Selected Works

Page 1

RAHUL GHERA

2017


RHODE ISLAND SCHOOL OF DESIGN MASTER OF ARCHITECTURE, 2017

UNIVERSITY AT BUFFALO BACHELOR OF SCIENCE IN ARCHITECTURE, 2015 MINOR IN ENVIRONMENTAL & URBAN DESIGN

FREELANCE EXPERIENCE


AFFECTING THE CITY TENSE_COMPRESS CONFESS SOUTHLIGHT SENSING BATHS MURMURATIONS

THE WEL DEFYING THE HORIZONTAL CONCRETE ARCH

SENSITIVE RESPONSE THE WRONG GALLERY BITTERTANG _ WARM UP PENGUIN EXHIBIT



PRIMARY ADVISOR: ERIK CARVER SECONDARY ADVISOR: AARON FORREST THESIS COORDINATOR: JONATHAN KNOWLES

AFFECTING THE CITY

DATE: PRESENT

- 04 -


NETWORKING

CONNECTIVE


THE

CITY

TISSUES




PANOPTIC

JAIL

TH E JA I L

CASINO

THE THE JAIL JAIL

HIGH CORRECTIONAL

HIGH CORRECTIONAL

REHAB

HIGH CORRECTIONAL

HIGH CORRECTIONAL

SURVEILLANCE SURVEILLANCE SURVEILLANCE SURVEILS J J J BANKINGBANKING A BANKING A BANK A I R FLOORS I R FLOO IR R FLOORS R FLOORS L E RELAX L E REL LE E RELAX E RELAX THE THE CASINO CASINO

I S OL C AT ION CENTER

TH E C ASI NO

I S OL C AT ION CENTER

I S OL C AT ION CENTER

H E AT H E AT H E AT H E AH A SLEEP A SLEEP A SLEEP A SLEA B PLAY B PLAY B PLAY B PLA B

GROUP THERAPY GROUP THERAPY GROUP THERAPY GROUP TH G

TOURIST TOURIST TOURIST TOURT

WELCOMEWELCOME CENTER WELCOME CENTER WELCOME CENTER W

POST WALL POSTST.WALL POSTST.WALL POSTST.WA OPPORTUNITIES OPPORTUNITIES OPPORTUNITIES OPPORTUO


HIGH CORRECTIONAL

HIGH CORRECTIONAL

SURVEILLANCESURVEILLANCE J J BANKING A BANKING A R FLOORS IR FLOORS I E RELAX LE RELAX L

I S OL C AT ION CENTER

I S OL C AT ION CENTER

H E AT H E AT A SLEEP A SLEEP B PLAY B PLAY

GROUP THERAPY GROUP THERAPY

TOURISTTOURIST

WELCOME CENTER WELCOME CENTER

POST WALL ST. POST WALL ST. OPPORTUNITIESOPPORTUNITIES



FACULTY: JONATHAN KNOWLES & BRETT SCHNEIDER PROGRAM: HIGH PERFORMANCE WALL DATE: OCTOBER 2016

TENSE_COMPRESS

COLLEAGUES: XICHEN QUE & AMELIA MILLAN

- 18 -


A WALL BASED SOLELY ON TENSION AND COMPRESSION.

VAPOR BARRIER INTERIOR FINISH

HORIZONTAL STRUT

AIR CAVITY

CELLULOSE INSULATION

STRAPPING

DIAGONAL STRUT

EXTERIOR FINISH WEATHER BARRIER

T BEAM L BEAM


8’ - 0”

1’ - 8”

8’ - 0”

1’ - 8”

G

R

I

D

B

R

A

C

E

C

L

I

P


ESTCODE

E

ESTCODE

D

ESTCODE

A

ESTCODE

C ESTCODE

A

FABRIC PLAN FABRIC PLAN = 1’ - 0” 1SCALE: 1/2” =11’1/2” - 0”

FABRIC ELEVATION FABRIC ELEVATION = 1’ - 0” 1SCALE: 1/2” =11’1/2” - 0”

ESTCODE

F

RAINSCREEN PLAN RAINSCREEN PLAN = 1’ - 0” 1SCALE: 1/2” =11’1/2” - 0”

RAINSCREEN ELEVATION RAINSCREEN ELEVATION = 1’ - 0” 1SCALE: 1/2” =11’1/2” - 0”

&


PERFORATED ALUMINUM RAINSCREEN PERFORATED ALUMINIUM RAINSCREEN

1/8” ALUMINIUM CHANNEL

1/4” BOLT

WEATHER BARRIER WEATHER BARRIER

1/8” ALUMINUM CHANNEL

1/4” BOLT

1/8” ALUMINUM CHANNEL

1/8” ALUMINIUM CHANNEL

ESTCODE

EXTERIOR CONNECTION DETAIL 12” = 1’ - 0” EXTERIOR CONNECTION DETAIL SCALE: 12” = 1’ - 0”

FABRIC CLAMP 1/8” ALUMINUM CHANNEL NEOPRENE SPACER 1/4” BOLT 1/16” ALUMINUM CLAMP 1/16” ALUMINIUM CLAMP

1/4” BOLT

NEOPRENE SPACER

WEATHER RESISTANT FABRIC WEATHER RESISTANT FABRIC

1/8” ALUMINIUM CHANNEL

WEATHER BARRIER

FABRIC CLAMP

WEATHER BARRIER

EXTERIOR CONNECTION DETAIL 12” = 1’ - 0” EXTERIOR CONNECTION DETAIL SCALE: 12” = 1’ - 0”

D

E

T

A

I

L


$ 1 0 0 /

S Q . F T .

