Work portfolio

Page 1

F A R MHO USE

1

WADA, MAHARASTRA, INDIA FIRM NAME : EPICONS CONSULTANTS PVT. LTD. TYPE :architecture AREA : 180 SQ.M

Farmhouse is the weekend home for the family. The function of this house is for refresement from the day today life. The form of this house design like a mass comng out of the earth moutain. Entrance of house have a small entrance porch which leads to large living room with an open kitchen with children bedroom on sides in big circular pipes. Behind living room there are two master bedroom adjoining tranparent toilet on both sides having a circular wall which surround the toilet for privacy.

front view of FARMOUSE

Ground Floor plan

section 1

terrace plan (roof plan)

section 2


residential bungalow

concept of Building Form

Dombivali, Mumbai, INDIA

FIRM NAME : EPICONS CONSULTANTS PVT. LTD. TYPE : architecture AREA : 305 SQ.M

Concept to build a minimilastic bungalow with simple clean uncluttered geometry where the interior and exterior blend into each other in an attempt to keep user constantly to keep touch with outdoors visually. The site was located in Dombivali MIDC area. The brief was very clear to designed a house for a family of four people and their full time maid. The rectangular Its an rectangular plot of 12.0 m x 24.0 m The challenge was to design a long and narrow bungalow with considerable length which stretches out between two facade. The main entry of plot leads to entrance porch of house which open into double height living room which is animated by natural light coming from a skylight above.

Section Evolution

Plan evolution

East side Elevation

North side Elevation

Ground Floor Plan

First Floor Plan

Terrace Plan

2


3

tlcm lab - sandoz mahad, maharastra, india

FIRM NAME : EPICONS CONSULTANTS PVT. LTD. TYPE : architecture AREA : 1400 SQ.M

The site is surround with road which is an added adavantage for a building. The is a single storied lab building. The building is a cube structure have a central atrium open to sky which allows natural light into building.

Entrance View

North Side Elevation

Ground Floor Plan

Site Plan


Master planning of powerica

4

mahad, maharastra, india

FIRM NAME : EPICONS CONSULTANTS PVT. LTD. TYPE : architecture AREA : 300000 Sqft

View 01

Master plan for Khopoli

Section

View 02


Marriot courtyard

5

bangalore, india

FIRM NAME : p. g. patki architects TYPE : architecture AREA : 250000 Sqft

View of Marriot Courtyard building


pacifica residency

6

bangalore, india

FIRM NAME : p. g. patki architects TYPE : architecture AREA : 250000 Sqft

View of Pacifica Residency Building


Mono rail - Phase 2

7

Mumbai, india

FIRM NAME : ratan j bataliboi pvt. ltd. TYPE : infrastructure

Design Approach & Concept: •Functional, buildable •Elevated & twin level station building •Linear plan for concourse due to restricted width of right of way •Narrow / long footprint •All operational rooms at one level •Unpaid & paid concourse proportionately distributed –1/3rd& 2/3rd •Narrow footpaths or no footpath – means of entering the station i.e. Staircase, escalator, lift planned in linear manner •Compliance with relevant codes and guidelines

Platform Lvl Plan

Concourse Lvl Plan

Road Lvl Plan


comprehensive architectural design of phase 1 of permant campus of iit jodhpur jodhpur rajasthan, india

FIRM NAME : ratan j bataliboi pvt. ltd. TYPE : architecture competition - design area : 340.74 hectares (842 acre)

The vision for IIT Jodhpur to be a “Smart - Intelligent Eco - Campus� aims to achieve social, economic and enviornmental suistainability. The IIT Jodhpur permant campus masterplan is conceived with the aim to meet the following primary objectives. 1. To create a place of education and living that sets itself apart from other institutions. 2. Provides functional convenyance. 3. Promotes interaction among students and faculty. 4. Allows efficient use of available natural resources and is compatible with GRIHA compliane standard for green buildings and site planning.

8


concept

9 conventional construction model

“Traditional architecture is not concerned with historical styles, but with historical principles.”

suistainable & heuristic method

- Lucein Steil (Tradition and Architecture) Design Intent: The design concept adopts architectural approach thats creates an outdoor spatial quality conducive to interactive place making. Successfully implemenating this approach of an outdoor responsive architecture relies as much on the created space on the attributtes to the organizations scales and texture. The pursuit of the social ‘publicness’ and interactive quality also define architecture of our buildings. Corridoor become ‘streets of comfort’ which induced airflow and roof tops draw from cultural traditions to become meeting spaces or spaces for quiets reflections. Buildinds, buildings elements, compenents and treatments are climate responsive and yet orchestrate the creation of public spaces as outdoor rooms.

Chowk

Street

Entrance

PUBLIC

Courtyard

Stairs

Terrace PRIVATE

suistainability

Corner jaalis allows for light penetration. Jaalis in the roof parapet allows air movement over the hot roof surface comparatively cooling it down in day-time and increase speed of heat loss during night time

Pergolas to cover terrace such that they shade the exposed surfaces reducing heat gain. using plants and other vegetation for shading, especially on the east, west and southfacades.

Using jharokhas to self shade the exposed exterior surfaces thus reducing the direct thermal gain in the living spaces

Wind catchers guide outside air over underground tank, inducing evaporation and bringing about a significant Using jharokhas to self shade Sloping sills to encourage better visiblity to exteriors, reflecting incident rays effective drainage of rainwater and drop in temperature before the air enters the interiors. the exposed exterior surfaces The hot air rises and escapes through a chimney stack. thus reducing the direct therdiscourage perching of birds mal gain in the living spaces


student housing

10

a. Hostel (girls & boys) b. married student hostel c. mess Design Intent: The intent has been to create and encourage permeability through the developement with a clear hierarchy between semi- public and private space. Spontaneous circulation has been created at elevated level at second floor. These elevated links have the potenial to connect to common amenities related to student housing. Considering the typical day in a season for each - hot & dry, hot& humid and cool type, we can determine appropriate strategies for the same. Though calculations and simulation the change in outdoor and indoor temperature. can be estimated to guage comfort span for the occupants. The earth being at a higher temperature than ambient air warms the water in the underground tank which transfers thid heat to the rooms above. Windows are kept closed to preseve heat. Lower sun altitude ensures solar penetration int the rooms warming them. Thick insulated walls help in retaining heat in the envelope. The roof surface is shaded by the solar panels which reduces solar gain considerably. Both shutters of the windows are opened out to increase air changes per hour. Warm air can also be let out through the vents opening into the corridoor. The wind catchers on the roof sucks in air which is let down through a duct in the basement. A mist spray introduces moisture into the air cooling it down to a more comfortable temp. The ground water tank acts as a heat sink and cools the ground level room. Shading prevents solar exposure of the facade. Only the jaali shutter is opened. The planning grid and size of the rooms has been establish to simplify construction drawing stage. The layout of the rooms provides adqueate privacy even with door left open. The location and design of the wall openings are derived to achieve comfortable ventilation and temperature in the room throughout the year. The need for further flexibility should be accomdated in un-built plot as ‘provisional’ arrangementon built structure can be potential nuisance for the scholar during the expansion stage

