Western Visayas Regional Action Plan
Balik Probinsya, Bagong Pag-asa Program Western Visayas Regional Action Plan
Approved by the Regional Development Council VI and adopted in Western Visayas through Resolution No. 35, Series of 2020. © 2021 by the National Economic and Development Authority, Region VI All rights reserved. Any part of this publication may be used and reproduced, provided proper acknowledgment is made.
Balik Probinsya, Bagong Pagasa (BP2)Program Western Visayas Regional Action Plan Published by: National Economic and Development Authority, Region VI Fort San Pedro Drive, Iloilo City Tel. No. (+63-33) 335 1070 Email: nro6@neda.gov.ph Website: https://www.nro6.neda.gov.ph Printed in Iloilo City, Philippines
Table of Contents Regional Development Council VI Endorsement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . vi Message from the RDCVI Chairperson . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ix Message from the RDC VI Vice Chairperson . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . x
BALIK PROBINSYA, BAGONG PAG-ASA ACTION PLAN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 Part 1 Assessment of Potentials in the Region . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 Part 2 Assessment of Settlement Areas . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 Part 3 Strategies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 Part 4 Special Programs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20
ANNEXES Annex A List of Programs, Projects and Activities per Key Result Area per Agency/Office . . . . . . . . . 23 Annex B Summary of Investement Requirements by Source of Funds . . . . . . . . . . . . . . . . . . . . . . . . . 105 Annex C Other Relevant Tables . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 109
W E S T E R N V I S AYA S R E G I O N A L AC T I O N P L A N
v
RDC Endorsement
vi
B A L I K P R O B I N S YA , B AG O N G PAG - A S A P R O G R A M
W E S T E R N V I S AYA S R E G I O N A L AC T I O N P L A N
vii
viii
B A L I K P R O B I N S YA , B AG O N G PAG - A S A P R O G R A M
Message
from the Chairperson, Regional Development Council As the country prepares for the “new normal, it is my pleasure to present the RDC VI BP2 Regional Action Plan, a plan which is a compilation of the efforts of the different government agencies and local government units in support to our constituents from Western Visayas in their transition from Metro Manila to their home provinces, including workers and IOverseas Filipino Workers because of the Enhance Community Quarantine. As we all know, BP2 by virtue of Executive Order No. 114 was institutionalized by the government to ensure balance regional development and equitable distribution of wealth, resources m and opportunities through policies and programs that boost countryside development and inclusive growth, provide adequate social services, and promote full employment, industrialization, and an improved quality of life in rural areas. Because of the pandemic, there were some hesitancy on the part of the NGAs and LGUs when the program was introduced in June 2020. However, we realized that we can do everything if we work together as one. This is what happened during the many meetings and conferences the RDC VI conducted in line with preparation of the BP2 Regional Action Plan. Government agencies were ready to provide support to BP2 objectives based on their mandates such as transportation from Metro Manila to their home provinces, livelihood assistance, housing facilities, subsistence, employment, education, etc. The LGUs, on the other hand, have expressed that they are prepared to assist the government agencies in the implementation of the programs identified by the latter. As we heal as one, it is my ardent wish that the Balik Probinsya, Bagong Pag-asa Program will be a means to provide an improved quality of life, alleviate poverty and protect our most vulnerable citizens from the harsh realities of the pandemic. As Henry Ford fittingly quoted, “coming together is a beginning. Keeping together is progress. Working together is success”.
RHODORA J. CADIAO
Governor, Province of Antique Chairperson, RDC VI
W E S T E R N V I S AYA S R E G I O N A L AC T I O N P L A N
ix
Message
from the Vice Chairperson, Regional Development Council
The Balik Probinsya, Bagong Pag-asa (BP2) Program, by virtue of Executive Order No. 114 , was institutionalized as a pillar of balanced regional development and equitable distribution of wealth, resources, and opportunities through policies and programs that will boost countryside development and inclusive growth, as well as provide adequate social services, promote full employment, industrialization , and an improved quality of life in the rural areas. The program is government’s way of decongesting Metro Manila and other highly urbanized cities and assisting low-income families who are willing to return or relocate to their home provinces. Most of these families are those who have lost their jobs and other sources of income, those in unsafe dwelling place, and those exposed to health and safety risks and other environmental hazard. The beneficiaries of the program will not be left unaided as they return home. Government has made sure that there shall be active participation of all stakeholders identified to contribute to improve coordination, understanding and support for the program. These are included as part of the program’s key result areas which include empowerment of local industries, food security and agricultural productivity, housing, social welfare, health, employment, human resource development and infrastructure development. As we go through towards the new normal and gradually recover from the damage caused by the Covid-19 Pandemic, the BP2 program is a timely program to support our less fortunate countrymen attain better economic lives and opportunities as we plan to enhance countryside development. Now is the time for us to take care of one another especially those who are under-privileged as we dream of a just, more inclusive and sustainable society.
MEYLENE C. ROSALES OIC-Regional Director Vice Chairperson, RDC VI
x
B A L I K P R O B I N S YA , B AG O N G PAG - A S A P R O G R A M
Balik Probinsya, Bagong Pag-asa
The Balik Probinsya, Bagong Pag-asa (BP2) Program is a national program that aims to provide hope for a better future to Filipinos through equity in resources throughout the country that will boost countryside development. It is geared towards addressing congestion problems in Metro Manila’s urban areas by encouraging people, especially informal settlers, to return to their home provinces and assist them in this transition with support and incentives on transportation, family, livelihood, housing, subsistence and education, among others. Institutionalized through Executive Order 114 issued on May 6, 2020, the BP2 program will ensure balanced regional development and equitable distribution of wealth, resources, and opportunities through policies and programs that boost countryside development and inclusive growth, provide adequate social services, and promote full employment, industrialization, and an improved quality of life in rural areas. Under the Program, government agencies will join hands in ensuring the continuous improvement of economies and quality of life in the provinces with the program’s long term plans on various investments in infrastructure, agriculture, business, transportation and access to a responsive healthcare system. Local governments will be empowered to effectively manage crises and build resilient communities.
W E S T E R N V I S AYA S R E G I O N A L AC T I O N P L A N
1
The BP2 Program Framework MATATAG, MAGINHAWA AT PANATAG NA BUHAY High-trust, socially cohesive, vibrant, resilient and sustainable communities
Key Results Areas
Empowerment of local industries
• Establish loan and facilities and credit funds • Implement livelihood programs
Strategies
• Provideperformancebased, targeted, timebound and transparent tax incentives • Promote investment in technology-based enterprises
Enabling Measures Preconditions
Legal support Socio-political context
Food security and agricultural prodcutivity
• Provide agriculture and agro-industries support services • Ensure access to credit, finance and other grants • Invest in agriculture infrastructure development • Promote innovations for agriculture production • Provide livelihood and employment opportunities
Housing, social welfare, health, employment and human resource development
• Promote communitydriven housing projects • Continue provision of social service and employment programs • Improve access to comprehensive quality health services • Invest in flexible learning delivery system and provide skills training
Infrastructure development
• Link food production and residential areas for efficiency and accessibility • Strengthen convergence of adequate transport infrastructure support • Provide reliable internet and adequate power and water supply services
Coherent PAPs
Institutional support
Conducive policy environment
Peace and security
Resource endowments
Disaster risk and vulnerability
National Spatial Strategy
Figure 1. Strategic Framework of the Balik Probinsya, Bagong Pag-asa Program
2
B A L I K P R O B I N S YA , B AG O N G PAG - A S A P R O G R A M
Towards the desired outcome of a high trust, socially cohesive, vibrant, resilient and sustainable communities, the BP2 program adopts a multidimensional framework for sustainable countryside development and resilient communities. The framework gives emphasis to the development of sustainable communities to achieve long-term growth and at the same time, espouses a vibrant local economy that promotes sustainable production and consumption. It also enhances countryside’s resilience to climate change, natural disasters and other economic and health risks. It advocates social inclusion by encouraging effective participation of all stakeholders to ensure that the projects and activities are responsive to their articulated priority. Local government units will take over the implementation of projects and activities, which are initially funded by line departments, to sustain their effective implementation. Integration through effective mechanisms and the active participation of all stakeholders is encouraged to achieve the desired synergy for rural growth and development. The program framework consists of four key result areas: 1) Empowerment of local industries; 2) Food security and agricultural productivity; 3) Housing, social welfare, health, employment, and human resource development; and, 4) Development of Infrastructure. Countryside development, as envisioned in the BP2 program, is one of the priority sectors in building a prosperous, predominantly middle-class society as articulated in AmBisyon Natin 2040. The BP2 program is aligned with the Philippine Development Plan (PDP) 2017-2022 and the Western Visayas Regional Development Plan (RDP) 2017-2022. Both plans espouse the strategies of spatial development, i.e., concentration, connectivity and vulnerability reduction. These spatial strategies aim to decongest the National Capital Region and other major urban centers and direct growth outside of the congested areas, improve linkages by connecting rural areas to growth centers or by strengthening urban-rural linkages, and make growth more inclusive by creating more opportunities for production and employment in lagging areas, thereby reducing poverty. The PDP and RDP also promote vulnerability reduction that aims to reduce or mitigate risks and vulnerabilities of population, production areas and protected zones.
W E S T E R N V I S AYA S R E G I O N A L AC T I O N P L A N
3
Assessment of potentials in the region Western Visayas or Region VI is located in the central part of the Philippine archipelago. It consists of the islands of Panay and Guimaras and half of Negros Island. It is made up of six provinces and 133 cities and municipalities. Figure 2. Political Map of Western Visayas
The region is the fourth largest economy outside of the NCR and the sixth fastest growing economy in 2019 with the regional economy growing by 6.4 percent. Its rich fishing grounds and fertile soil make Western Visayas one of the primary sources of agricultural and fishery products of the country. Its highly urbanized cities of Iloilo and Bacolod were recognized as among the best places to invest for outsourcing operations. The exciting mix of natural, historical and manmade attractions around the region has made Western Visayas a major tourist destination of the country.
4
B A L I K P R O B I N S YA , B AG O N G PAG - A S A P R O G R A M
Fishery and Agricultural Resources A rapid surveya was conducted by NEDA Region VI to assess the potential resources of the local government units of the region that may be harnessed to create new sources of livelihood. About 75.0 percent of the 117 respondent LGUs claimed that their economic activities are predominantly agriculture-based. Palay, corn and other crops were produced in all provinces of the region. Sugarcane is cultivated in all cities and municipalities of Negros Occidental. Fishing is also one of the dominant economic activity in the region with several species cultured and harvested like crustaceans, bivalves, salt and fresh water fish and squids/octopus. Sixty-eight or 58.12 percent of the LGUs have fishing industries with Iloilo having the highest number at 24 and Negros Occidental with 19. Capiz is the top producer of fish and other marine products, with all its municipalities culturing crustaceans. On the other hand, all the five municipalities in Guimaras cultured salt water fish, fresh water fish, and squid. Bivalves were also cultured in Bacolod City, Guimaras and Negros Occidental. Livestock, swine and chicken are raised in all LGUs, while cattle raising is present in only six LGUs. Logging or forestry-related activities have been noted in 22 LGUs in the region. Based on the survey conducted by the National Housing Authorityb, BP2 applicants chose agriculture, next to employment and retail, as their preferred occupation when they come home in their respective provinces.
Industry and Services Activities The Industry and Services sectors are the major contributors to the 6.4 percent growth of the regional economy in 2019, as expressed in gross regional domestic product (GRDP). Services contributed the highest share at 5.0 percent followed by Industry at 1.3 percent. The Services sector has the largest share at 62.1 percent of the total regional output and the fastest growth at 8.2 percent. By sub-industry, the top five largest sub-industries in the region are Trade which contributed 18.1 percent, Agriculture and Fisheries (16.9%), Manufacturing (10.4%), Transportation and Storage (8.2%), Financial and Insurance Activities (6.4%). Accommodation and Food Service Activities showed the fastest growth at 31.4 percent.c Based on the survey conducted by NEDA-VI, buy and sell industries as well as transport services are predominant in Iloilo and Negros Occidental. Retailing is also a leading activity in 27 LGUs of Iloilo Province and 23 LGUs in Negros Occidental. Automotive and mechanics industries are present in all provinces and HUCs, with Iloilo and Negros Occidental having the highest numbers, with 36 and 25, respectively. Parlor service is also common in almost all of the respondent LGUs, except for Madalag and Malinao in Aklan
a
Conducted from October 27 to November 16, 2020, with 117 respondents out of the 6 provinces, and 133 cities and municipalities
b
NHA Survey as of October 30, 2020
c
2019 Report on the Economic Performance of Western Visayas, Philippine Statistics Authority
W E S T E R N V I S AYA S R E G I O N A L AC T I O N P L A N
5
Figure 3. Preferred Source of Income of BP2 Applicants in Western Visayas
Source: BP2 Application Dashboard, as of October 30, 2020
province. A total of 67 or 57 percent of the respondent LGUs have spa and massage services, mostly in Negros Occidental and Iloilo. As to activities related to construction, Iloilo and Negros Occidental have the highest, with 33 and 23, respectively. Although all provinces and HUCs have BPO and online services, only 28 LGUs or almost 24 percent host the industry. Forty-three LGU respondents, including the cities of Bacolod and Iloilo, claimed that they have services, security and utility works, 21 of these are in Negros Occidental. Also, majority or 112 out of 117 respondent LGUs have buy and sell industry. Meanwhile, 103 LGUs (88.03%) have banking and finance services and almost 83 percent of the respondents have medical and allied services. The numbers are high in the Cities of Bacolod and Iloilo and the provinces of Iloilo and Negros Occidental. Based on the NHA’s profiling of BP2 applicants, the retail industry, aside from employment, tops as the most preferred source of income to financially support their family when they relocate back to their home province. The survey revealed that there are LGUs which could adequately respond to support the needs of BP2 applicants in terms of provision of opportunities for livelihood and other necessities to start their new life in the provinces. However, these LGUs also have to address the survival and development needs of their bona fide residents. Thus, there is a need for them to be more resourceful and creative in balancing the needs of their constituents. Likewise, there must be enabling mechanisms for the start-up requirements of those who want to relocate to the countryside.
6
B A L I K P R O B I N S YA , B AG O N G PAG - A S A P R O G R A M
Assessment of settlement areas Settlement areas in the region Iloilo and Bacolod Cities serve as the regional centers of the region. Iloilo City is the center of education, commerce and trade in Panay and Guimaras Islands and serves as the regional capital and administrative center of Western Visayas. Bacolod City is the center of commerce and trade in Negros Occidental. Both are linked to international and domestic destinations through the international airports and seaports. The sub-regional centers are the more progressive and fast-growing centers, which serve as market catchments of regional centers. Many of these currently function as provincial administrative centers such as the Municipality of San Jose in Antique, Municipality of Kalibo in Aklan, Roxas City in Capiz, Passi City in Iloilo, Municipality of Jordan in Guimaras and San Carlos City and Kabankalan City in Negros Occidental.
Figure 4. Heirarchy of Settlements in Western Visayas
There are municipalities and cities that could serve as Provincial Centers. These are typically the large municipalities in the provinces which take on the role of processing and trading centers. Like the sub-regional centers, they serve as market and service centers of the provinces, although on a limited scale. These include the municipalities of Culasi in Antique, Malay in Aklan, Mambusao in Capiz, the municipalities of Estancia, Sta. Barbara and Dumangas in Iloilo, Municipality of Buenavista in Guimaras and the cities of Victorias, Sagay City, and Sipalay in Negros Occidental.
Availability of services and facilities Housing availability About 8.0 percent or 765 of the 9,600 BP2 applicants signified that they have no place to stay when they go back to the region. Majority of then want to relocate in Negros Occidental and Iloilo. Table 1 shows the breakdown of applicants per province who are in need of housing facilities: On the other hand, the region still has to address the current housing backlogs. The 2019 Regional Development Report showed that despite the 120.43 percent increase in the number of resettlement projects completed by the National Housing Authority (NHA) and the additional 1,240 housing units for PNP/AFP personnel, the NHA still recorded a cumulative backlog of 133,797 housing units. On top of existing housing backlogs, the housing needs of the 765 BP2 applicants will add up to the inadequacy in the housing sector. Considering that most of the BP2 applicants do not have the capacity to build or purchase their own houses, the LGUs could coordinate with government shelter agencies to facilitate the provision of housing requirements of BP2 applicants in their respective area of jurisdiction.
W E S T E R N V I S AYA S R E G I O N A L AC T I O N P L A N
7
At present, the following are the available housing facilities under the following programs and projects that could be tapped by the LGUs: 1. 2. 3. 4. 5. 6.
Resettlement Assistance Program to Local Government Units (RAP-LGU) of the National Housing Authority (NHA) Yolanda Permanent Housing Program (YPHP) Armed Forces of the Philippines (AFP)/ Philippine National Police (PNP) Housing Program Socialized Housing Finance Corporation (SHFC) Housing Projects, foreclosed Pag-IBIG Fund Housing Projects Non-Government Organization (NGO) Housing Projects Socialized Housing Program of Property Developers Figure 5. Housing Needs of BP2 Applicants,
Nonetheless, there are several considerations in accessing these housing projects. Housing projects are located in selected LGUs only and not all LGUs have non-government organizations with housing projects operating in their area that have housing projects. It should be noted further that to be able to avail of the Socialized Housing Program of property developers, the SHFC housing projects and the PagIBIG foreclosed housing projects, one would need to provide a counterpart payment. Thus BP2 applicants must be informed of the availability/non-availability of housing facilities in their chosen LGU and the possible payment requirement for the housing facility available within the area. LGUs should assist in advocacy and information dissemination on the benefits and responsibilities of the BP2 applicants.
by Province
Source: BP2 Application Dashboard, as of October 30, 2020
Resettlement Assistance Program of NHA. Many LGUs still have to avail the Resettlement Assistance Program of NHA, a program that they could tap in providing housing assistance to their constituents, including the BP2 applicants. NHA’s fund contribution on a per project basis consists of an assistance of Php 25 million for all municipalities, 5th and 6th class cities and provinces and an assistance of Php 50 million for 1st to 4th class cities and provinces. Fifty percent of NHA contribution is considered as grant and the remaining balance shall be repaid following NHA’s terms of repayment. In utilizing the RAP, LGUs may build relocation and resettlement sites in accordance with their Local Shelter Plans (LSPs) and Comprehensive Land Use Plans (CLUPs) within an affordable repayment scheme. Yolanda Permanent Housing Program. The Yolanda Permanent Housing Program is an option that could address the housing needs of the BP2 applicants. It should be noted that housing facilities constructed under the program already have pre-identified recipients, although some recipients were not able to assume ownership/occupy their assigned units. The low occupation rate of some completed housing units is due to the following issues: 1. 2. 3. 4. 5. 6.
8
flooding within the project sites or in areas surrounding the project sites, including where the beneficiaries conduct their livelihood activities; need to strategically identify and provide sustainable livelihood assistance to families right in the resettlement sites since the source of livelihood of some beneficiaries are far from the area; some resettlement sites are located in identified hazard zones and are more than five kilometers away from the town center; some resettlement project sites are still agricultural/agro-industrial; some sites lack electrical connection and piped water supply; and, poor management of waste/garbage aggravated by other sanitation concerns.
B A L I K P R O B I N S YA , B AG O N G PAG - A S A P R O G R A M
Thus, these issues must first be resolved before an LGU can reassign ownership of the unoccupied Yolanda housing units or before the same sites can be offered as relocation or resettlement facilities for BP2 applicants. The list of Yolanda permanent housing projects that are located within danger/hazard zones and Environmentally Critical Areas (ECAs) and housing projects with small to moderate risks/exposure to hazards/ within environmentally critical areas (ECAs) are found in Annex C.
Figure 6. Number of Housing Units under the Yolanda Permanent Housing Program
As of October 20, 2020, there are 210 Yolanda housing projects in the region which are expected to produce 123,361 housing units. Out of this target, 89,510 units (72.56%) were completed, 52,525 or about 59.0 percent are already occupied. A total of 36,975 houses are available to those interested. As of June 30, 2020, there are 186 housing projects being implemented in Source: National Housing Authority as of October 20, 2020 Aklan, Antique, Capiz, Iloilo and Negros Occidental worth PhP34.360 billion. However, monitoring results show that many of these housing projects were experiencing negative slippages of more than 10 percent due to the following concerns/ bottlenecks: 1. problems in land acquisition and conversion 2. road right-of-way 3. documentary requirements including variation orders, time extensions, and changes in design, among others 4. project location within hazard zones are forcing the contractors to do additional works in land development and to descale a number of units Other concerns include lack of water and power supply, lack of social preparation and livelihood opportunities for the housing beneficiaries, and low occupancy rate despite having a number of substantially completed housing units. The family beneficiaries within the concerned districts are still living in hazard zones (coastal areas, beside the river, etc.), making them vulnerable to natural and manmade disasters. LGUs have to spend their scarce resources to assist/evacuate these families every time there is a disaster such as typhoons, flooding, and landslide. AFP/PNP Housing Program. The AFP/PNP Housing Program is another housing option for BP2 applicants. However, this is only possible once the AFP and the PNP have resolved the issue of nonoccupancy of their pre-identified personnel who are entitled to purchase property in the housing site. To date, several housing units under this program have not been occupied. (See Annex C) Other Housing Projects that can be tapped for BP2 applicants. Socialized Housing Finance Corporation (SHFC) Housing Projects, foreclosed Pag-IBIG Fund Housing Projects, and Socialized Housing Program of Property Developers are alternative choices that can be availed by BP2 applicants. Housing under these programs and projects comes at a cost and are not for free. However, affordable repayment schemes are available for the BP2 applicants to choose from.
W E S T E R N V I S AYA S R E G I O N A L AC T I O N P L A N
9
Non-Government Organization (NGO) Housing Projects can be an option for BP2 applicants. This is, however, coordinated directly with the NGOs. The LGUs can partner with the NGOs for the provision of housing not only to BP2 applicants but also to other informal settlers in their locality.
Social Services and Facilities Health Care. The COVID-19 pandemic showed that migrants, especially those from areas with local transmissions, bring diseases with them to the town or city destinations. Therefore, there is a need for the BP2 beneficiaries to be provided with comprehensive health check-up and other medical services. There are several health care facilities in place with quality health services for the residents of the region that could also serve the health care needs of the BP2 applicants. There are 64 government hospitals and 36 private hospitals operating in the region. Most government hospitals are first level hospitals or those with few specialties consisting mainly of internal medicine, obstetrics and gynecology, pediatrics, and general surgery with limited laboratory services, and with 20-50 bed capacity. These include district, rural, community and general hospitals. For Level 2 category, 17 are private hospitals, with as many as five to ten clinical specialties and with capacity of 200–800 beds, just like the regional, provincial and general hospitals. There are nine Level 3 hospitals, six are private and three are government-owned hospitals. Level 3 hospitals are those with highly specialized staff and technical equipment such as cardiology, intensive care units, and specialized imaging units, with some teaching activities in some facilities and with 300 to 1,500 bed capacity. All third level hospitals are located in Iloilo and Bacolod Cities. The region has 28 government infirmaries which are classified as small hospitals as well as health centers and stations located throughout the region that can provide immediate response to the health needs of the populace. The region has health professionals who are capable to provide primary health care services. However, Figure 7. Number of Health Care Facilities, by Province, CY 2020
Source: Department of Health Western Visayas Center for Health Development
10
B A L I K P R O B I N S YA , B AG O N G PAG - A S A P R O G R A M
except for nurses and midwives whose ratios are above human resource for health to population standards, the ratios of health professionals such as doctors, dentists to the population are still below standards. To augment the dearth of health professionals in LGUs, the DOH deployed personnel under its Human Resources for Health Deployment Program. Priority areas for deployment are high poverty geographically isolated and disadvantaged areas and municipalities with Indigenous Peoples. A total of 1,301 health professionals across the region were deployed as of December 2019.a Achieving universal health care is made more accessible through health insurance. As stipulated in the Universal Health Care Law, every Filipino will be automatically enrolled to PhilHealth, giving them access to a comprehensive range of quality health services. The National Health Insurance Program (NHIP) is levelling up the implementation of ALAGA KA Program by targeting the disadvantaged sectors, to include the Indigenous Peoples in the GIDAs. The strict compliance of the “No Balance Billing Policy”, will greatly benefit many of the poor constituents, including the BP2 applicants. Service desks were established in Western Visayas Medical Center in Iloilo City and Corazon Locsin Montelibano Memorial Regional Hospital in Bacolod City. Social Welfare. Under the Pantawid Pamilyang Pilipino Program (4Ps), government continues to invest in health and education of the poor and vulnerable households in order to break the intergenerational cycle of poverty. Through the Modified Conditional Cash Transfer, the number of beneficiaries in 2019 reached 299, 843 which include homeless street families, victims of natural and man-made disasters, and indigenous peoples (IPs) in GIDAs. Kalahi-CIDSS, which is designed to empower communities in targeted poor and disaster-affected municipalities to improve access to social services, was expanded in local government units. In 2018, it increased its value of assistance to Php1.227 billion for 252,760 beneficiaries from Php 359 million in 2017. The PNP and DSWD are on top in the advocacy campaigns on gender and development, violence against women and children, anti-human trafficking through conduct of dialogues, information dissemination, school visitations, among others. Women’s and Children’s desks are in place in PNP stations. Education. Government continues to invest in programs, projects, and activities to make education accessible to every Filipino. DepEd has recorded a total of 3,853 additional classrooms in 2019 from the 2,868 in previous year. This include 1,522 classrooms in the primary level and 2,331 in secondary level. Aside from regular students, the DepEd also cater to children with special needs with the corresponding facilities. It has also sustained its partnership with other government agencies and non-government organizations thru the Adopt-a-School Program (Brigada Eskwela) and other programs to augment the needs of learners.
a
Regional Development Report, 2019
W E S T E R N V I S AYA S R E G I O N A L AC T I O N P L A N
11
Strategies General Strategy BP2 Action Plan ought to be supply-driven rather than demand-driven. Being supply-driven, BP2 beneficiaries should be well informed of programs and projects offered by agencies, LGUs or private sector organizations that are available in their chosen destinations. Thus, when they apply for relocation, they are already aware of what livelihood and employment opportunities await them. These opportunities are open for them as well as to “insiders” so that government assistance will be fair for all. The short- and medium-term focus of BP2 is to contribute to economic recovery from the COVID 19 pandemic leading to the long-term sustainable poverty alleviation with no one left behind. This is the national development vision guiding the regional and local development plans. The improvement of the LGU’s governance processes and systems is critical to attract investments and build more infrastructures. The LGU should also actively engage with the private sector in generating more employment and livelihood opportunities to their constituents and BP2 beneficiaries. An Integrated Area Development (IAD) approach that requires coordinated and mutually reinforcing actions among the LGUs is also important for the effective and efficient implementation of the BP2 program. The idea is to provide employment packages through functional and spatial integration. For instance, if the preferred occupation or industry is not present in a certain municipality/city, the LGU may coordinate with nearby LGUs, particularly the growth centers which have more resources to cater to the livelihood needs of the applicants. Taking advantage of the existing facilities and linkages in a different town/city, district, or province does not take away the opportunities for an LGU to open up an industry to provide its residents with new employment or livelihood. Instead, it will ensure the effective utilization of the LGU’s resources and the improvement of the growth impulses that radiates to and from the smaller or developing towns/cities and urban/growth centers. The strategies that are already in the Regional Development Plan which can be interfaced with the strategies identified in the BP2 will be adopted and strengthened including the corresponding Programs, Projects, and Activities (PPAs). Additional strategies and PPAs will be identified by agencies and LGUs as well as other government institutions to support the BP2 Action Plan.
Specific Strategies by Key Result Areas The following are the specific strategies for each Key Result Area (KRA) and the relevant strategies of the Regional Development Plan (RDP) supportive of the BP2 key result areas that can be expanded to benefit the BP2 applicants:
KRA 1 - Empowerment of local industries A program will be developed to encourage the transfer or expansion of medium and large businesses to provincial economic hubs and promote regional development. To ensure sustainability and competitiveness, the program shall promote local industries which have comparative advantages in the locality, leveraging on local skills and resources, and the proactive and efficient services of the LGUs. The following are the enabling strategiesa identified in the RDP that will support KRA 1: 1. Establish loan and facilities and credit funds – the national government shall make financial
a
12
As discussed in Chapter 9 – Expanding and Developing Opportunities in Industry and Services of the RDP 2017-2022
B A L I K P R O B I N S YA , B AG O N G PAG - A S A P R O G R A M
capital available to those who intend to engage in industries in the region. There are available government loan and credit facilities but there are a lot of requirements that make it inaccessible to those who intend to avail. Loan processes shall be rationalized and made easier for individuals, MSMEs and cooperatives to avail. The region will conduct activities that will guide MSMEs, coops, overseas Filipinos and their families on how and where to access loans for their businesses. 2. Implement livelihood programs – To enhance labor capacities, formal trainings will be provided especially by TESDA to improve the capacity of the labor force in the region. The government, with inputs from the private sector especially on the needed capabilities of the labor force, will enhance the education and trainings curricula to make graduates capable to meet the requirements of industries, such as business process outsourcing. Programs on the development and enhancement of cottage industries and the promotion of priority commodities of the region shall continue. 3. Provision of performance-based, targeted, time-bound, and transparent tax incentives – Under this strategy, restrictions will be removed, incentives provided, and job-creating investments will be promoted. The region will pursue activities that will assist the LGUs to improve their capacity to entice investments. All LGUs will be required to formulate or update their Local Investments and Incentives Code. 4. Promotion of investment in technology based enterprises – Access to technology and innovation will be improved. The Small Enterprise Technology Upgrading Program (SET UP), Shared Service Facilities (SSF), and Fabrication laboratories (Fab Lab) would be expanded aggressively to improve productivity, efficiency, and resilience. 5. Support and advocate for more inclusive national competition policya – Strategies to diminish anti-competitive practices such as strengthening inter-agency collaboration to foster the culture of competition, developing of mechanisms for incorporating competition lens in local policies will be advocated. Also, reducing limit to entrepreneurship will be undertaken by making the regulatory environment less restrictive and reducing administrative burdens on start-ups and firms. To reduce barriers to entry of businesses, capacity-building activities among MSMEs will be conducted to invigorate competitive market for both offline and online consumers, such as business continuity awareness, entrepreneurial and e-commerce training.
KRA 2 - Food security and agricultural productivity b A productive and resilient agriculture and value chain is essential for the transformation of local economies. The region will modernize the agriculture sector. It will pursue innovations and technologies that are conducive to long-term and sustainable rural development. Local industries shall be supported and strengthened through infrastructure, logistics support and value chain development as well as extension of financial support. The following are the relevant strategies in the RDP that are supportive of this key result area: 1. Provision of agriculture and agro-industries support services – The use of farm and fishery machinery and equipment will be facilitated. The DA and its attached agencies like the BFAR, PCA, PhilFIDA, will continue to provide farm and fishery machinery and equipment to farmers and fisherfolks. These include farming and fishery machineries and equipment for planting to post harvesting.
a
As discussed in Chapter 16 – Supporting and Advocating the National Competition Policy of the RDP 2017-2022
b
As discussed in Chapter 8 – Expanding and Diversifying Opportunities in Agriculture and Fisheries of the RDP 2017-2022
W E S T E R N V I S AYA S R E G I O N A L AC T I O N P L A N
13
Agriculture and fishery (AFF)-based enterprises will be expanded through new and innovative production and marketing schemes and community-based enterprises in upland communities will be strengthened. Support to AFF-based MSMEs and start-ups will be continued by providing technical support from establishment of AFF-based MSMEs to production and marketing. Linkage with producers, processors and consumers will be facilitated and market consolidation assistance will be provided. 2. Ensure access to credit, finance, and other grants – The provision of agricultural insurance will be expanded to more small farmers and fisher folks. The region will continue to provide agricultural insurance through the cooperation of the LGUs with the Philippine Crop Insurance Corporation and campaign to the farmers and fisher folks to avail of agricultural insurance provided by the government. Access to affordable and formal credit that are being rolled out by the government will be improved with national government agencies as well as LGUs, guiding the farmers and fisher folks on how to access this credit. 3. Investment in agriculture infrastructure development – Investments in agriculture infrastructure will be accelerated with the construction of disaster and climate resilient small scale irrigation systems and retrofitting of existing ones. The region will continue to construct these irrigation systems through the DA, DAR and NIA especially on strategically identified areas very suitable for rice production. These small scale irrigation systems include shallow tube wells (STP), small water impounding projects (SWIP), solar irrigation pumps, among others. To physically link production areas to markets, farm to market roads and other infrastructure needed will be provided especially to areas included in the Provincial Commodities Investment Plans (PCIP). These projects will be funded under the Philippine Rural Development Project (PRDP) of the Department of Agriculture as well as other government agencies implementing farm to market roads. 4. Promote innovations for agriculture production – To promote innovations for agriculture the following strategies will be pursued: a. Diversification to commodities with high value or better income for producers and market potential. The region has identified mango, native chicken, aquaculture- which includes milkfish and seaweed, natural fibers, and “muscovado” as the commodities to be promoted and supported. It will also diversify or improve on the support for the production of banana, coffee, cacao, and lowland vegetables. To improve the profitability of these crops, market access and linkaging activities will be conducted. b. Expand AFF-based enterprises through new and innovative production and marketing schemes and strengthen community-based enterprises in upland communities. The region will continue to provide support to AFF-based MSMEs and start-ups from their establishment to production and marketing. Market and value chain studies will be conducted and facilitation to link producers, processors and consumers. Market consolidation assistance will be provided. c. Raise investments in R&D. The region through coordination with government research institutions like the state universities and colleges (SUCs) will push for more investments in agriculture and fisheries research and development. d. Enhance capacity of small farmers and fisherfolk to use better and new technologies. Technical assistance and trainings on better technologies in agriculture and fishery will be provided. Information campaigns as well as access to this new and better technologies
14
B A L I K P R O B I N S YA , B AG O N G PAG - A S A P R O G R A M
will also be undertaken. Agriculture and fisheries extension programs will focus on the dissemination and adoption of these new technologies. 5. Provision of livelihood and employment opportunities – Capacity building for small farmers and fisherfolk on value adding will be provided especially in processing of farm and fishery products to help them earn more income as well as reduce wastage. Non-farm livelihood options especially to seasonal farm and fishery workers will be provided through the promotion of agriand fishery tourism activities as well as government activities for environmental protection. The capacity of small farmers and fisherfolk to use better and new technologies will be enhanced. Technical assistance and trainings on new and better technologies in agriculture and fishery will be provided. Information campaigns as well as access to this new and better technologies will also be undertaken. Agriculture and fisheries extension programs will focus on the dissemination and adoption of these new technologies.
