONS

◉ reading ◉ sur ng the internet ◉ sorjourning ◉ public performances ◉ light retail

The image shows the vehicular and pedestrian movements on the site. This information is important in establishing the required street treatment and identi cation of streets that can be converted into pedestrianised zones.

LIVING

Ms. V. Madiro - Mr. T. Nyamande - Mr. I Ahmed

Mixed Use Complex : PEDESTRIAN ORIENTED DESIGN FOSTERING AN ENHANCED CITY EXPERIENCE

National University of Science and Technology

page

4


DESIGN DEVELOPMENT

PHILOSOPHY The project is primarily driven by the theoretical discoveries and the subsequent recommendations of the research stage of this thesis project. A pedestrian oriented development that hinges on new urbanist theories of pedestrianism.

The designer builds on the theory of enhancing urban experience through pedestrian oriented developments

SITE ZONING

CONCEPT FORMULATION

Horizontal Zoning

Horizontal Zoning

Horizontal Zoning

living

living

living

retail

o ce

o ce

Vertical Zoning

OPTION TWO

◉ has generous setback that allows good street interaction ◉ retail located at the base ◉ living area separated from ground ow access ◉ allows for views across the site ◉ poor relation between o ce and retail space ◉ retail zone not receiving light

◉ has generous setback that allows good street interaction ◉ retail located at the base ◉ living area separated from ground ow access ◉ allows for views across the site ◉ atrium design allows light into the retail zone ◉ poor relation between o ce and retail space

FUNCTIONAL RELATIONSHIPS

Live

secure lobby

Residential Units o ce

Twisting residential level allows for gardens and balconies in the spaces created

OFFICE LAYOUT secure lobby

STRUCTURAL SYSTEM

◉ good inter-relation between retail and o ces ◉ retail located at the base ◉ living area separated from ground ow access ◉ allows for views across the site ◉ atrium design allows light into the retail zone ◉ chance of overlapping access between shoppers and business people/residents

ELEVATION CONCEPTS

Communal Sapces

Receiving Dock

Cold Store

o ce secure lobby

atrium

conceptual structural system, distributing everything to the core through a service level.

o ce

OFFICE LAYOUT

secure lobby

Fire Escape Files Room

Meeting/ Conference

RETAIL LAYOUT

FLOOR PLAN CONCEPTUALIZATION

RESIDENTIAL LAYOUT

OFFICE

Deliveries

shops

secure lobby

The bubbling emphasises on clear circulation that creates a safe and e cient environment for shopping, business and living. The e cient separation of public and private spaces guarantees a functional spacial relationship.

The architect has been formally commissioned by the client to design a mixed use complex that harmoniously sums up all the lessons on pedestrianism and pedestrian oriented developments.

shops

apartments

Residents Access

RESTAURANT

atrium

secure lobby

Vertical Access Lobby

Shop

CONCEPTUAL LAYOUTS

shops

Fire Escapes

Entry

Work

RESIDENTIAL LAYOUT

Residential Suites

Deliveries

Secure Lobby

In one word...

ARCHITECT's BRIEF

o ce

O ce Space (open plan)

OPTION THREE

RESIDENTIAL ZONE

BUILDING

A transmutation of space to create a novel building that will inspire a more sitings pedestrian oriented design approach in the city of Harare.

Copy Room

atrium

RETAIL LAYOUT o ce

atrium

secure lobby

o ce

OFFICE LAYOUT

apartments

apartments

CIRCULATION PLANING

secure lobby

Empties Waiters

Kitchen

O ce Space

Kitchen/ Tea Prep.

RESIDENTIAL LAYOUT

Bar

This project will allow for the praxis of theories discord and pro ered on pedestrian oriented design in the research stage of this thesis project.

service acess Ablution

Dining Room

Ablutions

RETAIL

Fire Escape

Reception

Customer Access

Customer Access

FINANCIAL/BANKING Secure Lobby

Kitchen

Deliveries

O ce

Trans. Counters

Storage Shopping Floor

M.Arch

Back O ce

Sta

Receiving Lobby

Customer Access

Prince James Mpande Ncube - N01417597D

RETAIL LAYOUT

apartments

retail

Vertical Zoning

Vertical Zoning

OPTION ONE

PROGRAMATIC ALCHEMY*

The design of the mixed use complex will seek to act as a laboratory for the extension of the mixed use complex to include a residential program.

shops

atrium

DESIGN CONCEPT

SYNERGY

POS

POS

SCHEME ONCE

POS

SCHEME TWICE

FACILITIES: The scheme harmoniously integrates shopping, working and living environments into a hybrid building.

retail

SCHEME THRICE

ROUTE PLANING: The design greatly emphasises on the use of clear circulation planning that e ciently separates public from private spaces.

retail

retail

Strong Room

Secure Area

Banking Hall

LETS TALK ABOUT THEM...

