Sms doc 062 2 service report

Page 1

Service Report

ISO/IEC 20000 Toolkit Version 7 ©CertiKit


Service Report

Implementation Guidance (The header page and this section must be removed from final version of the document)

Purpose of this document The Service Report template sets out one option for delivering service-related metrics to the customer.

Areas of the standard addressed The following areas of the ISO/IEC 20000:2011 standard are addressed by this document: 6. Service delivery processes 6.2 Service reporting

General Guidance This template is intended as a monthly or quarterly formal service report to the customer. You may decide to present the information in a different format or via an intranet depending on the facilities available. There are many figures that could be included here and discussion should be had with the customer(s) to identify which ones they regard as meaningful and useful.

Review Frequency We would recommend that this document is reviewed annually.

Toolkit Version Number ISO/IEC 20000 Toolkit Version 7 ©CertiKit.

Document Fields This document may contain fields which need to be updated with your own information, including a field for Organization Name that is linked to the custom document property “Organization Name”. To update this field (and any others that may exist in this document): 1. Update the custom document property “Organization Name” by clicking File > Info > Properties > Advanced Properties > Custom > Organization Name

Version 1

Page 1 of 16

[Insert date]


Service Report

2. Press Ctrl a on the keyboard to select all text in the document (or use Select, Select All on the ribbon) 3. Press F9 on the keyboard to update all fields 4. When prompted, choose the option to just update TOC page numbers If you wish to permanently convert the fields in this document to text i.e. so that they are no longer updateable, then you will need to click into each occurrence of the field and press Ctrl Shift F9. If you would like to make all fields in the document visible then go to File > Options > Advanced > Show document content > Field shading and set this to “Always”. This can be useful to check that you have updated all fields correctly. Further detail on the above procedure can be found in the Toolkit Completion Instructions within the Project Resources folder.

Copyright notice Except for any third party works included in this document, as identified in this document, this document has been authored by CertiKit, and is © copyright CertiKit except as stated below. CertiKit is a trading name of Public I.T. Limited, a company registered in England and Wales with company number 6432088 and registered office at 5 Falcons Rise, Belper, Derbyshire, DE56 0QN.

Licence terms This document is licensed on and subject to the standard licence terms of CertiKit, available on request, or by download from our website. All other rights are reserved. Unless you have purchased this product you only have an evaluation licence. If this product was purchased, a full licence is granted to the person identified as the licensee in the relevant purchase order. The standard licence terms include special terms relating to any third party copyright included in this document.

Disclaimer Please Note: Your use of and reliance on this document template is at your sole risk. Document templates are intended to be used as a starting point only from which you will create your own document and to which you will apply all reasonable quality checks before use. Therefore please note that it is your responsibility to ensure that the content of any document you create that is based on our templates is correct and appropriate for your needs and complies with relevant laws in your country. You should take all reasonable and proper legal and other professional advice before using this document. CertiKit makes no claims, promises, or

Version 1

Page 2 of 16

[Insert date]


Service Report

guarantees about the accuracy, completeness, or adequacy of our document templates, assumes no duty of care to any person with respect its document templates or their contents, and expressly excludes and disclaims liability for any cost, expense, loss or damage suffered or incurred in reliance on our document templates, or in expectation of our document templates meeting your needs, including (without limitation) as a result of misstatements, errors and omissions in their contents.

Version 1

Page 3 of 16

[Insert date]


Service Report

[Replace with your logo]

Service Report MMM to MMM YYYY

Document Ref. Version: Dated: Document Author: Document Owner:

Version 1

Page 4 of 16

SMS-DOC-062-2 1 [Insert date]

[Insert date]


Service Report

Revision History Version Date

Revision Author

Summary of Changes

Distribution Name

Title

Approval Name

Version 1

Position

Signature

Page 5 of 16

Date

[Insert date]


Service Report

Contents 1

INTRODUCTION ....................................................................................................................................... 7

2

SUMMARY OF PERFORMANCE AGAINST SERVICE LEVEL TARGETS .................................. 8

3

SERVICE DESK PERFORMANCE ......................................................................................................... 9 3.1 INCIDENTS ............................................................................................................................................. 9 3.1.1 Number of Incidents logged and closed by month ........................................................................ 9 3.1.2 Percentage of Incidents Resolved within SLA .............................................................................. 9 3.1.3 First Line Percentage Fix Rates ................................................................................................. 10 3.1.4 Logged Incidents by Priority ...................................................................................................... 11 3.1.5 Top 10 Categories of Incidents ................................................................................................... 11 3.2 SERVICE REQUESTS ............................................................................................................................. 12 3.2.1 Number of Requests logged and fulfilled by month .................................................................... 12 3.2.2 Requests fulfilled within SLA ...................................................................................................... 12

4

SERVICE AVAILABILITY .................................................................................................................... 13 4.1 4.2 4.3 4.4 4.5 4.6 4.7