Section AA

Facade View Terrace Plan

Section BB

Section CC

Facade View

Second Floor Plan

The court within the building cluster are envisaged as series of outdoor rooms articulating along an organic path thus creating and containing space for appreciation and identity. This interesting and shaded walk starts from academic zone and culminates at the students mess which is designed as a local landmark to infuse character in the effort of ‘place making’ and a wind down zone. First Floor Plan

Ground Floor Plan

ZONE PLAN ACCESIBILITY & LINKAGE PLAN

2. Single Occupancy Room 3. Bathroom 4. Toilet

Basement Plan 1. Yoga/Multipurpose Room 2. IT/Pool/Room 3. Store/Spare Room 4. Office 5. U. G. Reservoir

Cluster Plan


b. Married student accomdation

11

Ground Floor Plan

First Floor Plan

Section

c. mess

Second Floor Plan

Elevation LEGEND 1 Recreation area 2 Yoga Room 3 Laundary Room 4 Gym 5 Locker Room 6 Auditorium 7 Gents Toilets 8 Ladies Toilets 34 AHU

LEGEND 7 Gents Toilet 8 Ladies Toilet 9 Dinning Area 10 Kitchen - Preparation Area 11 Receiving 12 RICE CLEANING AREA 13 WALK-IN CHILLER 14 DISH COLLECTION AREA 14 DISH COLLECTION AREA 15 EQUIPMENT ROOM 16 PROVISION AND DRY STORE 17 DISH WASHING AREA 18 POT WASHING 19 GARBAGE COLLECTION ROOM 20 DETERGENT CHEMICAL ROOM 21 GENTS TOILET 22 LADIES TOILET

Ground Floor Plan

Section

LEGEND 1 Living 2 Kitchen 2A Balcony 3 Study 4 Toilet 5 Bedroom 5A Balcony 6 Toilet

Elevation

LEGEND 23 Warden’s Office 24 Waiting Area 25 Living Room 26 Balcony 27 Kitchen 28 Dry Balcony 29 Bedroom 30 Walk-in- Wardrobe 31 Toilet 32 Master Bedroom 33 Gathering area 34 AHU


A. FACULTY APARTMENT

Faculty housing

12

a. faculty apartment b. faculty bungalow c. director bungalow Design Intent: The design of the faculty apartments is follows the ‘bungalow in the sky’ concept that is suggested in the Urban Design Guidlines in the Comprehensive Master Plan. The architectural design takes this concept to another evolving a typology that consist of splits level units which have its own private terrace. Keeping in mind the requirement of barrier unit access some unit have not split level. Each building comprises of three units that are stacked in various combinations to create ‘aangan’ courtyard at different levels through which one enters the apartment. The study in each apartment is segregated from rest of the living spaces giving allowing students or vistors of the faculty membersto enter the study without disturbing the privacy of other resident. The character of vernacular jodhpur architecture is incorparated in the form of details like contemporary jharokas, jaalis and staircase leading to mumty. Wind catchers that draw wind from courtyard into the apartments are used to cool apartments. Buildings are arranged to from a courtyards. The hierachy of courtyards range from permable spaces that are shared by four buildings and are part of circulation, to more intimate courtyards that are shared by two buildings. The overall massing of the building encourage social interaction within the community without comprising on the privacy of the residents.

Basement Plan Section 1

Section 2

Plan @ 2.0 M lvl LEGEND 1 Living/Dining 2 Kitchen 3 Service Balcony 4 Bedroom 5 Balcony 6 Toilet 7 Study 8 Private Terrace

Site Plan

Plan @ 5.0 M lvl

Plan @ 8.0 M lvl

Concept sketch

Terrace Plan

Elevation


b.Faculty bungalows

13

The concept for bungalow design is to create interior spaces that are responsive to the climate yet provide for interactive as well as individual private space for the family members. The layout revolves around internal courtyard which provides open to sky “ break “ in a built around spaces and activity areas. The design adopts traditional elements such as high mass living area, wind towers, insulated roof, water pond etc. there by ensuring comfortable habitable conditions. The construction materials adopted are local stone for external load bearing walls; bricks for internal walls and timber for doors & windows

Section AA

Section BB

Ground Floor Plan

Terrace Plan

c.director's bungalows

+6.60M +4.70M +3.45M +0.45M

Section AA

Section BB

Ground Floor Plan

Terrace Plan


staff housing

a. bungalow

14

a. bungalow b. apartments

Legend: 1 Living 2 Dining 3 Multipurpose Room 4 Bedroom 5 Toilet 6 Powder Room 7 Kitchen 8 Balcony 9 Lounge 10 Terrace

Ground Floor Plan

First Floor Plan

Second Floor Plan


staff housing

b. APARTMENT

15

a. bungalow b. apartments

Second Floor Plan

Site Plan

Cluster Section

First Floor Plan

Elevation

Ground Floor Plan

LEGEND 1 Living 2 Dining 3 Multipurpose Room 4 Bedroom 5 Toilet 6 Powder Room 7 Kitchen 8 Balcony 9 Lounge 10 Terrace


A. SECURITY BARRACK UTILITIES SERVICES A. SECURITY BARRACK B. COMMUNIITY CENTRE (FACULTY) C. Jodhpur club D. STAFF COMMUNITY CENTER AND CLUB

b. community centre

(Faculty)

c. JODHPUR CLUB

d. staff community centre & club

16

First Floor Plan

First Floor Plan

First Floor Plan

First Floor Plan

Ground Floor Plan

Ground Floor Plan LEGEND 1. Male Dormitory 2. Male Toilet 3. Female Dormitory 4. Female Toilet

Community Centre (Faculty)

Ground Floor Plan LEGEND 1. TV Room 2. Indoor Games 3. Lounge 4. Office 5. Store 6. Gents Toilet 7. Ladies Toilet 8. Hall

Jodhpur Club

Ground Floor Plan LEGEND 1. Restaurant 2. Terrace 3. Store 4. Ladies Toilet 5. Gents Toilet 6. Serving Area 7. Office 8. Reception

LEGEND 1. Restaurant 2. Kitchen 3. T V Room 4. Indoor Games Room 5. Lounge 6. Office 7. Store 8. Gents Toilet 9. Ladies Toilet 10. Library 11. Hall 12. Covered Terrace 13. Terrace


comprehensive architectural consultancy of construction a. preparation of conceptual master plan of Workshop Complex (S1 to S3 - N1 to N6) B. Steel Centre C. Combined Building For Estate Office & National Centre For Aerospace Innovation And Research (Ncair) D. Central Animal Facility (CAF) FOR INDIAN INSTITUTE OF TECHNOLOGY BOMBAY AT POWAI, MUMBAI FIRM NAME : ratan j bataliboi pvt. ltd. TYPE : architecture competition - design area : 21600 SQ.M

