In May of 2016, PSI will begin an exciting new building project on the current campus and a wonderful new chapter will begin for the school.
2
THE PROJECT PERIOD AND PROGRAMME CHANGES The building site will be heavily fenced and inaccessible to students to maintain a high level of campus safety throughout the project.
1
4
2
NEW FACILITIES AT PSI The aim of the Phase 2 Building Project is to provide PSI students with world class, international school facilities, new learning experiences and additional educational opportunities.
5
3 7
1. Entrance gate 2. Building site gate 3. Utilities Road Entrance 4. Constuction site fence
5. Temporary pitch roof / cover 6. Footbal and athletics track 7. Community playground
THE PHASE 2 BUILDING PROJECT NEW FACILITIES
THE NEW FACILITIES WILL INCLUDE:
— — — — — — — — — — —
6,500 square metres of space across five floors EC - Early Childhood for three and four year olds Science - Physics, Chemistry and Biology laboratories The Arts - Music, Drama, Visual Arts rooms Cafeteria / On Site Kitchen - Seating up to 250 people Auditorium - Seating up to 250 people for events Gym - A large double gym of 500 square metres Swimming Pool - A 25 metre, heated swimming pool Additional classrooms, offices and meeting rooms New Playgrounds - Primary and Secondary School Campus Beautification - Across all areas of the site