5

EMAIL SERVICE ................................................................................................................................... 13 INTERNET SERVICE .............................................................................................................................. 13 ABC SERVICE ...................................................................................................................................... 14 ALL OTHER SERVICES AVERAGE........................................................................................................... 14 PLANNED WITHDRAWALS OF SERVICE DURING REPORTING PERIOD ................................................... 15 UNPLANNED WITHDRAWALS OF SERVICE DURING REPORTING PERIOD ............................................... 15 FUTURE PLANNED WITHDRAWAL OF SERVICE..................................................................................... 15

IT SERVICE IMPROVEMENT.............................................................................................................. 16 5.1 5.2

IMPROVEMENT ACTIVITIES DURING REPORTING PERIOD ..................................................................... 16 SERVICE IMPROVEMENTS PLANNED ..................................................................................................... 16

List of Figures FIGURE 1 - INCIDENTS OPENED AND CLOSED ........................................................................................................ 9 FIGURE 2 - INCIDENTS RESOLVED WITHIN SLA ................................................................................................... 10 FIGURE 3 - FIRST LINE FIX RATES ........................................................................................................................ 10 FIGURE 4 - INCIDENT PRIORITIES ......................................................................................................................... 11 FIGURE 5 - TOP 10 INCIDENT CATEGORIES ......................................................................................................... 11 FIGURE 6 - SERVICE REQUESTS OPENED AND FULFILLED ................................................................................... 12 FIGURE 7 - REQUESTS FULFILLED WITHIN SLA ................................................................................................... 12 FIGURE 8 – EMAIL SERVICE AVAILABILITY ........................................................................................................... 13 FIGURE 9 - INTERNET SERVICE AVAILABILITY ....................................................................................................... 13 FIGURE 10 - ABC SERVICE AVAILABILITY ............................................................................................................ 14 FIGURE 11 - AVAILABILITY OF OTHER SERVICES.................................................................................................. 14

List of Tables TABLE 1 - PERFORMANCE SUMMARY ..................................................................................................................... 8 TABLE 2- PLANNED SERVICE WITHDRAWALS ....................................................................................................... 15 TABLE 3 - UNPLANNED SERVICE WITHDRAWALS.................................................................................................. 15 TABLE 4 - FUTURE PLANNED SERVICE WITHDRAWALS ........................................................................................ 15 TABLE 5 - IMPROVEMENT ACTIVITIES ................................................................................................................... 16 TABLE 6 - PLANNED SERVICE IMPROVEMENTS .................................................................................................... 16

Version 1

Page 6 of 16

[Insert date]


Service Report

1 Introduction The purpose of this document is to act as a regular communication tool between [Service Provider] and the [Organization Name] management team. This document will report against the metrics contained within the Service Level Agreement in order to give a measure of performance and provide additional information regarding trends and activities within [Service Provider]. This report covers the period [Month] to [Month] YYYY. The service management processes within IT are currently under significant change and it is anticipated that the accuracy and scope of the available reporting will improve over time. Many of the service level targets detailed in this document are subject to agreement with the business. This document is intended to be a tool for discussion regarding the content, frequency and level of detail of the reporting of IT performance.

Version 1

Page 7 of 16

[Insert date]


Service Report

2 Summary of Performance against Service Level Targets The following table summarises actual performance against the targets set in the SLA in the specified area. Service Level Incident

Service Requests

Service Availability

Description

Target

The percentage of incidents for which the target resolution timescales for the assigned priority are met The percentage of Service Requests for which the target fulfilment timescales are met % of incidents that are resolved 1st Line

X%

The target availability for the [application] service The target availability for the [application] service The target availability for the Internet service The target availability for all other services

Actual this Quarter Y%

X%

Y%

X%

Y%

X%

Y%

X%

Y%

X%

Y%

X%

Y%

Table 1 - performance summary

Further sections of this report give more information in each of these areas.

Version 1

Page 8 of 16

[Insert date]


Service Report

3 Service Desk Performance Various aspects of Service Desk performance are shown in the following charts with a brief narrative where appropriate. 3.1

Incidents

3.1.1

Number of Incidents logged and closed by month

Incidents opened and closed 1800 1600

No. incidents

1400 1200 1000 800

Opened

600

Closed

400 200 0 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Month

Figure 1 - Incidents opened and closed

The number of incidents logged by the service desk during the reporting period was higher/lower/as expected for the time of year. The main reasons for this are understood to be: •

3.1.2

[explain any factors that may have affected the number of incidents logged e.g. major outages, increased number of users, seasonal variations] Percentage of Incidents Resolved within SLA

The percentage of incidents that were resolved within the SLA target is shown in the chart on the following page. In general the performance against SLA targets has been good, with exception of September where staffing issues caused the service level provided to fall below the target of 90%.

Version 1

Page 9 of 16

[Insert date]


Service Report

% incidents resolved within SLA % resolved within SLA

100% 95% 90% 85% 80% 75% Jan

Feb Mar Apr May Jun

Jul

Aug

Sep

Oct

Nov Dec

Month

Figure 2 - Incidents resolved within SLA

3.1.3

First Line Percentage Fix Rates

The percentage of incidents that were fixed at first line is shown in the chart below.