DESIGN BRIEF

17


SITE INTRODUCTION

18

SITE: Site is located in IIT Bombay campus, Powai in Maharashtra, India. CLIENT’S BRIEF REDEVELOPMENT OF WORKSHOP COMPLEX Plot area: 21600 Sq. M Plot Location: North to SINE/IRCC/IDC’s Plot Total Built up Area: 26250 Sq. M 2. STEEL CENTRE Plot area: 1025 Sq. M Plot Location: It is proposed to be constructed on the workshop’s site in place of existing S1 workshop. Total Built up Area: 4317 Sq. M 3. COMBINED BUILDING FOR NCAIR & ESTATE OFFICE Plot area: 2256 Sq. M. Plot Location: East side of the existing Victor Menezes Convention Centre (VMCC) Building , North side of C.E.S.E. building & South to CAF Building’s plot Total Built up Area: 7100 Sq. M 4. CENTRAL ANIMAL FACILITY Plot area: 300 Sq. M. Plot Location: East side of the existing Victor Menezes Convention Centre (VMCC) Building and the North side of C.E.S.E. building . Total Built up Area: 2066 Sq. M SITE ACCESS: This site has access from a 12 m wide road Site Plan which also is an access for the existing IDC and the Victor Menzes convention centre and can be approached straight from Market gate. EXISTING STRUCTURES: The existing prominent structures present on the site are the existing Workshop bay, Faculty bungalow and some temporary structures. VEGETATION: The trees on the site are basically rain trees and palm trees which are demarcated in the layout as per the survey plan received from the Client. The same has been verified at site

1. Workshop 2. Steel Centre 3. Ncair & Estate Office 4. Central Animal Facilty

TOPOGRAPHY: The topography of the land on site is relatively flat with the maximum level difference of 0.70m-0.80m from one end of the site to the other. WATER BODY: No water body present as per the survey drawing provided by the client. OTHER UTILITIES: Main drain channel passes through the site Location Plan


Passive Design Strategies

1. Workshop

1. Day Light

Orientation of Site : - On account of the L- shape of the site boundary, the workshop building is proposed to be constructed in phases with its longer side facing East West direction. As steel centre is proposed to be constructed in the place of existing S1 workshop, the building is North-south oriented. Facade & Fenestration: - Keeping workshop area under consideration linear long slit windows have been proposed to facilitate proper light and ventilation. The entire facade has been provided a staggered profile considering future expansion. - Through & through Horizontal glazing is proposed to facilitate proper light and ventilation for the steel centre keeping in mind the activities proposed to be housed. Site Levels: The site has hardly any level difference which can minimize cutting and filling work thereby reducing cost. Trees & Landscaping: Existing vegetation will be preserved by means of non-disturbance or damage to the trees and other form of vegetation. Access: The nearest approach to the site is through the market gate As per the insulation and shadow analysis the building is exposed to varying heat during the working hours (11am-5pm). As per analysis the covered areas such as pedestrian pathways are cooler compared to directly exposed surfaces. The site demands a basic landscape element, so as to act as shading devices. The terrace have been treated as green roof so as to keep the building cooler and enhance the look.

2. Wind Direction 3. Reduce Dependance on Mechanical Option

Annual sun path Diagram Generated from: Eco Tec 2011

Evolution of Building Form

19


1. Workshop

20

Third Floor Plan

Master Plan of Workshop Second Floor Plan

First Floor Plan

Ground Floor Plan


2. steel centre

Passive Design Strategies 1. Day Light 2. Wind Direction 3. Reduce Dependance on Mechanical Option

21


2. steel centre

22

Third Floor Plan

Second Floor Plan

First Floor Plan

Ground Floor Plan

Fourth Floor Plan

Fifth Floor Plan

Terrace Floor Plan


3. ncair & estate office Orientation of Site : - On account of the L- shape of the site boundary, the workshop building is proposed to be constructed in phases with its longer side facing East West direction. As steel centre is proposed to be constructed in the place of existing S1 workshop, the building is North-south oriented. Facade & Fenestration: - Keeping workshop area under consideration linear long slit windows have been proposed to facilitate proper light and ventilation. The entire facade has been provided a staggered profile considering future expansion. - Through & through Horizontal glazing is proposed to facilitate proper light and ventilation for the steel centre keeping in mind the activities proposed to be housed. Site Levels: The site has hardly any level difference which can minimize cutting and filling work thereby reducing cost. Trees & Landscaping: Existing vegetation will be preserved by means of non-disturbance or damage to the trees and other form of vegetation. Access: The nearest approach to the site is through the market gate As per the insulation and shadow analysis the building is exposed to varying heat during the working hours (11am-5pm). As per analysis the covered areas such as pedestrian pathways are cooler compared to directly exposed surfaces. The site demands a basic landscape element, so as to act as shading devices. The terrace have been treated as green roof so as to keep the building cooler and enhance the look.

23

Third Floor Plan

Fourth Floor Plan

Second Floor Plan

Fifth Floor Plan

First Floor Plan

Sixth Floor Plan

Seventh Floor Plan Ground Floor Plan


3. ncair & estate office

24


4. central animal facilities (caf) Orientation of Site : - On account of the L- shape of the site boundary, the workshop building is proposed to be constructed in phases with its longer side facing East West direction. As steel centre is proposed to be constructed in the place of existing S1 workshop, the building is North-south oriented. Facade & Fenestration: - Keeping workshop area under consideration linear long slit windows have been proposed to facilitate proper light and ventilation. The entire facade has been provided a staggered profile considering future expansion. - Through & through Horizontal glazing is proposed to facilitate proper light and ventilation for the steel centre keeping in mind the activities proposed to be housed. Site Levels: The site has hardly any level difference which can minimize cutting and filling work thereby reducing cost. Trees & Landscaping: Existing vegetation will be preserved by means of non-disturbance or damage to the trees and other form of vegetation. Access: The nearest approach to the site is through the market gate As per the insulation and shadow analysis the building is exposed to varying heat during the working hours (11am-5pm). As per analysis the covered areas such as pedestrian pathways are cooler compared to directly exposed surfaces. The site demands a basic landscape element, so as to act as shading devices. The terrace have been treated as green roof so as to keep the building cooler and enhance the look.

25


4. central animal facilities (caf)

26

Ground Floor Plan

First Floor Plan

Fifth Floor Plan

Terrace Floor Plan

Second Floor Plan

Section

Third Floor Plan

Fourth Floor Plan


indore, madhya pradhesh, india

24.0 M WIDE ROAD

CONCEPTUAL DESIGN FOR PROPOSED SPORTS COMPLEX & SWIMMING POOL AT INDORE INDORE DEVELOPMENT AUTHORITY

Site Plan: 1.77 hectare plot in sector “F”, scheme no. 94 on ring road, Indore Flat land with no significant contours Access to the plot is from the 9 m wide service road flanking the 75 m wide ring road on the east and a 24 m road on thesouth No significant tree cover or other features on site

SITE 9.5 M WIDE SERVICE ROAD 16.0 M WIDE GREEN BELT 10.5 x 2 M WIDE DUAL CARRIAGE WAY 16.0 M WIDE GREEN BELT 9.5 M WIDE SERVICE ROAD

central block

FIRM NAME : ratan j bataliboi pvt. ltd.