19-1/4 16

LIVING ROOM

10

Livingroom

3

4

4

5

UP

BAT H R O O M

Bathroom

Closet

B E D R O O M / O Bedroom F F I C / E

9-3/4

D I Dinning N I N G

Workroom

F IR ST

F LO OR

First Floor

31-1/4

KITCHEN CORE Kitchen Core WA LL Wall

28

CLOSET

8-1/4

Up


H

O

M

E

19-1/4 16

B E D R O O M

10

Bedroom

CLOSET

Closet

Bathroom

CLOSET Closet

DOWN Down

B E D R O O M Bedroom

SE C OND F LO OR Second Floor

28

MEP

MEP

31-1/4

8-1/4

BAT H R O O M C ORE Core WA WallL L


P

A

S

S

I HIGH PERFORMANCE HOUSING CASE STUDY NO.1

V

E HIGH

CAS

ADVISOR:

ADVI

DESIGNERS:

DESI

JONAT

JONATHAN KNOWLES

AMEL XICHE RAHU

AMELIA MILAN XICHEN QUE RAHUL GHERA

FEB

FEBUARY 21, 2017

SOUTH FACADE

WES

SCALE: 1’ - 0” = 3/8”

SCAL

A 201

E L E V A T I O N

HIGH PERFORMANCE HOUSING CASE STUDY NO.1

CAS

ADVISOR:

ADVI

DESIGNERS:

DESI

JONATHAN KNOWLES

JONAT

AMELIA MILAN XICHEN QUE RAHUL GHERA

AMEL XICHE RAHU

FEBUARY 21, 2017

FEB

CROSS SECTION A

LONGI

SCALE: 1’ - 0” = 3/8”

SCAL

A 301

S E

C

T

HIGH

I O

N


H

O

M

E



FACULTY: JONATHAN KNOWLES & BRETT SCHNEIDER PROGRAM: CONFESSIONAL DATE: DECEMBER 2016

CONFESS

- 12 -


CONFESSING, THE ACT OF ADMITTING TO ONE’S SINS.

E X T E R I O R

A religious practice developed, allowing men and women to atone for their sins. Usually conducted within a confessional box, booth, or reconciliation room.


W

E

A

V

E


WHO IS REALLY LISTENING? COULD IT BE ANYONE?

I N T E R I O R

This architecture allows for complete anonymity between the user confessing and the user listening. Thus empowering the autonomy of confessing personal experiences.


P

L

E

A

T



LEADERS: AARON FORREST, YASMIN VOBIS, LAURA BRIGGS, JONATHAN KNOWLES, ELETTRA BORDONARO, BRETT SCHNEIDER, KATY FOLEY & JAMES BARNES PROGRAM: PERFORMANCE PAVILION DATE: JUNE 2016 AWARDS: AIA RI - 2016 MERIT AWARD AIA RI - 2016 PEOPLE’S CHOICE 2017 dbXchange AWARD, HONORABLE MENTION COLLEAGUES: SINA ALMASSI, YIN FU, SARP ARDITI, DANIEL STONE, QI AN, GENEVIEVE MARSH, FEIYI BIE, NATASHA RUIZ, XICHEN QUE, WILLIAM GANT, MARCO AGUIRRE & GIAN VILLARUEL

SENSING BATHS

ROLE: MEDIA, FUNDRAISING, EVENT PLANNING & OUTREACH COORDINATOR PROJECT PARTNERS: ULTRAMODERNE, RISD DEPT. OF ARCHITECTURE & DEPT. OF LANDSCAPE ARCHITECTURE, CITY OF PROVIDENCE DEPT. OF ARTS, CULTURE & TOURISM, L.I.S.C., RI HOUSING, SOUTH SIDE CULTURAL CENTER, SHAWMUT, ART PLACE AMERICA & SOCIAL LIGHT MOVEMENT PHOTOGRAPHY: NAHO KUBOTA

- 26 -


SouthLight, serves as soft program for residents in the surrounding neighborhood. The urban lawn interrupts a series of parking lots in the area, providing the community a space for interaction.



AN &

OPEN

PERF


FORMANCE URBAN

VENUE LAWN


The design reconfigures a greenhouse kit, consisting of translucent polycarbonate panels, allowing the open-plan pavilion to gently glow throughout its use.




