PORTFOLIO
RESUME
CHENYI GAO EDUCATION
2009-2016
The Southwest Jiaotong University Bachelor's Degree and Master Degree in Industrial Design
2017-2019
The University of Adelaide Bachelor's Degree Architecture Design
2020-2021
The University of Adelaide Master's Degree Architecture Design
EXPERIENCE
2016.6-2017.1
The China of Architecture Design & Research Group (CGA) • •
2017.11-2018.12
KITCHENEXT in Australia • •
2021.05-2021.12
Worked on CAD draft design and improved the design of benchtop and kitchen cabinet. Kitchen cabinet 3D rendering.
OA Design Solution • •
SKILLS
Helped in multiple projects at different stages of design, including schemattics, research, design development and constructure packages for working in local projects. Created packages using TianZheng CAD and SketchUp.
CAD & Revit Drafter Interior and Exterior Rendering
SOFTWARE • •
PHOTOSHOP
•
ILLUSTRATOR
•
INDESIGN
•
REVIT
•
AUTO CAD
•
GRASSHOPPER
•
LUMION
LANGUAGE •
VISA
RHINO
CHINESE (NATIVE SPEAKING)
•
ENGLISH (IELTS 6.5)
•
Temporary Graduate visa - Subclass 485
•
Plan to Work and Live in Adelaide
Andrew Bushnell M.Arch B.Arch(Hons) RAIA 113 Anzac Highway Ashford 5035 South Australia Phone: 0404290363 20th December 2021 To Whom It May Concern I, Andrew Bushnell, am pleased to provide a letter of recommendation on behalf of Chenyi Gao (Robbie). Robbie was employed as an intern from Adelaide University with OA Design Solutions in 2021 for 6 months. We are a small architectural office dedicated to offering environmentally, economically, and socially responsible design with a client base being private homeowners through to larger public buildings for both private and government.
INTERN REFERENCE
During Robbie’s employment at OA Design Solutions, he proved himself as being competent, motivated and a talented team member. Robbie was initially hired as an intern to observe the normal running of an architectural office and was included in all emails/correspondence and client meetings etc. It is hoped that this insight has provided further education to Robbie. It was not long into Robbie’s employ that it was noticed that he is extremely experienced in 3D rendering (possibly due to Robbie’s previous university education as an Industrial Designer). His knowledge using Sketchup, and Rhino are quite advanced, and he was observed to be able to produce renderings of high quality in a short timeframe. Robbie was well liked and respected by all staff at OA Design Solutions and the Home Ideas Centre where our office is located. During his time with us, Robbie remained positive and driven even during times of stress and was always a pleasure to be around. I highly recommend Robbie to any prospective employer/practice seeking a strong team player who can handle whatever is requested off him. I have no doubt that Robbie will prove to be an asset with his rendering knowledge, determination, and perseverance. Please feel free to contact me if you have any questions or would like any additional information. Sincerely,
Andrew Bushnell M.Arch B.Arch(Hons) RAIA OA Design Solutions
OA Design Solutions ABN 22 496 344 580 Home Ideas Centre, Suite 88, 113 Anzac Highway, Ashford, 5035 South Australia
01 UNI FINAL PROJECT
Insect Museum Hong Kong
H
ong Kong is facing a serious problem where the Urbanization rate continues to increase and green spaces are decreasing. As a result, the number of native butterflies has gone into serious decline. This has forced some species to migrate to other regions or even more seriously have become extinct. The purpose of my project is to design a ‘greenhouse within the city precinct’ to protect the butterfly environment and existence. The design will provide the basic substances required for butterflies, such as air, water and soil which are purified from the city before entering the butterfly sanctuary that I have designed. At the same time, the project provides a botanical garden, and a butterfly museum for the education of visitors.
BUILDING FORM GENERATION
BUILDING STRATEGIES
Amaryllis
Butterflies can fly as long as the air is
between 22-28° C. If the temperature drops too low, they may seek a light
Amaryllis
colored rock, sand or a leaf in a sunny
Purslane
EGG
Choose the right plants. Nectar plants
Purslane
feed adult butterflies, while caterpillars
Purslane
Crape Myrtle
Purslane
Amaryllis
Amaryllis
spot and bask.
Amaryllis
require specific host plants.
Provide shelter and sunshine. Grasses,
Crape Myrtle
Crape Myrtle
shrubs and piles of rocks or branches
Ginkgo
Purslane
give butterflies places to rest. Flat rocks let them bask in the sun.
Crape Myrtle
Ginkgo
Crape Myrtle
PUBLIC REALM
The volume are elevated creating a new public place under the building which is more welcoming and hence increase the local participation.
Horse Chestnut
CATERPILLAR
Ginkgo
Horse Chestnut
Ginkgo
Horse Chestnut Lotus Fragrant Lotus Fragrant
Ginkgo
Chinensis
Horse Chestnut
Lotus Fragrant
SELF-SHADED
The building is designed to be self-shaded especially the ground floor level to increase the flow of the public into the building.
PASSIVE VENTILATION
The orentation building bring fresh air in and send stale air out. By implementing a passive ventilation system in building.
Lotus FragrantAmaryllis
Lotus Fragrant
Amaryllis
Purslane
ADULT
Amaryllis
Purslane
Amaryllis
Amaryllis
Purslane
Purslane
Crape Myrtle
Purslane
Crape Myrtle
Crape Myrtle
Crape Myrtle
GREEN ENVIRONMENT
While not only providing natural shade towards glaring light and heat, vegetation modulates heat and cools interior spaces as a buffer.
Crape Myrtle
DOME PROTECTION
The dome allow natural lighting every space and collecting rain water for interior plant.
E
Living Wall System: Wallmounted construction designed to support planting modules containing living plants in an inorganic growing medium, automatically irrigated with nutrientenriched water and drained through integral layers of composite drainage material.
ach kind of butterfly has its unique egg design, thereby creating a myriad of beautiful variations in which to explore. The shape of the dome is a metaphor that has been inspired by butterfly eggs. The life of a butterfly is divided into three main periods. Egg, caterpillar, and butterfly. The egg and caterpillars naturally live on trees, whilst the butterfly lives in the entire surroundings relying mainly on flowers. The botanic garden is planted with appropriate trees and flowers which are suitable for specific butterflies. There are three methods to plant trees and flowers both on and inside buildings. Egg and caterpillar live on trees, butterfly live on flowers. The botanical garden is planted with some trees and flowers which are suitable for specific butterflies. There are three ways to plant trees and flowers on buildings. In such a form, the butterfly can fly up and down freely, and the human view is optimized.
1 4
1
Support System
2
Waterproof Backing Board
3
Rear Drainage Layer
4
Aluminium Rails and Dripline
5
Capillary Breaks
6
Grodan Growing Medium
2
5 6 3 7
8
7
Panel Box
8
Plants
02 CULTURE MUSEUM
Design Studio 5 Port Adelaide Train Center +Culture Museum Adelaide,SA
C
ulture is conservative per definition, as everything deemed culturally significant relies on matching an existing canon of values. Operating inside a sphere of defined values is comfortable and reassuring, however, to advance our discipline we need to step outside of existing certainties and create ‘a difference that makes the difference’. This involves risk. This studio encourages risky thinking by means of experimentation, subsequent analysis and invention of purpose and meaning. It starts with ‘wild’ spaces, allowing for deviance and independent thinking, which are critically evaluated for their potential to suggest alternative forms of organisation, both social and spatial.
Night View
SITE ANALYSIS
SITE CITY
SITE LOCATION
CITY HUB
The location of the site redef -ines train station hierarchies and relinks the main orders of the city by its relation to the train station.
The site linkage with the most important hubs of the city presents its pre-eminent location. The shadow area is shapping mall and residential area.
GREEN AREAS
Port Adelaide has less green park and reserved areas than other city blocks.
WATER NETWORKS The Port Adelaide has plant of hydrography resource.
STRAIGHT LINE TO CURVE
Skyline Contour
Curve Extraction
Articulation of Programme
Public Space Generation
Single Contour Curve
Station Rails +
+
Hills Like White Elephants
Reserch & Abstract
Drawing ( Straight Line )
Before 1836 Art Exhibition
Lecture Hall
Central Hall 1836 - 2010 Art Exhibition
Persent Art Exhibition
Programme
Separation of Programme
Stainless Steel with Dots BUILDING SURFACE Stainless steel with dots is used for the building surface. This material is quite common in factory and workshop. The image of Port Adelaid (street, block, transportation, ancient architecture) will be shown on the surface. The whole building will be hidden in the Port Adelaide. Actually you are facing to the whold Port Adelaid when staring at the building.
Comparison of Architecture and Context Both sides of building have reached harmony due to the old building are reflected to the new's skin.
Central hall is the main plot in story. Two moments happend in this space. 1.Train Waiting Moment 2.The communication between train station people and museum people. (Mind The Gap Moment)
Central Hall(Train Waiting Moment & Mind The Gap Moment )
Before 2010 art exhibition in 1 & 2 1.Stair Moment 2.Courtyard Moment
Lecture hall always has some open course for public: 1. Sea Wave Moment Exhibition 1 (Stair Moment)
Day View
03 INTEGRATE
Design Studio 4 Living Center Bloordale,AU
I
NTEGRATE explores collective housing as a means offoring a diverse community that shares and prioritizes cultural differences and offers affordable housing for bachelors and families while embracing the unique identity of each resident. The Bloordale neighbourhood provides a site that targets all senses with its diverse selection of foods,crafts and galleries; evident as one trails down its main street. Yet, it continues to gentrify,diminishing its multiplicity of practices while still being the home for current and migrating immigrants of all backgrounds,identities and economic standings.
diagram process
BLOOR ST
ground f loor plan
06
1. Central Courtyard 2. Shared Dining Room 3. Shared Kitchen 4. Shared Living Space
05
08
UP
07
03
A
UP
08
04
UP
UP
02
04
01
06
06
04 02
UP
UP
04
C
08 UP
07 08
UP
5. Large Family Unit 6. Small Family Unit 7. Single Unit 8. Unit Series Stairs
03
05
06
multi-unit axonometric B
A-A section
T
he building proposes an alternate form to the typical terrace typology,in which the smooth concrete facade disintegrates into arranged terraces and kitchens that shuffle as the building steps back,opening up to the central courtyard and binding itself up once again as the form is duplicated. These blocks focus on the courtyard,prioritizing the shared space and views of communal activities. The intimacy of unit to unit interaction is expanded between floors with split living and dining spaces of double heights that span to face the bordering street.
illustrated courtyard
C-C section
sectional perspective
04 INNOVATION CENTER STUDIO ARCHITECTURE SITE: LOT 14 INNOVATION CENTER DRAWING
DRAWING SCHEDULE
001
SITE PLAN
1:400
002
GROUND FLOOR 1
1:200
003
GROUND FLOOR 2
1:200
004
GROUND FLOOR 3
1:200
005
ELEVATION
1:300
006
SECTION
1:300
007
DETAIL PLAN AND ELEVATION
008
DETAILS
1:50 1:50/1:10/1:5
GENERAL NOTES: This drawing to be read in conjunction with the architects drawingds and all other relevant drawings. ALL WORKS shall be carried out in accordance with the Building Code of Australia, Australian Standards, Local Council requirements, SA guidlines and all other relevant by laws and authorities. In particular refer Australian standards: · site preparation AS 3798 · concrete constuction AS 2870 · timber construction and details AS 1684.2 · steelwork AS 4100, AS 1111 and AS 1112 . termite protection BCA and A.S 3660.1 .92
53
48
51.