10

TYPE : architecture

14

8

9

competition - Concept

13

7

12

6

area : 1.77 hectares 14

Competition Brief: Indore is a commercial capital of Madhya Pradesh. Largest city in MP and growing rapidly Home to numerous educational institutes including IIT & IIM The aging Nehru Stadium lacks modern facilities, requires maintenance and does not have a swimming pool Hence, an urgent need for a well equipped sports complex and stadium of international standards. Spirits of Sports 1. Agility 2. Aspiration 3. Inspiration 4. Strength 5. Dispcipline 6. Competition 7. Team Work 8. Fairness 9. Fitness 10. Balance 11. rigour 12. achievement

5

2

4

3

1

Ground Floor Plan

Legend: 1. Lobby 2. Table Tennis Courts 3. Squash Court 4. Badminiton Courts 5. Changing rooms/Toilets 6. Lift and Staircase Lobby 7. Store

7

5

4

2

1 5

Legend: 1. Main Entrance 2. Entry Court 3. Spirits of Sport Sculpture 4. Shops 5. Gymanasium 6. Lobby/Connecting Corridoor 7 Front Office/Back Office 8. Cafeteria 9. Medical Room 10. Kitchen 11. Patio 12. Lift and Staircase Lobby 13. Changing rooms/Toilets for field sports 14. Changing rooms/Toilets for aquatic sports

8

7

11

3

4

2

1

Legend: 1 – Main Entry 2 – Entry Court 3 – Spirit of Sports Sculpture 4 – Ramp to Basement Parking 5 – Patio 6 – Service Yard 7 – Service Entry 8 – Bus Parking

Sports hostel

3

Typical Floor Plan

Second Floor Plan

9

6

7

5

4

Schematic Section

8

3

1

3

15

Proposed Site Layout

Legend: 1. Lobby 2. Table Tennis Courts 3. Squash Court 4. Badminiton Courts 5. Changing rooms/Toilets 6. Lift and Staircase Lobby 7. Store

5

2

1

Ground Floor Plan First Floor Plan

14

9 4

3

4

10

27

5

6

2

Schematic Section

9 – Swimming Pool 10 – Diving Pool 11 – Sports Hostel 12 – Basketball Court 13 – Volleyball Court 14 – Tennis Court 15 – Open Ground for Kabbadi, KhoKho, Malkhamb and Criket pratice

13

12


reinventing dharavi

1. Introducing Dharavi

mumbaii, india

What is Dharavi for Mumbai? Dharavi is a settlement that started with 60,000 low income people, to around a million now. The Population Density of Dharavi is considered to be amongst the highest density in the world. Dharavi – a 225 hectare land strives to grow and sustain day by day. It is currently a multi-religious, multiethnic, diverse settlement. Flanked by possitives at all sides llike BKC, Mahim Railway Station, TATA power station, BEST Depot & Sion railway station, Dharavi has not been able to break the stigma of being called a SLUM. Attracting many opportunities for the Government & Developers, Dharavi has many times come under the Dharavi Redevelopment plan which has failed to restore their livelihood and desire Location of Dharavi to stay in a proper habitable residential zone. 2. Theoritical Framework

FIRM NAME : ratan j bataliboi pvt. ltd. TYPE : architecture competition area : 225 acres

‘Reinventing Dharavi: An Ideas Competition’ is about generating essentially new ideas, concepts and interventions for integration of urban uses – affordable housing, livelihoods, health and sanitation, recreation, education, urban design and urban planning, social and cultural activities, environment, governance, economics, amongst others in a sustainable manner. The objective is to initiate an on-going dialogue on the critical issues and spread the ideas contributed by the participants, world-wide among the concerned authorities, organisations and peoples. With open access it will be possible to influence the future directions towards our cherished aims.

Dharavi lies in center of Mumbai with excellent connectivity to South Mumbai & Suburbs. It has an easy access to all modes of transport at macro level. But at micro level, due to the urban fabric and the mixed use culture 80% of the inhabitants commute by foot.

Existing Fabric of Dharavi

Critiquing policies - its failures Lot many policies came got applied and failed. Then initiaties were taken to amend these policies and put into practice which could benefit both Slums and the government. First National Housing Policy was formulated in 1988. Gradually with change in the Government in 1990; a new National Housing Policy with little additions was announced in August, 1994. Further, new National Housing & Habitat Policy announced in July, 1998, with some landmark initiatives like involvement of multi-stakeholders. This was done mainly to repeal the Urban Land Ceiling Act, permitting Foreign Direct Investment in housing and real estate sector, etc.

Dharavi is surrounded by buffers, such as Mahim Nature Park, Mahim Creek, High tension line, Railway zone etc, which in a way gives it a distinct identity irrespective of it being a low lying area. Dharavi though being a deprived area has an active informal economic sector of numerous small scale enterprises employing many dwellers. Dharavi’s annual turnover has been considered to be US$500 million and above. Various goods such as Leather, textiles, pottery etc. are exported all over the world. As, all these policies were generic and applicable to both rural and urban areas, a need to take into account, the With increasing migration rate, economic opportunities emerging challenges for the required shelter along with and Lack of affordability has lead people to reside as illegal the growth of the slums. Then, the first ever National Urban hut men. Therefore, only building a shanty was the concern. Housing and Habitat Policy specific to urban areas was Being one of the contributors to Mumbai’s economy, Dharavi announced in December 2007. fails in public health due to the absence of sanitation & clean drinking water facility. The common loop hole seen in the entire range of policies As per 2006 records, there was only one toilet per 1,440 residents in Dharavi. Dharavi has a huge list of epidemics & natural disaster with significant loss of lives. Since years, there have not been any major improvements in the overall situation of Dharavi; instead diseases, illness, fires & other disasters have become very common.

was plotted development, higher FSI & high rises. None of the policies intervened into the social livlihood, their respective occupation etc. The focus was majorly laid on the residential component and not on the existing character of the slum. These policies failed in re-imaging the live- work – play model of these slums which went missing & failed in stacking up the units in G + 7, G + 15 structures.

Critical Questions: 1. Is redevelopment the only solution? 2. Why is Residential component the only aspect considered in redevelopment? 3. Why is stacking up of people in high rise   the only solution? 4. Can we house the entire Population? If Yes, how to sustain & balance the livelihood with redevelopment? 5. Why can’t all the components prevailing in Dharavi such as Industrial, R + C , Home based Industrial typology be considered together in DRP? 6. Does is have to be a Developer approach always?


reinventing dharavi mumbaii, india

3. Methodology : Process Chart


reinventing dharavi

3. Methodology : Identifying the three typologies within Dharavi

mumbaii, india

Industries

The bakery is a large, partially underground room split into four sections: one area to knead the flour, other to roll it, the next one to mould it into shape, and the last has a large oven to bake.They posses a separate area to store the raw materials.

Gold is kept in small earthenware pots which are then placed in a small opening above the fire. Once the gold melts it is mad into nuggets & weighed. The entire melting & moulding is carried out in the interior space. Only the pakaging materials are stored in the outdoor space.The gold is sold according to its weight to the jewellers. The gold that is thus smelted from old ornaments, sold to pay off debts or to buy new jewellery.

The leather hides from chennai are evened out, dyed & embossed with designs using machinary in the indoor area. These dyed hies area dried in a separated interior area which is then converted into various goods and sold.The outdoor space is not used in the case of leather goods.

