PORTFOLIO 2008 — 2017 Raísa Drumond
The city is made by people and for people, so that they act collectively and transversally in their individualities and differences. It is the human creation par excellence, being a set of territories for sharing, disputes and social exchange. My professional belief is that Architecture and Urban Design should investigate and transit between cities’ various problems and scales, in order to create excellent spaces that catalyze collective appropriations, in its visible and invisible powers, aiming to increase the quality of human relationships, perceptions and processes.
PROFESSIONAL WORKS
01
RIO DE JANEIRO INTERNATIONAL AIRPORT / RJ Intertechne Consultores, 2015-2016
02
MALI · LIMA ART MUSEUM EXPANSION / PER SPRAA architecture, 2016
03
APARTMENT #1 / SP AKS+RDN architecture, 2014
04
MORUMBI METRO STATION / SP 23 SUL arquitetura, 2013-2014
05
CLUBE ESCOLA IBAITI / PR AKS+RDN arquitecture, 2013
06
IMOA · MUSEUM OF ASTRONOMY / CH International competition, 2013
ACADEMIC WORKS
01a
IMAGINÁRIOS EMERGENTES Gradutaion Final Project, FAUUSP, 2014
02a
LUGAR OCUPADO / SP FAUUSP, 2013
03a
HOUSE #1 / SP FAUUSP, 2013
04a
HOUSING FOR THE ELDERLY / BCN ETSAB, 2012
05a
TECHNICAL PUBLIC SCHOOL / SP FAUUSP, 2011
1
3
2
5
4
6
8
7
9
10
11
13
12
15
14
DESENHOS DE REFERÊNCIA:
A
GIG-E009-3-TPS-05-201-DE-1501 - 0Aa - PLANTA BAIXA GIG-E009-3-TPS-05-201-DE-1002 - 0Aa - PLANTA BAIXA GIG-E009-3-TPS-05-201-DE-1102 - 0Aa - PLANTA BAIXA GIG-E009-3-TPS-05-201-DE-1203 - 0Aa - PLANTA BAIXA GIG-E009-3-TPS-05-201-DE-1401 - 0Aa - PLANTA BAIXA GIG-E009-3-TPS-05-201-DE-1302 - 0Aa - PLANTA BAIXA
LEGENDAS: ELEVAÇÃO ACABADA
B
ELEVAÇÃO EM OSSO CONCRETO
ALVENARIA A CONSTRUIR, EM BLOCOS D
DIVISÓRIA A CONSTRUIR, EM DRYWALL R
NOTAS:
C
1 - TODAS AS DIMENSÕES E ELEVAÇÕES ESTÃO EM OUTRA FORMA. 2 - VERIFICAR MEDIDAS NO LOCAL.
D
E
F
G
H
I COMO CONSTRUÍDO
100
09
0
CONCETOR · MAIN SECTION no scale
06
0Aa
EMISSÃO INICIAL
REV.
MODIFICAÇÃO
CONSÓRCIO CONSTRUTOR
03
CONSÓRCIO PROJETISTA
J 1
2
3
5
4
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24 COORD./GERENTE DE PROJETO
Marcelo Marchi dos Santos
JD
E1
JC
JB
D2
D1
J4
JA
C2
C
J3
B4
J2
B3
B2
B
B1
A
AA'
J1
SÍTIO
AEROPORTO INTE MACRO ÁREA DO SÍTIO:
-3-TP
TERMINAL DE PAS
CA 15 1.25 .53 .72
4.97
PAINÉIS EM CHAPA DE ALUMÍNIO COM NÚCLEO DE POLIETILENO (ACM), ESPESSURA 4mm, NA COR CINZA CLARO.
ESPECIALIDADE/SUBESPECIAL
3.41 5.25
LIMITE DO PISO DA CONCESSÃO (VER NOTA 6)
3
LIMITE DO PISO DA CONCESSÃO (VER NOTA 6)
AB DR RIGO TIPOAN TE 3
8 .9
)
.60 .25
.15
.40 .25
2.72
1. 5.96
5 .1
3.
R2.50
5.06 .12
° 65
.25 1.13
139
139
°
°
.84
.14
.14
85°
11.46
8.16
0 .5
75
17 9.
9.
1 13 .4 5
.2
3.
.0 13
20 1.
5
13 3, ,20 40
62
10 1.
10.33
2
.25
17
LEGENDAS: ELEVAÇÃO EM OSSO
2.85
1.25
.14
.40
1.25
10.05
11.25
.81
15.41
D
NUMERAÇÃO DA PORTA
3° 12 6.29
1.30
.30
5a
.30 1.075
1
3
4.30
1.075 .30
RND
RDAN
GCA
15/09/2015
RND
RDAN
RND
RDAN
GCA
07/07/2015
RND
RDAN
GCA
REVISÃO GERAL CONFORME DEFINIÇÕES DA RIOGALEÃO
25/06/2015
RND
RDAN
GCA
12/03/2015
RND
RDAN
GCA
13/02/2015
MCBC
MCBC
GCA
0
EMISSÃO INICIAL
0Aa
4.75
GCA GCA GCA GCA
26/10/2015
MODIFICAÇÃO
CONSÓRCIO CONSTRUTOR
DATA
PROJETISTA
GCA
DESENHISTA
APROVADO
CONSULTORES S.A.
