Usability

Page 9

o often are faster and easier to create with less time invested by designers o are more apt to change design - Disadvantages of Prototypes: o not an adequate representation of the whole system o are often not durable o testing results may not be parallel to those of the actual system.

- Rapid Iterative Testing and Evaluation (RITE) - In-lab test - The tester and team must o define a target population for testing, o schedule participants to come into the lab, o decide on how the users behaviours will be measured, o construct a test script and have participants engage in a verbal protocol (e.g., think aloud). - changes are made to the user interface as soon as a problem is identified and a solution is clear. - The changed interface is then tested with the remaining users.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.