KRA 3 – Housing, Social Welfare, Health, Employment and Human Resource Development The health and education of the people in their home provinces are important foundations for the success of the BP2 Program. Comprehensive assistance packages will be designed to encourage the voluntary and immediate movement of BP2 beneficiaries to their respective home provinces, including workers and overseas Filipino workers. Local health facilities shall be upgraded and local health capacity shall be improved to address the health needs of the community, such as building more hospitals and clinics, providing more ambulances and enhancing medical scholarship programs, among others. Educational institutions and technical and vocational schools shall be built in strategic areas, state universities and colleges shall be linked to industries, through, among others, the conversion of their idle lands into science or technology parks. Access to open distance learning shall be enhanced in rural communities. Employment shall be created and restored through various support programs and assistance packages, including resettlement to provincial township sites and community interventions or projects based on area/resettlement sites. The relevant strategies in the RDPa supportive of this KRA include the following: 1. Improve response of health care delivery systems – This will entail the construction, rehabilitation and upgrading of hospitals and other health care facilities, expansion of health insurance coverage, program for health professionals to participate in rural health development, enhancement of skills of frontline health providers, information dissemination of responsible parenthood and reproductive health services, as well as along communicable, noncommunicable and vector-borne diseases, expansion of nutrition programs and rehabilitation and reintegration of drug surrenders . 2. Provide quality, accessible, relevant and liberating basic education for all provided – Qualified teachers will be hired, students will be adequately prepared for higher learning, especially their skills in communication, mathematics and logical and critical thinking. 3. Improve quality of higher education and training for global competitiveness – Support will be provided to poor but deserving student to access higher education, especially those courses responsive to the likely needs of the industries that will relocate in the region. Jobskills matching and the conduct of relevant practical training programs to meet the needs of industries and improve the competitiveness of workers will be pursued. 4. Establish productivity enhancement measures in industry and the workplace – Safety and health of workers will be ensured. Gender-responsive occupational safety and health a
As discussed in RDP 2017-2022, Chapter 11 –Enhancing Human Capital and Access to Social Services
W E S T E R N V I S AYA S R E G I O N A L AC T I O N P L A N
15
practices and implementation of workplace emergency plans and disaster risk programs will be encouraged among establishments. Access of women to entrepreneurial opportunities will be improved and retraining for women to mainstream in the workforce will be given focus. Policies that promote work-life balance will be supported, such as the provision of enhanced maternal and paternal benefits. 5. Improve adequacy of and access to social infrastructure that are responsive to gender concerns as well as the needs of children, persons with special needs, and senior citizens.
KRA 4 – Infrastructure Development Infrastructure such as means of transport and communications, power resources, and irrigation facilities which support the operation and development of other economic sectors shall be developed. The completion of existing and future national road, highways, to facilitate the movement of people, as well as the creation and improvement of transport terminals, and the construction of public markets, logistics chains, and cold storage in communities, shall be prioritized. The following are the strategiesa of the RDP supportive of KRA 4: 1. Increase spending on public infrastructure – Planning, programming and the budgeting processes, government administrative systems and procedures in project implementation of the government will be improved, private sector participation will be encouraged, and infrastructure-related R&D will be intensified. 2. Enhance connectivity and mobility – Efficiency of the transport sector will be enhanced by providing adequate, accessible, reliable and safe access for people and goods within and across regions and the world. Transport links will be enhanced by constructing more access roads, and open more RO-RO routes to enhance connectivity and mobility within and outside the region. More amenities and facilities for the comfort and convenience of passengers and motorists will be constructed, and operational efficiency of airports and seaports will be improved. Traffic management will be improved and safety and security of travelers and tourists will be ensured. The use of ICT to promote good governance and human resource development and to support marketing and product development will be enhanced. 3. Linking food production and residential areas for efficiency and accessibility. Putting into place a good road system that will improve access to farms, fisheries sites and other food production areas, particularly of the smallholder farmers and fisherfolks in the rural communities, will increase producers’ income through reduced transport costs; improve access of people to fresh produce, and open up new areas for development. These roads are critical in the effective operation and development of public markets, logistics chains, cold storage facilities and related infrastructures. In the region, roads and bridges have been constructed through the convergence of DPWH with DA, DAR, DSWD, DTI, DOT and other concerned agencies to link communities and municipalities to industries, farms, and local tourist destinations, among others. In the pipeline are additional road and bridge projects that will be built by DPWH in strategic locations all over the region. However, taking into account the increasing food demand and the additional requirements of the BP2 beneficiaries, the LGUs should concertedly plan and push for the implementation of larger public infrastructure investments that have long-term effects on human development and local/regional economic productivity. The development of economic zones in growth centers or contiguous spaces between LGUs a
16
As discussed in Chapter 19 – Accelerating Infrastructure Development of RDP 2017-2022
B A L I K P R O B I N S YA , B AG O N G PAG - A S A P R O G R A M
is one of the long-term strategies that is seen to provide the LGUs and the region with more sustainable benefits. Special considerations should be given to economic zones that would improve the value chain of the regional priority commodities; and help meet both national and global commitments such as Chapter 8 of the Philippine Development Plan (Expanding economic opportunities in agriculture, forestry, and fisheries) and the Sustainable Development Goal 2 (End hunger, achieve food security and improved nutrition and promote sustainable agriculture). 4. Ensure reliable and adequate power and water supply – The continued reliability and stability of power supply will be maintained. New water supply sources will be explored and water retention designs in big infrastructure projects will be incorporated. Sanitation and sewerage systems projects will be implemented. 5. Strengthen resiliency of communities – Flood control systems using eco-efficient designs will be constructed and maintained. Solid waste management concerns will be addressed. Evacuation centers will be established in all of the six provinces
6. Strengthen convergence of adequate transport infrastructure support. Directly related to the road infrastructure development is the need to improve the transport system that would link populations to industries, economic nodes and centers, and other destinations. Currently, our regional transport system consists of road, water, and air transport, with the first being the dominant subsector. Improving the convergence of transport infrastructure is critical for ensuring safer and faster travel; strengthening the investment climate; and enhancing local economic growth. In recent years, the region has seen a significant improvement in the local road transport with the construction and/or rehabilitation of both publicly and privately operated transport terminals catering to buses, jeepneys, taxis and even tricycles in the rural towns. Similar developments are observed in the other subsectors with the expansion of the airports and the improvement of our seaports, particularly in the growth centers. However, the growing population and the additional requirements of the BP2 beneficiaries are seen to affect the movement of people, goods, and services especially in urban areas where congestions are increasing rapidly. Notwithstanding the development of more infrastructure facilities, a more sustainable solution to address the transport concerns is the intermodal integration or the strategic linking of the transport nodes among the LGUs, focusing on the potential growth sectors such as manufacturing, agriculture, and tourism. 7. Provision of reliable internet facilities and adequate power and water supply services. The world’s most valuable resource is no longer oil but data. Hence, high-speed, reliable, and affordable internet is the most important differentiating infrastructure today. In this regard, local planning efforts and investments should be geared towards the development of ICT particularly in developing a larger and integrated digital infrastructure to improve the quality of life of the people; make business transactions faster, more convenient and efficient; and improve the economic competitiveness of LGUs. Broadband technologies have unlocked numerous socio-economic opportunities for LGUs and communities in the region including the rise in the number of business process outsourcing
W E S T E R N V I S AYA S R E G I O N A L AC T I O N P L A N
17
(BPO) investments, internet shops/cafes, distance-learning institutions, and other internetdependent investments. However, even with the National Broadband Plan (NBP) implementation of other related ICT projects and the strengthening of the regional offices of DICT, internet connectivity remains a challenge particularly for rural communities that are far from urban centers. It is necessary to establish a partnership with and provide incentives to cooperatives, SUCs, and other private organizations to encourage them to invest in the ICT sector. This untapped opportunity can provide them with a constant flow of revenue while helping the local communities improve their access. Another strategy is the improvement of the web presence of micro, small, and medium enterprises (MSMEs). E-commerce provides MSMEs with an online presence. In the internet age, this is vital in helping businesses/enterprises increase their number of viewers/buyers, which is equivalent to a surge in revenues. Another benefit of e-commerce is online shopping which is expected to grow at a great pace, considering the outbreaks of public emergencies and climate change. Adequate power is necessary to improve the resilience of the ICT infrastructures and meet the consumption demand of both residential and commercial sectors. During the past few years, the region has seen more investments in power plants that use low-carbon alternatives. Power distribution has also improved with the rehabilitation and upgrading of the transmission lines and appurtenant structures. Comparable developments are also seen in the water sector as the local water districts continue to rehabilitate and improve their water lines. Apart from the additional supply of water, new players/companies bring additional technical and managerial competencies which would benefit the sector and the local economic development activities. More water supply for domestic and industrial use is also expected upon the completion of the Jalaur River MultiPurpose Project Stage (JRMP) II in 2023.
Short-, Medium-, Long-Term Components. Short-, medium-, and longterm programs, activities, and projects (PAPs) in support of BP2 shall be implemented. The short-term PAPs shall include those that will be implemented from 2020 until 2022 and other short-gestating PAPs thereafter. The medium- and long-term PAPs will be implemented from 2020 and can extend beyond 2022.
Short-Term The short-term PAPs shall include the immediate activities meant to assist the relocation of BP2 beneficiaries who are ready to return to the provinces. There shall also be a transition phase where existing supportive PAPs with available funds or appropriations are implemented to facilitate the repatriation of beneficiaries and start strengthening the local economies to provide sources of income for beneficiaries. These PAPs shall ensure strict adherence to health protocols to prevent the spread of SARS-Cov-2 during this COVID-19 pandemic. During this transitory period, convergence points are critical to ensure a holistic and integrated delivery of social services, including the creation of common targeting systems, particularly for basic services. Strong coordination with LGU local housing offices for assistance and monitoring of housing program beneficiaries shall be pursued. PAPs that enhance agriculture production, strengthen existing agri-based
18
B A L I K P R O B I N S YA , B AG O N G PAG - A S A P R O G R A M
enterprises, help develop new agri-based enterprises, and provide other livelihood and employment packages shall also be immediately rolled out. Relevant training programs shall be conducted to develop skills that match the available and potential employment in the locality. Funded PAPs that enhance connectivity, power, and communication in the receiving LGUs shall also be implemented.
Medium-Term In the medium term, the relocation of BP2 beneficiaries shall continue following the same relocation protocols described in Annex A. Likewise, existing PAPs with available funds or appropriations supportive of the BP2 program shall continue to be implemented. PAPs for funding in 2021 shall also be pursued to facilitate the implementation of other critical projects. These PAPs shall include the development of new housing projects to ensure the BP2 beneficiaries’ access to permanent housing. The housing sites shall be identified based on a set of criteria defined in Annex B. To this end, the concerned government agencies shall submit to the Department of Budget and Management (DBM) a budget proposal in line with this program. The relocation of enterprises, including start-ups and new enterprises, shall also be pursued by offering a combination of tax and non-tax incentives. Any tax and fiscal incentives to be given shall conform to the national policy that all incentives given shall be performance-based, targeted, timebound, and transparent. In addition to national government tax incentives, the LGUs may also provide counterpart incentives. Non-tax incentives shall cover areas such as ease of doing business, access to credit, access to utilities, and other related needs of the enterprises. Considering price and quality, enterprises to be established shall make use of skills and local products to help the local community expand their markets and add to the value of their products.
Long-Term In the long term, given initial support from the national government, LGUs would be more equipped to attract relocators with little or no national government assistance. PAPs that require longer time horizons to implement but require initial steps to be undertaken by national government agencies (NGAs) shall be considered. These include the proposed decentralization of powers and moving the seat of governance, priority legislation on rationalized, transparent, targeted, and results-based tax and non-tax incentives, and the creation of new urban centers outside of the NCR and existing major urban centers
W E S T E R N V I S AYA S R E G I O N A L AC T I O N P L A N
19
Special programs for BP2 beneficiaries Beneficiary Profile As of October 30, 2020, there are 9,600 applicants. Initial review and data analysis of NEDA-VI showed a total of 7,260 unique applicants: 601 for Aklan, 716 for Antique, 1,080 for Capiz, 135 for Guimaras, 1,670 for Iloilo including Iloilo City (255), and 3,058 for Negros Occidental including Bacolod City (654).
Figure 8. Overview on the Profile of BP2 Applicants
20
B A L I K P R O B I N S YA , B AG O N G PAG - A S A P R O G R A M
There are 3,530 female and 3,730 male applicants. For civil status, 3,750 are single, 3,202 are married, 297 are separated, 766 are with common-law partners, 131 are widowed and 14 have not specified. Of the applicants, 321 are persons with disabilities. A vast majority of the applicants are high school graduates (3,193). The group is followed by 1,548 college graduates, 1,097 undergraduates, 777 vocational, 614 elementary and 31 post-graduates. Among them, 84.79 percent or 6,156 have government insurance IDs via the Government Service Insurance System (GSIS) and Social Security System (SSS).
Interventions for BP2 Beneficiaries Housing is an integral component for the beneficiaries of BP2 as most of these beneficiaries are families who will be migrating out of congested Metro Manila and opted chose to return to their respective home provinces and towns. During the pandemic, various government agencies implemented enabling policies to address the concerns on housing services and to ease the people from payments of housing rentals and mortgages in the region. SSS waived one percent service fee and to temporarily hold payments of housing and pension loans. GSIS extended its loan programs for the affected employees and retirees which include the provision of housing loan moratorium. HDMF also moved the application process for its short-term loan (STL) and housing loans online and granted a 3-month moratorium on the housing loans and (STL). NHA suspended the collection of amortization or lease payments from residential account holders, individual accounts and community association. In response to the need for decent and affordable housing, the region may opt to adopt the Happy House Program of Korea – a vertical rental-housing model that utilizes idle lands situated near city centers, or near traffic hubs or workplaces of prospective residents. The vertical tenement model is, among others, characterized by its strategic location that significantly contributes to reduced travel times, eased traffic congestion, and increased hours of productivity. This model provides housing at a lower rate than the other home/residential options within the urban centers. This will help address housing insecurity experienced by young professionals, newly-married couples, and middle-income earners, who are generally not among the priorities of housing welfare and policy program in the country.
W E S T E R N V I S AYA S R E G I O N A L AC T I O N P L A N
21
Annex A
List of Programs, Projects and
Activities per Key Result Area per Agency/Office
Provincewide (Guimaras)
Provide technical assistance in enhancing their skills, knowledge and abilities (KSA) in relation to their tourism employment 1,800,000.00
1,000,000.00
800,000.00
500,000.00
50,000
130,000.00
30,000
300,000.00
1,000,000.00
300,000.00
1,000,000.00
0.00
170,000.00
45,000.00
45,000.00 0.00 340,000.00
45,000.00
45,000.00
170,000.00
80,000.00
B A L I K P R O B I N S YA , B AG O N G PAG - A S A P R O G R A M • W E S T E R N V I S AYA S R E G I O N A L AC T I O N P L A N
Provincewide (Guimaras)
Conduct of investment forum and B2B (tourism related business)
Linkaging of possible employment Provincewide (Guimaras) in the primary tourism enterprises
Migrant Support Services/ Provincewide (Guimaras) Employment Services Program for OFWs. Needs Assessment of Individuals/ Families Provincewide (Guimaras) Financial Assistance to Individuals Provincewide (Guimaras) & Families
Job Fairs/ Matching/ Special Provincewide (Guimaras) Recruitment Activities Migrant Support Services Alternative Local Employment (Off- Provincewide (Guimaras) Farm/ Off-Season Employment)
Job Search Assistance Program (Support to PESO Operation) Employment promotion related Provincewide (Guimaras) meetings/ forum
Trade and Investment Promotion Services Product Development, Market Provincewide (Guimaras) Promotion and Linkaging for MSMEs Capacity Development Workshops Provincewide (Guimaras) on Product Development
120,000.00
40,000.00
Provincewide (Guimaras)
Alternative livelihood using indigenous raw materials livelihood diversification strategy to reduce dependence of climate related income opportunities
100,000.00
60,000.00
160,000.00
Provincewide (Guimaras)
2021
50,000
1,000,000.00
500,000.00
2022
Annual Breakdown of Funding Requirements
Skills/ Technology Trainings
Total Funding Requirement
(4)
110,000.00
Location/Site
(3)
2020 A. LOCAL GOVERNMENT UNIT KEY RESULT AREA 1 EMPOWERMENT OF LOCAL INDUSTRIES SHORT TERM 1. BACOLOD CITY Assist MSMEs in securing all Bacolod City necessary permits Provide incentives both tax and Bacolod City non-tax to MSMEs SUB-TOTAL 2. PROVINCE OF GUIMARAS Institutional and Capability Building for Livelihood Enterprises, Businesses and Tourism Related Services Strengthening of CommunityProvincewide (Guimaras) Based Associations Cooperative Mandatory Trainings Provincewide (Guimaras) 350,000.00 240,000.00
Priority Projects/Activities
(2)
Annex A. Summary of Investment Requirements by KRA by PPA
(1)
Beyond
Funding Source
Timeline/ Implementation Period
(7)
PSWDO P/MSWDO
PEDO
PEDO
PEDO
2021-2022
General Fund- PTourO, DOT Special VI Purpose Project
2021-2022
25
1st-2nd Quarter
1st-4th Quarter
1st-4th Quarter
1st-4th Quarter
1st-2nd Quarter
PEDO
PEDO
1st-2nd Quarter
1st-3rd Quarter
1st-3rd Quarter
1st-3rd Quarter
1st-4th Quarter
PEDO
PEDO
PEDO
PEDO
LEIPO-BBDPC, Jan 2021 - Dec CCLDO 2022 LEIPO-BBDPC Jan 2021 - Dec 2022
Implementing Agency
(6)
General Fund- PTourO, PEDO, 2021-2022 Special Private Sector Purpose Project
PLGU
PLGU Guimaras
PLGU Guimaras
PLGU Guimaras/ DOLE
PLGU Guimaras/ DTI/ DOST PLGU Guimaras/ DTI/ DOST
PLGU Guimaras PLGU Guimaras PLGU Guimaras
(5)
5,700,000.00
1,050,000.00 5,130,000.00
480,000.00
410,000.00
Provincewide (Guimaras)
Provincewide (Guimaras)
Provincewide (Guimaras) Provincewide (Guimaras)
Provincewide (Guimaras)
Provincewide (Guimaras)
Provincewide (Guimaras)
Jordan, Guimaras
Guimaras Rise for Rice
Guimaras Rise for Rice Farmer's Information Technology Service (FITS) Center
Guimaras Rodents Eradication Program (GREP) Development of Agri-Tourism Farm in Support to Agri-Tourism Circuit: Support to Herbs & Municipality Endorsed-Potential Agri-Tourism Farm Development of Agri-Tourism Farm in Support to Agri-Tourism Circuit: Cacao Orchard Development Agroecological Approach Intensification in Farming System for Watershed Management
Provincewide (Guimaras)
3,900,000.00
Provincewide (Guimaras)
PRDP-PPMIU Operations
5,000,000.00
Provincewide (Guimaras)
3,100,000.00
4,000,000.00 1,800,000.00
1,500,000.00
8,024,600.00
Provincewide (Guimaras)
800,000.00
280,000.00
650,000.00
250,000.00
300,000.00
1,500,000.00
1,000,000.00
400,000.00
1,500,000.00
1,024,600.00
1,000,000.00
Support to Guimaras Mango Production Implementation of Special Quarantine Zone for Guimaras Mango Support to Livestock & Poultry Production Livestock Improvement through AI
20,000,000.00
5,600,000.00
600,000.00
25,000,000.00
Completion of Community FishBuenavista, Sibunag, San Landing Center Lorenzo, Nueva Valencia Capacity Building for Post-Harvest Provincewide (Guimaras)
1,100,000.00
210,000.00
200,000.00
1,000,000.00
300,000.00
1,500,000.00 1,000,000.00
1,200,000.00
1,000,000.00
1,500,000.00
2,000,000.00
4,500,000.00
10,000,000.00
7,400,000.00
500,000.00 1,425,000.00
500,000.00
Provincewide (Guimaras)
500,000.00 1,350,000.00 1,600,000.00 1,600,000.00
2021 1,000,000.00
Aquaculture Production Project (Establishment of Provincial Hatchery)
Provincewide (Guimaras) Sabang, Sibunag, Guimaras Nueva Valencia, Guimaras Jordan, Guimaras
150,000.00
2020
1,200,000.00
200,000.00
3,000,000.00
500,000.00
2,500,000.00 500,000.00
3,500,000.00
2,500,000.00
2,000,000.00
5,000,000.00
4,000,000.00
5,000,000.00
5,500,000.00
8,000,000.00
1,000,000.00 3,200,000.00
600,000.00
2022 1,000,000.00
Annual Breakdown of Funding Requirements
15,400,000.00
1,100,000.00 2,000,000.00 5,975,000.00 1,600,000.00 1,600,000.00
Provincewide (Guimaras)
(4)
Procurement of Farm Machineries Provincewide (Guimaras) (walk-Behind Transplanter)
Support to Agricultural Engineering Unit Construction of 10 Units SFRs Contruction of Flatbed Dryer Purchase of Combined Harvester Procurement of Farm Machineries (Combined Harvester)
150,000.00
Total Funding Requirement
(3)
Support to Agricultural Engineering Provincewide (Guimaras) Unit
Location/Site 2,000,000.00
(2)
Provincewide (Guimaras)
Priority Projects/Activities
Conduct of tourism capacity development programs
(1)
A N N E X A • L I S T O F P R O G R A M S , P R O J E C T S A N D AC T I V I T I E S P E R K E Y R E S U LT A R E A P E R AG E N C Y / O F F I C E
Beyond
Funding Source
Implementing Agency
(6)
SPP
SPP
SPP
SPP
SPP
SPP SPP
2021-2022
2020-2022 2020-2022 2020 2020
2021-2022
2020
2021-2022
Timeline/ Implementation Period
(7)
PGG-POAS
PGG-POAS
PGG-POAS
PGG-POAS
PGG-POAS
PGG-POAS
PGG-POAS
PGG-POAS
PGG-POAS
PGG-POAS
PGG-POAS
PGG-POAS PGG-POAS
2020-2022
2021-2022
2020-2022
2020-2022
2020-2022
2021-2022 2020-2022
2020
2020-2022
2020-2022
2020-2022
2020-2022
2020-2022
2021-2022
PGG-POAS, 2021-2022 GENRO, PEDO, PAssO, BFARPFO, OMAs
PGG-POAS
PGG-POAS PGG-POAS PGG-POAS PGG-POAS
PGG-POAS
Supplemental PGG-POAS Budget, 2020
SPP
SPP
SPP
SPP
SPP
20% DF
20% DF
20% DF
20% DF 20% DF 20% DF 2020 20% DF 2020
SPP
Supplemental PGG-POAS Budget, 2020
General Fund- PTourO, DOT Special VI Purpose Project
(5)
26
600,000.00
Bubog, Sibunag, Guimaras
13 barangays of Sibunag, Guimaras
250,000.00 1,400,000.00
200,000.00
500,000.00 2,500,000.00
100,000.00
8,000,000.00
1,000,000.00 7,000,000.00
50,000.00 8,000,000.00
50,000,000.00
2,000,000.00
20,000.00 50,000.00
3,500,000.00
1,400,000.00
100,000.00
50,000.00
30,000.00
3,500,000.00
2,800,000.00
70,000.00
47,500.00
20,000.00
20,000.00
20,000.00
20,000.00
200,000.00
30,000,000.00
1,500,000.00
15,000,000.00
5,200,000.00
2021 1,000,000.00
500,000.00 2,500,000.00
100,000.00
250,000.00
50,000.00
20,000.00
50,000.00
20,000.00
20,000.00
20,000.00
20,000.00
2,500,000.00
10,000,000.00
3,000,000.00
20, 000, 000.00
1,000,000.00
2022 1,200,000.00
Annual Breakdown of Funding Requirements
B A L I K P R O B I N S YA , B AG O N G PAG - A S A P R O G R A M • W E S T E R N V I S AYA S R E G I O N A L AC T I O N P L A N
Livelihood Assistance 13 barangays of Sibunag, Guimaras Provision of Livelihood/Kabuhayan 13 barangays of Sibunag,Guimaras Projects & Employment Opportunities
Establishment of Groundwater Pump Irrigation Projects (EGPIP) Solar Construction of Sibunag Slaugther Dasal, Sibunag, Guimaras House Construction of Municipal Trading Maabay, Sibunag, Guimaras Post Training of Farmers on value 13 barangays of Sibunag, Guimaras adding of Agri-Fishery Products
Sabang & Bubog, Sibunag, Guimaras Bubog, Sibunag, Guimaras
150,000.00
14 barangays of Sibunag, Guimaras
Support to Swine Production & Marketing Construction of Small Farm Reservoir Construction of Flatbed Drier
47,500.00
Promotion of Backyard Gardening
For Assessment
540,000.00
540,000.00
540,000.00
350,000.00
100,000.00
2020 650,000.00
40,000.00
(4)
145,000.00
14 barangays of Jordan, Guimaras 13 Barangays of Sibunag, Guimaras
580,000.00
580,000.00
580,000.00
2,500,000.00
200,000.00
30,000,000.00
10,000,000.00
3,000,000.00
1,500,000.00 20,000,000.00
15,000,000.00
Enrollment to Digital Jobs PH Training (partnership of DICT and the LGU) Facilitation of start-up capitals to various financial institutions Support to Animal Health Program
Production of Spices
Establishment of urban/backyard gardening
14 barangays of Jordan, Guimaras 14 barangays of Jordan, Guimaras
Concordia, Nueva Valencia, Guimaras 14 barangays of Jordan, Guimaras
Construction of Tourism Center
Provision of Direct Internet
Provision of Reliable Internet Services
Cabalagnan, San Antonio, Calaya, Oracon in Nueva Valencia, Guimaras Poblacion, Concordia, Igang, Sto. Domingo in Nueva Valencia, Guimaras Poblacion, Nueva Valencia, Guimaras
Construction of Water Supply System
Construction of Barangay Market
Livelihood Bldg. Construction of Slaughter House
New Poblacion, Buenavista, Guimaras Brgy. Avila, Buenavista, Guimaras Poblacion, Concordia, Nueva Valencia, Guimaras Dolores, Nueva Valencia, Guimaras
350,000.00
Provincewide (Guimaras)
Isolation Facility Bldg.
6,200,000.00 100,000.00
Total Funding Requirement
(3)
Provincewide (Guimaras) Provincewide (Guimaras)
Location/Site
Aquaculture Production Project Establishment of Freshwater Hatchery Dispersal of Freshwater Species
(2)
2,850,000.00
Priority Projects/Activities
Support to Farmers and Provincewide (Guimaras) Fisherfolks Organization & Council
(1)
Beyond
Funding Source
MLGU
MLGU
DA 6 DA-NMIS
DPWH
PGG-POAS
PGG-POAS PGG-POAS
PGG-POAS
Implementing Agency
(6)
MLGU
DA/MLGU
DANMIS/MLGU DA/MLGU
NIA
P/MLGU
DA/MLGU
MLGU
MLGU
Financial Institutions MLGU
MLGU MLGU DOLE/TESDA/ MLGU DTI/DSWD
DA
DA
DA-NMIS
NIA
PLGU
DA
MLGU
MLGU
Financial Institutions MLGU
2021
2022
2022
2021 2022
2021-2022 2020-2022
2021-2022
2021
2021
2021
2020-2021
2020-2022
2020-2022
2020-2022
2020-2022
2020-2022
2020-2022
2020-2022
2020 - 2022
2022
27
Feb to Jun 2021
2020
2021-2022 2020
2020-2022
Timeline/ Implementation Period
(7)
MLGU - Nueva 2021 Valencia
Provincial MLGU LGU/Municipa l LGU/NGA Municipal MLGU LGU/NGA Municipal MLGU / DICT LGU/NGA
MLGU Nueva Valencia MLGU
PLDT - Smart PLDT - Smart
MLGU
MLGU
DOH/ National DA Regional DA - NMIS
SPP 2020
SPP SPP 2020
SPP
(5)
Priority Projects/Activities
(2)
Location/Site
SUB-TOTAL 3. PROVINCE OF CAPIZ Establish of fast lane at the Outpatient Department and Emergency Room for BP2 Beneficiaries
50,000.00
5,000.00
50,000.00
50,000.00
350,000.00
852,294,600.00
10,000,000.00
500,000,000.00
22,172,100.00
147,422,500.00
500,000.00
100,000.00
200,000.00 1,000,000.00
5,000,000.00
13,000,000.00
3,500,000.00
7,500,000.00 250,000.00
5,000,000.00
5,000,000.00
1,400,000.00
120,000.00
240,000.00
500,000.00
250,000.00
500,000.00
2,100,000.00
300,000.00
150,000.00
300,000.00
1,000,000.00
300,000.00
1,500,000.00
300,000.00
50,000.00
450,000.00
150,000.00
150,000.00
50,000.00
350,000.00 200,000.00
300,000.00
2021 5,000,000.00
5,000,000.00
2020
5,000.00
112,070,000.00
10,000,000.00
500,000.00
100,000.00
8,000,000.00
700,000.00
250,000.00
2,000,000.00
120,000.00