The worn- out cardboard / abandoned cardboard are collected, bought and brought which is repaired & treated, made fit for using. This process is carried out in the interior area. The outdoor & part of interior area are used for stacking the fresh & good cardboard boxes

The metals pieces are melted on raw fire in the indoor area, which are further moulded into metal into buckles, loop pins, ear-rings, artificial chains & pendants etc.It is a labour intensive work. These Articles are treated with chemicals for giving attractive shiny finish. The outdoor area is hardly used in case of metal accessories.

The tin cans are first sorted into good & bad condition ones in the outdoor area. The good ones are cleaned & re-sold, but the bad ones are first beaten to remove the dents and then are treated with the chemicals. These treated cans are further embossed with compant seals and sold accordingly. The treating & the beating process takes place in the indoor space.

The plastics in bad condition are gathered from various sources are Sorted & grinded in the internal space before dispatching it for further treatment.Good plastic are retained, treated & sold for re use. These treated plastic are stacked in one end of the room. The sorting & crushing is handled separately in two differt rooms or else the outdoor space becomes the sorting area in some cases.

Abandoned Electrical goods are bought from second hand dealers, scarp manufactures. These goods are broken & flattened in the outdoor area, which is further sorted in terms of circuit. Once the entire process is done, the assembly of the electronic goods is done in the indoor space.


reinventing dharavi

3. Methodology : Identifying the three typologies within Dharavi

mumbaii, india

Industries The entire garment manufacturing is completely indoor machiene based work. The finished goods are kept in one side of the room, while the raw materials & other things on the other side.

Home based Industries - Typology 1 Broom Making

Both the living as well as the plinth area is used as a workspace for broom making, and mostly the living area in the monsoon. Broom-making is practiced both individually as well as collectively. The finished product is stored outside on the plinth area.

Basket Making

The plinth acts as the main workspace for the people as basket weaving is generally practiced in groups. The raw materials are kept out side the house on the3 plinth area. During bad weather conditions the living area acts as the workspace for them.

Garland Making

The living area of the house becomes the workspace for Garland making. Sometimes the plinth area becomes the extended workspace for the people. Individual members of the family collectively run the buisness.


reinventing dharavi

3. Methodology : Identifying the three typologies within Dharavi

mumbaii, india

Home based Industries - Typology 2 Papad Making

Tiffin Service

Tiffin service is generally practiced on an individual basis. In this case the kitchen or the living area with a stove becomes the workspace for the same. Savouries are generally practiced collectively, but could also be individually handled.

Courtyard cluster of Papad making communuties Papad making is a collective effort generally a pair of women within the family working together. The outdoor open courtyard becomes the workspace for this home based industry which includes its preparation (rolling of papad) and drying on inverted baskets. This activity is restricted to the living area during the monsoon season due to lack of sunshine. Therefore sunny open spaces are critical in this home based industry.

Attribute for locating the three base typologies within Dharavi

Residential Cum Commercial - Typology 3

Type - 1

Type - 2 A residential & commercial unit exists as one unit with different functions. These could either be linked or could have completely separate identity. The entry & exit points for both is separate. While commercial is directly accessed as it is flanked along the main road, the residential units have been indirectly accessed. The majority of the typology seen in Dharavi is the residential cum commercial units. These commercial units house a variety of occupation from a small stationary shop to decent sized restaurants


reinventing dharavi

3. Methodology :Strategies for the typologies

mumbaii, india

Industries

Home based Industries

Proposed Model: Industry + Dormitory (Live & Work Model)

Proposed Model: Live, work & play model 1. Understanding the needs of the various home based industries and accordingly mapping the required spaces For Eg.  • Papad 1. Better Physical Amenities (Sanitation, Fresh water supply, Drinking water  • Broom facility, Gender specific toilets, Drainage and Disposal Facility, Hygienic- healthy  • Basket living-working conditions, bed facilities, monitored cleaning etc) 2. Keeping residential space intact and matching the ​common areas as per the 2. Minimum Travel time and cost ( Dormitories within 1 km of radius walking requirement distance) 3. Each house would be on an ownership model 3. Easy Accommodation 4. Establishing a a DUSMC run- management office and shop  4. Better savings and work efficiency 5. The community has to register all the home based industry with the office 5. Inter-social Dependency (Health facilities at subsidized rate) Segregation of Spaces 6. Self sustaining model for individuals and industries- shift system • Household cluster - Enclosed is purely residential,  - semi enclosed is connected plinth area for      individual/group working  - open spaces for group working • Working clusters  - preparation and packing area in semi closed     plinth and open courtyards  - storage area: individual storage space in every house  and common storage at the community office and  separate storage for shops • Better Connectivity  - Dedicated Pedestrian paths  - Vehicular access  - Internal looping  - Better Physical amenities (Sanitation, water supply,     Drainage, Electricity Hygienic, working conditions) • Government will be responsible for legal matters • Community management would be responsible for entire  work and keeping common spaces free of encroachment. Roles of the office  1. Common space between houses would be owned and managed by the office 2. Supply of raw materials 3. Collaborate with outside agencies or companies for contracts and sales 4. Standardizing the work wages 5. Running and managing of shop


reinventing dharavi

3. Methodology :Strategies for the typologies

3. Methodology :Allocation methology for residential component

mumbaii, india

Residentail cum Commercial:

Macro Strategies & its Unifiers for Reinventing

Proposed Model: Live & Work Model

A. Macro Strategies • To create a zone of Legalized Industries • Develop commercial component around arterial and sub arterial roads - Office Spaces - Shops and Establishments • Model for home based industries to grow and sustain • Promotion of home based goods with development of required (new) commercial edge • Residential component for both Single and Family • Development of Residential units with Ownership, rental and salable component • To provide better transportation linkages • Development of “Dharavi Utility, Services and Management company(DUSMC)”-Special Body taking care of management and maintenance of Dharavi B. Unifyers Macro Strategies • Designated open spaces for community Development  – Concentrating on residential livelihood to help in formulating minimal disruption measures for the triggers • Mapping of Areas: Dharavi- The Urban Fabric  Higher Percentage of residential component for the EWS  The aspects would be catered by ownership and rental component • Governance and Management  – To establish management portals or offices in Dharavi, which will include • One office for managing the industries, their indulgence and work strategies: to certify and restrict them. • To develop employment guide centres: for student, literate- illiterate working class • The working panel could house experts- selected and employed from Dharavi by the  government Operation and maintenance cost covering physical and social aspects according to the  clusters • Financial Proposal Adopting a self driven model  • Model 1: Community - Government  • Model 2: Community - NGO - Government  • Model 3: Community - Developer - Government  • Model 4: Community - Local Contractor -  Government Only the management portals should be built and managed by government Developed road Network – Better linkages at Micro in hand with clusters – Inclusion of Mass Transport (Metro Line, BEST System, Bus stop) – Designated Parking spaces – Improved Pedestrian Network