LIGHTING AND TRANSPARENCY: Natural lighting will be greatly employed to light the interior. The scheme will integrate a grand atrium that allows for natural light into the retail and parts of the o ce spaces. At higher levels the building will employ full height glazing allowing transparency through building allowing inhabitants a full panoramic view of the city.

atrium

shops

o ce

SPACE AND MOVEMENT: The design will be dynamically moulded by access and circulation within and around it. Lower level access will employ landscaping features that will physically and psychologically transition the user in the a clam state ready to work or relax.

secure lobby

IDEA BAG

shops

shops

SCHEME ONE

SCHEME TWO

SCHEME THREE

However visually stable most of the features of this scheme have been discarded

Site chosen for having the best opportunities for a successful mixed use complex

the idea of shifting carried forward

Customer Access

Ms. V. Madiro - Mr. T. Nyamande - Mr. I Ahmed

oor levels will be

work + live shop + play

* statement coined by BIG Architectural Group - Denmark

Mixed Use Complex : PEDESTRIAN ORIENTED DESIGN FOSTERING AN ENHANCED CITY EXPERIENCE

National University of Science and Technology

page

5


27 ANGWA STREET | MIXED USE DEVELOPMENT ADJACENT BUILDINGS

ADJACENT BUILDINGS

ADJACENT BUILDINGS

PERSPECTIVES D

E

F

G

H

I

10.1sqm

Servery

Fire Lobby

12 13 14 15 16 17 18

RESIDENTS ACCESS

F

F

Store

6.4sqm

4.1sqm

Cold Store

Retail

Retail

37.9sqm

5.0sqm

Retail

55.9sqm

PF Conc

PF Conc

Retail

PF Conc

PF Conc

41.8sqm

27.1sqm

PF Conc

Display

F

Retail

Retail

41.8sqm

67.1sqm

PF Conc

Security

1

y

T UC

y

9

8

7

6

5

4

3

2

1

ATM Service

D

bb

2h Fire Rating

duct

k es Lo

Service Corridor

500.4sqm Porcelain Tiles

Ramp Down

3

2

ft Li

4 5

re

17

6 7

s

or

14

8 9

ft 2

RT T

se c

El ev

at

13

17 16

10

15 14

Li

80

18

11

Se

Fall 1:8

15

cu

1

3

O ffi c

Re

e

13.1sqm

12

ed ris pe su ca es Es Pr ire F

1

13

ft

9

Roller Shutter

10

Security

9 8 7

10

8

Retail

11

7

Li

12

6

13

5

Shelves

14 15

3 16

2 17

1 18

10

11

12

13

14

15

16

17

9

8

7

6

5

4

3

2

1 18

Retail

11

Retail 29.1sqm

PF Conc

1

23.8sqm

PF Conc

5

52.5sqm

SHOPPERS ACCESS

Retail

6

4 3

PF Conc

Display

2 1

Display

2400 wide

54.8sqm

PF Conc

Display

Canopy

Canopy

Retail

1

Extent of Original Pavment

2400 wide

Safe Pedestrian Crossing

BASEMENT ACCESS A

B

C

D

E

F

Sojourning & Social Interaction

Street Art/informal Traders

Kufamba Market

Kiss and Drop

2

PF Conc

Main Concourse

D n

Escalator 2

Security

rit

io

18

pt

17

ce

16

cu

15

Se

14

54.2sqm

18

OFFICE ACESS

13

s

on

Retail

Atrium above

4

Company Logos (street floor)

3

3

Ramp Up

12

e

ov

Ab

Building Signage

2

16

es

c ffi O

X

1

iti Atrium above

Display

Extent of Original Pavment

2

Fall 1:8

ATMs

Waiting

3

F HR

10.5sqm

ib

Fire Assembly Point A

12

xh

57.6sqm

Waiting

Specialist Detail

Stage

lE

Audience

Information Desk

11

na

io

ot

om Pr

Y

72ppl

19.2sqm

4

Fitting Cubicles

10

Escalator 1

e

ANGWA STREET

ov

Ab

SHOPPERS ACCESS

es

c ffi O

Performance Space

2

5

44.5sqm Ceramic Tiles

Supervisor

3

Water Feature

6

Fire Lobby

Canopy

Y

7

170 high kurb

12.3sqm

50ppl

10

Kitchen

Waiters

Food Court

Security

11

24.0sqm WF Conc

8

Service Corridor

74.8sqm Porcelain Tiles

12

Lift 5

X

10

Dining

Ice Cream

Lift 5 Lift 4 Security

18

180sec RTT

11

1

9

Elevators

17

2

8

Reception Desk

7

12

9

16

3

13

8

6

13

9

18

15

4

14

7

5

14

15

Security

17

14

5

16

6

4

15

M

Delivery Bay

16

13

6

5

16

17

4

15

7

18

Temp Rubbish Store

F HR

Waiting

17

4

1

8

Chute 3

2

18

Roller Shutter

14

11

3

Secure Lobby

9

12

4

Service Corridor 3

5

Roller Shutter

2

10

6

Service Corridor

F

11

7

Roller Shutter

10

8

Lobby

Roller Shutter

2

Fire Hydrant

9

Pressurised Fire Escape

Deliveries

13

Deliveries

Deliveries

1

Pressurised Fire Escape

L

SERVICE LANE (6000 wide) Roller Shutter

4

K

12

SERVICE LANE (6000 wide)