250,000.00
1,000,000.00
150,000.00
50,000.00
300,000.00
200,000.00
150,000.00
300,000.00
8,000,000.00
2022 8,000,000.00
Annual Breakdown of Funding Requirements
600,000.00
5,000.00
(4)
5,000,000.00
8,000,000.00
13,000,000.00
Total Funding Requirement
(3)
Roxas Memorial Provincial 15,000.00 Hospital OPD-Lanot and Arnaldo Boulevard Main Site, Roxas City, Capiz
27 Farmers Associations in San Lorenzo, Guimaras Aguilar , San Lorenzo, Guimaras Construction of Cold Storage Plant M. Chavez, San Lorenzo, (Vegetables and Fishery Products, Guimaras meat and poultry products)
Cabano Small Irrigation Reservoir
Livelihood Assistance
Municipal Public Market at Barangay M. Chavez, San Lorenzo, Guimaras Improvement and Municipal Public Market at Operationalization of Bagsakan Barangay M. Chavez, San Center Lorenzo, Guimaras Provision and Dispersal of Tilapia 6 Barangays of San Lorenzo, Fingerlings Guimaras Dispersal of Milkfish fingerlings 3 barangays of San Lorenzo, with feeds Guimaras Construction of Municipal Barangay M. Chavez, San Slaugther House Lorenzo, Guimaras Improvement of Municipal Public Barangay M. Chavez, San Market Lorenzo, Guimaras Construction of Small Farm 12 barangays of San Reservoir Lorenzo, Guimaras Construction of Flatbed Drier Cabano, M. Chavez, San Enrique, San Lorenzo, Guimaras Access to credit finance and other 32 Farmers Associations in grants for food security and San Lorenzo, Guimaras agricultural productivity Training of Farmers on value adding of Agri-Fishery Products
Establishment of Livestock Auction Market
Access to credit finance and other 13 farmers association in grants for food security and Sibunag, Guimaras agricultural productivity Construction of Rice Processing Sabang, Sibunag, Guimaras Center Improvement of Sibunag Public Maabay, Sibunag, Guimaras Market Certified Palay Seeds Subsidy Program 12 barangays of San Lorenzo, Guimaras Corn Seeds Subsidy Program 12 barangays of San Lorenzo, Guimaras Vegetable Seeds Distribution 12 barangays of San Lorenzo, Guimaras Farmer Field School on Rice and 12 barangays of San Vegetable Production Lorenzo, Guimaras Support to Cashew Production and 5 Barangays of San Lorenzo, Processing Guimaras Establishment of Farmers 12 barangays of San Livestock School on Sustainable Lorenzo, Guimaras Pig/Goat Production
(1)
A N N E X A • L I S T O F P R O G R A M S , P R O J E C T S A N D AC T I V I T I E S P E R K E Y R E S U LT A R E A P E R AG E N C Y / O F F I C E
Beyond
Funding Source
MLGU
MLGU
MLGU
MLGU
MLGU
MLGU
MLGU
MLGU
MLGU
MLGU
P/MLGU
DA/MLGU
Brgy. Farmers Association
Implementing Agency
(6)
2021-2022
Brgy. Farmers Association
BFAR, DA
NIA
MLGU
2022
2021-2022
2021-2022
DA/BFAR/MLGU 2021-2022
2021-2022
2021-2022 P/MLGU
DA/MLGU
2020-2022
2021
2021-2022
2021-2022
2021
2022
2021-2022
2020-2022
2020-2022
2020-2022
2020-2022
2021-2022
2021-2023
2022
2021-2022
Timeline/ Implementation Period
(7)
RMPH MOOE RMPH and PGO-1st Quarter 2021 HMS Province to 4th Quarter 2022 of Capiz
BFAR, DA
NIA
MLGU
DA, BFAR
LBP
PLGU
DA
DANMIS/MLGU MLGU, PLGU P/MLGU
DA-NMIS
DA, MGLU
DA, MGLU
MLGU
MLGU
MLGU
MLGU
DA, MLGU, PLGU DA, MLGU, PLGU DA, MLGU, PLGU MLGU
PLGU
DA
LBP
(5)
28
Total Funding Requirement
(3)
20,000,000.00
Capiz Province
6,243,600.00 18,500,000.00 7,200,000.00 300,000.00
Roxas City
1 per District
Capiz Provincial Park
6,000,000.00
17 LHOs, 5 Public Hospitals, 4 Private Hospitals and 1 Military Hospital, Capiz Province Province-wide
100,000.00
-
-
2,000,000.00
100,000.00
4,000,000.00
10,200,000.00
2,838,000.00
2,000,000.00
30,000,000.00
5,000,000.00
60,000,000.00
250,000.00 5,000,000.00
15,000,000.00
500,000.00
10,000,000.00
15,139,000.00
5,000,000.00
30,000.00
2021 20,000,000.00
100,000.00
3,200,000.00
8,300,000.00
3,405,600.00
2,000,000.00
30,000,000.00
5,000,000.00
250,000.00
500,000.00
10,000,000.00
30,000,000.00
500,000.00
5,000,000.00
30,000.00
2022 30,000,000.00
Annual Breakdown of Funding Requirements
B A L I K P R O B I N S YA , B AG O N G PAG - A S A P R O G R A M • W E S T E R N V I S AYA S R E G I O N A L AC T I O N P L A N
Provision of Personal Protective Equipment (PPEs) for the health workers managing COVID-19 cases Maintain Animal Disease-Free Status: FMD, BF, ASF Establishment of Cold Storage Facility Establishment of Cattle/Carabao Feedlot Conduct "Manindahan Ta! Street Market
2020
2,500,000.00
30,000.00
(4)
500,000.00
1,000,000.00
45,139,000.00
Capiz Province
Capiz Province Capiz Province
500,000.00
5 Governments Hospitals Capiz Province
Establishment of the Provincial Capiz Province Health Care providers Network Provision of Medical and Dental Capiz Province Outreach Activities in vulnerable areas with high number of BP2 beneficiaries Provision of Anti COVID-19 Capiz Province Vaccine for vulnerable population especially those BP2 beneficiaries
Support program to families Strengthening and integration of the Province-wide Health System
Human Resource Development Conduct seminar on Personal development and Psychological development Aid to Individual in Crisis Situation (Medical & Hospital) Provision of Psy-cho Social (Burial)
Provision of Financial Assistance to admitted BP2 beneficiaries
Provision of PhilHealth coverage to admitted BP2 beneficiaries
Roxas Memorial Provincial Hospital OPD-Lanot and Arnaldo Boulevard Main Site, Roxas City, Capiz Roxas Memorial Provincial Hospital Malasakit Center, Roxas City, Capiz Roxas Memorial Provincial Hospital Malasakit Center, Social Services, Roxas City, Capiz
Roxas Memorial Provincial 12,500,000.00 Hospital Molecular Laboratory Roxas City, Capiz
Location/Site
Provision of RT PCR Testing services to BP2 beneficiaries for faster reintegration to the community Participation of RMPH in the Healthcare Provider Network
(2)
Roxas Memorial Provincial 50,000,000.00 Hospital OPD-Lanot and Arnaldo Boulevard Main Site, Roxas City, Capiz Roxas Memorial Provincial 90,000.00 Hospital Molecular Laboratory Roxas City, Capiz
Priority Projects/Activities
Hiring of more health care workers to augment existing workforce in order to provide services to BP2 beneficiaries Training of medical technologists and laboratory staff for Molecular Laboratory to expedite processing of specimens of BP2 beneficiaries
(1)
Beyond
Implementing Agency
(6)
PHO, HMS, RMPH, Province of Capiz RMPH
RMPH, Province of Capiz
PHO, HMS, DOH
PHO, HMS
PHO, HMS
PHO
PHO
PSWDO
PSWDO
PGO-HMS
Province of Capiz
National
Province of Capiz
PLGU/OPV
National/PLG PLGU/OPV U National PLGU/OPV
Capiz Province, DOH
Capiz Province
Capiz Province Capiz Province
Capiz Province
GF Fund
GAD Fund
Province of Capiz
DOH MAIP, Province of PCSO, Capiz and OPSCF, AICS, RMPH Province of Capiz, Others
DOH, PhilHealth
DOH, PLGU, Municipal LGU, Others
PLGU, RMPH and PGO-HMS Province of Capiz RMPH MOOE RMPH Province of Capiz
Funding Source PLGU
(5)
2023
2023
2021-2022
Year round
29
1st Quarter for 1st batch 2nd Quarter for 2nd batch 2021 Year round
4th Quarter 2020 to 4th Quarter 2022 4th Quarter 2020 to 4th Quarter 2022
4th Quarter 2020 to 4th Quarter 2022
4th Quarter 2020 to 4th Quarter 2022
4th Quarter 2020 to 4th Quarter 2022
2nd Quarter 2021 to 4th Quarter 2022
Timeline/ Implementation Period
(7)
Priority Projects/Activities
(2)
Location/Site
100,000.00
Conduct of Technical Vocational Education/Skills Training
2,100,000.00
700,000.00
500,000.00
Municipal Wide
350,000.00
500,000.00
100,000.00
540,000.00
350,000.00
540,000.00
Panitan, Capiz
500,000.00 650,000.00 100,000.00
1,500,000.00
San Esteban Village, Rizal, Pontevedra, Capiz
500,000.00 650,000.00 100,000.00
Panitan, Capiz Panitan, Capiz Panitan, Capiz
100,000.00
3,500,000.00
Panay, Capiz
25,000.00
Panitan, Capiz
50,000.00 50,000.00
Panay, Capiz Panay, Capiz
Fiscal Incentives to MSMEs Creation of business associations/councils Capital Investments Assistance to MSMEs Livelihood Training for women Assistance to women farmers Provision of livelihood assistance to PWDs Livelihood Assistance Grant
Capital assistance for income generating of projects to employable senior citizens Construction of Talipapa (Minimarket)
750,000.00
700,000.00
2,000,000.00
25,000.00 50,000.00
375,000.00
5,000,000.00
10,000,000.00
Panay, Capiz
Establishment of eBPLS
30,000.00 10,000.00
10,000.00
2,500,000.00
50,000.00
25,000.00
50,000.00
100,000.00
30,000.00
Conduct of training on Abaca Craft Poblacion, Jamindan, Capiz making as OTOP Review and implementation of the Jamindan, Capiz Local Investment and Incentives Code Livelihood Training Municipalwide 375,000.00
20,000.00
20,000.00 5,000,000.00
20,000.00
50,000.00
100,000.00
20,000.00
50,000.00
25,000.00
300,000.00
Dumarao, Capiz, Municipal hall Dumarao, Capiz, Municipal Hall
Ivisan, Capiz
2021
168,000.00
200,000.00
200,000.00
75,000.00
336,000.00
2020
2022
700,000.00
5,000,000.00
2,500,000.00
100,000.00
168,000.00
200,000.00
75,000.00
Annual Breakdown of Funding Requirements
200,000.00
75,000.00
(4)
400,000.00
225,000.00
Total Funding Requirement
(3)
Dao, Capiz
Assessment/identification of Jamindan, Capiz possible industries MOA/MOU signing with banks and Jamindan, Capiz other credible loan institutions/cooperatives Provision of loans and credit funds Jamindan, Capiz
Promotion/Advertisement of Investment and Incentive Code Provision of skills trainings to BP2 beneficiaries Provide assistance in accessing loan credit,securing permit & licenses Updating of the Local Investment and Incentives Code
Human resource Up-skilling and re- Province of Capiz skilling Engagement of youth in the Province of Capiz creative industry and other entrepreneurial ventures such as animation, fashion accessories, crafts, etc. Weekly Tukar-tukar Acoustic Band Capiz Provincial Park Performance Skills Training Cuartero, Capiz, All Barangays
(1)
A N N E X A • L I S T O F P R O G R A M S , P R O J E C T S A N D AC T I V I T I E S P E R K E Y R E S U LT A R E A P E R AG E N C Y / O F F I C E
Beyond
Funding Source Province of Capiz Province of Capiz
Implementing Agency
(6)
Municipal Fund Provincial Fund Municipal Fund
Timeline/ Implementation Period
(7)
LGU Panitan LGU Panitan LGU Panitan
LGU Panay
LGU Panay LGU Panay
LGU Mambusao LGU, DICT
LEIPO
MO, DA
MO
MO, SB
MO, LEIPO
SB, TWG
MSWD
PEO
MEO
2020-2022
2020
2020
2020-2021
2020-2021 2021
2020-2021
1st Qtr. 2021
1st Qtr. 2021
2021-2022
Dec. 2020- Jan. 2021 Dec. 2020- Jan. 2021
2021
Landbank/LGU - 2021 Dumarao
MO/All 2020-2022 Agencies DSWD/MSWDO 2020-2021
LGU LGU Panitan Panitan/DSW D LGU Panitan LGU Panitan
LGU Panitan LGU Panitan LGU Panitan
LGU Panay
National Government LGU Panay LGU Panay
DSWD
LGUJamindan, Private LGUJamindan LGUJamindan
LGUJamindan LGUJamindan
Landbank/ LGU Dumarao LGU IvisanGF
DSWD
GF
Province of Province of Capiz Capiz LGU Cuartero LGU - Cuartero /TESDA
Province of Capiz/DOT Province of Capiz/DOT
(5)
30
Place of Origin to Pontevedra 15,450,000.00 for 103 applicants
Provision of transportation, food and shelter expenses for LSIs
2,500,000.00 30,000.00
Subsidy and Livelihood Assistance Roxas City, Capiz to Individuals During Off-Season
Roxas City, Capiz
Sapian, Capiz
Provide Training Materials, Kits and Utensils
Establishment of Credit & Financing SUB-TOTAL 4. PROVINCE OF ANTIQUE Provision of Seed/Business Capital Fund, Input Supply & Technical Assistance for: a. Organic Backyard Production with Processing Related Facility (Gardening Kits) b. Rice and Corn Production/Farming with Post Harvest Machineries c. Farm Tools and Chicken Layer Egg Production d. Food and Meat Processing or any other PangKabuhayan Program e. Food and Vegetable Vending or any other PangKabuhayan Program f. Livestock Raising and Breeding (Cattle, Carabao, Hog and Goat)
200,000
500,000
Municipal Wide - Hamtic
Anini-y
500,000 11,400,000.00
500,000 18,300,000.00
1,000,000.00
500,000
1,000,000
B A L I K P R O B I N S YA , B AG O N G PAG - A S A P R O G R A M • W E S T E R N V I S AYA S R E G I O N A L AC T I O N P L A N
Skills Training Program (Welding, Driving, Massage, Cooking, Automotive, etc.) Investment Promotion a. Promotion of Investment in technology based enterprise SUB-TOTAL 5. PROVINCE OF AKLAN
Skills Training with Starter Tool Kit San Remigio
100,000
2,400,000 5,000,000
4,800,000 5,000,000
Anini-y Libertad
Skills Enhancement Program
1,000,000
2,000,000
200,000 200,000
300,000
Barbaza
100,000 100,000
150,000
200,000
200,000
300,000
200,000
200,000
146,470,000.00
i. Establishment of the micro and small enterprise
500,000 500,000
750,000
San Remigio
100,000
100,000
150,000
100,000
100,000
20,100,000.00
12,500,000.00
15,450,000.00
1,500,000.00
2021 600,000.00
5,900,000.00
500,000
200,000
2,400,000
1,000,000
200,000 200,000
300,000
200,000
200,000
300,000
200,000
200,000
139,133,600.00
1,500,000.00
2022 600,000.00
Annual Breakdown of Funding Requirements
San Remigio San Remigio
500,000
San Remigio
30,000.00
30,000.00
2,500,000.00
1,500,000.00
2020 600,000.00
(4)
g. Buy/Sell of Palay/Rice h. Sari-Sari Store or any other Small Business Entrepreneurship
750,000 500,000
San Remigio
500,000
San Remigio
San Remigio
500,000
San Remigio
305,703,600.00
30,000.00
12,500,000.00
Provision of livelihood packages in Municipal Wide major industries, such as Food Processing, ICT and Retail Trading
4,500,000.00
1,800,000.00
Total Funding Requirement
(3)
Municipal Wide
Location/Site
Support to Agriculture Program
(2)
Municipal Wide
Priority Projects/Activities
Livelihood Assistance
(1)
Beyond
-
Funding Source
2020-2022
2020-2022
Timeline/ Implementation Period
(7)
DTI, LGU
DTI, LGU
TESDA/MLGU TESDA/MLGU
TESDA
MSWDO TESDA
DSWD TESDA TESDA
MSWDO
DSWD, MLGU,DTI
DSWD/LGU DSWD/DTI/ LGU
DSWD/DTI/ LGU
1 yr
2020-2022
2021
2021-2022
2020-2022
2020-2022
DA/DSWD/LGU 2020-2022
2020-2022
2020-2022
2020-2022
2020-2022
2020-2022
31
Nov 2020-Dec 2020
01/01/2020 12/31/2020
01/01/2020 12/31/2020
DSWD/LGU
DSWD/DTI/ LGU
DSWD/DTI/ LGU
DA/LGU
DA/LGU
DA/LGU
LGU
CAO
CMO
DSWD/National 2021
DSWD/National 2021
MAO
MSWD
Implementing Agency
(6)
DA/DSWD/ LGU
DSWD/DTI/ LGU
DSWD/DTI/ LGU
DA
DA
DA
Local Government (GAD) DTI
Local Government
National Government
Municipal Fund Municipal Fund National Government
(5)
2021 50,000.00
Municipality of Dingle
Medical/Financial Assistance
500,000.00 500,000.00 500,000.00 500,000.00
Enrique, Iloilo
Enrique, Iloilo
Enrique, Iloilo
Enrique, Iloilo
1,500,000.00 1,500,000.00 500,000.00 1,200,000.00
1,500,000.00 500,000.00 1,200,000.00
500,000.00
1,500,000.00
25,000,000.00
500,000.00
500,000.00
100,000.00
500,000.00
500,000.00
500,000.00
500,000.00
750,000.00
50,000,000.00
Enrique, Iloilo
Poblacion Ilaya, San Enrique, Iloilo Palabrica St., Poblacion Ilaya, San Enrique, Iloilo
100,000.00 1,000,000.00
Enrique, Iloilo
Enrique, Iloilo
750,000.00
180,000.00 100,000.00
180,000.00
1,000,000.00
100,000.00 100,000.00
100,000.00
3,000,000.00
500,000.00 300,000.00
Enrique, Iloilo
Barangay Gines Nuevo, San Enrique, Iloilo Provision of Service Vehicle to San Enrique, Iloilo Health Workers to render services to far-flung areas Provision of Water-sealed Toilet Enrique, Iloilo and construction materials to Indigent families Construction of one-storey X-ray San Enrique, Iloilo Building to the donated X-ray machine
Completion of Gines BHS
Construction of Pump Irrigation Project Construction of Shallow Well Water Impounding Project Provision of Post Harvest Facilities and Irrigation Projects Provision of Credit Facilities to farmers and other financial support from GFIs Provision of Insurance Services to farmers crops and livestock production Provision of farm inputs subsidy (seeds/fertilizers) Provision of technical assistance to farmers Establish demo farms and field trials Construction of 2-storey Public Market Construction of Counseling room with mini children's playground and conference room with 2 room CR for male and female
Establishment of flatbed and Enrique, Iloilo mechanical dryers Construction of Village Type Grain Enrique, Iloilo Harvest processing Center
Municipality of Dingle Municipality of Dingle
Livelihood Assistance Short Term Employment Program
10,000,000.00
600,000.00 10,000,000.00
25,000,000.00
500,000.00
1,000,000.00
200,000.00 100,000.00
300,000.00
50,000.00
2020
1,000,000.00
200,000.00 100,000.00
300,000.00
200,000.00
50,000.00
2022 50,000.00
Annual Breakdown of Funding Requirements
200,000.00
(4)
400,000.00
Total Funding Requirement
(3)
100,000.00
Location/Site
Registration/Profilling of MicroNumancia, Aklan Entrepeneurs Conduct of Skills Training on Food Processing and Provision of Numancia, Aklan Starter Kits SUB-TOTAL 6. PROVINCE OF ILOILO Construction of Solar Street Lights Banate, Iloilo
(2)
100,000.00
Priority Projects/Activities
Organization, Orientation Lezo, Aklan (Negosyo Serbisyo) registration of micro-entrepreneurs on various livelihood activities
(1)
A N N E X A • L I S T O F P R O G R A M S , P R O J E C T S A N D AC T I V I T I E S P E R K E Y R E S U LT A R E A P E R AG E N C Y / O F F I C E
Beyond
Funding Source
National
National
National
National
National
National
DARFU-6
DARFU-6
DARFU-6
DARFU-6
DARFU-6
DARFU-6
DARFU-6
DARFU-6
DOH/ MSWDO/ PCSO National
Provincial / National DOLE/DSWD DOLE
NGA
NGA
DTI/LGU
(5)
MAO
MAO
MAO
MAO
MAO
MAO
MAO
MSWDO/LGU
MSWDO/LGU PESO/LGU
LGU
DTI/LGU
DTI/LGU
DTI/LGU
Implementing Agency
(6)
2020-2022
2020-2022
2020-2022
2020-2022
2020-2022
2020-2022
2020-2022
2020-2022
2020-2022
2020-2022
2020-2022
2020-2022
2020-2022
2020-2022
2020-2022
2020-2021
2020-2021 2020-2021
2021
2021-2022
2021-2022
October, 20212022
Timeline/ Implementation Period
(7)
32
Priority Projects/Activities
Lucmayan, Concordia, Pandaoranan (Guimaras)
2,000,000.00 2,000,000.00 10,000,000.00
6,000,000.00 6,000,000.00 30,000,000.00
20,000,000.00
10,000,000.00
5,000,000.00
5,000,000.00
10,000,000.00
5,000,000.00 10,000,000.00
10,000,000.00 20,000,000.00
10,000,000.00
2,000,000.00
2,000,000.00
500,000.00
5,000,000.00
10,000,000.00
2,000,000.00
2,000,000.00
500,000.00
200,000.00
500,000.00
500,000.00
1,500,000.00
50,000 50,000
10,000 75,000
1,000,000.00
1,000,000.00
1,820,000.00
20,000.00
500,000.00
2022
5,000,000.00
5,000,000.00
500,000.00
1,500,000.00
B A L I K P R O B I N S YA , B AG O N G PAG - A S A P R O G R A M • W E S T E R N V I S AYA S R E G I O N A L AC T I O N P L A N
Construction of Transport Terminals
200,000.00
600,000.00
10,000,000.00
500,000.00 200,000.00
500,000.00 500,000.00
1,500,000.00
50,000 50,000
1,500,000.00
3,000,000.00
Provincewide (Guimaras)
50,000 50,000
1,000,000.00
150,000.00 150,000.00
Provincewide (Guimaras) Provincewide (Guimaras) Provincewide (Guimaras)
10,000 75,000
1,000,000.00 3,000 50,000
2,000,000.00 23,000.00 200,000.00
1,000,000.00
2,000,000.00
27,320,000.00
51,130,000.00
500,000.00
2021
80,270,000.00
1,000,000.00
100,000.00
2020 5,000,000.00
Annual Breakdown of Funding Requirements
20,000.00
(4)
40,000.00
2,000,000.00
Provincewide (Guimaras) Provincewide (Guimaras)
Bacolod City
Poblacion, Anilao, Iloilo
San Joaquin, Iloilo
100,000.00
Poblacion, Barotac Nuevo
Total Funding Requirement
(3)
5,000,000.00
Location/Site
Poblacion, Barotac Nuevo
(2)
Brgy. Avila, Buenavista, Guimaras Construction of Small Farm Municipal Wide in Reservoir Buenavista, Guimaras Procurement of Agricultural Inputs Municipal Wide in Buenavista, Guimaras Post Harvest Facility Municipal Wide in Buenavista, Guimaras Expansion of Electrification Municipal Wide in Buenavista, Guimaras Expansion of Level 3 water system Municipal Wide in Buenavista, Guimaras Concreting of Farm to Market Municipal Wide in Road Buenavista, Guimaras Construction of BHS Brgy. Old Poblacion, San Fernando, Tacay, Dagsaan & Magsaysay in Buenavista, Guimaras Core Shelter Facility Brgy. Old Poblacion, Buenavista, Guimaras Provision / Establishment of Chill Cabalagnan, Nueva Valencia, Cold Storage Support Facility in Guimaras Community Fish Landing Center
Creek Impounding
Provision of performancebased,targeted, time bound, and transparent tax incentives Promotion of investment in technology-based Livelihhod and financial Assistance Conduct of Business One Stop Shop SUB-TOTAL MEDIUM TERM 1. BACOLOD CITY Trainings on existing MSMEs to update and enhance them with the new normal SUB-TOTAL 2. PROVINCE OF GUIMARAS Skills Training Provision of Educational Assistance to Children Financial Assistance Psychosocial Intervention Increase investment in tourism like bed and breakfast, tourist transport services, farm tourism, recreation areas and other ancillary services. Conduct of tourism capacity development programs
(1)
Beyond
Funding Source
PSWDO PSWDO Private Sector
PLGU
DSSD, CCLDO
LGU/DTI
MSWDO/
LGU
LGU
Implementing Agency
(6)
Accredited Coop, Provincial Government, Municipal Government
BFAR
NHA
DOH/ National
LGSF
LGSF
NEA
DA Regional
DA Regional
DA Regional
NIA
2020-2022
2020-2022
2020-2022
2021-2022
2023-2025
2021-2022
2023-2025 2023-2025
Accredited Coop, Provincial Government, Municipal Government
BFAR
NHA/ LGU
LGU/ DOH 6
LGU/ DILG/ BWD LGU/ DILG
2020 -2022
2021 - 2022
2021-2022
2021-2022
2020-2022
2020-2022
33
Jan 2021 - Dec 2022
2021
3 years
1Year
1 Year
Timeline/ Implementation Period
(7)
LGU/ Guimelco 2020-2022
DA R6
DA R6
DA R6
NIA 6
General Fund- PTourO, DOT Special VI Purpose Project
PLGU PLGU
PLGU PLGU/DSWD
DTI, DSWD
LGU
NG, LGU
LGU
LGU
(5)
Priority Projects/Activities
Location/Site
San Roque, Lapaz, Igdarapdap, Cabalagnan, San Antonio, Calaya, Lanipe, Nueva Valencia, Guimaras
Poblacion (Guimaras)
(2)
180,000,000.00 10,000,000.00
100,000,000.00 36,000,000.00 48,700,000.00 20,500,000.00
17 LHOs and 5 Public Hospitals Capiz Province
17 LHOs and 5 Public Hospitals Capiz Province
Mambusao or Ivisan
Province-wide
Province-wide Province-wide
Augmentation of Human Resource for Health to government health facilities Provision of capacity development interventions on Human Resource for Health as based on their respective Learning and Development Plan Establishment of accredited abattoir Establishment of Small-scale Corn Silos Infusion of Animal Stocks A. Swine B. Poultry
100,000,000.00
1,300,000.00 5,900,000.00 100,000,000.00
Capiz Province Capiz Province Capiz Province
Capiz Province
10,000,000.00 20,000,000.00
Roxas Memorial Provincial Hospital OPD-Lanot and Roxas Memorial Provincial Hospital new site, Lanot, Roxas City, Capiz
1,044,123,000.00
500,000,000.00
300,000,000.00
30,000,000.00
100,000,000.00
4,000,000.00
Total Funding Requirement
(3)
Provision of Patient Transport Vehicles to BHS; and Ambulances to LHOs and Hospitals
SUB-TOTAL 3. PROVINCE OF CAPIZ Procurement of ambulance to provide additional transport for Provision of additional isolation/quarantine facilities for COVID 19 afflicted BP2 beneficiaries Practical Skills Training Livelihood Assistance Repair and maintenance of government health facilities: Barangay Health Stations (BHS), Local Health Offices (LHO) and Provincial Government Hospitals
San Roque, San Antonio, Salvacion, Guiwanon, Panoblon, Nueva Valencia, Guimaras Core Road Project Opening of Poblacion Salvacion Road Access Improvement / Concrete Pavement of Municipal & Cabalagnan Lanipe Barangay Roads Tando Napandong Igang Sto. Domingo Pandaraonan Dolores Lucmayan San Roque La Paz, Nueva Valencia, Guimaras Cabano Small Irrigation Reservoir Aguilar (Guimaras)
Barangay Electrification Project
Improvement of Municipal Public Market Construction of Cellsites
(1)
30,353,000.00
10,000,000.00
2020
-
6,000,000.00
7,000,000.00
60,000,000.00
(4)
23,700,000.00 12,500,000.00
20,000,000.00
70,000,000.00
5,000,000.00
60,000,000.00
50,000,000.00
300,000.00 2,900,000.00 50,000,000.00
5,000,000.00 10,000,000.00
209,385,000.00
100,000,000.00
10,000,000.00
50,000,000.00
2021 2,000,000.00 2,000,000
25,000,000.00 8,000,000.00
10,000,000.00
23,000,000.00
5,000,000.00
60,000,000.00
50,000,000.00
1,000,000.00 3,000,000.00 50,000,000.00
5,000,000.00 10,000,000.00
204,385,000.00
100,000,000.00
10,000,000.00
50,000,000.00
2022
Annual Breakdown of Funding Requirements
A N N E X A • L I S T O F P R O G R A M S , P R O J E C T S A N D AC T I V I T I E S P E R K E Y R E S U LT A R E A P E R AG E N C Y / O F F I C E
0.00
Beyond
Funding Source MLGU
Implementing Agency
(6)
NIA
DPWH
Guimelco, DOTC, NPC
2023-2024
2021 - BEYOND
2020 - 2022
2021 - 2022
2021 - 2022
Timeline/ Implementation Period
(7)
National National
National/ PLGU National/ PLGU/MLGU
C/MLGU Capiz Province DOH
C/MLGU Capiz Province DOH PCSO DOH
C/MLGU, Capiz Province, DOH
PLGU PLGU
LGU
PLGU/OPV
C/M/Capiz Province, DOH
DOH
C/M/Capiz Province, DOH, PCSO
2021-2023 2021-2023
2020-2022
2021-2024
PSWDO 2022 PSWDO 2022 C/M/Capiz Province, DOH
DOH, PCSO, Capiz Province 1st Quarter 2021 Province of and RMPH to 4th Quarter DOH, DPWH, Capiz Province 1st Quarter 2021 Province of and RMPH to 4th Quarter Capiz, Others 2022
NIA
DPWH
Guimelco, DOTC, NPC
Smart, Globe, Smart, Globe, DITO DITO
MLGU
(5)
34
Priority Projects/Activities
50,000.00 500,000.00
Ivisan, Capiz
Poblacion, Jamindan, Capiz
Panay, Capiz
2,500,000.00
8,500,000.00
525,000.00 1,000,000.00
3,500,000.00
2,275,000.00
3,000,000.00
1,000,000.00
750,000.00
500,000.00
500,000.00
50,000.00
500,000.00
B A L I K P R O B I N S YA , B AG O N G PAG - A S A P R O G R A M • W E S T E R N V I S AYA S R E G I O N A L AC T I O N P L A N
Fishery Sector Alternative Industry Brgy. Pawa, Buntod, Development Project (ValueBantigue, Butacal, Lat-asan, Adding) Jamul-awon, Binantuan, Lanipga Continuing Capital Investment All MSMEs operating within Assistance to MSMEs the jurisdiction of the Municipality of Panay
500,000.00
1,500,000.00
Panay, Capiz
1,000,000.00
Ivisan, Capiz
Comprehensive incentives package for pioneering industries in the locality MSME Development Program
50,000,000.00
100,000,000.00
Pangabuan, Jamindan, Capiz 600,000.00
150,000.00
250,000.00
Dumarao, Capiz, Municipal Hall Dumarao, Capiz, 33 brgys.
100,000.00
300,000.00
Dao, Capiz
100,000.00
100,000.00
100,000.00
1,000,000.00 1,000,000.00
1,000,000.00
Cuartero, Capiz, All Barangays
225,000.00
300,000.00
450,000.00
Province of Capiz
100,000.00
200,000.00
100,000.00 300,000.00
50,000.00
150,000.00
2021 200,000.00
3,000,000.00
1,500,000.00
1,000,000.00
500,000.00
600,000.00
500,000.00
50,000,000.00
100,000.00
100,000.00
100,000.00
225,000.00
100,000.00
200,000.00
100,000.00 300,000.00
50,000.00
200,000.00
2022 200,000.00
Annual Breakdown of Funding Requirements
1,000,000.00
200,000.00
50,000.00
2020 200,000.00
(4)
Cuartero, Capiz, All Barangays Dao, Capiz
400,000.00
200,000.00 600,000.00
Province of Capiz Province of Capiz
Province of Capiz
150,000.00
Province of Capiz
Province of Capiz
350,000.00
Province of Capiz
Total Funding Requirement
(3)
600,000.00
Location/Site
Province of Capiz
(2)
Establishment of facility for Mushroom culture/production
Linkage with national agencies for assistance to MSMEs Provision of Trainings on Livelihood Programs (Balut Making, Miswa, banana Chips, Buti and other Local industries) Identification of Local Tourism Sites Provision of tax incentives to small,Medium enterprises Road connectivity from Industry area to the Market(Concreting) Computerization of Business Permit and Licensing System (BPLS) Updating of the Municipal Revenue Code Establishment of restaurant/food hub showcasing local cuisines/delicacies
Conducted Sulhay:Arts Theraphy Workshop Extended subsistence grants to Capisnon Artist, Artisans, SchoolBased and Community-Based Performing Groups, and other Culture and Arts Related Organizations Hugod Capisnon: generation job opportunities for MSMEs in tourism and Creative Industry Implementation of livelihood programs
Kabalaka sa Kabuhianan sang mga Kabataan nga Kapisnon Kabalaka sa Kabataan Training for Entrepreneurs Program Kabalaka para sa mga Migrante nga Kapisnon Kabalaka sa Kabuhianan sang mga Kapisnon OFWs Organized Agri-Based Community Tourism Enterprises
(1)
Beyond
Funding Source
Province of Capiz Province of Capiz
CPG Province of Capiz/DA
CPG
CPG
CPG
Implementing Agency
(6)
LGU Panay
LGU Panay, DTI LGU Panay, BFAR
LGU Jamindan NGA LGU Panay
GF-LGU Ivisan LGU Jamindan NGA
LGU IvisanGF, DICT
LGU Dumarao DA
GF
LGU Cuartero/DTI GF
2020-2024
Timeline/ Implementation Period
(7)
LGU Panay
LGU Panay
LGU Panay
LGU Panay
MO, OMA
MO, Tourism Office
LGU Ivisan
DA/LGU Dumarao LGU-Ivisan
2022-2024
2022-2024
2022-2024
2022-2024
35
Jan.-Dec. 2022
Jan.-Dec. 2021
2021-2022
2021-2022
DTI and other 2020-2024 Agencies LGU - Dumarao 2021-2022
DTI and other Agencies
LGU Cuartero
Province of Province of Capiz/NCCA/ Capiz DTI LGU Cuartero LGU Cuartero /TESDA
Capiz Province Capiz Province Capiz Province Capiz Province of Capiz/DOT/D A Province of Capiz Province of Capiz/NCCA
(5)
Priority Projects/Activities
(2)
Location/Site
Mianay, Sigma, Capiz Sigma, Capiz
Sigma, Capiz
Enterprise Development Creation of MEEDO
Adoption of BMBE Law
a. Metal Crafts b. Small Engine Repair/ Volcanizing c. Wellnes Massage/ Massage Therapy d. Tailoring e. Beauty Care Service f. Food Processing/ Value Adding g. Implement livelihood programs h. Trisikad i. Retail Store
Culasi Culasi
Municipal Wide - Hamtic
Municipal Wide - Tibiao Municipal Wide - Tibiao Municipal Wide - Tibiao
Municipal Wide - Tibiao
Provision of Livelihood Municipal Wide - Tibiao assistance, Start-up capital for micro-business to boost industry development
Municipal Wide - Tibiao Municipal Wide - Tibiao
200,000.00
Sigma, Capiz
SUB-TOTAL 4. PROVINCE OF ANTIQUE Livelihood Program
5,000,000.00
Poblacion, Sapian, Capiz
2020
4,000,000
6,000,000
375,000 DSWD 375,000 DSWD
375,000 375,000
20,000,000
750,000 400,000
1,500,000 800,000
60,000,000
1,000,000
2,000,000
900,000 1,250,000
812,445,000.00
20,000.00
3,000,000.00 780,000.00
100,000.00
5,000,000.00
500,000.00
1,000,000.00
300,000.00
500,000.00
5,000,000.00
500,000.00
2,000,000.00
2021 3,600,000.00
300,000 DSWD 75,000 LGU
20,000,000
2,000,000
750,000 400,000
1,000,000
1,250,000
900,000
725,425,000.00
5,000,000.00 780,000.00
100,000.00
2022
Annual Breakdown of Funding Requirements
1,800,000
20,000,000
140,181,000.00
500,000.00
1,000,000.00
(4)
2,500,000
785,805,000.00
20,000.00
8,000,000.00 1,560,000.00
1,000,000.00
Sapian, Capiz
300,000.00
Panitan, Capiz 2,000,000.00
500,000.00
Panitan, Capiz
Sapian, Capiz
5,000,000.00
Panitan, Capiz
Livelihood Program (Hog Fattening, broiler production, vegetable production, & other related livelihood program) Livelihood Program (Cottage Industry- Furniture Cabinet making, Cosmetology, Basket Weaving, Dressmaking, Automotive/motorcycle maintenance & repair, etc.) Training on Organic Farming
Establish of food processing industry Establish Boneless Bangus Processing Establish Business Process Outsourcing Manpower Agency Assistance Job Placement
500,000.00
2,000,000.00
3,600,000.00
Total Funding Requirement
(3)
Livelihood Training, i.e. bayong Panitan, Capiz making, banana chips making and bio-intensive gardening, etc.
Construction Paseo de Panitan & Pob. Ilawod, Panitan, Capiz other amenities at the MiniConvergence Economic Center (Paseo de Panitan) Training for production Panitan, Capiz management, pest & disease control of High Value Commercial Crops (HVCC) i.e. carrot, cabbage, lettuce, tomato, etc.