1. Understanding the need of commercial cum residential unit to co-exist with a demarcated spatial segregation, along with individual residential &    commercial units  2. Developing commercial edge with a buffer along the roads for better accessibility and less crowding  3. Potential for R+C component to flourish better due to already existing infrastructure  4. Independent access for residential and commercial side ( Commercial : facing the road, Residential : entrance through pedestrian, internal roads) • Residential units: ownership and rental model (50-50%) • Commercial units: Classified on the basis of C1, C2, C3,C4&C5 categories  5. Commercial units would work on ownership, rental & Lease model


reinventing dharavi mumbaii, india

Outcomes 1. Sustainable neighborhood concept 2. DUSMC governed and managed ward offices (Technical assistance centres) and employment guide centres Role of the Technical Assistance Centre • Vocational training and career counseling Program • Camps for promoting schooling and higher studies • Hosting small short courses (skill development) • Sessions for promoting employment   opportunities • Employer- employee face to face briefing • Providing financial assistance for studies,   development of business and other work aspects List of Stakeholders Following are the tiers with their set of Stakeholders: 1st Tier: MCGM, BEST, Railway 2nd Tier: Developer, Local Contractor, NGO 3rd Tier: Community Special Body constituted by the Government for DHARAVI: DUSMC Relationship: The above 3 tiers are interdependent on each other. A redevelopment process can not be a success unless all contribute & work together Roles: 1.MCGM: To undertake & supervise the entire Re-development process To Select & appoint a developer or a local contractor. To undertake the financial responsibility To work hand in hand with the community 2.BEST / Railways: To help the re-development process by providing its land 3.Developer / Local Developer: To act as per the Government’s redevelopment plan To work as per the preferences of the community

4. NGOs • Assisting DUSMC for its redevelopment and rehabilitation  process • Bridging the technical and management gap between the  community and DUSMC • Assist DUSMC to conduct vocational training and career  counseling courses 5. Community: To co-operate with the Government for the redevelopment process 6. DUSMC (Dharavi Utility, Service and Management Company ) Formation of a Government run company to provide, manage and maintain Dharavi Roles:• Responsible for Redevelopment and rehabilitation • It is responsible to maintain the water supply, waste disposals, sewers, power, health services, roads, parks, etc of Dharavi. • Responsible to form sub management departments looking after industries - dormitories, home based industries, residential and commercial areas. Funding:All the income generated from rents and lease (commercial, residential and industrial units) forms the management and maintenance fund for DUSMC


reinventing dharavi

3. Methodology : Broad strategy of Governance & Management structures for different stakeholdership models

mumbaii, india

Stakeholdership model 1: COMMUNITY - GOVERMENT A public level approach where Government takes interest to solve the prevailing community basic needs Roles of the community 1. Collecting consent from majority of the crowd 2. Collaborating with the government officials 3. Stating preferences and needs of the community in terms of space and design 4. Collection of funds from community members and forwarding it to the Government Roles of the goverment 1. Approving the people to be rehabilitated based on legal tenure-ship according to the norms 2. Entrusting the responsibility to SRA or other

Stakeholdership model 2: COMMUNITY - NGO - GOVERMENT In the redevelopment process the NGO acts as middle men for providing technical assistance in bridging the gap between the community and the government. Roles of the community 1. Collecting consent from majority of the crowd. 2. Collaborating with a NGO. 3. Stating preferences and needs of the community in terms of space and design. 4. Selection of developer/ contractor in collaboration with the NGO. Roles of the goverment 5. Approving the people to be rehabilitated based on legal tenure-ship. 6. Approving the developer and the design. 7. Allocating the funds and phas-

  Government formed body for Development 3. Keep a check on construction phases and allocating the funds 4. Responsible to rehabilitate the residents based on number or chit system

ing the project. 8. Responsible to provide transit accommodation to the community. 9. Keeping a check on the construction . 10. Responsible to rehabilitate the residents based on number or chit system. Roles of the NGO 11. Bridging the technical gap between community and Government. 12. Selection of developer/ contractor with collaboration with community . 13. Formulating strategies for planProcess with Government. 14. Keeping check on project, completion process and allocation of units.


reinventing dharavi mumbaii, india

Stakeholdership model 3: COMMUNITY - DEVELOPER -COMMUNITY APPROACH 1 :

COMMUNITY - DEVELOPER -GOVERNMENT APPROACH 2 :

DEVELOPER - COMMUNITY -GOVERNMENT APPROACH 3 :


reinventing dharavi mumbaii, india

Stakeholdership model 4: COMMUNITY - LOCAL CONTRACTOR - GOVERMENT Community self appoints local contractors in and around the community area to carry on the redevelopment process called by the government. Roles of the community 1. Collecting consent from majority of the crowd 2. Selecting the set of people to work as construction workers/ local contractor. 3. Developing a plan as per the community needs. 4. Getting the design finalized and stages of development by the government . 5. Collection of part funds from community members and transferring it to the government as per the contract. Roles of the Local contractor 6. Responsible for preparing the design and getting it approved by the community and the government. 7. Responsible for the entire construction. 8. Working as per the preferences of the community and the government. Roles of the goverment 9. Approving the contractor. 10. 11. 12.   13.

Finalizing of the design and accordingly phases of   development. Fixing of finance model and providing the   construction materials. Responsible to provide transit accommodation to the community. Keeping a check on the construction .

Strategies for Health & Sanitation • Ensuring water and toilet facilities in every habitable space • Proper drainage channels • Segregated waste disposal system for Residential,  Commercial and industrial units • Availability of dispensaries and clinics at walking  distances • Conduction of Health awareness programs and camps specially for children, women and senior citizens

Strategies for education & social welfare • An attempt to retain all the institutions in Dharavi • All the schools existing and proposed are within 1 Km walking distance. • The institutions in and near the industrial zone would be re-located accordingly as per the above stated strategy. • Training & career counseling centres have been proposed  as a part of DUSMC schemes. • Proposal for Training & career counseling centres as a  part of DUSMC schemes.


reinventing dharavi mumbaii, india

5. Master Design Proposal Assumptions 1. Total development of Dharavi would happen in 15   years. 2. The master plan is divided in 5 phases. 3. Low lying Area, Area under Tata Power Line, CRZ, Approved & developed Housing Society, Public-semi public used spaces are considered in non developable area. 4. It will be a non-plotted development. 5. All the people of Dharavi agree for the development. 6. It is assumed the MCGM can get in agreement with   Railways and BEST and take part of their land to develop transit camps for period of 15 years. 7. The total no of household considered are 10% more than Mashal data 1995 (Considering the migration and natural population growth trends in Mumbai Slum) 8. Rehab component is assumed to be 300 Sq feet. Rent component is assumed to be 225 sq feet. 9. Total 20 % growth in Super Built up Area Industry,Residential +Commercial, Commercial is considered in the calculations. 10. Household size is considered 6.2 11. 45.7% of Residential Area is considered as   RehabComponent, 34.3% considered for 20% as Sale Component. This Rehab-rental ratio is taken to achieve same no.(50-50) of units. 12. Rehab, Rent, Lease & Sale model is considered in commercial component as 28%, 28%, 24% & 20%. 13. F.S.I. can be described as 2.88 for Rehab+ Rental Component and additional 0.72 for Sale component. 14. 3 Categories of saleable residential units are provided 525 sq ft, 750 sq ft and 900 sq ft. 15. Sale residential component can be G+7 (50%) and G+12 (50%) assuming them to be in close proximity to the main roads. 16. Industries are ready to shift into flattened Industry in Sector 2. 17. For Industry 10 people work per 100 Sq. M. (9515 Industrial Worker) 25% worker (2379) will require Dormitories. 18. Area required per person in Dormitories is for 7.5 sq mt per person. 19.Crowding is based on various observed scenarios. 20.It is assumed that on average 2 people are working per household for analyzing crowding density. 21.For Industrial, Commercial and R+C Crowding is considered that 80% people are working from Dharavi and 20 % from outside.

