Traingle risk assessment

Page 1

Corris Railway -Activity Risk Assessment Record Risk Assessment Record ACTIVITY

LOCATION

Operating over level crossings

Triangle accomodation crossing

RA 03008 ACTIVITY UNDERTAKEN

POTENTIAL RISK/ HAZARDS

Train moving over

Collision with

level crossing

vehicles or persons

L

S/C

1

7

TOTAL (LxS/C) 7

EXISTING MEASURES

ADDITIONAL MEASURES REQUIRED

Gates closed to farm traffic when

Notice board displaying the train times

trains are operating fastened by

and the telephone number to alert

slide bolt.

control if a vehicle is stuck on a

Driver/guard to use locomotive whistle

crossing.

when approaching the crossing Whistle boards Train moving over

Collision with

level crossing

animals

1

3

3

Gates are locked against the railway when trains are not operating, the key is kept on the train staff.

COMPILED BY

A.Britchford

DATE OF ASSESS

ASSISTED BY

D.Coleman

NEXT DUE ASSESS

L = LIKELIHOOD OF RISK

01/05/2008

HEALTH & SAFETY ADVISOR

A.Britchford

Form A/01 Issue No.1 Date of issue 01/12/02 S/C = SEVERITY/ CONSEQUENCE


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Traingle risk assessment by Derek Pratt - Issuu