PORTFOLIO
RANRAN ZHANG Professional Works 2023-Present Master of Science in Design, University of Pennsylvania
PROFESSIONAL WORK SITE SITUATION
SITE SITUATION
Residential Building
Design Phase: Design Development Occupancy Type: R-2 Residential This is a five-story high residential building including commercial space, elevator access and scooter parking garage space. There are 20 units in this apartment. This project shows the construction drawings of this building in the design development phase. I was responsible for setting up the assembly sheets for this project, which include unit assembly, kitchen assembly and bathroom assembly as well as completing the plans and legends on each sheet. I also completed this project’s stair details. In addition, I worked with other team members to complete other parts, such as sections, elevations, and door schedules.
2
3
PROFESSIONAL WORK SITE SITUATION
SITE SITUATION
Residential Building
Design Phase: Design Development Occupancy Type: R-2 Residential This is a three -stor y residential building for a healthcare organization. There are three types of units in this building. This project shows the construction drawings of this building in the design development phase. In this project, I was responsible for the sections, section details, wall details and stair assemblies. I also coordinated with engineers and modified related design to satisfy structural requirements. In addition, I worked with other team members to complete other parts, such as plans, interior elevations, and exterior elevations. I updated the model and construction drawings according to redlines provided by team leaders and arc hitec t s fo r t he 5 0% D D submission phase. 4
5
PROFESSIONAL WORK SITE SITUATION
PROFESSIONAL WORK SITE SITUATION
City Hall
Single-family House
This project has two parts: renovation of existing building, and construction of a new building with drive thru, council chamber, and office spaces. And this project shows the construction drawings of the new building in the design development phase.
This is a single-family house project, which includes renovation of the existing garage, addition of a new pool cabana and addition of an guest bathroom. It required all construction drawings of this building for the design development phase and the handbook for the clients.
I was responsible for the site and existing building models, life safet y plans, elevations, and restroom assembly sheets for this project. In addition, I collaborated with other members of the team to complete other parts, including overall plans, dimension plans, RCP plans, and final plans.
I was responsible for the layout of new bathroom, sections and plans (overall, dimension, finish, RCP). I also focused on the required drawings for the handbook, which included elevation renderings, plan renderings, interior renderings, exterior rendering, a site plan and an area plan.
Design Phase: Design Development
6
Design Phase: Design Development
7
SITE SITUATION
Portfolio of Ranran Zhang Professional Works 2023-Present Email: ranranz97@outlook.com Telephone: (267) 918-3267
8