R A F A E L . A . B E R R A L . Z U R I T A . C V. P O R T F O L I O
RAFAELA.BERRALZURITA/ARB ARCHITECT(SENIOR).concept,development.teammanagement. PROFILE name: Rafael A. Berral Zurita nationality: Spanish location: LONDON, UK email: rafaelberralzurita @gmail.com phone: +44(0)7729256012 skype: rafaelaberralzurita linkedin: linkedin.com/in/rafaelberral/
I am an ARB chartered Architect with more than seven years of experience (Master degree finished in 2011) with relevant work managing teams and planning projects (retail, mixed use, offices, etc.). Specialized in concept, SD and DD stage, able to plan, coordinate and produce high quality drawings for tender phase. I also have remarkable experience in following construction stage and solving the inconsistencies and issues generated during the process.
Key • • • • • •
PROFESSIONAL CAREER DESIGN INTERNATIONAL
May 2016 - Current LONDON, UK www.designinternationalc.om
2013
2016
madrid beijing london JUNIOR ARCHITECT SENIOR TEAM LEADER BIM COORD.
professional skills: Deep knowledge of retail architectural principles. Able to coordinate different consultants in a proactive way. Budget monitoring and resources management. Look for reliable solutions which save time and money to the project and to the client. Attention to detail. Continious audition of work, able to identify problems and solve them. Avoid deadlock situations. Also comfortable with concept stage and short time works / competitions.
Team Leader (Nov2016-current) -
previous:
Senior
Architect / BIM Coordinator
(May2016-Nov2016). ++DI is a global firm focused on the design of commercial centres. I worked on two projects, from the concept stage to the construction. My responsabilites included team management, production, liasing with clients, coordinating with consultants, auditing processes and budget, answering queries during the construction process, etc. Remarkable Projects: • Ada Mall (Belgrade, Serbia) -SD, DD, CD- Under construction. To be completed in 2019. * • Al Araimi Boulevard (Muscat, Oman) - DD, aux at CD- Completed in 2018. • Al Araimi Walk (Barka, Oman) -SD, DD, CD- Under construction. Excavation process. * +Lulu malls Concepts and DDs.
CCDI
June 2013 - April 2016 BEIJING, CHINA www.ccdi.com.cn
Senior Architect (aux. team leader, project responsible) (Feb2014-Apr2016) - previous: Team Architect (Jun2013-Feb2014). ++CCDI is one of the biggest firms in the chinese construction and architectural design fields. More than 1000 employees. Member of the Progressive Atelier, specialized in retail, commercial and public buildings. Remarkable Projects: • Grand Hyatt Hotel (Jinmao, China) -DD, aux at CD- Built in 2014. • Private Primary School (Tai-Hu, China) -SD, DD, aux at CD- Built in 2015. • Retirement Home (Beijing, China) -SD, DD, aux at CD- To be built. +Several masterplans, competitions and concept stages.
July 2015 - October 2015 QUITO, ECUADOR www.ctamericas.com yachay.gob.ec
...
CV1_PROFILE
CHINA TELECOM AMERICAS /CCDI
Site Architect. ++Joint Venture between different chinese firms (CCDI, CTA, SINOHYDRO) for a public licitation. Four-month assigment in Quito (Ecuador) to study the feasibility of several projects in Yachay (Intelligent city prototype in Latin America) and to check the site works. Visits to construction site, meeting with contractors, project reviews and budget analysis and planification. 19 projects audited.
pag 2 ••••CV+Portfolio /// Rafael A. Berral Zurita
ORTIZ LEÓN
October 2011 - April 2013 MADRID, SPAIN www.ortizleon.com
Architect. ++OL specializes in offices buildings and corporative architecture. Member of different teams developing projects for clients such as Iberia, Scottish Power or BBVA, among others. Development of projects during different phases, from the first conceptual sketches to the approved site plans. Remarkable Projects: • Iberia Headquarters (Madrid, Spain) - SD, DD, CD. • Scottish Power Headquarters (Glasgow, UK) - SD, DD - Built in 2013. • Manoteras Offices (Madrid, Spain) - DD, CD - Built in 2012. • José Abascal ta (Madrid, Spain) - Concept, SD - Built in 2012. +Several competitions and concept stages.
EDUCATION SAN PABLO CEU UNIVERSITY
Oct 2005 - May 2011 MADRID, SPAIN. www.uspceu.com
Master in Architecture and Building Engineering. Design: architecture and urban planning. Calculation and design: construction, structures and MEP. •
First final thesis to be evaluated with 10 and first student to be graduated with honors.
SKILLS SOFTWARE 2D
Autocad. (pro)
3D
3D Max. Sketchup. (pro) Rhino.
BIM
Adobe
Office
Creative. Commited. Responsible. Proactive. Communicative. Attention to detail. Adaptable. Outgoing.
Revit. (pro) Dynamo. Vray. Mental Ray. Lumion. Photoshop. (pro) Illustrator. (pro) InDesign. (pro) Word. (pro) Excell. (pro) Project. (pro)
CAREER DEVELOPMENT Concept SD DD CD 2013
2016
LANGUAGES ENG SPA 汉语
Cambridge CAE (C1) IELTS (2016): 8/9. Mother tongue. HSK4 (2017); preparing HSK5.
present day
Render
SOFT SKILLS
2024
2D 3D BIM PARAMETRIC
1.The Firm where I developed the project. 2. Name, function, location and GLA/GBA of the project. 3. Project schematic drawing. 4. Key information, such my responsibility in the project or the role of the Firm. 5. Project timeline and how my role changed during the process. 6. A summary of the works that I developed on the project. 7. Project nickname. 8. Briefly description of the project and the firm, in case of necessary.
3 4
8
5 7
6
...