6
ESQUADRIA DE ALUMÍNIO COM VIDRO, EXISTENTE
COORD./GERENTE DE PROJETO
Marcelo Marchi dos Santos
CREA
CREA
RESPONSÁVEL TÉCNICO
SP 5061264632 Lourenço J. N. Babá
RJ 36084/D
CÓDIGO DO PROJETISTA
REVISÃO
1403-GA-8-TP-C01-01-C-30-DE-1203
100
SÍTIO
AEROPORTO INTERNACIONAL TOM JOBIM O
MACRO ÁREA DO SÍTIO:
TERMINAL DE PASSAGEIROS
B
SUB ÁREA DO SÍTIO:
A
CONECTOR
ESPECIALIDADE/SUBESPECIALIDADE:
ARQUITETURA GERAL TIPO DO DOCUMENTO:
DESENHOS DE REFERÊNCIA:
14
15
16
17
FASE DO PROJETO:
DESENHO
GIG-E009-3-TPS-03-201-DE-0004 - PLANTA GERAL DO MEZANINO - ELEV. 13,495 GIG-E009-3-TPS-03-201-DE-0007 - QUADRO GERAL DE ACABAMENTOS GIG-E009-3-TPS-03-201-DE-0830 - MAPA DE ESQUADRIAS DE AÇO GIG-E009-3-TPS-03-201-DE-0831 - MAPA DE ESQUADRIAS DE MADEIRA GIG-E009-3-TPS-03-201-DE-0832 - MAPA DE ESQUADRIAS DE ALUMÍNIO - PARTE 1 GIG-E009-3-TPS-05-201-DE-0113 - FACHADAS LADO AR E LADO TERRA - CONECTOR 18
19
EXECUTIVO
ESPECIFICAÇÃO DO DOCUMENTO: ESCALA:
1:100
DATA:
SBGL-TPS-201-3597 20
21
PLANTA BAIXA /EMBARQUE EIXOS- 1/6 - A/G - ELEV. 18,395
FOLHA:
13/02/2015
CÓDIGO ANAC
A 13
1 de 1 REVISÃO
P
CÓDIGO RIO GALEÃO:
REVISÃO
GIG-E009-3-TPS-05-201-DE-1203
100 22
23
100 24
DIREITOS AUTORAIS RESERVADOS - PROIBIDA QUALQUER REPRODUÇÃO SEM AUTORIZAÇÃO EXPRESSA - FORMATO ORIGINAL A0
01
M
CONSÓRCIO PROJETISTA
C
12
L
GCA
RDAN
EMISSÃO FINAL. APROVADO CONFORME 1403-GA-ODE-GD-4464. INCLUÍDO DEPOSÍTO DE RESÍDUOS E RETIRADO HOLD DO ALÇAPÃO
LIBERADO PARA CONSTRUÇÃO ATENDENDO COMENTÁRIOS CCG-RIOGALEÃO
NOTAS:
11
GCA
RDAN
RDAN RDAN
ONDE INDICADO CONFORME ATA RIOGALEÃO-CCG 28/07/15. ARMAZENAMENTO DE 27/08/2015 RESÍDUOS, RAMPA ACESSO PIERSUL E PRESSURIZAÇÃO ESCADAS DE EMERGÊNCIA.
1A
REV.
1.10
PARA PORTA AUTOMÁT GIG-E009ICA VER 3-TPS-03-2 01-DE-085 7
1 - TODAS AS DIMENSÕES E ELEVAÇÕES ESTÃO EM METRO, EXCETO ONDE INDICADO DE OUTRA FORMA. 2 - ESTÃO INDICADAS AS ÁREAS TOTAIS DOS COMPARTIMENTOS ALTERADOS PELO PROJETO, MESMO QUE ELES NÃO ESTEJAM REPRESENTADOS INTEGRALMENTE NESTA PRANCHA. 3 - PARA ESPECIFICAÇÃO DE ACABAMENTOS VER DES. GIG-E009-3-TPS-03-201-DE-0007. 4 - NOS COMPARTIMENTOS DE SANITÁRIOS E ESCADAS, AS ESPECIFICAÇÕES DOS ACABAMENTOS, BEM COMO, AS COTAS INTERNAS, SERÃO INDICADAS NOS SEUS RESPECTIVOS DETALHES DE AMPLIAÇÃO. 5 - VERIFICAR MEDIDAS NO LOCAL. 6 - NOS LIMITES DAS CONCESSÕES, UTILIZAR SOLEIRA COM ACABAMENTO DO PISO ADJACENTE (GRANITO BRANCO FORTALEZA, ACABAMENTO POLIDO ESPESSURA 2cm). LARGURA 20cm. COMPRIMENTO TÍPICO 1,50m ONDE NÃO INDICADO.