J

1

C

11

B

10

A

G

H

Fire Hydrant

I

Fire Assembly Point B

J

Street Art/informal Traders

K

L

Kufamba Market

GEORGE SILUNDIKA

Ground - Site Plan 1:100

Prince James Mpande Ncube - N01417597D

M.Arch

Ms. V. Madiro - Mr. T. Nyamande - Mr. I Ahmed

Mixed Use Complex : PEDESTRIAN ORIENTED DESIGN FOSTERING AN ENHANCED CITY EXPERIENCE

National University of Science and Technology

page

9


27 ANGWA STREET | MIXED USE DEVELOPMENT X

H

4

4

16

3

17

2

18

1

Temp Holding

Common Room

40

41

Chief Security 12.4sqm

Security Post

8 7 6 5

CCTV

F M

OFFICE PARKING

Grilled Floor Drains

38 39

F HR

9

Lift 5

15

Fire Lobby

14

5

Passage

42

43

44

45

4 3 2

Security

1

PERSPECTIVES

18

13

6

L

17

12

7

K

16

11

8

J

15

9

I

14

10

48.6sqm

G

Pressurised Fire Escape

Vent Gas Plant Room

F

13

4

E

Fire Lobby

Grilled Floor Drains

46

47

48

49

50

51

170 high kurb

37

Fall 1:8

Fall 1:8

32

31

30

29

28

27

26

25

24

X

Grilled Floor Drains

23

22

21

20

19

18 Grilled Floor Drains

OFFICE PARKING

2

170 high kurb

2

Ramp Up

170 high kurb

33

Ramp Up

34

Y

170 high kurb

Y

Vehicle Elevator

Fall 1:8

OFFICE PARKING

35

3

Ramp Down

3

170 high kurb

36

Ramp Down Fall 1:8

18 17 16

17

16

15

14

13

11

12

170 high kurb

10

9

8

7

6

5

4

3

2

15

1

14 13

F HR

12

Retail

11 10 9

Office and Retail Switch Room

8 7 6 5 4 3

F HR

28.2sqm

2 1

11

10

12

13

14

15

16

17

18

9

8

7

6

5

4

3

2

1

[-2&-3] Residents Basement Parking 1:150

D

11

C

12

B

10

A

1

X

1

43

44

45

63

64

65

66

Grilled Floor Drains

RESIDENTS PARKING 42

62

46

47

48

49

50

Rentable Storage

30

29

28

27

26

25

24

X

Grilled Floor Drains

16

15

12

9

20.2sqm

13

Secure Access

7

6

3

2

Roller Shutter

31

17

20.2sqm

Rentable Storage

Vehicle Elevator

Fall 1:8

Y Fall 1:8

32

No Parking

170 high kurb

170 high kurb

2

Rentable Storage

8

170 high kurb

33

20.2sqm

11

Ramp Up

34

Security

Ramp Down

Y

Security

Secure Access

35

RESIDENTS PARKING

3

Lift 5

51

37

36

10

15.2sqm

61

15.2sqm

60

15.2sqm

59

Fire Lobby

15

Rentable Storage

58

1

15.2sqm

41

57

2

15.2sqm

40

56

3

Rentable Storage

39

55

4

Rentable Storage

Grilled Floor Drains

38

54

5

Rentable Storage

No Parking

53

16.1sqm

6

Rentable Storage

52

16.1sqm

7

Roller Shutter

1

No Parking

2

18

Lift 5

17

Lift 4

16

14

13

11

12

23

22

21

20

19

18 Grilled Floor Drains

RESIDENTS PARKING 170 high kurb

10

9

8

7

6

5

4

3

2

Rentable Storage

1

Mechanical Plant Room

Rentable Storage

Rentable Storage

Rentable Storage

Rentable Storage

35.3sqm

35.3sqm

35.3sqm

35.3sqm

35.3sqm

1

2

3

4

5

10

11

12

13

14

15

16

18

F HR

9

8

7

6

5

4

3

2

1

Sump

Pressurised Fire Escape

37.5sqm

17

[-1] OfďŹ ce Basement Parking 1:150

15

3

8

18

14

4

19.5sqm

Rentable Storage

17

13

5

Control Officer

16

12

6

Store Room

15

11

7

9

14

37.5sqm

8

13

25.3sqm

10

Elevator Lobby