1 2
CV2_PROFILE
***This portfolio should be read as a double-page composition. Odd number should be on the right.
CV+Portfolio /// Rafael A. Berral Zurita •••• pag 3
•••• DESIGN INTERNATIONAL LONDON
Ada Mall/ @Belgrade. Shopping Centre. GLA 34.000 m2. 2016-2017-2018 scheme
project description
key information year responsability role of the firm phases
+2016-2017-2018. +bim coordinator, team leader. +leading architects. +concept, sd, dd, tender and design/cons supervission.
project timeline concept
sd
dd
cd roles: team leader bim coordinator architect auxiliar
3
5
8
1,5
Ada Mall is the first project which I developed when I joined Design International. I started to work on it during the concept stage as Senior Architect and BIM Specialist and, along the process, I was promoted to Team Leader. Ada Malll has been as well the first BIM project in Design International. Indeed, part of my initial responsabilites was to set up the templates and standards for it. We developed the Revit model up to BIM Level 2 of Coordination with LOD 300. Once the tender was completed, I followed all the requests by the leasing agents to modify the layout of the units. I also was in charge of monitoring the indicative tenants plans. I designed and developed several construction details in cordination with local contractor. Among them, the interior feature (timber nest), the balustrades or several facade details. Although I haven’t followed daily correspondence during the last stage, I have travelled to site and supervised each of the documents produced by the team. The project is due to open in early 2019.
team members:
works developed Floor plans design Facade Design
Hand sketching BIM modelling 3d modelling construction details team leading and organization coordinationg with consultants
...
ADA_16.17.18
Interior Design
pag 4 ••••CV+Portfolio /// Rafael A. Berral Zurita
Conceptual sketch
Ada Mall @ Belgrade (Serbia) ••••
Concept diagrams:
Site plan
First floor
Second floor Ground floor
ADA_16.17.18
Third floor
...
Fourth floor
Axonometric section
CV+Portfolio /// Rafael A. Berral Zurita •••• pag 5
•••• DESIGN INTERNATIONAL LONDON
Trans section Original escale 1:200
Central feature construction detail Original escale 1:50
Central feature detailled elevation Original scale 1:50
...
ADA_16.17.18
BIM detail LOD 300
Coordinated BIM model LOD 300
pag 6 ••••CV+Portfolio /// Rafael A. Berral Zurita
BIM detail LOD 300
Ada Mall @ Belgrade (Serbia) ••••
Facade construction details Original scale 1:20
Construction process pictures April 2018
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
+22.50 MULTIFUNCIONAL SPACE ROOF 100.00
25
BORDER GRAĐ.PARCELA
8.00 8.00 P
8.00 O
8.00 N
8.00 M
8.00 L
8.00 K
8.00
4
J
MATERIAL LEGEND Reinforced concrete
BUILDING LINE
02
Q
LINE REGULATION
01
R
Thermal insulation
Waterproofing
ALUMINIUM FRAMED SKYLIGHT REFER TO TYPICAL SECTION AR-825-MD-1/2
Screed
Wall Section 4-4'
Facing brickwork
215 135
8.00 135 215
Glass balustrade
I
8.00 H
Wall Section 3-3'
8.00 8.00
1'
2
1
240 215
Wall Section 1-1'
8.00
240 215
240 215
215
240
240 215
8.00
5'
B
Green wall
Facade construction details Original scale 1:20
215 240
2'
8.00
Wall Section 5-5'
Facade construction details Original scale 1:20 DIMENSIONS IN CM
WT - 14
3'
215 240
1000
215 240
8.00
3
F
E
D
C
WT - 01
5
240 215
8.00
4'
G
Facade construction detailled axonometric Original scale 1:20
Wall Section 2-2'
A
TREE PLANTING SECTION IN PLANTER ON SLAB REFER TO SOFT LANDSCAPE DETAIL DRAWING LD-DE-03
BT - 05
WT - 13
Keyplan
+22.07 99.57
4F TERRACE SSL
RT - 04A
+22.50 100.00
RT - 04B
55
43
4F FFL
43
+22.50 100.00
62
CT - 02
TENANT SIGNAGE ZONE
WT - 02
03F3-01
3F FFL
3F TERRACE SSL
400
150 RT - 03B
RT - 03B
RT - 03A
RT - 03B
2F TERRACE SSL
RT - 02B
NOTES
BULKHEAD TYPE 02 REFER TO TYPICAL DRAWING AR-813-MD
400
WT - 03 RT - 02B
RT - 02A
02F2-03
+11.45 88.95
+11.37 88.87
FT - 06B
110
+16.47 93.97
TENANT SIGNAGE ZONE
02F2-01
1.
This drawing is the property of Design International and shall not be reproduced or disclosed or executed in whole or in part, and the copyright and license shall not be released in whole or in part without their prior written consent.
2.
Use only written dimensions and information only, and any discrepancies found or missing shall be reported to Design International immediately.
3.
This drawing is subject to verification and approval by all relevant local authorities and registered structural engineers.