10
RND
RDAN
RND RND
N
11
SALA DE EMBARQUE (TERMINAL 2)
18,395
18,41
2.21
4.22
° 83 .25
.30
RND RND
06/11/2015 04/11/2015
.18
.93
4.30 2.50
3.21
PA 3.75 5 2.50
3.08
C
.14
D
3.75
PA 4
°
88
.93
PARA PORTA GIG-E009-3 AUTOMÁTICA VER -TPS-03-20 1-DE-0857
ABRIGO HIDRANTE TIPO 3
2.25
JUNTA DE DILATAÇÃO
18,41
RND
06/01/2016
REVISADOS LIMITE COM TPS2 ONDE INICADO, HIDRANTE E ACM PILARES EMISSÃO FINAL. APROVADO SEM COMENTÁRIOS CONFORME GUIA 1403-GA-ODE-GD-4711
3A
RND
03/02/2016
10/12/2015
INCLUÍDOS INDICAÇÃO DE PISO ELEVADO NA SALA DE ELETRÔNICA,SHAFT DE HVAC E REMOVIDO FORRO DAS SALAS ELÉTRICA/ ELETRÔNICA, COMO INDICADO
1 0
22/03/2016
COMO CONSTRUÍDO
EMISSÃO FINAL. REVISADO ONDE INDICADO ATENDENDO COMENTÁRIOS CCG-RIOGALEÃO
3
7.2
CAIXILHO DE ALUMÍNIO NUMERAÇÃO DO CAIXILHO
ONDE INDICADO. INCLUSÃO DE ACESSO DE FUCIONÁRIOS CONFORME COMENTÁRIOS RIOGALEÃO ONDE INDICADO. ADEQUAÇÃO AO SISTEMA BHS CONFORME COMENTARIOS CCG. INDICAÇÃO DE TIPOS DE HIDRANTE E COMPATIBILIZAÇÃO COM ESTRUTURA METÁLICA E INSTALAÇÕES ONDE INDICADO
6 5 4
2A
SOLEIRA EM GRANITO, ERAMPEADA PARA COMPATIBILIZAR OS NÍVEIS DOS DOIS LADOS DA PORTA
INÍCIO DA PAGINAÇÃO DO GRANITO BRANCO NO VÉRTICE DO PILAR EXISTENTE
.15
CA 1
PORTA MADEIRA
100
INÍCIO DA PAGINAÇÃO DO GRANITO BRANCO NO LIMITE DO DRYWALL
.90
1.21
3.20
.15
.14
P
9
NUMERAÇÃO DA PORTA
PM 1
3B
4.17
1.00
1.28
K
PISO / PAREDE / TETO / RODAPÉ
X
PORTA DE AÇO
PAC 1
CA 14
18,345
18,345
4.71
68 ° 1.50
.15
2.20
1.80 1.85
0402 S-03-201-DE-
HO
1
1
2
2
ALVENARIA EXISTENTE ALVENARIA A CONSTRUIR, EM BLOCOS DE CONCRETO
X
2
1.00
GIG-E009-3-TP
VER DESEN
17,50 3,40
18,395
135,65m²
3
2.33
18,395
CONECTOR · DEPARTURE LEVEL no scale
8
X,XX
X
17.50
R2.16 45°
R2.
1.34 .30
O
19.81
0 1.8 5.06
24
1.
CONCESSÃO ALIMENTAÇÃO (6.3.2)
50
1
9.36
7
ELEVAÇÃO ACABADA
DIVISÓRIA A CONSTRUIR, EM DRYWALL RU, COM 14cm DE ESPESSURA
3
1 1.53
13
2
SALA DE ACESSO AO ALÇAPÃO DO ELEVADOR 13
°
138
SHAFT DE VENTILAÇÃO MECÂNICA
6
X,XX
4a X
CIRCULAÇÃO DE EMBARQUE DOMÉSTICO
)
2
18,345
GIG-E009-3-TPS-05-201-DE-0132
4.35
.14
6.64
2.45
ÍP
(T
3
18,395
3.80
1.86
1.60
50
HO VER DESEN 0403 S-03-201-DEGIG-E009-3-TP
3.75
0°
1.50 (TÍP)
1.
9.90
245,00m²
N
5
J
SEM ESCALA
4
7
°
ELEVADOR DE SERVIÇO
CHAPIM EM GRANITO CINZA TAPEROÁ 29cm EM TODO PÓRTICO
4
H
PLANTA CHAVE
4
CONCRETO
85
1
7
SOLEIRA EM GRANITO CINZA TAPEROÁ NA LARGURA DA ALVENARIA EXISTENTE MAIS O COMPLEMENTO EM DRY WALL
3
D
A
139
99,00m² 2
D
°
CONCESSÃO COMERCIAL (7.3.7) 3
A
.7
.8
8°
1.50
1
CONCESSÃO ALIMENTAÇÃO (6.3.3)
D1
2
60 H
1
14
17
12
13
E
Nº TDR: 1403-GA-TD1
I
55
10
5
REVESTIMENTO EM ACM
CONTROLE DE ACESSO DE FUNCIONÁRIOS (INTERNACIONAL)
SHAFT DE HIDRÁULICA
18,395
M
50
15
C 13 A
.2
5.27 °
.15
CHECK-IN NOVOS
F
45
.2
.1
PC 1 F .9 2. 0 10
64 3.40
40
0
1
3
1. .25
13
13
5
PCF 1
.2
.90 2.10
3a
35
20
1
.25
7
SAGUÃO DE EMBARQUE (ILHA DE CHECKIN 0)
L
30
25
8
04
18,345
60
FECHAMENTO EM DRYWALL
K
11
H
1
5
.25
.2
34,09m²
1.09
)
1
18,345
2.37
2.50
18,345
ÍP
3
FECHAMENTO EM ACM
CIRCULAÇÃO DE EMBARQUE DOMÉSTICO
9.54
(T
G
5
1
3.4
1
2d JUNTA DE DILATAÇÃO
18,395
9 7.22
1
18,00
2. .90 10
2. .90 10
22.60
50
13
18,10 TABEIRA EM GRANITO BRANCO FORTALEZA LARGURA: 20cm
1.11
13
50
1.
12
18,395
5
2°
CIRCULAÇÃO
2.00
.96
45 °
2.90
18,395
CIRCULAÇÃO
1.87
E
PA 3 C
61
207,38m²
1.
PCF 1
GUARDA-CORPO H= 1.10
.1
4
5.
PRAÇA DE ALIMENTAÇÃO
°
1.20
7.74
TÉCNICA
18,345
3.9
27
.15
GALERIA
1.10
.15
.70
1.08
3
00
ABRIGO HIDRANTE TIPO 3
0
.90 2.10
.60 .25 .67
2.20 .25
J
20
.00
1.52
2.59
13
SHAFT DE AR CONDICIONADO
1
18,395
R3.
R1
175° (TÍP)
2.06
2e
1.00 .15 .15
.15
4.89
13
9
90°
.20
ABRIGO TE HIDRAN TIPO 3
R2
.80 2.10
1.50 (TÍP) .14
1°
2
PA 3 C
SALA DE ELÉTRICA
2.
