P O R T F O L I O Selected Works Rajlaxmi Prashant Mandge. rajlaxmimandge@gmail.com MGM’S JNEC , Aurangabad.
CONTACT Address
Hudco, T.V.Centre ,Aurangabad, Maharashtra. 18/03/01 7020105019 rajlaxmimandge@gmail.com
DOB Mobile No Email EDUCATION
RAJLAXMI MANDGE
H
ello ! Myself Rajlaxmi. An ambitious, hardworking , focused, punctual and curious fourth year student of Architecture. Looking forward to gain more experience , knoweldege in a firm that provides an engaging, challenging and supportive work environment where i can contribute creative and artistic abilities in the area of architecture and obtain knoweldege and ideas. For me Architecture is The art or science of building : The art or practice of designing and building edifices for human use, taking both aesthetic and practical factors into account.”
ACADAMICS 2018 2019 2020
Bungalow design Canteen design Architect’s office Residential school Community centre (minor project) 3 - Star hotel Convention Center Residential Township 300 Bedded Multispecialty Hospital
2018 Present
MGM’s Jawaharlal Nehru Engineering College, Aurangabad Bacherlor’s Of Architecture,Aurangabad.
2021
2016-2018
S.B.E.S College Of Science Aurangabad. Higher Secondary Education - 12th Board Aurangabad.
SOFTWARE SKILLS
2005-2016
S.B’s Sharda Mandir High School , Aurangabad.
LANGUAGES ENGLISH HINDI MARATHI SKILLS
SOFT SKILLS
Hand Dreafting Sketching Model Making Painting Interior Designing Rendering
Good Communicator Team Working Creative Leadership Innovative And Imaginative
INTRESTS
CONTENTS
01
02
03
04
05
Residetial Township
Cafeteria
Multispeciality Hospital
Working Drawing
06
07
Technical Drwaings Autodesk Autocad Revit Digital Modelling Sketchup Graphics design Adobe Photoshop Adobe InDesign Visualization Enscape Basics MS Word MS Powerpoint MS Excel WORKSHOP Bamboo Workshop ( Auroville ) Brick, wattle and daub workshop ( Auroville ) Tensile Strcutres ( ZONASA ) COMPETITIONS AND EXTRACURICULAR Urband Escape ( Archmello Comprtition ) ENS Webinar Head of Tensile Strctures At ZONASA 2k19hosted by JNEC Designed Exterior OF Mr.Jagdale’s Residence Artwork For Mr.Patil( Painting for Saloon)
Convention Center
Groupwork Competition
Miscellaneous
The aim of the project was of campus planning considering all the diffrent public activities .To design Convention center, Auditorium, Open Air Amphitheratre,Offices,Hotel ,Food court,Exihibition Hall and Admin. The basic zoning has done considering user activity placement of blocks done in such a way that it should easily accessible on the site.
CONVENTION CENTER
01
Administration Food Court
Open Air Amphitheatre
Office Block Convention Hall
Auditorium
Banquet Hall
Exihibition Hall Hotel
01
LOCATION : Paithan road, Nakshtrawadi MBR,Auranagabd,Maharashtra. SITE AREA : 33,645 SQ.M
portfolio /02
A 543 M
Office 1- For 25-30People Office 2 -For 30-50People Office 3- For 50-80People
Toilets
544 M
545 M
Courtyard [Waiting Area]
546 M
131
547 M
P
Electrical Duct
Banquet Hall 2 Banquet Hall 1
ADJACENT PLOT (PRESENTLY NOT CONSTRUCTED)
P P
Office Typology 2
AHU
Store
105
D
E RO A
12M WID
M
P
Office Typology 3
Exhibition Hall2
I
ADJACENT PLOT ( PRESENTLY NOT CONSTRUCTED)
Pre Function Area
179
K P
Exhibition Hall1
J
P
Exhibition Hall
L P
N H
B
RESIDENTIAL AREA
P
45 M WIDE ROAD
EXIT
C P G P P
F
P
ENTRY
3
A
P
E
13
D
543 M 544 M
ADJACENT PLOT (PRESENTLY NOT CONSTRUCTED)
NATURAL WATER CHANNEL ON SOUTH
34
Toilets [Male] Toilets [Female]
Office Typology 2
Meeting Rooms
Lecture Hall 1 Lecture Hall 2
38
57
Office Typology 3
LEGEND
A.MAIN ENTRY TO THE SITE B.EXIT FROM THE SITE C.DROP OFF POINT D.ADMINISTRATION BLOCK E.EXHIBITION HALL F.PEDESTRIAN RAMP G.AUDITORIUM H.CENTRAL PLAZA WITH THE FOUNTAIN I.TRANSITIONAL SPACE WITH SKYLIGHT J.CONVENTION HALL K.BANQUET HALL L.HOTEL M.OFFICE BLOCK N.FOOD COURT O.OAT P.LANDSCAPE
Second Floor
Office Typology 3 Recreationl space Conferance Hall
First Floor
Convention Hall
545 M
A'
Banquet Hall
547 M
I
O
Administration Block
Third Floor
Stage Area Office Typology 3
Toilets
546 M
First Floor
Office Typology 3 Backstage Area
Pre Function Area
Ground Floor
Ground Floor
03
Convention Hall
Office Typology 3
Office Block
portfolio /04
The aim of the project was to design different varying housing typologgies like Row houses, semi-detached duplexes, bungalows; 1BHK,2 BHK and 3BHK apartments were To be provided. In addition to above the Social Amenities and other Infrastructural facilities required to be providedv, like shopping complex and recreational spaces like club house,swimmimg pool,indoor reacreational and community center.
Commercial area Residential area
RESIDENTIAL TOWNSHIP
02
SEMESTER VII
Initial Zoning
Walkways along the stream
Green pockets are created in the site.