BT - 03
2F FFL
TENANT SIGNAGE ZONE
SECOND FLOOR MALL 02F2-MA
8
+11.45 88.95
CT - 01
22
80 57
13
Date
Ref
23-05-2017
A
Revision Note
Revised piles, waterproofing and insulation
7
CT - 02 CT - 01
CT - 01
WT - 04
01F1-01
FIRST FLOOR MALL 01F1-MA
110
BT - 03
+6.00 83.50
+.5.2 83.42
FT - 06B
Client
80
1F TERRACE SSL
17 Stycznia 45A Nothus Building 02-146 Warsaw Tel: +48 22 16 60 700 www.gtc.com.pl
TENANT SIGNAGE ZONE
TENANT SIGNAGE ZONE
00GF-01
00GF-03
Lead Architectural Consultant
430
WT- 11
600
557
82
+5.57 83.07
22
43
8
WT - 03
BT - 05
BULKHEAD TYPE 01 REFER TO TYPICAL DRAWING AR-813-MD
+6.00 1F FFL 83.50
400
502
545
TENANT SIGNAGE ZONE
MAIN ENTRANCE MALL
-0.40 77.10
163 Tower Bridge Road London SE1 3LW Tel: 20 7092 2700 Fax: 20 7092 2799 E-mail: london@designinternational.com
MEP Engineering Consultant
-
0.00 77.50
-0.08 77.42
FT - 06A
FT - 06A Structural Consultant
22
-0.72 76.78
(MAIN ENTRANCE DETAIL REFER TO DRAWING AR-816-MD)
GF FFL
WSP
-3.90 73.60
FT - 01A
FT - 01B
WT - 16
332 WT - 16
FT - 01B
WT - 16
WT - 16
FT - 01A
Project
ADA Mall, Belgrade
440
Design for Construction
WT - 10
THE UNDERGROUND GRAĐ. LINE
FT - 01B
WT - 16
WT - 10
390 273
FT - 01A
Date
23-06-2017 Scale
1:50@A0 Drawn By
LA
1
1.5
2
2.5
5
25 1160
0.5
...
-3.90 73.60
0
Traffic Consultant
60
-1.00 -1.17 76.50 76.33 -0.72 76.78 CURRENT LEVEL OF PIT PROTECTION
-1.10 76.40
0.00 77.50
GROUND FLOOR MALL 00GF-MA
EXISTING TERRAIN LINE
15 35 8
45 32 40
DETAIL TO BE CHECKED
24
23
22
21
Drawing Title
Wall Section 1 Radnika Street Entrance
Checked By
PB
Project Number
6262
Drawing Number
ADA_16.17.18
BT - 05
WT - 04
CT - 01
43
545
502
CT - 02
7
13
115
43
+16.90 94.40
+16.82 94.32
FT - 11
22 8
+16.90 94.40 +16.47 93.97
BULKHEAD TYPE 03 REFER TO TYPICAL DRAWING AR-813-MD
THIRD FLOOR MALL 03F3-MA
BT - 06
BT - 05
WT - 03
517
560
CT - 03
AR-311-WS AR-314-WS
Revision
A
Detailled long section Original scale 1:20
CV+Portfolio /// Rafael A. Berral Zurita •••• pag 7
•••• DESIGN INTERNATIONAL LONDON
Lulu Koyambedu Mall/ @Chennai (India). Shopping centre. GLA 75.000 m2. 2018-2019 scheme
key information year responsability role of the firm phases
project description +2018-2019. +team leader. +leading architects. +concept and sd. +artistic supervision during dd.
project timeline concept
sd
dd
The Koyambedu and OMR shopping centres are currently being developed in parallel. Both are promoted by the Chennai Baashyaam Real Estate group under the main tenant’s supervision, Lulu Group My tasks on these projects are not only to lead and to coordinate the team (i.e, management functions, budget administration and resources coordination), butI also to contribute to the leasing layout design, develop the interior concept, model part of the 3D, work on floor plans, etc.
cd roles: team leader bim coordinator architect auxiliar
3
3
1
team members:
works developed Floor plans design
Interior Design Hand sketching BIM modelling 3d modelling construction details team leading and organization coordinationg with consultants
...
KOYAMBEDU_18
Facade Design
pag 8 ••••CV+Portfolio /// Rafael A. Berral Zurita
Exterior concept. Diagrams, mood boards and interior renders produced by the team.
Lulu Koyambedu Mall @ Chennai (India) •••• E
F
9.00
G
9.00
H
9.00
9.00
I
J
9.00
K
9.00
L
9.00
M
9.00
to LULU Loading Bay (parking level)
N
9.00
9.00
A
O
B
C
11.00
9.00
D 9.00
E
F
9.00
H
9.00
9.00
I
J
9.00
9.00
K
L
9.00
9.00
M 9.00
N 9.00
O
A
9.00
SSL +6.00 (19.50)
665.5 m2
SSL +6.00 (19.50)
DN
UP
DN
UP
DN
DN
UP
UP
DN
UP
DN
11.00
UP
11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00
20 11.00
21
DN
F&B-22 20.3 sqm
UP
11.00
Seating area 10 456.8 sqm
SSL +18.00 (31.50)
22
SSL +18.00 (31.50)
11.00
Male Toilet
23
SSL +18.00 (31.50)
11.00
SSL +18.00 (31.50)
