BCMS-DOC-08-7 Business Continuity Plan

Page 19

Business Continuity Plan

7 Business continuity plan activation Once the IRT has been assembled at the command centre and as much detail as possible has been collected about the incident and its impact, a decision needs to be made about the most appropriate response. [Organization Name] has a variety of business continuity procedures that provide for actions to be taken to respond to different types of incidents. These procedures are as follows:

DOC REF

PROCEDURE TITLE

PROCEDURE DESCRIPTION

Plan001

Loss of Access to Building A

Move key business activities to alternate site

Plan002

Loss of main business critical IT servers

Restore backups to warm recovery site

Plan003

Failure of Critical Supplier

Increase supply from alternative suppliers

[List all business continuity plans]

Table 4: Business continuity procedures

Based on the current understanding of the business activities affected by the incident, an appropriate combination of the above business continuity procedures should be activated to try to mitigate the impact. The BCMS form Plan Activation Log should be used to record the business continuity procedures that are activated to address the specific business activities impacted by the incident. The method of activation of each procedure is detailed in the individual procedure document.

Version 1

Page 19 of 28