1
92
2
3
4
5
6
7
CONSULTANTS: Drawings shall be read in conjunction
8 Sewer IP
53.
36 52.
SET OUT POINT
.44
50
.44
4 0.4
8
6 2.3
5
4 0.4
5
44 .4484 50. 5510.
8
8
4.84 515.1
4 514.4 50.
36 5428. 51.
.48
51
5 4 0.4
5
36 52.
4 0.4
5
2 3.9
50.
366 5522..3
2 3.9
5
44 50. 2 9 . 3 5
5
2 3.9
5
44
A45
.4 4580
50.
51.
ROOF 11 42940MM
.44
0
ROOF GROUND TIMBER
57250
36
Core F5-17
5
52
ADJACENT BUILDING ELEANOR HERRAL
D
4 0.4
44.36 50.52
44 5
VOID
ROOF GROUND TIMBER
44 5306. . 2 5 44 50.
52 4 0.4
44
5
50.
4 0.4
5
444 92 44 5500..4 53.2.3650. 5
36
52.
36
44
52.
50.
36
52.
36
92
52.
44
53.
92
53.
6 44 .36 52.3 50. 52
36 52.44 50.
SLAB & FOOTINGS: All footings to structural engineers details. A moisture barrier shall be installed under any habitable concrete slab to BCA, Australian Standards and the manufacturer’s requirements
4 36 0.4 52. 5
84250
50. 6 2.3
RETAINING WALLS: all retaiing walls to structural engineers details. provide rubble backfill and agg drainage to all retaiing walls. Builder to provide tanking where required.
5
36 52. .36
52
orientation prior to construction setout. All building setout and confirmation of setbacks and height to be carried out by a Licensed Surveyor. No footing, or wall
44 50. 92 563. 2.3
ROOF 18 71440MM
E6
.36
SETOUT: Contractor to confirm exact siting and
to encroach the title boundary
3 52.
6 2.3
errors shall be referred to the builder and client prior to installation or manufacture of any works. Confirm levels and RL’s on site prior to commencement of
Stormwater IP
Core F5-17
Core F1-3
6
3 52. 50.
on site prior to construction. Any discrepancies or
92
44 504.4 50.
.36
Sign
5336. 52.
C
52.
DIMENSIONS: Do not scale off drawings - use figured dimensions only. Contractor shall verify all dimensions
work.
B
36.48 52.51
Set-out Point
Core F1-3
VOID
36 48 4 52.51. 1.48 8 50.4 5 4 51. 36 52.
DOCUMENTATION: The contractor shall carry out works in accordance with the signed drawings and specifications and anything reasonable inferred, and with the Conditions of Contract, and in accordance with the directions and to the satisfaction of the Architect, whose intrepretation of the contract documents shall be final. The drawings and specifications/schedules shall be considered complementary, and any work and/or materials absent from one but present or implied in the other shall be furnished as if they were present in both.
6 2.3
5
5
6 424.3 50.5 44 50. 4 0.444 550.
FROME RD
44
92
53.
5
co-ordinated with consultant documentation prior to construction
Sewer Vent
50 6 2.3
4 51.
with engineers drawings and computations. All structure to Engineers design. All drawings to be
ADJACENT BUILDING ACS AUSTRALIA
44
50.
ADJACENT BUILDING
ADJACENT BUILDING
LOT FOURTEEN BUILDING
BICE BUILDING
36 52.44 50. 44
50.
ADJACENT BUILDING SOUTHERN ANGELS
EXISTING SITE CONDITIONS: All existing elements have been shown indicatively. The Contractor shall inspect the site to fully understand the scope of works. Contractors are to inform themselves of existing site conditions and services before submitting a Tender. No additional claims shall be approved due to a lack of knowledge of existing site conditions. The Contractors Tender amount shall be deemed to include the cost of dealing with existing conditions and services. The existence of which was ascertainable from the appropriate authority, or from visual inspection on or adjacent to the site; or which are shown on the Drawings or described in the Specification.
ADJACENT BUILDING MACHINE LEARNING
GAS MAIN WATER MAIN ELECTRICAL MAIN
FINAL CERTIFICATE: At completion of work, Builder to obtain and supply a Certificate of Classification from a Building Certifier
NORTH TERRACE � AUTODESK � � � � �
NORTH
THE CONCEPTS ON AND CONTENT OF THIS DRAWING REMAIN THE PROPERTY OF LAKERS. THIS DRAWING SHALL ONLY BE USED FOR THE PURPOSE FOR WHICH IT WAS COMMISSIONED. UNAUTHORISED RETENTION, USE OR COPYING OF THIS DOCUMENT OR ITS I.P INFRINGES COPYRIGHT. ADVENT ARCHITECTURE ACCEPTS NO RESPONSIBILITY OR LIABILITY FOR ANY ACTION / CONSEQUENCE FROM THE UNAUTHORISED USE OR MISUSE OF THIS DRAWING AND ITS CONTENTS OR ANY ALTERATIONS OR AMENDMENTS MADE BY OTHER PARTIES.
NORTH PROJECT LOT 14 INNOVATION CENTER DRAWING
DRAWING SITE PLAN
ISSUE DATE 30/05/2021
DRAWN BY CHENYI GAO / A1698700
DRAWING NO. 001
SCALE @ A1 1:400
9
53.
.36
GENERAL LEGEND: GENERAL LEGEND:
1
44
50.
2
3
9000
44
44
50.
48 51.
5
50.
A
9000
B-B 006
48.44 51.50
4 0.4
B
5
9000
9000
7
9000
52. 48 51.
.48
5 SET OUT51POINT 0
E
8145
8
9000
6665
92
53.
G 6665
50.
H
6365
I
2887 6 .3
W.GX XX
DENOTES ASCENDING WINDOW NUMMBER DENOTES ASCENDING WINDOW NUMMBER DENOTES GLASS TYPE TYPE DENOTES GLASS
44
AAA
DENOTES FLOOR DENOTES FLOOR FINISHFINISH
52 .36 52
50.
92
53.
.44
50
WALL TYPES:
WALL TYPES:
WT.1 220
44
50.
CORE D.3
F
A/C
1030
WT.02 200
A 200
LADIES FFL 107.35
D.14-27 DT.03
TLE.04
1980
MENS FFL 107.35
D.14-28 DT.04
SEPARATION AREA FFL 107.35
FIRE ESCAPE FFL 107.35
53
.44
CON.01
RUBBISH
1800
330
1755 8305
TWO BEDROOM APARTMENT FFL 107.35 D.14-16
330
DT.02
POS.02
4 50.
1050
1445
TWO BEDROOM APARTMENT FFL 107.35 D.14-10
DT.02
POS.02
DT.02
POS.02
WT.01 300
52
W.G-14.15 G.02
W.G-14.16 G.02
6 2.3
W.G-14.14 G.02
WT.01 300
2285
2660
300420
1760
E-1 005
840
7840
1760
990
6560
1110
1760
.36
44 52
53
53
5
W.G-14.12 G.02
W.G-14.13 G.02
.92
.92
50.
W.G-14.11 G.02
6
3 52.
W.G-14.10 G.02
36 52. 44 . 0 5
W.G-14.09 G.02
36
52.
840
1760
990
1110
1760
840
6560
1760
990
1950
6560
1760
840
44
50.
1760
1150
6660 SET OUT POINT
B-B A 200
B-B 006
ADJACENT BUILDING LOT FOURTEEN BUILDING
6
5
44
50.
TLE.03
46405
4 2.3 0.4 5
E-2 005
WT.01 300 WT.01 300 WT.01 300
.36
W.G-14.08 G.02
PRIVATE BATHROOM FFL 107.35
WT.01 300
UP
2645 4
44
WT.02 200
E-1 A 100
A-A A 200
3. FLOOR FINISHES TO CONTINUE UNDER DOOR LEAF 1. ALL DIMENSIONS ARE NOMINAL AND ARE TO BE TO SUPPORT SEAL. VERIFIED PRIOR TO THE COMMENCEMENT OF WORK 4. ALL ON SITEMATERIALS AND FITTINGS TO BE FIXED IN STRICT ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. 2. METAL ANGLE TILE TRIM TO TILE EDGE AT ALL 5. ALL EXPANSIONS, CONSTRUCTIONS AND OTHER EXTERNAL & INTERNAL DOOR THRESHOLDS UNLESS NOMINAL STRUCTURAL JOINTS ARE TO EXTEND OTHERWISE NOTED. THE FULL LENGTH, WIDTH, HEIGHT (WHATEVER THE CASE MAYBE) OF THE STRUCTURE. ALIGNING WITH 3. STRUCTURAL FLOOR FINISHES TO CONTINUE UNDER DOOR LEAF GRID AND JOINTING PATTERNS. TO SUPPORT SEAL. 6. THE FIRE HAZARD PROPERTIES OF ALL FLOOR MATERIALS, FLOOR COVERINGS, WALL AND CEILING 4. MATERIALS ALL MATERIALS FITTINGS TO BE C1.10A FIXED OF IN SHALL AND COMPLY WITH CLAUSE THE BCA. STRICT ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS.
DOOR TYPES
5. ALL EXPANSIONS, CONSTRUCTIONS AND OTHER NOMINAL STRUCTURAL JOINTS ARE TO EXTEND DT.01 920 SOLID CORE, METAL FRAME DOOR, DOUBLE DT.02 820 HOLLOW CORE, TIMBER FRAME DOOR THE FULL LENGTH, WIDTH, HEIGHT (WHATEVER THESINGLE DT.03 820 HOLLOW CORE, TIMBER FRAME DOOR DOUBLE CASE MAYBE) OF THE STRUCTURE. ALIGNING WITH DT.04 16MM THICK MDF 162412 DS AVION GREY MATT STRUCTURAL GRID THICK AND JOINTING PATTERNS. DT.05 22MM MDF 162412 DS AVION GREY MATT DT.06 VERMICULITE CORE FIRE RATED DOOR, SINGLE 6. THE FIRE HAZARD PROPERTIES OF ALL FLOOR MATERIALS, FLOOR COVERINGS, WALL AND CEILING MATERIALS SHALL COMPLY WITH CLAUSE C1.10A OF THE BCA.
DOOR TYPES:
ADJACENT BUILDING BICE BUILDING
DT.01 DT.02 DT.03 DT.04 DT.05 DT.06
44
50.
44 50.44 50.
E-2 A 100
A-A 006
50.
WT.02 200
TWO BEDROOM APARTMENT FFL 107.35 D.14-13
WT.01 300
6
44
W.G-14.07 G.02
WT.04 200
3 52.