Road network within site
School
Clubhouse
Community centre
Commercial area
Final massing
05
portfolio /06
CONVENIENCE SHOPPING AREA+ SCHOOL PRE-PRIMARY AND PRIMARY SCHOOL
CONVENIENCE SHOPPING AREA+ CAFETERIA
TYPOLOGY 1BHK APARTMENTS
CLUB+GYM+SWIMMING POOL+ RECREATION INDOOR DN -450
DN
I
TYPOLOGY 2 BHK APARTMENTS
-300
DN
-300
I
E G
F
TYPOLOGY 4BHK BUNGALOW
TYPOLOGY 2BHK ROW DUPLEX
G
I
J
D
H
C
RECREATIONAL SPACE ALONG THE STREAM
SIZES
A
PARKING
3.3X4.5M
15 SQ.M
B
LIVING ROOM
4.2X3.5M
14 SQ.M
C
UP
K
B
A
UP +450
AREA
SPACES
2.0X1.5M
3.00 SQ.M
D
KITCHEN CUM DINING
SKYLIGHT
3.6X5.0M
17SQ.M
E
UTILITY
0.9X2.6M
2.3 SQ.M
F
C.TOILET
2.1X1.5M
3.15 SQ.M
G
BEDROOM 1
3.0X4.1M
12 SQ.M
H
FAMILY LOUNGE
3.6X2.6M
9.5 SQ.M
I
ATT. TOILET
2.1X1.5M
3.15 SQ.M
J
BEDROOM 2
3.0X4.1M
12 SQ.M
K
OPEN TERRACE
4.2X3.6M
15 SQ.M
TOTAL AREA OF THE PLOT - 96 SQ/M
SR.NO
SPACES
SIZES
AREA
A
PARKING
3.2X4.2
15 SQ.M
B
11 SQ.M
LIVING ROOM
3.6X3.0
C
SKYLIGHT
1.8X2.0
3.6 SQ.M
D
DINING
3.3X3.0
10SQ.M
E
C.TOILET
2.1X1.0
2.3 SQ.M
F
ATT. TOILET
2.1X1.0
2.3 SQ.M
G
BEDROOM 1
3.3X3.3
10 SQ.M
H
KITCHEN
3.4X3.3
11.0 SQ.M
UTILITY
1.2X1.7
1.50 SQ.M
3.0X4.1
12 SQ.M
I J
BEDROOM 2
K
OPEN TERRACE
4.2X3.6
15 SQ.M
L
BEDROOM 2
3.2X3.2
10 SQ.M
M
BEDROOM 3
3.5X3.6
12 SQ.M
N
ATT. TOILET
2.1X1.0
2.3 SQ.M
O
C.TOILET
2.1X1.0
2.3 SQ.M
O
OPEN TERRACE
3.3X4.2
13 SQ.M
F D
E
C
D
E
TYPOLOGY 2BHK ROW DUPLEX
07
TYPOLOGY 3BHK SEIMI DETACHED
L
N
N O
C P
B
UP
C P
UP
A
A
UP +450
TOTAL AREA OF THE PLOT - 128 SQ.M FOR SINGLE UNIT A'
A'
M
O
C
B
UP +450
M
H
F
SR.NO
L
G
H
DN
RECREATIONL SPACES
A
A
A
A
A'
A'
TYPOLOGY 3 BHK APARTMENTS
COMMUNITY CENTRE+FUNCTION HALL+LIBRARY
portfolio /08
A
A
D
D
L DN -300
C
J
E
K
SR.NO T
L
S
1
R
U
A
J
SPACES
LOBBY ENTRANCE FOYER
AREA
SIZES
-
-
-
-
B
H
E
K
K
I
M
B
I
Q
I H
B
LIVING CUM DINING
4.3MX5.3M
23 SQ.M
C
BALCONY
1.8MX2.0M
3.6 SQ.M
D E F G
UP
KITCHEN DRY BALCONY C.TOILET MASTER BEDROOM
4.7MX3.5M
17SQ.M
G
G
F
D
3.5MX3.5M
O
D
P
C
A
H
C
M
M
N
A'
A
E
A
E
N
F
1
F
G
F B
B A
A
G
O
O
A
P
P
P
P
A'
1
A
4.5 SQ.M 12.25 SQ.M
A
A'
A
E
E
A
F
F
A
B
G
O
B
F
O
G
F
G
AREA OF THE SINGLE UNIT - 60 SQ.M
B
F
B
C
H
N
C
D
E
A
H
C
UP +600
F N
M
D D
D
L
H
C
B
M
N D
E
A
M
H
L
C
L
D
D
H
E
K
I
B
L
D E
F
A
A
G
F
G
M B
3.5MX1.2M 2.5MX1.8M
C
G
I
J
H
C
F
COURTYARD [3.3X3.5]
E
J
L
J
H
M
K
G
C
H
I
D
E
B
M
I
K
K
E
K
I
G
G C
I
K
C
B L
J
J
L
J
H
H
J
A
A'
A'
11 09
portfolio /10
CAFETERIA
03
LOCATION :Beed By Pass Road,Aurangabad,Maharashtra. SITE AREA :0.80 Acre. A public garden is being developed by Aurangabad Municipal Corporation on the southern side of Beed by pass road. The total area of the garden is about 2 Acres. The area of the proposed site of the cafeteria is about 0.80 acres The aim of the project was to design cafeteria which should be free structure while considering functionality nd structural component. 150MM X 75MM CHANNEL SECTION
25MM THICK FIBRE CEMENT SHEET
NUT BOLTS OR RIVETS PROVIDED FOR THE FIXING
150MM X 75MM CHANNEL SECTION
CLAMPS TO HOLD THE SECTION
PLAN OF CLAMP
CHANNEL SECTION
150MM X 75MM CHANNEL SECTION
VIEW OF THE CLAMP
CLAMPS TO HOLD THE SECTION
X
80
80
B
A' 11 +450
C +450
G
100
E
32
A
BASE STRUCTURE
THICKLY FORESTED AREA
F D
LEGEND A.MAIN ENTRY B.SECURITY OFFICE C.PARKING D.WELCOMING LANDSCAPE E.ENTRANCE PORCH F.CAFETERIA G.LANDSCAPE H.OUTDOOR SEATING I.SERVICE ROAD J.SERVICE ENTRY
68
H +300
15 M WIDE ROAD TOWARDS BEED BY PASS ROAD
SUPPORT BAR PROVIDED FOR EXTRA SUPPORT
C
To construct the structure on the site i propose to use channel sections and clamps to hold the section. Nut bolts are provided for the fixing of clamps on the upper so they will hold the channel section.
I have used 25mm thick fibre cement sheets for the roofing.fibre cement is a composite material, made up of portland cement (limestone, iron and clay), sand, and sustainably sourced cellulose fibres which are used to further reinforce the material and improve its durability.
CYLINDRICAL COLUMN FOR THE SUPPORT SECTIONS JOINT BY NUT BOLTS
32
C
I
11
BRICK
CEMENT REINFORCED PANELS
GLASS
STAINLESS STEEL
STONE TILES
portfolio /12
The aim of the project was to built 300 bedded hospital at Kanchanwadi,Aurangabad.As it is a hospital so i have created breathing spaces for natural ventilation and to as to break the hospital psycology . Created indoor outdoor relationship spaces between masses and open . Campus planning has done considering road networks, service circulation built unbuilt masses.
MULTISPECIALITY HOSPITAL
Proposed site
Marking out trees
Developing the form
13
04
Retaining of trees and carving out courtyrads
Final massing
portfolio /14
COURTYARD PA
TI
EN
LIFT
LI FT
EV ATO
T
EL
EN
EL EV ATO R
OPD
VERTICAL CIRCULATION
OPD
R
COURTYARD
BED
PHYSIO
T
BED
TI
PA
E VT EM CE GO CH AN S UID G
SERVICE CORE
VERTICAL CIRCULATION
SEMI PRIVATE ROOM
COURTYARD SEMI PRIVATE ROOM
HELP DESK / BILLING
BED ELEVATOR BED ELEVATOR
PATIENT LIFT PATIENT LIFT
PRIVATE ROOM (SINGLE BED)
DELUXE ROOMS
WAITING AND RECEPTION COURTYARD
GENERAL WARD 1 GENERAL WARD 2
CASUALTY
GENERAL WARD 2
DOS
4TH YEAR B.ARCH [ BATCH II ] 409221
SUBJECT
ADVII
COLLEGE
JNEC AURANGABAD
AHU CENTRAL T
EN
TI LIFT BED EV
EL
VERTICAL CIRCULATION
R
O
AT
COURTYARD
BED
R
ATO
EV
EL
SERVICE CORE
MATERNITY WARD
ICU
SERVICCE CORE
PA
CLASS ROLL NO
GROUND FLOOR
LIFT
REMARK
RAJLAXMI PRASHANT MANDGE
T
DOC
LOWER GROUND
NAME
EN
DATE
SECOND FLOOR
SECOND FLOOR
TI
SIGN
GENERAL WARD 3
THIRD FLOOR
BLOOD BANK
TITLE
TERRACES
PA
BED ELEVATOR
GROUND FLOOR
TERRACES
GENERAL WARD 1
BED ELEVATOR
ADMINISTARTION
MINOR OT
NO
LINAC UNIT
SIGN
TITLE
SHEET NO
VERTICAL CIRCULATION
3 AHU
LOWER GROUND
REMARK
ELECTRICAL PANEL ROOM
TELECOMMUNI SURVILLANCE
BED ELEVATOR
PATIENT LIFT
BED ELEVATOR
BED ELEVATOR PATIENT LIFT
PATIENT LIFT
KABORATORIES AND SERVICES
OPERATION THEATRES COMPLEX CARDIO CATH LAB
BED ELEVATOR
PATHOLOGY
15
TITLE
SHEET NO
DATE
NAME
RAJLAXMI PRASHANT MANDGE
DOC
CLASS
4TH YEAR B.ARCH [ BATCH II ]
FIRST FLOOR
THIRD FLOOR
LOWER GROUND FLOOR SIGN
CARDIO CATH CVTS
DELIEVERY ROOM
CCU
RADIOLOGY
LOWER GROUND FLOOR
RECOVERY WARD
BED ELEVATOR
NO
VERTICAL CIRCULATION
3
TITLE
LOWER GROUND
SIGN
REMARK
DATE
NAME
RAJLAXMI PRASHANT MANDGE
DOC
CLASS
4TH YEAR B.ARCH [ BATCH II ]
ROLL NO
409221
SUBJECT
ADVII
DOS
FIRST FLOOR
portfolio /16
DRAWINGS ARE NOT TO BE MEASURED . THE WRITTEN DIMENSIONS ARE STRICTLY TO BE FOLLOWED .