(1)
A N N E X A • L I S T O F P R O G R A M S , P R O J E C T S A N D AC T I V I T I E S P E R K E Y R E S U LT A R E A P E R AG E N C Y / O F F I C E
Beyond
-
Funding Source
LGU
LGU
LGU
LGU Panitan
LGU Panitan
LGU Panitan
LGU Panitan
LGU Panitan
LGU Panitan
Implementing Agency
(6)
DSWD/LGU
DSWD
DTI
TESDA TESDA MLGU/DTI/ DOST
TESDA
TESDA
TESDA
DSWD/LGU
DSWD
DTI, LGU
DTI/DOST
TESDA TESDA
TESDA
TESDA
TESDA
Office of the Mayor /PESO MLGU/DTI/DA Office of the Mayor MLGU Office of the Mayor MLGU Office of the Mayor /BPLO
MLGU
DTI
DTI
LGU Panitan/DA DTI
LGU Panitan/DA
LGU Panitan/DA
LGU Panitan/DA
LGU Panitan/DA
LGU Panitan 20% DF
(5)
2021-2022
2021
3 yrs
2021-2022
2021-2022 2021-2022
2021-2022
2021-2022
2021-2022
2021-2022
2021
2021-2022 2021
2021-2022
Jan. 2021-Dec 2022 Jan. 2021-Dec 2022 Jan. 2021-Dec 2022
Timeline/ Implementation Period
(7)
36
Priority Projects/Activities
Location/Site
Tobias Fornier
(2)
Municipal Wide - Tibiao
Municipal Wide - Tibiao
Municipal Wide - Tibiao
Municipal Wide - Tibiao
Municipal Wide - Tibiao
Municipal Wide - Tibiao
Municipal Wide - Tibiao
Municipal Wide - Tibiao
c. Security Services
d. Tailoring
e. driving
f. Small Engine System
g. Service Electrical System
h. Beauty Care Services
i. Emergency Medical Services
j. Wellness Massage/ Massage Therapy k. Crop Production
Municipal Wide - Tibiao Tobias Fornier Municipal Wide - Hamtic
Municipal Wide - Tibiao
Municipal Wide - Tibiao
200,000 50,000,000
150,000,000
50,000,000
300,000 300,000
500,000
1,000,000
200,000
200,000
200,000
200,000
200,000
200,000
200,000
200,000
200,000
200,000
10,000,000
100,000
10,000,000
50,000
3,000,000
2021
600,000 800,000
3,000,000
2020
50,000,000
300,000 300,000
300,000
500,000
1,000,000
200,000
200,000
200,000
200,000
200,000
200,000
200,000
200,000
200,000
200,000
10,000,000
100,000
10,000,000
50,000
4,000,000
2022
Annual Breakdown of Funding Requirements
300,000
(4)
600,000
1,000,000
2,000,000
400,000
400,000
400,000
400,000
400,000
400,000
400,000
400,000
400,000
400,000
20,000,000
200,000
20,000,000
100,000
10,000,000
Total Funding Requirement
(3)
B A L I K P R O B I N S YA , B AG O N G PAG - A S A P R O G R A M • W E S T E R N V I S AYA S R E G I O N A L AC T I O N P L A N
l. Poultry and Livestock Production m. Food Processing/ Value Adding n. Tour Guiding Livelihood Training Program Establish loan and facilities and credit funds
Municipal Wide - Tibiao
Municipal Wide - Tibiao
Municipal Wide - Tibiao
b. Metal Crafts
Libertad
Municipal Wide - Tibiao
Libertad
a. Carpentry/ Masonry
Provision of technical assistance to improve the capacity of labor force with the cooperation of Technical Education and Skills Development Authority (TESDA), Department of Science and Technology (DOST), Department of Trade and Industry (DTI), Department of Tourism (DOT) on the following:
Local Industry Development Program Facilitate the Balik Probinsya benefeciaries and the community to form into registered organizations for local industry development. Sustainable Community-Based Ecotourism Program Skills Enhancement Program
Facilitate access to loans and Municipal Wide - Tibiao grant for business extended by the national government agencies, cooperatives and banks and other gov't. lending institutions
Loan Assistance
(1)
Beyond
Funding Source
DTI
DTI, LGU
MLGU/DA/PLG U MLGU/DA/PLG U MLGU/DTI/DOS T MLGU/DOT TESDA/DTI
MLGU/TESDA TESDA
MLGU/TESDA TESDA
MLGU/TESDA TESDA
MLGU/TESDA TESDA
MLGU/TESDA TESDA
MLGU/TESDA TESDA
MLGU/TESDA TESDA
MLGU/TESDA TESDA
MLGU/TESDA TESDA
MLGU/TESDA TESDA
MLGU/PLGU
DOT/PLGU/ MLGU
MLGU/PLGU
MLGU
MLGU/PLGU
MLGU/DA/ PLGU MLGU/DA/ PLGU MLGU/DTI/ DOST MLGU/DOT TESDA/DTI
3 yrs
2021-2022 2020-2022
2021-2022
2021-2022
2021-2022
2021-2022
2021-2022
2021-2022
2021-2022
2021-2022
2021-2022
2021-2022
2021-2022
2021-2022
2021-2022
2021-2025
2021-2022
2021-2025
2021-2022
37
Timeline/ Implementation Period
(7)
DMPCI (COOP) 2020-2022
Implementing Agency
(6)
MLGU/PLGU
MLGU/PLGU
MLGU
DMPCI
(5)
Priority Projects/Activities
(2)
Location/Site
Banate,Iloilo
Construction of Multi-Purpose Building
Municipality of Dingle
Municipality of Dingle
Provision of livelihood and employment opportunities Promotion of organic farming and sustainable agricultural practices
Barotac Nuevo, Iloilo
Local Consultations and Survey of Zarraga, Iloilo Businesses
Implement livelihood programs
Provision of agricultural support Enrique, Iloilo (quality seeds, fertilizers, mechanization equipment, irrigation facilities) Skills Training in Defensive Driving Enrique, Iloilo and NCII Establish loan and facilities and Poblacion, Barotac Nuevo credit funds
Enrique, Iloilo
Municipality of Dingle
Assistance to Job Opportunities
500,000.00
Human Resource Municipality of Dingle Development/Capability Trainings
Infrastructure Development
30,000,000.00
Bularan, Banate, Iloilo
Construction of Strom Surge Protection with Embankment
30,000.00
10,000,000.00
20,000,000.00
10,000,000.00
20,000,000.00
60,000.00
800,000.00
300,000.00
150,000,000.00
20,000,000.00
Poblacion,Banate,Iloilo
Rehabilitation / Improvement of Municipal Terminal
3,000,000.00
Talokgangan,Banate, Iloilo
25,000,000.00
15,000,000.00
10,000.00
5,000,000.00
5,000,000.00
5,000,000.00
10,000.00
5,000,000.00
10,000,000.00
10,000,000.00
30,000.00
200,000.00
100,000.00
60,000,000.00
200,000.00
8,000,000.00
5,000,000.00
1,000,000.00
10,000,000.00
5,000,000.00
5,000,000.00
10,000,000.00
30,000.00
200,000.00
100,000.00
30,000,000.00
100,000.00
14,000,000.00
5,000,000.00
1,000,000.00
10,000,000.00
5,000,000.00
5,000,000.00
50,000,000.00
150,000,000.00
20,000,000.00
122,850,000.00
73,200,000.00
315,650,000.00 50,000,000.00
5,000,000
2021
10,000,000
2020
10,000.00
10,000,000.00
400,000.00
100,000.00
60,000,000.00
200,000.00
8,000,000.00
10,000,000.00
1,000,000.00
5,000,000.00
5,000,000.00
10,000,000.00
50,000,000.00
118,850,000.00
5,000,000
9,000,000
2022
Annual Breakdown of Funding Requirements
12,000,000
(4)
21,000,000
Total Funding Requirement
(3)
Mangrove Eco Park Development
Improvement of Commercial Stalls Poblacion,Banate,Iloilo along Coastal Area
Banate, Iloilo
Livelihood Training for Production & Entrepreneurship
Investment in flexible learning Municipal Wide - Tibiao delivery system and provision of skills training Provision of technical support to Municipal Wide - Tibiao the community from the establishment of MSMEs to production and marketing, conduct of market and value chain studies, linkaging producers, processors and consumers and even market consolidation assistance. SUB-TOTAL 5. PROVINCE OF ILOILO Upgrading / Rehabilitation / Banate, Iloilo Concreting of Farm to Market Road
(1)
A N N E X A • L I S T O F P R O G R A M S , P R O J E C T S A N D AC T I V I T I E S P E R K E Y R E S U LT A R E A P E R AG E N C Y / O F F I C E
Beyond
Funding Source
LGU/NGA
LGU/DPWH
LGU/TESDA
LGU/DPWH
LGU
LGU
LGU
LGU/DPWH
LEIPO
18 months
2020-2022
2 Years
2020-2022 Cooperative, National Agency LGU
National Government, Private National Government, LGU LGU
2020-2022
2020-2022
2020-2023
2020-2023
2020-2023
2020-2023
2021-2023
2021-2023
2021-2023
2021-2023
2021-2023
National
DARFU-6
2021-2023
2021-2025
2021-2022
Timeline/ Implementation Period
(7)
LGU/DSWD/DA 2021-2023
LGU / DPWH
MLGU/DA
MLGU/DOH
Implementing Agency
(6)
DOLE/DSWD/ DOLE/LGU LGU PLGU
LGU/DILG/ Prov/NGA DOLE/LGU
Local / National / Provincial Local / National / Provincial Local / National / Provincial Local / National / Provincial Local / National / Provincial Local / National / Provincial LGU/MSWDO /TESDA
Local / National / Provincial
MLGU/DA
DOH
(5)
38
Poblacion Salvacion Cabalagnan Lanipe Tando Napandong Igang Sto. Domingo Pandaraonan Dolores Lucmayan San Roque La Paz, Nueva Valencia, Guimaras 14 barangays of Jordan, Guimaras
Capiz Province
100,000,000.00
250,000,000.00
50,000,000.00 58,510,000.00
5,000,000.00
3,000,000.00
For Assessment
500,000.00
50,000,000.00
250,000,000.00
113,545,000.00
10,000,000.00
3,000,000
20,000.00
500,000.00
100,000,000.00
B A L I K P R O B I N S YA , B AG O N G PAG - A S A P R O G R A M • W E S T E R N V I S AYA S R E G I O N A L AC T I O N P L A N
Construction and rehabilitation of other government health facilities
Roxas Memorial Provincial Hospital new site, Lanot, Roxas City, Capiz
50,000,000.00 374,595,000.00
10,000,000.00
5,000,000.00
40,000.00
1,500,000.00
300,000,000.00
10,000 15,000
10,000,000.00
5,000 5,000
20,000,000.00 25,000.00 30,000.00
5,000,000.00
10,000,000.00
Processing Facility for Agri Fishery Alegria, Sibunag, Guimaras Products Construction of Cold Storage Plant Sabang, Sibunag, Guimaras
Alegria, Sibunag, Guimaras
200,000.00 195,755,000.00 5,000,000.00
-
15,000.00
1,000,000.00 20,000,000.00
2021 15,000.00
50,000,000.00
102,535,000.00
2,000,000.00
20,000.00
500,000.00
100,000,000.00
10,000 5,000
10,000,000.00
5,000,000.00
5,000,000.00
170,925,000.00
200,000.00
1,000,000.00 10,000,000.00
2022
Annual Breakdown of Funding Requirements
10,000,000.00
200,000.00 161,655,000.00
8,000,000.00
Construction of Dam SUB-TOTAL 3. PROVINCE OF CAPIZ Completion of the New RMPH Building at Lanot, Roxas City
15,000.00
1,000,000.00 20,000,000.00
2020
600,000.00
(4)
528,335,000.00
3,000,000.00 50,000,000.00
45,000.00
Total Funding Requirement
(3)
Construction of Water Impounding Dasal, Maabay, Millan , System Ayangan, Sibunag, Guimaras
Facilitation to multi-national 14 barangays of Jordan, companies through the private Guimaras sectors for online job sustainability
Marketing/promotion and/or buyback of produce
Core Road Project Opening of Road Access Improvement / Concrete Pavement of Municipal & Barangay Roads
Provincewide (Guimaras) Provincewide (Guimaras)
Bacolod City
Poblacion, Anilao, Iloilo
Zarraga, Iloilo San Joaquin, Iloilo
Location/Site
Livelihood Program Construction of Farm to Market Roads Enhancement of Business Permit Licensing System (BPLS) SUB-TOTAL LONG TERM 1. BACOLOD CITY Establish Livelihood programs with start-up capitals and continuing support-NGA Establish Livelihood programs with start-up capitals and continuing support-LOCAL SUB-TOTAL 2. PROVINCE OF GUIMARAS Skills Training Provision of Other Social Services
(2)
Zarraga, Iloilo
Priority Projects/Activities
Entrepreneurial Skill Development
(1)
Beyond LGU
Funding Source
DPWH
PSWDO PSWDO
CCLDO, TOURISM OFFICE
CCLDO
PESO DPWH, LGU
LEIPO
Implementing Agency
(6)
2021 - BEYOND
May 2021- Dec 2022
2020-2022
2020-2022 3 years or more
2020-2022
Timeline/ Implementation Period
(7)
NIA
DA/BFAR/ MLGU BFAR
DA/MLGU
C/MLGU Capiz Province DOH
C/M/Capiz Province, DOH
DOH, DPWH, Capiz Province of Province, PEO Capiz, Others and RMPH
NIA
BFAR
BFAR
DA
39
1st Quarter 2021 to 4th Quarter 2022
2026
2024
2023
2023-2025
Municipal Municipal 2022 onwards LGU/Provinci LGU/Farmers' al Associations LGU/Farmer Associations Private Sectors 2021 onwards
DPWH
PLGU PLGU
20% DEV.FUND
DTI,DOLE
LGU/IPG
NGA NG, LGU
(5)
Priority Projects/Activities
(2)
Location/Site
1,000,000.00
1,000,000.00
Province of Capiz
Cuartero, Capiz, All Barangays
50,000,000.00 50,000,000.00 400,000.00
Dumarao, Capiz, Aglalana
Ivisan, Capiz
Manufacture or assembly of electronic data processing & accessories Strenthening and assistance to NGO, CSO and Business Sector Partners
50,000,000.00
Dumarao, Capiz, Aglalana
Establishment of Canning & Dumarao, Capiz, Gibato preserving of fruits and fruit juices
100,000,000.00
Dumarao, Capiz, Poblacion
Establishment of Shopping center & supermarket Establishment of Garment factory
15,000,000.00
Dumarao, Capiz, All Barangays
Establishment of loan and credit facilities
3,000,000.00
2,000,000.00
300,000.00
15,000,000.00
750,000,000.00
Province of Capiz
Cuartero, Capiz, All Barangays
200,000,000.00
28,100,000.00 24,400,000.00 6,200,000.00 6,000,000.00
50,000,000.00
450,000,000.00
Total Funding Requirement
(3)
Province of Capiz
Second District First District Province-wide Province of Capiz
Provision of Training on Dao, Capiz Sustainability of Livelihood Programs (Balut Making, Miswa, banana Chips, Buti and other Local industries) Improvement/Promotion of Local Dao, Capiz Tourism Sites Expansion of Agri-Trade and Dumalag, Capiz Industrial Area
Establishment of loan and credit facilities
Improved road network leading to tourist destination and points of entry Establishment of MICE Facilities and Services Established and maintained cultural infrastructure (museum, library, gallery, performance venue, parks, cultural centers, Institute of Living Traditions (ILT) / School for Living Traditions (SLT) etc. Product Development
Infusion of Animal Stocks A. Carabao B. Cattle C. Goat MICE (Meeting, Incentives, Events, and Convetion Exhibitions) hosting and participation
Operationalization of the 300-bed Lanot, Roxas City, Capiz Roxas Memorial Provincial Hospital Site Achieve of the Functional Level for Capiz Province all the Maturity Level Index for the Local Health Systems Integration
(1)
2020
100,000.00
-
(4)
200,000.00
1,000,000.00
100,000.00
500,000.00
100,000,000.00
18,500,000.00 16,200,000.00 4,800,000.00 3,000,000.00
25,000,000.00
2021 250,000,000.00
200,000.00
50,000,000.00
50,000,000.00
50,000,000.00
100,000,000.00
15,000,000.00
3,000,000.00
1,000,000.00
100,000.00
15,000,000.00
1,000,000.00
500,000.00
100,000,000.00
9,600,000.00 8,200,000.00 1,400,000.00 3,000,000.00
25,000,000.00
2022 200,000,000.00
Annual Breakdown of Funding Requirements
A N N E X A • L I S T O F P R O G R A M S , P R O J E C T S A N D AC T I V I T I E S P E R K E Y R E S U LT A R E A P E R AG E N C Y / O F F I C E
Beyond
Funding Source
LGU IvisanGF
Private investor
LGU Dumarao/DTI/ DA Private investor Private investor Private investor
Local
GF
LGU Cuartero/ DTI/DA LGU Cuartero/ DTI/DA GF
MULTISECTOR Province of Capiz/NCCA
DOT/DPWH
National National National Province of Capiz/DOT
C/MLGU Capiz Province
DOH - 450
(5)
2021-beyond
2021-beyond
2021-2023 2021-2023 2021-2023
Timeline/ Implementation Period
(7)
LGU Ivisan
Private investor
Private investor Private investor Private investor
LGU - Dumarao
2022-onwards
2022-0nwards
2022- onwards
2022-onwards
LGU - Dumalag Jan – Dec 2022 In partnership and beyond with concerned agencies
MO/All Agencies
LGU - Cuartero
LGU - Cuartero
Province of Capiz
DPWH
PLGU PLGU PLGU Province of Capiz
Capiz Province, DOH
Capiz Province, DOH
Implementing Agency
(6)
40
5,000,000.00 5,000,000.00
Poblacion, Jamindan, Capiz
Mambusao, Capiz
Mambusao, Capiz
Recycled Materials Making
Brgy. Cristina, Tapaz, Capiz
Feed Mill Establishment
Municipality of Dingle
Banate,Iloilo
Alacaygan-Talokgangan, Banate,Iloilo Banate, Iloilo
Lezo, Aklan
16,000,000.00
1,000,000.00
10,000,000.00
45,000,000.00 800,000,000.00
100,000,000.00
400,000,000.00
-
5,000,000.00
400,000,000.00
15,000,000.00
150,000,000.00
35,000,000.00
5,000,000.00 5,000,000.00
70,000,000.00
761,550,000.00 35,000,000
13,550,000.00
10,000,000.00
5,000,000.00
70,000,000
2,357,850,000.00
11,000,000.00
25,000,000.00
15,000,000.00
20,000,000.00
7,000,000.00
7,000,000.00
2,750,000.00
500,000.00
5,000,000.00
5,000,000.00
2021
10,000,000.00
400,000,000.00
20,000,000.00
150,000,000.00
5,000,000.00 5,000,000.00
35,000,000.00
35,000,000
832,750,000.00
11,000,000.00
15,000,000.00
15,000,000.00
15,000,000.00
20,000,000.00
7,000,000.00
7,500,000.00
3,750,000.00
500,000.00
5,000,000.00
40,000,000.00
2022 10,000,000.00
Annual Breakdown of Funding Requirements
B A L I K P R O B I N S YA , B AG O N G PAG - A S A P R O G R A M • W E S T E R N V I S AYA S R E G I O N A L AC T I O N P L A N
Sea Port Modernization & Reopening of Operation Housing Project
SUB-TOTAL 4. PROVINCE OF ANTIQUE Manufacturing and Processing Industry for Marine and Coconut Products SUB-TOTAL 5. PROVINCE OF AKLAN Establishment of Food Terminal SUB-TOTAL 6. PROVINCE OF ILOILO Construction of By-Pass Road with Strom Surge Protection Construction of Drainage System
Coffee and Cacao Processing Industry
Libertad
Poblacion/Bilao, Sapian, Capiz Brgy. Daan Banwa, Tapaz, Capiz Brgy. Carida, Tapaz, Capiz
Bamboo Processing Industry
Establish Real Estate Services
Establishment of chared service facilities for global production industries in electronics, machineries and food
5,000,000.00
Capital assistance for business and innovative start-ups
Businesses and start-ups 19,000,000.00 operating in the Municipality of Panay Pontevedra, Capiz 20,000,000.00
6,000,000.00
Fishery Sector Alternative Industry Pawa, Buntod, Lat-asan, 20,500,000.00 Development Project (ValueJamul-awon, Butacal, Adding) Bantigue, Binantuan, Lanipga
8,250,000.00
1,750,000.00
All MSMEs operating within the Municipality of Panay
Research & Development Assistance for MSMEs
2020
700,000.00
(4)
Establishment of Agro-Industrial Brgy. Calapawan, Binantuan, 1,700,000.00 Zones and incentives package for Calitan, Anhawon, Cogon, locators Tico, Agbalo, Cabugao Oeste
5,000,000.00
40,000,000.00
Total Funding Requirement
(3)
Poblacion, Jamindan, Capiz
Location/Site 10,000,000.00
(2)
Ivisan
Priority Projects/Activities
Construction of Common Facility for Processing of seafoods and marine products Establishment of Commercial Center Establishment of Tourism information center and specialty/souvenir shop Bamboo Handicraft Making
(1)
Beyond
-
Funding Source
LGU Panay, DTI, DOST
LGU Panay
LGU Panay
LGU Mambusao LGU Mambusao LGU Panay
MO, Tourism Office
MO, MEO
LGU Ivisan
Implementing Agency
(6)
LGU/NGA/ NGOs
Local / Provincial / National National
National
DA/DENR
LGU
LGU/DPWH
LGU/DPWH
LGU/DPWH
DA/DENR
DTI/ DOST/ MENRO DENR D.A./DTI/DOS ECON. ENT./ T Artuz Farmers Marketing Association D.A M.A.O.
National Fund DSWD/ National
LGU Panay, DTI, DOST
LGU Panay, BFAR
LGU Panay, DTI, DOST
LGU Panay
DTI
LGUJamindan, NGA DTI
NGA, Private
BFAR, Prov Govt
(5)
2020-2028
2021-2026
2021-2026
2021-2026
2021-2029
41
2022 and Beyond
Jan. 2023-Dec 2026 2022 and Beyond
2022
2025-2034
2025-2030
2025-2030
2025-2030
2022 and beyond
2022 and beyond
2022 and beyond
Timeline/ Implementation Period
(7)
6,000,000.00
Enrique, Iloilo
SUB-TOTAL 1,732,500,000.00 KRA 1 TOTAL 8,493,026,200.00 KEY RESULT AREA 2 FOOD SECURITY AND AGRICULTURAL PRODUCTIVITY SHORT TERM 1. BACOLOD CITY Trainings on new technologies in Bacolod City 500,000.00 farming Trainings on new technologies in Bacolod City 500,000.00 aquafarming SUB-TOTAL 1,000,000.00
1,000,000.00
3,600,000.00
900,000.00
4,500,000.00
Enrique, Iloilo
30,000,000.00
4,500,000.00
Enrique, Iloilo
Enrique, Iloilo
6,000,000.00
Enrique, Iloilo
Enrique, Iloilo
3,000,000.00
-
244,500,000.00 816,351,100.00
1,200,000.00
2,000,000.00
10,000,000.00
300,000.00
1,500,000.00
1,500,000.00
2,000,000.00
1,000,000.00
1,000,000.00
3,000,000.00
70,000,000.00
30,000,000.00
2,000,000.00
1,000,000.00
2020 5,000,000.00
5,000,000.00
(4)
15,000,000.00
Enrique, Iloilo
Capital Assistance for Small Scale Zarraga, Iloilo Operators, salaries and wages to those who engaged in Cash for Work Program Construction of Bagsakan Center Pantalan, Anilao, Iloilo
To develop entrepreneurial and skills for livelihood projects to tricycle and sikad drivers affected by the government policies and new normal Construction and operationalization of 1 unit San Enrique Family Friendly Center (Balay Paghinangpanay) Construction of Person with Disability Massage and Displace Center Construction of Senior Citizens Recreational Center with complete facilities such as T.V., entertainment facility for exercise and music therapy Construction of Day Care PreSchoolers Playground Funding support for affected lowincome and small scale and informal businesses Funding for additional health personnel (1 doctor and 1 nurse)
To provide capital for OFW who has lost job due to COVID-19 (200 pax) To develop entreprenuerial skills Enrique, Iloilo for livelihood project of displaced/ laid off workers (Training and Seminar on Entrepreneurial Livelihood Projects)
210,000,000.00
Barangays of Cabugao Viejo/Paga, San Enrique, Iloilo Enrique, Iloilo
15,000,000.00 90,000,000.00
Municipality of Dingle
Enrique, Iloilo
3,000,000.00
76,000,000.00
Total Funding Requirement
(3)
Municipality of Dingle
Location/Site
Access to credit, finance and other grants Provision of agriculture and agroindustries support Concreting of farm-to-market roads (FMR) Construction of NHA Housing Projects (160 raw houses)
(2)
Municipality of Dingle
Priority Projects/Activities
Tourism Development
(1)
1,000,000.00
-
DA, BFAR
LGU/DA
DSWD FO6
National
National
National
DOT/LGU/ LOAN/ GRANTS MSWDO/DA/ NGO DA/LGU/ DPWH/NGO National
DA
Beyond
Funding Source
500,000.00
750,500,000.00 3,215,593,600.00
1,200,000.00
2,000,000.00
10,000,000.00
300,000.00
1,500,000.00
1,500,000.00
2,000,000.00
1,000,000.00
1,000,000.00
5,000,000.00
70,000,000.00
30,000,000.00
7,000,000.00
1,000,000.00
2022 37,000,000.00
(5)
500,000.00
731,500,000.00 3,325,942,500.00
1,200,000.00
2,000,000.00
10,000,000.00
300,000.00
1,500,000.00
1,500,000.00
2,000,000.00
1,000,000.00
1,000,000.00
5,000,000.00
70,000,000.00
30,000,000.00
5,000,000.00
1,000,000.00
2021 30,000,000.00
Annual Breakdown of Funding Requirements
A N N E X A • L I S T O F P R O G R A M S , P R O J E C T S A N D AC T I V I T I E S P E R K E Y R E S U LT A R E A P E R AG E N C Y / O F F I C E
Timeline/ Implementation Period
(7)
DA
DA
LGU/DA
MSWDO
LGU/MAO
LGU/NGA
May - Dec 2021
May - Dec 2021
2023
2020-2022
2020-2022
2020-2022
2020-2022
2020-2022
2020-2022
2020-2022
2020-2022
2020-2022
2020-2022
2020-2022
2020-2022
2020-2028
2020-2028
LGU/DOT/PTO 2020-2028
Implementing Agency
(6)
42
Priority Projects/Activities
Location/Site
500,000.00
22 Barangays of Nueva Valencia, Guimaras
(4)
200,000.00
250,000.00
1,500,000.00
2,500,000.00
2020
250,000.00
500,000.00
2,500,000.00 1,000,000.00
5,000,000.00
200,000.00 200,000.00
250,000.00
1,500,000.00
2,500,000.00
2021
250,000.00
500,000.00
2,500,000.00 1,000,000.00
5,000,000.00
600,000.00
200,000.00 400,000.00
875,000.00
1,500,000.00
2,500,000.00
2022
Annual Breakdown of Funding Requirements
B A L I K P R O B I N S YA , B AG O N G PAG - A S A P R O G R A M • W E S T E R N V I S AYA S R E G I O N A L AC T I O N P L A N
1,500,000.00
5,000,000.00 3,000,000.00
15,000,000.00
22 Barangays of Nueva Valencia, Guimaras
La Paz, Cabalagnan, Lanipe, Igdarapdap, San Antonio, Salvacion, Igang, Sto. Domingo, San Roque (Guimaras) Poblacion (Guimaras) 22 Barangays of Nueva Valencia, Guimaras
Improvement of Barangay Health Station
Construction of Halfway Home Provision of Trainings for LSI's & OFW's *Agricultural Crops NCII *Animal Production ( PoultryChicken) NCII *Construction Painting NCII *Mango Production *T-shirt Printing *Food & Beverage Services *Cookery *Food Processing Provision of IEC Materials regarding Health Improvement specifically COVID-19 & Other Health Problems Information Drive on every barangay
Guimaras
Establishment of Protected Area -Provision of livelihood opportunities to farmers and fishers
600,000.00
1,200,000.00
Guimaras
Support to Marine Protected Area Guimaras - Provision of livelihood opportunities to fisherfolks
Provision of livelihood and employment opportunities
1,375,000.00
4,500,000.00
7,500,000.00
Total Funding Requirement
(3)
Guimaras
*Support to Agroforestry Development Project -Provision of farm tools, planting materials, vegetable seeds and technical support -Provision of fruit and forest tree seedlings, farm inputs and technical support
Provision of agriculture and agro- Guimaras industries support services
Guimaras
Guimaras
Provision of employment assistance to affected persons/sectors of COVID-19 pandemic Provision of financial assistance for medical and processing of requirements to job-seekers for overseas employment
Provision of employment opportunities (Employment Services Program)
Guimaras Guimaras Guimaras
Guimaras
(2)
Provision of seed capital Provision of livelihood trainings
Provision of livelihood (Livelihood Program)
2. PROVINCE OF GUIMARAS
(1)
Beyond
Funding Source
Implementing Agency
(6)
PLGU, MLGU PLGU, MLGU
MLGU, DOH
DTI PESO/MESO
DTI PESO/MESO
MLGU, DOH
MLGU TESDA
DOH
MLGU TESDA
DOH
20% DF / GENRO General Fund
20% DF GENRO General Fund
20% DF GENRO General Fund
General Fund GO/PEDO
General Fund GO/PEDO
(5)
2021 - 2022
2021 - 2023
2021 - 2022 2021 -2023
2021 - 2023
CY 2022
43
CY 2020-2022
CY 2020-2022
2020-2022
2020-2022
Timeline/ Implementation Period
(7)
100,000.00 50,775,000.00
Province wide Province wide
Promotion of Purple Corn Vegetable Seed Support a. Production Loan Easy Access Loan b. Expanded SUREAID for MSFF c. Kapital Access for Young Entrepreneurs (KAYA) d. Agri-Negosyo Loan (ANYO) Provision of Certified Seeds
1,500,000.00 300,000.00
Dao, Capiz
100,000.00 50,000.00 250,000.00
Dumarao, Capiz, Municipal Hall
Dumarao, Capiz, Municipal Hall
Dumarao, Capiz, BP2 beneficiary location
Provision of training on highly productive & profitable food or farm production practices Provide assistance/Linkage with the lending institution for loan package Provision of Agricultural inputs package( certified seeds, fertilizers, pesticides & herbicides
1,500,000.00
Dao, Capiz 5,000,000.00
300,000.00
Dao, Capiz
Dumalag, Capiz
900,000.00
Dao, Capiz
500,000.00
500,000.00
Cuartero, Capiz, All Barangays Cuartero, Capiz, All Barangays Cuartero, Capiz, All Barangays Dao, Capiz
0.00 500,000.00
0.00 0.00
504,000.00 839,100.00 28,000,000.00
Provision of Complimentary Assistance to Support Food Sufficiency among Beneficiaries
Provision of certified palay/corn/vegetable seeds Conduct Training on livestock production and management Conduct of Farmer's Trainings on various agricultural technologies
Rehabilitation of Farmers Training Center Conduct farmer's training on various agricultural technologies
Fertilizer Subsidy
Provision of Vegetable Seeds
8,080,000.00
500,000.00
100,000.00
300,000.00
100,000.00
1,500,000.00
500,000.00
500,000.00
500,000.00
100,800.00 439,100.00 28,000,000.00
2,000,000.00
2,000,000.00
8,000,000.00
Province Wide
Rice Bufferstocking
4,450,000.00
2020
50,000,000.00
(4)
50,000,000.00 1,100,000.00
SUB-TOTAL 3. PROVINCE OF CAPIZ Health - Provision of vitamins top 5 Governments Hospitals be distributed to healthcare Province CapizNursery Provision of Tree Growing Material ESLA andof Nagba and Seedlings Crop Insurance Province Wide
10,000,000.00
500,000.00
Total Funding Requirement
(3)
Dasal, Sibunag, Guimaras
Location/Site
Improvement of Internet Connectivity in the municipal site
(2)
22 Barangays of Nueva Valencia, Guimaras 22 Barangays of Nueva Valencia, Guimaras
Priority Projects/Activities
Provide Good Oral Health & Hygiene Logistics Provision for Emerging and Re-Emerging Infectious Disease Prevention and Control
(1)
250,000.00
50,000.00
100,000.00
2,500,000.00
500,000.00
100,000.00
300,000.00
100,000.00
-
201,600.00 200,000.00
3,040,000.00
3,000,000.00
100,000.00
18,850,000.00
100,000.00
5,000,000.00
2021 250,000.00
2,500,000.00
500,000.00
100,000.00
300,000.00
100,000.00
-
201,600.00 200,000.00
3,040,000.00
3,000,000.00
1,000,000.00
19,975,000.00
5,000,000.00
2022 250,000.00
Annual Breakdown of Funding Requirements
A N N E X A • L I S T O F P R O G R A M S , P R O J E C T S A N D AC T I V I T I E S P E R K E Y R E S U LT A R E A P E R AG E N C Y / O F F I C E
Beyond
Funding Source
DA, LGU Dumarao
LGU Dumarao
DA
DA
GF
GF
GF
GF
LGU Cuartero/DA LGU Cuartero/DA LGU Cuartero/DA 20% DF
Province of Capiz Calamity Fund Calamity Fund Calamity Fund
GLOBE
DOH, PLGU, MLGU DOH, NDRRM Fund, MLGU, PLGU
(5)
2021-2022
2021 - 2022
2021 - 2022
Timeline/ Implementation Period
(7)
2020-2021 2020-2021
2020 - 2022 2020-2022 2020-2021
2020 - 2022
2020 - 2022
2021
2021
2021
2021
DA/MAO
MAO
DA/MAO
2021
2021
2021
LGU - Dumalag Dec 2020 – Dec In partnership 2021 with concerned agencies
MAO
MAO/MO
MAO/MO
MAO/MO
2020-2021 LGU Cuartero LGU Cuartero LGU Cuartero MPDO/MO/ME 2021
OPA OPA
OPA
OPA
PGO-HMS 2020 Capiz Province CaPENRO
GLOBE
DOH, PLGU, MLGU DOH, NDRRM Fund, MLGU, PLGU
Implementing Agency
(6)
44
Priority Projects/Activities
Location/Site
Dumarao, Capiz, BP2 beneficiary location Ivisan, Capiz Ivisan, Capiz
(2)
100,000.00 30,000.00 1,000,000.00
1,800,000.00
1,000,000.00
1,000,000.00 500,000.00
Maayon,Capiz
Maayon,Capiz
Maayon,Capiz
Maayon,Capiz
Maayon,Capiz
Maayon,Capiz
Maayon,Capiz
Maayon,Capiz
Maayon,Capiz
Maayon,Capiz
Maayon,Capiz
Establish SEEDEX
Promotion of High Yielding Variety (HYV) Conduct Bantay Peste Brigade/Integrated Pest Management (IPM) Update number of farmers and land area till every three years Promotion of hybrid Corn seeds
Strengthening the corn growers
Conduct animal immunization
Raising of 15 heads of carabao, 15 heads of cattle and 25 heads of goat for breeding, milk and meat purposes Rearing of 250 heads of layer chicken and 250 heads of broiler chicken for egg and meat purposes Construct additional pig pen for rearing the pig (raising 60 heads of pig) Establish the hydro-phonics garden 600,000.00
100,000.00
50,000.00
1,200,000.00
100,000.00
100,000.00
250,000.00
500,000.00
500,000.00
900,000.00
50,000.00
25,000.00
500,000.00
50,000.00
500,000.00
600,000.00
20,000.00
80,000.00
B A L I K P R O B I N S YA , B AG O N G PAG - A S A P R O G R A M • W E S T E R N V I S AYA S R E G I O N A L AC T I O N P L A N
Maayon,Capiz
1,000,000.00
Maayon,Capiz
60,000.00
160,000.00
Maayon,Capiz
Implementation of RCEF Program
200,000.00
100,000.00
100,000.00
500,000.00
800,000.00
800,000.00
20,000.00 50,000.00
50,000.00
20,000.00
20,000.00
2021
750,000.00 300,000.00
150,000.00
2022
400,000.00
250,000.00
500,000.00
500,000.00
900,000.00
50,000.00
25,000.00
500,000.00
30,000.00
50,000.00
500,000.00
600,000.00
20,000.00
80,000.00
300,000.00
825,000.00 330,000.00
150,000.00
Annual Breakdown of Funding Requirements
50,000.00
Maayon,Capiz
Distribution of vegetable seeds/planting materials
2020 600,000.00
(4)
50,000.00
2,175,000.00 630,000.00
300,000.00
Total Funding Requirement
(3)
Establish rice Techno-Demo Farms (RMF) Conduct Farmers Field school
Site identification for Jamindan, Capiz vegetable/high value crops production Conduct of trainings and seminars Poblacion, Jamindan, Capiz on poultry, duck, hog, and livestock raising and provision of starter kits Conduct of trainings and seminars Poblacion, Jamindan, Capiz on vegetable/ high value crops production and provision of seeds
Livelihood Program Livelihood support to affected families and communities Establish strong linkage with the Jamindan, Capiz Department of Agriculture for possible funding of PPAs for BP2 programs Assessment of available resources Jamindan, Capiz
Livelihood development
(1)
Beyond
Funding Source
2021-2022
Timeline/ Implementation Period
(7)
2021 and beyond
2021 and beyond
2021 and beyond
2021 and beyond
2021 and beyond
2021 and beyond
2020 and beyond
2021 and beyond
2021 and beyond
Jan.-Dec. 2021
Jan.-Dec. 2021
Jan.-Dec. 2021
Jan.-Dec. 2021
Jan.-Dec. 2021
LGUMaayon/DA
45
2020 and beyond
2021 and beyond
LGU-Maayon/ LGU-Maayon/ OPA/DA OPA/DA LGUMaayon/DA
2021 and beyond
LGU-Maayon/ LGU-Maayon/ OPA/DA OPA/DA
2021 and beyond
LGU2021 and beyond Maayon/OPA LGU2021 and beyond Maayon/OPA/D A/DOST
DA/LGUMaayon LGU-Maayon
LGU-Maayon
DA/LGUMaayon DA/LGUMaayon DA/LGUMaayon
DA/LGUMaayon DA/LGUMaayon DA
OMA, MO
OMA
OMA
OMA
MO
LGU Ivisan Year round DRRMC/C,MEO Post Disaster
MAO
Implementing Agency
(6)
LGU-Maayon/ LGU-Maayon/ OPA/DA OPA/DA
LGUMaayon/OPA LGUMaayon/OPA/ DA/DOST
DA, LGUJamindan DA/LGUMaayon LGU-Maayon
DA, LGUJamindan DA, LGUJamindan DA, LGUJamindan DA, LGUJamindan DA, LGUJamindan DA, LGUJamindan
DA, LGUJamindan
DA, DTI
LGUJamindan LGUJamindan
LGUJamindan
GAD FUND DRRMF
DA
(5)
Priority Projects/Activities
560,000.00
Selected Barangays Mambusao, Capiz Selected Barangays Mambusao, Capiz Selected Barangays Mambusao, Capiz
2021
36,000,000.00 48,700,000.00 20,500,000.00 8,000,000.00
Province-wide
Province-wide Province-wide Panay, Capiz
Provision of Biologics to Animal Health & Diseases Prevention
60,000.00
60,000.00
200,000.00
2,000,000.00
Alternative Livelihood assistance to fisherfolks
Buntod, Pawa, Lat-asan, Butacal, Bantigue, Jamulawon, Binantuan, Agojo Panitan, Capiz
1,000,000.00
Capital and technology assistance Bago Grande, Bago Chiquito, 2,000,000.00 to Farmer’s Cooperatives Anhawon, Cogon, Libon, Calitan, Linao, Lus-onan
1,800,000.00
1,000,000.00
3,000,000.00
1,500,000.00
Procurement and Distribution of High Quality Palay seeds
4,500,000.00 Brgy. Calitan, Anhawon, Cogon, Cab. Oeste, Cab. Este, Calapawan, Libon, Bago Grande, Bago Chiquito, Linao, Lus-onan, Daga, Bahit, Binangig, Magubilan, Tico, Agbanban, Candual
23,700,000.00 12,500,000.00 8,000,000.00
20,000,000.00
1,500,000.00
-
6,000,000.00
100,000,000.00
70,000,000.00
72,000,000.00
Atiplo, Burias, Cala-agus, Tumalalud, Maralag, Sinondojan, Bergante, Pangpang Sur, Bungsi, Mambusao, Capiz Mambusao or Ivisan
132,000,000.00
20,000,000.00
Brgy. Manibad, Mambusao, 20,000,000.00 Capiz Brgy. Bula, Mambusao, Capiz 3,000,000.00
250,000.00
500,000.00
1,000,000.00
280,000.00
5,000.00
100,000.00
2022
25,000,000.00 8,000,000.00
10,000,000.00
23,000,000.00
60,000,000.00
3,000,000.00
250,000.00
7,819,250.00
1,000,000.00
280,000.00
100,000.00
Annual Breakdown of Funding Requirements
20,000,000.00
7,000,000.00
2020 100,000.00
(4)
27,819,250.00
2,000,000.00
5,000.00
Mambusao, Capiz
Total Funding Requirement
(3)
300,000.00
Location/Site
Maayon,Capiz
(2)
1,500,000.00 Brgy. Calitan, Anhawon, Cogon, Cab. Oeste, Cab. Este, Calapawan, Libon, Bago Grande, Bago Chiquito, Linao, Lus-onan, Daga, Bahit, Binangig, Magubilan, Tico, Agbanban, Candual
Establishment of accredited abattoir Establishment of Small-scale Corn Silos Infusion of Animal Stocks A. Swine B. Poultry Acquisition of Modern Farm Machineries Promotion of Organic Farming
Provision of Farm Machinery & Post-harvest Facilities Science & Technology Advisory Project Establishment of Communitybased Training Center Establishment of Customized Feed Mill Farm to Market Roads
Livelihood Projects
Implementation of organic vegatable garden (organic farming)/ Expansion of VermiComposting Assessment a. Food Production Areas b. Residential Areas c. Training & Capability Needs d. Crops Sustainability e. Food Value Chain f. Market Training/Capability Building
(1)
A N N E X A • L I S T O F P R O G R A M S , P R O J E C T S A N D AC T I V I T I E S P E R K E Y R E S U LT A R E A P E R AG E N C Y / O F F I C E
Beyond
Funding Source
Implementing Agency
(6)
LGUMambusao
LGUMambusao LGUMambusao LGUMambusao LGUMambusao
LGUMambusao
LGU Panitan
LGU Panay, BFAR
DA
DA
LGU Panay
National National DA
2020-2022
2021-2024
2022
2021
2021-2022
2021-2022
2021
2021
2020 and beyond
Timeline/ Implementation Period
(7)
2021
LGU Panitan
LGU Panay, BFAR
LGU, DA
2020-2021
2020-2021
LGU Panay, DA 2020-2021
LGU Panay
PLGU 2021-2023 PLGU 2021-2023 LGU Panay, DA 2021
National/PLG PLGU/OPV U National/PLG LGU U/MLGU
DA
DOST
DA
DA
ATI/TESDA
LGUMambusao
LGU-Maayon LGU-Maayon
(5)
46
Priority Projects/Activities
30,000.00 100,000.00 2,880,679.31 200,000.00
All Barangays Panitan, Capiz
Panitan, Capiz
Panitan, Capiz
2020
Municipal Wide - Pandan
Agriculture Development Program Provision of Hybrid Seeds (Corn, Palay) & High Value Crops
Numancia, Aklan
Municipal Wide - Hamtic
Municipal Wide - Pandan
Anini-y
64,672,654.85
50,000,000.00
200,000.00
1,000,000.00
4,000,000.00
200,000.00
1,964,454.85
7,308,200.00
570,203,029.31
20,000.00 150,000.00
10,172,654.85
200,000.00
500,000.00
200,000.00
1,964,454.85
7,308,200.00
122,510,579.31
7,000,000.00
50,000.00
1,080,000.00
51,500,000.00
50,000,000.00
500,000.00
1,000,000.00
272,291,600.00
20,000.00 150,000.00
50,000.00
2021
3,000,000.00
500,000.00
2,500,000.00
175,400,850.00
20,000,000.00
2022
Annual Breakdown of Funding Requirements
B A L I K P R O B I N S YA , B AG O N G PAG - A S A P R O G R A M • W E S T E R N V I S AYA S R E G I O N A L AC T I O N P L A N
SUB-TOTAL 5. PROVINCE OF AKLAN Enrollment of BP beneficiaries to Registry System for Basic Sector (RSBS)
Provision of agriculture and agroindustries support services
Provision of Planting Materials (palay, vegetable, corn) Provision of Vegetable Seeds
Municipal Wide - Pandan
Food Assistance Program
Barbaza
Municipal Wide - Pandan
Tapaz, Capiz Tapaz, Capiz
7,000,000.00
Sigma, Capiz
Distribution of Fingerlings Skills training to male and female landless farmers SUB-TOTAL 4. PROVINCE OF ANTIQUE Food Security Program
100,000.00
1,080,000.00
Sigma, Capiz
2,000,000.00
Sigma, Capiz
2,000,000.00
4,000,000.00
Seminar on Business Plan Formulation Credit Facilitation
4,000,000.00
300,000.00
Livelihood Assistance Grant
300,000.00
1,500,000.00
1,500,000.00
200,000.00
2,880,679.31
30,000.00 100,000.00
50,000.00 120,000.00
80,000.00
(4)
Conduct technical trainings for Sapian, Capiz farmers and fisherfolks Provision of farm and fisheries Sapian, Capiz machineries equipment Provision of Agricultural insurance Sapian, Capiz for small farmers and fisherfolk.