50.
52.
2645
FIRE ESCAPE LOBBY FFL 106.80 POS.02
RECYCLE
3250
D.14-07 DT.02
WT.02 200
WT.02 200
WT.01 300
W.G-14.17 G.02
36
50
36
52.
POS.02
WT.02 200
WT.02 200
WT.02 200
4000 D.14-19 DT.06
D.14-30 DT.03
.92
WT.02 200
TLE.03
2810
1960
WT.04 200
WT.04 200
WT.02 200
TLE.03
W.G-14.06 G.02
THREE BEDROOM APARTMENT FFL 107.35
910
TLE.04
D.14-20 DT.04
PRIVATE BATHROOM FFL 107.35
WT.01 300
910
D.14-26 DT.05
VOID
PRIVATE BATHROOM FFL 107.35
D.3
1200 2000
TLE.03
LIFT
2000
PRIVATE BATHROOM FFL 107.35
D.14-09 DT.02
D.3
D.14-18 DT.02
D.14-22 DT.05
WT.01 300
9595
UP
WT.04 200
M
D.14-12 DT.02
1760
WT.04 200
D.14-25 DT.05
EA-A
RECYCLE
910
WT.04 200
WT.01 300
36
52.
840
910
910
D.14-15 DT.02
92
1760
D.3
D.14-20 DT.04 D.14-21 DT.05
WT.01 300
LOBBY
D.3 910
D.3
D.14-23 D.14-24 DT.04 DT.05
D.3
WT.04 200
SEWAGE
1310 850 850 7400
850
12900
8500
LIFT
D.3
WT.04 200
910
LIFT
WT.04 200
A1
D.14-06 DT.02
D.14-08 DT.02
D.14-11 DT.02
D.14-14 DT.02
D.3
FLOOR FINISHES NOTE:
1150
RECYCLE
D.14-17 DT.06
2. METAL ANGLE TILE TRIM TO TILE EDGE AT ALL EXTERNAL & INTERNAL DOOR THRESHOLDS UNLESS OTHERWISE NOTED.
53. D.14-05 DT.02
3000
WT.04 200
50.
WT.01 300
POS.02
2590
910
LOBBY
9000
44 50.44 50.
44
WT.02 200
D.3 WT.04 200
TLE.04
B1
AIR AIR RETURN RETURN
CORRIDOR FFL 107.35
WT.01 300
W.G-14.05 G.02
POS.02
LIFT
36
52.
WT.01 300
POS.02
DN
36
52.
CORRIDOR FFL 107.35
WT.01 300
UP
36
52.
THREE BEDROOM APARTMENT FFL 107.35
WT.01 300
A-A 006
2130 WT.04 200
2000
D
AIR SUPPLY
D.14-04 DT.02
CORE
910
3000
3500
D.3
AIR SUPPLY
TLE.04 CON.01 POSITILE SYSTEM CARPET TILE WITH UFAD SERVICES POS.02 FLOOR FINISHES NOTE: 300MM X 300MM DESIGNER BATHROOM TILE TLE.03 (APARTMENTS) 1. ALL DIMENSIONS ARE NOMINAL AND ARE TO BE 300MM X 300MM BATHROOM TILE TLE.04 VERIFIED PRIOR TO THE COMMENCEMENT OF WORK ON SITE
21490
1130
840
5530
SEALED CONCRETE - POLISHED POSITILE SYSTEM CARPET TILE WITH UFAD SERVICES 300MM X 300MM DESIGNER BATHROOM TILE (APARTMENTS) 300MM X 300MM BATHROOM TILE SEALED CONCRETE - POLISHED
FLOOR FINISHES:
840
5740 1030
8900 2300
WT.01 300
910
44
920
D-P A 300
WT.1 220
910
50.
5530
WT.01 300
9000
36
5
390 920
W.G-14.04 G.02
D.14-03 DT.06
CON.01
50
D.3
6 2.3
4745
DN
3100
D.14-02 DT.02
FIRE ESCAPE FFL 107.35
30570 8305
W.G-14.03 G.02
WT.04 200
OUTDOOR CONCRETE FLOOR
.44
52.
D.14-01 DT.02
WT.02 200
PRIVATE BATHROOM FFL 107.35
9000
44 36 50. 52.
WT.01 300
CON.01 POS.02 TLE.03
840
B
UP
NG
36
LIFT
C
C1
53. 52.
910
44 50.
5
92
W.G-14.02 G.02
D.3
UP
4 0.4
W.G-14.01 G.02
UP
910
D1
910
M
D.3
GROUND FLOOR 0.00M 48
D.3
910
9895
48 36
36 51.
LOBBY D.3
RECYCLE
51.
52.
52.
910
1585
9000
1800
910
D.3
LIFT
910
1150
WT.01 300
E1
D.3
1760
1760
B-B A 200
840
WT.01 300
1950
51
1760 D.3
LIFT
LOBBY
VOID
44 50.
1150
1760
F1 .48
2430
1760
D.3 910
36 .48 52. 51
3100 F
910
RECYCLE
1350
A
D.3
910
1485
910
1760
D.3
WT.01 RITEK THERMAL XL 300 SYSTEM WT.02 RITEK THERMAL XL 200XL SYSTEM RITEK THERMAL 300 SYSTEM WT.01 WT.03 200MM 851-500 SERIES GLAZED SYSTEM RITEK THERMAL XLDOUBLE 200 SYSTEM WT.02 WT.04 200MM INSITU CONCRETE (200) 200MM 851-500 SERIES GLAZED SYSTEM WT.03 WT.05 AUSTRALIAN STANDARD BRICKDOUBLE (304MM TOTAL) 200MM INSITU CONCRETE (200) WT.04 WT.06 AUSTRALIAN STANDARD BRICK (228MM TOTAL) WT.05 AUSTRALIAN STANDARD BRICK (304MM TOTAL) WT.06 AUSTRALIAN STANDARD BRICK (228MM TOTAL) FLOOR FINISHES:
13990
A/C
48 51.
DENOTES ASCENDING DOOR NUMMBER DENOTES ASCENDING DOOR NUMMBER DENOTES DOOR TYPE TYPE DENOTES DOOR
D.X XX
44
92
53.
6665
DENOTES WALL TYPE DENOTES WALL TYPE DENOTES THICKNESS DENOTES WALLWALL THICKNESS
36
50.
F
WT.XX X
52.
44
5
50.
44
50.
9000
6 2.3
44
D
8000
6
36
48 51. .44
48 .48 51. 51
C
2887
4
44
50.
920 SOLID CORE, METAL FRAME DOOR, DOUBLE 820 HOLLOW CORE, TIMBER FRAME DOOR SINGLE 820 HOLLOW CORE, TIMBER FRAME DOOR DOUBLE 16MM THICK MDF 162412 DS AVION GREY MATT 22MM THICK MDF 162412 DS AVION GREY MATT VERMICULITE CORE FIRE RATED DOOR, SINGLE
36 52. 4 4 50.
ADJACENT BUILDING SOUTHERN ANGELS
44
50.
66 GAWLER PLACE/ ADELAIDE / SA 5000 0402329834
THE CONCEPTS ON AND CONTENT OF THIS DRAWING REMAIN THE PROPERTY OF AA Architects. THIS DRAWING SHALL ONLY BE USED FOR THE
PROJECT Oceanum - Construction Drawings
PROJECT BY LOT 14 INNOVATION CENTERDRAWN DRAWING Axel Lee / A1678820
DRAWING Ty p i c a l Pr i va te A p a r t m e n t Floor Plan DRAWING GROUND FLOOR PLANDRAWING NO. A 0 03
DRAWN BY CHENYI GAO / A1698700
DRAWING NO. 002
PURPOSE FOR WHICH IT WAS COMMISSIONED. UNAUTHORISED RETENTION, USE OR COPYING OF THIS DOCUMENT OR ITS I.P INFRINGES COPYRIGHT.
THE CONCEPTS ON AND CONTENT OF THIS DRAWING REMAIN THE PROPERTY OF KERS. THIS DRAWING SHALL ONLY BE USED FOR THE PURPOSE FOR WHICH IT WAS
ADVENT ACCEPTS 1111 S Figueroa St,ARCHITECTURE Los Angeles, CA NO RESPONSIBILITY OR LIABILITY FOR ANY ACTION / CONSEQUENCE FROM THE UNAUTHORISED USE OR MISUSE zhongyuaxellee@ 90015, United States COMMISSIONED. RETENTION, OF THIS DRAWING AND ITS CONTENTS OR ANY ALTERATIONS ORUNAUTHORISED AMENDMENTS MADE BY OTHER PARTIES.USE OR COPYING OF THIS DOCUMENT student.adelaide.edu.au
xxxxxxx@xxx.com.cn
OR ITS I.P INFRINGES COPYRIGHT. ADVENT ARCHITECTURE ACCEPTS NO RESPONSIBILITY
OR LIABILITY FOR ANY ACTION / CONSEQUENCE FROM THE UNAUTHORISED USE OR MISUSE OF THIS DRAWING AND ITS CONTENTS OR ANY ALTERATIONS OR AMENDMENTS MADE BY OTHER PARTIES.
