![](https://assets.isu.pub/document-structure/230306151318-05782a1b4341181fef973b8d9c6c1886/v1/d954ec208c2037dc3631ca1fa155171d.jpeg?width=720&quality=85%2C50)
1 minute read
System-Wide Easement Acquisitions for Obstruction Removal
Project Location
Scope
The project involves the purchase of negotiated airspace easements to remove obstructions within the runway approach surfaces to comply with Federal Grant Assurance 20, Hazard Removal and Mitigation. The program includes independent appraisals of the value of airspace easements, prepared in compliance with the regulations of the Federal Aviation Administration and the U.S. Department of Transportation.
Cost
$2.5 Million
1,967 Total Actual & Near Obstructions
![](https://assets.isu.pub/document-structure/230306151318-05782a1b4341181fef973b8d9c6c1886/v1/dfe95dda3b1367fdefa617d2023e80bb.jpeg?width=720&quality=85%2C50)
Federal regulations require that RIAC address airspace obstructions presented by vegetation and growing trees with the potential to create hazards in airspace surrounding state airports.
Currently Under Contract
ARTICLE A: Environmental Assessments
ARTICLE B: Avigation Easement Acquisitions (OQU only)
Proposed Contract Amendment 1
![](https://assets.isu.pub/document-structure/230306151318-05782a1b4341181fef973b8d9c6c1886/v1/64eb69d0f5276111873c0f7ee86bfa28.jpeg?width=720&quality=85%2C50)
Terminal Demolition Design & Construction at Quonset
Scope
This project includes a conceptual study for demolition of an outdated and abandoned maintenance equipment facility at the Quonset State Airport (OQU) to allow the parcel to be used for new, aviation related development.
Cost
$2.1 Million
Project Location
![](https://assets.isu.pub/document-structure/230306151318-05782a1b4341181fef973b8d9c6c1886/v1/a39817f44fd67d5bfcd2926485dd9c95.jpeg?width=720&quality=85%2C50)