9

11

Pressurised Fire Escape

12

Mechanical Plant Room

4 10

4

1

1

A

B

Prince James Mpande Ncube - N01417597D

C

D

M.Arch

E

F

G

H

Ms. V. Madiro - Mr. T. Nyamande - Mr. I Ahmed

I

J

K

L

Mixed Use Complex : PEDESTRIAN ORIENTED DESIGN FOSTERING AN ENHANCED CITY EXPERIENCE

National University of Science and Technology

page

10


27 ANGWA STREET | MIXED USE DEVELOPMENT FUNCTIONAL ANALYSIS

B

C

D

E

F

G

H

I

J

K

L

PERSPECTIVES

X

A

10

10

37.7sqm Ceramic Tiles

Fire Lobby

Orders

Waiters

F HR

24.0sqm WF Conc

Strong Room Office 4.1sqm

Cold Store

Supervisor Store

4.1sqm

Retail

Retail

5.0sqm

Retail

39.4sqm

66.9sqm

Retail

37.8sqm

8.2sqm

Office

Office

8.2sqm

8.2sqm

Retail

37.8sqm

24.3sqm

14 15 16 17 18

4

6.4sqm

Service Lobby

Lift 5

11

9

11.1sqm

11

9

Bar

12

8

Lift 5

13

12

8

13

Lift 4

14

13

7

12

SHOPPERS ACCESS

15

14

7

50ppl

16

15

6

Kitchen

16

6

Food Court

45.9sqm

Fall 1:8

M

5

1

Void

Ramp Up

F

5

11

2

F

4

3

F

17

4

10

4

18

17

3

5

Chute

18

2

6

F

1

7

Lobby

3

8

Service Corridor 2

9

Service Corridor

F HR

RESIDENTS ACCESS

4

Pressurised Fire Escape

1

4

3600 wide

2

Reception/ Enquiries

1

2

3

4

5

6

7

8

9

Escalator 4

Escalator 2

Escalator 1

Escalator 3

84.7sqm

ATMs

18

17

16

15

14

13

12

11

ART/MARKET

Y

10

ART/MARKET

Rentable Space (Kiosk/ Cosmetics)

Y

Writing Shelf

34.9sqm

BASEMENT ACCESS

Void

ATM Service

186.5sqm

Security

2

13.1sqm

Corridor T UC 3

2

Li ft

1

3

Reception/ Cashier

4

18

5 7

15

X

6

16

8

14

9

2

11

Li ft

10

0.300

165.9sqm

17

12

Void

19.9sqm

1

10

ft

Gaming

18

1

17

2

16

3

15

4

14

5

13

6

12

7

11

8

Li

0.890

Anchor Retail

52.5sqm

44.1sqm

9

1.800 3.580

Retail

Internet

13

0.890

3600 wide

M

D

73.1sqm

35.2sqm

Corridor

3600 wide

Security

2

Back Office

F

Void

3

Banking Hall

1

OFFICE ACESS

3

MAIN SHOPPERS ACCESS

Writing Shelf

Corridor

3600 wide

Cashiers

Fall 1:8

Security

Corridor

45.9sqm

3

Outdoor Deck

Ramp Down

Vending Stall Plan 1:30

30.5sqm

Technician 9.2sqm

igh

1800 h

1

1

art A

View Open

View Closed & Locked

B

C

D

E

F

G

H

I

J

K

L

F

G

H

I

J

K

L

Retail First Floor Plan 1:150 B

C

D

E

X

A

4

13

7

12

12

8

11

11

8

9

10

10

9

13 14 15 16 17 18

Fire Lobby

Retail

Retail

Retail

39.4sqm

Retail

37.8sqm

37.8sqm

8.2sqm

Office

Office

8.2sqm

8.2sqm

Retail

24.3sqm 4

66.9sqm

24.0sqm WF Conc

Strong Room Office 4.1sqm

Street View

Service Lobby

Lift 5

13

7

Lift 5

14

6

Lift 4

15

14

6

12

1

16

15

5

2

16

5

11

3

224.3sqm

4

4

17

4

10

5

Chute 18

17

3

6

Service Corridor 18

2

7

Service Corridor

Anchor Retail

1

8

3

9

2

Pressurised Fire Escape

1

4

Security

2

3

ATMs

18

17

16

15

14

13

12

11

10

Reception/ Enquiries

84.7sqm

1

2

3

4

5

6

7

8

9

Escalator 4

Escalator 2

Y

25.2sqm

Escalator 1

Escalator 3

Y

3

Banking Hall

1

Rentable Space (Kiosk/ Cosmetics)