LOAD BEARING - BUNGALOW
ANY DISCREPANCIES OR AMBIGUITIES ARE TO BE BROUGHT TO ARCHITECTS NOTICE BEFORE COMMENCEMENT OF WORK ON SITE. ALL DRAWINGS ARE TO BE READ WITH RESPECT TO STRUCTURAL AND SERVICES DRAWING.
1229
1256
1229
1229
1229
1075.28
1075
1075
1229
1055.1
848.08
460
PUJA [2150X2110MM]
DINING [5880X3810MM]
1651.24
1630
1630
LIVING ROOM [5880X4893MM] 1905
1468
WC [1500X1200MM]
751
750.69
750.69
600
1229
1229
750
1229
1229
911.66
911.66
@550 ABOVE FFL
BATH [2500X1500MM]
1234
1256
ELECRICAL LAYOUT GROUND FLOOR - 01
1234
1229
1229
750
1234
D.B.
1940
E
3000
3000
3000
3000
3000
3000
S/BJ @1450 ABOVE FFL S/BK @1050 ABOVE FFL
DINING [5880X3810MM] S/BI @1650 ABOVE FFL FOR CHIMNEY
1905
1630
1630
S/BC @1050 ABOVE FFL S/BD @5OO ABOVE FFL
750.69
1905
SUSPENDED LIGHT
10
EXHAUST FAN
11
PLUG POINT
N/L
D
24M WIDE ROAD
W1
0
17
C
E
STARTING POINT DRAWING
F
G
H
I
SUSPENDED LIGHT
10
EXHAUST FAN
11
PLUG POINT POWER POINT N/L
NIGHT LAMP DISTRIBUTION BOARD
D.B.
24M WIDE ROAD
DRAWING TITLE
DRAWINGS ARE NOT TO BE MEASURED . THE WRITTEN DIMENSIONS ARE STRICTLY TO BE FOLLOWED . ELECTRICAL LAYOUT-
01
ANY DISCREPANCIES OR AMBIGUITIES ARE SCALE 1:50 TO BE BROUGHT TO ARCHITECTS NOTICE BEFORE COMMENCEMENT OF S WORK ON SITE. ALL DRAWINGS ARE TO E BE READ WITHW RESPECT TO STRUCTURAL AND SERVICES DRAWING. ELECTRICAL LEGEND SIGN
SR.NO SYMBOLS 1 2
N
DESCRIPTION DOOR BELL
RAJLAXMI PRASHANT MANDGE
CEILING LIGHT
3
CEILING FAN
WD I
LCD / PLASMA TV
309221
NIGHT LAMP
JNEC AURANGABD MUSIC SYSTEM
OTTA [3000X3650MM]
911.66
SHEET NO
BUNGLOW
ELE01
6
TELEPHONE POINT
7
BUZZER POINT
8
SWITCH BOARD
9
SUSPENDED LIGHT
10
EXHAUST FAN
11
PLUG POINT POWER POINT N/L
NIGHT LAMP DISTRIBUTION BOARD
D.B.
KEY PLAN
DRAWING TITLE
ELECTRICAL LAYOUT- 01 911.66
SCALE 1:50 S E
UP
J.N.E.C. AURANGABAD
ELE01
BUNGLOW
ALL DIMENSIONS ARE IN MM UNLESS SPECIFIED OTHERWISE.
4
W
309221 WDI
SHEET NO
PROJECT NAME
GENERAL NOTES
5
PROJECT NAME
T.Y.B.ARCH [ II ]
B
9
POWER POINT
DISTRIBUTION BOARD
D.B.
RAJLAXMI PRASHANT MANDGE
A
SWITCH BOARD
T.Y.B.ARCH.[II]
911.66
750.69
3000
1940
750.69
3000
8
KEY PLAN
13
S/BA DOOR BELL @1500
911.66
1468
3000
7
14
14
S/BE @750 ABOVE FFL
1468
MAIN ENTRY
START POINT PLOT LINE COORDINATE
1940
SWITCH BOARD
1075 S/BB @1050 ABOVE FFL
LIVING ROOM [5880X4893MM]
1468
0
BUZZER POINT
1651.24
1630
1630
UP
N
1468
0
TELEPHONE POINT BUZZER POINT
12
S/BB @1050 ABOVE FFL
SIGN
7
ENTRANCE LOBBY [3000X3000MM]
1468
911.66
S/BL @1650 ABOVE FFL FOR REFRIGERATOR
2010
TELEPHONE POINT
750.69
D.B.
1174.36
A,00
6
911.66
S/BH @1500 ABOVE FFL
[5880X3880MM]
W
MUSIC SYSTEM
S/BG @4050 ABOVE FFL
911.66
KITCHEN
2186
MUSIC SYSTEM
6
460
750.69
1940
4 5
KEY PLAN
1433.56
S
UP
1468
OTTA
SCALE 1:50 [6230X2000MM]
CEILING FAN LCD / PLASMA TV
13
OTTA [3000X3650MM]
@1050 ABOVE FFL @550 ABOVE FFL
3
12 1229
1229
1433.56 1075
1630
CEILING LIGHT
14
750.69
DN
1024
1468
1468
1075
1468
1
@1050 ABOVE FFL @550 ABOVE FFL
S/BH @1500 ABOVE FFL
3000
1630
2
S/BF @1500 ABOVE FFL
750.69
1905
START POINT DRAWING
DOOR BELL
1234
S/BR @1350 ABOVE FFL
911.66
S/BO @1500 ABOVE FFL
S/BN @1500 ABOVE FFL
1468
@550 ABOVE FFL
1905
S/BM @1500 ABOVE FFL
MASTER BEDROOM [4900X4920MM]
848.08
PUJA [2150X2110MM]
LIVING ROOM STORE ROOM [2150X2880] [5880X4893MM]
1468
1940
1468 @1450 ABOVE FFL
[2150X2880MM]
1055.1
1500
1468
A,01
5700
76 06 .6
9
1
DRAWING TITLEUTILITY
[5880X3880MM] 1940
SP01
1440
S/BU @500 ABOVE FFL
1651.24
S/B AS PER MANDIR LEVEL
1468
KITCHEN
1466
1075.28
1035.44
2700
3000
2446
ENTRANCE LOBBY 1234 [3000X3000MM]
S/BP @1350 ABOVE FFL
1630
S/BE @750 ABOVE LVL FFL
BUNGLOW
970 S/BV @500 ABOVE FFL
SHEET NO
PROJECT NAME
1174.36
2348
1630
CHILRENS BEDROOM [4900X3880MM]
750.69
2
5350
1075
2
1940
S/BW @500 ABOVE FFL
1229
1940
970
DINING [5880X3810MM]
1229
1468
1468
3000
OTTA [6230X2000MM]
S/BQ @1350 ABOVE FFL
DESCRIPTION
1
9
S/BR @1350 ABOVE FFL
2707 DN
5
ALL DRAWINGS ARE TO BE READ WITH RESPECT TO STRUCTURAL AND SERVICES DRAWING.