ISSUE DATE 10/06/2020 ISSUE DATE 30/05/2021 1:200 0
SCALE @ A1 1:200
1
2
5
GENERAL LEGEND: GENERAL LEGEND:
B-B 006
WT.XX X
1
2
3
9000
A
4
9000
9000
C
B 2887
5 9000
7
9000
D
8000
6 9000
E
8145
8
F
6665
G
6665
DENOTES ASCENDING DOOR NUMMBER DENOTES ASCENDING DOOR NUMMBER DENOTES DOOR TYPE TYPE DENOTES DOOR
D.X XX
9000
H
6665
DENOTES WALL TYPE DENOTES WALL TYPE DENOTES THICKNESS DENOTES WALLWALL THICKNESS
I
6365
2887
W.GX XX
DENOTES ASCENDING WINDOW NUMMBER DENOTES ASCENDING WINDOW NUMMBER DENOTES GLASS TYPE TYPE DENOTES GLASS
AAA
DENOTES FLOOR DENOTES FLOOR FINISHFINISH
WALL TYPES:
WALL TYPES:
910
CORE
W.G-14.01 G.02
M
WT.01 300
LIFT
D.2 D.14-03 DT.06 1010
CON.01
9000
WT.1 300
DN
D.14-22 DT.05
LIFT 2
WT.4 D.14-26 DT.05300
LADIES FFL 107.35 TLE.04
D.14-28 DT.04
D.3
MENS D.6 107.35 FFL
D.14-27 DT.03
910
SEPARATION AREA FFL 107.35 TLE.04
TLE.03
D.14-20 DT.04
D.14-19 DT.06
D.2 1010
D.2 1010
WT.02 200
D.2 1010
1010
CHANGING PLACES D.2 1010
A/L
D.2 RUBBISH
RECYCLE
D.14-30 DT.03
PRIVATE BATHROOM FFL 107.35
WT.2 120
D.2 1010 WT.02
D.2 1010
2810
D.2 1010
3250 W.G-14.07 G.02
120
D.2 1010
200
D.2 WT.021010
MEDIA ROOM
KITCHEN
POS.02
/KIOSK POS.02
HUB
DT.02
TWO BEDROOM APARTMENT SCV FFL 107.35 D.14-13 POS.02 WT.01 300
WT.01 300
DT.02
BOOSTER
D.2 TWO BEDROOM APARTMENT 1010 FFL 107.35 D.14-10
CHANGING POS.02 ROOM
ACC
W.G-14.08 G.02
DT.02
EQUIPMENT ROOM
WT.01 300
PRIVATE BATHROOM FFL 107.35
WT.04 200
TLE.03 WT.01 300
WT.2 120 WT.2 120
W.G-14.15 G.02
W.G-14.16 G.02
W.G-14.14 G.02
WT.2 120
WT.2 120
W.G-14.13 G.02
21490
WT.02 200
200
WT.2 W.G-14.11 G.02 120
W.G-14.12 G.02
W.G-14.10 G.02
W.G-14.09 G.02
A1 2645
330
1800
1755
330
2645
1050
8305
1445
2285 7840
2660
300420 E-1 005
1760
840
1760
990
6560
1110
1760
840
1760
990
1110
6560
1760
840
1760
990
1950
6560
1760
840
1760
1150
6660 SET OUT POINT
46405
B-B A 200
B-B 006
E-2 A 100
A-A 006
D.14-07 WT.2 DT.02
D.2
COFFE 1010 TWO BEDROOM APARTMENT SHOP FFL 107.35 D.14-16
1350
POS.02
D.2 1010
WT.02 200
4000
D.2 1010
MEDIA ROOM
FORUM
WT.02 200
1810
W.G-14.06 G.02
THREE BEDROOM APARTMENT FFL 107.35
WT.02 200
TLE.03
WT.1 300
D.3
WT.02 200
300
FIRE ESCAPE LOBBY STORAGE FFL 106.80
W.G-14.17 G.02
WT.2 120
D.2 1010
D.14-09 DT.02
WT.02 200
TLE.03
WT.1 300
D.2 1010 WT.01
WT.04 200
A/L
WT.01 300
PRIVATE BATHROOM FFL 107.35
WT.02 200
D.14-06 DT.02
D.14-08
PRIVATE BATHROOM FFL 107.35
POS.02
LIFT
STORAGE
2000
WT.1 300
1010TLE.04
STORAGE
300
1960
WT.1 300
CON.01
WT.04 STORAGE 200
1200
910
FIRE ESCAPE FFL 107.35
M
RECYCLE
SEWAGE
850 850
A-A A 200
1980
850
D.14-05 DT.02
DT.02 CENTER
D.14-12 DT.02
WT.1 300
D.14-18 DT.02
D.3
WT.04 200
2000
WT.01 300
POS.02
ELEVATOR WT.01 300
TLE.03
LIFT
7400
12900
D.14-25 DT.05
WT.04 200
D.14-15 DT.02 WT.1
WT.04 200
910
DN
WT.04 200
F D.3
LIFT 1
CORE
WT.01 300
WT.04 200
D.14-20 DT.04 D.14-21 DT.05
WT.02 200
WT.01 300
D.14-23 D.14-24 DT.04 DT.05
TLE.03
D.6 1010
UP
8500
1030 D.14-11 DT.02
D.14-14 DT.02
2590
910
D.2 1010
B1
WT.1 300
FLOOR FINISHES NOTE:
WT.01 300
D.14-17 DT.06
A/C
1310
D.3
9000
E
CORRIDOR FFL 107.35
WT.01 300
2. METAL ANGLE TILE TRIM TO TILE EDGE AT ALL EXTERNAL & INTERNAL DOOR THRESHOLDS UNLESS OTHERWISE NOTED.
POS.02
3000
WT.04 200
RECYCLE
A-A 006
AIR AIR RETURN RETURN
WT.1 220
WT.04 200
D
WT.01 300
W.G-14.05 G.02
POS.02
WT.2 120
POS.02
WT.04 200
THREE BEDROOM APARTMENT FFL 107.35
STORAGE
9595
3000
3500
CORRIDOR FFL 107.35
WT.01 300
POS.02
STORAGE
1485
RAMPDOWN 8%
WT.01 300
9000
UP
2130
WT.04 200
D.14-04 DT.02
FLOOR 3 13000MM
C1
1130
2000
2300
D-P A 300
5530
1760
D1 C
920
840
390 920
AIR SUPPLY
1760
4745
AIR SUPPLY
D.2 1010
840
3100
1030
8305
VOID 5530
CAFE
WT.01 300
30570
W.G-14.04 G.02
CAFE KITCHEN
POSITILE SYSTEM CARPET TILE WITH UFAD SERVICES POS.02 FLOOR FINISHES NOTE: TLE.03 300MM X 300MM DESIGNER BATHROOM TILE (APARTMENTS) 1. ALL DIMENSIONS ARE NOMINAL AND ARE TO BE TLE.04 300MM X 300MM BATHROOM TILE VERIFIED PRIOR TO THE COMMENCEMENT OF WORK ON SITE
9895
FIRE ESCAPE FFL 107.35
840 E-2
DN
POS.02
ELEVATOR
D.2 1010
D.14-02 DT.02
840
WT.04 200
TLE.04 CON.01
1760
5740
WT.1 300
UP
8900
910
WT.4 300
FLOOR 3 13000MM
W.G-14.03 G.02
D.3
SEALED CONCRETE - POLISHED POSITILE SYSTEM CARPET TILE WITH UFAD SERVICES 300MM X 300MM DESIGNER BATHROOM TILE (APARTMENTS) 300MM X 300MM BATHROOM TILE SEALED CONCRETE - POLISHED
FLOOR FINISHES:
1760
PRIVATE BATHROOM FFL 107.35
DN
WT.1 300
D.14-01 DT.02
WT.02 200
1760
TLE.03
005
UP
1760
RECYCLE
910
CON.01 POS.02 TLE.03
1585
910
POS.02
B
W.G-14.02 G.02
D.3
D.3
RITEK THERMAL XL 300 SYSTEM RITEK THERMAL XL 200XL SYSTEM RITEK THERMAL 300 SYSTEM 200MM 851-500 SERIES GLAZED SYSTEM RITEK THERMAL XLDOUBLE 200 SYSTEM 200MM INSITU CONCRETE (200) 200MM 851-500 SERIES GLAZED SYSTEM AUSTRALIAN STANDARD BRICKDOUBLE (304MM TOTAL) 200MM INSITU CONCRETE (200) AUSTRALIAN STANDARD BRICK (228MM TOTAL) AUSTRALIAN STANDARD BRICK (304MM TOTAL)
WT.05 WT.06 AUSTRALIAN STANDARD BRICK (228MM TOTAL) FLOOR FINISHES:
D.3
1810
D.3
1800
F
LIFT 2
RAMPDOWN 8%
1150
TLE.03
DN
LIFT 1
WT.1 300
1760
1150
WT.1 300
840
WT.01 300
MEETING ROOM
B-B A 200RECYCLE
WT.1 300
FOYER
9000
D.6 1010
910
1760
WT.01 300
WT.1 300
WT.1 300
E1
D.1 1010
D.1 1010
D.3 D.1 1010
1150
2430
D.2 1010
WT.01 300
D.1 1010
A/L
WT.01 300
1950
A
WT.2 120
MEDIA ROOM
MEDIA ROOM
WT.1 300
CHANGING PLACE FACES
3100
CORE STORAGE
D.2 1010
WT.01 WT.02 WT.01 WT.03 WT.02 WT.04 WT.03 WT.05 WT.04 WT.06
13990
WT.01 300
D.1 1010
F1
WT.2 120
STORAGE
RECEPTION ROOM
WT.2 120
WT.1 300
D.2 1010
D.2 1010
A/L
D.2 1010
WT.2 120 D.2 1010
D.1 1010
D.2 1010
KITCHEN
D.2 1010
RECEPTION ROOM
WT.2 120
VIP
WT.2 120
A/C
WT.2 120
PERIVATE MEETING ROOM
D.2 1010
VIP
WT.2 120
D.2 1010
E-1 A 100
A-A A 200
3. FLOOR FINISHES TO CONTINUE UNDER DOOR LEAF 1. ALL DIMENSIONS ARE NOMINAL AND ARE TO BE TO SUPPORT SEAL. VERIFIED PRIOR TO THE COMMENCEMENT OF WORK 4. ALL ON SITEMATERIALS AND FITTINGS TO BE FIXED IN STRICT ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. 2. METAL ANGLE TILE TRIM TO TILE EDGE AT ALL 5. ALL EXPANSIONS, CONSTRUCTIONS AND OTHER EXTERNAL & INTERNAL DOOR THRESHOLDS UNLESS NOMINAL STRUCTURAL JOINTS ARE TO EXTEND OTHERWISE NOTED. THE FULL LENGTH, WIDTH, HEIGHT (WHATEVER THE CASE MAYBE) OF THE STRUCTURE. ALIGNING WITH 3. STRUCTURAL FLOOR FINISHES TO CONTINUE UNDER DOOR LEAF GRID AND JOINTING PATTERNS. TO SUPPORT SEAL. 6. THE FIRE HAZARD PROPERTIES OF ALL FLOOR MATERIALS, FLOOR COVERINGS, WALL AND CEILING 4. MATERIALS ALL MATERIALS FITTINGS TO BE C1.10A FIXED OF IN SHALL AND COMPLY WITH CLAUSE THE BCA. STRICT ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS.
DOOR TYPES
5. ALL EXPANSIONS, CONSTRUCTIONS AND OTHER NOMINAL STRUCTURAL JOINTS ARE TO EXTEND DT.01 920 SOLID CORE, METAL FRAME DOOR, DOUBLE DT.02 820 HOLLOW CORE, TIMBER FRAME DOOR THE FULL LENGTH, WIDTH, HEIGHT (WHATEVER THESINGLE DT.03 820 HOLLOW CORE, TIMBER FRAME DOOR DOUBLE CASE MAYBE) OF THE STRUCTURE. ALIGNING WITH DT.04 16MM THICK MDF 162412 DS AVION GREY MATT STRUCTURAL GRID THICK AND JOINTING PATTERNS. DT.05 22MM MDF 162412 DS AVION GREY MATT DT.06 VERMICULITE CORE FIRE RATED DOOR, SINGLE 6. THE FIRE HAZARD PROPERTIES OF ALL FLOOR MATERIALS, FLOOR COVERINGS, WALL AND CEILING MATERIALS SHALL COMPLY WITH CLAUSE C1.10A OF THE BCA.