% fixed at first line 95%

% fixed

90% 85% 80% 75% 70% Jan

Feb Mar Apr May Jun

Jul

Aug Sep

Oct Nov Dec

Month

Figure 3 - First line fix rates

This shows that the target of 80% is frequently exceeded. Again, September’s figure was affected by resourcing issues within the service desk.

Version 1

Page 10 of 16

[Insert date]


Service Report

3.1.4

Logged Incidents by Priority

The pie chart below shows the breakdown of incidents by priority for the month of December.

Incident priorities in Dec 20

99

P1

375

P2 P3 P4

494

Figure 4 - Incident priorities

3.1.5

Top 10 Categories of Incidents

The top 10 categories of incidents are shown in the chart below. Many of these are areas in which problem management resource continues to be allocated.

No. incidents

Top 10 incident categories for Dec 120 100 80 60 40 20 0

Category

Figure 5 - Top 10 incident categories

Version 1

Page 11 of 16

[Insert date]


Service Report

3.2

Service Requests

3.2.1

Number of Requests logged and fulfilled by month

The number of service requests submitted to the service request and the number fulfilled by month is shown in the chart below.

Service requests opened and fulfilled No. service requests

700 600 500 400 300

Opened

200

Closed

100 0 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Month

Figure 6 - Service requests opened and fulfilled

The sharp drop in Dec is most likely due to the holiday period and the closure of the Seattle office. 3.2.2

Requests fulfilled within SLA

The percentage of service requests fulfilled within the SLA target timescales is shown in the chart below.

% service requests fulfilled within SLA 100%

% fulfilled

80% 60% 40% 20% 0% Jan Feb Mar Apr May Jun

Jul

Aug Sep Oct Nov Dec

Month

Figure 7 - Requests fulfilled within SLA

Version 1

Page 12 of 16

[Insert date]


Service Report

4 Service Availability 4.1

Email Service

The availability of the service is shown in the chart below.

% Service Availability 100.00

% availability

99.50 99.00 98.50 98.00 97.50 Jan Feb Mar Apr May Jun

Jul

Aug Sep Oct Nov Dec

Month

Figure 8 – Email Service availability

4.2

Internet Service

The availability of the Internet service is shown in the chart below.

% Service Availability 100.00

% availability

99.50 99.00 98.50 98.00 97.50 Jan Feb Mar Apr May Jun

Jul

Aug Sep Oct Nov Dec

Month

Figure 9 - Internet service availability

Version 1

Page 13 of 16

[Insert date]


Service Report

4.3

ABC Service

The availability of the ABC service is shown in the chart below.

% Service Availability 100.00

% availability

99.50 99.00 98.50 98.00 97.50 Jan Feb Mar Apr May Jun

Jul

Aug Sep Oct Nov Dec

Month

Figure 10 - ABC service availability

4.4

All other services average

The availability of all other services is shown in the chart below.

% Service Availability 100.00

% availability

99.50 99.00 98.50 98.00 97.50 Jan Feb Mar Apr May Jun

Jul

Aug Sep Oct Nov Dec

Month

Figure 11 - Availability of other services

Version 1

Page 14 of 16

[Insert date]


Service Report

4.5

Planned Withdrawals of Service during Reporting Period

Planned service withdrawals were carried out on the following occasions within the reporting period.

Date ddmmyyyy

Time Hh:mm

Services Affected Email Internet

Length 1 hour

Reason Upgrade of network router

Table 2- Planned service withdrawals

Notice was given for these withdrawals according to the guidelines set out in the SLA. 4.6

Unplanned Withdrawals of Service during Reporting Period

On the following occasions service had to be withdrawn at short notice due to unexpected circumstances.

Date ddmmyyyy

Time Hh:mm

Services Affected Email ABC service

Length 2 hours

Cause Emergency change to server disk configuration

Table 3 - Unplanned service withdrawals

The major incident report for these incidents are available on request.

4.7

Future Planned Withdrawal of Service

During the next reporting period the following withdrawals of service are currently planned.

Date ddmmyyyy

Time Hh:mm

Services Affected Email

Length 4 hours

Reason Upgrade of software version

Table 4 - Future planned service withdrawals

Version 1

Page 15 of 16

[Insert date]


Service Report

5 IT Service Improvement 5.1

Improvement Activities during Reporting Period

The following improvement activities were completed during the reporting period.

Service Internet

Improvement A faster connection was installed

Benefits Internet browsing is now quicker and more users can be supported

Comments This was requested as part of a recent user satisfaction survey

Table 5 - Improvement activities

5.2

Service Improvements Planned

The following service improvements are planned during the next reporting period.

Service Email

Improvement New functionality in calendaring

Benefits Users will be able to view staff calendars more easily

Comments This was requested at a management meeting in Nov

Table 6 - Planned service improvements