Rhode Island Airport Corporation Balances Diverse Interests of Stakeholders
The development plan for the Rhode Island Airport Corporation had to balance the varied perspectives of its diverse stakeholders, as illustrated through the stakeholders’ interests related to the topic of airspace hazard mitigation.
STAKEHOLDER
Preservation of Safe Airspace Bill Airspace Hazard Mitigation
Mandates Preservation of Safe Airspace Bill
Support/ Opposition of Litigation
Requires FMV for easement acquisitions
Support/ Opposition of Airport Improvement
Issues federal $ for capital improvements
Federal Aviation Administration
Requires airspace hazard mitigation
Rhode Island
Airport Host Municipalities
Exclusively controls all U.S. airspace
Controls federal $ funding for easements and obstruction removal
Passed Airspace Bill
Required $92K be returned for obstruction removal design at WST State of
Passed laws mandating "airport zoning" to mitigate hazard areas in 1999
State Court issued injunction, preventing obstruction removal at WST
Two of ten formally supported Preservation of Safe Airspace Bill
Seven of ten municipalities have not implemented airport zoning Without zoning, enforcement can be a challenge
No material support for the ongoing litigation
State RIDOT exercises condemnation on RIAC's behalf
Verbally supported development at airport, but may not support Preservation of Safe Airspace Bill or avigation easements
Pilots and Stakeholders
AOPA, RIPA, Skydive Newport and FlightLevel formally supported the Preservation of Safe Airspace Bill
Neighbors and Communities
Neighbors in WST filed lawsuit in March 2016 preventing hazard removal via condemnation
Support mitigation of airspace hazards
Did not respond to airport's request to join the lawsuit
Mixed stances and positions
Support capital investments
BID neighbors filed lawsuit against RIAC and tenant for nuisance and inverse condemnation from noise
Most do not support additional development
Business Assessment
The Rhode Island Airport Corporation assessed opportunities to decrease the financial reliance of its General Aviation airports on PVD subsidies.
The General Aviation Strategic Business Plan bridges the gap between near-term (1- to 5-year) financial planning and long-term (20-year) planning.
For more information, please visit flyri.com/riac/development-opportunities.
Fifteen commercially viable parcels, totaling nearly 150 acres were identified as available for development at the five GA airports. Appraised lease rates and highest and best uses for each parcel were defined to support the financial analysis.*
*Note: The above estimates have been updated since the January 2022 publication of the GA Airport Strategic Business Plan.
The development of the 15 parcels at the general aviation airports is estimated to generate over $2.3 million* of additional revenue annually by fiscal year (FY) 2030.
![](https://assets.isu.pub/document-structure/230306151318-05782a1b4341181fef973b8d9c6c1886/v1/95f111ce5ea96884bf74b5ed841bee37.jpeg?width=720&quality=85%2C50)
![](https://assets.isu.pub/document-structure/230306151318-05782a1b4341181fef973b8d9c6c1886/v1/6baa785fa0b76432f0f83b96ed4f47af.jpeg?width=720&quality=85%2C50)
![](https://assets.isu.pub/document-structure/230306151318-05782a1b4341181fef973b8d9c6c1886/v1/b951c9728850b79db0787eaceaaf6a41.jpeg?width=720&quality=85%2C50)
![](https://assets.isu.pub/document-structure/230306151318-05782a1b4341181fef973b8d9c6c1886/v1/461c8637167418bd9abcf89d04780637.jpeg?width=720&quality=85%2C50)
![](https://assets.isu.pub/document-structure/230306151318-05782a1b4341181fef973b8d9c6c1886/v1/58d5a2972456595a650b432a9626db44.jpeg?width=720&quality=85%2C50)
Capital Programs at General Aviation Airports
![](https://assets.isu.pub/document-structure/230306151318-05782a1b4341181fef973b8d9c6c1886/v1/6ae77038a3287fac50bfbcdfc77aa2ef.jpeg?width=720&quality=85%2C50)
![](https://assets.isu.pub/document-structure/230306151318-05782a1b4341181fef973b8d9c6c1886/v1/847afc2bf0564ccf9e233d453de29dda.jpeg?width=720&quality=85%2C50)
Runway 16-34 Design & Construction at Quonset
![](https://assets.isu.pub/document-structure/230306151318-05782a1b4341181fef973b8d9c6c1886/v1/3aa27cd3691bfb6556654298684f66c9.jpeg?width=720&quality=85%2C50)
Scope
This project reconstructs Runway 16-34. The project will include full depth runway reconstruction and associated electrical and storm water improvements and threshold changes to accommodate a full 1,000-foot safety area. The three phases of this project include design which is currently underway and two construction seasons through FY24.
![](https://assets.isu.pub/document-structure/230306151318-05782a1b4341181fef973b8d9c6c1886/v1/4249ae7c343d1d33df81822aad3474d0.jpeg?width=720&quality=85%2C50)
![](https://assets.isu.pub/document-structure/230306151318-05782a1b4341181fef973b8d9c6c1886/v1/1f6cd00e4017d01332cd05167f8edf55.jpeg?width=720&quality=85%2C50)
Cost
$108.7 Million*
* Updated cost as of 12/30/2022
Project Location
![](https://assets.isu.pub/document-structure/230306151318-05782a1b4341181fef973b8d9c6c1886/v1/0892f186414933441f9e10866b68ddb9.jpeg?width=720&quality=85%2C50)