Municipal Wide, Pontevedra, 20,000,000.00 Capiz
50,000.00 120,000.00
All Barangays Panitan, Capiz
Total Funding Requirement
(3)
80,000.00
Location/Site
Panitan, Capiz
(2)
Agricultural Development Program Roxas City, Capiz
Maintenance of Municipal Seed Production Farm Binhian sa Barangay Reserve for Food Prog. Rice & Corn & Vegetables Farmers Class sa Barangay Provision of medical and foods to PWDs Acquisition of goods for emergency relief and Covid-19 related needs Provision of food supplies & hygiene kits to children affected by pandemic Establishment of chared service facilities for global production industries in electronics, machineries and food
(1)
-
LGU Panitan
LGU Panitan
LGU Panitan LGU Panitan
LGU Panitan LGU Panitan
LGU Panitan
Implementing Agency
(6)
Office of the Mayor/DTI OMA
April 2020 December 2020 LGU-20% IRA OMA
LBP/Private Banks/Lendin g Inst. BFAR M.A.O. 5%GAD M.A.O.
MLGU
MAO
None
DA
DA/OPA/OMA
DA, LGU
LGU-20% IRA OMA
DA
DA, MLGU
LGU-20% IRA MSWDO DA, MLGU,OPA
2022
Timeline/ Implementation Period
(7)
Open
47
April 2020 December 2020 1 yr
April 2020 December 2020 April 2020 December 2020 2020-2022
2021 2021
June -Dec. 2020
44166
Sept -Dec 2020
CMO/Agricultur 01/01/2020 e Office 12/31/2020 DA/LGU Nov 2020-Dec 2020 DA/LGU Nov 2020-Dec 2020 DA/LGU Nov 2020-Dec 2020 MLGU/DSWD MSWDO
DA/BFAR
DA/BFAR
Local Government DA/BFAR
National Fund DSWD/ National
LGU Panitan
LGU Panitan
LGU Panitan LGU Panitan
LGU Panitan LGU Panitan
LGU Panitan
Funding Source
Bayanihan Grant to Cities & Office of the Municipalities LCE
Beyond
(5)
100,000.00
Poblacion, Barotac Nuevo, Iloilo
Poblacion, Barotac Nuevo, Iloilo Lambunao, Iloilo
Lambunao, Iloilo
Ensure access to credit, finance and other grants PPAs to fight Against COVID-19
Construction of Isolation Facility
SUB-TOTAL 2. PROVINCE OF GUIMARAS
SUB-TOTAL MEDIUM TERM 1. BACOLOD CITY Assist access to credit finance Bacolod City and other grants Provision of farm inputs,equipment Bacolod City and accessories
500,000.00
Banate, Iloilo
Gulayan Sa Barangay (Procurement of Vegetables Seeds & Gardening Tools Provision of agriculture and agroindustries support services
2,000,000.00
2,000,000.00
78,700,000.00
6,000,000.00
-
71,700,000.00
100,000.00 50,000,000.00
100,000.00
100,000.00
500,000.00
3,000,000.00
3,000,000.00
51,000,000.00
3,000,000.00
Banate, Iloilo
CCAM -Cash for Work
3,000,000.00
Banate, Iloilo
Livelihood Skills Training (Food Processing,SMAW, etc.)
15,000,000.00
2020
8,072,000.00
(4)
15,000,000.00
600,000.00
Lezo, Aklan
SUB-TOTAL 6. PROVINCE OF ILOILO Procurement of reagents,Test Banate, Iloilo Kits, vaccine,medical supplies and other related PPA's for COVID-19
600,000.00
Lezo, Aklan
400,000.00
Lezo, Aklan
1,000,000.00
Provision of climate resilient rice & Lezo, Aklan vegetable seeds to farmers
Provision of crop insurance to farmer-beneficiaries Provision of agricultural farm inputs (i.e. fertilizer, seed/plant boxes, potting bags, etc.)
122,000.00
Lezo, Aklan
Backyard Vegetable Gardening
Agri-Livestock
150,000.00 5,000,000.00
Total Funding Requirement
(3)
Numancia, Aklan Lezo, Aklan
Location/Site 200,000.00
(2)
Numancia, Aklan
Priority Projects/Activities
Provision of Free-Accident Insurance Provision of Vegetable Seeds Provision of post-harvest facility
(1)
1,000,000.00
1,000,000.00
3,500,000.00
3,000,000.00
500,000.00
4,035,000.00
300,000.00
300,000.00
200,000.00
500,000.00
1,000,000.00
1,000,000.00
3,500,000.00
3,000,000.00
500,000.00
4,037,000.00
300,000.00
300,000.00
200,000.00
500,000.00
62,000.00
2,500,000.00
2,500,000.00 60,000.00
75,000.00
2022 100,000.00
75,000.00
2021 100,000.00
Annual Breakdown of Funding Requirements
A N N E X A • L I S T O F P R O G R A M S , P R O J E C T S A N D AC T I V I T I E S P E R K E Y R E S U LT A R E A P E R AG E N C Y / O F F I C E
Beyond
Funding Source
DA/LGU
DA/LGU
OMA
DA/LGU
OMA
OMA DA/LGU
OMA
Implementing Agency
(6)
20% DEV.FUND
General Fund,20% Dev't Fund, National, Others General Fund,20% Dev't Fund, National, Others
LGU
Local/ Provincial, National LGU
Local/ Provincial, National National (DSWD)
2021
Jan-Mar, 20202021 Feb.-May 20212023 Feb.-May 20212023
June 2021-2023
Jan-Mar, 20202022
yearly Oct. 2022-2024
yearly
Timeline/ Implementation Period
(7)
2021-2022
MDRRMO/ MEO
LEIPO-BBDPC, Mar 21 CCLDO City Agriculture Jan 2021 - Dec Office 2022
2020-2022
1 Year
1 Year
2021
MDRRMO
LGU
LGU
MAO/OPA/DA
LGU (MSWDO/ 2021 MENRO)
LGU/DSWD/DA 2021
Local,Provinci LGU al, National (DBM)
DA
DA
DA
DA
DA
LGU DA
LGU
(5)
48
Priority Projects/Activities
419,800.00
1,800,000.00
5,800,000.00 5,800,000.00
1,000,000.00
Cuartero, Capiz, All Barangays Cuartero, Capiz, All Barangays Cuartero, Capiz, AllBarangays 5,000,000.00
1,000,000.00
0.00
Roxas City
5,000,000.00
1,000,000.00
1,000,000.00
287,500.00
2,000,000.00
2,000,000.00
700,000.00
25,274,840.00 5,000,000.00 839,600.00
B A L I K P R O B I N S YA , B AG O N G PAG - A S A P R O G R A M • W E S T E R N V I S AYA S R E G I O N A L AC T I O N P L A N
Upgrading of Drying Pavements
Provision of Certified Seeds
6. Establishment of techno-demo on Integrated Aquaculture Farm (Phase 1) Rice Production Program
1,800,000.00
1,750,000.00
Province-wide
Food Security Program (Special Province Wide Livelihood Project) Backyard Vegetable Garden Contest Food Security Program (Special Province Wide Livelihood Project) Backyard Vegetable Garden Contest KABALAKA "KABUHAYAN" Project Province Wide (Livelihood trainings and provision of start-up kits and initial capital)
350,000.00
25,274,840.00 13,000,000.00 2,099,000.00
Province Wide Province Wide Roxas City
603,750.00
50,000.00
6,000,000.00
1,050,000.00
3,250,000.00
1,000,000.00
2021
9,250,000.00
1,000,000.00
22 Barangays of Nueva Valencia, Guimaras
500,000.00
1,000,000.00
2020 750,000.00
316,250.00
2,000,000.00
2,000,000.00
700,000.00
8,000,000.00 839,600.00
1,000,000.00
2022
Annual Breakdown of Funding Requirements
5,000,000.00 1,000,000.00
500,000.00
22 Barangays of Nueva Valencia, Guimaras
(4)
5,000,000.00 1,000,000.00
1,000,000.00
22 Barangays of Nueva Valencia, Guimaras
Total Funding Requirement
(3)
750,000.00
Location/Site
22 Barangays of Nueva Valencia, Guimaras
(2)
Household
Provision of Livelihood Projects/ Kabuhayan and Employment Opportunities * Animal Production * Food Processing * Mango Production * Construction Painting Provision of Trainings for LSI's & OFW's *Agricultural Crops NCII *Animal Production ( PoultryChicken) NCII *Construction Painting NCII *Mango Production *T-shirt Printing *Food & Beverage Services *Cookery *Food Processing Provision of IEC Materials regarding Health Improvement specifically COVID-19 & Other Health Problems Provision of Trainings for LSI's & OFW's *Agricultural Crops NCII *Animal Production ( PoultryChicken) NCII *Construction Painting NCII *Mango Production *T-shirt Printing *Food & Beverage Services *Cookery *Food Processing SUB-TOTAL 3. PROVINCE OF CAPIZ Berde: Urban Gardening and Upcyling Production Input Subsidy Palay Procurement Project Urban/Backyard Gardenig for Households Capiz Kadiwa Market on Wheels
(1)
-
0.00
Beyond
DTI PESO/MESO
DTI PESO/MESO
LGU Cuartero/DA LGU Cuartro/DA LGU Cuartero/DA
GAD
Regular Program
LGU Cuartero LGU Cuartero LGU Cuartero
OPA
OPA
OPA
OPA
OPA
OPA OPA
General Fund CaPENRO
TESDA
TESDA
MLGU, DOH
DTI PESO/MESO
DTI PESO/MESO
MLGU, DOH
DA BFAR DOLE, DTI TESDA TESDA
DA BFAR DOLE, DTI TESDA TESDA
Implementing Agency
(6)
DSWD
Funding Source DSWD
(5)
2021-2022
2021-2022
2020-2022
2020-2022
2020-2022
49
2020 - 2022 2020 - 2022 2020-2022
2023
2023
2023
2023
Timeline/ Implementation Period
(7)
Priority Projects/Activities
300,000.00 10,000,000.00
Dao, Capiz
Dumalag
13,928,410.00 1,045,020.00
Ivisan, Capiz Ivisan, Capiz
1,000,000.00 100,000.00
Pangabuan, Jamindan, Capiz 1,000,000.00 200,000.00 11,000.00
Maayon,Capiz
Maayon,Capiz
11,000.00
500,000.00
Pangabuan, Jamindan, Capiz 500,000.00
200,000.00
220,000.00
6,391,990.00 358,820.00
1,449,679.00 82,500.00
50,000.00
100,000.00
1,000,000.00
100,000.00
200,000.00
420,000.00 200,000.00
1,500,000.00
5,810,900.00 326,200.00
1,317,890.00 75,000.00
50,000.00
100,000.00
1,500,000.00
1,725,520.00 360,000.00
4,508,000.00 190,000.00
50,000.00
100,000.00
2,500,000.00
2,500,000.00
200,000,000.00
100,000.00
500,000.00
400,000.00
2022 400,000.00
Pangabuan, Jamindan, Capiz 1,000,000.00
Jamindan, Capiz
Ivisan, Capiz
7,275,569.00 347,500.00
Ivisan, Capiz Ivisan, Capiz
Agricultural Production Program Agriculture support service for Rice Coastal Resource Management Fisheries Development Program
Construction of Capiz Blend (Coffee Blend With TESDA counter Part) Livelihood Center Food assistance for affected families Introduction of modern rice farming techniques and provision of funds thereon Establishment of Municipal Poultry Farm Establishment of Municipal Duckery Establishment of Municipal Piggery Grow 1,000 pcs of fingerlings and 1,000 pcs of hito Rehabilitation and purchase of MRDC facility and equipment for processsing and research
150,000.00
100,000.00
300,000.00
Ivisan, Capiz
300,000.00
Institutional Development
600,000.00 100,000.00
100,000.00
600,000.00
2,500,000.00
5,000,000.00
200,000,000.00
10,000,000.00
100,000.00
500,000.00
400,000.00
2021 400,000.00
Annual Breakdown of Funding Requirements
2,500,000.00
100,000.00
500,000.00
400,000.00
2020 400,000.00
(4)
5,000,000.00
400,000,000.00
1,500,000.00
Dao, Capiz
Dumarao, Capiz,33 brgys.
1,200,000.00
Dao, Capiz
Total Funding Requirement
(3)
1,200,000.00
Location/Site
Dao, Capiz
(2)
Construction of Irrigation facilities Dumarao, Capiz, Bungsuan,Dacuton,Agbauan, Gibato& Lawaan Farm mechanization Dumarao, Capiz, BP2 beneficiary location High yield seed production Dumarao, Capiz, Astorga, Gibato,Salcedo Establishment of demoIvisan, Capiz farms/learning centersfor oranic agriculture Livelihood Insurance Support Ivisan, Capiz
Concreting of FMRs
Sustain and expand the Community Seed Farm Adoption and Promotion of Integrated and Diversified Organic and Inorganic Farming System and Inland Fishing Poultry/Livestock Dispersal Program Provision and installation of Open source small irrigation system for identified barangays Barangay Development that supports Livelihood and Employment Opportunities
(1)
A N N E X A • L I S T O F P R O G R A M S , P R O J E C T S A N D AC T I V I T I E S P E R K E Y R E S U LT A R E A P E R AG E N C Y / O F F I C E
Beyond
DA, LGUJamindan DA, LGUJamindan DA, LGUJamindan LGUMaayon/DA LGUMaayon/DA/D OST
DA, LGUJamindan
DRRMF
DF
GF GF
LGU IvisanGF LGU IvisanGF GF GAD
LGU IvisanGF
DA
DA
DA,LGU, External NIA,DA
LGUMaayon/DA LGUMaayon/DA/ DOST
OMA, MO
OMA, MO
OMA, MO
MDRRMO, MSWDO OMA
MEO
MAO MAO
MAO MAO
MAO
MAO
MAO
DA
DA
NIA/DA
MEO
2022 and beyond
2021 and beyond
Jan.-Dec. 2022
Jan.-Dec. 2022
Jan.-Dec. 2022
Jan.-Dec. 2022
Year-round
MAR-OCT
Year-round Year-round
Year-round APR-NOV
2020 onwards
2020 onwards
2020 onwards
2021
2021-2022
2021-2022
2021-2022
LGU - Dumalag Jan – Dec 2021 In partnership with concerned agencies
2021-2023
2021-2023
2021-2023
2021-2023
Timeline/ Implementation Period
(7)
DPWH/ Province
MAO
MAO/MO
MAO/MO
Implementing Agency
(6)
MAO/MO
Funding Source
GF
GF
GF
GF
(5)
50
Priority Projects/Activities
Location/Site
3,000,000.00 2.000,000.00
9,000,000.00 9,000,000.00
Municipal Wide - Tibiao
250,000
34,803,320.00
2,000,000.00
2,000,000.00
5,000,000.00
50,000
500,000
330,931,930.00
500,000.00 20,000,000.00
200,000.00
10,000,000.00
3,000,000.00
3,000,000.00
8,000,000.00
500,000.00
2,500,000.00
3,000,000.00
1,000,000.00
4,500,000.00
2021 5,000,000.00
50,000
500,000
20,000,000.00 289,119,839.00
500,000.00
300,000.00
10,000,000.00
500,000.00
4,500,000.00
3,000,000.00
500,000.00
7,000,000.00
2022 10,000,000.00
Annual Breakdown of Funding Requirements
B A L I K P R O B I N S YA , B AG O N G PAG - A S A P R O G R A M • W E S T E R N V I S AYA S R E G I O N A L AC T I O N P L A N
Access to Credit Facilitate access to affordable formal credit from government financial institutions.
Provision of farm machineries and Municipal Wide - Tibiao equipment by the Department of Agriculture and its attached agencies to improve agricultural productivity and efficiency.
Facilitate the Balik Probinsya benefeciaries/ community to form into registered organizations for agriculture and agro-industries development.
2,000,000
20,000,000.00 656,855,089.00
Tabon, Tapaz, Capiz
Tobias Fornier Municipal Wide - Tibiao
1,000,000.00 20,000,000.00
Sigma, Capiz Lahug, Tapaz, Capiz
Vegetable Production Agricultural Trading and Livelihood with support facilities and Equipment Livestock Farm SUB-TOTAL 4. PROVINCE OF ANTIQUE Agricultural Insurance (PCIC)
20,000,000.00
Sigma, Capiz 500,000.00
5,000,000.00
5,000,000.00
Sapian, Capiz
Sapian, Capiz
8,000,000.00
Pres. Roxas
1,500,000.00
2,500,000.00
4,000,000.00
Calitan, Anhawon, tanza Sur, 2,500,000.00 Agbanban, Bago Grande, Bago Chiquito, Libon, Calapawan, Cogon, Linao, Lus-onan, Daga, Magubilan, Agbalo Pawa 5,000,000.00
3,000,000.00
2020 3,000,000.00
(4)
14,500,000.00
Skills Training on Meat Processing, Sigma, Capiz VCO, & Food Processing
Establish Palay buying station center Credit Facilitation
Construction of Cold Storage Facility Construction of corn Post Ha rvest Facilities Construction of irrigation system
Continuing Access to Credit for farmers
Total Funding Requirement
(3)
Bago Grande, Bago Chiquito, 18,000,000.00 Magubilan, Bahit, Binangig, Daga, Linao, Lus-onan, Candual, Agbanban, Cogon
(2)
Anhawon, Bago Grande, Bago Chiquito, Cogon, Magubilan, Binangig High-Value Crop Development Anhawon, Bago Grande, Bago Chiquito, Cogon, Magubilan, Binangig Capital and technology assistance Cogon, Libon, Calapawan, to Farmer’s Cooperatives Linao, Lus-onan, Anhawon, Agbalo Livestock Development Project Magubilan, Bingangig, Bahit
Establishment of Post-Harvest Facilities & Infrastructure
Acquisition of Modern Farm Machineries
(1)
Beyond
-
Funding Source
LGU/PCIC
DA
PCIC LGU/DA/DTI/ DOST LGU
D.A.
MLGU/DA D.A
Timeline/ Implementation Period
(7)
2022-2024
2022-2024
DA/LGU
NIA/LGU
DAR/DA
Private Sector
LGU
LGU Panay
LGU/PCIC
PCIC LGU/DA/DTI/D OST
M.A.O.
OMA M.A.O
2021-2025
2020-2024 2021-2024
51
2021-2022-2023
2021-2022 2021
2021-2022
Jan. 2021-Dec 2022 Jan. 2021-Dec 2022 2021-2022
2021
2022
2022-2024
2022-2024
LGU Panay, DA 2022-2024
LGU Panay
LGU Panay
LGU Panay, DA 2022-2024
Implementing Agency
(6)
LBP/Private OMA Banks/Lendin g Inst. MLGU/DTI/DA Office of the Mayor /PESO
DA
Private Sector External Source DA/NIA
LGU Panay, DA LGU
DA
LGU Panay, DA
LGU Panay, DA
DA
(5)
Priority Projects/Activities
Location/Site
Municipal Wide in 13 training venues - Tibiao
Provision of financial support to organizations in diversifying high value commercial commodities.
Anilao, Iloilo
300,000.00
1,500,000.00
Anilao, Iloilo
Municipal Livelihood Support program (Financial Assistance to Farmers and Fisherfolks Associations)
260,700.00
Livestock Development Program
Zarraga, Iloilo
Short-Term Employment Program
1,185,000.00
3,000,000.00
Zarraga, Iloilo
Emergency Employment Program
85,000.00
525,000.00
500,000.00
1,000,000.00
86,900.00
395,000.00
25,000.00
165,000.00
450,000.00
2,250,000.00
Agricultural Development Program Anilao, Iloilo
Zarraga, Iloilo
Zarraga, Iloilo
100,000.00
-
200,000.00
10,000,000.00
Calam-isan, Oton
2,750,000.00
300,000.00
1,000,000.00 850,000.00
600,000.00
14,490,000.00
4,200,000
10,000,000.00
Poblacion, Barotac Nuevo, Iloilo Zarraga, Iloilo
-
845,000
150,000.00
500,000.00
1,000,000.00
86,900.00
395,000.00
30,000.00
180,000.00
1,350,000.00
100,000.00
10,000,000.00
10,000,000.00
1,350,000.00
150,000.00
500,000.00 400,000.00
300,000.00
5,395,000.00
2,000,000
1,000,000
2021
1,000,000
2020
815,000
1,000,000
845,000
150,000.00
500,000.00
1,000,000.00
86,900.00
395,000.00
30,000.00
180,000.00
450,000.00
1,400,000.00
150,000.00
500,000.00 450,000.00
300,000.00
5,210,000.00
2,000,000
2022
Annual Breakdown of Funding Requirements
1,815,000
(4)
2,000,000
4,225,000
Total Funding Requirement
(3)
Sta. Monica, Oton
Lezo, Aklan
Numancia, Aklan Numancia, Aklan
Agribusiness Development Program
SUB-TOTAL 6. PROVINCE OF ILOILO Concreting of Sta. Monica Irrigation Road Concreting of Calam-isan Irrigation Road Promote innovations for agriculture production Purchase of Relief Goods (Rice, Coffee, Canned Goods, Noodles, Meat, etc.) for the Front liners and for the whole household in the Municipality. Aqua-Culture Development Project (Fingerlings dispersal Agriculture and provision technical office assistance to brackish and fresh water aquaculture production.)
Provision of Agri-Fishery Inputs Establishment of Gulayan Sa Barangay (17 Barangays) Swine Production
SUB-TOTAL 5. PROVINCE OF AKLAN Conduct of Skills Training Program Numancia, Aklan
Municipal Wide - Tibiao
Municipal Wide - Tibiao
Municipal Wide - Tibiao
(2)
a. Poultry Production (meat & egg) b. Goat Raising
Skills Enhancement Program/Project Management Conduct training on crop production and diversification as well as poultry and livestock production. Provision of livelihood assistance/ start-up capital for poultry and livestock production
(1)
A N N E X A • L I S T O F P R O G R A M S , P R O J E C T S A N D AC T I V I T I E S P E R K E Y R E S U LT A R E A P E R AG E N C Y / O F F I C E
Beyond
Funding Source
Implementing Agency
(6)
LGU/BFAR
LGU/DA
LGU/DA
NGA/ Prov'l
NGA
LGU
LGU
LGU/Prov./ NGA
LGU
DA
DA
DA
NGA NGA/LGU
NGA
DA/ Line Agencies DA/ Line Agencies MLGU/ PLGU/ DA/ BSWM
LGU/BFAR
LGU/DA
LGU/DA
PESO
Municipal Agriculture Office PESO
Municipal Agriculture Office
MDRRMO
LGU
DA/MEO/MAO
DA/MEO/MAO
DA/LGU
DA/OPA/OMA DA/OPA/OMA
DA/OPA/OMA
MLGU/ DA/ Line Agencies MLGU/ DA/ Line Agencies MLGU/Partner Agencies
LGU/ DA/ ATI LGU/ DA/ ATI
(5)
2021
2020-2022
2020-2022
2020-2022
2020-2022
2020-2022
2020-2022
2020-2022
2 Years
Jan - June 2021
Jan - June 2021
2nd Quarter 2021 & 2022
2021-2022 2021-2022
2021-2022
2021-2022
2021-2022
2021-2022
2021-2025
Timeline/ Implementation Period
(7)
52
128,100.00 2,000,000.00
100,000.00 300,000.00 1,228,100.00 2,000,000.00
50,000.00
100,000.00
239,000.00
1,750,000.00
2,500,000.00
2,000,000.00 4,940,000.00
32,750,000.00
30,000,000.00
2,000,000.00 750,000.00
5,000,000.00
5,000,000.00
36,891,900.00
200,000.00
43,000.00
2,000,000.00
30,750,000.00
30,000,000.00
750,000.00
-
12,821,900.00
2,500,000.00
500,000.00 100,000.00 -
2021 10,000,000.00
300,000.00 1,928,100.00 2,000,000.00
100,000.00
60,000.00
150,000.00
263,000.00
2,450,000.00
3,500,000.00
20,000,000.00
2,000,000.00 4,940,000.00 20,000,000.00
33,750,000.00
30,000,000.00
3,000,000.00 750,000.00
5,000,000.00
5,000,000.00
15,291,900.00
2,500,000.00
2022 10,000,000.00
Annual Breakdown of Funding Requirements
600,000.00 3,284,300.00 6,000,000.00
153,000.00
-
250,000.00
1 Mun. per district
Roxas City
502,000.00
4,200,000.00
Roxas City
1 Mun. in 1st District
6,000,000.00
20,000,000.00
6,000,000.00 9,880,000.00 20,000,000.00
98,000,000.00
90,000,000.00
5,000,000.00 3,000,000.00
10,000,000.00
Roxas City
Province-wide Province Wide
Constancia, Cabano, Suclaran, M. Chavez, San Enrique Lebas, San Lorenzo, Guimaras 12 barangays of San Lorenzo, Guimaras
Provincewide (Guimaras) 22 Barangays of Nueva Valencia, Guimaras
10,000,000.00
65,005,700.00
10,000,000.00
15,000,000.00
2020
100,000.00
(4)
500,000.00 200,000.00
20,000,000.00
Total Funding Requirement
(3)
B A L I K P R O B I N S YA , B AG O N G PAG - A S A P R O G R A M • W E S T E R N V I S AYA S R E G I O N A L AC T I O N P L A N
Solar Powered Irrigation System Project Establishment of Provincial Techno Demo on: multi-species cage culture production and crab fattening Establishment of Techno-Demo on Shellfish (oyster and mussel production with depuration facilitiy) Establishment of techno-demo on Sustainable Corn Production in Sloping Areas (SCOPSA) Mechanized compact technodemo farm Sustained Operation of AgriFisheries Service Facilities Complementary Food Processing Facility (Insumix) Operation of Provincial Seed Processing Plant (JICA Facility) Organic Trading Post Agri-Aqua Laboratory Agri-Fishery Machineries Pool
SUB-TOTAL 3. PROVINCE OF CAPIZ Maintain Animal Disease-Free Status: FMD, BF, ASF Farm Mechanization Support Irrigation Support
Farm to Market Road Projects
SUB-TOTAL 2. PROVINCE OF GUIMARAS Procurement of Lot Provision of Livelihood Projects/ Kabuhayan and Employment Opportunities * Animal Production * Food Processing * Mango Production * Construction Painting Fiber Optic, Cable Connection
SUB-TOTAL LONG TERM 1. BACOLOD CITY Provide continuous agriculture and Bacolod City food production support
Anilao, Iloilo Poblacion, Barotac Nuevo, Iloilo Poblacion Ilaya, Bansag, Tampucao, Pandan, Lambunao, Iloilo
Location/Site
Input Assistance to Farmers Promote innovations for agriculture production Socialized Housing Project
(2)
Anilao, Iloilo
Priority Projects/Activities
Municipal Livelihood Support program (Livestock and Poultry)
(1)
Beyond
Funding Source
LGU/DA LGU
LGU/DA
Implementing Agency
(6)
National/PLG U 20% DF External Source External Source
OPA
OPA
OPA
OPA
OPA
OPA/DA
PLGU/OPV OPA OPA
DPWH
DA BFAR DOLE, DTI TESDA Service Provider
DA BFAR DOLE, DTI TESDA Service Provider DA
NGA DSWD
DA, City Agriculture Office NGA DSWD
DA, CMO
GF, 20% Mayor's Office, Dev't Fund & MSWDO Others
LGU/DA LGU
LGU/DA
(5)
2021
2021-2022
2021-2022
2021-2022
2021-2022
2022
2023-2025 2021-2022
2026 - 2028
2026-2028
2020 - 2023
Januar 2021 onwards
53
2020-2022
2 Years
2021-2022
Timeline/ Implementation Period
(7)
Priority Projects/Activities
Location/Site
Dumarao, Capiz - Dacuton Dumarao, Capiz - Gibato Dumarao, Capiz - Bungsuan
Basiao and Cabugao, Ivisan, Capiz Basiao and Cabugao, Ivisan, Capiz CapSU Jamindan Ext'n. Campus, Pangabuan, Jamindan, Capiz
Maayon,Capiz
Maayon,Capiz
Maayon,Capiz
Maayon,Capiz
Construction of warehouse Establishment of rice mill Establishment of Feedmill
Establishment of water testing facility Establishment of relaying station and depuration facilities Construction of multipurpose building for trainings/ seminars, with kitchen/food processing room for meat processing and value adding of agricultural products and rooms for lodging and other amenities Diversify/Improve/Promote the production of Banana, Coffee and Cacao Dairy production
Chocolate & Coffe production
Calamansi with Cucumber juice
Conduct laboratory testing for yielding improvement Conduct On-The-Job Training for the graduate student (Senior High & College Student)
Conduct skills training for farmers Maayon,Capiz
Maayon,Capiz
Jamindan, Capiz
Dumalag, Capiz Dumalag, Capiz
Concreting of Farm and Market Roads Natural Regeneration Assisted
1,000,000.00 300,000.00
Dao, Capiz Dao, Capiz
400,000.00
2,000,000.00
5,000,000.00
10,000,000.00
15,000,000.00
200,000.00
200,000.00
200,000.00
2,000,000.00
5,000,000.00
10,000,000.00
15,000,000.00
50,000,000.00
50,000,000.00
3,000,000.00 3,000,000.00 3,000,000.00
15,000,000.00 500,000.00
2,000,000.00
1,000,000.00 100,000.00
2,000,000.00 500,000.00
1,000,000.00 500,000.00
500,000.00 500,000.00
2022 180,000.00
300,000.00
200,000.00
100,000.00
2021 150,000.00
4,500,000.00
100,000.00
2020 108,000.00
Annual Breakdown of Funding Requirements
300,000.00
(4)
4,500,000.00
3,000,000.00 3,000,000.00 3,000,000.00
15,000,000.00 500,000.00
2,000,000.00
2,000,000.00 500,000.00
Cuartero, Capiz Cuartero, Capiz
Dumalag, Capiz
1,000,000.00 500,000.00
500,000.00 500,000.00
438,000.00
Total Funding Requirement
(3)
Cuartero, Capiz, (Growth Centers) Cuartero, Capiz
Cuartero, Capiz Cuartero, Capiz
(2)
Provision of Production Support (Rice and Corn Seeds)
Provincial Plant Nursery and Freshwater Tilapia Project Provision of Training for Livestock Productionofand its Sustainability Provision Trainings for farmers on new or advanced farming technology Establishment of Agricultural Market Trading Establish animalPost raisers' organization Establishment of Feed Mill Establishment of Agri-based Marketing Assistance Center Promotion of Agricultural Technologies and Strategies Provision of Agricultural Equipment
(1)
A N N E X A • L I S T O F P R O G R A M S , P R O J E C T S A N D AC T I V I T I E S P E R K E Y R E S U LT A R E A P E R AG E N C Y / O F F I C E
Beyond
Funding Source
2021- beyond 2021- beyond
Timeline/ Implementation Period
(7)
DA/DTI/LGUMaayon DA/DTI/LGUMaayon DA/DTI/LGUMaayon DA/DTI/DOST
LGULGU2021 and beyond Maayon/DOS Maayon/DOST T
2022 and beyond
2022 and beyond
2022 and beyond
2022 and beyond
2022 and beyond
Jan.-Dec. 2021
2022 and beyond
OMA, MO
OMA
2022 onwards
2022 onwards
2022 2022 2021
LGU-Ivisan
LGU-Ivisan
DA DA DA
LGU - Dumalag Jan – Dec 2022 In partnership and –beyond LGU - Dumalag Jan Dec 2022 In partnership and beyond with concerned agencies
LGU - Dumalag Jan – Dec 2022 In partnership and beyond with concerned agencies
LGU Cuartero LGU Cuartero LGU Cuartero LGU Cuartero DA, MAO MAO
LGU Cuartero LGU Cuartero
Implementing Agency
(6)
DA/DTI/DOST DA/DTI/DOST
DA/DTI/LGUMaayon DA/DTI/LGUMaayon DA/DTI/LGUMaayon DA/DTI/DOST
DA
LGU-Ivisan, BFAR LGU-Ivisan, BFAR, DOST NGA
DA DA DA
DPWH DENR
DA
LGU Cuartero/DA LGU Cuartero/DA LGU Cuartero/DA LGU Cuartero/DA LGU - Dao LGU - Dao
LGU Cuartero/DA LGU Cuartero/DA
(5)
54
Priority Projects/Activities
Location/Site
Maayon,Capiz
5,000,000.00 1,000,000.00
13,200,000.00 437,967,300.00 15,000,000.00 7,000,000.00
Tapaz, Capiz
Tobias Fornier
5,000,000.00
1,000,000.00
68,987,100.00
24,879,100.00
5,000,000.00
Tobias Fornier Tobias Fornier
6,600,000.00
5,000,000.00
2,000,000.00
3,000,000.00
5,000,000.00
1,000,000.00
2,000,000.00
10,000,000.00
6,500,000.00
Sigma, Capiz
2,000,000.00
5,000,000.00
20,000,000.00
1,000,000.00 7,000,000.00
Maninang, Bilao, Sapian, Capiz Lonoy, Poblacion, Sapian, Capiz Sigma, Capiz
Sapian, Capiz
20,000,000.00
Panitan, Capiz 3,000,000.00
10,000,000.00
Panitan, Capiz
Bailan, Pontevedra, Capiz
50,000,000.00
5,500,000.00
19,000,000.00
Panitan, Capiz
2,500,000.00 5,000,000.00
4,000,000.00 19,000,000.00
2,000,000.00
3,000,000.00
5,000,000.00
344,101,100.00
6,600,000.00
5,000,000.00
5,000,000.00
1,000,000.00
3,000,000.00
10,000,000.00
3,000,000.00
20,000,000.00
10,000,000.00
50,000,000.00
7,000,000.00
7,000,000.00
500,000.00
1,500,000.00
2,000,000.00
15,000,000.00
5,000,000.00
30,000.00
2,500,000.00
4,000,000.00
5,000,000.00
2022 500,000.00
5,500,000.00
2,000,000.00
5,000,000.00
30,000.00
2,500,000.00
4,000,000.00
5,000,000.00
2021 500,000.00
5,000,000.00
5,000,000.00
500,000.00
2020
Annual Breakdown of Funding Requirements
5,000,000.00
(4)
B A L I K P R O B I N S YA , B AG O N G PAG - A S A P R O G R A M • W E S T E R N V I S AYA S R E G I O N A L AC T I O N P L A N
Coffee & Cacao Production & Processing Native Chicken Production and Marketing Farm Implements and Facilities Improvement SUB-TOTAL 4. PROVINCE OF ANTIQUE Farm Mechanization Program Introduction/Production of High Value Crops Technical Assistance & Training Programs
Establish Fish Hatchery
Construction & Rehabilitation of Irrigation Facilities Provision of Farm Inputs (Fertilizer, rice, corn, fruit, pesticide, insecticide, industrial and root crops, etc.) Construction of Solar Power Irrigation Establishment of Trading Post/Livestock Market Construction of farm to market roads Construction of Rice Mill
Construction of DA Satellite Office- Maayon,Capiz Tuburan Institutionalization of Fishery Co- Pawa, Buntod, Butacal, Management Areas Bantigue, Binantuan, Jamulawan, Navitas High-Value Crop Development Magubilan, Binangig, Talasa, Daga, Bahit Local Livestock Industry Mabubilan, Bahit, Binangig Production (Industrial and Market Distribution Project Intensified Farm Mechanization Bago Grande, Bago Chiquito, Project Magubilan, Bahit, Binangig, Daga, Linao, Lus-onan, Candual, Agbanban, Cogon
15,000,000.00
60,000.00 15,000,000.00
Maayon,Capiz
Maayon,Capiz
5,500,000.00
Maayon,Capiz
8,000,000.00
Maayon,Capiz
10,000,000.00
-
1,000,000.00
Total Funding Requirement
(3)
Implementation of contour farming in hilly area (SALT /SCOPSA Technology) Update number of farmers and land area till every three years Construction of Multi- Purpose Dryer Construction of Farmers Center
Maayon,Capiz
Maayon,Capiz
Maayon,Capiz
(2)
Improve farm inputs (facility)
Provide Soft loans with low rates for farmers Strengthening the farmers organization Establishment of grain buying station
(1)
Beyond
-
Funding Source
Implementing Agency
(6)
ATI/DA
DA,ATI,LGU
DA
MLGU/DA/ DSWD D.A
MLGU/DA
DA/BFAR
DA
LGU Panitan/DA Provincial Fund DA
LGU Panitan/DA LGU Panitan/DA
LGU Panay
LGU Panay, DA LGU Panay, DA
DA
LGUMaayon/DA LGUMaayon/DA LGU-Maayon
2021 and beyond
2021 and beyond
Timeline/ Implementation Period
(7)
2025-2027
2022 and beyond
2022 and beyond
2022
ATI
LGU
DA
M.A.O.
