Portfolio for UCL

Page 1

Simiao Qi Architecture Portfolio UCL ID:20159956 Programme Architectural Design MArch

Conntent Individual work The Seconde Green House House Among nature 3d Print Museum

Group work The Roving Memory

Other work Adaptive facade - the morning glory Bridge in wavey





















5.40

classroom

classroom

m/s 0.9

0m

SE

/s

lobby

toilet

toilet

classroom

classroom

winter

Other Works the morning glory flower atonomy

calystegia

flower cut vertically, with its two foliaceous bracts resembling an accessory calyx (mag)

phylum class order

Adaptive Facade

calystegia sepium bindweed

The Morning Glory

calystegia

flower

stamen (mag.)

calystegia pistil (mag.)

Group work building facade

calystegia

diagram of the flower and two foliaceous bracts

Morning Glory

bindweed

embryo laid open (mag.)

bindweed

bindweed

fruit (mag.)

seed, entire and cut vertically (mag.)

angiosperm solanales morning glory

family genus species

convolvulaceae ipomoea morning glory

Annual twining herb with inverted pubescent stems and mixed inverted or spreading long hairs. Leaves broadly ovate or nearly circular, deeply or shallowly 3-lobed, even 5-lobed, 4-15 cm long, 4.5-14 cm wide, base rounded, heart-shaped, medium lobes oblong or oval, acuminate or cusp, lateral lobes shorter, triangular, cleft sharp or round, leaf surface or sparsely or densely pubescent; petioles 2-15 cm long, hairy identical stem. Native to tropical America, this species has been widely planted in tropical and subtropical areas, growing in hillsides thickets, dry valley roadside, garden side houses, mountain roadside, or for cultivation. Compliance is strong, sunny enough, can withstand half shade. Be fond of warm cool, yi ke can bear the heat of summer heat high temperature, but do not bear cold, fear frost. Xifeimei loose soil pile, water resistance and early dry, salt and alkali resistance. Seed germination suitable temperature 18 ~ 23℃, seedlings in 10℃ above the temperature can grow.

origami form

ARC301 Architectural Technology Group: Simiao.Qi Xu.Li Qi.Xue Qi.Zheng Yu.Gu

south elevation 1:200

existed building condition modular details

annual daylight

wind analysis

origami process / top

origami process / front

origami process / top

ideal daylight

axo explode NW

commom room 5.40 m/s

9.

00

/s

bouquet

0m

7.2

m

/s

toilet

toilet office

office

summer classroom 450 lx office 450 lx

lecture hall

toilet 150 lx corridor 150 lx staircase 150 lx

common room 300 lx print room 300 lx

shading membrane

detail section classroom 1:20

9.00 m/s

5.40

track / pry

classroom

m/s 0.9

0m

SE

/s

lobby

toilet classroom

lecture hall

support

open 30%

detail plan 1:25

open 90%

shading strategy toilet

classroom

winter

15% 66FFCC

support

the morning glory

open 60%

lobby 150 lx

15% #1 pattern

25% 66CCCC


calystegia

diagram of the flower and two foliaceous bracts

bindweed

embryo laid open (mag.)

bindweed

of summer heat high temperature, but do not bear cold, fear frost. Xifeimei loose soil pile, water resistance and early dry, salt and alkali resistance. Seed germination suitable temperature 18 ~ 23℃, seedlings in 10℃ above the temperature can grow.

bindweed

fruit (mag.)

seed, entire and cut vertically (mag.)

origami form

origami process / top

support

origami process / front

open 30%

origami process / top

open 60%

open 90%

shading strategy 15% 66FFCC

25% 66CCCC

15% #1 pattern

30% 66FFFF

25% #2pattern

30% #3pattern

60% 9933FF

85% FF99CC

60% #4 pattern

85% #5 pattern

facade


allows trees growing through.

However, this cause structure

bridge as a whole

problems extand them from two direction

may work in terms of structure ,

C

howevevr, it reduce the feeling of the

C

ath

path as a part of the first path and

D

having the two ends of the second

B

path departure from the first path

B

having the two ends of the second

supported by the first path above the first path, which can be we have the second path curving combining the three ideas together,

A

a

co

going down

A

Design Prossece

when it meet

D

C

C

two parts together this geometry design provides

structure potential to combine the

B

B

A

problems problems

integral system and structural interweave.

path departure from the first path

relaxed students can experience through the upper deck at

having the two ends of the second

can pass the lower deck conveniently and quickly, but

having the second path going down

also provides the functional interweave where pedestrian

allows trees growing through.

people on different layers to communicate and play. It

having the second going down two ends of the second having the twothe ends of ends the second having thepath second path going down having the having the two ends of the second having two of the second having the two ends of the second combining the three ideas together, this geometry design provides and up creates when troubles when it meetpath departure path departure the first path partfirst of the first path and and up creates troubles it meet from thefrom first path path as path a partasofathe path and path as a part of the first path and we have the second path curving structure potential to combine the withpath the first path may work in of structure , extand them from two direction with the first may work in terms of terms structure , extand them from two direction extand them from two direction

The bridge allows the affective interweave when the

may work in terms of structure ,

express the cultural interweave in architectural language.

howevevr, it reduce the feeling of the

The concept of the bridge is the interweave.It aims to

the first path, which can be trees growing through. two parts together howevevr, reduce theabove feeling allows howevevr, it reduceitthe feeling of the of the allows trees growing through. pathHowever, this cause structure as a wholesupported by the first bridge asbridge a whole However, this cause structure

to grow, supporting the upper-lever bridge, which form an

problems

the same time. The trusses of lower-level bridge continue

However, this cause structure

Group work

and up creates troubles when it meet with the first path bridge as a whole

Bridge in wavy


Construction Progress

Plan

The truss combines two parts of

the bridge together - the truss beneath the bridge and the walking space is formed by it as well.

The decks are simple timber forming path like ribbon.

Combine the deck and the truss together and add three beams to connect the bridge with the ground.

Finally, two pairs of railing are added to the decks.

Elevation S-N


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.