8
1234
24M WIDE ROAD 1256
S/B @1500 ABOVE FFL
WC [1500X1200MM]
751
970
970
S/BT @500 ABOVE FFL
S/BS @500 ABOVE FFL
600
460
1229
BATH [2500X1500MM]
S/BY @500 ABOVE FFL
1229
S/BX @500 ABOVE FFL
1075
UP
848.08
PUJA [2150X2110MM]
STORE ROOM [2150X2880]
SEATOUT [5350.8X2500MM]
FOR WATER HEATER
1229
1055.1
1500
SEATOUT [5350.8X2500MM]
S/BC @1500 ABOVE FFL
1075.28
1075
3 UTILITY [2150X2880MM]
SEATOUT [5249.8X3230MM]
1229
1229 1075
1075
1440
1234
KEY PLAN S/B AS PER MANDIR LEVEL
3
UP
MASTER BEDROOM [4900X4920MM]
970
1229
3000
SEATOUT 2967 [5249.8X3230MM]
LCD / PLASMA TV
ANY DISCREPANCIES OR AMBIGUITIES ARE TO BE BROUGHT TO ARCHITECTS NOTICE BEFORE COMMENCEMENT OF WORK ON SITE.
SR.NO SYMBOLS
4 970
CEILING FAN
4
ELECTRICAL LEGEND
1234
CHILRENS BEDROOM [4900X3880MM]
4
3
05
N/L
3000
911.66
OTTA [3000X3650MM]
@1050 ABOVE FFL @550 ABOVE FFL
@1050 ABOVE FFL @550 ABOVE FFL
@1450 ABOVE FFL
970
1630
1468
1468
5 FOR WATER HEATER
911.66
1630
750.69
1905
1468
1940
750.69
KITCHEN
970
CEILING LIGHT
DRAWINGS ARE NOT TO BE MEASURED . THE WRITTEN DIMENSIONS ARE STRICTLY TO BE FOLLOWED .
[5880X3880MM] 1940
3228
2
WORKING DRAWINGS
S/BE @750 ABOVE LVL FFL
1174.36
5
DOOR BELL
13
ALL DIMENSIONS ARE IN MM UNLESS SPECIFIED OTHERWISE.
DESCRIPTION
1
12
GENERAL NOTES
1433.56
1940
ENTRANCE LOBBY [3000X3000MM]
1468
1468
1468
D.B.
1035.44
3000
SEATOUT [5350.8X2500MM]
UP
S/B @1500 ABOVE FFL
1940
3488
1234
S/BC @1500 ABOVE FFL
1500
OTTA [6230X2000MM]
DN
1234
1468
6
MASTER BEDROOM [4900X4920MM]
STORE ROOM [2150X2880]
UTILITY [2150X2880MM]
6
ELECTRICAL LEGEND
1234
SR.NO SYMBOLS
S/B AS PER MANDIR LEVEL
1075
3000
3749
1234
970
ANY DISCREPANCIES OR AMBIGUITIES ARE SEATOUT TO BE BROUGHT TO ARCHITECTS [5249.8X3230MM] NOTICE BEFORE COMMENCEMENT OF WORK ON SITE. . ALL DRAWINGS ARE TO BE READ WITH 1440AND SERVICES RESPECT TO STRUCTURAL DRAWING.
7
WC [1500X1200MM]
CHILRENS BEDROOM [4900X3880MM]
1075
2027.12
DRAWINGS ARE NOT TO BE MEASURED . THE WRITTEN DIMENSIONS ARE SRITCTLY TO BE FOLLOWED . 970
7
N/L
4010
600
751
970
1229
1229
1229
BATH [2500X1500MM]
970
ALL DIMENSIONS ARE IN MM UNLESS SPECIFIED OTHERWISE.
750
FOR WATER HEATER
GENERAL NOTES
ELECRICAL LAYOUT GROUND FLOOR - 02
PROJECT NAME
SHEET NO
BUNGLOW
ELE03
N SIGN
DRAWING TITLE
ELECTRICAL LAYOUT- 03
portfolio /18
SPECIFIED OTHERWISE.
Z3
B4
S/B O @
O2
SPLIT A.C.
O1
P2
SPLIT A.C.
P1
Q1
SPLIT A.C.
Q2
C3 [230x430]
A2
A3
+600 +450 +300 +150
S2
S1b
S3
S1c
S/B Z 5@
[230x380] C5
C4 [230x430]
A4
R2
SPLIT A.C.
R1
C2 [230x380]
S/B Z6 @
[230x380]
F/S D'1
F/S
F/S
F/S
D'2
D'3
P5
O3
C12-[230x430] F12-[1100x1400]
C13-[230x430] F13-[1100x1400]
C14-[230x430] F14-[1100x1400]
C15-[430x230] F15-[1400x1100]
C1-[230x430] F1-[1100x1400]
C2-[230x380] F2-[900x900]
02 01
C4-[230x430] F4-[1400x1100]
C3-[230x430] F3-[1400x1100]
C5-[230x430] F5-[1400x1100]
ROAD WIDE
1500
C14 [230x430]
1485
2000
C7 [230x430]
37615
C2 [230x380]
19
START POINT PLOT LINE COORDINATE
SIGN
DETAILED FIRST FLOOR PLAN
C2 [230x380]
35x6MM THK M.S. PLATE
50x6MM THK M.S. CUT PLATE
ELEVATION AT 'A' [WC BATH]
RAJLAXMI PRASHANT MANDGE C19
C25 [230x430]
[230x430]
WDII 9
8
7
6
5
4
3
2
A'
1
250 250 250 250 250 250 250 250 250 250 250 250
C20 PROJECT NAME [230x430]
ARCHITECTS OFFICE
[230x430]
06
GROUND FLOOR PLAN
DRAWING TITLE
DETAILED FIRST FLOOR
DRAWING TITLE
STAIRCASE DETAILS
1115
1115
14
15
16
17
18
19
20
21
22
23
24
25
26
J.N.E.C. A AURANGABAD250250250 250250250250250 250250250250 13
12
11
10
9
8
7
6
5
4
3
2
A'
1
SCALE 1:40
DN
DN
250 250 250 250 250 250 250 250 250 250 250 250
UP
SHEET C26 NO
C25 [230x430]
C19 [230x430]
T.Y.B.ARCH [ II ] 309221
A
250 250 250 250 250 250 250 250 250 250 250 250250250 14
15
13
16
12
17
11
18
10
19
9
20
8
21
7
22
6
23
5
24
4
25
3
760
4 5
CEILING LIGHT POINT
450 450
METER BOARD DISTRIBUTION BOARD
D. B.
ELEVATION AT' D' [BATH ]
7
W
A'
1
UP
16
ELEVATION AT B' [BATH ]
SUSPENDED LIGHT POINT
C20 [230x430]
450
FLOOR STANDING LIGHT POINT
WINDOW EXHAUST FAN
450
10 LOUVERED GLASS
450
TELEPHONE POINT F/S
WALL TILES 425
FIRST FLOOR PLAN
MIRROR
HEALTH FAUCET
2100
450
COLD WATER PILLAR
525
450
450
FLUSH TANK TOILET PAPER HOLDER
BIB COCK
ELEVATION AT 'C' [WC AND BATH ]
GRANITE COUNTER TABLE TOP BASIN WALL MOUNTED CABINET FLOOR FINISH LEVEL BRICK BAT COBA150MM THK PCC 100MM THK DPC 75MM THK RUBBLE SOILING [230MM THK] RAMPED EARTH
E
V
V
WATER HEATER
HOT AND OLD BATH MIXER WITH FAUCET AND SPOUT
450
600
450
BATH [2500X1500MM] +740
300
600
D
450
A C
B
300
WC [1500X1200MM] + 740
750
COLD WATER PILLAR S SIGN
GRANITE COUNTER
DRAWIN
TOILE
LOUVERED GLASS WINDOW
GULLY TRAP
D
A C
D5
B
D4
SCALE 1:
TOILET PAPER HOLDER EXHAUST FAN HEALTH FAUCET AND BIB COCK GULLY TRAP TILE DROP
SIGN
EXTERNAL PLASTER [18MM THK] INTERNAL PLASTER [12MM THK]
RAJLAX
C26 [230x430]
TERRACE FLOOR PLAN
PROJEC
BUNG
LINE OF SOIL PIPE LINE OF WASTE PIPE
T.Y.B.AR
RAJLAXMI PRASHANT MANDGE
STAIRCASE DETAIL
RAMPED EARTH
PLUG POINT
EXHAUST FAN LOUVERED GLASS WINDOW
TILE DROP
C26 [230x430]
FLOOR FINISH LEVEL BRICK BAT COBA150MM THK PCC 100MM THK DPC 75MM THK RUBBLE SOILING [230MM THK]
