Di meng resume worksample 0327

Page 1

DI MENG University of Pennsylvania | School of Design | Master of Architecture Candidate 2016 3600 Chestnut Street, RM303 MB720, Philadelphia, PA 19104 | 206.618.8656 | dimeng90@gmail.com EDUCATION University of Pennsylvania, Philadelphia, PA M.Arch Expected Graduation Date: 05/2016 University of Washington, Seattle, WA B.A. with Honors in Architectural Studies Awards L.Arnie Chinn Memorial Endowed Scholarship Dean’s List: Annual Dean’s List

8/2013-present

8/2009-6/2013 2013 2010-2013

SKILLS Language Chinese – native language English – speak fluently and read/write with high proficiency Graphic Representation Adobe Creative Suite (Photoshop, Illustrator, InDesign, Premiere) | AutoCAD | Maxwell Render | Vray | Podium 3D Modeling Rhino 5 | Maya | Revit | SketchUp | AutoCAD Data Processing Microsoft Office Other Medium Freehand Sketch | Water Color Painting | Hand Drafting | Color Pencil Rendering/Sketching | Hand Crafting EXPERIENCE Studio 19 Architects, Seattle, WA Student Intern - Designed schematic layouts for loft units in Jinan High Rise project. - Did researches and analysis of the site; developed drawings, physical models, digital models and digital renderings for the project of Everett Farmer’s Market. - Prepared presentation files and firm’s portfolio. - Participated in producing construction documents for two mixed-use projects. China-US Professional Workshop and Charrette Project Coordinator - Lead a team of six members to prepare and participate in a 2-day case based interactive problem-solving charrette with professionals from Seattle and cities of Chengdu, Chongqing, Beijing and Lanzhou. - Attended the Annual Conference of the American Planning Association WA chapter in Olympia-special track on trans-pacific practice. University of Washington Research Assistant - Help Prof. Elizabeth Golden translated and researched on articles that related to the construction technology and details on Ningbo Museum designed by Wang Shu. Trace Architecture Office, Beijing, China Student Intern - Developed drawings, renderings and physical model for one residential project and one tea-factory project.

6/2012-9/2012

9/2012-10/2012

5/2012

7/2011-9/2011

ACTIVITIES Chinese Students and Scholars Association, UW, Seattle, WA Graphic Designer - In charge of designing and making posters, membership cards, tickets, banners and flyers for every major event and activities. - Help hold activities and events. The Foundation for International Understanding Through Students Facilitator - Helped new coming international students adjust life in Seattle and assisted in carrying out events and activities PUBLICATIONS/OTHER WORKS Discovery Park Field Lab - Published on The Future +Design Website, December, 2011 Adaptive Reuse - Bringing Art into Neighborhoods - Published on SKIN, volume 10, 2013 Visual Identification Suite design & Interior Design for Beijing Kcalin New Energy Technology Co.,Ltd - 2012 Logo Design, Business card Design for Tianjin Wei Neng New Materials Co., Ltd - 6/2012

9/2010-6/2013

9/2010-12/2010


ructor: Ezio Blasetti

fall_2013_prof. Ezio Blasetti

INVASION - a dancing performing art space As a dancing performing art space, this project starts with a series studies of human body movement and eventually come up with a pavilion that houses performing spaces. roolF reppU oidutS etavirP egatS nepO

ybboL etavirP

mooR gnisserD

egatS oidutS gnicnaD

egatS nepO

staeS ecneiduA

egatS nepO ybboL cilbuP

invasion an interactive performing art center

staeS ecneiduA

invasion egatS

an interactive performing art center

staeS ecneiduA

noitpeceR

N

ecnartnE cilbuP NALP

PennDesign Arch 501 Design Studio Fall 2013, instructor: Ezio Blasetti

design team: Di Meng

PennDesign Arch 501 Design Studio Fall 2013, instructor: Ezio Blasetti

NOITCES

design team: Di Meng

design team: Di Meng


THRESHOLD - a subdivision matrix as public pavilion

fall_2013_prof. Ezio Blasetti

As a public pavilion, this project is a full scale design build practice. Working as a group with Yingfei Wang.


fall_2013_Prof. Franca Trubiano

Revit - addition to an existing Philadelphia row-home

This is a Revit project that I did in construction class. My clients have an existing property on Pine Street in Philadelphia and they’ve asked you to build an addition to their row home. They are looking for an addition reflective of a new sensibility in the design of urban townhouses. Modern materials and open space planning will be used for the addition. 1