Writing Shelf

3600 wide

3

Vending Stall Design

Corridor

3600 wide

Cashiers

Corridor

Writing Shelf

Void

SERVICE

ATM Service

186.5sqm

Security

2

13.1sqm

F

Corridor

3

2

1

ft 3

4

Li

18

5 6

16

7

15

8

14

9

X

12 11

2

Perfume Section

Internet

13

79.4sqm

Reception/ Cashier

17

Retail

3600 wide

M

D UC T

3600 WIDE WALK

35.2sqm

Corridor

3600 wide

Security

2

Back Office

Anchor Retail 197.7sqm

52.5sqm

Li

ft

10

46.9sqm

10 11

13

6

12

7

Li

8

18

1

Gaming

17

2

16

3

15

4

14

5

3600 WIDE WALK

47.7sqm

9

ft 1

Retail

30.5sqm

Technician 9.2sqm

1

Retail First Floor Plan 1:300

Prince James Mpande Ncube - N01417597D

A

B

C

D

E

F

1

G

H

I

J

K

L

Retail Second Floor Plan 1:150 M.Arch

Ms. V. Madiro - Mr. T. Nyamande - Mr. I Ahmed

Mixed Use Complex : PEDESTRIAN ORIENTED DESIGN FOSTERING AN ENHANCED CITY EXPERIENCE

National University of Science and Technology

page

11


27 ANGWA STREET | MIXED USE DEVELOPMENT C

D

E

F

Double Skin Module

I

H

L

K

14.7sqm

Balustrading

14.7sqm

16 people

F HR

Office Corridor 1

2

3

Office

4

Office

13.5sqm

Metting 1

Office

13.5sqm

Office

13.5sqm

13.5sqm

Office

13.5sqm

50.3sqm 16 people

Meeting

4

PERSPECTIVES

Culture Wall

14.7sqm

Lift 4

50.3sqm

14.7sqm

50.3sqm

Office

13.7sqm

18

1

14.7sqm

Office

Break-away Room

17

2

14.7sqm

Office

9 8 7 6 5 4 3 2

18

16

3

14.7sqm

17.6sqm

Office

17

15

4

11.9sqm

Office

16

14

5

Office

15

13

6

Office

14

12

7

Balustrading

Meeting 2

General Storage

13

11

8

File Room

12

10

Break-away Room

9

Lift 5

Pressurised Fire Escape

Balcony

J

11

4

Double Skin Module

G

X

B

10

A

1

F HR

Copy & Print

Handrail

3

Handrail

ou D

Y

e bl

Pool Office

in

Sk

W ai tin g

e ul

od

M

Co-operate Roof Garden

Atrium Below

269.1sqm 24 Work Stations

Handrail Handrail

2

Handrail

1 17 18

24.5sqm

16

2

e

DUCT

14 15

3

ul

22.5sqm

13

5 4

od

Male Ablution

10

11

12

6

M

Female Ablution

2 ft Li 7

Li

10

Culture Wall

1 2 3 4 5 6 7 8 9

T

1 ft

8

in

Double Skin Module

D

3 ft Li

s

at

RT

se

c

ev

El

Recovery

T UC

y bb Lo e O ffi c re

or

cu Se

g

80

10

tin

11

9

Sk

ed ris pe su ca es Es Pr ire F

e

bl

ou

D

W ai

11

9

X

12

8

13

13

7

14

14

6

17 15

15

5

18 16

12

16

4

5.6sqm

17

3

F HR

Kitchenette

18

2

W ai

Covered Eating 1

tin

g

Re

ce

pt

io

n

2

Landscaping

3

Y

Handrail

Landscaping

Balustrading

1

Balustrading

1

Double Skin Module

A

B

C

D

E

F

H

G

I

L

K

J

Culture Wall

1

Office

16 people

Meeting

Break-away Room

Office

18

Office

17

Office

16

Office

15

X

2

14

4

3

13

3

4

12

Metting 1

2

5

Balustrading

16 people

Office Corridor 1

6

11

Lift 4

Y

F HR

Balcony

Meeting 2

10

9 8 7 6 5 4 3 2 1

F HR

le

24 Work Stations

Handrail

Atrium Below

in

Sk

Co-operate Roof Garden

Atrium Below

Landscaping

b ou

Pool Office

Handrail

X

D

Copy & Print

Handrail

u od

M le

Handrail

y Lo bb

2 3 4 5

T

6

UC

7 8

D

9

ffi ce

16 15 14 13 12 11 10

2

X

10

7

11

2

Se

9

8

3

3 4 6

12

5

13

Li ft

16

1

17

Kitchen

14

O

17

18 15

F HR

cu re

18

10 11 12 13 14 15 16 17 18

1

Female Ablution

4 3 2 1

n

i Sk M

DUCT

7

ft

8

5

e

Li

Landscaping