131
49°
12
4.94
SANITÁRIOS
início da paginação piso elevado
F
05
10
52,98m²
.2
°
.40
.40
1
2
6.52
92,40m²
18,345
GIG-E009-3-TPS-01-201-DE-3033
1
1.
1.
.25
5
18,345 CONCESSÃO COMERCIAL (7.3.4) 3
7.88
177°
1.50
13
1
5
0
14
2
2
18,345
.25
.90 2.10
2.10
.80 2.10
13
18,395
10.26
1
18,345
3
.40
832,20m²
)
F
18,395 18,395 18,345
PAINÉIS EM CHAPA DE ALUMÍNIO COM NÚCLEO DE POLIETILENO (ACM), ESPESSURA 4mm, NA COR CINZA CLARO.
2.60
EMBARQUE DOMÉSTICO
.1
.3
18,345
3.02
CIRCULAÇÃO
)
ÍP
(T
ÍP
0
SHAFT DE AR CONDICIONADO 170x80
8.72
CIRCULAÇÃO
.14
2c
.25
1.54
50
(T
62,58m²
I
.40
5°
1.
4.42
.14
36
34°
.63
05
13.34
1.90
63,52m²
25°
1.
1.52
SANITÁRIO MASCULINO
7.
49°
5
7.88
.45
.25
SHAFT DE HIDRÁULICA
1.28
.8
75,34m²
REVESTIMENTO EM ACM
17
18,695
4
3
18,395
CONCESSÃO COMERCIAL (7.3.6)
.20
9
10
18,395
GIG-E009-3-TPS-05-201-DE-0111
A
)
2
2
3.6
SANITÁRIO FEMININO
58
17,75m²
6.67
3
GUARDA -CORPO
18,345
.20 .17 .15 .20
GUARDA-CORPO H= 1.10
3.16
°
SALA DE ELÉTRÔNICA
4
1
E
3
ESCADA
.25
2
10.6
1.4
)
52,21m² 3
0
R2.3
13 ° (TÍP
CONCESSÃO COMERCIAL (7.3.3)
PM 1A
H
64 63 62 61 60 59 58
2
2
10.64
VAZIO
GIG-E009-3-TPS-05-201-DE-0109
°
(TÍP
PM 1A
1
ESCADA FIXA
50
2.
R
77
175
58 59 60 61 62 63
18,345 1.50 (TÍP)
2.43
PAC 3
1.25
1.40
PM 4A
1.50
GIG-E009-3-TPS-05-201-DE-0102
PM 4A
1
.15
ESCADA FIXA
57 56 55 54 53 52 51 50 S
1
.90 2.10
1
6.71
2b
13
2.47
.92 .25
1.40.15 1.85
18,00
1
ESCADA FIXA
.46
18,345
P) 0 (TÍ 5 4.4
18,395
.25
18,395
CIRCULAÇÃO
ABRIGO E HIDRANT TIPO 3
.90 PCF 2.10 1
2a
GUARDA -CORPO
GIG-E009-3-TPS-05-201-DE-0111
.15
2.65
3
.50
4
D
14
CÓDIGO RIO GALEÃO:
GIG-E009-3-TPS-0
15
DIREITOS AUTORAIS RESERVADOS - PROIBIDA QUALQUER REPR
60,95m²
50 S 51 52 53 54 55 56 57
65,46m² R2
1.27
1.5
.25
CONCESSÃO COMERCIAL (7.3.5)
140°
°
74
1.39
11
9
R1.00
18,345
.25
13.54
1.50
1.80
77
6 .7
65 5.
)
ÍP
ÍP
(T
(T
1.
0
13
100
13
18,10
GIG-E009-3-TPS-05-201-DE-0105
.41 .35
SHAFT DE AR CONDICIONADO E ÁGUAS PLUVIAIS
.33
GUARDA -CORPO
GIG-E009-3-TPS-05-201-DE-0111
EMBARQUE INTERNACIONAL
12
148°
18,345
1
2
2
4°
1
3
15
3 5.41
4
B
SHAFT DE ELÉTRICA 3.62
1.00
GIG-E009-3-TPS-05-201-DE-0111
43,56m²
SHAFT DE ELETRÔNICA
1
3A
GUARDA -CORPO
11
JUNTA DE DILATAÇÃO
9
VARIÁVEL
.40
13
18,345
15,00 m² (9 und. 240L)
F
17
134°
ARMAZENAMENTO TEMPORÁRIO DE RESÍDUOS
LIMITE DO PISO DA CONCESSÃO (VER NOTA 6)
65
VAZIO
1
18,395
1
18,345
12
REVESTIMENTO EM ACM
1.
13
BALCÃO DE ATENDIMENTO A PASSAGEIROS
.69
HALL DE ELEVADORES
C 18 A
13
18,395 8
5
PAINÉIS EM CHAPA DE ALUMÍNIO COM NÚCLEO DE POLIETILENO (ACM), ESPESSURA 4mm, NA COR CINZA CLARO.
ACESSO EMBARQUE INTERNACIONAL 10 PIER SUL
9
0
.7
64
1°
17
.4
HI
1.
G
2
27
6
GIG-E009-3-TPS-05-201-DE-0128
30
2
818,345
1.
2. 70 60
1.
REVESTIMENTO ACM
.0
05
76
1 2.
2.7
E
3
7
78
31 6.
1.
6
1
6
1.
61
13 .9
SBGL-TPS-201-3506
238,92m²
44°
5
14.41
00
2.
(TÍP
0 (TÍ
1.5
C 17 A
4 2.