1

ADD202

ADD201

2

2

ADD202

ADD201

Level T.O. Roof 34' - 3 3/16"

Level T.O. Roof 34' - 3 3/16" Level 3 23' - 6" 2

10' - 0"

10' - 0"

Level 2 13' - 6"

Level 2 13' - 6"

3 ADD501

11' - 6"

11' - 6"

9" INSULATION

Level 2 13' - 6"

4" Exterior Brick Masonry 1 1/2" Air Cavity 1 1/2" Rigid Insulation 8" Concrete Masonry Block 6 Mil Vapor Barrier 1/2 Metal Furring 3/4" Interior Finish Gypsum Board

Level 1 2' - 0" GROUND 0' - 0"

METAL TIE

WOOD BLOCKING

1/2" EPDM MEMBRANE AROUND SKY LIGHT 1/2" CLAPBOARD SIDING 6 MIL AIR BARRIER 3/4" PLYWOOD SHEATHING 6" METAL STUD WALL 6 MIL VAPOR BARRIER 1/2" GYP BD INTERIOR

Level 3 23' - 6"

ROOF DRAINAGE

WOOD BLOCKING

WOOD BLOCKING FOR GY BD

METAL LADDER

GROUND 0' - 0"

8' - 6"

8' - 6"

Level 2 Rear 11' - 0"

Level 1 2' - 0"

8'X8' CHROME FRAME SKYLIGHT 1" INSULATED GLASS

ARCH 431/531: Construction Technology 1

Level 3 23' - 6"

2-1/2" RIGID INSULATION

Addition to an Existing Philadelphia Rowhome

5-1/2" INSULATION

Level 3 23' - 6"

ARCH 431/531: Construction Technology 1

1/4" CHROME PANEL 24"x48" 3/4" PLYWOOD SHEATHING 2x6 WOOD STUD WALL 3/4" INL PLYWOOD SHEATHING 6 MIL RUBBER MEMBERANE CONTINUOUS FLASHING 2 ADD502

Addition to an Existing Philadelphia Rowhome

10' - 9"

10' - 9"

ADD503

8" CMU

Level Basment -6' - 6"

Callout of Addition South Wall Section 1" = 1'-0"

1

2

Typical Wall Call Out Details

Callout of Building Section North/South (Looking East)1 1" = 1'-0"

Project Number Issue Date Author Checker

Project Number Date

Building Section

1

Building Section North/South (Looking East)1 3/8" = 1'-0"

Drawn By Checked By

4" EXTERIOR BRICK WYTHE WEATHERED MORTAR JOINT 1-1/2" AIR CAVITY 1-1/2" RIGID INSULATION 8"X8"X8" BEARING CMU 6ML VAPOR BARRIER 1/2" METAL FURRING 3/4" GYPSUM BOARD INTERIOR

Scale 2

12' - 8"

4' - 2 1/2"

2' - 10"

ADD202

3/8" = 1'-0"

Scale

BOND BEAM

WOOD BLOCKING

1' - 3"

1" = 1'-0"

BRICK

ANCHOR BOLT

ADD503

2' - 6"

ADD502

BRICK SILL

11/25/2013 11:52:56 AM

Date Building Section East/West (Looking South)1 3/8" = 1'-0"

Checked By

Project Number Issue Date Author Checker

Project Number

2

Drawn By

11/25/2013 11:53:19 AM

Level Basment -6' - 6"

STEEL ANGLE

1' - 10 1/2"

Level 3 23' - 6"

Level 1 2' - 0"

2X10 WOOD JOINTS

METAL TIE

2X10 LUMBER SECTION

BRICK 1 1/2" AIR GAP 1 1/2" RIGID INSULATION 8" CMU

CONCRETE BOND BEAM

2' - 0"

4X8X16 CMU BLOCKS CLEAR GLAZING

3' - 2"

FLUSHING WITH DRIP EDGE OVER SILL

GROUND 0' - 0"

STEEL ANGLE

GYP BORAD 16" FOUNDATION WALL

1' - 7 1/2" 1' - 7 1/2"

TEMPERED GLASS

Level 3 23' - 6" 3 ADD503

Level 2 13' - 6"

curtain wall head detail 1 1/2" = 1'-0"

19' - 6"

2' - 4"

1' - 0"

3

1' - 4"

Level 2 13' - 6"

2" CONCRETE INSULATION

GRAVEL

BOND BEAM 6" FOUNDATION SLAB

6' - 6"

SOLAR SHADING DEVIDE

ALUMINUM CURTAIN WALL MULLION

ARCH 431/531: Construction Technology 1

1' - 7 1/2"