DOOR TYPES: 920 SOLID CORE, METAL FRAME DOOR, DOUBLE 820 HOLLOW CORE, TIMBER FRAME DOOR SINGLE 820 HOLLOW CORE, TIMBER FRAME DOOR DOUBLE 16MM THICK MDF 162412 DS AVION GREY MATT
DT.01 DT.02 DT.03 DT.04 DT.05 DT.06
THE CONCEPTS ON AND CONTENT OF THIS DRAWING REMAIN THE PROPERTY OF LAKERS. THIS DRAWING SHALL ONLY BE USED FOR THE PURPOSE FOR WHICH IT WAS COMMISSIONED. UNAUTHORISED RETENTION, USE OR COPYING OF THIS DOCUMENT OR ITS I.P INFRINGES COPYRIGHT. ADVENT ARCHITECTURE ACCEPTS NO RESPONSIBILITY 66 GAWLER PLACE/ ADELAIDE / SA 5000 0402329834 zhongyuaxellee@ student.adelaide.edu.au
PROJECT LOT 14 INNOVATION CENTER DRAWING
THE CONCEPTS ON AND CONTENT OF THIS DRAWING REMAIN THE PROPERTY OF AA Architects. THIS DRAWING SHALL ONLY BE USED FOR THE
OR LIABILITY FOR ANY ACTION / CONSEQUENCE FROM THE UNAUTHORISED USE OR MISUSE OF THIS DRAWING AND ITS CONTENTS OR ANY ALTERATIONS OR AMENDMENTS
PURPOSE FOR WHICH IT WAS COMMISSIONED. UNAUTHORISED RETENTION, USE OR COPYING OF THIS DOCUMENT OR ITS I.P INFRINGES COPYRIGHT.
MADE BY OTHER PARTIES.
ADVENT ARCHITECTURE ACCEPTS NO RESPONSIBILITY OR LIABILITY FOR ANY ACTION / CONSEQUENCE FROM THE UNAUTHORISED USE OR MISUSE OF THIS DRAWING AND ITS CONTENTS OR ANY ALTERATIONS OR AMENDMENTS MADE BY OTHER PARTIES.
DRAWN BY CHENYI GAO / A1698700
DRAWING HUB FLOOR PLAN
PROJECT DRAWING NO. Oceanum - Construction Drawings 003 DRAWN BY Axel Lee / A1678820
22MM THICK MDF 162412 DS AVION GREY MATT VERMICULITE CORE FIRE RATED DOOR, SINGLE
ISSUE DATE 30/05/2021 DRAWING Ty p i c a l Pr i va te A p a r t m e n t Floor Plan DRAWING NO. A 003
ISSUE DATE SCALE @ A1 10/06/2020 1:200 1:200
0
1
2
5
DP 50
GENERAL LEGEND: GENERAL LEGEND:
DETAIL PLAN 1:50
WT.XX X DE 50
DETAIL ELEVATION 1:50
1
2
3
9000
A
DP 50
4
9000
9000
C
B 2887
6
9000
7
9000
D
B-B 006
8000
5
9000
E
8145
8
F
6665
G
6665
DENOTES ASCENDING DOOR NUMMBER DENOTES ASCENDING DOOR NUMMBER DENOTES DOOR TYPE TYPE DENOTES DOOR
D.X XX
9000
H
6665
DENOTES WALL TYPE DENOTES WALL TYPE DENOTES THICKNESS DENOTES WALLWALL THICKNESS
I
6365
2887
W.GX XX
DENOTES ASCENDING WINDOW NUMMBER DENOTES ASCENDING WINDOW NUMMBER DENOTES GLASS TYPE TYPE DENOTES GLASS
AAA
DENOTES FLOOR DENOTES FLOOR FINISHFINISH
DE 50
1310 850 850 850
A/C
WT.2 120
1980
TLE.04
D.1 1810
D.14-28 DT.04
FLOOR 3 13000MM D.14-27 DT.03
POS.02
SEPARATION AREA D.2 1010 FFL 107.35 TLE.04
OFFICE WT.04 200
1200 2000
D.1 1810
MENS FFL 107.35 TLE.04
MEETING ROOM D.2 1010
WT.04 200
WT.1 300
STORAGE D.1 1810
A1
D.6
WT.1 300
1810
1800
330
1755
WT.04 200
2645
1050
8305
1445
WT.2 120
WT.02 200
PRIVATE BATHROOM FFL 107.35
WT.4 300
7840
FLOOR 3 13000MM
WT.02 200
D.6 1010
WT.02 200
CORRIDOR POS.02
2660
300420
OFFICE
D.2 1010
TWO BEDROOM APARTMENT FFL 107.35 D.14-16
D.2 1810
WT.2 120
TWO BEDROOM APARTMENT OFFICE FFLWT.2 107.35 D.14-13 120
DT.02
W.G-14.15 G.02
D.2 1810
D.2 1010
DT.02
WT.1 300
VIP
D.6
STORAGE W.G-14.14 G.02
W.G-14.13 G.02
D.2 1810
1810
840
1760
990
6560
1110
1760
840
1760
990
OFFICE
D.2 1810
W.G-14.12 G.02
WT.1 300
VIP
PRIVATE BATHROOM FFL 107.35
D.2 1010
840
6560
6560
1760
990
1950
1585 1760 1760
9895
840
E-2 005 A-A 006
A-A A 200
D.2 1810
1760
840
1760
1150
6660 SET OUT POINT
46405
B-B A 200
E-1 005
B-B 006
840
W.G-14.09 G.02
G.02
1810
1760
E-2 A 100
D.2 1810
STORAGE W.G-14.10
1810
BALCONY
1110
W.G-14.08 G.02
WT.01 300
WT.1 300
D.6
W.G-14.11 G.02 D.2
D.2 1810
WT.2 120
D.2 TLE.03 1010
D.2 1010
BALCONY
1760
WT.02 200
DT.02
POS.02 WT.01 300
D.2 1010
WT.1 300
BALCONY W.G-14.16 G.02
D.2 1010
POS.02 WT.01 300
FLOOR FINISHES NOTE:
1810
WT.02 200
TWO BEDROOM APARTMENT FFL 107.35 D.14-10
W.G-14.07 G.02
3250 D.6
D.14-07 DT.02
MEETING ROOM
W.G-14.06 G.02
POS.02
CORRIDOR
WT.2 120
WT.02 200
POS.02
D.1 1810
BALCONY
2285
VOID
WT.1 300 D.1 1810
THREE BEDROOM APARTMENT D.2 WT.2 1810 120 FFL 107.35
WT.02 200
TLE.03
D.6 1010
D.2 1010
4000
D.6
POS.02
STORAGE
W.G-14.17 1810 G.02
D.1 1810
330
ROOM
WT.02 200
TLE.03
OFFICE
WT.01 300
D.2 1010 D.6
D.1 1810
BALCONY
2645
RECYCLE VIP
VIP
D.2 1010
POS.02
WT.1 300 D.14-30 DT.03
FIRE ESCAPE D.2 LOBBY 1010 FFL 106.80
OFFICE
D.14-06 D.2 DT.02 1810
OFFICE
2810
WT.01 300
D.1 1810
WT.2 120
D.2 1010
CORRIDOR
WT.04 200
RUBBISH
D.2 1810
D.14-09 DT.02
1810
D.14-19 DT.06
CON.01
D.14-20 DT.04
1810
WT.02 200
WT.01 RECREATION 300
PRIVATE BATHROOM D.2 FFL1010 107.35
WT.02 200
UP
D.6
LIFT
WT.2 120
FIRE ESCAPE D.2 FFL 107.351010
D.2 1010
TLE.03
D.14-05 DT.02
WT.4 300
D.2 1010
2. METAL ANGLE TILE TRIM TO TILE EDGE AT ALL EXTERNAL & INTERNAL DOOR THRESHOLDS UNLESS OTHERWISE NOTED.
D.2 1010
D.6 1010
POS.02
D.14-12 DT.02
PRIVATE BATHROOM FFL 107.35
1960
POS.02
CORRIDOR
D.14-26 DT.05 CORRIDOR
LADIES FFL 107.35
BALCONY
2000
CORRIDOR
D.14-22 DT.05
WT.01 300
WT.02 200
D.2 1010
D.14-04 DT.02
D.14-08 DT.02
D.2 1810 WT.01 300
D.1 1810
WT.04 200
D.14-18 DT.02
WT.04 200
D.6 1810
WT.2 120
OFFICE
D.14-15 DT.02
LIFT
7400
12900
8500
WT.04 200
D.14-25 DT.05
WT.01 300
1010
D.6 1010
TLE.03
STORGE ROOM
W.G-14.05 G.02
POS.02
D.2 1810
LARGE OFFICE
WT.04 200
D.14-20 DT.04 D.14-21 DT.05
WT.2 120
D.1 D.14-11 DT.02
WT.04 D.2 200
WT.4 300
CORRIDOR FFL 107.35
D.2 1010
WT.01 300
D.2 1810
UP
THREE BEDROOM APARTMENT FFL 107.35 LARGE OFFICE
D.2 1010
WT.01 300
D.2 1010
D.14-23 D.14-24 DT.04 DT.05
WT.01 300
2130 WT.04 200
D.2 1810
WT.2 120
D.2 1010
AIR SUPPLY
D.6 1010
D.2 1010
W.G-14.04 G.02
F
AIR AIR M RETURN RETURN
RECYCLE
WT.2 120
OFFICE
1130
LIFT 2
D.2 1010
D.2 1810
D.1 1810
POS.02
D.2 1010
5530
BALCONY
D.14-14 DT.02
DN
B1
RECREATION ROOM D.6 1010
OFFICE
WT.2 120
D.14-17 DT.06
CORRIDOR
D.2 1010
CORRIDOR FFL 107.35
D.2 1010
OFFICE
WT.04 200
WT.04 200
UP
E
WT.01 300
WT.4 300
LARGE OFFICE
A-A A 200
D.2 1010
STORGE ROOM
D.1 1810
9000
TLE.03
1010
WT.01 300
D.2 1010
WT.2 120
A-A 006
D.6 1010
WT.2 120
D.1 1810
D
UP D.6
AIR SUPPLY
LIFT 1
920
D-P A 300
D.1 1810
RECYCLE
OFFICE
CON.01
D.14-03 DT.06
21490
9000
D.6 1010
5530
DN
D.2 1010
FIRE ESCAPE FFL 107.35 TLE.03
9595
D.1 1810
BALCONY
OFFICE
390 920 LARGE OFFICE
M
RECYCLE
SEWAGE
3500
D.1 1810
3000
2300
WT.2 120
4745
WT.2 120
D.2 1810
30570 3100
LIFT 2
D.2 1010
C
C1
8305
D.1 1810
WT.2 120
LIFT 1 D.2 1010
D.2 1010
D.2 1010
F
D.6 1010
D.2 1810
WT.2 120
D.14-02 DT.02
TLE.04 CON.01 POSITILE SYSTEM CARPET TILE WITH UFAD SERVICES POS.02 FLOOR FINISHES NOTE: 300MM X 300MM DESIGNER BATHROOM TILE TLE.03 (APARTMENTS) 1. ALL DIMENSIONS ARE NOMINAL AND ARE TO BE 300MM X 300MM BATHROOM TILE TLE.04 VERIFIED PRIOR TO THE COMMENCEMENT OF WORK ON SITE
1760
RECYCLE OFFICE
TLE.03
2590
WT.2 120
DN
D.6 1010
STORGE ROOM
D.2 1010
W.G-14.03 G.02
1010
SEALED CONCRETE - POLISHED POSITILE SYSTEM CARPET TILE WITH UFAD SERVICES 300MM X 300MM DESIGNER BATHROOM TILE (APARTMENTS) 300MM X 300MM BATHROOM TILE SEALED CONCRETE - POLISHED
FLOOR FINISHES:
1350
D.2 1010 D.6 1010
D.14-01 DT.02