5
1.50
P)
3
REVISÃO
2. 14
GIG-E009-3-TPS-05-201-DE-0130
CORTE A - PARCIA
1 de 1
CÓDIGO ANAC
CONCESSÃO ALIMENTAÇÃO (6.3.1)
.1
(TÍP)
)
60
)
5. 54
.40 1.50
174
9.3
03/03/2015
(TÍP
10
1.02
)
° (TÍP
59
ELEVADOR DE PÚBLICO
ESPECIFICAÇÃO DO DOCUMEN
3
18,345
CFOLHA:
DATA:
1:100
5
0
.20
2.7
174°
2
2
ESCALA:
7.76
.3
18,345
2.
2
DESENHO
66,00m²
2
1.
2
CONCESSÃO COMERCIAL (7.3.2)
8.01
L
1
TIPO DO DOCUMENTO:
66 109°
3
.25
Nº TDR:
ARQUITETURA GERAL
1
5.
CONCESSÃO COMERCIAL (7.3.1) 60,58m²
D
PIER SUL CONECTOR GE
1.40
.25
C
1
SUB ÁREA DO SÍTIO:
B 14.99
.25
19.23
22,50 2,50
DESCIDA DE ESGOTO Ø100mm
G
1403-GA-8-TP-C01-00-C-3
B
ENHO VER DES -DE-2201 S-10-201
GIG-E009
K B
SP
CÓDIGO DO PROJETISTA
A
A
RIO DE JANEIRO INTERNATIONAL AIRPORT PASSENGER TERMINAL 2 EXPANSION year 2015 – 2016 site Galeão, Rio de Janeiro, Brazil status expansion phase I built architecture team intertechne consultores s.a. personal contributions electronic 3D modeling, CAD executive detailed plans, construction follow-up and technical monitoring of the site throughout the construction period
6
136.50
4 133.00
5
129.00
6
124.00
1
120.00
3
116.00
4
2
2
5
6
LONGITUDINAL SECTION 0
2
5
3
1
10
2 2
4
2
5
1
GROUND LEVEL 137 GROUND LEVEL 136.50
1 212 33 4 45 6 5 6
PEDESTRIAN ENTRANCE PEDESTRIAN ENTRANCE ENTRANCE NEW WING ENTRANCE MALI'S NEW WING SERVICE ACCESS (LIFT) SERVICE ACCESS ENTRANCE MALI'S PALACE MALI LIBRARY (REMAINED) ENTRANCE 3 MALI PALACE RESTAURANT (RELOCATED) MALI LIBRARY RESTAURANT
1 2
2 0
2
5
2
1
6
10
GROUND LEVEL 136.50 1 2 3 4 5 6
PLAZA LEVEL 133 1 PLAZA 2 FOYER ACCESS 3 CAFE 4 LIBRARY 5 LIBRARY PLAZA 6 SPECIAL COLLECTIONS LEVEL 136.50 7GROUND INFORMATION 81 TEACHERS ROOM PEDESTRIAN ENTRANCE 2 ENTRANCE MALI'S NEW WING 3 93 CLASSROOMS SERVICE ACCESS (LIFT) 4 ENTRANCE MALI'S PALACE 10 EDUCATION ACCESS 5 MALI LIBRARY (REMAINED) 6 RESTAURANT (RELOCATED) 11 OUTDOOR EXHIBITIONS 12 LIFT 13 STORAGE ELEVATOR
0
2
5
PEDESTRIAN ENTRANCE ENTRANCE MALI'S NEW WING SERVICE ACCESS (LIFT) ENTRANCE MALI'S PALACE MALI LIBRARY (REMAINED) RESTAURANT (RELOCATED) 12
13
10
2
6
3
4
2
8
7
5 0
2
5
9
1
10
1 11
5 2
1
9
4
2
2
6
10
PLAZA LEVEL 133.00 1 2 3 4 5 6 7 8 9 10 11 12 13
PLAZA FOYER ACCESS CAFE LIBRARY LIBARY PLAZA SPECIAL COLLECTIONS INFORMATION EDU TEACHERS ROOM CLASSROOMS EDUCATION ACCESS OUTDOOR EXHIBITIONS LIFT STORAGE ELEVATOR
0
2
STATION LEVEL 129 1 FOYER 2 METRO STATION EXIT 3GROUND INFORMATION LEVEL 136.50 4 SHOP 1 PEDESTRIAN ENTRANCE 52 WARDROBE ENTRANCE MALI'S NEW WING 3 SERVICE ACCESS (LIFT) 64 GALLERY ACCESS ENTRANCE MALI'S PALACE MALI LIBRARY (REMAINED) 756 PLAZA ACCESS RESTAURANT3 (RELOCATED) 8 PARK ACCESS
5
2
5
7
2 6
4 3
5
1
10
8
1
2
7
1 4
2 0
6
5
2
10
STATION LEVEL 129.00 1 2 3 4 5 6 7 8
FOYER METRO STATION EXIT INFORMATION SHOP WARDROBE GALLERY ACCESS PLAZA ACCESS PARK ACCESS
0
2
6
5
4
3
1 5
0
VIDEO PROJECTION PEDESTRIAN ENTRANCE ENTRANCE MALI'S NEW WING SUPPORT ROOM SERVICE ACCESS (LIFT) ENTRANCE MALI'S PALACE FOYER ACCESS MALI LIBRARY (REMAINED) RESTAURANTELEVATOR (RELOCATED) STORAGE IT ROOM
2
5
2
1 1
2
LEVEL 136.50 1GROUND GALLERY
02
4
10
GALLERY LEVEL 124
21 32 3 44 5 56 6
3
1
10
GALLERY LEVEL 124.00 1
GALLERY
1
MALI LIMA ART MUSEUM EXPANSION ARCHITECTURE COMPETITION year 2016 site Lima, Peru status not published architecture team spraa architecture personal contributions architectural concept for new contemporary art wing, ¡3D model, CAD draft plans Inspired by the original building of the museum and a very representative point of it, we recreate the Patio translating its void into three solid construction with the same square proportion. The water, that comes from the Andes, irrigates the site The Plaza, at 3.50 meters below the ground level, acts initially as an extension of the existing public areas of the site. The public underground passageway connects the Dammert Park, Metro Station and the Exposition Park by crossing the museum voids and inviting visitors to experience art from the outside.