ALUMINUM CURTAIN WALL

2-1/2" RIGID INSULATION

BRICK SILL STEEL ANGLE

BOND BEAM 1" GRAVEL LAYER

CONCRETE WALL ANCHOR BOLTS

Level 1 2' - 0"

16" FOUNDATION WALL

Level Basment -6' - 6"

2' - 0"

Addition to an Existing Philadelphia Rowhome

FLASHING

GROUND 0' - 0"

2' - 10"

FOOTING FRENCH DRAIN

Level 1 2' - 0"

4 ADD503

Level 1 2' - 0"

0' - 7"

1

Addition call out section 1 1/2" = 1'-0"

Checked By

Section 1 3/8" = 1'-0"

4

curtain wall sill detail 1 1/2" = 1'-0"

Scale

Level 3 23' - 6"

10' - 0"

Level 2 13' - 6"

Level 2 13' - 6"

8" CMU

1 1/4" MASONRY TIE

2

2 1 ADD501

BRICK

8" CMU

BRICK SILL STEEL ANGLE

ANCHOR BOLT

Level 1 2' - 0"

GROUND 0' - 0"

GROUND 0' - 0" 16" FOUNDATION WALL

16" FOUNDATION WALL

16" FOUNDATION WALL

2" CONCRETE INSULATION

2" CONCRETE INSULATION

2 ADD501

GRAVEL

FOOTING FRENCH DRAIN

GRAVEL

FOOTING FRENCH DRAIN

FOOTING FRENCH DRAIN

6" FOUNDATION SLAB

6" FOUNDATION SLAB

6" FOUNDATION SLAB

1" GRAVEL LAYER

1" GRAVEL LAYER

1" GRAVEL LAYER

Level Basment -6' - 6"

Level Basment -6' - 6"

Level Basment -6' - 6"

Wall Section

2-1/2" RIGID INSULATION

2-1/2" RIGID INSULATION

2-1/2" RIGID INSULATION

Level 1 2' - 0"

BOND BEAM

STEEL ANGLE

Project Number Issue Date Di Meng Checker

Project Number Date Drawn By

axon3

1

Addition North Wall Section 1/2" = 1'-0"

Exploded Axonometrics

Project Number Date Drawn By Checked By

Project Number Issue Date Author Checker

3

11:52:33 AM

3

Checked By

Addition South Wall Section 1/2" = 1'-0"

3

Interior View_2 12" = 1'-0"

2

Addition East Wall Section 1/2" = 1'-0"

Scale

ADD401 5

Interior View_3 12" = 1'-0"

1/2" = 1'-0"

Pro

Da

Dra

11/25/2013 11:53:10 AM

CONCRETE WALL ANCHOR BOLTS

GROUND 0' - 0"

8' - 6"

3D View section perspective of curtain wall 12" = 1'-0"

BOND BEAM

Level 1 2' - 0"

2" CONCRETE INSULATION GRAVEL

Interior View_1 12" = 1'-0"

3D View curtain wall 12" = 1'-0"

11' - 6"

1

11' - 6"

11' - 6"

BRICK 1 1/2" AIR GAP 1 1/2" RIGID INSULATION 8" CMU

8' - 6"

BOND BEAM

4" Exterior Brick Masonry 1 1/2" Air Cavity 1 1/2" Rigid Insulation 8" Concrete Masonry Block 6 Mil Vapor Barrier 1/2 Metal Furring 3/4" Interior Finish Gypsum Board

Level 2 13' - 6"

8' - 6"

STEEL ANGLE CONCRETE WALL ANCHOR BOLTS

10' - 0"

10' - 0" BRICK

1 ADD502

ARCH 431/531: Construction Technology 1

BRICK SILL

As indicated

4" EXTERIOR BRICK MASONRY 1 1/2" AIR CAVITY 1 1/2" RIGID INSULATION 8" CONCRETE MASONRY BLOCK 6 MIL VAPOR BARRIER 1/2 METAL FURRINGM 3/4" INTERIOR FINISH GYPSUM BOARD

Addition to an Existing Philadelphia Rowhome

8" CMU

ADD503

Level 3 23' - 6"

Level 3 23' - 6"

RE BAR

Issue Date Author Checker

Date

4" EXTERIOR BRICK MASONRY 1 1/2" AIR CAVITY 1 1/2" RIGID INSULATION 8" CONCRETE MASONRY BLOCK 6 MIL VAPOR BARRIER 1/2 METAL FURRINGM 3/4" INTERIOR FINISH GYPSUM BOARD