25
Technical
Nursery
24 11.00
MSU-06 459.1 sqm
RESTAURANT-16 316.5 sqm
25 11.00
RESTAURANT-14 323.9 sqm
11.00
11.00
ANCHOR - 05 1498.3 sqm
26
26
26
(12.50)
11.00
RESTAURANT-15 513.6 sqm
27
27
11.00
11.00
11.00
27 Terrace-02 281.5 sqm
28
28
Te
m
ple
28
11.00
11.00
ANCHOR - 02 1435.9 sqm
19
F&B-17 87.5 sqm
RESTAURANT-17 188.6 sqm
11.00
11.00
5% slope
DN
Female Toilet
25 Main Entrance
Seating area 09 267.9 sqm
24 SSL +0.00 (13.50)
18
Toilets Staff
23
RESTAURANT - 04 151.2 sqm
Nursery
17 SSL +18.00 (31.50)
Technical
SSL +18.00 (31.50)
RESTAURANT-13 188.6 sqm
11.00
SSL +6.00 (19.50)
Technical Technical
Technical
SSL +18.00 (31.50)
Spare room
Seating area 08 321.8 sqm
UP
Male Toilet
Seating area 06 29.9 sqm Seating area 07 37.9 sqm
RESTAURANT-12 237.6 sqm
Terrace-01 457.3 sqm
22
SSL +6.00 (19.50)
11.00
24
RESTAURANT - 02 371.8 sqm
11.00
21
16
Wet Garbage
F&B-16 50.1 sqm
RESTAURANT-11 228.3 sqm
11.00
11.00
Female Toilet
Dry garbage
F&B-15 46.7 sqm
20
15
Spare room
F&B-14 46.7 sqm
RESTAURANT-10 150.7 sqm
11.00
C-212 C-211 24.3 sqm 24.3 sqm
Spare room
F&B-13 46.7 sqm
Seating area 05 576.9 sqm F&B-21 F&B-20 20.7 sqm 20.7 sqm
RESTAURANT-09 226.8 sqm
14
Spare room
F&B-12 46.7 sqm
11.00
SSL +6.00 (19.50)
SSL +18.00 (31.50)
DN
Technical C-210 24.3 sqm
UP
DN
C-209 29.8 sqm
F&B-10 33.1 sqm F&B-11 33.1 sqm
Technical
19 ANCHOR - 06 1288.9 sqm
11.00
(13.50)
5% slope
Nursery
UP
DN
UP
DN
UP
(13.50)
D-211 59.8 sqm
A-211 79.4 sqm
23
Male Toilet
Technical
Kiosk -06 10.0 sqm
C-207 C-208 114.0 sqm 113.4 sqm
ANCHOR - 04 1416.3 sqm
22 D-111 98.2 sqm
Entrance from parking
C-205 C-206 132.2 sqm 132.3 sqm
Kiosk -05 10.0 sqm
21
D-110 99.2 sqm
C-110 C-111 105.8 sqm 106.1 sqm
A-113 87.9 sqm
Female Toilet
C-109 35.3 sqm
Technical
A-210 47.2 sqm
20
D-109 40.7 sqm
(13.50)
C-108 47.4 sqm
A-209 44.4 sqm
11.00
(13.50)
F&B-19 34.1 sqm
Seating area 04 451.3 sqm
18
Technical
D-210 34.5 sqm
C-201 C-202 C-203 C-204 44.0 sqm 43.4 sqm43.4 sqm 44.0 sqm
11.00
ANCHOR - 03 1339.7 sqm C-107 135.3 sqm
D-209 27.3 sqm
A-208 65.9 sqm
19
C-105 154.5 sqm
C-106 136.4 sqm
ANCHOR - 01 1302.7 sqm
SSL +6.00 (19.50)
F&B-02 F&B-03 24.6 sqm 38.0 sqm F&B-04 23.2 sqm F&B-05 23.2 sqm F&B-06 23.2 sqm F&B-07 23.2 sqm F&B-08 23.2 sqm F&B-09 23.2 sqm
Seating area 03 395.3 sqm
11.00
C-104 154.4 sqm
A-112 39.6 sqm
18
1:25 1:25
11.00
1:25
Technical
SSL +6.00 (19.50)
13 SSL +18.00 (31.50)
17
SSL +6.00 (19.50)
A-207 61.9 sqm
11.00
A-111 35.7 sqm 1:25
D-108 29.8 sqm
C-102 C-103 85.5 sqm 59.5 sqm
F&B-18 34.1 sqm
SSL +18.00 (31.50)
Male Toilet
F&B-01 39.0 sqm
16
D-208 37.7 sqm
Technical
11.00
Cafe'-02 C-101 59.3 sqm 85.5 sqm
A-110 339.3 sqm
MSU - 05 633.5 sqm
RESTAURANT-08 81.5 sqm
SSL +18.00 (31.50)
Seating area 02 647.3 sqm
12
Female Toilet
RESTAURANT-06 RESTAURANT-07 170.2 sqm 170.6 sqm
11.00
(13.50)
(13.50)
SSL +18.00 (31.50)
1861.1 m2
15
B-209 37.9 sqm
MSU-03 604.2 sqm
11.00
D-107 42.6 sqm
Bounce L10
14
D-207 325.1 sqm
17
(13.50)
(13.50)
11.00
EXHIBITION SPACE - 01 594.6 sqm
Technical
Kiosk -04 10.0 sqm
A-206 40.0 sqm
11.00
(to parking level)
13 SSL +6.00 (19.50)
D-206 46.0 sqm
B-206 157.9 sqm
Cafe'-03 B-207 B-208 54.4 sqm 43.4 sqm 60.0 sqm
A-205 40.4 sqm
16
(13.50)
D-106 327.2 sqm
A-109 403.5 sqm
B-205 157.6 sqm
11 Kiosk -11 12.2 sqm
SSL +18.00 (31.50)
SSL +18.00 (31.50)
11.00
8% slope
8% slope
11.00
(13.50)
15
Loading-02 226.3 sqm
11.00
B-110 Cafe'-01 85.5 sqm 73.2 sqm
11.00
B-109 85.6 sqm
A-108 60.8 sqm
Kiosk -03 10.0 sqm
A-204 218.2 sqm
Male Toilet
SSL +6.00 (19.50)
11.00
B-108 73.0 sqm
Wet garbage Dry garbage
11.00
B-204 149.4 sqm
D-205 51.6 sqm
11.00
A-107 61.6 sqm Loading-01 249.0 sqm
14
(13.50)
D-105 254.1 sqm
B-107 179.9 sqm
11.00
B-203 148.7 sqm
Cafe'-06 38.5 sqm
12
Female Toilet
D-204 51.6 sqm
11.00
B-106 179.6 sqm
SSL +6.00 (19.50)