FACULTY: LAURA BRIGGS & STUART BLAZER PROGRAM: BATHHOUSE DATE: FEBRUARY 2016 TRAVEL STUDIO: PORTUGAL

SENSING BATHS

- 34 -


SENSING BATHS IS DESIGNED TO HEIGHTEN SENSORY-BASED NAVIGATION. The circulation is based solely on sound, touch, smell, and taste, guides the user through the bathhouse. Suspended panels diffuse light and neighboring imagery, blending the boundaries between each user, providing for a neutral space.

GLASS FACADE SKYLIGHT SCREEN

SCREEN PANEL OPAQUE PANEL STRUCTURAL WALL TUB ROOM LOCKERS SAUNA CAFE MAIN POOL MID POOL TEA GARDEN YOGA ROOM

OUTDOOR POOL FAMILY POOL


YO GA

TEA

FA M I LY


FUNCTIONAL USES ARE EMBEDDED WITHIN THE POCHE' OF THE WALLS. Wrapping the length of the building is a curtain wall, spanning eighteen feet high, along with a slatted screen system which acts as a shading mechanism and as panels that open the space for more public occasions.

4

5

6

9

8 10 2 3

7

1

1. cafe, 2. lockers, 3. sauna, 4. tub room, 5. main pool, 6. mid pool, 7. family pool, 8. tea garden, 9. yoga room, 10. outdoor pool

N


L O C AT I O N

L A Y O U T

FUNCTION



FACULTY: KYNA LESKI PROGRAM: OBSERVATION TOWER DATE: DECEMBER 2015

MURMURATIONS

- 40 -


CAN ARCHITECTURE BREATHE SIMILAR TO OUR LUNGS? The layers of our lungs are responsible for balancing pressure within and outside of our body. Can an atrium perform the same way? The program of an observation tower and stairwell merge as naturally as the anatomical composition of our lungs.

I N F L A T E

D E F L A T E


T R A C K I N G

MURMURATION STARLINGS FOLLOW 5-7 BIRDS IN THEIR PERIPHERALS, IN ORDER TO MAKE QUICKER, SWIFTER MOVEMENTS. THIS CREATES A NETWORK WITHIN THE FLOCK

The network of links push and

M A P P I N G

SHUTTLE DROP pull one another, causing the AS THE PAPER DROPS, IT’S NETWORK OF LINKS shuttle to ANOTHER, collapse COLLAPSING on itself, IN ON PUSH AND PULL ONE ITSELF, THEN CATCHING AIR AND EXANDING, till it catches air and breathes. SIMILAR TO THE MOTION OF A SPRING. TRANSLATED AS BREATHING

MURMURATION

STARLINGS FOLLOW 5-7 BIRDS IN THEIR Starlings follow 5-7 birds in their PERIPHERALS, IN ORDER TO MAKE QUICKER, SWIFTER MOVEMENTS. THIS CREATES A NETWORK peripherals, in order to make WITHIN THE FLOCK quicker, swifter movements. This develops hundreds of networks within the flock.


The layers of wire are translated into surfaces. The form and tectonics of the tower mimic those of our lungs. Binary circulation areas wrap around the observation core, providing for fluid air flow.




FACULTY: ANNETTE LECUYER PROGRAM: ARTIST COLONY DATE: DECEMBER 2014 COLLEAGUE: ANDRE ASSIS

THE WEL

- 46 -


BALANCING PRIVACY AND EXPOSURE IN AN URBAN ARTIST COLONY. The site cast concrete building, like a daylight factory, has a robust industrial character. Panels of stainless steel mesh veil the north and south faces of the atrium, providing artists with privacy, while allowing views into the public realm. The Allen St. facade, the more open residential facade, is defined by an exposed site case concrete wrapper and recessed glazing.

GROUND FLOOR

THIRD FLOOR


W

E

S

T

N

O

R

T

H


A SKY LIT ATRIUM DRAWS USERS TO THE HEART OF THE BUILDING. Open stairs crisscross the central void, so that artists pass back and forth through the atrium as they move between their dwellings and workspaces.

R E S I D E N C E

A T R I U M

S T U D I O




FACULTY: NEREA FELIZ & DENNIS MAHER PROGRAM: OBSERVATION TOWER DATE: JULY 2014 TRAVEL STUDIO: BARCELONA

DEFYING THE HORIZONTAL

- 52 -


INVERTING MIES. The users experience shifts from a heavy, horizontal plinth, to fragile vertical mesh. The tower exposes thin scaffolding members that currently structure the deceiving plinth and walls.

L AYERED

F R A G M E N T S

PAT H S

R E P E T I T I O N

S

C

A

F

F

O

L

D



E T I S

Curtains made of metal chain-link and glass crystals, are suspended from an extruded steel frame, along with an intersecting catwalk and stairwell.




FACULTY: CHRISTOPHER ROMANO PROGRAM: CONCRETE SHELTER DATE: MAY 2012 COLLEAGUES: ALEXANDRA N COOP, MATTHEW DELLEHUNT, RYAN HUGHES, EDGAR MARTINEZ, GIOVANNI PEREZ & PETER URBAN

CONCRETE ARCH

- 58 -


THIS INSTALLATION SPANNED 30 FT ACROSS OUR STUDIO, STANDING 11 FT HIGH. The raw studio space became the formwork for casting each beam. A custom wood member was cast within the beam in order to act as a joint, smoothly connecting each beam during installation. A highly refined aggregate mixture reduced weight per beam by 35%.


J O I N E R Y

FORMWORK

1-2-3


S1: S2: S3: S4: S5:

LIFT. ALIGN. FASTEN. REPEAT. POLISH.




FACULTY: RAHUL GHERA PROGRAM: WINTER ELECTIVE STUDIO DATE: FEBRUARY 2017 STUDENTS: ALEXANDRIA CLAY, JOY LU, KEVIN LEE, NABIL BURIAS, ROHAN CHAURASIA, ROCHELLE GATUS, LISA GROENE, KAREN JIANG, VAL NGUYEN, GRACE OH & KATIE SOLIEN

SENSITIVE RESPONSE

- 64 -


TEXTUALIZING

SPATIALLY

MANIFESTED

THROUGH


Y

H

INDUCED

EMOTIONS

INSTALLATION



CURATORS: AMELIA MILLAN & RAHUL GHERA GRAPHIC DESIGNER: XICHEN QUE DATE: FEBRUARY - MAY 2017 LOCATION: 41.822387, -71.412150 FLETCHER BUILDING, ROOM 300 PROVIDENCE, RI 02903

THE WRONG GALLERY

- 68 -


Contemporary art galleries have worked effortlessly to make art more accessible.

whom? rendered a n o n y m o u s . By exposing graduate student work through a series of choreographed approaches, we aim to blur the gap between We The

ask, to user group is

artist - art - user.

Wrong Gallery intends to establish an interactive approach between the two parties.


REST RO O M

G GALL ERY 300

3’

7.5’

E

5 .5 ’

E

E

2’

RM 3 0 0

E

4’

12’

12’

P 8 ’ p ly w o o d w a l l p ly w o o d s ta i r s

12’

monitor with CCTV feed

8’

E

electrical unit

COR R ID O R

P

power switch

E

electrical unit (above) peep-hole

E L E VATOR

security camera



DESIGNER: BITTERTANG FARM DATE: MAY 2016 LOCATION: MOMA PS1 LONG ISLAND CITY, NY EVENT: WARM UP COLLEAGUES: MICHAEL LOVERICH, ADAM FELDMAN & MOMA PS1 INSTALL CREW

BITTERTANG _ WARM UP

- 72 -





COMPANY: CANNON DESIGN PROGRAM: AQUARIUM OF NIAGARA PENGUIN EXHIBIT DATE: JULY 2015 LOCATION: 701 WHIRLPOOL ST, NIAGARA FALLS, NY 14301

PENGUIN EXHIBIT - 76 -


Penguin Exhibit 701 Whirlpool St, Niagara Falls, NY 14301

04726.01 DESIGN DEVELOPMENT SUBMISSION AUGUST 10, 2015 NOT FOR CONSTRUCTION

2170 Whitehaven Road Grand Island, New York 14072 T: 716.773.6800 F: 716.773.5909

BOSTON NEW YORK BALTIMORE WASHINGTON DC BUFFALO TORONTO MONTREAL PITTSBURGH CHICAGO ST. LOUIS VANCOUVER SAN FRANCISCO LOS ANGELES PHOENIX MUMBAI ABU DHABI Consultants:

8/25/2015 10:16:50 AM C:\Revit Local Files\AON_AR_2015_rghera.rvt

© Cannon Design 2015 All rights reserved. No part of this document may be reproduced or utilized in any form, without prior written authorization by The Cannon Corporation.

Hall Aquatic Design Life Support Systems Atlanta, Georgia 30313 678-873-7401

6 VIEWING WINDOW EXHIBIT POOL 102A

EXHIBIT CORRIDOR 106

Aquarium of Niagara

1" ACRYLIC PANEL R2

BACKER ROD

SEAT SURFACE [VARIES] 2'-0 1/2"

GRADING LEVEL 15'-10 1/2"

NON SHRINK GROUT

FRP RAILING

METAL SUPORT ANGLE FRAME 3' X 3' X 3/8"

2'-6"

R1 2" METAL DECK

VIEWING WINDOWS

GRADING LEVEL 15'-10 1/2"

2170 Whitehaven Road Grand Island, New York 14072 T: 716.773.6800 F: 716.773.5909

R1 4" X 4" METAL SUPPORT ANGLE

LEVEL 01 11'-0"

WATER LINE

CAST IN PLACE CONCRETE

8

Penguin Exhibit

QUARANTINE 105 SHOTCRETE ROCKWORK

SHOTCRETE ROCKWORK

VIEW WINDOW JAMB DETAIL AT ROCK WALL

2

1 1/2" = 1'-0"

POOL

CONCRETE RAMP 12" WIDE

BENCH SECTION DETAIL

Hall Aquatic Design Life Support Systems Atlanta, Georgia 30313 678-873-7401

POOL

3/4" = 1'-0" CONCRETE STAIRS BEYOND LEVEL 01 11'-0"

4" GROUT FILL EXISTING CONCRETE SLAB

HOT DIPPED GALVANIZED METAL RAILING SYSTEM

TYP. QUARATINE POOL/FLOOR DETAIL

7

3/4" = 1'-0"

PARAPET 29'-1"

2'-10"

INSULATED METAL FRAMED SKYLIGHT OBSERVATION DECK 207

LEVEL 02 - ROOF 26'-8"

EXISTING ROOF SLAB

COMPOSITE DECK AND SUPPORTS

DUCT LOUVER

COMPOSITE DECK AND SUPPORTS EXISTING DECK SEE PLANS

EXISTING DECK SEE PLANS

BEAM BEYOND

4" METAL STUD

2

EXHIBIT 108

5/8" GYPSUM BOARD 4'-8"

4' X 4' X 1/4" METAL ANGLE SUUPPORT BRACE AT 4' O.C.

STEEL TUBE RE STRUCTURAL

SKYLIGHT SECTION

1

NOT FOR CONSTRUCTION

R2

3/4" = 1'-0"

NESTING BOX

HVAC DUCT WORK 34" X 12"

EXHIBIT 108

5 A0402

SS PLATE BEYOND

2' X 2' X 1/8" ANGLE FRAMED NESTING BOX SUPPORT

ACRYLIC PANEL BEYOND 1

4'-6"

EXHIBIT POOL 102

EXHIBIT CORRIDOR 106

PASSAGE 103

STEEL DECK RE STRUCTURAL

3" ACRYLIC PANEL

8'-10"

EXHIBIT POOL 102

STEEL TUBE RE STRUCTURAL MASONRY RE STRCTURAL & A0201

WATER FEATURE

ROCKWORK BEYOND

2'-4"

SS TUBE

WATER LINE

R2

GRADING LEVEL 15'-10 1/2"

ROCKWORK BEYOND R2

WATER LINE

R1

FIBERGLASS DECKING STEEL BRACE

WATER LINE

POOL

POOL

-

METAL DECK RE STRUCTURAL

4'-0" 1'-2" 8/25/2015 10:16:21 AM

© Cannon Design 2015 All rights reserved. No part of this document may be reproduced or utilized in any form, without prior written authorization by The Cannon Corporation.

EXHIBIT CORRIDOR 106

KEY PLAN

N

Drawing Title:

R2

LEVEL 01 11'-0" MASONRY RE STRUCTURAL AND A0201

SHOTCRETE ROCKWORK

STEEL TUBE RE STRUCTURAL

STEEL DECK RE STRUCTURAL

EXISTING CONCRETE SLAB

SECTION DETAILS

EXISTING CONCRETE SLAB

EXISTING CONCTRETE SLAB

Project No.: 04726.01

3

EXHIBIT VIEW WALL SECTION 3/4" = 1'-0"

Date

4" X 4" METAL BRACE

CONCRETE CURB BEYOND

CAST IN PLACE CONCRETE

01 AUG 2015

Description

METAL TUBE RE STRUCTURAL

3/4" = 1'-0"

SHOTCRETE ROCKWORK

DD SUBMISSION

No. POOL

DETAIL SECTION AT NESTING BOXES 4'-0"

4 A0402

5

4

COAST DETAIL AT WATER FEATURE 3/4" = 1'-0"

6

SIDE POOL SECTION AT VIEWING WINDOW 3/4" = 1'-0"

Checked by: Checker

A0401 © Cannon Design 2015


C:\Revit Local Files\AON_AR_2015_rghera.rvt

14'-0" EXISTING WALKWAY HEIGHT

2

2

Aquarium of Niagara

5'-8" X 1'-4" FLOOR SLAB OPENING

CONCRETE RAMP 12" WIDE

3

CONC.STAIRS

9

3

2

2

UP

14'-0"

A0601 2

QUARANTINE 105

11'-0"

4

CONCRETE RAMP 12" WIDE

CONCRETE RAMP 12" WIDE

11'-0"

2170 Whitehaven Road Grand Island, New York 14072 T: 716.773.6800 F: 716.773.5909

8 A0601

FD

11'-0"

11'-0"

3'-0"

Hall Aquatic Design Life Support Systems Atlanta, Georgia 30313 678-873-7401

6

10'-0"

6

CMU WALL RE: STRUCTURAL TYP

2

FD

3

5

2

HOLDING 104

UP

5

3'-0"

4

A0601

2

2

11'-0"

Penguin Exhibit

9

3

3

10'-0" 2

10 A0402

BENCH SHOTCRETE ROCKWORK

1

7

1

8 A0601

7 A0402

8

Sim

7

13'-6"

4

CAST CONC. RE: STRUCTURAL

8

NOTE: ADD CONCRETE SLAB AND TOPPING REFER TO STRUCTURAL DRAWINGS DWGS

9

EXHIBIT CORRIDOR 106

4

9

11'-0"

11'-0"

10

Sim

9 A0402

11'-0"

NOTE: REMOVED 2 1/2" EXISTING CONC. TOPPING AT LOCATION OF POOL

10'-8 1/2"

RE: STRUCTURAL DWG'S FOR STEEL WITH DECK TYPICAL

14'-6"

10 4 A0402

11

12

11

7 A0402 CMU WALL REFER TO STRUCTURAL TYPICAL

EXHIBIT 108

E

9 A0402

EXHIBIT 108

16'-4"

E

11'-0"

14'-6"

6 A0402

NOT FOR CONSTRUCTION

CMU WALL RE: STRUCTURAL TYP

1

4

C C

4

7

1

A0601

6 A0601

11'-0"

4

4 FD

-

01 AUG 2015

Description

Date

5

F

5

FD

6 A0601

5

A

DD SUBMISSION

No.

4

5

5

5

5

KEY PLAN

N

Drawing Title:

ENLARGED FLOOR PLANS- MAIN LEVEL

A 8/25/2015 10:15:59 AM

© Cannon Design 2015 All rights reserved. No part of this document may be reproduced or utilized in any form, without prior written authorization by The Cannon Corporation.

5

Project No.: 04726.01

2

ENLARGED POOL PLAN 2'-0" AFF

1

1/4" = 1'-0"

Checked by: Checker

A0201

ENLARGED POOL PLAN 6'-0" AFF 1/4" = 1'-0"

1/4" PLEXI LOUVER (L-1) ROOM B004

SIMILAR

ROOM B003

2' SQUARE ACCESS DOOR

LEVEL 01 11'-0"

STEEL CASEWORK

R2 14 A0601

FRP RAILING

SHOTCRETE ROCKWORK

GATE JAMB DETAIL

10

6" = 1'-0"

SLIDING GATE PLAN, TYP.

13

1/2" = 1'-0"

ENTRY VESTIBULE 8'-1"

Aquarium of Niagara Penguin Exhibit BASEMENT 0"

GRADING LEVEL 15'-10 1/2"

REFRIGERATOR N.I.C.

14

M.O.

SS SINK DRAIN BOARD

6" CMU WALL

EXHIBIT 108

TOP WALL TO CLG

17

1/4" PLEXI GATE

WATER PROOFING LAYER

V.I.F.

18

S.S. TRACK 1/8" THICK

R2

EXISTING WALL

S.S. ANCHORS 6" O.C.

ARTIFICIAL CONCRETE ROCKWORK

11'-0"

C:\Revit Local Files\AON_AR_2015_rghera.rvt

© Cannon Design 2015

25'-0" ( CAST CONC. )

EXIST

PREP AREA ELEVATION

12

1/4" = 1'-0"

EXIST

V.I.F.

PASSAGE B015 1/4" = 1'-0"

2170 Whitehaven Road Grand Island, New York 14072 T: 716.773.6800 F: 716.773.5909

LEVEL 02 - ROOF 26'-8"

R2

LEVEL 02 - ROOF 26'-8"

LEVEL 02 - ROOF 26'-8"

EXISTING BEAM

BEAM BEYOND

LEVEL 02 - ROOF 26'-8"

Hall Aquatic Design Life Support Systems Atlanta, Georgia 30313 678-873-7401

EXISTING SLAB

REFRIGERATOR N.I.C.

EXISTING BEAM

SHOTCRETE ROCKWORK FIBERGLASS STAIRS RAILING & GRATING

HOLDING ROOM 1/4" PLEXI GATE

3'-6"

GRADING LEVEL 15'-10 1/2"

POOL FIBERGLASS STAIRS RAILING & GRATING

LEVEL 01 11'-0" EXISTING CONCRETE SLAB

SLIDING GATE ELEVATION, TYP.

CONCRETE STAIR DETAIL

5

1/2" = 1'-0"

9

1/4" = 1'-0"

8

1/4" = 1'-0"

GRADING LEVEL 15'-10 1/2"

FIVERGLASS STAIRS RAILING & GRATING LEVEL 01 11'-0"

LEVEL 01 11'-0"

EXISTING CONCRETE SLAB

RAMP SECTION D

PASSAGE 103

FIBERGLASS STAIRS RAILING & GRATING

PASSAGE 103

GRADING LEVEL 15'-10 1/2"

EXISTING CONCRETE SLAB

11

CLASSROOM 101

PASSAGE 103

PASSAGE 107

FRP RAILING CONCRETE STAIR

CONCRETE RAMP 12" WIDE

10

LEVEL 01 11'-0" EXISTING CONCRETE SLAB

EXISTING CONCRETE SLAB

STAIR SECTION C

7

1/4" = 1'-0"

STAIR SECTION B

6

1/4" = 1'-0"

STAIR SECTION A 1/4" = 1'-0"

11 STEEL CASEWORK SECTION DETAILS

LEVEL 02 - ROOF 26'-8"

LEVEL 02 - ROOF 26'-8"

1'-4"

EXISTING BEAM

3'-0"

WHITE BOARD

1'-11 3/4"

1'-6"

EXISTING CONCRETE SLAB

ACOUSTIC CEILING

NOT FOR CONSTRUCTION

A/V CONNECTION RE: ELECTRICAL DWGS

CLEAR

CLASSROOM 101

7'-0"