1 1/4" MASONRY TIE

Callout of Building Section North/South (CUTTING AT AN ANGLE) 1 1/2" = 1'-0"

Project Number

Drawn By

2

3

ARCH 431/531: Construction Technology 1

Callout of Elevation - East 1" = 1'-0"

Callout of Addition North Wall Section 1 1/2" = 1'-0"

Addition to an Existing Philadelphia Rowhome

2' - 0"

Level Basment -6' - 6" FOUNDATION WALL

Level 1 2' - 0"

1

2

Call out Details for High Performance East Facade Project Number

GROUND 0' - 0"

11/25/2013 11:53:23 AM

1' - 5"

GROUND 0' - 0"

Ch

Sca


spring_2013_Prof. Jessica Miller

TENDENCY - a fire station (modeled and designed in REVIT)

This is a Revit group project. My partner was Troy Lacombe. The intention was to play with three massing blocks to divide different programs and utilize the intersection of three blocks to create inter-active spaces for firemen. TEAM 06

2

3

4

SHEET INDEX

ARCHITECTURAL A-000 COVER SHEET A-100 BUILDING SITE PLAN A-101 LEVEL 1 FLOOR PLAN A-102 LEVEL 2 FLOOR PLAN A-103 LEVEL 3 FLOOR PLAN A-201 BUILDING ELEVATIONS A-202 BUILDING ELEVATIONS A-211 BUILDING SECTIONS A-212 BUILDING SECTIONS A-300 PERSPECTIVE A-301 WALL SECTION_CREW AREA A-302 WALL SECTION_AP BAY A-311 GARAGE DOOR 1 A-312 GARAGE DOOR 2 A-313 SLATTING A-314 SLATTING COMPONENT A-401 INTERIOR ELEVATIONS 17

1

1

A-212

6

Consultant Address Address Phone Fax e-mail Consultant Address Address Phone Fax e-mail

E Bunker Gear Room

Work Area

286 SF

134 SF

EMS StorageSupply Storage Janitor 134 SF

111 SF

Restroom

81 SF

D

Consultant Address Address Phone Fax e-mail

90 SF 1 A-302

Consultant Address Address Phone Fax e-mail

C Station Office

Consultant Address Address Phone Fax e-mail

189 SF UP

Lounge 700 SF 1

1 A-211

A-301

1

5

A-401

No.

B

Description

Date

South-West View

A

South-East View

TEAM 06

2

3

4

1 A-212

Consultant Address Address Phone Fax e-mail

4 A-313

LEVEL 3

1

3 A-312

Report Desk

1/8" = 1'-0"

Clean RM

Hose & Store

264 SF

130 SF

D

133 SF

Lobby

Consultant Address Address Phone Fax e-mail

1 A-302

Consultant Address Address Phone Fax e-mail

Apparatus Bay

0'

4'

8'

16'

C

1802 SF

Eq Storage

Dining RM

UP

Day Room

177 SF

GYM

116 SF

323 SF

290 SF

007 Fire Central LEVEL 3 FLOOR PLAN 0800 07 May 2013 Meng - Lacombe Miller

Project number Date Drawn by Checked by

A-103 1/8" = 1'-0"

Scale

Consultant Address Address Phone Fax e-mail

79 SF

Kitchen

Meng - Lacombe

Consultant Address Address Phone Fax e-mail

E

6/12/2013 4:24:28 PM

1

1

1

A-301

A-211

5

View from South West

UP

Janitor 38 SF

Rest Room

View from North-W TEAM 06

Officer Quarter Officer's Quarter

136 SF

No.

B

Description

Date

119 SF

73 SF

Officer Quarter

A

Lobby

99 SF Consultant Address Address Phone Fax e-mail Consultant Address Address Phone Fax e-mail TEAM 06

TEAM 06

3

Meng - Lacombe

Consultant Address Address Phone Project number Fax e-mail Date

Storage

Electrical WC

Laundry

169 SF

109 SF

Consultant Checked by Address

103 SF 158 SF

4'

8'

Address Phone Fax e-mail

D

154 SF 0'

Scale

16'

Consultant Address Address Phone Fax e-mail

View from South West C

1

84 SF

150 SF

A-211

85 SF

120 SF

Locker RM 146 SF

Toilet/Shower Janior 130 SF

Atrium

73 SF

Communication

1 A-301

Crew Area Lounge A-102 1/8" = 1'-0" View from South West

Consultant Address Address Phone Fax e-mail

Consultant Address Address Phone Fax e-mail

ROOF 90' - 0"

View from North-West

View from North-West

Consultant Address Address Phone Fax e-mail

ApparatusConsultant Bay 2nd Floo Address Address Phone Fax e-mail

No.