11.00
A-106 221.1 sqm
11.00
B-202 136.3 sqm
11.00
Technical
11.00
1:25
9 10
SSL +6.00 +0.00 (13.50) (19.50)
11.00
13
(13.50)
D-203 43.1 sqm
SSL +6.00 (19.50)
B-201 136.0 sqm
(13.50)
1:25
8
SSL +18.00 (31.50)
11.00
1:25
Male Toilet
7
SSL +18.00 (31.50)
11
D-202 42.1 sqm Kiosk-02 12.2 sqm
Restaurant-03 150.6 sqm
SSL +6.00 (19.50)
A-203 496.0 sqm
11.00
B-105 244.6 sqm
5053.8 m2
Seating area 01 ##### sqm
10
D-201 308.2 sqm
SSL +0.00 (13.50)
A-202 345.0 sqm
11.00
D-104 69.4 sqm
B-104 171.2 sqm
(13.50)
4714.0 m2
11.00
A-201 409.7 sqm
12 1:25
6
Lulu Cinema L08
9 SSL +6.00 (19.50)
Kiosk -01 57.2 sqm
11.00
(9.50)
Toilet
(13.50)
5
FEC L07
11.00
11.00
A-105 40.9 sqm
Technical
SSL-4.00
RESTAURANT - 01 93.5 sqm Female
B-102 40.9 sqm
B-103 158.1 sqm
4
SSL +18.00 (31.50)
SSL +18.00 (31.50)
11.00
11.00
MSU-04 546.0 sqm
Seating area 01 505.6 sqm
SSL +6.00 (19.50)
11
(to parking level)
D-101 D-102 D-103 48.5 sqm 37.2 sqm 42.0 sqm
(13.50)
B-101 109.6 sqm
3
11.00
11.00
A-103 A-104 51.5 sqm 25.7 sqm
MSU-01 651.7 sqm
2
11.00
11.00
A-101 A-102 64.7 sqm 51.5 sqm
O 9.00
11.00
11.00
(9.50)
N 9.00
11.00
11.00
Pedestrian entrance from parking
M 9.00
8 MSU-02 902.7 sqm
10
(to parking level)
SSL-4.00
L 9.00
11.00
11.00
(13.50)
K 9.00
1
7
9 (escapes on parking level)
J 9.00
SSL +18.00 (31.50)
6
6
8
(escapes on parking level)
I 9.00
5 SSL +6.00 (19.50)
7
(13.50)
H 9.00
SSL +18.00 (31.50)
11.00
11.00
5832.7 m2
SSL +6.00 (19.50)
(13.50)
G 9.00
4
Lulu Department Store L02
5
9009.5 m2
F 9.00
SSL +18.00 (31.50)
3
4 Lulu Hypermarket L01
E 9.00
2
SSL +6.00 (19.50)
3
(escapes on parking level)
D 9.00
11.00
11.00
Lulu Office L03
SSL +6.00 (19.50)
C 9.00
1 11.00
1
(13.50)
2
(13.50)
B 11.00
(escapes on parking level)
(13.50)
G
9.00
9.00
UP
D 9.00
DN
C 9.00
UP
B 11.00
DN
A
19
20
21
22
23
24
25
26
A SITE BOUNDARY
B
+19.50 SSL
Kiosk Seating Area
+19.50 SSL
+19.50 SSL
+19.50 SSL
+19.50 SSL
5.70
5.00
+13.50 SSL
+13.50 SSL
11.00
11.00
11.00
11.00
11.00
11.00
11.00
11.00
3.30 4.30
4.30
+8.90 SSL
3.30
7.90 11.00
+5.30 SSL
11.00
11.00
Drop Off
30°
11.00
+5.30 SSL
Restaurant
+13.50 SSL
30°
+8.90 SSL
MEP
Restaurant
+19.50 SSL
11.00
11.00
11.00
11.00
11.00
11.00
11.00
11.00
11.00
11.00
11.00
11.00
E
F
G
+37.50
SSL
+31.50
SSL
+25.50
SSL
H
I
J
K
L
First Floor
+19.50
SSL
Ground Floor
+13.50
SSL
Basement -1
+8.90
Basement -2
+5.30
Internal Road
SSL SSL
+11.50 SSL
Roof +37.50 SSL
11.70
Roof Floor
Third Floor
Second Floor
30°
35°
Lulu Hypermarket
+13.45 SSL
+25.50 SSL
TECH
+0.00 +12.50
Lulu Bounce
M
Loading
Shop
+31.50 SSL
+25.50 SSL
+19.50 SSL
Shop
Roof +37.50 SSL
+31.50 SSL
Shop
MEP
4.30
+25.50 SSL
MEP
3.30
+25.50 SSL
6.85
+25.50 SSL
D
Roof +43.50 SSL
7.60
+25.50 SSL
Restaurant
5.70
Lulu Dept. Store
5.00
2.70
Lulu Office
Restaurant
+31.50 SSL
30°
Lulu Office
Roof +37.50 SSL
+31.50 SSL
5.70
5.00
+31.50 SSL
30°
2.70
+25.50 SSL
+31.50 SSL
5.00
7.80
11.70
+31.50 SSL
Anchor
Roof +37.50 SSL
Roof +37.50 SSL
Cinema
C
SITE BOUNDARY
18
BUILDING LIMIT
17
Main Atrium +13.50 SSL
+8.90 SSL +5.30 SSL
Seating Area +31.50 SSL
BOH
F&B
MSU
+25.50 SSL
MSU
+19.50 SSL
7.94
16
SHOP
3.37
15
7.80
14
5.50
13
5.00
12
5.00
11
5.00
10
4.30
9
3.30
8
5.70
7
5.70
6
+43.50 SSL
5.70
5
BUILDING LIMIT
4
SITE BOUNDARY
3
BUILDING LIMIT
2
BUILDING LIMIT
1
+8.90 SSL
Internal Road
Roof Floor
+37.50
SSL
Third Floor
+31.50
SSL
Second Floor
+25.50
SSL
First Floor
+19.50
SSL
Ground Floor
+13.50
SSL
Basement -1
+8.90
Basement -2
+5.30
SSL SSL
+11.50 SSL
+5.30 SSL
+0.00 +12.50
11.00
9.00
9.00
9.00
9.00
9.00
9.00
9.00
9.00
9.00
9.00
9.00
9.00
Architectural documentation: ground floor, first floor, third floor, long section and trans section. Original scale 1:200
...
KOYAMBEDU_18
Interior concept. Diagrams, mood boards and interior renders produced by the team.