Y

6

bl

Balustrading

Balustrading

e

ul

od

Male Ablution

Li

ft

Y 9

ou

D

Culture Wall

Re ce pt W i ai tin on g

Handrail 1

Double Skin Module

Office

18

Office

17

Office

16

Office

15

Office

14

Office

7

13

Office

8

12

File General Room Storage

9

11

Y

Break-away Room

Balustrading 10

Lift 5

[+03] Office Layout 1:150

Double Skin Module

Typical Office Layout 1:150 Prince James Mpande Ncube - N01417597D

M.Arch

Rendered Layout 1:150 Ms. V. Madiro - Mr. T. Nyamande - Mr. I Ahmed

Mixed Use Complex : PEDESTRIAN ORIENTED DESIGN FOSTERING AN ENHANCED CITY EXPERIENCE

National University of Science and Technology

page

12


27 ANGWA STREET | MIXED USE DEVELOPMENT X

c

Lift 5

Passage

9

6 5 4 2

8 7 6 5 4 3 2

Elevator Lobby

18

tra

tre en

En

tC

N CO

Kitchen

O

D

12.1sqm

Bed 2

ss Pa e ag

5.1sqm

10.8sqm

Lounge

Dining

19.6sqm

17.4sqm

12 10

6.6sqm

Bed 1

En-suite 7.2sqm

20.5sqm

Lanai 7.2sqm

X

Bed 4

[+10] Residential Apartments 1:150

T

D N BE E R M U RT FO A AP

Balcony

Bed 3

Balcony

Bed 1

Lounge

En-suite

16

Entrance

13.0sqm

6.2sqm

Bed 2

18.6sqm

13.4sqm

Bath

X

17

D

BE

Lift 4

1

Kitchen

14.8sqm

15

19.3sqm

Balcony

e

m

nc

14 16

sq en

11 15

.3 m in

10

y on

O TW

12.6sqm

9

Lift 5

ge un

e ag

lc

Ba

13

15 rta

ss

Pa

[+10] Residential Apartments 1:100

Den

13.0sqm

Bed 1

II

I

i

Bed 1

19.6sqm

14

5.1sqm

j

D.W. D.W.

17.3sqm

III

7.2sqm

h

12

Lo

e 11

II

Pressurised Fire Escape

Dining

Bed 4

En-suite

Balcony

[+09] Residential Apartments 1:100

10.8sqm

Bath

6.2sqm

I

i

e

III

7.2sqm

5.1sqm

14.8sqm

10.8sqm

ag

te

ss

e

Bed 4

En-suite

Bed 3

Pa

ag

En

.7

id Vo sqm

ss

Pa

Bed 1

g

Bath

j

13.0sqm

39.3sqm

f

j

Bed 2

Main Residential Entrance

Bed 2

Living

10.8sqm

6.2sqm

Balcony

13.4sqm

Bed 3

h

15.3sqm

i

14

y

14.8sqm

4.6sqm

6.9sqm

9

9

on

Dining

y

on

qm

6s

lc

Ba 2. LE G X ) N LE R SI UP E D OW (L

g

Bath

18

8

8

Bed

j

13.0sqm

39.3sqm

Bed 1

13

16 15

10

7

7

lc

Bed 2

5.8sqm

17

e 18

F Es ire ca p

11

6

6

16.2sqm

13.4sqm

Ba

Kitchen

1

X

3 2 1

3

6

8

9 8 7

nc e

Lift 4

Lift 5 Lift 4

Passage

X

5

17

I.C B.

tra

7

5

5

12

Fu rn

w

En

4

13

4

4

e

Kitchen

Living

f

3

3

13.0sqm

Kitchen

36.7sqm

2

ny

2

Bath

Bed 1

1

1

qm

18

4.6sqm

i Living

h

2

17

o lc Ba

in g

16

10.8sqm

d

r do e rri wid Co 400

15

18

2

17

9s

15.3sqm

14

16

e

r do e rri wid Co 400

15

in

13

14

ag

13

13.0sqm

12

12

e

Bed 2

Bed 1

11

11

ag

6.

10

10

ss

ny

Bed 1

g

Living

ss

Pa

o lc Ba

2.

D

7.1sqm

15.3sqm

Y

e

Bath

32.5sqm

h

ag

ss

c

Bed 1

10.8sqm

e

Y

14

itu re

18

:5 0

17

-1

16

ps

15

U

14

Bl o

16.2sqm

Pa

ny

qm

Bed 2

IV

12.1sqm

Pa

e

o lc Ba

s .7

LE G X N LE R) SI UP PE D P (U

n he t tc m as Ki 8sq kf 5. ea m Br 1sq

d

i Vo

14

32.5sqm

Y

g

Living

d

Lounge

ny

Bed 2

Bed

id sqm Vo14.7

ag

7.1sqm

c

37.1sqm

ss

ny

Bath

Y

f

Living

Bath

4.6sqm

b

Pa

35.6sqm

4.6sqm

id sqm Vo14.7

o lc Ba

b

Living

16.2sqm

Bath

16.2sqm

IV

12.1sqm

Bed

o lc Ba

a

Bed

ny

ny

37.1sqm

Bed 2

35.9sqm

id sqm Vo14.7

Living

35.6sqm

Living

4.6sqm

f o lc Ba

o lc Ba

ite su qm

Living

e

Bath

30.2sqm

ny

35.6sqm

En

6s 4.