OMA/MEEDO
2021-2027
2020-2027
2020-2027
2021-2022
2022 -2023
55
DA/DPWH/LGU Jan. 2023-Dec 2026 DA/LGU Jan. 2023-Dec 2026 DA/LGU Jan. 2023-Dec 2026 OMA/MEEDO 2022-2024
PEO
LGU Panitan
LGU Panitan
LGU Panitan
LGU Panay, DA 2025-2034
LGU Panay, DA 2025-2034
LGU Panay, DA 2025-2034
LGU Panay, BFAR
LGUMaayon/DA LGUMaayon/DA LGU-Maayon
2021 and beyond
LGU2021 and beyond Maayon/DA/NF A LGU2021 and beyond Maayon/DA LGUMaayon/DA
LGU-Maayon LGU-Maayon
LGUMaayon/DA/N FA LGUMaayon/DA LGUMaayon/DA
LGU-Maayon LGU-Maayon
LGU-Maayon LGU-Maayon
(5)
Zarraga, Iloilo
Zarraga, Iloilo
Vegetable production Project (distribution of vegetable seeds)
Special Program for Employment of Students Construction of Auction House Construction of Small Reservoir Irrigation Project (SRIP)
3,000,000.00 5,000,000.00
Palaypay, Anilao, Iloilo
Sta. Rita, Dangulaan, Cagan, Palaypay, Vista Alegre, Anilao, Iloilo
Bacolod City
Bacolod City
Continuing Provision of Social Services (Grants and Donations-AICS)
SUB-TOTAL 2. PROVINCE OF GUIMARAS
Coordinate with TESDA, DOLE the Bacolod City needs of the beneficiaries in terms of skills and employment Trainings
Segregation and establishing of Data Banks Coordinate with DSWD Regional Office the status of interventionsfor each beneficiary
1,000,000.00
1,000,000.00
-
1,000,000.00
1,000,000.00
16,265,280.00 867,747,810.00
-
16,659,040.00 934,794,729.00
NGA/ LGU
LGU
LGU/DA/DTI
LGU/DA
LGU/DA
LGU/DA
1,575,040.00
50,000.00
34,000.00
10,000,000.00
2022 - onwards 2022
DSWD/LGU
Implementing Agency
(6)
15 Nov 20
2024
2023-2025
2023
2023-2025
2023 2024
2020-2022
2020-2022
2020-2022
3 Years
3 Years
2021-2022
Timeline/ Implementation Period
(7)
56
PESO
Jan- June 2021
CPDO,BHA,CH Dec 1-30, 2020 O,PESO DSSD Jan- Dec 2021
CMO
LGU/DA/DTI
LGU/DA
LGU/DA
LGU/DA
LGU/DA LGU/NIA
Municipal Agriculture Office PESO
National LGU Government, LGU National LGU Government, LGU LGU Municipal Agriculture Office
3,000,000.00
1,181,280.00
50,000.00
34,000.00
10,000,000.00
5,000,000.00
7,350,000.00
NIA/DA DA/LGU
DSWD/LGU
Funding Source
LGU/DA LGU/NIA
787,520.00
37,500.00
32,500.00
10,000,000.00
5,000,000.00
Beyond
(5)
5,000,000.00 9,000,000.00
3,543,840.00
137,500.00
100,500.00
30,000,000.00
5,000,000.00
2,000,000.00
15,000,000.00
2,000,000.00 NGA 5,350,000.00 NGA
2022 100,000 DSWD 50,000 LGU 10,000,000.00 10,000,000.00
2021
150,000 DSWD
9,350,000.00
7,000,000.00
2020
Annual Breakdown of Funding Requirements
2,000,000.00
(4)
4,000,000.00 5,350,000.00
27,150,000.00
150,000.00
Total Funding Requirement
(3)
Improvement/Rehabilitation of Old Poblacion, Anilao, Iloilo 1,000,000.00 Village type Fish Processing Center 74,781,840.00 15,857,520.00 SUB-TOTAL KRA 2 TOTAL 2,181,022,613.16 338,195,074.16 KEY RESULT AREA 3 HOUSING, SOCIAL WELFARE, HEALTH, EMPLOYMENT AND HUMAN RESOURCE DEVELOPMENT SHORT TERM 1. BACOLOD CITY Creation of Local Council for PB2 Bacolod City
Construction of Post Harvest Facility (Multi-Purpose drying pavements/solar dryer) Construction/ Rehabilitation of Slaughter House Farm Mechanization Development Program (Procurement of Farm Machineries)
Zarraga, Iloilo
Agri-Productivity/ Urban Gardening Project (establishment of container gardening)
Poblacion, Anilao, Iloilo Sab Carlos, Palaypay, Serallo, Medina, Vista Alegre, Mostro (Anilao) Medina, Agbatuan, Palaypay, Balunos, Guipis (Anilao)
Poblacion, Barotac Nuevo, Iloilo
Provision of livelihood and employment opportunities
Location/Site
Numancia, Aklan Numancia, Aklan
(2)
Poblacion, Barotac Nuevo, Iloilo
Priority Projects/Activities
Agro Forestry Development Program SUB-TOTAL 5. PROVINCE OF AKLAN Upgrading of Irrigation Canal Construction of Agri-Tourism Facilities (Receiving Hall, Plant Nursery, Working/Training Hall, Stock Room, Water facilities) SUB-TOTAL 6. PROVINCE OF ILOILO Investment in agriculture infrastructure development
(1)
A N N E X A • L I S T O F P R O G R A M S , P R O J E C T S A N D AC T I V I T I E S P E R K E Y R E S U LT A R E A P E R AG E N C Y / O F F I C E
Priority Projects/Activities
(2)
Location/Site
12 barangays of San Lorenzo
Employment Program
Cuartero, Capiz, All Barangays
Dao, Capiz
Improvement of the delivery of social services
Construction of Bahay PagAsa
3,000,000.00
500,000.00
500,000.00
800,000.00
500,000.00
500,000.00
800,000.00
B A L I K P R O B I N S YA , B AG O N G PAG - A S A P R O G R A M • W E S T E R N V I S AYA S R E G I O N A L AC T I O N P L A N
Cuartero, Capiz, All Barangays
Cuartero, Capiz, All Barangays
51,786,065.00
186,888,887.24
294,639,952.24
30,000.00 100,000.00
30,000.00 100,000.00
6,000,000.00
San Lorenzo, Guimaras
18,000,000.00
Guimaras
22 Barangays of Nueva Valencia, Guimaras
10,000,000.00
10,000,000.00
4,000,000.00
20,986,065.00
1,000,000.00
500,000.00
200,000.00 300,000.00
20,000.00 50,000.00 100,000.00 100,000.00
2021 8,200,000.00
30,000,000.00
4,000,000.00
163,770,105.24
100,000.00
200,000.00 300,000.00
5,000.00 50,000.00 100,000.00 100,000.00
2020 8,263,782.00
3,000,000.00
49,970,000.00
6,000,000.00
10,000,000.00
4,000,000.00
20,000,000.00
500,000.00
500,000.00
200,000.00 300,000.00
20,000.00 50,000.00 100,000.00 100,000.00
2022 8,200,000.00
Annual Breakdown of Funding Requirements
200,000.00
(4)
200,000.00
12,000,000.00
Guimaras
22 Barangays of Nueva Valencia, Guimaras 22 Barangays Association of BAFC in Nueva Valencia, Guimaras
204,756,170.24
1,500,000.00
1,100,000.00
600,000.00 900,000.00
40,000.00 150,000.00 300,000.00 300,000.00
24,663,782.00
Total Funding Requirement
(3)
Guimaras
Health Services to the Brgys
Enactment of Municipal Incentive & Investment Code Access to credit finance and other grants for food security and agricultural productivity of small farmers, fisherfolks and other associations. Provision of agricultural insurance & fishery insurance to small farmers and fisherfolks Updating of Municipal Investment & Incentive Code Updating of Municipal Investment & Incentive Code SUB-TOTAL 3. PROVINCE OF CAPIZ Procurement of Medicines
Provision of Skills Training (Operationalization of PTEDC)
Medical response and prevention of outbreaks through provision of drugs and medicines, PPEs, test kits, maintenance of quarantine facilities, support to medical/health personnel, rapid health assessment, advocacies, coordination activities, capability building and other related requirements
re-emerging infectious diseases
Municipal Site, Sapal and Cabungahan, San Lorenzo Health response to emerging and Guimaras
14 barangays of Sibunag 12 barangays of San Lorenzo
TUPAD Project Livelihood Program
Improvement/Expansion of Production Center
Provincewide 14 barangays of Sibunag 14 barangays of Sibunag Alegria, Dasal, Oracon, Sabang, San Isidro, Sebaste & Tanglad in Sibunag
Provision of Other Social Services Skills Development Program Family Welfare Program Assistance to Individual/Family In Crisis Situation
Provision of financial assistance Guimaras for medical, hospitalization, medicines and blood requirement of indigent patients and persons in crisis situation
(1)
Beyond
Funding Source
Implementing Agency
(6)
LGU Cuartero Gen. Fund LGU Cuartero Gen. Fund LGU Cuartero Gen. Fund GF
MLGU
MLGU
PICC
MSWDO
LGU - Cuartero
LGU - Cuartero
LGU - Cuartero
MLGU
MLGU
PICC
LBP, DBP, BAFC Provincial Govt. Cooperatives
SB
General Fund GO MLGU
MLGU
DOLE/MLGU MLGU/DOLE/ DSWD PESO/MLGU
PSWDO MLGU/TESDA MLGU MLGU
National GO Grant and General Fund
MLGU
DOLE MLGU/DOLE/ DSWD DOLE, MLGU
PLGU MLGU MLGU MLGU
General Fund GO/PSWDO
(5)
2021
2021
2021
2021
2021 - 2023
2021
2020-2022
2020-2022
57
2021-2022
2020-2022
2020-2022 2020-2022
2020-2022 2020-2022 2020-2022
2020-2022
Timeline/ Implementation Period
(7)
1,500,000.00
Dumalag, Capiz
Dumalag, Capiz
Dumalag, Capiz
Dumalag, Capiz
Dumalag, Capiz
Provision of Foods, Medical and Livelihood Support to BP2 Beneficiaries
Conduct Capability Building e.g. Skills Training and Value Formation
Procurement of Medicines and Vitamins
Educational Program for BP2 Beneficiaries for Internet Based Learning
Monitoring of BP2 Beneficiaries in Dumalag
120,000.00 250,000.00
500,000.00
25,000.00
120,000.00
10,000.00 25,000.00
10,000.00 50,000.00
345,000.00
25,000.00
25,000.00
100,000.00
300,000.00
250,000.00
200,000.00
500,000.00
500,000.00
2021
250,000.00
2022
Annual Breakdown of Funding Requirements
345,000.00
213,500.00
213,500.00
Organization of BP2 committee
Dumarao, Capiz, Municipal hall Validation of BP2 beneficiary Dumarao, Capiz, Municipal hall Conduct social preparation & Dumarao, Capiz, Municipal psychosocial intervention hall Ensure Linkages of beneficiary list Dumarao, Capiz, Municipal with targeting data bases such as hall unconditional cash transfer program, rice subsidy ,among others Assistance for pre-employment Dumarao, Capiz, Municipal requirements hall Provide access to comprehensive Dumarao, Capiz, Municipal health services hall
300,000.00
100,000.00
300,000.00
250,000.00
200,000.00
1,000,000.00
500,000.00
2020 150,000.00
300,000.00
(4)
Improvement/Provision of Dumalag, Capiz, Brgy. Amenities of Municipal Evacuation Consolacion Center Nutrition Program Dumalag, Capiz
200,000.00
600,000.00
500,000.00
400,000.00
1,000,000.00
Total Funding Requirement
(3)
Transport and Relocation Package Dumalag, Capiz for Individual and Family Beneficiaries
Location/Site 150,000.00
(2)
Dumalag, Capiz
Priority Projects/Activities
Social Preparations, Programming Investment and Funding of PPAs for Family Beneficiaries of BP2 of Dumalag
(1)
A N N E X A • L I S T O F P R O G R A M S , P R O J E C T S A N D AC T I V I T I E S P E R K E Y R E S U LT A R E A P E R AG E N C Y / O F F I C E
Beyond
Funding Source
Timeline/ Implementation Period
(7)
LGU - Dumalag Nov. 2020 – Dec. In partnership 2021 with concerned agencies
LGU - Dumalag Nov. 2020 – April In partnership 2021 with concerned agencies
LGU - Dumalag Nov. 2020 – April In partnership 2021 with concerned agencies
Implementing Agency
(6)
LGU - Dumalag Dec-2020-Dec In partnership 2021 with concerned agencies
DOH,LGU Dumarao
DSWD
DSWD
LGU/DSWD
LGU
LGU
Local
Local
Local
2020-2021
2020
2020
DOH
DSWD
2021-2022
2021
DSWD,MSWDO 2021
MSWDO
MSWDO
MSWDO
LGU - Dumalag Jan – Dec 2020
LGU - Dumalag Jan – Dec 2020
LGU - Dumalag Dec 2020-Dec In partnership 2021 with concerned agencies
DepEd/Tesda LGU - Dumalag Dec 2020-Dec /CHED In partnership 2021 with concerned agencies
DOH
DSWD/TESDA LGU - Dumalag Dec. 2020 - Dec /DOLE In partnership 2021 with concerned agencies
DSWD/DOH
LTO/DSWD
DSWD
(5)
58
Priority Projects/Activities
Location/Site
775,000.00 310,000.00
Ivisan, Capiz Ivisan, Capiz
Ivisan, Capiz
Ivisan, Capiz
New Born Screening
Water and Sanitation Program WASH (Water sanitation and hygiene) Development of housing site and housing Emergency Assistance Philhealth Program Provisions of Insurances Uncondional Cash Transfer Program (UCTP)
40,000.00 50,000.00 100,000.00
Jamindan, Capiz
Jamindan, Capiz
Jamindan, Capiz
(4)
10,000.00
50,000.00 300,000.00
896,000.00
1,920,000.00
65,000.00 700,000.00
170,000.00
540,000.00
250,000.00 100,000.00
250,000.00 130,000.00
200,000.00
200,000.00
900,000.00
50,000.00
2020 50,000.00
100,000.00
50,000.00
40,000.00
50,000.00
400,000.00 200,000.00
50,000.00 300,000.00
896,000.00
900,000.00 1,500,000.00 100,000.00 1,920,000.00
165,550.00
540,000.00
250,000.00 100,000.00
250,000.00 130,000.00
200,000.00
200,000.00
900,000.00
50,000.00
400,000.00
2021
440,000.00 220,000.00
55,000.00 330,000.00
985,600.00
990,000.00 1,650,000.00 110,000.00 2,112,000.00
20,000,000.00
182,105.00
594,000.00
275,000.00 110,000.00
275,000.00 140,000.00
220,000.00
220,000.00
990,000.00
2022 50,000.00
Annual Breakdown of Funding Requirements
B A L I K P R O B I N S YA , B AG O N G PAG - A S A P R O G R A M • W E S T E R N V I S AYA S R E G I O N A L AC T I O N P L A N
50,000.00
840,000.00 420,000.00
Jamindan, Capiz
Ivisan, Capiz Ivisan, Capiz
COVID 19 Testing Funeral assistance to COVID deaths (suspect, probable and confirmed) Organization of Balik Probinsya, Bagong Pag-asa (BP2) Council/Committee Validation of Balik Probinsya, Bagong Pag-asa (BP2) applicants/beneficiaries Coordinative meeting of the BP2 Council Social preparation through comprehensive family case management Establishment of database/profiling of BP2 applicants/beneficiaries and their family
155,000.00 930,000.00
10,000.00
Ivisan, Capiz Ivisan, Capiz
Nutrition Program Water and Sanitation Project
2,777,600.00
1,955,000.00 3,850,000.00 210,000.00 5,952,000.00
20,000,000.00
517,655.00
Jamindan, Capiz
Ivisan, Capiz
Supplemental Feeding Program
Ivisan, Capiz Ivisan, Capiz Ivisan, Capiz Ivisan, Capiz
Cudian, Ivisan, Capiz
775,000.00 400,000.00
1,674,000.00
620,000.00
Ivisan, Capiz Ivisan, Capiz
620,000.00
2,790,000.00
100,000.00
400,000.00
100,000.00
Total Funding Requirement
(3)
Ivisan, Capiz
Ivisan, Capiz
Dumarao, Capiz, Municipal hall Ivisan, Capiz
Dumarao, Capiz, Municipal hall Dumarao, Capiz, Municipal hall
(2)
Comprehensive Anti-Illegal Drug Program Crime and Public Safety Municipal Anti-illegal Drug Program Crime and Public Safety Public Safety
Aid to Partner Groups and Organizations Strengthening of NGO's and PO'S
Capacity enhancement of health workers Provide livelihood & emergency employment assistance to BP2 beneficiary Reskilling & Upskilling of workers
(1)
Beyond
Funding Source
LGUJamindan, DSWD
LGUJamindan LGUJamindan
LGUJamindan
LGUJamindan
DRRMF DRRMF
LGU-Ivisan, NHA GF 5% GAD DRRMF OUTSIDE SOURCES (DSWD) OUTSIDE SOURCES (DSWD) 1% LCPC 20% DF
GAD
MCP/NCP TRUST FUND
5% GAD 5% GAD
5% GAD GF
GF
5% GAD
GF
DTI
DOH,LGU Dumarao DOLE
(5)
Year-round Year-round
Year-round
Year-round
Year-round
2020-2021
2021
2021-2022
Timeline/ Implementation Period
(7)
MSWDO
MSWDO
MO
MSWDO
MO
LCE,DRRMO
MSWDO MENRO, MO, MEO
LGU
MSWDO MSWDO LCE DSWD
NHA
MHO
59
Jan.-Dec. 2021
Jan.-Dec. 2021
Every Qtr.
Jan.-Dec. 2021
Dec 21
Year-round Year-round
Jul-Dec Feb-Jul
Year-round
Year-round Year-round JUN-JUN Year-round
2022 onwards
Year-round
PNP Year-round MO/PNP/DILG/ Year-round BFP/MHO MHO Year-round
PNP PNP
Office of the Mayor Office of the Mayor PNP
DTI
DOLE
DOH
Implementing Agency
(6)
Priority Projects/Activities
(2)
Location/Site
5,000,000.00 50,000.00
Jamindan, Capiz
Jamindan, Capiz
Maayon, Capiz
Maayon, Capiz
Maayon, Capiz
Maayon, Capiz
Maayon, Capiz
Organization of solo parents into federation or association
Rehab and Recovery to Drug Dependents
Pre-Marriage counseling
Supplemental Feeding
Organization of Out of School Youths Information Technology Literacy Program for Out of School Youth and Youth w/ Disabilities
100,000.00 700,000.00
Maayon, Capiz
Organization and Livelihood Opportunities for Women
Community- Based Rehabilitation, Maayon, Capiz Provision of assistive device and livelihood opportunities to PWD's and their PPAs
1,000,000.00
3,000,000.00
700,000.00
100,000.00
100,000.00
250,000.00
150,000.00
50,000.00
100,000.00
100,000.00
2020
700,000.00
(4)
700,000.00
-
800,000.00
Organizing, Advocacy and Social Maayon, Capiz Enhancement of PWD's Organization and Social Maayon, Capiz Enhancement of Senior Citizens and their PPAs Assistance to Individual/Families in Maayon, Capiz Crisis Situation
300,000.00
Maayon, Capiz
Maayon, Capiz
250,000.00
450,000.00
150,000.00
300,000.00
Rehabilitation of Day Care Centers Maayon, Capiz
Sharing Computer Access Locally and Abroad (SCALA) Child Protection Services
Maayon, Capiz
Maayon, Capiz
Maayon, Capiz
Family Development Sessions 100,000.00
800,000.00
Jamindan, Capiz
Maayon, Capiz
1,000,000.00
30,000.00
Total Funding Requirement
(3)
Jamindan, Capiz
Parent Effectiveness Service/
Provision of Transportation Assistance to returning individuals/families Provision of Medicines and Personal hygiene kits to returning individuals/Families Provision of financial assistance package to returning residents Coordination Activities with key agencies and the private sector Empowerment and Reaffirmation of Parental Abilities (ERPAT)
Formulation/Crafting of Local Jamindan, Capiz Ordinance against discrimination for returning residents affected of the COVID-19 situation
(1)
1,000,000.00
800,000.00
100,000.00
150,000.00
50,000.00
100,000.00
50,000.00
2,500,000.00
400,000.00
500,000.00
2021 30,000.00
1,000,000.00
100,000.00
150,000.00
50,000.00
100,000.00
2,500,000.00
400,000.00
500,000.00
2022
Annual Breakdown of Funding Requirements
A N N E X A • L I S T O F P R O G R A M S , P R O J E C T S A N D AC T I V I T I E S P E R K E Y R E S U LT A R E A P E R AG E N C Y / O F F I C E
Beyond
Funding Source
MO, MSWDO
MO, MHO
MO, MSWDO
SB
Implementing Agency
(6)
GFPS, LGUMaayon
OSCA/MSWD OSCA/MSWDO, O, LGULGU-Maayon Maayon LGU-Maayon LGU-Maayon
LGU-Maayon LGU-Maayon
PDAO/DSWD, PDAO/DSWD, LGU-Maayon LGU-Maayon
GFPS, LGUMaayon
LCPC, LGU- LCPC, LGUMaayon Maayon LGU-Maayon LGU-Maayon
TESDA/DICT/ TESDA/DICT/ LGU-Maayon LGU-Maayon
LGULGU-Maayon/ Maayon/DSW DSWD D
LGU-Maayon LGU-Maayon
LGU-Maayon/ LGU-Maayon/ PNP/RHU/BF PNP/RHU/BFP P
LGU-Maayon LGU-Maayon
LGU-Maayon LGU-Maayon
LGU-Maayon LGU-Maayon
LGUMO Jamindan LGU-Maayon LGU-Maayon
NGA
NGA, LGUJamindan
DSWD
LGUJamindan
(5)
Regular Program
Regular Program
Regular Program
Regular Program
As the need arises
2020
Jan.-Dec. 2021
2021-2022
2021-2022
2021-2022
1st Qtr. 2021
Timeline/ Implementation Period
(7)
60
Priority Projects/Activities
Mambusao, Capiz
Mambusao, Capiz
All Forty-Two (42) Barangays of Panay All Forty-Two (42) Barangays of Panay All Forty-Two (42) Barangays of Panay
All Forty-Two (42) Barangays of Panay
All Forty-Two (42) Barangays of Panay
Provision of Aid to Individual in Crisis Situation (AICS)
Cash for Work
Expansion of PhiHealth beneficiaries Health personnel complementation Capital assistance to displaced OFWs and LSIs
Acquisition of health emergency equipment, mobility, medicines and supplies
Integrated Shelter Development Program for Resettled communities
2,500,000.00
5,000,000.00
7,000,000.00
2,500,000.00
750,000.00
5,000,000.00
1,750,000.00
2,750,000.00
820,000.00
800,000.00
5,500,000.00
3,500,000.00
2,460,000.00
2,400,000.00
16,500,000.00
200,000.00
100,000.00
500,000.00
1,000,000.00
1,000,000.00
7,000,000.00
2,500,000.00
2,500,000.00
2,000,000.00
1,750,000.00
820,000.00
800,000.00
5,500,000.00
400,000.00
200,000.00
500,000.00
1,000,000.00
1,000,000.00
B A L I K P R O B I N S YA , B AG O N G PAG - A S A P R O G R A M • W E S T E R N V I S AYA S R E G I O N A L AC T I O N P L A N
Mambusao, Capiz
1,000,000.00
Establish Botika ng Bayan Program Maayon, Capiz
Conduct of Livelihood Skills Training Program
500,000.00
Maayon, Capiz
1,500,000.00
Ambulance Service Free of Charge Maayon, Capiz (Indigent Families)
Conduct Medical and Dental Mission (Semi- Annual)
3,000,000.00
Maayon, Capiz
Provision of Medical Facilities in the Brgys. & RHUs
3,000,000.00
2,000,000.00
2,000,000.00
Maayon, Capiz
Maayon, Capiz
100,000.00
100,000.00
Maayon, Capiz
100,000.00
100,000.00
Maayon, Capiz
820,000.00
800,000.00
5,500,000.00
400,000.00
200,000.00
500,000.00
1,000,000.00
1,000,000.00
350,000.00
350,000.00
50,000.00
2022 100,000.00
Maayon, Capiz
50,000.00
2021 100,000.00
700,000.00
1,500,000.00
50,000.00
2020 100,000.00
Annual Breakdown of Funding Requirements
700,000.00
1,500,000.00
Maayon, Capiz
(4)
Brgy. Tuburan, Maayon, Capiz
150,000.00
Maayon, Capiz
Total Funding Requirement
(3)
300,000.00
Location/Site
Maayon, Capiz
(2)
Expansion of Philhealth Coverage
Reactivate or re-organize Brgy. Nutrition Scholars WASH Purchase additional toilet bowls (150 toilet bowls) Provision of Ambulance in the Upland Areas
Emergency Shelter Assistance (P10,000.00/H.H.) As the need arises Creating set of validators in assessment and situational damage report Construction of: a.) 38 units Jetmatic Pumps in 23 Barangays with insufficient water per IWASH Plan Service Delivery: Establish and functionalize satellite birthing facility in Brgy. Tuburan Establish and functionalize Animal Bite Teatment Facility
(1)
Beyond
Funding Source
Implementing Agency
(6)
Timeline/ Implementation Period
(7)
LGU Panay, National Government
LGU Panay, National Government LGU Panay
LGU Panay
LGUMambusao/ DSWD LGUMambusao/ DSWD LGU Panay
LGU Panay, DOLE, NHA, DSWD
LGU Panay
LGU Panay, DOLE
LGU Panay, PhilHealth LGU Panay
2021
2020-2021
2020-2021
2021
2020-2021
DSWD/MSWDO 2020-2022
DSWD/MSWDO 2020-2022
61
Regular Program
Regular Program
Regular Program
TESDA/DOLE/ TESDA/DOLE/L 2020-2022 LGUGU-Mambusao Mambusao
LGULGUMaayon/DOH Maayon/DOH
LGULGUMaayon/DOH Maayon/DOH
LGULGUMaayon/DOH Maayon/DOH
LGULGUMaayon/DOH Maayon/DOH
LGULGUMaayon/DOH Maayon/DOH
LGULGUMaayon/DOH Maayon/DOH
LGU-Maayon LGU-Maayon
LGU-Maayon LGU-Maayon
LGULGUMaayon/DOH Maayon/DOH
LGULGUMaayon/DOH Maayon/DOH
LGU-Maayon LGU-Maayon
LGULGURegular Program Maayon/DSW Maayon/DSWD D LGU-Maayon LGU-Maayon
(5)
Poblacion, Pilar, Capiz
Dulangan, Pilar, Capiz
Burgos St. Poblacion, Pilar, Capiz
Concreting Municipal Road at Calle 13, (70 meters)
Concreting of Road
Concreting of Road (65meters)
650,000.00
2,500,000.00
700,000.00
150,000.00
120,000.00
24 Barangays of Pilar
Poblacion, Pilar, Capiz
120,000.00
Coastal Barangays of Pilar
Rehabilitation of Health Center
Conduct skills training for male/female on fishery Program Organized marginalized male and female members of the Family with no acccess to alternative livelihood opportunities on agriculture Programs
160,000.00
200,000.00
Panitan, Capiz
24 Barangays of Pilar
100,000.00
Panitan, Capiz
2,000,000.00 400,000.00
1,300,000.00
Panitan, Capiz
Assistance in Crisis Situation (AICS) Care giving training for member of the PWD Promote awareness of laws, benefits and protection for the PWDs and elders Swab Testing Conduct social preparation,and provide livelihood project for women Asses and Identify the probable interested wowen to join the skills training /Coordinate with TESDA & DOLE TO conduct skills training
Panitan, Capiz 24 Barangays of Pilar
1,700,000.00
100,000.00
100,000.00
Provision of medicines/supplies/ Panitan, Capiz laboratory examination to indigent women & their family, including health workers & other front liners
500,000.00
500,000.00
Provision of hygiene and sanitary Panitan, Capiz packs in relief packages for women Conduct of Care giving training for Panitan, Capiz family member of elder persons
650,000.00
2,500,000.00
700,000.00
150,000.00
40,000.00
40,000.00
80,000.00
2,000,000.00 200,000.00
200,000.00
100,000.00
1,300,000.00
1,700,000.00
100,000.00
100,000.00
Panitan, Capiz
100,000.00
2020
Provision of essential health care package to pre-school and public elementary school children
(4)
100,000.00
500,000.00
500,000.00
Total Funding Requirement
(3)
Provision of Supplementary Panitan, Capiz feeding to malnourished children & nutrition educ'n.to mothers
All Forty-Two (42) Barangays of Panay
Location/Site
Technology assistance to personnel in the education sector
(2)
All Forty-Two (42) Barangays of Panay
Priority Projects/Activities
Skills Development & Education Program
(1)
80,000.00
80,000.00
80,000.00
200,000.00
500,000.00
2021 500,000.00
2022
Annual Breakdown of Funding Requirements
A N N E X A • L I S T O F P R O G R A M S , P R O J E C T S A N D AC T I V I T I E S P E R K E Y R E S U LT A R E A P E R AG E N C Y / O F F I C E
Beyond
Funding Source
20% Development Fund 20% Development Fund 20% Development Fund 20% Development Fund
GAD
GAD
GAD
DOH GAD
LGU Panitan
LGU Panitan
LGU Panitan
LGU Panitan
LGU Panitan
LGU Panitan
LGU Panitan
LGU Panitan
LGU Panay, National Government LGU Panay
(5)
Timeline/ Implementation Period
(7)
LGU Pilar
LGU Pilar
LGU Pilar
LGU Pilar
LGU Pilar
LGU Pilar
LGU Pilar
LGU Panitan LGU Pilar
LGU Panitan
LGU Panitan
LGU Panitan
LGU Panitan
LGU Panitan
LGU Panitan
LGU Panitan
LGU Panitan
LGU Panay
2020
2020
2020
2020
2020&2021
2020&2021
2020&2021
2020&2021
2021
LGU Panay, 2021 TESDA, DSWD
Implementing Agency
(6)
62
2,000,000.00
Cursam St. Pilar, Capiz
San Blas, Pilar, Capiz
Casanayan, Pilar, Capiz
Sta. Fe, Pilar, Capiz
Tabun-Acan, Pilar, Capiz
Poblacion, Pilar, Capiz
Sitio Soledad, Sinamongan, Pilar, Capiz San Nicolas, Pilar, Capiz Dayhagan, Pilar, Capiz San Pedro, Pilar, Capiz Balogo, Pilar, Capiz San Antonio Pilar, Capiz Dayhagan, Pilar, Capiz Natividad, Pilar, Capiz Pilar, Capiz
Concreting of Road (150 meters)
Concreting of Farm to Market Road
Concreting of Farm to Market Road
Concreting of Farm to Market Road
Concreting of Farm to Market Road
Establishment of Transport Terminal
Concreting of Farm to Market Road Construction of access Road Construction of access Road Construction of access Road Construction of access Road Installation of Potable water Installation of Potable water Construction of access Road Health Promotion through Provision of Vitamins and Medicines Procurement of Disenfectants against Covid-19 Disease Safety and Protection of Frontliners through Provision of Personal Protective Equipment(PPE) Procurement of Covid-19 Testing kits (RRT/PCR and Covid-19 Antigen Testing Kits) Establishment of Resettlement Housing Establishment of Community Training Center for Technical Vocational Education 1,600,000.00
Pilar, Capiz
1,200,000.00
1,000,000.00
3,600,000.00
1,000,000.00
1,200,000.00
2,000,000.00
2,000,000.00 1,140,000.00
5,000,000.00
5,000,000.00
1,140,000.00
500,000.00
50,000,000.00
1,000,000.00
1,600,000.00
1,600,000.00