CV+Portfolio /// Rafael A. Berral Zurita •••• pag 9
•••• DESIGN INTERNATIONAL LONDON
Al Araimi Walk / @Barka (Oman). Shopping centre / Mixed use. GLA 99.000 m2. 2017-2018-2019 scheme
key information year responsability role of the firm phases
project description +2017-2018-2019 +team leader +leasing architect. +concept, sd, dd and tender. +artistic supervision during dd.
project timeline concept
sd
dd
cd roles: team leader bim coordinator architect auxiliar
3
4
6
1
team members:
works developed Floor plans design
Interior Design Hand sketching BIM modelling 3d modelling construction details team leading and organization coordinationg with consultants
...
BARKA_17.18.19
Facade Design
pag 10 ••••CV+Portfolio /// Rafael A. Berral Zurita
On Al Araimi Walk Project I coordinated a multidisciplinary team. We developed the concept following continuous instructions from the client and, once it was fully accepted, I led the project during the coordination phase with the different local consultants (architects, MEP, structures, traffic, fires, etc). During the process I travelled in many occasions to Muscat (I followed this project in parallel to my work in Al Araimi Boulevard) to carry out frequent workshops with consultants. That way, I could contribute to sort out problems by identifying issues and implementing changes in the project/design to solve them. When the DD was completed and before the tender phase, we carried out a value engineering process. Besides management and coordination tasks, I developed many documents (mainly facade and skylight construction details and diagrams) as well as I headed and supervised all construction documents developed by the rest of the team.
Al Araimi Walk Commercial Centre @ Barka (Oman) ••••
Typical main elevation Original scale 1:100
Typical facade case alucobond arches) Original scale 1:50
Typical arch diagram Original scale 1:100
Typical detail sections alucobond arches) Original scale 1:20
Walls Construction details (floor plans) Original scale 1:10
...
BARKA_17.18.19
Typical facade case (LED screen arches) Original scale 1:50
CV+Portfolio /// Rafael A. Berral Zurita •••• pag 11
•••• DESIGN INTERNATIONAL LONDON
Ground Floor Original scale 1:100
Typical trans section Original scale 1:200
...
BARKA_17.18.19
Coordination with MEP engineers Sketch during work process. How MEP provides fresh ir in GF
BIM Model LOD 300
pag 12 ••••CV+Portfolio /// Rafael A. Berral Zurita
Coordination with MEP engineers (BIM Model) LOD 300
BIM Model LOD 300
Al Araimi Walk Commercial Centre @ Barka (Oman) ••••
Typical long section Original scale 1:200
Typical skylight structure details Different scales
Skylight 3d scheme Original scale 1:100
Typical skylight section Original scale 1:50
BARKA_17.18.19
Balustrade construction details Original scale 1:50
Balustrade construction details Original scale 1:10
...
Interior construction section Original scale 1:50
Internal features construction details Original scale 1:50
CV+Portfolio /// Rafael A. Berral Zurita •••• pag 13
•••• DESIGN INTERNATIONAL LONDON
Al Araimi Bolulevard / @Muscat (Oman). Shopping centre. GLA 70.400 m2. 2017-2018 scheme
key information year responsability role of the firm phases
project description +2017-2018 +architect. +leasing architects. +artistic supervissor. +dd, tender and cd.
project timeline concept
sd
dd
cd roles: team leader bim coordinator architect auxiliar
3
1
team members:
works developed
Facade Design Interior Design Retail coordination BIM modelling 3d modelling construction details team leading and organization coordinationg with consultants
...
BOULEVARD_17.18
Floor plans design
pag 14 ••••CV+Portfolio /// Rafael A. Berral Zurita
Al Araimi Boulevard came to Design International straight after the DD phase. The design concept and the previous stages were developed by a company not specialized in shopping centres. Because of this, the client required a specialized team to complete the work and develop a feasible leasing proposal, as well as the corresponding documentation of shop front criteria. Together with local consultants, we also developed budget evaluation and value engineering tasks. Some of the most successful ideas of the project, such as the inclusion of external retail pavilions (restaurants) were proposed by us after the DD stage. We also developed several indicative tenant plans (ITP) as requested by client. During the leasing process, the retail units were modified following the request of the leasing team. From January to September of 2018 I travelled in many occasions to Muscat to monetarize the construction process and suggest ideas regarding the quality of the interior of the building.
Al Araimi Boulevard Commercial Centre @ Muscat (Oman) ••••
Site pictures July 2018
Interior concept Developed by Kaosys.
...
BOULEVARD_17.18
Retail proposal Original document published in the retail catalogue
CV+Portfolio /// Rafael A. Berral Zurita •••• pag 15
•••• CCDI BEIJING / CHINA TELECOM AMERICAS
Yachay/ @Ecuador. 19 projects. 2015 scheme
project description
key information year responsability role of the firm phases
+2015 +site architect. +external consultants. +construction auditory.
project timeline concept
sd
dd
cd roles: team leader bim coordinator site architect auxiliar
team members:
works developed Site monitoring Budget revision Project scheduling Auditory
...
YACHAY_15
pag 16 ••••CV+Portfolio /// Rafael A. Berral Zurita
Yachay is a prototype of Intelligent / Educational city developed in Ecuador. On this project I worked for a joint Venture composed by different Chinese firms (CCDI, CTA, SINOHYDRO) to develop a public assignment in Ecuador. I had a four-month assingment in Quito to study the feasibility of 19 projects in Yachay and to check the site works processes. My role included visits to construction site, meetings with contractors, project reviews and budget analysis and planification.
19 projects in “Ciudad del conocimiento” @Yachay (Ecuador) ••••
Render of the Yachay Auditorium, one of the 19 projects audited
...