SPLIT AIR CONDITIONER
M. B.
6
450
450
SPILT A .C
TOWEL HANGER
26
2
250 250 250 250 250 250 250 250 250 250 250 250
UP
C20 [230x430]
3
SHEET NO
PROJECT NAME
ARCHITECTS OFFICE
17
450
9M WIDE ROAD
C16 [230x430]
250 250
EXHAUST FAN
FLOOR FINISH LEVEL BRICK BAT COBA150MM THK PCC 100MM THK DPC 75MM THK RUBBLE SOILING [230MM THK]
02 ELO2
DETAIL AT 'C'
1115
2
ANY DISCR TO BE BRO NOTICE BE WORK ON . ALL DRAW RESPECT DRAWING.
HEALTH FAUCET
ROAD WIDE
ELO4 04
SIGN W3
C25 [230x430]
WALL TILES
800
GROUND LEVEL
G.L.
SWITCH BOARD
S/B
450
2
E
1
TOWEL HANGER
450
+600
W
DESCRIPTION
450
RCC STAIRCASE SOFIT [150MM]
KEY PLAN
50MM M.S. POST
600
DRAWINGS THE WRIT TO BE FOL
450
450
450
50MM DIA BASE CAPING TO M.S. POST
PLINTH LEVEL
7 6 5
J.N.E.C. AURANGABAD 600
10
SYMBOL
WATER HEATER
WDII
SILL LEVEL
SR NO
9
309221
DIA M.S.
DETAIL AT 'B'
9
4
T.Y.B.ARCH [ II ]
450
POST
50
GENERAL
ELECTRICAL LEGEND
8
RAJLAXMI PRASHANT MANDGE
+1800
8
3
75
RAMPED EARTH
600
FLOOR STANDING LIGHT POINT 50MM
F/S
ELEVATION AT B' [WC ]
450
SCALE 1:75
WALL MOUNTED CABINET FLOOR FINISH LEVEL BRICK BAT COBA150MM THK PCC 100MM THK DPC 75MM THK RUBBLE SOILING [230MM THK]
E
450
LANDING
GRANITE COUNTER TABLE TOP BASIN
W
450
GROUND FLOOR SLAB LEVEL
RCC BEAM [350X450MM]
SCALE 1:75
450
14 MID
MIRROR FLUSH TANK HOT AND OLD BATH MIXER WITH FAUCET AND SPOUT SPOUTS COLD WATER PILLAR
ELECTRICAL LAYOUT G.F.
450
9+4500
13
WALL TILES
S
100
50MM DIA M.S. HANDRILL
12MM DIA M.S. TELEPHONE POINT PLATE WELDED TO HANDRILL
DETAILED GROUND FLOOR LINTEL LEVEL PLAN
2700
DRAWING TITLE
DETAIL AT 'A'
C6 [230x430]
450
3.ANY DISCREPANCIES OR AMBIGUITIES ARE TO BE BROUGHT TO ARCHITECTS NOTICE BEFORE COMMENCEMENT OF WORK ON SITE. . 4. ALL DRAWINGS ARE TO BE READ WITH RESPECT TO STRUCTURAL AND SERVICES DRAWING.
C5 [230x430]
ALL DIMEN SPECIFIED
11
V
KOTA STONE IN RISERS KOTA STONE IN TRADES QUARTER ROUND
PLUG POINT
GROUND FLOOR PARAPET LEVEL
S
10
C16 [230x430]
C15 [230x430]
C4 [230x430]
+600 +450 +300 +150
WINDOW EXHAUST FAN WATER HEATER
450
450
SUSPENDED LIGHT POINT
05
+5400
C24 [230x430]
11
J'14
C14 [230x430]
C8 [230x430]
SHOWER
SIGN
+00
12
J'10
1800
300
DISTRIBUTION BOARD
+3000
1
13
C24 [230x430] J'9
J'8
450
2.DRAWINGS ARE NOT TO BE MEASURED . THE WRITTEN DIMENSIONS ARE SRITCTLY TO BE FOLLOWED .
ARCHITECTS OFFICE
450
MILD STEEL RAILING 22
32 MMT TUBULAR BALUSTER
A
S/B K' @
LOUVERED SHEET NO GLASS
PROJECT NAME
METER BOARD
FIRST FLOOR SILL LEVEL
+3890
23
12
16
C22 [230x430]
ELECRICAL LAYOUT FIRST FLOOR
SPLIT AIR CONDITIONER
SHEET NO
7
10
24
B
C6 [230x430]
02 ELO2
450
PROJECT NAME
BRICK WALL 230MM
15
C5 [230x430]
ELO4 04
450
35
11
15
F/S K'1
450
GENERAL NOTES
1.ALL DIMENSIONS ARE IN MM UNLESS SPECIFIED OTHERWISE.
WAIST SLAB
M. B.
ARCHITECTS 8OFFICE
36
MILD STEEL RAILING
14
F/S K'2
C13 [230x430]
C3 [230x430]
ROAD
C1 [230x430]
C6 [230x430]
600
3440
RCC BEAM [350X450MM]
DRAWING TITLE
KEY PLAN
C21 [230x430]
F/S
K'3
C7 [230x430]
100
MID LANDING
40 39
29
A
F/S K'4
C12 [230x430]
9M WIDE ROAD
50 50
41
38 37
28
100x100x5MM MS BASE PLATE
F/S
K'5 J.N.E.C. AURANGABAD
C11 [230x430]
WIDE
SPLIT A.C.
12M
42
9M WIDE ROAD
A' S
43
DN
C4 [230x430]
E
±00
44
16
C8 [230x430]
ELO1
00
45
17
C19 [230x430]
C3 [230x430]
C20 WDII [230x430]
S/B Z 5@
CEILING LIGHT POINT STEPS CONCRETE
SPILT A .C
FLOOR LINTEL D. LEVEL B. 6FIRST +6600
46
W3
N W
S/B Z6 @
DESCRIPTION
3FIRST FLOOR PARAPET LEVEL
27
TUBULAR BALUSTER INTERMIDIATE C
C23 [230x430]
309221
C19 [230x430]
A'9
Z7
S/B Z7 @
C5 [230x430]
EXHAUST FAN
5
25
PASSAGE
J'15
T.Y.B.ARCH [ II ]
S/B Z @
9M WIDE ROAD
18
+4500
DRAWING TITLE
[230x430]
Z8
C4 [230x430]
SWITCH BOARD
+7620
19
C15 [230x430]
+3360
C18 [230x380]
C17 [230x430]
C10 [230x380]
C9 [230x430]
FIRST FLOOR SLAB LEVEL
20
C28 [230x430]
J'7
J'5
RAJLAXMI PRASHANT MANDGE
KEY PLAN
S/B Z8 @
A4
2
26
PASSAGE [G.F.]