22. For Industrial, Commercial and R+C Crowding is considered that 80% people are working from Dharavi and 20 % from outside. 23. Special Areas such as Kumbharwada & Koliwada are not considered under redevelopment. Limitations:  1. Due to the high tension line, CRZ, development cannot take place in certain areas.  2. As per current DPR, MHADA & SRA policy rental Developable & Non developable areas Housingshould be less than 180 Sq. Ft. & Re-hab Considering the special areas of Kumbharwada, Koliwada dwelling is 225 Sq. Ft. and already developed areas by SRA & other public – private bodies, along with the existing main roads,  3. After 1995 there is no official data regarding population figure, no. of house holds, household railway yards, TATA Power station, Mahim Nature Park, Mahim creek, High tension line, existing open areas, size, open space area etc. religious & institutional structures as Non-developable  4. Here is no official record of the existing transareas. portation 0-0 survey, Mode of transport, PUC etc.  5. No official data on number of industrial & com- Our proposal focus is to create an undifferentiated area, merging the already done structures intelligently. mercial units and worker working in the industries.


reinventing dharavi mumbaii, india

Strategy for inclusion of city level infrastructure: Key physical and social infrastructure of existing and proposed infrastructure in Dharavi Present attributes • BEST • Sewerage Pumping station Land • Water Pipelines • Good Road and Rail connectivity • Lies in centre of western suburbs and central suburbs • Proposed Metro line • Existing Electricity supply station Lack of Attributes • No waste disposal systems • Lack of Toilets and hygiene Conditions Strategies Our strategy is to link and optimally use the existing resources in Dharavi and improve on the missingattributes accordingly by • Ensuring water and toilet facilities in every habitable space • Proper drainage channels and segregated waste disposal system for industries and residentialunits • Introduction of transit hub catering and managing railway, metro, BEST and para-transit crowd • Enhancing connectivity Environmental structures • Retaining the buffers of Mahim nature park • Incorporating habitants, commercial spaces and industries of Naik Nagar and Rajiv Gandhi Nagar (low lying areas) in other sectors and treating them as an extension of Mahim nature park • Industrial buffer – high tension line, crematorium on one side and road on the 3 side • Using high tension line buffer as service road & area and Temporary loading / Unloading area for    industries and not for residential purposes. • 30 meter buffer to be taken around Nala and to be developed as a community open space • Using existing buffers such as high tension line and crematorium to demarcate the industrial zone • Generating the road fronting the T-junction as a mangrove promenade public edge


reinventing dharavi mumbaii, india

Strategies for strategy:

Transport

• Introduction of transit hub catering and managing railway, metro, BEST and Paratransit crowd. • Hierarchical road network with its designated use • Improving and widening of roads • Providing proper designed - signalized junctions and Bus stops at regular intervals • Designed Non Motorized vehicle and pedestrian paths • Providing better footpaths, FoB /subways Section through 60 feet road wherever required • Bus-stops are proposed at every 500 M

Present pedestrain road connectivity

SRA approach - plotted development

Strategies for Open spaces and religious structures • An attempt to retain all the religious structures which are well within the proposed master plan cluster boundaries • All religious structure falling in roads, industrial zone and proposed transit hub will be Our approach - Non plotted developrelocated ment to retain pedestrian connectivity • Community spaces would be a part of the non plotted   Section through 90 feet road development • 30 meter buffer around Nala and to be developed as a community open space • The open spaces have been planned around the religious & Management structures • The road junctions Section through 9.0 m road integrated with open spaces to Creating open spaces at road junction for Road network between clusters to main- Connecting the religious structures with enhance the road experience. pedestrain pathways to retain social enhanced street experience tain linkages within different clusters fabric


Key Features of Phase 2 1. Dwelling Units: 9359 (Rehab and Rental) + 744 Sale Component. 2. Commercial built up area: 17510 sq.m 3. Public and semi public area: 29665.22 sq.m 4. Recreational Area: 35466.49 sq.m 5. Cost incurred: 3615.08 crores 6. Income Generated: 3663.79 Crores

Key Features of Phase 1 1. Dwelling Units: 7288 (Transit Camp at Dharavi Bus Depot and Mahim Railway Land) 2. Dwelling Units: 7868 (Rehab and Rental) + 626 Sale Component. 3. Commercial built up area: 14838 sq.m 4. Public and semi public area: 24912.43 sq.m 5. Recreational Area: 27699.40 sq.m 6. Cost incurred: 3347.87 crores 7. Income Generated: 2739 Crores

reinventing dharavi mumbaii, india

Phase 1

Phase 2 Key Features of Phase 3 1. Dwelling Units: 13888 (Rehab and Rental) + 1400 Sale Component. 2. Commercial built up area: 22624.92 sq.m 3. Public and semi public area: 45079.53 sq.m 4. Recreational Area: 57879.06 sq.m 5. Cost incurred: 4243.07 crores 6. Income Generated: 6064.71 Crores

Key Features of Phase 4 1. Dwelling Units: 16334 (Rehab and Rental) + 1593 Sale Component. 2. Industrial Built up area : 95416 sq.m 3. Commercial built up area: 47501 sq.m 4. Dormitories built up area: 17620 sq.m (for 25% Industrial workers) 4. Recreational Area: 79429.10 sq.m 5. Cost incurred: 5099.86 crores 6. Income Generated: 8142.16 Crores


reinventing dharavi mumbaii, india

Final Phase Key Features 1. Railway Quarters 2139 D.U. at Mahim Railway Quarters. 2. Dwelling Units: 2679 (Rehab and Rental) + 3002 (Sale Component) 3. Commercial Built up area: 35677.70 sq.m 4. Recreational Area: 55610.80 sq.m 5. Cost incurred: 4818.17 crores 6. Income Generated: 16264.70 Crores


reinventing dharavi mumbaii, india

Masterplan Massing


reinventing dharavi mumbaii, india

Phasing of a demonstration area


reinventing dharavi

Unit cluster plans for proposed industrial typologies

mumbaii, india

Typical courtyard unit - Third floor plan

Typical courtyard unit - Second floor plan

Section 1

Section 2

Typical courtyard unit - First floor plan

Typical courtyard unit - Ground floor plan

Cluster Level Plan for Industries


reinventing dharavi

Unit cluster plans for proposed home based & residential typologies

mumbaii, india

Proposed Home Based residential typology

1 2

3

First Floor Plan

Ground Floor Plan

4

4

5

5

Ground floor plan Section 1

3

Typical floor level plan

Section 2

Cluster Level Plan for Home Based & Residential area

Section 3

Section 4

Section 5


reinventing dharavi mumbaii, india

Class 3 - Typical Section 2

Class 1 - Typical section 1

1

1 2

2

Section through commercial edge buffer areas


reinventing dharavi mumbaii, india


planning and comprehensive design of nausena

Design process

Concept

c

b

A

d

New delhi, india

FIRM NAME : ratan j bataliboi pvt. ltd. TYPE : architecture competition area : 1.77 hectares

Competition Brief: 2.1. Requirements (General) (a) Land proposed for Nau Sena Bhawan building is marked on site plan as ‘A’ measuring approximately 5.41 acres. (b) Floor Area Ratio (FAR) of about 130 considering the location of the area and prevailing situation. (c) Ground coverage (25%), as per laid down regulations and Supreme Court decision. (d) The building is to be constructed in conformity with the ambience of the area. Accordingly, it has been specified in CPWD layout Plan that height should be equal to adjoining DRDO building and constitute of six floors. (e) Basement parking shall be explored to fullest extent by incorporating 2 level basements for parking. Parking for at least 402 ECS with 62 ECS on surface parking and 340 in two level basements has been envisaged in CPWD layout.