YACHAY_15
Site pictures of the Yachay Auditorium, one of the 19 projects audited
CV+Portfolio /// Rafael A. Berral Zurita •••• pag 17
•••• CCDI BEIJING
Retirement home/ @Beijing. Nursing home. 124.000 m2. 2013-2014-2015 scheme
project description
key information year responsability role of the firm phases
+2013-2014-2015 +bim coordinator, team leader, auxiliar architect (during dd and cd). +leading architects. +concept and sd, dd and cd (auxiliar role).
project timeline concept
sd
dd
cd roles: team leader bim coordinator architect auxiliar
2
3
4
team members:
CCDI is one of the largest construction firms in China. I was part of its Beijing branch, being a team member of a department specialized in public buildings. My team was composed of a Chinese Manager and a local Team Leader. After the trial period, my role was to accompany the Team Leader as the second project responsible as well as sharing with her the production and team management tasks. The team was usually composed by 8 people. This building is the first project of its kind funded by private developers in China. It is as well the first concept that I developed for CCDI: I led it during its initial stages and proposed the layout (which is designed following three phases of construction). I also proposed different options and material compositions for the façade, developed the concept and specifications for the interior space, etc. As the building is specialized in hosting patients with Alzheimer’s disease, we followed the guidelines of foreigner specialized consultants, who we met in several workshops. In the DD phase the project was led by CCDI Technical Department. However, I was supervising the BIM model during both SD and DD.
works developed
SENIORS_13.14.15
Floor plans design Facade Design Interior Design Hand sketching BIM modelling 3d modelling construction details team leading and organization coordinationg with consultants
...
pag 18 ••••CV+Portfolio /// Rafael A. Berral Zurita
Concept diagrams
Retirement Home@Beijing (China) ••••
Masterplan Original scale 1:200
Ground Floor Plan Original scale 1:300
Exterior elevation Original scale 1:300
Interior Concept SketchUp (modeled by me)
Exterior elevation Original scale 1:300
SENIORS_13.14.15
Patients´room interior layout Original scale 1:50
...
CV+Portfolio /// Rafael A. Berral Zurita •••• pag 19
•••• CCDI BEIJING
Primary School/ @Taihu. School complex. 119.250 m2. 2013-2014-2015 scheme
project description
key information year responsability role of the firm phases
+2013-2014-2015 +team leader, architect. +leading architects. +concept, sd and dd. auxiliar during cd.
project timeline concept
sd
dd
cd roles:
This project was funded by the local government of Taihu. Due to Chinese Public Buildings inputs, we had to use cost-saving construction systems. This was a strong challenge, as the client was particularly interested in us achieving an emblematic and iconic result. In this project I shared the leadership responsibilities with the Team Leader, who took over the DD phase next to the Technical Department of CCDI. However, I remained linked to it until almost the end of the construction stage. Facade design as well as most of the production of floor plans and 3D were my responsibility. I also supervised the production of facade details when it was being developed by CCDI Technical Department.
team leader architect auxiliar
2
3
4
team members:
works developed
Facade Design Interior Design Hand sketching BIM modelling 3d modelling construction details team leading and organization coordinationg with consultants
...
XUEXIAO_14.15.16
Floor plans design
pag 20 ••••CV+Portfolio /// Rafael A. Berral Zurita
Elevations Original scale 1:200
Primary School@Taihu (China) ••••
Built project picture
Render
Built project picture
Render
Render
School floor plans Original scale 1:200
...
School Masterplan Original scale 1:200
XUEXIAO_14.15
Sections Original scale 1:200
CV+Portfolio /// Rafael A. Berral Zurita •••• pag 21
•••• CCDI BEIJING
Grand Hyatt Hotel/ @Jinmao. Hotel. 25.120 m2. 2013-2014 scheme
project description
key information year responsability role of the firm phases
+2013-2014 +team member, architect. +leading architect +sd, dd and auxiliar in dd.
project timeline concept
sd
dd
cd
The concept for this hotel-village was originally designed by the Team Leader. However, I oversaw the team during the production of the SD and, once it was completed, I joined the Technical Department during the DD phase. This experience gave me the chance to become familiar with CCDI’s technical production standards. I produced several construction details (1:20 / 1:50). Although coordination with consultants was not my responsibility, I highly contributed during the process. After the DD and tender phases I had many chances of visiting the construction site to follow the building process and the realisation of the interior finishes.
roles: team leader architect auxiliar
3
8
6
team members:
works developed Floor plans design Facade Design
Hand sketching BIM modelling 3d modelling construction details team leading and organization coordinationg with consultants
...
JINMAO_13.14
Interior Design
pag 22 ••••CV+Portfolio /// Rafael A. Berral Zurita
Site plan render
Grand Hyatt Hotel@Jinmao (China) ••••
General sections Original scale 1:200
Built project pictures
Hotel Masterplan Original scale 1:200
Interior construction section Original scale 1:50
...
Construction process pictures
JINMAO_13.14
Interior construction section Original escale 1:50
CV+Portfolio /// Rafael A. Berral Zurita •••• pag 23
•••• ORTIZ LEÓN MADRID
Iberia Headquarters/ @Madrid. Offices building. 42.000 m2. not built. 2011-2012 scheme
description
key information year responsability role of the firm phases
+2011-12 +junior achitect. +leading architects +concept, sd, dd and cd.
project timeline concept
sd
dd
cd roles:
Ortiz León (Madrid) was the first company in which I worked as an architect. During the two years I contributed to several projects and competitions. Specifically, in the Iberia Headquarters I was a team member during all the phases of the project, from the competition stage to the elaboration of the building documentation. Although I worked as a junior architect, I was integrated in a team among several seniors. Thanks to this, I learned not only about how the project was coordinated, but many other standardized processes that were taking place in the office. We completed the entire construction documentation (CD). However, the project was never built due to the economic situation.
junior architect
3
5
8
1,5
team members:
works developed Floor plans design Facade Design Interior Design
IBERIA_13.14
Hand sketching BIM modelling 3d modelling construction details team leading and organization coordinationg with consultants
...
pag 24 ••••CV+Portfolio /// Rafael A. Berral Zurita
Typical Section + Concept diagrams This project was developed until CD. The documenation on these pages comes from the concept stage (competition), as the rest is subject to confidentiality clauses
Iberia Headquarters@Madrid (Spain) ••••
Ground floor Original scale 1:200
Long/Trans sections Original scale 1:200
Second Floor Original scale 1:200
IBERIA_13.14
...