D.2 1810
PRIVATE BATHROOM D.2107.35 FFL
WT.04 200
WT.2 120
OFFICE
D.2 1810
WT.02
200 OFFICE
WT.01 300
D.1 1810
D.1 1810
WT.2 120
STORGE ROOM D.2 1010
9000
D.2 1010
WT.01 300
WT.2 120
CON.01 POS.02 TLE.03
1485
OFFICE
CORRIDOR
DINING ROOM
POS.02
D.6 1010 WT.2 120
WT.4 300
DN
B
FLOOR 3 13000MM
LIFT POS.02
KITCHEN
UP
D.1 1810
OFFICE
D.2 1010
POS.02
D.6 1010
D1
CORRIDOR
D.6 1010
WT.2 120
D.2 1810
W.G-14.02 G.02
1760
BALCONY
8900
DINING ROOM
D.2 1010
D.1 1810
W.G-14.01 G.02
840
OFFICE
WT.2 120
OFFICE
KITCHEN
D.6 1010
OFFICE
D.2 1010
1760
WT.2 120
D.2 1010
VOID
WT.2 120
D.2 1010
CORRIDOR
840
D.1 1810
9000
BALCONY D.2 1010
D.6 1010
D.6 1010
D.2 1010
D.2 1010
1760
BALCONY D.2 1010
D.6
1150
POS.02
WT.2 120
OFFICE
D.2 1810
D.2 1010
1800
2000
CORRIDOR
D.1 1810
WT.2 120
OFFICE
FLOOR 3 13000MM
D.2 1010
1150
WT.01 300
E1
OFFICE
1760
WT.01 300
WT.2 120
840
WT.01 300
A
1760
1810
B-B A 200
D.2 1010
WT.1 300
1150
2430
MEETING ROOM
1030
1950
D.2 1010
D.1 1810
D.2 1010
D.2 1010
CORRIDOR
1810
13990
WT.01 300
BALCONY
D.6
1810
WT.1 300
3100
WT.01 RITEK THERMAL XL 300 SYSTEM WT.02 RITEK THERMAL XL 200XL SYSTEM WT.01 RITEK THERMAL 300 SYSTEM WT.03 200MM 851-500 SERIES GLAZED SYSTEM WT.02 RITEK THERMAL XLDOUBLE 200 SYSTEM WT.04 200MM INSITU CONCRETE (200) WT.03 200MM 851-500 SERIES GLAZED SYSTEM WT.05 AUSTRALIAN STANDARD BRICKDOUBLE (304MM TOTAL) WT.04 200MM INSITU CONCRETE (200) TOTAL) WT.06 AUSTRALIAN STANDARD BRICK (228MM WT.05 AUSTRALIAN STANDARD BRICK (304MM TOTAL) WT.06 AUSTRALIAN STANDARD BRICK (228MM TOTAL) FLOOR FINISHES:
D.2 1810
STORAGE
D.6 1810
WT.2 120
UP
D.6
WT.2 120
MEETING ROOM
CORRIDOR
STORAGE ROOM
WT.01 300
D.6
D.2 1010
D.6 1810 WT.1 300
WT.1 300
D.2 1010
F1
STORAGE
D.2 1810
D.2 1010
D.2 1010
1810
D.1 1810
STORAGE
D.6 1810
WALL TYPES:
WALL TYPES:
D.2 1810
D.2 1810
D.2 1810
WT.01 300
D.2 1010
STORAGE ROOM
D.6 1810
D.2 1810
3000
STORAGE
WT.1 300
D.2 1810
5740
D.1 1810
D.1 1810
D.1 1810
1030
D.1 1810
D.1 1810
D.1 1810
A/C
D.1 1810
E-1 A 100
3. FLOOR FINISHES TO CONTINUE UNDER DOOR LEAF 1. ALL DIMENSIONS ARE NOMINAL AND ARE TO BE TO SUPPORT SEAL. VERIFIED PRIOR TO THE COMMENCEMENT OF WORK 4. ALL ON SITEMATERIALS AND FITTINGS TO BE FIXED IN STRICT ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. 2. METAL ANGLE TILE TRIM TO TILE EDGE AT ALL 5. ALL EXPANSIONS, CONSTRUCTIONS AND OTHER EXTERNAL & INTERNAL DOOR THRESHOLDS UNLESS NOMINAL STRUCTURAL JOINTS ARE TO EXTEND OTHERWISE NOTED. THE FULL LENGTH, WIDTH, HEIGHT (WHATEVER THE CASE MAYBE) OF THE STRUCTURE. ALIGNING WITH 3. STRUCTURAL FLOOR FINISHES TO CONTINUE UNDER DOOR LEAF GRID AND JOINTING PATTERNS. TO SUPPORT SEAL. 6. THE FIRE HAZARD PROPERTIES OF ALL FLOOR MATERIALS, FLOOR COVERINGS, WALL AND CEILING 4. MATERIALS ALL MATERIALS FITTINGS TO BE C1.10A FIXED OF IN SHALL AND COMPLY WITH CLAUSE THE BCA. STRICT ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS.
DOOR TYPES
5. ALL EXPANSIONS, CONSTRUCTIONS AND OTHER NOMINAL STRUCTURAL JOINTS ARE TO EXTEND DT.01 920 SOLID CORE, METAL FRAME DOOR, DOUBLE DT.02 820 HOLLOW CORE, TIMBER FRAME DOOR THE FULL LENGTH, WIDTH, HEIGHT (WHATEVER THESINGLE DT.03 820 HOLLOW CORE, TIMBER FRAME DOOR DOUBLE CASE MAYBE) OF THE STRUCTURE. ALIGNING WITH DT.04 16MM THICK MDF 162412 DS AVION GREY MATT STRUCTURAL GRID THICK AND JOINTING PATTERNS. DT.05 22MM MDF 162412 DS AVION GREY MATT DT.06 VERMICULITE CORE FIRE RATED DOOR, SINGLE 6. THE FIRE HAZARD PROPERTIES OF ALL FLOOR MATERIALS, FLOOR COVERINGS, WALL AND CEILING MATERIALS SHALL COMPLY WITH CLAUSE C1.10A OF THE BCA.
DOOR TYPES: 920 SOLID CORE, METAL FRAME DOOR, DOUBLE 820 HOLLOW CORE, TIMBER FRAME DOOR SINGLE 820 HOLLOW CORE, TIMBER FRAME DOOR DOUBLE 16MM THICK MDF 162412 DS AVION GREY MATT 22MM THICK MDF 162412 DS AVION GREY MATT VERMICULITE CORE FIRE RATED DOOR, SINGLE
DT.01 DT.02 DT.03 DT.04 DT.05 DT.06
THE CONCEPTS ON AND CONTENT OF THIS DRAWING REMAIN THE PROPERTY OF LAKERS. THIS DRAWING SHALL ONLY BE USED FOR THE PURPOSE FOR WHICH IT WAS COMMISSIONED. UNAUTHORISED RETENTION, USE OR COPYING OF THIS DOCUMENT OR ITS I.P INFRINGES COPYRIGHT. ADVENT ARCHITECTURE ACCEPTS NO RESPONSIBILITY 66 GAWLER PLACE/ ADELAIDE / SA 5000 0402329834 zhongyuaxellee@ student.adelaide.edu.au
THE CONCEPTS ON AND CONTENT OF THIS DRAWING REMAIN THE PROPERTY OF AA Architects. THIS DRAWING SHALL ONLY BE USED FOR THE
OR LIABILITY FOR ANY ACTION / CONSEQUENCE FROM THE UNAUTHORISED USE OR MISUSE OF THIS DRAWING AND ITS CONTENTS OR ANY ALTERATIONS OR AMENDMENTS
PURPOSE FOR WHICH IT WAS COMMISSIONED. UNAUTHORISED RETENTION, USE OR COPYING OF THIS DOCUMENT OR ITS I.P INFRINGES COPYRIGHT.
MADE BY OTHER PARTIES.
ADVENT ARCHITECTURE ACCEPTS NO RESPONSIBILITY OR LIABILITY FOR ANY ACTION / CONSEQUENCE FROM THE UNAUTHORISED USE OR MISUSE OF THIS DRAWING AND ITS CONTENTS OR ANY ALTERATIONS OR AMENDMENTS MADE BY OTHER PARTIES.
PROJECT LOT 14 INNOVATION CENTER DRAWING
DRAWING OFFICE FLOOR PLAN
PROJECT DRAWN BY Oceanum - Construction Drawings CHENYI GAO / A1698700 DRAWN BY Axel Lee / A1678820
DRAWING DRAWING NO. Ty p i c a l Pr i va te A p a r t m e n t 004 Floor Plan DRAWING NO. A 003
ISSUE DATE 30/05/2021 ISSUE DATE SCALE @ A1 10/06/2020 1:200 1:200
0
1
2
5
A-A 006 A-A 006
1
2 9000
1
3 9000
2 9000
4 9000
3 9000
5 9000
4 9000
6 9000
5 9000
7 9000
6 9000
8 9000
7 9000
8 9000
Level 18
3500
71440
3500 3500
Level 18 Level 17 71440 67940
3500 3500
Level 17 Level 16 67940 64440
3500 3500
Level 16 Level 15 64440 60940
3500 3500
Level 15 Level 14 60940 57440
4000 3500
Level 14 Level 13 57440 53940
Level 13 5394012 Level
CONCRETE THROUGH HIGH COLUMN
3500 4000
49940
Level 12 Level 11 49940 46440
3500 3500
CONCRETE THROUGH HIGH COLUMN
Level 11 Level 10 46440 42940
3500 3500
CONCRETE FLOOR SLAB 330MM
Level 10 Level 9 42940 39440
3500 3500
CONCRETE FLOOR SLAB 330MM GRC FACADE
Level 9 Level 8 39440 35940
3500 3500
GRC FACADE
3500 3500
Level 8 Level 7 35940 32440
3500 3500
Level 7 Level 6 32440 28940
3500
Level 6 Level 5 28940 25440
25440
8440
Level 5
Level 4
8440
GRASS LAND 17000
4000
GRASS LAND
Level 4
A-A 200
17000 Level 3
4000 4000
13000
SECTION A-A 1:200
MIRRO SLAB
Level 3 13000 Level 2
Level 2
5000 4000
9000
MIRRO SLAB
9000
4000
4000 5000
Level 1
B-B 200
SECTION B-B 1:200
A-A 200
ELEVATION A-A 1:200
4000
Level 1 Ground Floor 4000 0
Ground Floor 0
A-A 006 A-A 006
THE CONCEPTS ON AND CONTENT OF THIS DRAWING REMAIN THE PROPERTY OF LAKERS. THIS DRAWING SHALL ONLY BE USED FOR THE PURPOSE FOR WHICH IT WAS COMMISSIONED. UNAUTHORISED RETENTION, USE OR COPYING OF THIS DOCUMENT OR ITS I.P INFRINGES COPYRIGHT. ADVENT ARCHITECTURE ACCEPTS NO RESPONSIBILITY OR LIABILITY FOR ANY ACTION / CONSEQUENCE FROM THE UNAUTHORISED USE OR MISUSE OF THIS DRAWING AND ITS CONTENTS OR ANY ALTERATIONS OR AMENDMENTS MADE BY OTHER PARTIES.