Exisiting conditions Scenario (Form with respect to Proposal (Form with respect to trees Site is located at the junction of Rajaji existing trees & available space): & climate sensitivity): Marg (Ceremonial road) & Tyag Raj Bulky mass. Long surfaces of building Other than trees along the road Marg. Presently the site is covered facing east and west instead of north periphery and park, most other trees with trees and existing buildings and south. Thus, not ideal. are transplanted to the north-west which are to be demolished. No interaction between buildings corner of the No natural light inside site. This allows for a better orientation & It also slows down the north-west winds from gushing through the funnel into the ceremonial space.

28

The hot and dry climate of New Delhi is the major deciding factor for evolution of the form. The building form respects the existing natural features such as trees by minimal disruption. Passive strategies have been developed on the selective model of the Vitruvian tri-partite model of environment (Hawkes) Applying different passive solar design strategies depends on the relationship between the building and the environment, which may be either selective or exclusive. Architecture Comfort An exclusive model isolates the building’s indoor environment from the outdoors to achieve comfortable conditions, while a selective model Climate allows interaction between the two spaces. The exclusive mode seals buildings, and mechanical systemswork inside them to create comfortable conditions.

Future expansion: The North-east corner of the plot features a water body that creates a wind funnel to bring in cool air towards the ceremonial space, using the predominant north-west winds. In future, this waterbody could be used as an underground water tank and a new programme can be The selective mode uses passive strategies and allows selected climate variables to enter the building to create comfortable conditions. accomodated over it if required.

Evolution of form

Level 5

1

4

Existing plot boundary with identification of Splitting of the bulky mass of Officer’s Zone to allow for more light adjacents roads

7 Tilting of mass on the south side to reduce the facade area exposed to direct harsh south light.

10 Realization of final mass with vertical circulation blocks

Level 4

Level 3

2

5

Proposed plot boundary with alteration of Public Identification of vertical circulation blocks as per Park belonging to Nau Sena Bhavan building code

8 Tilting of mass to allow interaction between Officer’s and Executive Zone

11 Large shaded surfaces within and between buildings

Level 2

Level 1

3

6

Proposed plot boundary with alteration of Public Further splitting of mass of Officer’s Zone Park belonging to Nau Sena Bhavan to allow soft northern light

9

12

Introduction of water body and creating a Identification of black, brown and green wind funnel to bring in cool air towards the top surfaces within the site ceremonial space, using the predominant north-west winds

Level 0


planning and comprehensive design of nausena New delhi, india

A Energy efficient design

B Passive strategies & renewable energy generation

High

Solar energy absorbed by paved areas and rooftops causes surface temperature of urban structures to be higher than ambient air temperatures The resulting higher temperature caused by the urban heat island has the effect of increasing the demand for cooling energy in commercial and residential buildings Urban Heat Island Profile

29

Using teflon coated fabric roofs for skylights to bring in natural daylight in the inner core of the building.

Use of solar panels to generate electricity to reduce power consumption and thus reduce the energy load. The excess energy generated can be fed to the grid. They also shade the roof surface.

low The landscape design has evolved based on the insolation analysis diagram showing ground surface exposure to incident heat.

b

Permeable pavements to reduce hard paved areas to reduce heat gain by paved areas

Office Space Office Space

c

Office Space

d ard Courty

Climate Responsive Design Summer

The building elements such as the openings on the south facing facade have been designed to block the heat penetrating the interiors of the building but at the same time allowing the light to enter.

Winter

a

ark r Car P

ent fo

Basem

ing

Summer

Winter

21st June

N

N

SECTION

SECTION In

Shadow Analysis 21st June

W

Out

In

21st June

6 pm

E

PLAN

4 pm

Out

W

2 pm

12 pm

E S

6 pm

PLAN

c waste water treatment Using soil biotechnology for treatment of grey and black water. The recycled water can be used for flushing and landscaping. The soil residue, which is rich in organic content, can be used in gardening. Space required for treatment is minimal and can be incorporated as part of landscaping / garden. Treatment requires no electricity. Routine maintenance can be carried out by unskilled manpower.

4 pm 2 pm

12 pm

S

21st December

Case 01: Southern window without shading device and single glazing on northern facade. Concentration of higher lux levels in a zone 21st December southern window S

W

N

E Case 01: Southern window without shading device and single glazing on northern facade. Concentration of higher lux levels in a zone southern window

Case 02: Southern window with shading devices and stone cladding and double glazing on northern facade. Uniform distribution of lux levels in a zone southern window.

W

N

S E Case 02: Southern window with shading devices and stone cladding and double glazing on northern facade. Uniform distribution of lux levels in a zone southern window.

e Rain water Harvesting Average Annual Rainfall in Delhi = 611.8 mm = 0.6 m Roof area (Catchment area)= 3982.85 sq.m Rainwater collection and reuse potential = Average annual rainfall x Catchment area x Runoff coefficient = 0.6X3982X0.95 = 2270 cu.m. = 22,70,000 litres annually (assuming 4 months of rainfall). Annual water demand of the building can be calculated as : Occupants= 1500 Water demand= 70lpd Total water demand= 1,05,000 litres per day = 1,26,00,000 litres in the monsoon months.

d solid waste managment The aim is to avoid contributing to the landfill and adopt a cradle to cradle approach. One of the ways to achieve this is to convert wet waste from kitchens into manure through organic waster converter

*It is suggested that stack parking be used instead of two levels of basement for economic & environmental benefits.

e


planning and comprehensive design of nausena

30

New delhi, india

Se

rvi

Ceremonial Entran ce

Fourth Floor Plan

ce E

nt ry

Pu b

lic

En tra

nc e

Third Floor Plan

Second Floor Plan

South Elevation

First Floor Plan

Ground Floor Plan

South Elevation


o ng c m r p l mumbai, INDIA FIRM NAME :

3

4

EPICONS CONSULTANTS PVT. LTD. TYPE interior AREA : 1510 SQ.M

2

5

6 6

1 1

7 2 9

1. Reception & lobby with Conference Room 2. General Manger Cabin 3. DGM Cabins 4. Chairman Cabin 5. Sr. Manager Workstation 6. Office Workstation 7. Canteen 8. Toilet 9. Kitchen

8


Viman nagar Residence pune, INDIA FIRM NAME : For young India. TYPE :architecture AREA : 1510 SQ.M

The Brief was to design the interior spaces with

View of Living Room

View of Living Room

View of Bedroom


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.