1 minute read

Figure 11 NSW, jobs in utility-scale PV (all scenarios

Utility-scale PV Total jobs in utility-scale PV for all four scenarios are shown in Figure 11. Averages range from 1,700 jobs in the Slow Change scenario to 3,800 jobs in the Hydrogen Superpower scenario. Under the Offshore Wind scenario, a large portion of new utility-scale PV installations are displaced by offshore wind construction, particularly from the mid-2030s. Hydrogen Superpower projects strong growth in utility-scale PV with a peak of over 3,000 jobs in the mid-2020s and reaching around 9,000 jobs by the mid-2040s factoring in repowering.

Figure 11 NSW, jobs in utility-scale PV (all scenarios)

This article is from: