PORTFOLIO Thong Jun Lok Raymond Bsc. Architecture
VISITOR INTERPRETIVE CENTRE The Heart and Soul of Petaling Jaya
Topography and Geography This project revolves around the city in downtown Kuala Lumpur, The Petaling Street, also known as the Chinatown of Kuala Lumpur. By learning the figure-ground study, we can decide which site is the suitable site for an adaptive reuse brief.
1889
Site Proposed
1895
Street Traffic
Learning the circulation, the street traffic and doing a site study of the site proposed allows us to further understand how the site works for a better design.
1962
Site Study
Learning the Lives Inside of Gospel Hall and Yan Keng Hall A study of how the people of Gospel Hall KL and Yan Keng Hall uses the space and to conclude which type of adaptive reuse proposal would work.
Gospel Hall KL
Yan Keng Hall
Concept
Objectives »Preserving the heritage of Petaling Street. »A gathering space in Petaling Street. »A place to tell stories of the old.
Past
Present
Future
Main Spaces
Issues »Lack of townscape / cityscape »Lack of places that tells the story of Petaling Street. »The lack of historical remembrance of the culture in Petaling Street.
Space Planning
Historical galleries
Gallery 02 Hawker Stalls
Hawker Stalls
Central Atrium
Pockets of Parks
Gallery 01 Garden 01
Retail Stores
Gallery 03
Admin Office
Garden 02 Toilet
Cafes
Design Development
Concept
Design Development
THE SEEKING Religious Cultural Centre for People of Nilai
Research and Study
Site Context
In order for us to complete this particular brief of Religious Cultural Centre, we would need to study the details on specific religion in Malaysia as it is a very sensitive topic, therefore, Brickfields was used as a study sample before heading towards Nilai.
Primary and Secondary road usage.
LRT train route to reach specific religious sites.
The above picture is a study on how the disabled travels to religious space despite their inconvenience in mobility.
Amount of Green pockets, site scenery and current construction sites.
Religious buildings in Brickfields. Programme study of a Temple.
Programme study of a Church.
Layout
Temple Layout
Site’s Synergy This task is done to ensur we have a clear understanding of what Nilai is and what emotions we are able to bring out. For me I have used photography to throw out my thought process of Nilai as a Religious hub. Architecture, Technicality, Mobility, Textures and Stories.
Church Layout
Concept
Layout Planning
The Divine Law of Every Religion that shows the similarities.
A plan was devised to to fit all criteria of creating a suitable religious communal hub for all types of religion and to find the middleground between solitary and community.
Objects converts from Primitives(Pixels) to Organics(Nature) and Laws of Magnetic Field(Universe) to Black Hole (Spiral).
UNIVERSE
COMMON SPACE
PIXEL
SOLITARY
NATURE
SPIRAL
COMMUNITY
There is (SOLITARY) when it comes to religion. We always needed to connect to our soul but at the same time we needed companionship (COMMUNITY).
COMMUNITY AREA
RELIGIOUS ACTIVITIES
Space Planning Carpark
Loading Bay
Community Space
Gallery of Scholars Main Entrance
Multipurpose Hall
Main Atrium
Seeking Space
Threshold
Toilet
Seeking Space
Open Cafe
Threshold Seeking Space
Side Entrance Toilet
Side Entrance
Seeking Space
Lounge Cafeteria
Open Library
Carel Room Carel Room
Carel Room
Carel Room
Plans
Sections
Elevations
THE HUB Business Incubator for People of Putra Heights
Research Before proposing the brief, we have to find out what kind of place Putra Heights ought to be. Having to undertand the type of development Putra Heights, we can then propose a suitable brief for the town.
Pedestrian walkway is covering throughout the whole KL Sentral ground.
High Density Mixed-Use Area Designed to be More Pedestrian Friendly
Consist of Central Transit Stop
Great Connection with the Private to
TRANSITORIENTED DEVELOPMENT
Dependant on Public Transport
Benefits the Low-Income if Done with Equity
An analysis done having KL Sentral as a case study.
Reduce Land Area for Automobile
Public Realm and Private Realm interlink between each other all within 800m radius.
Sun Path
Site Context Wind Directions By understanding the wind directions for every season, we are able to pinpoint the form of out building making it more sustainable using less energy.
Wind rose data of Putra Heights
By understanding the sun path for the entire year, we are able to determine the direction of our building orientation before finalizing our proposal.
During the South-West Monsoon season.
During the North-East Monsoon season.