PROJECT LOT 14 INNOVATION CENTER DRAWING
DRAWING ELEVATIONS
ISSUE DATE 30/05/2021
DRAWN BY CHENYI GAO / A1698700
DRAWING NO. 005
SCALE200 @ A1 1:200
B-B
ELEVATION B-B 1:200
B-B 006
B-B 006
A
B
C
A
9000
9000
9000
B
D
C
9000
9000
E
9000
D
9000
DP 50
DETAIL PLAN 1:50
DE 50
DETAIL ELEVATION 1:50
E
9000
DP 50 Level 18
3500
71440
DE 50
Level 17
Level 16
35003500
67940 Level 18 71440
67940
Level 15
35003500
64440 Level 17
64440
Level 14
35003500
60940 Level 16
60940
Level 13
35003500
57440 Level 15
57440
3500 4000
53940 Level 14
Level 12 Level 13 49940 53940
4000 3500
Level 11
MIRRO SLAB
46440 Level 12
Level 10
MIRRO SLAB
35003500
49940
46440
Level 9
35003500
42940 Level 11
42940
Level 8
35003500
39440 Level 10
STEEL HANDLERAIL
39440
Level 7
35003500
35940 Level 9
STEEL HANDLERAIL
35940
Level 6
35003500
32440 Level 8
Level 5
35003500
28940 Level 7 32440
A-A 200
SECTION A-A 1:200
B-B 200
SECTION B-B 1:200
A-A 200
ELEVATION A-A 1:200
B-B 200
ELEVATION B-B 1:200
25440 Level 6
25440
Level 4
4000
17000
8440
Level 5
8440 3500
28940
4000 4000
Level 3 Level 4 13000 17000
5000 4000
Level 2 Level 3 9000 13000
Level 2 Level 1 9000
4000 5000
4000
Ground Floor 0Level 1
4000
4000
Ground Floor 0
B-B 006
THE CONCEPTS ON AND CONTENT OF THIS DRAWING REMAIN THE PROPERTY OF LAKERS. THIS DRAWING SHALL ONLY BE USED FOR THE PURPOSE FOR WHICH IT WAS COMMISSIONED. UNAUTHORISED RETENTION, USE OR COPYING OF THIS DOCUMENT OR ITS I.P INFRINGES COPYRIGHT. ADVENT ARCHITECTURE ACCEPTS NO RESPONSIBILITY B-B
PROJECT LOT 14 INNOVATION CENTER DRAWING
DRAWING ELEVATIONS
ISSUE DATE 30/05/2021
DRAWN BY CHENYI GAO / A1698700
DRAWING NO. 005
SCALE @ A1 1:200
006
OR LIABILITY FOR ANY ACTION / CONSEQUENCE FROM THE UNAUTHORISED USE OR MISUSE OF THIS DRAWING AND ITS CONTENTS OR ANY ALTERATIONS OR AMENDMENTS MADE BY OTHER PARTIES.
B-B 006
1
2
3
9000
9000
4 9000
5 9000
6
7
9000
9000
8 9000
Level 18
3500
71440 BALCONY
FIRE ESCAPE OFFICE
OFFICE
FIRE ESCAPE
Level 17
3500
67940
FIRE ESCAPE BALCONY
OFFICE
OFFICE
FIRE ESCAPE
Level 16
3500
64440
FIRE ESCAPE BALCONY
OFFICE
OFFICE
FIRE ESCAPE
Level 15
3500
60940
FIRE ESCAPE BALCONY
OFFICE
FIRE ESCAPE
BALCONY
OFFICE
FIRE ESCAPE
OFFICE
Level 14
3500
57440
FIRE ESCAPE OFFICE
Level 13
4000
53940
PODIUM TERRACE
Level 12
3500
49940
Level 11
3500
46440 BALCONY
FIRE ESCAPE OFFICE
FIRE ESCAPE
OFFICE
FIRE ESCAPE
OFFICE
FIRE ESCAPE
OFFICE
BALCONY
OFFICE
FIRE ESCAPE
OFFICE
BALCONY
OFFICE
BALCONY
OFFICE
FIRE ESCAPE
OFFICE
BALCONY
OFFICE
BALCONY
OFFICE
FIRE ESCAPE
OFFICE
BALCONY
OFFICE
BALCONY
Level 10
3500
42940
FIRE ESCAPE BALCONY
Level 9
3500
39440
BALCONY
FIRE ESCAPE
Level 8
3500
35940 BALCONY
FIRE ESCAPE OFFICE
FIRE ESCAPE
OFFICE
BALCONY
OFFICE
FIRE ESCAPE
Level 7
3500
BALCONY
OFFICE
FIRE ESCAPE
3500
32440
BALCONY
OFFICE
FIRE ESCAPE
FIRE ESCAPE
DETAIL 1 1:50
OFFICE
BALCONY
OFFICE
FIRE ESCAPE
OFFICE
BALCONY
D1 50
OFFICE
BALCONY
OFFICE
FIRE ESCAPE
OFFICE
BALCONY
D2 10
DETAIL 2 1:10
D3 5
DETAIL 3 1:5
D1 50
DETAIL 1 1:50
D2 10
DETAIL 2 1:10
D3 5
DETAIL 3 1:5
Level 6 28940
FIRE ESCAPE
Level 5 25440 PODIUM TERRACE FIRE ESCAPE
8440
PODIUM TERRACE
PODIUM TERRACE
FIRE ESCAPE
D1 50
Level 4
4000
17000
HUB MEETING ROOM
VIP
MEETING ROOM
D1 50
D2 10
Level 3
4000
13000
MEETING ROOM
HUB MEETING ROOM
D1 50
VIP
Level 2
D3 5
5000
D3 5
Level 1 4000
4000
D1 50
Ground Floor 0
A-A 200
D2 10
SECTION A-A 1:200 D3 5
B-B
COMMISSIONED. UNAUTHORISED RETENTION, USE OR COPYING OF THIS DOCUMENT OR ITS I.P INFRINGES COPYRIGHT. ADVENT ARCHITECTURE ACCEPTS NO RESPONSIBILITY OR LIABILITY FOR ANY ACTION / CONSEQUENCE FROM THE UNAUTHORISED USE OR MISUSE OF THIS DRAWING AND ITS CONTENTS OR ANY ALTERATIONS OR AMENDMENTS MADE BY OTHER PARTIES.
D3 5
DETAIL 1 1:50 DETAIL 2 1:10
D2 10
9000
THE CONCEPTS ON AND CONTENT OF THIS DRAWING REMAIN THE PROPERTY OF LAKERS. THIS DRAWING006 SHALL ONLY BE USED FOR THE PURPOSE FOR WHICH IT WAS
D2 10
PROJECT LOT 14 INNOVATION CENTER DRAWING
DRAWING SECTION
ISSUE DATE 30/05/2021
DRAWN BY CHENYI GAO / A1698700
DRAWING NO. 006
SCALE @ A1 1:200
B-B 200
SECTION B-B 1:200
DETAIL 3 1:5
A-A 006
A
B
C
E
9000
9000
9000
D
9000
Level 18
3500
71440 BALCONY
BALCONY OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
MEETING ROOM
OFFICE
OFFICE
Level 17 67940
3500 3500
BALCONY
3500
BALCONY
3500
BALCONY BALCONY
BALCONY
MEETING ROOM
OFFICE
OFFICE
Level 16 64440 BALCONY OFFICE
OFFICE
MEETING ROOM
Level 15 60940 BALCONY MEETING ROOM
OFFICE
OFFICE
Level 14 57440 BALCONY
OFFICE
OFFICE
MEETING ROOM
Level 13
4000
53940
PODIUM TERRACE
PODIUM TERRACE Level 12
3500
49940 PODIUM TERRACE
PODIUM TERRACE
Level 11
3500
46440 BALCONY
BALCONY OFFICE
OFFICE
MEETING ROOM
AISLE
MEETING ROOM
AISLE
MEETING ROOM
RECREATION ROOM
OFFICE
Level 10
3500
BALCONY
3500
BALCONY
3500
BALCONY
3500
BALCONY
3500
42940
BALCONY
BALCONY OFFICE
OFFICE
RECREATION ROOM
OFFICE
AISLE
RECREATION ROOM
OFFICE
MEETING ROOM
AISLE
RECREATION ROOM
OFFICE
MEETING ROOM
AISLE
RECREATION ROOM
OFFICE
MEETING ROOM
AISLE
RECREATION ROOM
OFFICE
Level 9 39440
OFFICE
OFFICE
BALCONY
Level 8 35940
OFFICE
OFFICE
BALCONY
Level 7 32440
OFFICE
OFFICE
BALCONY
Level 6 28940
OFFICE
OFFICE
BALCONY
Level 5 25440 PODIUM TERRACE
8440
PODIUM TERRACE
PODIUM TERRACE
Level 4
4000
17000
HUB MEETING ROOM
HUB MEETING ROOM
AISLE
VIP
VIP
VIP
VIP
VIP
VIP
Level 3
4000
13000
HUB MEETING ROOM
HUB MEETING ROOM AISLE
VIP
VIP
Level 2
5000
9000
Level 1
4000
4000
A-A 200
SECTION A-A 1:200
B-B 200
SECTION B-B 1:200
Ground Floor 0
A-A 006
THE CONCEPTS ON AND CONTENT OF THIS DRAWING REMAIN THE PROPERTY OF LAKERS. THIS DRAWING SHALL ONLY BE USED FOR THE PURPOSE FOR WHICH IT WAS COMMISSIONED. UNAUTHORISED RETENTION, USE OR COPYING OF THIS DOCUMENT OR ITS I.P INFRINGES COPYRIGHT. ADVENT ARCHITECTURE ACCEPTS NO RESPONSIBILITY OR LIABILITY FOR ANY ACTION / CONSEQUENCE FROM THE UNAUTHORISED USE OR MISUSE OF THIS DRAWING AND ITS CONTENTS OR ANY ALTERATIONS OR AMENDMENTS MADE BY OTHER PARTIES.