CV+Portfolio /// Rafael A. Berral Zurita •••• pag 25
•••• CCDI BEIJING
Secondary projects & competitions/ @CCDI Beijing. International Airport Center/ @CCDI Beijing. Not built. Project timeline
Year 2013 Location Qingdao. Works Sketch Up Model. Concept idea.
Project timeline concept
sd
dd
cd roles: architect
Competition that finally was not awarded to CCDI.
Hefei Courtyard villas/ @CCDI Beijing. Not built. Project timeline
Year 2012-13 Location Shantou Works Concept idea. 3D model.
Project timeline concept
sd
dd
cd roles: architect
Concept idea requested by a local developer.
RANDOM_CCDI_13.14.15
Hospital @CCDI Beijing. Built. Project timeline
Year 2015-16 Location Glasgow Works Concept idea. Floor plans. 3D model.
Project timeline concept
sd
dd
cd roles: team leader architect
Competition that we were awarded and developed until the end of SD. DD stage was developed by the Technical Department of CCDI.
...
pag 26 ••••CV+Portfolio /// Rafael A. Berral Zurita
CCDI BEIJING ••••
Tianjin Sino-Canadian Ecological Exhibition & Reception Center/ @CCDI Beijing. Built. Project timeline
Year 2015 Location Tianjin Works Diagrams. Conceptual SketchUp model.
Project timeline concept
sd
dd
cd roles: architect
I was involved during most of the Concept Stage, designing the primary volume and conceptual idea.
Nanotechnology Centre/ @CCDI Beijing. Not built. Project timeline
Year 2013-14 Location Beijing Works Floor plans. 3D model.
Project timeline concept
sd
dd
cd roles: team leader architect
Competition and Schematic Design that we developed in collaboration (as local architects) of the german firm HENN. I worked for four months on this project.
Project timeline
Year 2013-14 Location Hangzhou Works Floor plans. 3D model. Facade.
Project timeline concept
sd
dd
cd roles: architect
Development of floor plans and facade during Concept stage and SD.
...
RANDOM_CCDI_13.14.15
Biochemistry Centre/ @CCDI Beijing. Not built.
CV+Portfolio /// Rafael A. Berral Zurita •••• pag 27
•••• ORTIZ LEÓN MADRID
Projects as Junior Architect/ @Ortiz-Leon. Madrid. Built. Scottish Power Headquarters/ @Glasgow. Offices. Built. Profile
Year 2012-13 Location Glasgow Works Floor plans. 3D model. BIM.
Project timeline concept
sd
dd
cd roles: architect bim user
Headquarter for Scottish Power firm in Glasgow. Project developed next to local firm Page & Park. I had an important role in the production of the BIM model, which was developed for the first time in Ortiz-León. I was sponsored in a 60 hours Revit course.
Edificios en Manoteras/ @Madrid. Offices. Built. Profile
Year 2012 Location Madrid Works Floor plans. Details. BIM.
Project timeline concept
sd
dd
cd roles: junior architect bim user
On this project I worked during the latest stages, producing the BIM model and implementing several modifications. I also elaborated sections and construction details.
VARIOS_OL_11.12.13
José Abascal 56/ @Madrid. Facade rehabilitation. Built. Profile
Year 2012 Location Madrid Works Design. Details. 3D model. Images.
Project timeline concept
sd
dd
cd roles: architect (1 person)
Competition that I developed individually.
...
pag 28 ••••CV+Portfolio /// Rafael A. Berral Zurita
SELF-PROMOTED PROJECTS AND COMPETITIONS ••••
Self-promoted projects and competitions. Torre en el Calderón/ @Madrid. Mixed use. Project timeline
Year 2015 Location Madrid Works Architect. Design. 3D.
Project timeline concept
sd
dd
cd roles: freelance
Architectural high-rise proposal designed to replace Vicente Calderón Stadium. PUBLISHED: https://www.huffingtonpost.es/rafael-berral-zurita/una-torre-para-elsolar-del-calderon_b_7231834.html
RE-Barceló/ @Madrid. Facade rehabilitation. Project timeline
Year 2015 Location Madrid Works Architect Graphic. 3D.
Project timeline concept
sd
dd
cd roles: freelance
Design rehabilitation for an iconic failed building in Madrid City Centre. PUBLISHED: https://somosmalasana.elperiodico. com/tatuar-las-paredes-del-mercado-de-barcelo/
SELF_PROMOTED_15
Leganitos Chinatown/ @Madrid. Urban intervention. Project timeline
Year 2015 Location Madrid Works Concept. Graphic. Urban idea.
Project timeline concept
sd
dd
cd roles: freelance
...
Urban proposal to create an iconic Chinatown style-intervention in Madrid Asian neighbourhood. PUBLISHED: https://www.huffingtonpost.es/ rafael-berral-zurita/un-chinatown-en-madrid_b_6659232.html
CV+Portfolio /// Rafael A. Berral Zurita •••• pag 29
if you want to check out some older and more personal work, please, go to: https://issuu.com/rafaelbezu87/docs/pfc if you would like more info about any of the described projects, please, contact me.
THANK_YOU
...
pag 30 ••••CV+Portfolio /// Rafael A. Berral Zurita
THANK_YOU
THANK YOU for your time. Rafael. Please contact me at rafaelberralzurita@gmail.com +44(0)7729256012
...
CV+Portfolio /// Rafael A. Berral Zurita •••• pag 31