PLANTA ESC. 1:50
03
APARTMENT #1 APARTMENT REFURBISHMENT IN SANTANA year 2014 site Santana neighbourhood, SĂŁo Paulo, Brazil status built architecture team raĂsa drumond & artur shum personal contributions architectural concept of a threeroom 70 m2 home transformed into a open studio. visualizations, draft and detailed drawings, construction follow-up and builder team coordination construction diary bit.ly/santana_apartment
LEGEN
DOCU
DE-4.0
PARADA DE ÔNIBUS
AV. FRANCISCO MORATO SENTIDO CENTRO
OR-4.1
AV. FRANCISCO MORATO SENTIDO BAIRRO
MD-4.1 ED 21
POÇO NORTE
ED 02
NOTA
ED 02
EE 357-01 BLOQUEIOS (ÁREA TARIFADA)
EB 15 EC 86-01
SAN/VEST. FEM. CONTRATADA
EB15
1-M
EC 86-01
2-D EXEC
3-O ARQ
EB 66-01 ED 23 EB 15
4-P ESTR
5-E SER
EF 07
EB 15 EC 86-01
EE 360
EC 86-01
EB 15
6-A VENT FORN
EC 98 ED 21 EB 66-01
EI MO 01
ED 21
EE 324-08
EE 324-05
EC 86-01
8- OS EXTE (SÉR
EI MO 01
EE 324-05
EB 15
EA 47 EI MO 01
EB 15
EE MO 04
DUTO DE INSUFLAÇÃO Ø=1.80m
EE 324-08
EE 324-09
EE 324-13 EB 15 EC 08
EF 06
PASSARELA
PRO
EB15
EM
ED 21
ELEV. 02
EB 66-01
EE MO 05
ED 23
EK 215
HID
EB 66-01
ED 23
EK 217 PASSARELA
EE 365 EC 86-01
HID
EB 36
EB36
ED 21
EI MO 01
EB 15 EF 121-03
EC 98
EI MO 01
EB 21
EE 264
EK 222
EB 66-02
EF 05
Esta folha é de propriedade da Companhia do Metrô e seu conteúdo não pode ser copiado ou revelado a terceiros. A aprovação deste documento não exime a projetista de sua responsabilidade sobre o mesmo.
EB 66-02
7- PA PRO
ED 21
ED 23 EB 15
EB 15 EB 15
EB 15
EH 34-02
EC 08
EC 86-01
ALÇAPÃO DE MANUTENÇÃO SISTEMA DE VENTILAÇÃO
EB 15 PV-01-01
PV-01-01
PV-01-01 VENTILADOR
ATENUADOR DE RUÍDO
ED 21
PV-01-01 ATENUADOR DE RUÍDO
EB 15
EB 15
EB 15
EC 08
EC 08
EC 08
CORTE LONGITUDINAL ACCESS PELO TÚNEL DE LIGAÇÃO DO POÇO NORTE SECTION · PLATAFORM no scale
VER CONTINUAÇÃO NO DESENHO 1 FOLHA DE-4160100_6B3-108
PLANT ALÇAPÃO DE MANUTENÇÃO DO SISTEMA DE VENTILAÇÃO
ALÇAPÃO DE MANUTENÇÃO DO SISTEMA DE VENTILAÇÃO
1 EF 121-03
EF 121-03
EE 264 EE MO 05 DUTO DE INSUFLAÇÃO Ø=0.90m
EC 86-01 EB 36
EE MO 04 EB 15
DUTO DE INSUFLAÇÃO Ø=1.80m
EE 323-02 EC 86-01
EB 36
HID
EB 45
EB 45
EE MO 04 EB 15 EE 324-05
EE 324-08 EI MO 01
EC 86-01
EI MO 01
EC 98 EC 86-01
PI 01
PI 01
EK 215
8.65
PROJ. PAV. SUPERIOR
EB 15 EE 323-03
PROJ. PAV. SUPERIOR
EB 15
EK 215 EK 222
EK 222
EC 86-01 EB 15
EB 15
EC 08
EA 47 EC 08
5.29
1.57
8
EIXO VIA 01 - SENTIDO BAIRRO
2(preto) - PENA 0,20
5(preto) - PENA 0,50
6(preto) - PENA 0,60
1.75
7(preto) - PENA 0,70
8(preto) - PENA 0,80
8
707,68
84
°1
FÔRMAS
DE-4-16.01.02/6J2 - 002 A 006
FÔRMAS
LEV.COTAS_FINAL (24/08/2012)
LEVANTAMENTO PLANIALTIMÉTRICO COMPLEMENTAR
DE-4-16.00.00/1C1 - 012
LEVANTAMENTO PLANIALTIMÉTRICO E CADASTRAL
- 016, 008
1
1.89
4.62
1.65
EMITENTE METRÔ
DE-4-16.01.04/6J2 - 101 A 104
Consórcio
HIDROCONSULT NORONHALENC
AUTORIA
Nome (Autor)
Verificação
Verificação
CREA nº
CREA nº
CAU nº
PILAR METÁLICO DE APOIO DA Nome (Co-Autor) PASSARELA
LEVANTAMENTO PLANIALTIMÉTRICO E CADASTRAL
DE-4-14.00.00./2C1 - 016
2'
EK 210
EE 324 -01
FÔRMAS FÔRMAS
Responsável Técnico CREA nº
LEVANTAMENTO PLANIALTIMÉTRICO E CADASTRAL
Nome (Colaborador)
Código
Objeto
Data:
DOCUMENTOS DE REFERÊNCIA
OBSERVAÇÕES
Modalidade
Modalidade ART nº
01/2012
EIXO VIA 02 - SENTIDO CENTRO
EE 304
EB 15
707,68
EB 15
6.32 EB 35
ED 21
EC 55 1.78
0.20 2.40
EB 15
PCF 01
2.12
0.20
ED 21 P-04 EB 15
EH 51-02 P-05
ED 21
0.10 2.55
0.20
0.80
1.11
4.45
EC 55
EJ 73
PLATAFORM LEVEL no scale
04
4.71 0.20 709,38 EE 349-01 EJ 73
P-06 EH 51-02 EB 15 EC 55
EB 15 EB 35
MANUTENÇÃO 709,38
0.85
0.10
ED 21 EC 55
0.80
DUTO PRESSUR.