PROJECT LOT 14 INNOVATION CENTER DRAWING
DRAWING SECTION
ISSUE DATE 30/05/2021
DRAWN BY CHENYI GAO / A1698700
DRAWING NO. 200 006
A-A
ELEVATION A-A 1:200
SCALE @ A1 1:200
330
RITEK THERMAL XL 125 WALL SYSTEM RFL 240/240/240
3595
4015
4015
125
3500
125
OFFICE
BALCONY
4955
125
3500
LIGHTWEIGHT WATERPROOF FACARE
3500
3500
STORAGE
3375
POLISH METAL HANDRAILS 1100MM
BALCONY
125
3500
CONCRETE FLOOR SLAB 330MM
125
CONCRETE THROUGH HIGH COLUMN
3500
6700
330 2115
5060
700 125 1810 1085
CONCRETE FLOOR SLAB 330MM
OFFICE RITEK THERMAL XL 330
DE 50
3500
DP 50
DETAIL PLAN 1:50
DETAIL ELEVATION 1:50
OFFICE
DP 50
POSITILE CARPET TILE
BALCONY
DETAIL PLAN 1:50
� AUTODESK � � � � �
THE CONCEPTS ON AND CONTENT OF THIS DRAWING REMAIN THE PROPERTY OF LAKERS. THIS DRAWING SHALL ONLY BE USED FOR THE PURPOSE FOR WHICH IT WAS
PROJECT DP LOT 14 INNOVATION CENTER DRAWING COMMISSIONED. UNAUTHORISED RETENTION, USE OR COPYING OF THIS DOCUMENT OR ITS I.P INFRINGES COPYRIGHT. ADVENT ARCHITECTURE ACCEPTS DENO RESPONSIBILITY DETAIL ELEVATION 50 50 OR AMENDMENTS 1:50 OR LIABILITY FOR ANY ACTION / CONSEQUENCE FROM THE UNAUTHORISED USE OR MISUSE OF THIS DRAWING AND ITS CONTENTS OR ANY ALTERATIONS MADE BY OTHER PARTIES.
125
WALL SYSTEM RFL 240/240/240
DRAWN BY CHENYI GAO / A1698700
DRAWING DETAIL PLAN AND ELEVATION
ISSUE DATE 30/05/2021
DRAWING NO. 007
SCALE @ A1 1:50
RECYCLE
CONCRETE WALL
POSITILE CARPET TILE I-BEAM 300MM CONCRETE FLOOR SLAB TO STRUCTURE 330MM
COBBLESTONE WATERPROOF MEMBRANE ROOF SOIL SUPPORT
由 由 由 由 由 KSEDOTUA 由
GRC FIXING PANEL
由 AUTODESK 由 由 由 由 由
4035
GARDEN SOIL
EXTERIOR MIRROR BOARD INSULATION AS SPECIFED FIXING STEEL BALT
INSIDE OUTSIDE
STEEL FOUNDATION CONNECTION FIXING STEEL BOLT
INSIDE
OUTSIDE
WATERPROOF MEMBRANE
CONCRETE FLOOR
INSULATION AS SPECIFED GRC PANEL
D1 50
DETAIL 1 1:50
D2 10
DETAIL 2 1:10
THE CONCEPTS ON AND CONTENT OF THIS DRAWING REMAIN THE PROPERTY OF LAKERS. THIS DRAWING SHALL ONLY BE USED FOR THE PURPOSE FOR WHICH IT WAS COMMISSIONED. UNAUTHORISED RETENTION, USE OR COPYING OF THIS DOCUMENT OR ITS I.P INFRINGES COPYRIGHT. ADVENT ARCHITECTURE ACCEPTS NO RESPONSIBILITY OR LIABILITY FOR ANY ACTION / CONSEQUENCE FROM THE UNAUTHORISED USE OR MISUSE OF THIS DRAWING AND ITS CONTENTS OR ANY ALTERATIONS OR AMENDMENTS
D3 5
由 AUTODESK 由 由 由 由 由
MADE BY OTHER PARTIES.
DETAIL 3 1:5
PROJECT LOT 14 INNOVATION CENTER DRAWING
DRAWN BY CHENYI GAO / A1698700
由 DRAWING AUTODESK 由 由 由 由 由 DETAIL
ISSUE DATE 30/05/2021
DRAWING NO. 008
SCALE @ A1
D1 50
DETAIL 1 1:50
D2 10
DETAIL 2 1:10
D3 5
DETAIL 3 1:5
D1
05 REVIT EXERCISE
CONSTRUCTION 3 Adelaide,SA
T
he assignment was picking a building around your living area and drawing it by Revit.
IN-SITU REINFORCED CONCRETE CORES CAST MONOLITHICALLY WITH FRAME AND FLOOR SLAB PROVIDE LATERAL STABILITY
IN-SITU REINFORCED CONCRETE STRUCTURAL FRAME FOR CORROSION RESISTANCE AND SHEAR STABILITY
1
2
3
4
5
6
7
8 A
FIRE WALL
12000
Soda Lime Glass
B
24000
Gypsum Wall Board
C 6000
Concrete masonry units
Concrete masonry units
?
D 6000
CURTAIN WALL IN GROUND FLOOR,1 LEVEL AND 2 LEVEL
E 6000
6000
6000
6000
6000
6000
6000
42000
1
HIGHER LEVEL IN GROUND FLOOR AND FIRST FLOOR FOR COMERICIAL
3D OVERALL
2
CONCRET FOUNDATION TO SUPPORT THE LOAD
3D Structure
3
Level 1 Overview 1 : 200
A
C
70MM ANTI SUNLIGHT GREEN ROOF TO ENGINEER'S SPECIFICATIONS, DRAINED TO PIPES AT BUILDING PERIMETER 2-5FLOOR FOR DEWELLI NG
A
B
150X150 TERRACOTTA TILES DIRECTLY FIXED TO BALCONY SLAB
C 300MM TWO-WAY SPANNING IN-SITU CONCRETE FLOOR
Roof 20000
Level 5 16800 GROUND FLOOR-1 FLOOR FOR COMERCIAL
20MM PLASTERBOARD CEILING SUSPENDED FROM CONCRETE FLOOR ABOVE ON RONDO KEY-LOCK SYSTEM
25MM DOUBLEGLAZED CURTAIN WALL WINDOWS
Level 4 13600
East
4
723MM CEILING VOID
1 : 200
6
West 1 : 200
100MM CONCRETE MASONRY STRUCTURE
Level 3 THE MAIN WAST WHATER PIPE AND TOILET UNDERGROUND
6 INCH OUTLET MECHANICAL EQUIPMENT
10400 300MM CONCRETE BEAMS TRANSFER LOAD OF COLUMNS
ANTI-CAPILLARY BARRIER
8
19MM VICTORIAN ASH FLOATING BOARDS OVER CONCRETE FLOOR
A1-1
Level 2
100MM KINGSPAN K10 SOFFIT BOARD INSULATION, JOINS TAPED
7200
100MM KINGSPAN K10 SOFFIT BOARD INSULATION, JOINS TAPED
Level 1 3600
STRUCTURAL FRAMING MODIFIED TO CREATE TWO-STORY VOID ON ALTERNATE LEVELS
50MM Thermal/Air Layer
9 A1-1
19MM VICTORIAN ASH FLOATING BOARDS OVER CONCRETE FLOOR
Fire escape
Ground Floor
7 5
North
Section A
0 100MM BASIC FACADE BRICK WALL
1 : 100
8
1 : 200
Section A - Callout 1 1 : 20 CLIENT
Overall
CHENYI GAO A1698700
9 PROJECT
Section A - Callout 2 1 : 20 TITLE
DATE:
SIZE: SCALE:
A1
44000 42000 6000
1
6000
6000
2
3
AIR INHALE DUCT
6000
6000
4
5
6000
3071
6
7
Room Legend
8
Plumbing Room
A
UP
Meeting Room
Woman
1
2
3
4
5
6
7
8
Electrical Room
Electrical Room Exit Room Mechanical Room
Reception Room
AIR SUPPLY DUCT
2929
A
Exit Room Lift
B
Man
B
Man
26000
Mechanical Room UP
UP
Reception Room
C
Meeting Room
5825
Public Space
Plumbing Room
Exit Room
Public Space
D
Lift
UP
C
D
6176
Reception Room Woman
E
4
3D Mechanica Totall
E Electrical Equipment Schedule
Commercial Level
1
1 : 200
Location
1
2
3
4
5
6
7
Room Legend
8
Plumb Room UP
A
Electrical Room Exit Room DN
WC Women
Bed Room Bed Room Large
Mechanical Room Bed Room
Space 11 Space 11 Space 11 Space 11 Space 11 Space 11 Space 11 Space 9
B
WC Men
Electrical Room
Mains 100 A 100 A 100 A 100 A 100 A 100 A 100 A 100 A
Mark 2 3 4 5 6 11 13 17
Max #1 Pole Breakers 12 12 12 12 12 12 12 12
3
Type
Level 1 Mechanical 1 : 200
-
225 A 225 A 225 A 225 A 225 A 225 A 225 A 100A
ELECTRICAL CIRCLE IN EACH ROOM
SUPPLY ELECTRIC FOR AIR TERMINAL
Exit Room Lift
Public Space
Bed Room Large
C
Mechanical Room Plumb Room
D
UP Room Lift Exit
Public Space WC Men
31 DN
E
WC Women Duct System Schedule
Dwelling Level
2
ALL CLEANWATER PIPES COME FROM ROOF WATER TANK
1 : 200
9 5
7
Elevation -Service 1 : 200
MAIN ELECTRICAL DISTRIBUTION BOARD AND COMMUNICATION SWITCHBOARDS
MAINS WATER AND FIRE PUMPS
6
3D Plumbing Total Layout
FOR TOILET DRAIN WATER PIPE
8
CHENYI GAO A1698700
FOR DRAIN WATER PIPE
3D Plumbing Category CLIENT
Service
1 : 200
3D Electrical Layout RED PIPE FOR HOT WATER WITH ISOLATION
ALL WASTEWATER PIPES DRAIN TO STREET
Ground Floor Electrical
PROJECT
BLUE PIPE FOR COLD WATER AND FIRE WATER PIPE
WHTER HEATER
TITLE
Family and Type
Type
Flow
Duct System: Supply Air Duct System: Supply Air Duct System: Return Air Duct System: Return Air Duct System: Return Air Duct System: Supply Air Duct System: Return Air Duct System: Supply Air Duct System: Return Air Duct System: Supply Air Duct System: Return Air Duct System: Supply Air Duct System: Return Air
Suppl y Air Suppl y Air Retur n Air Retur n Air Retur n Air Suppl y Air Retur n Air Suppl y Air Retur n Air Suppl y Air Retur n Air Suppl y Air Retur n Air
283.2 L/s 236.0 L/s 1651.8 L/s 0.0 L/s
DATE:
SIZE: SCALE:
A1
System Classificati on Supply Air Supply Air Return Air Return Air
0.0 L/s Return Air 236.0 L/s 5191.4 L/s 236.0 L/s 5191.4 L/s 236.0 L/s 5191.4 L/s 236.0 L/s 5191.4 L/s
Supply Air Return Air Supply Air Return Air Supply Air Return Air Supply Air Return Air
06 WOODEN HOUSE
REP 3 Adelaide,SA
W
ooden house was designed in grassland park. It was used for seed museum which rawing by hand drafter.
gaochenyi4175262@gmail.com