Linck p finalpresentation

Page 1

LOGAN TRIANGLE Preston Linck LARCH 414 Spring 2013


site photographs


site photographs


site analysis

10’ 20’

30’ 40’

subsurface coal ash depths

exisiting site topography


walking & viewshed diagram 1/2 mile

9th street north_north to south

1/4 mile

west wyoming street_west to east

1 1/2 mile

9th street south_south to north


building deconstruction

1940

1992

1997

2002

2012


site road structures

all existing roads

open roads

closed roads

main roads


site analysis

vacant land library recreation facility

school open park space green stormwater demonstration

farmer’s market

vacated railroad


concept model


concept application • open concentrated corridors • soil treatment • biomass

• recreative • healthy living • productive

programatic corridors for playing, relaxing, & exercise

rapeseed potentials

phytoremediation - chromium - mercury - lead - zinc - arsenic biomass per hectare (2.47 acres) - straw 108 GJ - seed 83 GJ - oil 48 GJ - oil seed cake 36 GJ - total plant = 191 GJ

6.25 GJ = 1 barrel of oil = 19.3 gallons of gas

biomass per acre = 122 gallons of biodiesel 40 acres = 3,093 GJ = 494 barrels of oil per harvest


master plan

biomass facility art center plaza community center trolley line / bike lane parking trolley stop parking event lawn

corridor track/harvesting path corridor extension

stormwater catchment

existing church

open lawn rapeseed fields

existing church bridge

100’

0 50’

200’


circulation

walking

running

biking

maintanence


program

recreative space

community facilities

production faciltiies

planting fields


program

trolley

water

parking

exisiting churches


corridor perspective_concept


corridor perspective_phase 1


corridor perspective_phase 2


corridor perspective_phase 3


corridor perspective


corridor perspective


corridor perspective


site view


event lawn & community center perspective


stormwater catchment & open lawn section

rapeseed coal ash

bioswale wyoming ave.

sidewalk

open lawn stormwater catchment

rapeseed coal ash


corridor extension & running/harvesting path

rapeseed coal ash

shared path

corridor extension

rapeseed coal ash


RUBBLE

417,652 sq/ft

305,147 sq/ft

= 765,814 sq/ft of building 130,151 sq/ft

multiplied by 4 ft of depth = 2,943,256 sq/ft of rubble

2,076,466 sq/ft within the site


rubble removal method

excavate

move

grind down by machine

grind down by hand


rubble removal method


rubble removal method


rubble removal method


rubble removal method


rubble movment phasing by acre management plan

week 1

9 square acres

41 square acres on site

week 2

building footprints

week 3

rubble

9 week phase example

week 4

clear surface

week 5

week 6

week 7

week 8

week 9


soil and planting concept


planting progression

remediate

stabilize

build

diversify

rapeseed

switchgrass

switchgrass

mixed flowers

feed

bio-based crops

produce

rapeseed


soil movement_exisiting condition coal ash

surfaced coal ash

abandoned roads

edge conditions


soil movement_year 1

6� coal ash


soil movement_year 5

2’-6” coal ash


soil movement_year 10

5’ coal ash


soil movement_year 20 10’ coal ash


yearly planting cycle

APRIL

AUGUST

AUGUST

OCTOBER

OCTOBER

OCTOBER

APRIL


biomass calculations_by acre

.78

1.76

.75

1.62

.66

.82

1.51

.71

.65

2.26

= 37.6 acres of rapeseed

.82

3.81

1.91

= 2,907 GigaJoule of energy .97

1.48

.89

1.61

.96

1 barrel of oil = 19.3 gallons of gas

3.21 67

2.22

.57

5

8 1.

= 19,488 gallons .39

1.

3.65

= 464 barrels of oil


LOGAN TRIANGLE Preston Linck


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.