1400
J'6
FLOOR STANDING LIGHT POINT
F/S
J'12
A'6
12M
C23 [230x430]
9
A'5
A10
S/B
4
21
OPEN TERRACE
+5615
CENTERLINE PLAN C1
1
50
RCC BEAM 230x450MM
C28 [230x430]
Z5
10115
C2,C3,C4,C5
C6-[230x430] F6-[1100x1400]
A3
TOWER SLAB LEVEL SR STAIRCASE NO SYMBOL +10500
30
MID LANDING
J'4
C27 [230x430]
S/B Z4 @
Z1
Z2
D
C22 [230x430]
S
J'13
S/B Z 3@
Z4
A8
+10950
51
4800
PASSAGE [F.F.]
[3330x430MM]
W3
PLUG POINT TELEPHONE POINT
C16 [230x430]
ROA
STUDIO [5000x8885]
+4500
C7,C8
C1,C6
A9
+600 +450 +300 +150
WIDE
C13 [230x430]
O2 655
4966
[3350x2100MM]
W1
+7115 +5715
C8 [230x430]
+8700
31
02 ELO2
W3 C12 [230x430]
C35 [230x380]
C27 [230x430]
[600x600MM] C21 [230x430]
O1
J'3 J'2
A'3
K'6
8
450
5000
2100
C20 [230x430]
D4
900
J'1 K'7
E
J'11
Z9
+600 A1
A2
MILD STEEL RAILING
PASSAGE
J'16
W
K'8
SUSPENDED LIGHT POINT
C15 [230x430] S/B Z2 @
E4
MD
C7 [230x430]
A6
STAIRCASE TOWER
450
[1000x380MM]
+600
D5
1600
COURTYARD [11040x4115]
SCALE 1:100
CENTERLINE PLAN
RCC BEAM [350X300]
3440
D2
W3
C11 [230x430]
D5
C34 [230x380]
[1500x430MM]
OPENINGS SIZES
SR NO
750
K'10
K'9
SIGN
450
1015 1200 1093
1889
RCC BEAM [350X300]
3.ANY DISCREPANCIES OR AMBIGUITIES ARE TO BE BROUGHT TO ARCHITECTS NOTICE BEFORE COMMENCEMENT OF WORK ON SITE. MILD STEEL RAILING . 4. ALL DRAWINGS ARE TO BE READ WITH 34 RESPECT TO STRUCTURAL AND SERVICES 33 32 DRAWING.
271
1200
C33 [230x380]
600
LADIES TOILET [2500x3000]
1600
[1200x380MM]
W5
271
D4
D3
+4950
D5
271
C35 [230x380] S/B J' @
C26 [230x430]
DISTRIBUTION BOARD
12M
670
1200 1378 600 200 200
600 200 200
1200
3155 4423
1485
1615
900
3000
600
1741
W3
1000
271
GENTS TOILET [2500x3000]
[2000x2100MM]
3000
750
11040
W4
SHEET NO
02
C24 [230x430]
STAIRCASE TOWER PARAPET LEVEL
PCC COPING DRIP MOULD PARAPET WALL
RCC BEAM
C34 [230x380]
A'1
10
ELECTRICAL LEGEND
PCC COPING DRIP MOULD BRICK BAT COBA RCC SLAB [150 MM THK ]
D4
C33 [230x380]
SCALE 1:75
C25 [230x430]
METER BOARD
A'8
C14 [230x430]
150
1500
1200
4130 3000 250 250 250 250250 250 250 250250 250 250 250
D3
600
D. B.
C'7
C'6
C'5
C32
S/B A @
C3 [230x430]
2.DRAWINGS ARE NOT TO BE MEASURED . 49 230x450MM 48 THE WRITTEN DIMENSIONS ARE SRITCTLY 47 TO BE FOLLOWED .
SCHEDULE FOR OPENINGS
1200
1200 445
1000
D3
271
6
DRAWING TITLE
[230x380] ELECTRICAL LAYOUT G.F.
KEY PLAN
C42 [230x430]
D5
W1
+10745
PROJECT NAME
03
1500
600
M. B.
A'7
S/B Z1 @
E3
C6
C5
G3
C6 [230x430]
C9,C12,C13,C14,C16
C16-[230x430] F16-[1100x1400]
C8-[230x430] F8-[1400x1100]
2000
10230
9M WIDE ROAD
C15
ARCHITECTS OFFICE C7-[230x430] F7-[1400x1100]
1500
271
750
MEETING ROOM 2
12M
C10,C11
C10 [230x380]
1250
C31 [230x380]
W5
9000
C11-[430x230] F11-[1400x1100]
C9 [230x430]
5000
C10-[380x230] F10-[900x900]
1500
5
W3
3000
+10845
W1
1000
W2
+3360
1250
WINDOWS SIZES
JUNIOR ARCHITECT
C32 [230x380]
C26 [230x430]
1250
C'3
S/B B' @
SPLIT AIR CONDITIONER
ELECRICAL LAYOUT GROUND FLOOR
ROAD
+10860
05
1500
W5
C'4
F/S
Z6
1368
WIDE
06
04
C9-[230x430] F9-[1100X1400]
C18,C23
C24-[230x380] F24-[900x900]
C4
B2
C2 [230x380]
12M
C22-[230x430] C23-[230x380] F22-[1100x1400] F23-[900x900]
C19 [230x430]
1250
W5
C29 [230x430]
S/B Y @
+600
E2
C13 [230x430]
A7
C1 [230x430]
C30 [230x430]
W4
E1
C7
I1
S/B H' @ S/B I' @
B1
G2
W3
2700
C21-[230x430] F21-[1100x1400]
B4
S/B G @
3000
C20-[230x430] F12-[1100x1400]
C8
S/B B @
LANDING 1115 MM WIDE
C18-[380x230] C19-[230x430] F18-[880x730] F19-730x930]
+14075
D4
Z3
+600 G1
X1
D5
C1
C'2
C'1
A'4
W1
H2
G7
H1
V1
S/B X @
S/B E @
C2
C3
H'1 G'4 G'3
11
+600
B3
5000
07
C17-[230x430] F17-[1100x1400]
C17,C19,C20,C21,C22,C24
C22 [230x430]
D3
S/B C @
+600
F/S
01 ELO1
W3 +14150
C18 [230x380]
W5
W5 C41 [230x430]
1798
C25,C26
[750x2100MM]
1250
SR NO
MIDLANDING
C17 [230x430]
+17860
LIBRARY [5000x8885]
W2
C40 [230x380]
1200
C27
C28-[230x380] F28-[900x900]
08
[900x2100MM] 4360
1650
D5
C28
+600
S/B D @
F3
TERRACE 1.ALL DIMENSIONS9000 ARE IN MM UNLESS 52 SPECIFIED OTHERWISE.