7'-0" 3'-0"

2'-3"

19

18 1'-6" 1'-2" 1'-4"

2'-8" 1'-6"

17

3'-0"

2'-6"

ACOUSTIC CEILING 2'-0" 301 - W

LEVEL 01 11'-0"

4"

3'-0"

DUCT WORK RE MECHANICAL

TACK BOARD

CLASSROOM 101

INTERACTIVE WHITE BOARD BY OTHERS

FOLDING LAPTOP STORAGE DATA PORT BOX

17

CABINET

18

1/2" = 1'-0"

SINK

19

1/2" = 1'-0"

WARDROBE

CLASSROOM INTERIOR ELEVATION B

3

1/2" = 1'-0"

1

1/4" = 1'-0"

8

CLASSROOM INTERIOR ELEV 1/4" = 1'-0"

8 PAINT EXISTING CONCRETE STRUCTURE SURFACES TYPICAL METAL STUD, GLASS MAT BOARD, AND PVC PROTECTIVE WALL COVERING SOFFIT

DD SUBMISSION

No.

01 AUG 2015

Description

Date

2'-8"

LEVEL 02 - ROOF 26'-8"

EXISTING CONCRETE BEAM WALL BEYOND SS TRIM

R1

B1

B1 B1

EXHIBIT CORRIDOR 106 10'-0"

12'-0"

GRADING LEVEL 15'-10 1/2" R1

R1 WATER LINE

2'-8"

MIN.

2'-6"

KEY PLAN

N

Drawing Title:

INTERIOR ELEVATIONS

B1 B1

ACRYLIC EXHIBIT ENCLOSURE CAST-IN-PLACE ARTIFICIAL ROCKWORK.

B1

LEVEL 01 11'-0" 8/25/2015 10:16:27 AM

© Cannon Design 2015 All rights reserved. No part of this document may be reproduced or utilized in any form, without prior written authorization by The Cannon Corporation.

EXHIBIT CORRIDOR 106

2 A0401

CAST-IN-PLACE ARTIFICIAL ROCKWORK. EPOXY FLOORING WIITH 4" ROLLED BASE DISPLAY CASE AND VIEWING WINDOWS (3) TOTAL

4

ROCK BENCH INTERIOR ELEVATION 1/4" = 1'-0"

2

GALLERY/EXHIBIT INTERIOR ELEVATION 1/4" = 1'-0"

CAST-IN-PLACE CONCRETE CURB ACRYLIC GLAZING EXHIBIT BELOW WATER VIEWING

Project No.: 04726.01

Checked by: Checker

A0601 © Cannon Design 2015


2'-1

OBSERVATION DECK 207

PASSAGE 107

FRP RAILING

PASSAGE 103

CONCRETE STAIR

GRADING LEVEL 15'-10 1/2" EXISTING ROOF SLAB

POOL

COMPOSITE DECK AND SUPPORTS

DUCT LOUVER

4" METAL STUD

CONCRETE SLAB

FIBERGLASS STAIRS RAILING & GRATING

EXISTING DECK SEE PLANS

LEVEL 01 11'-0" EXISTING CONCRETE SLAB

5/8" GYPSUM BOARD 4'-8"

R DETAIL

9

E S

LEVEL 01 11'-0"

EXISTING CONCRETE SLAB

RAMP SECTION D 1/4" = 1'-0"

4' X 4' X 1/4" METAL ANGLE SUUPPORT BRACE AT 4' O.C.

SKYLIGHT STAIR SECTION SECTION

1

8

3/4" = 1'-0"

C

1/4" = 1'-0"

HVAC DUCT WORK 34" X 12"

11

5 A0402

SS PLATE BEYOND

ACRYLIC PANEL BEYOND

SS TUBE

EXHIBIT POOL 102

EXHIBIT CORRIDOR 106

3" ACRYLIC PANEL

8'-10"

R2

2'-0" WATER 301 LINE 17 - W

WATER LINE

4'-0"

SHOTCRETE ROCKWORK

3'-0"

1'-2"

CONCRETE CURB BEYOND

CLASSROOM 101

POOL

7'-0"

POOL

4 A0402

19

18 1'-6" 1'-2" 1'-4"

R1

7'-0"

WATER FEATURE

ACOUSTIC CEILING

ROCKWORK BEYOND

EXISTING CONCRETE SLAB

R2

WARDROBE

CAST IN PLACE CONCRETE

1/2" = 1'-0"

EXISTING CONCTRETE SLAB

3

EXISTING BEAM

EXHIBIT POOL 102

3

CLASSROOM INTERIOR ELEVATION B

SHOTCRETE ROCKWORK

1/4" = 1'-0"

MASONRY RE STRUCTURAL AND A0201

STEEL TUBE RE STRUCTURAL

STEEL DECK RE STRUCTU

EXISTING CONCRETE SLAB

EXHIBIT VIEW WALL SECTION

4

3/4" = 1'-0"

COAST DETAIL AT WATER FEATURE 3/4" = 1'-0"

8 PAINT EXISTING CONCRETE STRUCTURE SURFACES TYPICAL METAL STUD, GLASS MAT BOARD, AND PVC PROTECTIVE WALL COVERING SOFFIT

ADING LEVEL 15'-10 1/2"

R1

B1

B1 B1

EXHIBIT CORRIDOR 106 10'-0"

12'-0"

2'-8"

VEL 02 - ROOF 26'-8"

MIN.