a

o lc Ba

Living

Living

d

Bath

7.4sqm

10.8sqm

I

10.3sqm

11.2sqm

2

Bed 2

30.2sqm

1

Bed 1

Bed 2

r do e rri wid Co 400

Living

2

Living

2

18

e 35.9sqm

3

17

Bath

7.4sqm

10.8sqm

I

6.0sqm

12.6sqm

4

16

13

1

5

15

12

2

Bath

Bed 1

6

14

11

3

d

7

13

4

10.3sqm

11.2sqm

8

12

10

5

9

11

6

r do e rri wid Co 400

Bed 2

6.0sqm

7

Bed 1

Bed 2

10

12.6sqm

Bath

8

y on lc Ba

Bed 1

9

c Pressurised Fire Escape

y on lc Ba

Pressurised Fire Escape

a

III

II

b

X

a

III

II

IV

b

F Es ire ca p

IV

Prince James Mpande Ncube - N01417597D

M.Arch

Ms. V. Madiro - Mr. T. Nyamande - Mr. I Ahmed

Mixed Use Complex : PEDESTRIAN ORIENTED DESIGN FOSTERING AN ENHANCED CITY EXPERIENCE

National University of Science and Technology

page

13


27 ANGWA STREET | MIXED USE DEVELOPMENT IV

Roof

X

a

III

II

b c

11

8

12

7

13

6

14

5

15

4

16

3

17

2

18

1

1500high wall

d Lift 4

10

9

Lift 5

Pressurised Fire Escape

1500high wall

Deck 7 6 5

14

4

15

3

16

2

17

1

18

Fire Escape

a Hand Rail

IV

11

f

8

13

Entertainment Area

Pool

9

12

170 high kurb

10

I

e F HR

Hand Rail

b g 9

15

P Fi res re su Es ris ca ed pe

c

8

7

R

6 5

12

h

4

13

3

14

2

15

1

16

X 12

Lift 4

9

W

8

W

4

5

6

7

DR

2

3

21.0sqm

Female Ablution

1

to ab Sui ov te e

18.9sqm

in

ry

D g

h

III

Li

IV

s ne

i

f s

17.6sqm

Hand Washing

ne

Male Ablution

45.9sqm

Li

Service

DR W W

Service

W

DR DR DR DR W

W

Service

W R D R D

I

170 high kurb

g

W

W

in

W

W

Communal Laundry

W

e F Es ire ca p

W

a j

11

12 11

W

DR

R D R D R D R D R D W W W W W

DR

ry

waiting

e

D

g

d

10

15 14 13

R D R D

R D W

10

1

Lift 5

18

10

D

R

e ic rv Se

17

D R D

X

16

R

hi

W

11

9

W

12

8

W

7

W

6

W

5

W

4

W

3

W

2

X

1

13

2

18

9

14

3

28.5sqm

y

8

g 15

4

17

7

tin

j

F HR

16

5

16

6

ai

w 18.9sqm

17

6

on

5

s

Hand Washing

18

7

Caretaker

lc

4

or

Fire Escape

8

15

3

at

er

45.9sqm

9

14

2

en

i

13

1

G

ts an en s l T om tia Ro en ch sid it Re Sw

f

Pressurised Fire Escape 12

W

Hand Rail

Ba

Communal Laundry

11

gh

W

ku

c 10

l 0

a

III

II

18

rb

17

al

w 17

b

H

11

gh hi

e

IV

F

10

00

d

Building Elevations

Y

Hand Rail

Y

II

b

I

Y

[+8] Residents Deck 1:150

Y

g

X

c

h 18 17

8

e

10

7

11

6

12

5

13

4

14

3

15

2

16

1

F Es ire ca p

e

d

9

i Water Tanks

j

f

g Water Storage and Purification

h j i

Perspective Views of the Roof and Deck Prince James Mpande Ncube - N01417597D

M.Arch

III II

I

[+17] Residential Roof 1:150 Ms. V. Madiro - Mr. T. Nyamande - Mr. I Ahmed

Mixed Use Complex : PEDESTRIAN ORIENTED DESIGN FOSTERING AN ENHANCED CITY EXPERIENCE

National University of Science and Technology

page

14


27 ANGWA ST | MIXED USE DEVELOPMENT DETAILS NGL

30째

Brick

30

30

RC Concrete Wall Aluminium Flange

P-4011-29A (3/16" ALUM.) U.I.F.

Corner Cap 30

05

Earth RC Concrete Slab Flashing

Detail A

600 x 600 suspended acoustic ceiling tiles

LIVING aluminium awning to S.E detials aluminium awning to S.E detials

Drain Pipe

Purlin and Kurb Detial

Detail B

Tanking Detail

R40 steel reinforced fiber support cable Cable to beam connection to manufacturer's detail

600 x 600 suspended acoustic ceiling tiles

12mm thick toughened glass slung to 10mm stainless steel slings

Prefabricated steel brace

Roof Drainange

Detail D

225X152X52mm steel I-beam steel work to SE.E details

LIVING aluminium awning to S.E detials aluminium awning to S.E detials

Detail C

Canopy Fixing Detail

steel work to SE.E details

LIVING

230 plastered brick wall with concrete coping on top

Bitumen lining

steel work to SE.E details

25mm dis hollow MS section (prop) welded to a 50mm dis section and forked connector pin jointed to a 20mm thick MS connectorplate at 1200cc 12mm thick toughened glass slung to 10mm stainless steel slings