1.24
1.15
0.20
EJ 73 0.80
EB 15
2.12
4.65 EC 55 0.44
6 EB 35
10
ED 21 0.85
PASSAGEM DE MACA
EF 10
NOVA INSUFLAÇÃO DECORRENTE DA FUTURA INTERGRAÇÃO COM A LINHA 17 - OURO (VER ESTUDOS NAS FOLHAS 4.16.01.00 / 6B2-016 a 018)
1.05
707,76
707,76
2'
EB 45
EB 15
EB 66-02
ELEVADOR 02
PL 2
HID
2.60
2.28 EB 45
1.65
0.035
PROJ. PASSARELA
PLATAFORMA SENTIDO CENTRO 707,68 EC 86-01
4.62
E.R. 04
EK 212 EK 210
2'
°1
84
1.53
1.89
0.25 EB 15
0.20
0.20 5.96
EC 55 EB 15 1.20
EB 35
°1
EK 212
EE 264 EF 67
707,76
01 02 03 04 05 06 07 08 09
1.89
EK 210
84
2.48
707,76
0.10
EF 121-02 1.65
4.60
E.R. 03
EB 15
2.50
P-03 MANUTENÇÃO
0.76
1
EE MO 03-01 0.10 1.20 0.10
PCF 02
EB 35
0.63
EE MO 03-01 2.44
EK 217 EK 215
0.035
EB 15
EK 222-02
3.75
EK 212
EC 86-01
0.20 0.25
EB 36
EK 210
EF 121-01
QER.03
0.15 0.15
4.43
EF 03
EF 121-01 EF 67 EE 264
2.20
EB 36
0.35
2.03
EF 67 EE 264
EB 36 EE MO 05
1.75
EF 03
NOVO ALÇAPÃO
0.15
EE MO 05
10 09 08 07 06 05 04 03 02 01
2.40 0.15 2.05
1.75 0.15
EB 36
0.035
0.39
0.35
0.035
EF 67 EE 264
EK 217 EK 215
4.43
QER.04
PROJ. PASSARELA
EF 121-01 0.15
10 09 08 07 06 05 04 03 02 01
EK 210 EK 208
EK 222-01
2.50
1 EC 86-01 EF 121-01 EK 212
EB 67
PROJ. PASSARELA
1 2 3 4 5
EF 121-01
0.75
PORTA DE PLATAFORMA CONFORME ESPECIFICAÇÃO DO FABRICANTE
EI MO 01
HID
9(preto) - PENA 0,90
1
1.89
DE-4-16.01.06/6J2 - 101 A 102 DE-4-16.01.05/6J2 - 101 A 105
PILAR METÁLICO DE APOIO DA PASSARELA DE-4-16.00.00./1C1
PROJ. PASSARELA
1.75
3(preto) - PENA 0,30
1.65
CORTE TRANSVERSAL - TÚNEL DAS PLATAFORMAS EK 212 E.R. 02
EF 121-02
PORTA DE PLATAFORMA CONFORME ESPECIFICAÇÃO DO FABRICANTE
4(preto) - PENA 0,40
4.60
EB 15
EC 86-01 PLATAFORMA SENTIDO BAIRRO
1
VER CONTINUAÇÃO NO DESENHO 1 FOLHA DE-4160100_6B3-108
PROJ. PASSARELA
EE 304
EB 45
EB 15 EK 212
EK 222-03
0.75
5 4 3 2 1
0.035
0.25 0.20
EB 36
EF 121-01
EI MO 01
PORÃO DE CABOS
1.99
QER.02
0.15
3.75
0.15 4.43
0.25
PROJ. PASSARELA
0.35
NOVO ALÇAPÃO
EB 36
EK 210
PROJ. PASSARELA
0.35
EK 215
EF 121-01
QER 01
4.43
3.05
EB 45 2'
°1
84
EK 210 CORTE TRANSVERSAL - EKTÚNEL DAS PLATAFORMAS (PASSARELA METÁLICA) EK 212 217 E.R. 01
1
0.25
0.15
EC 86-01
1.53
Esta folha é de propriedade da Companhia do Metrô e seu conteúdo não pode ser copiado ou revelado a terceiros. A aprovação deste documento não exime a projetista de sua responsabilidade sobre o mesmo.