The Hub The Hub is a design based on a business incubator hub themed. This design is mainly focusing on incubating new small business and also co-working space runned by the same platform. Putra Heights is a commercialized area but it is still fairly new, therefore, the crucial part of the design is to allow permeability towards the station and the incubator hub as well as allowing its residence to share the auditorium and conference halls available as it is a necessity for a business district.
Community Space Co-Working Space
Provides Residence, Dedicated office, Thinking Pod Meeting Rooms, Phone Booth, Library, Workstation Area, Sleeping Pod, Roof Garden
Auditorium, Conference Hall, Carparks, Bicycle Parkings
Space Planning
Exploded Axonometric
Plans
Ground Floor Plan
First Floor Plan
Second Floor Plan
Fourth Floor Plan
Perspectives
Pedestrian Entrance
Incubator and CoWorking Entrance
Office Suites
Sections
Elevations
Internship The three months long experience in STA Architects.
Project Proposal Presentation Tasked to create presentation slides for two proposal project and to build the 3d Sketchup Model for visualization.
Setapak Residence (Proposal Project).
Bukit Jalil Residence (Proposal Project)
Symphony Union Suites The project that I am most involved with.
Jotun Paint Job comments.
Tile Setting out
Staircase Design and Detail
4
FOR CONSTRUCTION
7
NOVEMBER 2019
2275
1
7
SC11 - BLOW-UP DETAIL 'B1'
5
4 8 9 11
4
SC11 - BLOW-UP DETAIL 'A1' 8
1
SC11 - UPPER UNIT PLAN (TYPICAL) 6
3
SC11 - BLOW-UP DETAIL 'B2'
CONSTRUCTION AND COMPLETION OF MAIN BUILDING AND EXTERNA WORKS FOR CADANGAN MEMBINA DAN MENYIAPKAN 2 BLOK BANGU PERDAGANGAN YANG MENGANDUNGI :
SC11 - BLOW-UP DETAIL 'B'
1. BLOK A : 42 TINGKAT DENGAN : A) 34 TINGKAT SOHO (626 UNIT) B) 1 TINGKAT (TINGKAT 42) KEMUDAHAN AWAM DAN MEKANIKAL (GIMNASIUM, ARKED PERMAINAN, TAMAN ATAS BUMBUNG) C) 6 TINGKAT PODIUM (TEMPAT LETAK KERETA) D) 1 TINGKAT (TINGKAT 7) KEMUDAHAN AWAM DAN KEDAI MAMPU MILIK (KOLAM RENANG, SURAU, BILIK PERSALINAN, DEWAN SERBAGUNA) E) 2 BESMENT TEMPAT LETAK KERETA
11
SC11 - BLOW-UP DETAIL 'A'
2. BLOK B : 2 TINGKAT RUANG PERNIAGAAN (PETAK TANAH) 3. 1 UNIT RUMAH SAMPAH 4. 1 UNIT PONDOK PENGAWAL
DI ATAS PT 363, JALAN PJS 9/1, BANDAR SUNWAY, MUKIM DAMANSAR DAERAH PETALING, SELANGOR DARUL EHSAN
9
SC11 - BLOW-UP DETAIL 'B3'
UNTUK TETUAN SYMPHONY CRESCENT SDN. BHD.
6 SACHA AND TAN ARCHITECTS SDN BHD 44-3, Jalan 27/70A, Desa Sri Hartamas 50480 Kuala Lumpur T: 03-2300 9910 F: 03-2300 9901 E:info@stastudios.com W:www.stastudios.com
STAIRCASE ASSEMBLY:
10
SC11 - BLOW-UP DETAIL 'C'
STAIRCASE 11 - PLAN LAYOUT, SECTIO & BLOW - UP
STA.179.TD.D.SC11.G23(01)
2
SC11 - SECTION A-A
LEGEND :
C
MINIMUM COATING OF 60MICRONS THK OF JOTUN "SAHARA" CORRO-COAT PE-F 1301 7043 COMPRISE OF ONE COAT GARDEX PRIMER AND 2 COAT OF GARDEX SEMI-GLOSS CODE: 9928 "SOLID STEEL" NATURAL CEMENT RENDER
5
SC11 - BLOW-UP SECTION 11
SC11 - BLOW-UP DETAIL 'C1'
10MM THK ASG CLEAR TEMPERED FLOAT GLASS PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS DRAWING
Signage Package Mandatory Signs
Operational Signs
Directional Signs