Eastside Waterfront Park Boothbay Harbor Waterfront Preservation
Site Plan Pre-Application Presentation Planning Board | Boothbay Harbor | Maine 8 April 2020 MRLD Landscape Architecture
Eastside Waterfront Park | Boothbay Harbor Waterfront Preservation
Applicant Boothbay Harbor Waterfront Preservation 501(c)(3) a public charity PO Box 55 Boothbay Harbor, Maine 04538 Agent Mitchell Rasor MRLD Landscape Architecture EASTSIDE
Waterfront PARK
Page 2
Eastside Waterfront Park | Boothbay Harbor Waterfront Preservation
Presentation Overview Mitchell Rasor: MRLD Landscape Architecture 1. Existing Site Summary 2. Existing Site Conditions Overview 3. Proposed Park Overview 4. Project Progress 5. Questions and Comments
3. Proposed Park Overview: Proposed
Page 3
Eastside Waterfront Park | Boothbay Harbor Waterfront Preservation
DOWNTOWN
SITE
FISH PIER 1. Existing Site Summary: Context View Northwest
Page 4
Eastside Waterfront Park | Boothbay Harbor Waterfront Preservation
1. Existing Site Summary 1. Address:
65 Atlantic Ave
2. Acreage:
0.84 Acres
3. Zoning:
Limited Commercial / Maritime Shoreland
4. Impervious Coverage:
95% +/1. Site Information Overview
Page 5
Eastside Waterfront Park | Boothbay Harbor Waterfront Preservation
Purpose of Limited Commercial/Maritime District The purpose of the Limited Commercial/Maritime District is to reserve a reasonable portion of the Boothbay Harbor waterfront for the protection of traditional water-dependent uses, such as bait suppliers, wholesale and retail lobster and fish markets, boat launching ramps, marine repair, marinas and similar marine activities; to allow development of new, compatible non-maritime uses, such as hotels, restaurants, and similar uses, and the creation of new opportunities for public waterfront access and conservation of existing public physical and visual access to coastal waters. Source: BBH Ordinance 1. Existing Site Summary
Page 6
Eastside Waterfront Park | Boothbay Harbor Waterfront Preservation
X X X
+
+
X
X
X
+
X
+
+ + +
2. Existing Site Conditions Overview: View East
Page 7
Eastside Waterfront Park | Boothbay Harbor Waterfront Preservation
Existing Uses Summary 1. Hotel 2. Mixed-Use Building (apartment, hotel, office) - historic Hodgdon Home 3. Restaurant 4. Marina 5. Working Waterfront Uses (2003 Permit)
2. Existing Conditions Overview: Uses
Page 8
Eastside Waterfront Park | Boothbay Harbor Waterfront Preservation
3. Proposed Park Overview: Existing
Page 9
Eastside Waterfront Park | Boothbay Harbor Waterfront Preservation
3. Proposed Park Overview: Proposed
Page 10
Eastside Waterfront Park | Boothbay Harbor Waterfront Preservation
2. Multi-Family / General Store 1. Park
3. Working Waterfront
4. Marina
3. Proposed Park Overview: Proposed
Page 11
Eastside Waterfront Park | Boothbay Harbor Waterfront Preservation
3. Proposed Park Overview: View West: Proposed
Page 12
Eastside Waterfront Park | Boothbay Harbor Waterfront Preservation
Proposed Uses Summary 1. 2. 3. 4. 5.
3 Unit Multi-Family Home (in historic home) General Store (in historic home) Park Marina (existing) Working Waterfront Uses (existing)
Required Parking: 37 Spaces Proposed Parking: 51 Spaces (includes 14 overflow) Impervious Coverage: 55%+/- (40% increase in open space) 3. Proposed Park Overview: Uses
Page 13
Eastside Waterfront Park | Boothbay Harbor Waterfront Preservation
4. Project Progress • • • • • • • •
DEP pre-application meeting for full NRPA Permit DEP compliance confirmation of 2003 NRPA Permit Asbestos remediation completed Resource Assessment for NRPA Permit Agreement with Town on proposed Atlantic Ave sidewalk Coordination with Town on boat ramp improvements Submitted Demolition Permit to Town TONIGHT: Planning Board pre-application meeting for Site Plan Review Permit
4. Project Progress
Page 14
Eastside Waterfront Park | Boothbay Harbor Waterfront Preservation
5. Questions and Comments