W2
JUNIOR ARCHITECT
C31 [230x380]
250 250 250 250250 250 250 250250 250 250 250
+18075
W4
1500
3000
[1000x2100MM] 5109
10
KEY PLAN
C21 [230x430]
F5
BRICK WALL 230MM
SCHEDULE FOR WINDOWS
3460
1200
+18150
F/S
S/B V @
S/B W @
C23 [230x430]
Y1f
F/S
SHEET NO
B2
S/B H1 @
1998
W1
Y1e
Y1d
CEILING LIGHT POINT SPILT A .C
7
U3
F'4
F'3
ELO3 03
C27-[230x380] F27-[900x900]
D4
ELO4 04
D2
C29,C30
11
09
C26-[230x430] F26-[1400x1100]
C25-[230x430] F25-[1400x1100]
+19875
5000
906
C30-[230x430] F30-[1100x1400]
C35-[230x380] F35-[900x900]
OPEN OUTDDOR SPACE
[1200x2100MM]
1200
C29-[230x430] F29-[1100x1400]
C34-[230x380] F34-[900x900]
1000
12
C33-[230x380] F33-[900x900]
+19960
C31,C32,C33,C34,C35
2104
13
3115
4615
D3
1000 1025
C42-[230x430] F42-[1400x1100]
906
C41-[230x430] F41-[1400x1100]
F/S
D2
C12 [230x430]
F4
F1
BRICK BAT COBA RCC SLAB [150 MM THK ]
C39 [230x380]
1250
C30 [230x430]
W4
C32-[230x380] F32-[900x900]
1500
4363
250250250250250250250250250 250250250
C38 [230x380]
[2320x2100MM]
D2
+24805
Y1c
G4
C16 [230x430]
W3
2000
C5 [230x430]
1093
+115
± 00
C6,C16
D1
C31-[230x380] F31-[900x900]
C15 [230x430]
00
01
+5115
C5,C15,C24,C28
02
+7190
C35
03
+7215
C42
04
05
C23,C27
+10155
+12108
+12213
C34
C23,C27
06
07
+12245
+12345
C23,C27
C4
08
09
+16173
C33,C40
10
+16460
+16762
C13,C21
C8
11
12
+20164
C32,C39
13
+22900
+23000
C26
C7
14
15
+24173
C31,C38
16
+26230
C19,C25
17
+27730
+27805
C30
18
+27815
C18
C11,C3
20
+30885
C36
21
+32960
+37960
C1,C9
C29
22
19
W2
C37 [230x380]
DOOR SIZES
SR NO
C36,C37,C38,C39,C40,C41,C42
F/S
C9
G5
GENERAL NOTES
6615
14
Y1b
S/B D1 @
F2
A
C29 [230x430]
D1
S/B H @
G6
309221
C36 [230x380]
C40-[230x380] F40-[900x900]
C11 [230x430]
W3
ELO3 03
23
3.ANY DISCREPANCIES OR AMBIGUITIES ARE TO BE BROUGHT TO ARCHITECTS NOTICE BEFORE COMMENCEMENT OF WORK ON SITE. WDII . J.N.E.C. AURANGABAD 4. ALL DRAWINGS ARE TO BE READ WITH RESPECT TO STRUCTURAL AND SERVICES DRAWING.
F/S
C20 [230x430]
UP
H1a
DETAILED GROUND FLOOR PLAN
T.Y.B.ARCH [ II ]
Y1a
F/S
A'2
C28 [230x430]
G'5
D'9
S/B C' @
EXHAUST FAN
B'1
U5
C27 [230x430]
E'4
PROJECT NAME
ARCHITECTS OFFICE
I3
I2
H'3
H'2
E'3
SWITCH BOARD S/B
4
F/S
Y1g
Y1h
Y1i
S/B Y 1@
S/B F @
I3
C10 [230x380]
01 ELO1
A'
SCHEDULE FOR DOORS
C39-[230x380] F39-[900x900]
1500
D. B.
2.DRAWINGS ARE NOT TO BE MEASURED . THE WRITTEN DIMENSIONS ARE SRITCTLY
C38-[230x380] F38-[900x900]
3000
3000
UP
RAJLAXMI PRASHANT MANDGE TO BE FOLLOWED .
C36-[230x380] C37-[230x380] F36-[900x900] F37-[900x900]
I4
C9 [230x430]
C24 [230x430]
1200
W1
C4 [230x430]
+600 +450 +300 +150 _ 00 +
Y1j
H1b
4083
2000
F/S
F/S
F/S
F/S
G'2
G'1
SPLIT A.C.
F'5
S/B A' @
U2
F'2
F'1
9M WIDE ROAD
D'8
3
Y3
E'2
E'1
D'7
DESCRIPTION
2
W2
C19 [230x430]
I2
W5
1200
5000
GENERAL NOTES
1.ALL DIMENSIONS ARE IN MM UNLESS SPECIFIED OTHERWISE.
STARTING POINT DRAWING
3330
1000 1985
C3 [230x430]
I1
A5
2550
C35 [230x380]
S/B T @
U1
Y1k
SYMBOL
1
T1
S/B U @
+600
Y4
Y1l
F/S
S/B I @
02 ELO2
W5
1501
7074
T2
+600
+1260
C18 [230x380]
C17 [230x430]
STUDIO [12000x5000]
W2
T3
C34 [230x380]
LANDING 1115 MM WIDE
SIGN
0
C2 [230x380]
C8 [230x430]
T4
C33 [230x380]
+600
O2
15140
T5
T6
K7
J4
4800
A
C7 [230x430]
SR NO
Y1
3000
S
W1
1500
1083
C28 [230x430]
12000
1498
2000
2160
2320
S1a
S/B S1 @
S/B S @
Y2
LANDING 1115 MM WIDE
B
C
C1 [230x430]
3000
3474
1500
K6
C26 [230x430]
Y5
C25 [230x430]
L1
300 450
3000
K5
10600
D
3000
J2
J3
6918
D1
6467 1493
PRINTER PLOTTER ROOM [3885X5115]
W3
300450
E
3000
WAITING + RECEPTION [6310x5115]
3300
5000
C14 [230x430] O3 1885
ELECTRICAL LEGEND
S1
L2
715
F
G
3000
K4
F/S
1500
H
3000
C13 [230x430]
1500
I
J
3000
C12 [230x430]
1500
3000
ACCOUNTS [3300x3000]
3870
3350
CHIEF ARCHITECTS CABIN 1 [5000x4423]
1500
K
3000
2975
2400
C23 [230x430]
C22 [230x430]
O1
D4
1500
333
L
3000
C21 [230x430]
R5
R4
U4
1500
1200
M
3000
K3
C35 [230x380]
CHIEF ARCHITECTS CABIN 2 C27 [5345x4363] [230x430] D2
Q4
Q3
S/B L @
J1
5027
N
3000
K2
+600
S/B J @
1425
1200
3000
900
5000
1093
O
3000
C29 [230x430]
D4
1500
P
3000
1600
1600
4130
Q
3000
K1
S/B K @
LADIES TOILET [2500x3000]
C34 [230x380]
3000
R
3000
C20 [230x430]
3000
S
3000
3150
W1
271
D5
D4
+600
1900 1000
3000
E
600
750
D5
COURTYARD [11040x4115]
300300300
W
271
P3
1911
3000
0 START POINT PLOT LINE COORDINATE
1194
CONFERENCE HALL [10000x5000]
2000
900
3000
271
750
D5
D2
W2
1368
ENTRY
3460
D2
3800
SCALE 1:100
A,00 0
10000
W3PLAN AND DETAIL SITE START POINT
1
D5
UP 11040
4715 1200
3000
A,01 3000
4500
4500
5500
4500
4500
4500
4500
4500
4500
4500
4500
4500
4500
4500
4500
4500
4500
4500
08
UP
900
N
97
750
600
271 271
P4
N2
S/B N @
D'4
D'6
01 ELO1
PAVEMENT AREA
_ 00 +
C26 [230x430]
C19 [230x430]
C11 [230x430]
7263
1200
01
600
271
GENTS TOILET [2500x3000]
C33 [230x380]
+1050
750
271
N1
S/B M @
C42 [230x430]
S/B G' @
ELO3 03
PARKING
START POINT BUILDING LINE COORDINATE
_ 00 +
_ 00 +
3502
5000
D3 1085
DRAWING TITLE
38080
1
MODEL MAKING [5000x2985]
SHEET NO
ARCHITECTS OFFICE 2
600
271
1500
3000 8000
1768
D3
5115
3105
2
C10 [230x380]
1000
D3
5230
PROJECT NAME
1911
7800
W3
MEETING ROOM 2 [4000x3000]
1000
23615
+1260
1911
7800
3000
7800
C9 [230x430]
3
5455
5455
3000
9M WIDE ROAD
1200
3000
LANDSCAPE AREA 3105
3
W3
1200
4
5000
C25 [230x430]
D2
C18 [230x380]
879
3000 5000
906
3105
3000
C32 [230x380]
1250
MIDLANDING
2985
12M
WIDE
ROAD
3000
C17 [230x430]
1500 4000
3000
5
3000
3000
W4
200 3000
1110 1000
3000
10730
7800
D3
1250
C42 [230x430]
W5
C41 [230x430]
C40 [230x380]
02 ELO2
S/B F' @
SPLIT A.C.