2'-8"

B1 B1

B1

LEVEL 01 11'-0" CAST-IN-PLACE ARTIFICIAL ROCKWORK. EPOXY FLOORING WIITH 4" ROLLED BASE DISPLAY CASE AND VIEWING WINDOWS (3) TOTAL

2

GALLERY/EXHIBIT INTERIOR ELEVATION 1/4" = 1'-0"


101 PASSAGE 103

FIBERGLASS STAIRS RAILING & GRATING

PASSAGE 103

GRADING LEVEL 15'-10 1/2"

GRADI

C:\Revit Local Files\AON_AR_2015_rghera.rvt

FIVERGLASS STAIRS RAILING & GRATING

XI

CHORS

EXISTING CONCRETE SLAB

ACK CK

1/4" PLEXI GATE

7

PROOFING

STAIR SECTION B

EXHIBIT 108 1/4" = 1'-0"

LEVEL 01 11'-0" EXISTING CONCRETE SLAB

17

ARTIFICIAL CONCRETE ROCKWORK

S.S. ANCHORS 6" O.C.

6

R2

R2 14 A0601

1/4" PLEXI

SIMILAR 18

STAIR SECTION A STEEL

FRP RAILING

SHOTCRETE ROCKWORK

SLIDING GATE PLAN, TYP.

WATER PROOFING LAYER

SS SINK DRAIN BOARD

14 A0601

GRADING LEVEL 15'-10 1/2"

REFRIGERATOR N.I.C.

10

S.S. TRACK 1/8" THICK

CASEWORK 1/4" = 1'-0"

PREP ELEVATION GATEAREA JAMB DETAIL 13141/4"6"==1'-0" 1'-0"

1/2" = 1'-0"

10

LEVEL 02 - ROOF 26'-8"

SLID

1

1/2" = 1'-0

LEVEL 02 - R 2

LEVEL 02 - ROOF 26'-8"

BEAM BEYOND

LEVEL 02 - ROOF 26'-8"

DUCT WORK RE MECHANICAL

R2

ACOUSTIC CEILING EXISTING BEAM

2'-3"

A/V CONNECTION RE: ELECTRICAL DWGS

SHOTCRETE ROCKWORK

CLEAR

HOLDING ROOM

1'-6"

PASSAGE 107

FRP RAILING

TACK BOARD

3'-0"

POOL

GRADING LEVEL 15'-10 1/2"

INTERACTIVE WHITE BOARD BY OTHERS

LEVEL 01 POOL 11'-0"

FRP R

CONC STAIR

CONCRETE RAMP 12" WIDE

PASSAGE 10 103

CONCRETE STAIR

E RAMP

CLASSROOM 101

3'-6"

HOLDING ROOM

WHITE BOARD1/4" PLEXI GATE

1'-11 3/4"

FIBERGLASS STAIRS RAILING & GRATING

EXISTING CONCRETE SLAB

FIBERGLASS STAIRS RAILING & GRATING

FOLDING LAPTOP STORAGE EXISTING CONCRETE SLAB

1

CRETE STAIR DETAIL

9

11

DATALEVEL PORT 01BOX SLIDING GATE ELEVATION, TYP. 11'-0"

5

CLASSROOM INTERIOR ELEV EXISTING CONCRETE SLAB 1/2" = 1'-0"

LEVEL 01 CONCRETE STAIR DETAIL 11'-0" 1/4" = 1'-0"

EXISTING CONCRETE SLAB

1/4" = 1'-0"

RAMP SECTION D

8

1/4" = 1'-0"

STAIR SECTION C 1/4" = 1'-0"

STEEL CASEWORK SECTION DETAILS

1'-6"

2'-8"

2'-6"

1'-4"

11

EXISTING BEAM

CLASSROOM 101

CABINET

18

1/2" = 1'-0"

SINK 1/2" = 1'-0"

19

7'-0"

17

3'-0"

WATER LINE

ACRYLIC EXHIBIT ENCLOSURE CAST-IN-PLACE ARTIFICIAL ROCKWORK.

19

18 1'-6" 1'-2" 1'-4"

7'-0"

R1

17

4"

2'-0" 301 - W

3'-0"

WALL BEYOND SS TRIM

3'-0"

ACOUSTIC CEILING

WARDRO 1/2" = 1'-0"

EXISTING CONCRETE SLAB

8

WARDROBE

CAST-IN-PLACE CONCRETE CURB

19

1/2" = 1'-0"

ACRYLIC GLAZING EXHIBIT BELOW WATER VIEWING

3

CLASSROOM INTERIOR ELEVATION B 1/4" = 1'-0" LEVEL 02 - ROOF 26'-8"

EXISTING CONCRETE BEAM

8



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.