1,000,000.00
2021
1,200,000.00
500,000.00
2022
Annual Breakdown of Funding Requirements
B A L I K P R O B I N S YA , B AG O N G PAG - A S A P R O G R A M • W E S T E R N V I S AYA S R E G I O N A L AC T I O N P L A N
Extend DSWD’s Liveli hood Pres. Roxas, Capiz Assistance G ra nt (LAG ) to BP2 57 beneficia ries Procurement of additionaI Pres. Roxas, Capiz Business Process Outsourcing hardwa re for tra in ing at the Tech4Ed center for BP2 beneficiaries Technical/Vocational/Mobile Roxas City, Capiz Technical Training
Binuntucan PAID Center, Pontevedra, Capiz
50,000,000.00
1,600,000.00
Pilar, Capiz
Pontevedra, Capiz
1,000,000.00
10,000,000.00 10,000,000.00 10,000,000.00 10,000,000.00 5,809,665.70 6,105,287.30 10,000,000.00 1,400,000.00
Pilar, Capiz
10,000,000.00
1,000,000.00
100,000.00
100,000.00
1,000,000.00
100,000.00
2,000,000.00
2020 1,100,000.00
10,000,000.00 10,000,000.00 10,000,000.00 10,000,000.00 5,809,665.70 6,105,287.30 10,000,000.00 1,400,000.00
(4)
10,000,000.00
1,000,000.00
100,000.00
100,000.00
1,000,000.00
100,000.00
1,100,000.00
(3)
Concreting of Medicare Road (110 Poblacion, Pilar, Capiz meters)
(2) Total Funding Requirement
Priority Projects/Activities
Location/Site
(1)
Beyond
Funding Source
Mun. GAD
NHA
LGU Pilar
LGU Pilar
LGU Pilar
LGU Pilar LGU Pilar LGU Pilar
-
LGU Pilar
LGU Pilar
LGU Pilar
LGU Pilar
LGU Pilar
LGU Pilar
LGU Pilar
Implementing Agency
(6)
Local Government
ExternaI Source
Provincial Fund ExternaI Sou rce
2021
2021
2021-2022
2021
2020
2020
2020
2020 2020 2020
-
2020
2020
2020
2020
2020
2020
2020
CMO
Mayor's Office
01/01/2020 12/31/2020
2020-2022
63
Timeline/ Implementation Period
(7)
Mayor's Office 2020
Prov. GAD
National Fund TESDA
National Govt. Fund Municipal Fund
DBM
DBM
DBM
External External External External SALINTUBIG SALINTUBIG External DBM
20% Development Fund 20% Development Fund 20% Development Fund 20% Development Fund 20% Development Fund 20% Development Fund 20% Development Fund External
(5)
Health Development Program
Provision of Social Pension for Senior Citizen 60 and above Health
Senior Citizen Program
ALL MLGUs
Social Welfare Aid to Individual in Crisis Situation ALL MLGUs (AICS) d. Transitory Family Support Belison Package for identified BP2 benes of LGU
b. Transportation/Relocation Belison Assistance for identified BP2 benes of LGU c. Procurement of Lot for Belison Resettlement/Relocation Township
a. Provision and Identification of Safe Relocation Site/Construction of Housing Project
Relocation Sites and Housing Program
San Remigio
1,600,000.00 400,000.00
Tapaz, Capiz Tapaz, Capiz
SUB-TOTAL 4. PROVINCE OF ANTIQUE Housing
200,000.00
Tapaz, Capiz
Traditional-Non traditional livelihood training to women formed group Medical Services Program Medicare Para sa Masa program
211,500.00
720,000.00
1,050,000.00
360,000,000.00
360,000.00
1,050,000.00
360,000,000.00
2,000,000.00
2,000,000.00
108,321,550.00
800,000.00 400,000.00
200,000.00
50,000.00
200,000.00
2,000,000.00
360,000,000.00
50,000.00 250,000.00
500,000.00
1,000,000.00
178,174,953.00
800,000.00
432,000.00
1,692,000.00
2,160,000.00
2021
360,000.00
360,000,000.00
2,000,000.00
51,168,705.00
50,000.00
2022
Annual Breakdown of Funding Requirements
500,000.00
5,000,000.00
337,665,208.00
482,000.00
Sigma, Capiz
Transportation/Relocation Assistance
1,892,000.00
Sigma, Capiz
Sigma, Capiz
311,500.00 2,410,000.00
Sigma, Capiz
Provision of Quarantine Food & Accommodation
Provision of Family Food Packs and Emergency Kits Provision of Assistance for RTPCR Testing
300,000.00 2,000,000.00
300,000.00 2,000,000.00
Conduct Livelihood trainings thru Sapian, Capiz TESDA Initiating cash for works programs Sapian, Capiz
1,000,000.00
30,000,000.00
40,000.00
200,000.00
5,000,000.00
1,000,000.00
30,000,000.00
40,000.00
Roxas City, Capiz
2020 3,600,000.00
Sapian, Capiz
200,000.00
Roxas City, Capiz
(4)
Sapian, Capiz
5,000,000.00
Roxas City, Capiz
Total Funding Requirement
(3)
3,600,000.00
Location/Site
Roxas City, Capiz
(2)
Enhancement of VAWC desk
Priority Projects/Activities
Indigency and Universal Health Care Financing Program Health Development Program Purchase of Drugs and Medicines for Senior Citizens Skills Training Program - Rice by Product Processing, Packaging and Marketing Conduct of Training Seminar on Fish Handling, Value Addition and Strategies Installation of solar streetlight
(1)
A N N E X A • L I S T O F P R O G R A M S , P R O J E C T S A N D AC T I V I T I E S P E R K E Y R E S U LT A R E A P E R AG E N C Y / O F F I C E
Beyond
-
Funding Source
LGU/BRGY
LGU/PESO
LGU
LGU
CAO
CAO
CHO
CHO
Implementing Agency
(6)
DSWD
DSWD
Jan. - Dec. 2020 2021
May -Dec 2020, 2021-2022
May -Dec 2020, 2021-2022
May -Dec 2020, 2021-2022
Nov 2020-Dec 2020 Nov 2020-Dec 2020 Nov 2020-Dec 2020 Nov 2020-Dec 2020 May -Dec 2020
01/01/2020 12/31/2020
01/01/2020 12/31/2020
01/01/2020 12/31/2020 01/01/2020 12/31/2020
Timeline/ Implementation Period
(7)
LGU
MSWDO
MSWDO
MSWDO
2021
2020-2029
2021
2021
DENR/NHA/LG 2020-2022 U
MHO M.O./MSWDO
Office of the Mayor /MDRRMO Office of the Mayor /MDRRMO Office of the Mayor /MDRRMO GFPS
DSWD/MLGU MSWDO
LGU
DSWD
NHA
5%GAD GF
5% GAD
MLGU
MLGU
MLGU/DOH
MLGU/DSWD MSWDO
DOLE/DSWD
DOLE/DSWD
DSWD
Local Government (GAD) Local Government (GAD) DOE/NGAs
Local Government Local Government
(5)
64
1,800,000.00
Municipal Wide - Pandan
1,000,000.00
Anini-y
Belison Barbaza
750,000.00 100,000,000.00
(4)
815,465,000.00
200,000.00
400,000.00
200,000.00
200,000.00
1,800,000.00
100,000.00
500,000.00
30,000.00
2020 2,204,720.00
750,000.00 50,000,000.00
1,000,000.00
500,000.00
40,000.00 500,000.00
50,000,000.00 50,000,000.00 10,000,000.00
2,000,000.00
1,500,000.00 1,526,400.00
2,000,000.00
40,000.00
20,000.00
2021
50,000,000.00
500,000.00
40,000.00 500,000.00
10,000,000.00
50,000,000.00
2,000,000.00
2,000,000.00 1,526,400.00
40,000.00
2022
Annual Breakdown of Funding Requirements
B A L I K P R O B I N S YA , B AG O N G PAG - A S A P R O G R A M • W E S T E R N V I S AYA S R E G I O N A L AC T I O N P L A N
Cash for Work Program
1,815,465.00
280,000.00 1,000,000.00
San Remigio Anini-y
100,000,000.00 50,000,000.00 20,000,000.00
4,000,000.00
Barbaza
Barbaza Libertad Anini-y
3,000,000.00 3,052,800.00
400,000.00
200,000.00
2,000,000.00
Barbaza Anini-y
Municipal Wide - Pandan
Municipal Wide - Pandan
g. Livelihood Settlement grants for Municipal Wide - Pandan identified BP2 benes of LGU
b. SMEs, Women's Associations, Balik Probinsya recipient and other c. Job Opportunites for Income and Generating Activities d. Swine Dispersal e. Provision of Fishing Gears, Nets and Accessories f. Livelihood/ Entrepreneurship Development Programs/Projects
Nutrition Program Provision of Supplemental Feeding Program, Multivitamins Employment Sustainable Livelihood Assistance Program for: a. Farmers and Fisherfolks in the form of livelihood opportunities
Operation and maintenance of border and checkpoints
Activity in support to CoViD19 Pandemic Oil, fuel lubricants expenses
CoViD19 Mitigation, Protection and Municipal Wide - Pandan Response Program
Emerging & re-emerging Diseases Mitigation, Protection and Response Program
100,000.00
100,000.00
Municipal Wide - Pandan
San Remigio
500,000.00
Municipal Wide - Pandan
f. Provision of Mental Health and Psychosocial Support Activity
50,000.00
2,204,720.00
Total Funding Requirement
(3)
Municipal Wide - Pandan
Location/Site
b. Personal protective safety gears/ device of MDRRMC, PERRT members c. Procurement of Medicines/Multivitamins d. Procurement of PPEs and other Medical Supplies e. Purchase of ambulance
(2)
Municipal Wide - Pandan
Priority Projects/Activities
a. Drugs and medicines expenses
(1)
Beyond
Funding Source
Implementing Agency
(6)
Office of the LCE
DOH/MHO
DSWD DOLE
2020-2022
MAO/MLGU
DOLE/PESO MAO/MLGU
MSWDO DOLE
2021 2021-2022
2020-2022
MAO, MSWDO 2021-2022 MLGU/PLGU 2021 MSWDO
BFAR, DA
65
April 2020 December 2020
April 2020 December 2020
January 2021December 2021
April 2020 December 2020 April 2020 December 2020 April 2020 December 2020
January 2020December 2021
April 2020 December 2020
Timeline/ Implementation Period
(7)
MHO, MSWDO 2021-2022 MSWDO 2021-2022
LGU-20% IRA Office of the LCE
BFAR
DOLE/LGU DA
DA, DSWD MLGU/PLGU DSWD
BFAR, DA
DOH, DSWD DSWD
Bayanihan Office of the Grant to LCE Cities & Municipalities
Bayanihan Office of the Grant to LCE Cities & Municipalities
LGU-20% IRA, General Fund
DOH/LGU
LGU- General Office of the Fund LCE
LGU-20% IRA MHO
LGU-20% IRA MHO
LGU-70% P/MDRRMO MDRRM Fund
Bayanihan MHO Grant to Cities & Municipalities
(5)
Location/Site
SUB-TOTAL MEDIUM TERM 1. BACOLOD CITY Skills Trainings
Implementation of Health Emergency Preparedness Response and Recovery Plan (HEPRRP) Construction of Small Water Impounding Project (SWIP)
Investment in flexible learning delivery system and provision of skills training Manpower Development and Employment Generation Program
Livelihood Assistant Grant to Displaced Individuals Provision of Skills Training Improvmeent of Medical Equipment Improve access to comprehensive quality health services
Bacolod City
Lambunao, Iloilo
Anilao, Iloilo
Anilao, Iloilo
Poblacion, Barotac Nuevo
Poblacion, Barotac Nuevo
Oton Oton RHU
Oton
Oton
5,000,000.00
18,135,000.00
13,000,000.00
900,000.00
900,000.00
400,000.00
500,000.00
300,000.00 1,000,000.00
735,000.00
400,000.00
18,050,000.00
300,000.00
Tayhawan, Agcawilan, Silakat Nonok, Sta. Cruz Bigaa
6,000,000.00
450,000.00
All Barangays
Improvement/Upgrading of Existing COVID Barangay Isolation Facility Hiring and training of new additional health and frontline service provider personnel Livelihood training for machine sewing & provision of start-up capital (kit) Livelihood training for Carpentry works with start-up tools and materials SUB-TOTAL 6. PROVINCE OF ILOILO Emergency Employment Program
100,000.00
-
8,050,000.00
7,000,000.00
300,000.00
300,000.00
200,000.00
250,000.00
-
5,000,000.00
9,485,000.00
6,000,000.00
300,000.00
300,000.00
200,000.00
250,000.00
300,000.00 1,000,000.00
735,000.00
400,000.00
12,025,000.00
150,000.00
225,000.00
5,000,000.00
6,000,000.00
50,000.00
300,000.00
643,873,900.00
2021 5,000,000.00 2,962,500.00 125,000.00 100,000,000.00
600,000.00
1,182,349,720.00
100,000.00
100,000.00
50,000.00
2020
600,000.00
300,000.00
300,000.00
6,025,000.00
150,000.00
225,000.00
5,000,000.00
50,000.00
300,000.00
300,000.00
582,053,900.00
2,962,500.00 125,000.00 100,000,000.00
2022
Annual Breakdown of Funding Requirements
300,000.00
Poblacion
Poblacion
Stress Management
(4)
600,000.00
872,947,985.00
10,000,000.00
Numancia, Aklan Numancia, Aklan Numancia, Aklan
SUB-TOTAL 5. PROVINCE OF AKLAN Provision of Food Stuff Conduct of Counselling Provision of Financial Assistance
100,000.00
100,000.00
5,000,000.00 5,925,000.00 300,000.00 200,000,000.00
Total Funding Requirement
(3)
Poblacion
Municipal Wide - Pandan
Municipal Wide - Pandan
Libertad Anini-y San Remigio Pandan
(2)
Subsidy to the Bureau of Fire
Human Resource Development Program Subsidy to the Philippine National Police
Priority Projects/Activities Cash for Work Program
(1)
A N N E X A • L I S T O F P R O G R A M S , P R O J E C T S A N D AC T I V I T I E S P E R K E Y R E S U LT A R E A P E R AG E N C Y / O F F I C E
Beyond
Funding Source DOLE MSWDO DOLE/LGU DOLE
Implementing Agency
(6)
Jan - Dec 2021
March-April, 2023
2nd Qtr. 2021/2022
Jan-Dec. 2021/2022
PESO
MEO/MAO
National, Province, 20% DF
LGU
LGU
LGU
TESDA/LEIPO DOH/MHO
Jan - Dec 2021
2020-2022
2020-2022
2020-2022
2 Years
2 Years
Jan - Sept 2021 Jan - June 2021
DSWD/MSWDO Jan - Sept 2021
DOLE/PESO
DTI/ TESDA/ LGU
DTI/ TESDA/ LGU
DOH/LGU
LGU/DOH
TESDA
yearly as needed yearly
April 2020 December 2020
April 2020 December 2020
2020-2022 2021-2022
2021
Timeline/ Implementation Period
(7)
Jan-Dec. 2021/2022 DPWH/ DSWD/ March-Dec., 2021 LGU Tangalan
DOH/DA
MSWDO MSWDO MSWDO
LGU/DOH
LGU
LGU
LGU
TESDA DOH
DSWD
DOLE
DTI/ TESDA
DTI/ TESDA
DOH
DPWH
DOH
LGU
LGU
LGU-General Office of the Fund LCE
LGU-General Office of the Fund LCE
DOLE DSWD DOLE/LGU DOLE
(5)
66
Priority Projects/Activities
Location/Site
2,250,000.00
Maayon, Capiz 600,000.00 1,800,000.00
5,000,000.00
Jamindan, Capiz
Maayon, Capiz Maayon, Capiz
500,000.00 1,000,000.00
Poblacion, Jamindan, Capiz Jamindan, Capiz
750,000.00 200,000.00 600,000.00
200,000.00 600,000.00
750,000.00
5,000,000.00
500,000.00 1,000,000.00
8,000,000.00
1,000,000.00
6,000,000.00
1,500,000.00
1,200,000.00
2,000,000.00
2,000,000.00
1,000,000.00
5,000,000.00
B A L I K P R O B I N S YA , B AG O N G PAG - A S A P R O G R A M • W E S T E R N V I S AYA S R E G I O N A L AC T I O N P L A N
>Hiring of medical officer on a contractual basis >Hiring of additional PHN
16,800,000.00
6,000,000.00
Dumalag, Capiz
Ivisan, Capiz
1,500,000.00
Dumalag, Capiz
2,000,000.00
1,200,000.00
Dumalag, Capiz
Ivisan, Capiz
2,000,000.00
Dumalag, Capiz
2,000,000.00
Purchase of Garbage Truck for Collection of Municipal/Barangay Waste Purchase of Barangay Emergency Service Vehicle Procurement of Rescue/Mass Transport Ambulance Purchase of Lot for LGU Development
Establishment and Operation of Local Radio Station for learning and information Construction of Municipal Temporary Treatment and Monitoring Facility (TTMF) Upskilling of BP2 beneficiaries through skills training conducted Reintegration of undergraduate returning individuals to formal school and providing them with scholarship grants Provision of Livelihood support through Sustainable Livelihood Program of the DSWD HUMAN RESOURCE FOR HEALTH: >Hiring of additional RHMs (3)
500,000.00
6,000,000.00
-
6,000,000.00
5,000,000.00
500,000.00
6,000,000.00
6,000,000.00
10,100,000.00
-
2021 100,000.00
10,200,000.00
2020
200,000.00 600,000.00
750,000.00
8,800,000.00
1,000,000.00
1,000,000.00
-
100,000.00
2022 100,000.00
Annual Breakdown of Funding Requirements
5,000,000.00
(4)
5,000,000.00
200,000.00
Total Funding Requirement
(3)
2,000,000.00
Dao, Capiz
Cuartero, Capiz, All Barangays
Cuartero, Capiz, Organizations/ Groups Cuartero, Capiz
22 Barangays of Nueva Valencia, Guimaras
Bacolod City
(2)
Upgrading of Local Health Dumalag, Capiz Capabilities (Health Personnel and Frontliners)
Partner witn national agencies for possible provision of employment programs Provision of TESDA Skills Training
Additional Health Services
Put up a Job Fair wherein qualifications and skills have been crossmatched Construct Housing facilities that will temporarily serve as living quarters for those for BP2 beneficiaries SUB-TOTAL 2. PROVINCE OF GUIMARAS Provision of agricultural insurance & fishery insurance to small farmers and fisherfolks SUB-TOTAL 3. PROVINCE OF CAPIZ Partnership with government and private agencies for Skills Training
(1)
Beyond
Funding Source
PICC
CMO, BHA
PESO
Implementing Agency
(6)
2021-beyond
2021
June 2021, June 2022
Timeline/ Implementation Period
(7)
MSWDO
MO, PESO MO
MEO
LGU-Ivisan
LGU-Maayon LGU-Maayon LGU-Maayon LGU-Maayon
67
Jan.-Dec. 2021
Jan.-Dec. 2021 Jan.-Dec. 2021
FEB-NOV
starting 2021 onwards
LGU - Dumalag Jan – Dec 2021
LGU - Dumalag Jan – Dec 2021
LGU - Dumalag Jan – Dec 2021
LGU - Dumalag Jan – Dec 2021
LGU - Dumalag Jan – Dec 2021 In partnership with concerned agencies
TESDA, MO
LGU - Cuartero
LGU-Maayon LGU-Maayon
DSWD
LGUJamindan, LGUJamindan
NAT. GOVT
LGU-Ivisan
Local Dumalag Local Dumalag Local Dumalag
Local Dumalag
DOH
LGU Cuartero/ DOH
LGU Cuartero LGU - Cuartero /TESDA
PICC
DOLE, LGU
(5)
Mambusao, Capiz
Mambusao, Capiz
All Forty-Two (42) Barangays of Panay Bago Grande, Tanza Norte
Sustainable Livelihood Program
KALAHI-CIDSS
Expansion of PhiHealth beneficiaries Establishment of additional Barangay Centers Upgrading of Health Facilities (laboratory & Equipment)
DepEd Panay District
Social Welfare
Development of Resettlement/Relocation Township (Construction of Houses)
Transitory Shelter Assistance for identified BP2 benes of LGU
Level II Water System SUB-TOTAL 4. PROVINCE OF ANTIQUE Housing Socialized Housing Project
Level II Water System
Construction of Barangay Birthing Clinic Construction of additional facilities in the birthing clinic Construction of Water Tank
60,000,000.00 3,750,000.00 50,000,000.00
Belsion Belison
50,000,000.00
1,500,000.00 203,010,000.00
5,000,000.00
Municipal Wide - Hamtic
Libertad
Brgy. Katipunan, Tapaz, Capiz Brgy. Lahug, Tapaz, Capiz
Brgy. Tacayan, Tapaz, Capiz 1,000,000.00
33,270,000.00
2,000,000.00
20,000,000.00
1,875,000.00 45,000,000.00
20,000,000.00
20,000,000.00
1,500,000.00 127,620,000.00
5,000,000.00
1,000,000.00
500,000.00
500,000.00
1,500,000.00
4,000,000.00
8,000,000.00
Brgy. Katipunan, Capiz
20,000,000.00
20,000,000.00
2,500,000.00 20,000,000.00 10,000,000.00
2,500,000.00
500,000.00
2,500,000.00
1,000,000.00
3,000,000.00
5,000,000.00
600,000.00
10,050,000.00
1,020,000.00
400,000.00 1,100,000.00
2021 200,000.00
1,875,000.00 3,000,000.00
20,000,000.00
30,000,000.00
42,120,000.00
4,000,000.00
1,000,000.00
400,000.00
2,000,000.00
1,000,000.00
3,000,000.00
5,000,000.00
600,000.00
10,050,000.00
1,020,000.00
400,000.00 1,100,000.00
2022 200,000.00
Annual Breakdown of Funding Requirements
20,000,000.00 10,000,000.00
6,000,000.00
600,000.00
2,500,000.00
7,000,000.00 1,500,000.00
4,000,000.00
6,000,000.00
3,000,000.00
5,750,000.00
9,000,000.00
600,000.00
15,750,000.00
10,050,000.00
1,020,000.00
400,000.00 1,100,000.00
2020 200,000.00
(4)
1,800,000.00
30,150,000.00
3,060,000.00
1,200,000.00 3,300,000.00
600,000.00
Total Funding Requirement
(3)
Brgy. Tacayan, Tapaz, Capiz 1,500,000.00
Labor/employement linkage All skilled laborers/workers assistance for local skilled workers within the Municipality of Panay COVID-19 Vaccine Panitan, Capiz Improvement of health facilities, Sapian, Capiz birthing clinics Construction of Commercial Poblacion, Bilao, Sapian, establishments Capiz Provision of COVID Vaccine Sigma, Capiz
Technology assistance to personnel in the education sector
Establishment and Maintenance of Pob. Ilaya Crisis Center Establishment of e-Learning Pob. Ilaya, Agbalo Facilities for students
Municipal Government of Panay (RHU)
Maayon, Capiz Mambusao, Capiz
Location/Site
>Hiring of full time MNAO Organization of Identified Beneficiaries
(2)
Maayon, Capiz
Priority Projects/Activities
>Hiring of IT personnel
(1)
A N N E X A • L I S T O F P R O G R A M S , P R O J E C T S A N D AC T I V I T I E S P E R K E Y R E S U LT A R E A P E R AG E N C Y / O F F I C E
Beyond
Funding Source
Implementing Agency
(6)
Timeline/ Implementation Period
(7)
LGU, PhilHealth LGU Panay
LGU Panay
LGU Panay
LGU Panay, DepEd
LGU Panay
MEO
MEO
MEO
MEO
Office of the Mayor /MHO MEO
National NHA Shelter Agency/PLGU / MLGU TESDA, DTI TESDA, DTI, LGU DSWD MSWDO LGU LGU
DILG
DILG
DILG
DOH
DOH
DOH
DOH LGU Panitan DOH/DILG/DP DPWH/LGU WH
LGU Panay
LGU Panay, National Government LGU Panay
LGU Panay
2021-2022 2021-2023
3 yrs
2021-2025
2021
2021
2021
2021
2021
Jan. 2021-Dec 2022 Jan. 2021-Dec 2022 2021-2022
2022-2024
2022-2024
2022-2024
2022-2024
2022-2024
2022-2024
2022-2024
DSWD/MSWDO 2020-2022
DSWD/MSWDO 2020-2022
LGU, National LGU Panay, Government DOH
LGU Panay
LGUMambusao/ DSWD LGUMambusao/ DSWD LGU Panay
TESDA/DOLE/ TESDA/DOLE/L 2020-2022 LGUGU-Mambusao Mambusao
LGU-Maayon LGU-Maayon
(5)
68
Priority Projects/Activities
Location/Site
100,000.00
150,000.00 225,000.00
Procurement of Garbage bins Zarraga, Iloilo Purchase of PPE, Facemask, Zarraga, Iloilo Gloves, Alcohol, etc and augmentation supplies for COVID19 Mitigation
50,000.00 75,000.00
30,000.00 50,000.00
30,000.00
60,000.00
400,000.00
30,000.00
800,000.00
50,000.00 75,000.00
30,000.00 50,000.00
30,000.00
60,000.00
400,000.00
30,000.00
800,000.00
100,000.00
68,000,000.00
B A L I K P R O B I N S YA , B AG O N G PAG - A S A P R O G R A M • W E S T E R N V I S AYA S R E G I O N A L AC T I O N P L A N
90,000.00 150,000.00
Zarraga, Iloilo 90,000.00
180,000.00
Zarraga, Iloilo
Zarraga, Iloilo Zarraga, Iloilo
90,000.00 1,200,000.00
Zarraga, Iloilo
2,400,000.00
200,000.00
85,900,000.00
Zarraga, Iloilo
Poblacion, Barotac Nuevo
30,000,000.00
30,000,000.00
3,000,000.00
5,000,000.00
4,000,000.00
1,500,000.00
Zarraga, Iloilo
Enhancement of Food Handling and Food Safety Implementation of Limpyo GCQ Disinfection of Quarantine facilities, market, schools, offices
SUB-TOTAL 6. PROVINCE OF ILOILO Promotion of community-driven housing projects Purchase of supplies for COVID19 and for provision of other health services Purchase of Nutrition Food Supplies Purchase of Supplies, PPEs, Drugs and Medicines Purchase of Emergency Equipment
1,500,000.00 23,000,000.00
1,500,000.00
3,000,000.00
8,400,000.00
10,000,000.00
Numancia, Aklan
Ibao, Bugasongan, Carugdog, Silakat Nonok, Tayhawan, Sta. Ctuz, Sta. Cruz Biga-a (Lezo, Aklan) Poblacion, Lezo, Aklan
8,500,000.00
Numancia, Aklan
Numancia, Aklan
1,500,000.00 23,000,000.00
Numancia, Aklan
100,925,000.00
190,800,000.00
23,050,000.00
12,000,000.00
500,000.00 1,000,000.00
21,000,000.00
500,000.00
500,000.00
500,000.00
50,000.00
2021
Municipal Wide - Tibiao
500,000.00
50,000.00
2020
50,000.00 75,000.00
30,000.00 50,000.00
30,000.00
60,000.00
400,000.00
30,000.00
800,000.00
19,400,000.00
8,400,000.00
5,000,000.00
4,500,000.00
1,500,000.00
66,425,000.00
9,000,000.00
1,500,000.00
500,000.00
500,000.00
50,000.00
2022
Annual Breakdown of Funding Requirements
3,000,000.00
Pandan
(4)
Barbaza
2,400,000.00
150,000.00
Total Funding Requirement
(3)
Anini-y
San Remigio
(2)
Procurement of various health Poblacion, Lezo, Aklan facility equipment (i.e. medical lab. Equip’t., x-ray, etc.) Identification and establishment of Agcawilan/Tayhawan, Lezo, Housing Project site Aklan
Construction/ improvement of Rural Health Unit with amenities
Establishment / Construction of Barangay Isolation Facilities (17 Barangays) Hiring and Training of Health Personnels Upgrading/improvement of Day Care Centers with amenities
Scholarship Program for the poor and indigent students and deserving children of Sakada's. Health Provision of quality health care services through the upgrading of barangay health facilities. SUB-TOTAL 5. PROVINCE OF AKLAN Purchase of Medicines and Medical Supplies Vaccination Program
Educational Assistance for poor but deserving students
Scholarship Program
(1)
Beyond
-
Funding Source
Implementing Agency
(6)
LGU LGU
LGU LGU
LGU
LGU/ Prov./NGA LGU
LGU
LGU/ Prov./NGA
LGU
MHO
MHO
MHO
MHO
MENRO MDRRMO
MENRO MENRO
LGU MHO
DOH/ LGU
DOH/ LGU
DSWD/ LGU
DOH/LGU
DOH / PGO / MHO DOH/DILG
MHO
MLGU/DOH
LGU
NHA/ DHSUD NHA
DOH
DOH
DSWD
NGA
NGA
NGA
LGU
DOH
LGU
National/LGU LGU
National/LGU LGU
National/LGU LGU
(5)
69
2020-2022 2020-2022
2020-2022 2020-2022
2020-2022
2020-2022
2020-2022
2020-2022
2020-2022
2 Years
Jan-Dec. 2022; Jan-Dec., 2023
4th Qtr 2022
3rd Qtr 2022
Jan-Dec. 2022
3rdQ 2021-2022
2021-2022
Jan 2021- Nov 2022 3rd Quarter 2021
2021-2022
2020-2022
2020-2022
Timeline/ Implementation Period
(7)
Dao, Capiz
Provision of TESDA Skills Training
Dumalag, Capiz
Dumalag, Capiz
Procurement of Equipment and Supplies to Compliment Functionality of Polyclinic
Hiring of Additional Physician and Rural Inspector
Provision of Housing Programs Dao, Capiz Provision of Scholarship Programs Dao, Capiz Construction of three level Dumalag, Capiz Polyclinic
Cuartero, Capiz, MHO
2,000,000.00
600,000.00
11,000,000.00
30,000,000.00 10,000,000.00 40,000,000.00
1,000,000.00
2,000,000.00
10,000,000.00
-
210,000,000.00
30,000,000.00
220,000,000.00
Cuartero, Capiz, Brgy Agdahon Cuartero, Capiz, All Barangays Cuartero, Capiz, Poblacion
10,000,000.00
20,000,000.00
100,000,000.00 100,000,000.00
4,000,000.00 10,615,000.00
Bacolod City
-
1,000,000.00 2,900,000.00
100,000,000.00 100,000,000.00
6,000,000.00 11,475,000.00
2,100,000.00
1,000,000.00
20,000.00
60,000.00
200,000.00 10,000.00 800,000.00
2021
Bacolod City Bacolod City
-
20,000.00
20,000.00
200,000.00 10,000.00 500,000.00
2020
20,000.00
20,000.00
600,000.00
11,000,000.00
30,000,000.00 10,000,000.00 40,000,000.00
1,000,000.00
2,000,000.00
10,000,000.00
2,000,000.00
30,000,000.00
10,000,000.00
10,000,000.00
4,000,000.00 11,175,000.00
2,900,000.00
1,000,000.00
200,000.00 10,000.00 1,500,000.00
2022
Annual Breakdown of Funding Requirements
14,000,000.00 33,265,000.00
7,900,000.00
Sibacungan, Poblacion, Lambunao, Iloilo
(4)
Sibacungan, Lambunao, Iloilo
3,000,000.00
3 barangays, Anilao, Iloilo
Increase in manpower for health
Improvement of the Main Health Center
Livelihood Program
Improvement of Sanitary Landfill SUB-TOTAL LONG TERM 1. BACOLOD CITY Land bankning/Lot acquisition Construction of Disaster Resilient Housing Facility Offer sccholarship programs, educational assistance SUB-TOTAL 2. PROVINCE OF CAPIZ Socialized Housing Project
Rehabilitation/ Construction of Health Facilities Construction & Installation of Sewerage Treatment Plant (STP)
60,000.00 600,000.00 30,000.00 2,800,000.00
Zarraga, Iloilo Zarraga, Iloilo Anilao, Iloilo
100,000.00
Total Funding Requirement
(3)
Zarraga, Iloilo
Location/Site
Counseling and Psychological support sessions Training Program Organization of OFWs Municipal Livelihood Support Program (Women, Senior Citizen, Disabled and other CSOs)
(2)
Zarraga, Iloilo
Priority Projects/Activities
Purchase of water containers, trash bin, Folding beds with bed mattresses and hygiene kits.