1(preto) - PENA 0,10
EC 86-01
EF 01
PORÃO DE CABOS
0.20
0.035
EF 121-01
EF 121-01
EF 01
1.75
EK 212
0.15
EK 208
10 09 08 07 06 05 04 03 02 01
EK 215
EK 222-01
1.75
EF 67 EF 121-01FIXAS) EF 67 CORTE TRANSVERSAL - TÚNEL DAS PLATAFORMAS (ESCADAS EK 210 EK 217 EB 67
ELEVADOR 01
EB 66-02
EB 15
0.15
EE 264
10 09 08 07 06 05 04 03 02 01
0.15
EE MO 05
EE 264
1.00
1.53
2.44
EB 36
EB 15 EE MO 05
1.00
EE 264
0.035
HID
EB 15
EB 36
0.20
EK 217
EE 264
0.67
1.80
EE MO 03-01
EE 264 EF 67
EF 05
EB 36
PORÃO DE CABOS
1.53
DUTO EXAUSTÃO
0.035
DUTO EXAUSTÃO
0.24
PORÃO DE CABOS
09 08 07 06 05 04 03 02 01
EB 66-01
EC 86-01
0.44
EE 264
0.59
EK 217
EE MO 05
ASSESSORIA TÉCNCA
METR
Contrato: 4142921 O.S.: E-2459
GC
Verificação CAU nº
Validação
Verificação CREA nº
CREA nº
Modalidade ART nº
Aprovação CREA nº
MORUMBI METRO STATION, LINE 4 YELLOW EXECUTIVE ARCHITECTURE PROJECT year 2013-2014 site SĂŁo Paulo, Brazil status under construction architecture team 23 sul arquitetura personal contributions architecture and landscape design CAD plans at detailed level, layout studies, compatibility of engineering disciplines, materials spreadsheets; visual communication design
GROUND LEVEL no scale
05
CLUBE ESCOLA IBAITI ARCHITECTURAL DESIGN FOR A SPORT CLUB year 2013 site Ibaiti, Paraná, Brazil status not built architecture team raísa drumond, artur shum, thomas ho personal contributions architectural concept from draft to CAD detailed plans, layout studies, electronic 3D model
The project was designed from visitors point of view by thinking about the pathway they follow. From walking, from observing, from looking to infinity, the visitor route was designed so as to highlight her curiosity about the sky that instigates any inhabitant of our planet. Thus the situations encountered on the pathway of the museum are unique but mutable, such as the sky. Light, sky and shadow are carefully combined in every designed situation to create an intriguing atmosphere.
06
INTERNATIONAL MUSEUM OF ASTRONOMY IMOA ARCHITECTURE COMPETITION year 2013 site Atacama, Chile status not published architecture team bernardo loureiro, caio pereira, raísa drumond & selma shimura personal contributions architectural concept, electronic 3D modeling and draft plans
SAN PEDRO DE ATACAMA
IMOA SITE 7,5 KM FROM CITY BY BICYCLE 20’ BY CAR 10’
VOLCANO JURIQUES VOLCANO LICANCABUR
01a
A questão do tipo de cidade que desejamos é inseparável da questão do tipo de pessoa que desejamos nos tornar. A liberdade de fazer e refazer a nós mesmos e a nossas cidades dessa maneira é, sustento, um dos mais preciosos de todos os direitos humanos. (David Harvey)
IMAGINÁRIOS EMERGENTES PRÁTICAS URBANAS ALTERNATIVAS EM SP GRADUATION FINAL RESEARCH year 2014 status
published at University of São Paulo · FAUUSP
surpervisors profs. ana barone & jorge bassani keywords open source urbanism, colaborative actions, placemaking, community environment, sao paulo issuu bit.ly/raisadrn_fau_finalproject An initial thesis — from three study cases in São Paulo — about people taking responsibility for their cities and engaging in improving their environments. The research discuss how temporary urban interventions and bottom-up actions, often operating outside of traditional planning culture, could inspire or potentialise local community ambience and create more livable cities through proactive attitudes and participation.
02a
LUGAR OCUPADO WORKSHOP & PUBLIC SPACE INTERVENTION year 2013 site Butantã Metro Station, São Paulo, Brazil status academic work · FAUUSP architecture team students at expofau2013 personal contributions workshop coordination and model layout drawings keywords open source urbanism, community power proactive actions, placemaking, furniture, sao paulo video bit.ly/lugarocupado
03a
HOUSE #1 UNIFAMILIAR HOME CONCEPTUAL DESIGN year 2013 site Pompeia, São Paulo, Brazil status academic work / not built · FAUUSP architecture team raísa drumond & selma shimura personal contributions architectural concept from draft to CAD detailed plans, layout studies, electronic 3D model
COMMUNITY SERVICES · STREET LEVEL no scale
ELDERLY REST & SHARED AREA · 1ST LEVEL no scale
DROMITORIES · TYPICAL LEVEL no scale
04a
MAIN STREET FAÇADE no scale
BACKSTREET FAÇADE no scale
HOUSING FOR THE ELDERLY AND COMMUNITY SERVICE AT BORN DISTRICT year 2012 site Barcelona, Spain status academic work / not built · ETSAB UPC, architecture concept and detail raísa drumond
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
POOL & SPORT 路 WATER LEVEL no scale
+745.00
CLASSROOMS 路 2ST LEVEL no scale
+751.00 to 756.00
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
05a
CLASSROOMS 路 1ST LEVEL no scale
+761.00 to 766.00
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
+756.00 to 761.00
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
LIBRARY & LABS 路 1ST LEVEL no scale
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
TECHNICAL PUBLIC SCHOOL AT CANTINHO DO CÉU DISTRICT year 2011 site Cantinho do Céu, Billings, São Paulo status academic work / not built · FAUUSP architecture team joão viaro, selma shimura e raísa supervisors angelo bucci, alexandre delijaicov, milton braga
Raísa Drumond Architect & Urban Designer raisadrn@gmail.com +55 11 99953 0953 São Paulo SP · Brazil