full bore outlet aluminium awning to S.E detials

aluminium awning to S.E detials

Column

225X152X52mm steel beam

LIVING

Cable to beam connection to manufacturer's detail

Detail E

Roof Drainange

Detail F

Canopy Fixing Detail

OFFICE 600 x 600 suspended acoustic ceiling tiles

OFFICE 600 x 600 suspended acoustic ceiling tiles

OFFICE 600 x 600 suspended acoustic ceiling tiles

OFFICE 600 x 600 suspended acoustic ceiling tiles

D-A

OFFICE

600 x 600 suspended acoustic ceiling tiles

RETAIL

600 x 600 suspended acoustic ceiling tiles

RETAIL 600 x 600 suspended acoustic ceiling tiles

RETAIL NGL

NGL

rc slabs & beams to S.E details

OFFICE PARKING

rc slabs & beams to S.E details

RESIDENTS PARKING

rc slabs & beams to S.E details

RESIDENTS PARKING

D-B All sub-structure to Structural Engineer's details

Section Y-Y

1:100

Vehicle Elevator to specialist details

Sectional Elevation in City Context Prince Ncube - N01417597D

M.Arch

Ms. V. Madiro - Mr. T. Nyamande - Mr. I Ahmed

PEDESTRIAN ORIENTED DESIGN FOSTERING AN ENHANCED CITY EXPERIENCE

NUST

page

15


27 ANGWA ST | MIXED USE DEVELOPMENT SPECIAL STUDY

+88.347

DOUBLE FACADE DESIGN The Double Skin Façade is an architectural trend driven mostly by: ÎƉƋĘåƉ±åŸƋĘetic desire for an all glass façade that leads to increased transparency ÎƉƋĘåƉŞractical need for improved indoor environment ÎƉƋĘåƉĹååÚƉfor improving the acoustics in buildings located in noise polluted areas ÎƉƋĘåƉųåÚƚÏƋĜŅĹƉof energy use during the occupation stage of a building

+82.496

+78.756

+75.016 +73.816 +70.616 +69.516 600 x 600 suspended acoustic ceiling tiles

LIVING

+65.776

SLEEPING

steel work to SE.E details

LIVING

+62.036

600 x 600 suspended acoustic ceiling tiles

+61.219

LIVING

+58.296

The objective of this partitioning concept is to encourage natural ventilation by adding the partitioning of the facades so as to create an increased stack e ect( compared to naturally ventilated faces which are partition by storey) Thus is is logical that this type of facade and partitioning is applied to the west facing o ces in the Mixed Use Complex.

LIVING aluminium awning to S.E detials

SLEEPING

steel work to SE.E details

LIVING

+54.556

LIVING

steel work to SE.E details

600 x 600 suspended acoustic ceiling tiles

LIVING

+50.816

SLEEPING

LIVING

+47.076

LIVING

600 x 600 suspended acoustic ceiling tiles

steel work to SE.E details

LIVING

+43.336

SLEEPING

+42.519

LIVING

+39.596

aluminium awning to S.E detials

LIVING

+38.096 +38.096

+33.096

PHOTOVOTIAC GLAZING

steel girder to SE.E details

RESIDENTIAL SERVICES

+33.996

Photovoltaic glass (PV glass) is a technology that enables the conversion of light into electricity.

+33.396 +29.660

To do so, the glass incorporates transparent semiconductor-based photovoltaic cells, which are also known as solar cells. The cells are sandwiched between two sheets of glass. Photovoltaic glass is not perfectly transparent but allows some of the available light through.

OFFICE double glazed facade to specialist 600 x 600 suspended acoustic ceiling tiles

+25.920

OFFICE 600 x 600 suspended acoustic ceiling tiles

+22.180

+18.440

OFFICE double glazed facade to specialist

600 x 600 suspended acoustic ceiling tiles

OFFICE 600 x 600 suspended acoustic ceiling tiles

+14.700

OFFICE

+14.396 +9.800

rc slabs & beams to S.E details

RETAIL 600 x 600 suspended acoustic ceiling tiles

+4.900

RETAIL 600 x 600 suspended acoustic ceiling tiles

NGL

±0.000

RETAIL

NGL

rc slabs & beams to S.E details

-0.296

OFFICE PARKING

-0.964

1500

2280

50dia. MS handrail

-5.500 rc slabs & beams to S.E details

light fixture

RESIDENTS PARKING

-11.296

3.740

RESIDENTS PARKING

-16.500

1.870

rc slabs & beams to S.E details

1.870

-11.000

16mm dis MR rod iron fixed to horizontal supports on both sides

All sub-structure to Structural Engineer's details

Section X-X Prince Ncube - N01417597D

M.Arch

1:100

Ms. V. Madiro - Mr. T. Nyamande - Mr. I Ahmed

50mm MS vertical support welded to support handrail on top & to steel plate at bottom

Note Staircase structural design to engineer's details. Balustraden and all steel works to specialist details

Typical Stair Detail PEDESTRIAN ORIENTED DESIGN FOSTERING AN ENHANCED CITY EXPERIENCE

NUST

1:100 page

16



27 ANGWA STREET | MIXED USE DEVELOPMENT

Prince James Mpande Ncube - N01417597D

M.Arch

Ms. V. Madiro - Mr. T. Nyamande - Mr. I Ahmed

Mixed Use Complex : PEDESTRIAN ORIENTED DESIGN FOSTERING AN ENHANCED CITY EXPERIENCE

National University of Science and Technology

page

18


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.