LEVEL 3 77' - 0"

Consultant Address Address Phone Fax e-mail

15' - 5 1/2"

Double RM Single RM Single RM Lounge

Consultant Address Address Phone Fax e-mail

0800 07 May 2013 Meng - Lacombe Miller

Drawn by

Description

Consultant Address Address Phone Fax e-mail

TEAM 06

Meng - Lacombe Consultant

Address 007 Fire Central Address PERSPECTIVE

5

140 SF

UP

Crew Area Lounge

Apparatus Bay 2nd Floor

View to Circulation Atrium

Project number

LEVEL 2 62' - 0"

Date Drawn by Checked by

No.

Description

Date

12' - 0"

B

Consultant Address Address Phone

Fax Consultant e-mail Address Consultant Address Address Address Phone Phone Fax e-mail Fax e-mail Consultant Address Address Phone Fax e-mail

ROOF 90' - 0"

007 Fire Centra PERSPECTIVE

Consultant Consultant Address Address Address Phone Fax Address e-mail Phone Consultant Fax Address Address e-mail Project number Phone

LEVEL 3 77' - 0" Date

1

NORTH ELEVATION 1/8" = 1'-0"

0800 07 May 2013 Meng - Lacombe Checker

Meng - Lacomb

LEVEL 1 50' - 0"

1 A-401

Phone Fax e-mail

A-300 Scale

5 A-313

A

Date

Description Consultant Address Address Phone Fax e-mail

No.

15' - 0"

mech

13' - 0"

E

1/8" = 1'-0"

Consultant Address Consultant Address Address Address Phone Phone Fax e-mail Fax e-mail

6/12/2013 4:24:25 PM

LEVEL 2

Consultant Address Address Phone Fax e-mail

007 Fire Central LEVEL 2 FLOOR PLAN

1 A-212

1

TEA

Consultant Address Address Phone Fax e-mail

4

6/12/2013 4:25:27 PM

2 1

Fax e-mail

07 Meng -

Drawn by Checked by

Crew Area Lounge

Apparatus Bay 2nd Floor

View to Circulation Atrium

LEVEL 2 62' - 0"

A-300 Scale

No.

Description

Da

LEVEL 1 50' - 0"

Meng - Lacombe

SECTION 1

007 Fire Central LEVEL 1 FLOOR PLAN

1/8" = 1'-0"

Project number Date

LEVEL 1

Drawn by Checked by

1/8" = 1'-0"

A-101 8'

16'

Scale

1/8" = 1'-0"

08 07 May 20 Meng - Lacom Chec

Project number Date Drawn by Checked by

A-211

13' - 0"

4'

Meng - Lacombe

007 Fire Central BUILDING SECTIONS

ROOF 90' - 0"

1/8" = 1

Scale

LEVEL 3 77' - 0"

15' - 0"

0'

0800 07 May 2013 Meng - Lacombe Miller

Descrip

LEVEL 2 62' - 0"

Meng - L 12' - 0"

1

No.

6/12/2013 4:24:21 PM

1

007 Fire BUIL ELEVA

LEVEL 1 50' - 0"

Project number Date Drawn by Checked by

2

A-2

SOUTH ELEVATION 1/8" = 1'-0"

Scale


other design studio works

TASTE OF WINE - a winery, gallery and restaurant This building is intended to be a prospective project on the Chateau Ste Michelle site. My intention was to apply the beauty of wine bottles into the building design.

REPEATING FRAME - a collaboration of experimental film artist Spaces are excavated from volumes that are created from repeating frame. Frames are fixed, however the spaces are changing throughout the day. Just like the process of film making, combining steady frames together will create moving scenes.

CONNECTION - discovery park field lab This is a design invention on water-bluff edge conditions fund at Discovery Park. The task was to design a field lab for Seattle high school science students that will be used year round for environmental study.

ADAPTIVE REUSE - bringing art into neighborhoods Grids and squares have always been structured or shaped in artists and architects’ life. For artists, sometimes grids are their limitations and sometimes they are artists’ windows for new ideas. As Art Spaces, the design plays between standardized units and order, trying to show different possibilities that grid can bring and articulates the tension between freedom and order. Eventually, this grid system will grow into the city spaces as art pieces that can pass the concept of freedom and order to publics. Perspective Perspective

PerspectivePerspective


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.