10730
7800
PARKING 4
DINNING [5000x5415]
ELO4 04
3105
5
1000
D3
1250
JUNIOR ARCHITECT [4000x3000]
17270
4360
KEY PLAN
6
LANDSCAPE AREA
1000
250 250250250250250250250250 250250250
3000
6000
1500 4000
JUNIOR ARCHITECT [4000x3000]
C31 [230x380]
1485
3105
6
1650
3000
W4
1200
7
5415
3000
3000
1485 C29 [230x430]
4200
3105
3000
C30 [230x430]
1000 1025
2000
1600
1250
W5
M. B.
3000
8 3000
2000
7
900
1250
4000
MEETING ROOM 1 [4000x3000]
D5
3230
3230
3000
1500
W5
1485
9
8250
1250
C41 [230x430]
W2
SPLIT A.C.
3105
8
1250
4000 PANTRY [2500x3000]
3000
3000
24075
1500
C40 [230x380]
W2
3000
10
1250
950
600
C39 [230x380]
W2
3000
2000
2850
2850
2850
2850
2850
2850
2850
2850
2850
2850
2850
2850
2850
2850
2850
3030
9
LANDSCAPE AREA +200
_ 00 +
+150
950
C38 [230x380]
W2
N
LANDSCAPE AREA
3000
C37 [230x380]
W5
N
10
C36 [230x380]
R3
N
2850
M1
Q5
C39 [230x380]
ELO4 04
S/B E' @ SPLIT A.C.
D'5
3.ANY DISCREPANCIES OR AMBIGUITIES ARE TO BE BROUGHT TO ARCHITECTS NOTICE BEFORE COMMENCEMENT OF WORK ON SITE. . +1050 4. ALL DRAWINGS ARE TO BE READC32 WITH C30 C31 [230x430] RESPECT [230x380] TO STRUCTURAL AND SERVICES [230x380] DRAWING.
C38 [230x380]
C6 [230x430]
3.ANY DISCREPANCIES OR [230x430] AMBIGUITIES ARE TO BE BROUGHT TO ARCHITECTS S/B D' @ NOTICE BEFORE COMMENCEMENT OF WORK ON SITE. . 4. ALL DRAWINGS ARE TO BE READ WITH RESPECT TO STRUCTURAL AND SERVICES DRAWING.
01 ELO1
A
S/B R @
S/B Q @
S/B P @
C1 [230x430]
Z7
S/B Z7 @
S/B Z8 @
450
0
2.DRAWINGS ARE NOT TO BE MEASURED . THE WRITTEN DIMENSIONS ARE SRITCTLY TO BE FOLLOWED . C36 C37
A10
450
A
A9
A8
450
B
C8 [230x430]
A1
A7
450
C
+600
C7 [230x430]
450
D
A6
Z8
2100
E
G3
C42 [230x430]
S/B G @
Z9
2100
F
G2
C41 [230x430]
C40 [230x380]
Z6
900
G
G1
C39
KEY PLAN
Z5
1500
H
C38
Z4
MD
S/B B @
2.DRAWINGS[230x380] ARE NOT TO BE MEASURED . [230x380] THE WRITTEN DIMENSIONS ARE SRITCTLY TO BE FOLLOWED .
S/B Z @
1.ALL DIMENSIONS ARE IN MM UNLESS SPECIFIED OTHERWISE.
E4
S/B A @
ROAD
I
B2
WIDE
J
C37 [230x380]
E3
C6
C5
B1
12M
K
+600
A5
C36 [230x380]
C4
H2
G7
H1
2100
L
1.ALL DIMENSIONS ARE IN MM UNLESS SPECIFIED OTHERWISE.
Z1
Z2
1732
M
SPLIT A.C.
B3
3.ANY DISCREPANCIES OR AMBIGUITIES ARE TO BE BROUGHT TO ARCHITECTS NOTICE BEFORE COMMENCEMENT OF WORK ON SITE. . 4. ALL DRAWINGS ARE TO BE READ WITH RESPECT TO STRUCTURAL AND SERVICES DRAWING.
S/B Z4 @
S/B Z 3@
S/B Z2 @
S/B Z1 @
770
N
O
GENERAL NOTES
2500
P
C14 [230x430]
+600
ELO3 03
Q
C7
F3
G4
S/B H1 @
ELO3 03
R
C8
C9
G5
C13 [230x430]
F5
F2
G6
N
RCC- ARCHITECTS OFFICE S
H1a
S/B H @
GENERAL NOTES
2.DRAWINGS ARE NOT TO BE MEASURED . THE WRITTEN DIMENSIONS ARE SRITCTLY TO BE FOLLOWED .
T.Y.B.ARCH [ II ] 309221 WDII
DETAILED PLAN OF COMMON TOILET
TOILET DETAIL
portfolio /20
309221 WDI J.N.E.C.
GROUPWORK AND COMPETITION
21
06
portfolio /22
TYPOLOGY :CONTEMPORARY ARCHITECT : THOUGHTS PARALLELS AREA : 500 sq.m YEAR : 2018 INFORMATION :
/,*+71(66 2) %(,1*
LIGHTNESS OF BEING
Through the manipulation of forms, play of materials and control of light & shadow, the concept evolves into a sensory experience.
Internal staircase highlighting vertical circulation and establishing connectivity.
FIRST FLOOR
Located at the coastal city of Kozhikode in Kerala, the project was given an architectural envelope that orientates to the north providing privacy to the entrance facade. The house then rests within a completely inwards focused environment, separating both the social and coexistence space on the ground floor and the private space on the upper floor.
LIGHTNESS OF BEING
LIGHTNESS OF BEING
INDEX
LINEAR
GROUND FLOOR
NETWORK PATTERN
AOAF- 12
AOAF- 12
The zoning distribution blends the family's common space and an inside-out living area adjacent to one of the fundamental parts of the project - the indoor courtyard on the ground floor and the private space on the upper floor.
NATURAL LIGHT
LIGHTNESS OF BEING
AOAF- 12 B
/,*+71(66 2) %(,1* A’
A
SECTION A-A’
ROOF The concrete flat slab with inner lining of wood ELEMENT OF ARCHITECTURE
GLASS PANELS
LOUVERED WINDOWS Wooden louvered windows are placed on the southern façade to cut the heat intern creating a play of light in the interiors.
Glass panels are placed with wooden slit windows for better ventilation and outside views.
Concrete columns are used to support the floating cantilever and also to maintain the style throughout the project
The roof is kept flat and simple. The roof levels are staggered at place and treated differently in order to create variations and comfort. The roof on the formal living is covered with greenery which is placed at a rather low height and it acts as an insulation against the afternoon heat (south direction). The slabs on certain levels are projected and creatively dealt in order to create shading devices.
BALLUSTRADE Wooden railing with glass is used to enhance the planer form.
AOAF- 12
FLOOR The exterior flooring is a grid of regular intervals of grass and tiles, whereas Italian marble is used for interiors.
B’
SECTION B-B’
The name of the house itself makes it obvious that the house is full of light play. Courtyards on the either sides of the living and dinning brings in ample of light without hindering the privacy. Huge glass windows for the office space and other semi-public areas lights up the whole internal environment. Louvers in the south façade lets in the filtered light keeping away the heat and in turn create a play of light.
TYPES OF ROOF
DOOR
WALL
A small wooden door with minimalistic design is used.
Exposed concrete wall is used at places to compliment the greenery and the contemporary style.
ELEVATION
23
AOAF- 12
ELEM
AOAF- 12
portfolio /24
MISCELLAENEOUS
27
07
portfolio /28
Rajlaxmi Prashant Mandge rajlaxmimandge@gmail.com 7020105019