(1)
A N N E X A • L I S T O F P R O G R A M S , P R O J E C T S A N D AC T I V I T I E S P E R K E Y R E S U LT A R E A P E R AG E N C Y / O F F I C E
Beyond
LGU
LGU
Funding Source
MSWDO
MDRRMO
Implementing Agency
(6)
2020-2022
2020-2022
Timeline/ Implementation Period
(7)
Local Dumalag
DOH/HFEP
DOH/HFEP
LGU Cuartero/DTI LGU Cuartero/DO H LGU Cuartero/DO H
NHA
Dep Ed, CHED,
Borrowings AIP, NHA
General Fund,20% Dev't Fund, National, Others GF
LGU/DOH
LGU Dumalag
NHA CHED and Other LGU- Agencies Dumalag In partnershipwit h concerned agencies LGU Dumalag In partnership with concerned agencies
TESDA, MO
LGU Cuartero
LGU Cuartero LGU Cuartero LGU Cuartero
CMO, BHA CMO, BHA, CEO PESO, DSSD
MENRO
MENRO/LGU
LGU/DOH
Jan – Dec 2022 and beyond
Jan – Dec 2022 and beyond
2021-beyond 2021-beyond Jan – Dec 2022 and beyond
2021-beyond
Feb 2021 - Dec 2023 June 2021continuing
2020-2022
2020-2022
2020-2022
NGA/ Prov'l PESO 2020-2022 LGU PESO 2020-2022 LGU/DSWD/DALGU/DSWD/DA 2020-2022
(5)
70
Dumalag, Capiz
Dumalag, Capiz
Expansion of Health Facilities and Services
Maintenance of Peace and Order and Security
Mambusao, Capiz
20,000.00
11,000,000.00
-
20,000.00
11,000,000.00
1,000,000.00
1,000,000.00
1,000,000.00
1,500,000.00
1,000,000.00
1,500,000.00
B A L I K P R O B I N S YA , B AG O N G PAG - A S A P R O G R A M • W E S T E R N V I S AYA S R E G I O N A L AC T I O N P L A N
60,000.00
2,000,000.00 33,000,000.00
Mambusao, Capiz
Mambusao, Capiz
2,000,000.00
Mambusao, Capiz
Procurement of Fuel & oil for Rescue Vehicle, Ambulance & Transport Vehicle Improvement & Maintenance of Quarantine Facilities Provision of Capital/Employment/Tools & Facilities
2,000,000.00
Mambusao, Capiz
3,000,000.00
Mambusao, Capiz
Maintenance of Rescue Vehicle, Ambulance & Transport Vehicle
2,000,000.00
Mambusao, Capiz
Provision of food for LSI & Repatriate Procurement of Drugs
12,000,000.00
36,000,000.00 200,000.00
1,000,000.00
1,000,000.00
3,000,000.00
3,200,000.00
10,000,000.00
10,000,000.00
12,000,000.00
250,000,000.00
250,000,000.00
Mambusao, Capiz
Case Management of Returning Individual
500,000.00
500,000.00
4,000,000.00
2022 1,000,000.00
20,000.00
11,000,000.00
1,000,000.00
1,000,000.00
1,000,000.00
1,500,000.00
1,000,000.00
1,500,000.00
12,000,000.00
1,000,000.00
2,000,000.00
2021
6,000,000.00
2020
Annual Breakdown of Funding Requirements
2,000,000.00
(4)
6,000,000.00
500,000.00
500,000.00
4,000,000.00
1,000,000.00
Total Funding Requirement
(3)
Procurement of Hygeine Kit (Bath Soap, Laundry Soap, Alcohol, Tissue, Shampoo, Zonrox) for disinfection/contamination
Institutionalization of Tourism Ivisan, Capiz Office Construction of Barangay Health Jamindan, Capiz Stations Development of new housing and Jamindan, Capiz settlements Additional Birthing Clinic Facilities Maayon, Capiz to Cater Patients in Neighboring Municipalities Concreting of Access Road Going Brgy. Indayagan,Maayon, to Socialized Housing at Brgy Capiz Indayagan Land Development Maayon, Capiz
Dumalag, Capiz
Location/Site
Promotion of Alternative Energy Sources Program
(2)
Dumalag, Capiz
Priority Projects/Activities
Local Tourism Development and Promotion
(1)
Beyond
Funding Source
NHA, MO
MO, MEO
LGU-Ivisan
RHU/LGUMambusao
RHU/LGUMambusao RHU/LGUMambusao RHU/LGUMambusao
LGUMambusao
MSWDO
RHU/LGUMambusao LGUTESDA/DOLE/ Mambusao LGUMambusao
DOH
DOH
DOH
DOH
DOH
NHA, LGUMaayon RHU/LGUMambusao
2020-2022
2020-2022
71
2020 and beyond
2020 and beyond
Jan.-Dec. 2021
starting 2022 onward 2022 and beyond
LGU Jan – Dec 2022 Dumalag In and beyond partnership with concerned agencies
LGU Jan – Dec 2022 Dumalag In and beyond partnership with concerned agencies
LGU Jan – Dec 2022 Dumalag In and beyond partnership with concerned agencies
LGU-Maayon LGU-Maayon NHA, LGUMaayon DOH
Timeline/ Implementation Period
(7)
LGU Jan – Dec 2022 Dumalag In and beyond partnership with concerned agencies
Implementing Agency
(6)
LGULGUMaayon/DOH Maayon/DOH
NHA
NGA
LGU-Ivisan
PNP
Local Dumalag
DE
Tourism
(5)
Priority Projects/Activities
Location/Site
Poblacion, Barotac Nuevo
60,000.00
180,000.00 10,000,000.00
5,000,000.00 5,000,000.00
-
3,765,000.00 1,687,363,560.24
100,000.00 5,000.00
21,295,000.00 3,467,568,145.24
3,500,000.00
300,000.00 15,000.00
100,000.00
10,500,000.00
300,000.00
5,000,000.00
5,000,000.00
3,765,000.00 1,715,456,515.00
60,000.00
100,000.00 5,000.00
3,500,000.00
100,000.00
-
3,765,000.00 1,366,942,605.00
60,000.00
100,000.00 5,000.00
3,500,000.00
100,000.00
2,000,000.00 4,000,000.00
6,500,000.00
-
2,000,000.00
4,500,000.00
-
10,500,000.00
4,000,000.00
-
517,640,000.00
10,000,000.00
10,000,000.00
20,000,000.00
5,000,000.00
5,000,000.00 240,000,000.00 5,000,000.00
500,000.00
500,000.00
35,000,000.00
Poblacion, Numancia, Aklan
-
347,940,000.00
10,000,000.00
10,000,000.00
500,000.00
400,000.00
30,000,000.00
5,000,000.00
2022 20,000.00
8,500,000.00
Aids to Individual in Crisis Zarraga, Iloilo Situations (AICS) Employment Assistance Fund Zarraga, Iloilo On-line Job Facilitation and Zarraga, Iloilo Electronic Manpower and Skills Registry System Job Fair Zarraga, Iloilo Assistance to Indigent Individual, Anilao, Iloilo Families and Other Sectoral Groups - (Sustainable Livelihood Program) SUB-TOTAL KRA 3 TOTAL KEY RESULT AREA 4 INFRASTRUCTURE DEVELOPMENT SHORT TERM 1. BACOLOD CITY Improvement of roads Bacolod City
SUB-TOTAL 2. PROVINCE OF GUIMARAS
218,240,000.00 218,240,000.00
60,340,000.00
500,000.00
20,000.00
6,000,000.00
2021
Annual Breakdown of Funding Requirements
Numancia, Aklan
Municipal Wide - Tibiao
925,920,000.00
10,000,000.00
Poblacion, Sapian, Capiz
SUB-TOTAL 3. PROVINCE OF ANTIQUE Housing Program Establishment of socialized housing project in safe zones. SUB-TOTAL 4. PROVINCE OF AKLAN Upgrading of Barangay Health Stations Improvement of Municipal Health Facilities SUB-TOTAL 5. PROVINCE OF ILOILO Continuing provision of social service and employment programs
20,000,000.00
Bilao, Sapian, Capiz
Construction of Additional Housing Units Construction of Business Center
5,000,000.00 30,000,000.00
Sapian, Capiz
Municipal RHU
1,500,000.00
Municipal Government of Panay Pilar, Capiz Pilar, Capiz Bailan District Hospital 5,000,000.00 240,000,000.00 5,000,000.00
5,500,000.00
Linateran, Panay, Capiz
4,600,000.00
25,000,000.00
90,000,000.00
2020 20,000.00 6,000,000.00
(4)
17,000,000.00
60,000.00
Total Funding Requirement
(3)
Tico, Bago Grande, Tanza Norte Pob. Tabuc, Panay, Capiz
Mambusao, Capiz
(2)
Construction of farm to market roads
Community Monitoring and Reporting Establishment of Zonal Health Centers Establishment of Municipal Hospital and fully-equipped Laboratory Establishment of Municipal Technical Education and Skills Center Full operation of Public Employment Service Office Purchase of Lot for Housing Construct 500 Housing units Improvement of Health Service Facilities
(1)
A N N E X A • L I S T O F P R O G R A M S , P R O J E C T S A N D AC T I V I T I E S P E R K E Y R E S U LT A R E A P E R AG E N C Y / O F F I C E
Beyond
-
Funding Source
LGU
PESO PESO
MSWDO
LGU
DOH / DILG / DPWH DOH/LGU
NHA
DPWH/LGU
DPWH/LGU
DPWH/LGU
MHO
LGU Pilar LGU Pilar PHO
LGU Panay
LGU Panay, TESDA
LGU Panay
LGU Panay
MSWDO
Implementing Agency
(6)
CEO, DPWH
CEO
LGU PESO LGU/MSWDO LGU/MSWDO/ /DA/DTI DA/DTI
NGA/ Prov'l LGU
LGU
NGA
NGA
NHA
NGAs/DA/DIL G/DPWH
NGAs/DA/DIL G/DPWH NHA/DPWH
NHA Provincial Fund National Fund
0.20
LGU Panay
LGU Panay
LGU Panay
LGUMambusao LGU Panay
(5)
Jan - March 2021
2020-2022 2023
2020-2022 2020-2022
2020-2022
3 Years
2022
2021-2022
2021-2026
Jan. 2023-Dec 2026 Jan. 2023-Dec 2026
Jan. 2023-Dec 2026
2022
2022
2025-2034
2025-2027
2025-2034
2025-2030
2020-2022
Timeline/ Implementation Period
(7)
72
Priority Projects/Activities
Location/Site
Sapal, Cabungahan, Constancia, San Lorenzo Calaya, Napandong, Igang, Salvacion, San Antonio, Lucmayan, Nueva Valencia San Antonio, Igang, Lanipe, Nueva Valencia
Cabano, San Lorenzo
25,000,000.00 10,786,000.00 12,500,000.00
Dao,Capiz
Dao,Capiz
Dao,Capiz
12,500,000.00
1,500,000.00
5,000,000.00
4,000,000.00
4,000,000.00
18,144,077.00 12,000,000.00
10,000,000.00 400,744,077.00 12,000,000.00
2,500,000.00 3,000,000.00
500,000.00
2,500,000.00 6,500,000.00
1,000,000.00
7,000,000.00
4,286,000.00
10,000,000.00
5,000,000.00 168,000,000.00
2,500,000.00
300,000.00 2,000,000.00
2,300,000.00
500,000.00
200,000.00
1,200,000.00
1,000,000.00
100,000.00
50,000,000
1,000,000.00
100,000
300,000.00
12,000,000.00
50,000,000 20,000,000.00
12,000,000.00
5,500,000.00
2021
1,500,000.00
1,000,000.00
100,000.00
50,000.00
11,294,077.00
2,700,000.00
2020
5,000,000.00
10,000,000.00
5,000,000.00 117,100,000.00
3,000,000.00
2,500,000.00
1,000,000.00
500,000.00
1,500,000.00
1,000,000.00
100,000.00
50,000,000
1,000,000.00
50,000, 000
12,000,000.00
50,000, 000 20,000,000.00
12,000,000.00
2,000,000.00
5,500,000.00
2022
Annual Breakdown of Funding Requirements
3,000,000.00
500,000.00
300,000.00
(4)
B A L I K P R O B I N S YA , B AG O N G PAG - A S A P R O G R A M • W E S T E R N V I S AYA S R E G I O N A L AC T I O N P L A N
Concreting of Farm to Market Roads Rehabilitation of Farm to Market Roads Construction of Public Transport Terminal
Social Services (Assistance to poor or indigent families) Housing Assistance
100,000,000.00
2,000,000.00
150,000,000.00
350,000.00
24,000,000.00
100,000.00 40,000,000.00
4 Barangays of San Lorenzo
24,000,000.00
2,000,000.00
Maabay, Sibunag
San Isidro, Sibunag 12 barangays of San Lorenzo
11,294,077.00
Oracon & Bubog, Sibunag
13 Barangays of Sibunag
13,700,000.00
Total Funding Requirement
(3)
Guimaras
Guimaras
(2)
12 barangays of San Lorenzo, Guimaras 12 barangays of San Lorenzo, Guimaras 12 barangays of San Lorenzo, Guimaras TUPAD Project 12 barangays of San Lorenzo, Guimaras Cash for Work Projects 12 barangays of San Lorenzo, Guimaras Provision of Livelihood/Kabuhayan 12 barangays of San Projects & Employment Lorenzo, Guimaras Opportunities Purchase of Medical/Transport RHU San Lorenzo, Guimaras Vehicle Aid to Individual in Crisis Situation 12 barangays of San (AICS) Lorenzo, Guimaras Shelter Assistance Provincewide SUB-TOTAL 3. PROVINCE OF CAPIZ Improvement of the quality of Cuartero water supply Improvement of drainage system Cuartero, Capiz
Improvement of Irrigation Facilities/Construction of Disaster & Climate Resilient small scale irrigation Skills Development Program
Construction of Small Farm Reservoir
Construction of Cellsites
Improvement/Expansion of Level III Water System Improvement of Internet Connectivity in the municipal site
Assistance to Water Districts for additional water source and expansion of water system Construction of Water Supply System Facility (for implementation ) Construction of Transport Terminal Construction of Water System Facility Construction of Cellsites Farm to Market Road Projects
Provision of adequate water supply (Infra Support Development Program)
(1)
Beyond
Funding Source
Implementing Agency
(6)
MLGU/TESDA
DA
MLGU
Smart, Globe
MLGU, PLGU, Private Sector GLOBE
Smart, Globe DA
PLGU/MLGU, Cooperative DILG/MLGU
DILG/MLGU
DOLE/MLGU
Trust Fund
20% DF
LGU Cuartero 20%DF 20% DF
DILG
NGA
LGSF-FA to LGUs DSWD
2020-2022
2021
2020-2022
2020-2022
2020-2022
2021-2022
2020-2022
2020-2022
MPDO/MO/ME 2021
MPDO/MO/ME 2021
73
2021 - 2023
2021 - 2022
2021 - 2022
2020-2021
2021-2022
2021 - 2022 2021-2022
2021-2022
2022
2020-2021
2020-2022
Timeline/ Implementation Period
(7)
MPDO/MO/ME 2021
LGU - Cuartero
LGU - Cuartero
NGA
MLDU, DSWD
MLGU
DOLE, LGSF, MLGU DSWD DOLE/TESDA/ MLGU DTI/DSWD
DOLE
DBM - LGSF - MLGU FA to LGUs MLGU/DSWD MLGU
MLGU
DA, NFA
DA
Smart, Globe
GLOBE
DILG
LGSFSALINTUBIG Smart, Globe DA
PLGU
LGSFSALINTUBIG
General Fund GO
(5)
Const. of Comfort Rooms for terminal Concreting of Pavement PNP Parking Area
Const of Waiting Shed
a. Improvement of Central MRF and Vermi-Composting Facility b. Const. of standard septic vault for special wastes Const. of Multi-purpose Building
Amortization of Loan for the Purchase of Heavy Equipment Construction of Fencing of (DA) Multi-pupose Building in Tuburan
Completion of the Unfinished Public Market Building in Barangay Tuburan Priority Development Projects in Barangay's 3.1 Concreting of Road at Sitio Ilaya Brgy Alayunan 3.2 Improvement/Extension of Multi-purpose Hall at Jebaca 3.3 Construction of Solar Dryer at Maalan 3.7 Construction of Brgy. Road Opening at Brgy Parallan Improvement of the Tabuc Public Market Construction of Motor Pool at Barangay Indayagan Construction of: a.) 38 units Jetmatic Pumps in 23 Barangays with insufficient water per IWASH Plan b.) 16 Tire Path c.) School Stage Construction of concrete pathwalk for farmers along the Irrigation Canal in Sitio Pangpang Tapulang 1,300,000.00
1,300,000.00
Pob. Tabuc, Pob. Proper, Mambusao, Capiz Pob. Proper, Mambusao, Capiz
Burias, Cala-agus, Manibad, Baye, Pangpang Norte, Mambusao, Capiz Bula, Burias, Tumalalud
500,000.00
300,000.00 130,000.00
300,000.00 130,000.00
200,000.00
7,700,000.00
880,000.00
300,000.00
2,900,000.00
500,000.00
300,000.00
Brgy. Tuburan, Maayon, Capiz 880,000.00
2,900,000.00
Maayon, Capiz
200,000.00
1,300,000.00
1,300,000.00
Brgy. Indayagan, Maayon, Capiz Maayon, Capiz
243,292.40
1,300,000.00
1,300,000.00
Brgy. Tabuc, Maayon, Capiz
243,292.40
500,000.00
Brgy Parallan, Maayon, Capiz 500,000.00
LGUMambusao LGUMambusao LGUMambusao
LGUMambusao
LGUMambusao LGUMambusao LGUMambusao
LGUMambusao
LGU-Maayon LGU-Maayon
LGU-Maayon LGU-Maayon
LGU-Maayon LGU-Maayon
LGU-Maayon LGU-Maayon
LGU-Maayon LGU-Maayon
LGU-Maayon LGU-Maayon
LGU-Maayon LGU-Maayon
LGU-Maayon LGU-Maayon
LGU-Maayon LGU-Maayon
LGU-Maayon LGU-Maayon
LGU-Maayon LGU-Maayon
500,000.00
LGU-Maayon LGU-Maayon
500,000.00
7,700,000.00
MO
MEO
MEO
LGU-Ivisan
2020
2020
2020
2020
2020
2020
2020
2020
2020
2020
2020
2020
2020
2020
Jan.-Dec. 2021
MAR-JUN
Year-Round
LGU - Dumalag Jan – Dec 2020
LGU - Dumalag Jan – Dec 2020
Brgy. Maalan, Maayon, Capiz 500,000.00
Brgy. Tapulang, Maayon, Capiz
74 Timeline/ Implementation Period
(7)
MPDO/MO/ME 2021
LGU-Maayon LGU-Maayon
LGUJamindan
20% DF
20% DF
Local Dumalag Local Dumalag LGU-Ivisan
Trust Fund
Implementing Agency
(6)
LGU-Maayon LGU-Maayon
Beyond
Funding Source
500,000.00
0.00
2,200,000.00
2022
(5)
Brgy Alayunan, Maayon, 500,000.00 Capiz Brgy. Jebaca, Maayon, Capiz 500,000.00
Maayon, Capiz
2,000,000.00
50,000.00
50,000.00
2,000,000.00
2,000,000.00
2021
Annual Breakdown of Funding Requirements
4,200,000.00
Brgy. Tuburan, Maayon, Capiz
Construction of Concrete Drainage Poblacion, Ivisan, Capiz Canal Construction of Multi-Purpose Poblacion, Ivisan, Capiz Building Proper coordination with TELCO Jamindan, Capiz Operators and DICT/NTC regarding the establishment of communication facilities
1,200,000.00
2,000,000.00
2,000,000.00 1,200,000.00
700,000.00
Dumalag, Capiz, Brgy. Sta. Carmen Dumalag, Capiz, Brgy. San Agustin Ivisan, Capiz 700,000.00
2020 37,500,000.00
(4)
700,000.00
Total Funding Requirement
(3)
700,000.00
Location/Site
Construction of 97 Units Post Street Lights Construction of Water Supply System Municipal Development Projects
(2)
37,500,000.00
Priority Projects/Activities
Construction of New Public Market Dao,Capiz
(1)
A N N E X A • L I S T O F P R O G R A M S , P R O J E C T S A N D AC T I V I T I E S P E R K E Y R E S U LT A R E A P E R AG E N C Y / O F F I C E
Priority Projects/Activities
Location/Site
Pob. Proper, Mambusao, Capiz Balit, Mambusao, Capiz
(2)
60,000.00
600,000.00
Total Funding Requirement
(3)
Sinamongan, Pilar, Capiz
Installation of Street Lights at Brgy. Sinamongan
2020
LGU Panitan LGU Panitan LGU Panitan 20% DF LGU Panitan 20% DF 20% Development Fund 20% Development Fund 20% Development Fund 20% Development Fund 20% Development Fund
150,000.00 100,000.00 500,000.00
100,000.00
100,000.00
100,000.00
100,000.00
1,059,738.71
485,489.65
LGU Panitan
900,000.00
LGU Panay
LGU Panitan
3,000,000.00
7,500,000.00
LGU Panay
LGU Panay
LGUMambusao LGUMambusao LGUMambusao
5,450,000.00
Beyond
Funding Source
LGU Panay, National Government LGU Panay, National Government
2022
(5)
50,000,000.00
7,500,000.00
5,000,000.00
60,000.00
2021 600,000.00
Annual Breakdown of Funding Requirements
1,000,000.00
3,500,000.00
30,000,000.00
(4)
B A L I K P R O B I N S YA , B AG O N G PAG - A S A P R O G R A M • W E S T E R N V I S AYA S R E G I O N A L AC T I O N P L A N
100,000.00
100,000.00
San Esteban, Pilar, Capiz
Construction/Rehabilitation of health center
100,000.00 100,000.00
Olalo, Pilar, Capiz
Installation of Street Lights (Purok San Nicolas, Pilar, Capiz 1,5,6,& 7
Rehab of Multi-Purpose Hall
Balit, Batiano, Bula, 5,000,000.00 Calaagus, Manibad, Maralag, Pob. Tabuc, Pob. Proper, Mambusao, Capiz Construction of public transport Tanza Norte, Pob. Tabuc, 7,500,000.00 terminals, stops and waiting areas Pawa, Bintod, Pob. Ilaya, Calitan, Tico Concreting, Rehabilitation, All roads within the territorial 80,000,000.00 Maintenance and Improvement of jurisdiction of Panay various FMRs Expansion, repair and Calitan, Anhawon, Tanza 7,500,000.00 maintenance of irrigation facilities Sur, Agbanban, Bago Grande, Bago Chiquito, Libon, Calapawan, Cogon, Linao, Lus-onan, Daga, Magubilan, Panay, Capiz Construction of satellite public Bago Chiquito, Cabuago 5,450,000.00 markets Oeste, Lus-onan Construction of solar-powered Pob. Tabuc, Ilaya, Bonga and 6,500,000.00 streetlights all barangays along the Capiz East Road within the Municipality of Panay Rehabilitation of TTMF, Isolation Pob. Ilawod, Panitan, Capiz 1,000,000.00 Facility for LSIs, repatriates, suspect/ probable case, Improvement isolation facility for COVID asymptomatic front liners & provision of its amenities & other needs Construction of Level II to Level III Intampilan, Panitan, Capiz 900,000.00 Water System at the KABALAKA Ecopark Rehabilitation/ operation of Intampilan, Panitan, Capiz 150,000.00 Municipal Nursery Sanitation Program/provision of All Barangays 100,000.00 latrines to target hh in 26 barangays Installation of Street Lighting Panitan, Capiz 500,000.00 System Construction/Rehabilitation of Panitan, Capiz 485,489.65 drainage Systems Construction of Street Lights from Natividad, Rosario, 1,059,738.71 Brgy. Natividad-Rosario Poblacion, Pilar, Capiz
Const. of Septic Tank & Accessories Concreting of Local Roads
Rehab. of Cultural Center
(1)
LGU Pilar
LGU Pilar
LGU Pilar
LGU Pilar
LGU Pilar
LGU Panitan
LGU Panitan
LGU Panitan
LGU Panitan
LGU Panitan 20% DF
LGU Panitan 20% DF
LGU Panay
LGU Panay
LGU Panay, DPWH, DA, DILG LGU Panay, NIA
LGU Panay
LGUMambusao LGUMambusao LGUMambusao
Implementing Agency
(6)
2020
2020
2020
2020
2020
2020-2021
2021
2021
2020-2021
2021
75
Timeline/ Implementation Period
(7)
Binaobawan , Pilar, Capiz
Monteflor, Pilar, Capiz
San Ramon, Pilar, Capiz
San Antonio, Pilar, Capiz
Blasco, Pilar, Capiz
San Pedro, Pilar, Capiz
Installation of Street lights
Construction of Multi-Purpose Building
Rehab of Multi-Purpose Building (Stage)
Rehab of Multi-Purpose Building (Stage)
Rehab of Multi-Purpose Building (Brgy. Hall)
Construction/ Installation of potable water supply system
100,000.00
100,000.00
100,000.00
100,000.00
100,000.00
100,000.00
100,000.00
2,683,800.00
2,054,000.00
1,000,000.00
1,400,000.00
Roxas City, Capiz
Roxas City, Capiz
Roxas City, Capiz
Roxas City, Capiz
Roxas City, Capiz
Roxas City, Capiz
Construction/Widening of Barangay Road,Tiza-Milibili Road
Construction of Road, Banica to Bato and Milibili
Repair/Rehabilitation/Widening of road at Brgy. Milibili
Repair/Rehabilitation/Widening of road at Brgy. Milibili/Asphalt Overlay of Road at Sitio Agdalipe, Brgy. Bago Repair/Rehabilitation/Widening of road at Brgy. Milibili/Asphalt Overlay of Road at Sitio Cabral, Brgy. Dayao Road Concreting Araza Subdivision at Barangay Dayao
1,500,000.00
2,000,000.00
24,000,000.00
Extension of Pondol -Sangkal FMR Pondol, Pres. Roxas, Capiz
Poblacion, Pilar, Capiz
1,000,000.00
Cayus, Pilar, Capiz
Installation of Street lights
100,000.00
Rehab of Multi-Purpose Building (Civic Center
San Fernando, Pilar, Capiz
Rehab of Multi-Purpose Hall (Comfort Room)
100,000.00
100,000.00
Natividad, Pilar, Capiz
Rehab of Multi- Purpose Building (fencing)
100,000.00
100,000.00
Total Funding Requirement
(3)
Const./Expansion of Multi-Purpose Yating, Pilar, Capiz Building
Dayhagan, Pilar, Capiz
Location/Site
Rehab of Health Center(fencing)
(2)
San Silvestre, Pilar, Capiz
Priority Projects/Activities
Rehab of Multi-Purpose Hall (Comfort Room)
(1)
1,400,000.00
1,000,000.00
2,054,000.00
1,500,000.00
2,000,000.00
2,683,800.00
1,000,000.00
100,000.00
100,000.00
100,000.00
100,000.00
100,000.00
100,000.00
100,000.00
100,000.00
100,000.00
100,000.00
100,000.00
2020 100,000.00
(4)
24,000,000.00
2021
2022
Annual Breakdown of Funding Requirements
A N N E X A • L I S T O F P R O G R A M S , P R O J E C T S A N D AC T I V I T I E S P E R K E Y R E S U LT A R E A P E R AG E N C Y / O F F I C E
Beyond
Funding Source
Local Government (20% DF)
Local Government (20% DF)
20% Development Fund 20% Development Fund 20% Development Fund 20% Development Fund 20% Development Fund 20% Development Fund 20% Development Fund 20% Development Fund 20% Development Fund 20% Development Fund 20% Development Fund 20% Development Fund 20% Development Fund External Source Local Government (20% DF) Local Government (20% DF) Local Government (20% DF) Local Government (20% DF)
(5)
CEO
CEO
CEO
CEO
CEO
CEO
DPWH
LGU Pilar
LGU Pilar
LGU Pilar
LGU Pilar
LGU Pilar
LGU Pilar
LGU Pilar
LGU Pilar
LGU Pilar
LGU Pilar
LGU Pilar
LGU Pilar
LGU Pilar
Implementing Agency
(6)
01/01/2020 12/31/2020
01/01/2020 12/31/2020
01/01/2020 12/31/2020
01/01/2020 12/31/2020
01/01/2020 12/31/2020
01/01/2020 12/31/2020
2021
2020
2020
2020
2020
2020
2020
2020
2020
2020
2020
2020
2020
2020
Timeline/ Implementation Period
(7)
76
Priority Projects/Activities
1,600,000.00 3,000,000.00
1,250,000.00 1,500,000.00 20,000,000.00
10,000,000.00 1,000,000.00
Sigma, Capiz
Brgy. Amaga & Mianay, Sigma, Capiz Brgy. San Antonio, Tapaz, Capiz Tapaz, Capiz
Tapaz, Capiz
Brgy. Salong, Tapaz, Capiz
Brgy. Salong, Tapaz, Capiz
Brgy. Katipunan, Tapaz, Capiz
Bacolod City
Anilao, Iloilo
Zarraga, Iloilo
Poblacion, Barotac Nuevo, Iloilo
5,200,000.00
17,200,000.00
2,000,000.00
-
2,000,000.00
5,000,000.00
5,000,000.00
5,000,000.00
5,000,000.00
9,000,000.00
5,000,000.00
5,000,000.00
7,000,000.00
5,000,000.00
-
29,500,000.00
1,500,000.00
800,000.00
10,000,000.00
2022
2,000,000.00
-
50,000,000 50,000,000.00
183,826,000.00
11,000,000.00
1,000,000.00
1,000,000.00
10,000,000.00
20,000,000.00
1,250,000.00
3,000,000.00
800,000.00
8,000,000.00
2021
Annual Breakdown of Funding Requirements
9,000,000.00
10,000,000.00
10,000,000.00
5,000,000.00
200,000.00
-
214,256,320.76
1,500,000.00
20,000,000.00
2,000,000.00
2020 50,000,000.00
(4)
15,000,000.00
2,000,000.00
200,000.00
50,000,000 50,000,000.00
427,582,320.76
11,000,000.00
Brgy. Katipunan, Tapaz, Capiz
Tobias Fornier
1,000,000.00
Brgy. Katipunan, Tapaz, Capiz
1,500,000.00
18,000,000.00
20,000,000.00
Sapian, Capiz
Sigma, Capiz
2,000,000.00
Sapian, Capiz
Total Funding Requirement
(3)
50,000,000.00
Location/Site
Roxas City, Capiz
(2)
B A L I K P R O B I N S YA , B AG O N G PAG - A S A P R O G R A M • W E S T E R N V I S AYA S R E G I O N A L AC T I O N P L A N
SUB-TOTAL 2. PROVINCE OF CAPIZ Construction of Multi-purpose Evacuation/Isolation Facilities Construction/Rehabilitation of Damagaed Infrastructure facilities and evacuation centers
Road Opening of 1.2 Km Farm to Market Road at Sitio Tungguhan, Brgy. Katipunan Concreted 1.3 Km. Farm to Market Road at Sitio Karagatan to Poblacion II, Brgy. Katipunan SUB-TOTAL 4. PROVINCE OF ANTIQUE Farm to Market Road SUB-TOTAL 5. PROVINCE OF ILOILO Linking food production and residential areas for efficiency and accessibility Purchase of MDRRMO Rescue Vehicle Repair and Maintenance of Local Roads and Bridges SUB-TOTAL MEDIUM TERM 1. BACOLOD CITY Provision of Strong and affordable Internet Access for online transactions & Education mediums
Construction of Barangay Health Station Construction of Resilient type Barangay Health Station Construction of Barangay Health Station Construction of additional building to accommodate COVID-9 patients and persons under monitoring/investigation Procurement of hospital equipment and supplies Road opening of 1.5 Km Farm to Market Road at Sitio Sambuong Ilawod, Brgy. Katipunan
Maintenance of Farm -to-Market Roads Establishment of Brgy. Satellite Market (Talipapa) Land Banking
Construction of Banica Wharf at Brgy. Banica Establish Road Right of Way for FMR Establish Lot
(1)
Beyond
Funding Source
DPWH/LGU
DPWH/LGU
LFP/CEO
Implementing Agency
(6)
LGU
MDRRMO
LGU
Prov. Gov't.
DPWH
DPWH
M.E.O.
MEO
MEO
MEO
MEO
Office of the Mayor MEO
Telecom, DICT, DEPED,LSB
PGO,PEO
PGO,PEO
CMO, MITCS, CLO
77
2020-2022
1 Year
2021
2021
2021
2021
2021
2021
2022
2021
Jan.-Dec. 2020
2021
2021-2022
01/01/2020 12/31/2020 Nov 2020-Dec 2020 Nov 2020-Dec 2020 2021-2022
Timeline/ Implementation Period
(7)
LGU/DILG/DB LGU/DILG/DBM 2020-2022 M/DPWH /DPWH
LGU
PRDP
D.A.
D.A.
D.A.
DOH
DOH
5%Gad
5%GAD
20%DF
MLGU
MLGU/BLGU/ MEO PLGU DA OMA
DILG/DPWH
External Source DILG/DPWH
(5)
4,000,000.00 2,500,000.00
3,000,000.00
3,000,000.00 4,000,000.00 2,500,000.00
Dumalag, Capiz, Sitio Proper, Brgy. Conception
Dumalag, Capiz, Sitio Proper, Poblacion
Dumarao, Capiz, DacutonAstorga-Mahunod-hunod Dumarao, Capiz, DacutonTina Dumarao, Capiz, Brgy. Sibarawan
Construction/Repair/Improvement of Multi-Purpose Hall/MultiPurpose Building/Evacuation Center Construction/Repair/Improvement of Multi-Purpose Hall/MultiPurpose Building/Evacuation Center Construction/Concreting/Improve ment/of Provincial Road Construction/Concreting/Improve ment/of Provincial Road Construction/Concreting/Improve ment/of Farm to Market Road
Jamindan, Capiz, Guintas
Construction/Concreting/Improve ment/of Farm to Market Road
Construction/Repair/Improvement Maayon, Capiz, Sitio Proper, of Multi-Purpose Hall/MultiBrgy. Poblacion Tabuc Purpose Building/Evacuation Center
Jamindan, Capiz, Brgy. Fe
2,000,000.00
3,000,000.00
3,000,000.00
3,000,000.00
Jamindan, Capiz, Brgy. Agcagay
2,000,000.00
Ivisan, Capiz, Brgy. Cabugao 1,000,000.00
2,000,000.00
Ivisan, Capiz, Jose Hermio Street, Brgy. Poblacion Sur
Jamindan, Capiz, Sitio Proper, Brgy. Pangabat
2,000,000.00
3,000,000.00
Ivisan, Capiz, Sitio Proper, Brgy. Mianay
Construction/Concreting/Improve ment/of Farm to Market Road
Construction/Repair/Improvement of Multi-Purpose Hall/MultiPurpose Building/Evacuation Center Construction/Concreting/Improve ment/of Farm to Market Road
Construction/Repair/Improvement of Multi-Purpose Hall/MultiPurpose Building/Evacuation Center Construction/Repair/Improvement of Multi-Purpose Hall/MultiPurpose Building/Evacuation Center Construction/Concreting/Improve ment/of Farm to Market Road
3,000,000.00
1,500,000.00
Dao, Capiz, Sitio Batuan, Brgy. Malonoy
Construction/Concreting/Improve ment/of Farm to Market Road
4,000,000.00
Dao, Capiz, Sitio Proper, Brgy. Centro
2,000,000.00
3,000,000.00
3,000,000.00
3,000,000.00
1,000,000.00
2,000,000.00
2,000,000.00
2,000,000.00
3,000,000.00
1,500,000.00
3,000,000.00
4,000,000.00
1,000,000.00
Construction/Concreting/Improve ment/of Farm to Market Road
2022 3,000,000.00
3,000,000.00
2021
3,000,000.00
2020
Annual Breakdown of Funding Requirements
3,000,000.00
(4)
3,000,000.00
3,000,000.00
Total Funding Requirement
(3)
Cuartero, Capiz, Mahunodhunod - Putian Cuartero, Capiz, Sitio Proper, Maindang
Location/Site
1,000,000.00
(2)
Cuartero, Capiz, Sitio Proper, Nagba
Priority Projects/Activities
Rehabilitation of Affected Roads and Bridges Construction/Repair/Improvement of Multi-Purpose Hall/MultiPurpose Building/Evacuation Center Construction/Concreting/Improve ment/of Provincial Road Construction/Concreting/Improve ment/of Farm to Market Road
(1)
A N N E X A • L I S T O F P R O G R A M S , P R O J E C T S A N D AC T I V I T I E S P E R K E Y R E S U LT A R E A P E R AG E N C Y / O F F I C E
Beyond
(5) Funding Source
PGO,PEO
PGO,PEO
PGO,PEO
PGO,PEO
PGO,PEO
PGO,PEO
PGO,PEO
PGO,PEO
PGO,PEO
PGO,PEO
PGO,PEO
PGO,PEO
PGO,PEO
PGO,PEO
PGO,PEO
PGO,PEO
PGO,PEO
PGO,PEO
PGO,PEO
Implementing Agency
(6)
Timeline/ Implementation Period
(7)
78
2,000,000.00 5,000,000.00 1,500,000.00
1,500,000.00 2,000,000.00 5,000,000.00 1,500,000.00
Pontevedra, Capiz, Agbanog
President Roxas, Capiz, Brgy.Pondol President Roxas, Capiz, Brgy. Marita Roxas City, Capiz, Sitio Proper, Brgy. Jumaguicjic
Construction/Improvement Facilities Construction/Improvement Facilities Construction/Improvement Facilities Construction/Repair/Improvement of Multi-Purpose Hall/MultiPurpose Building/Evacuation Center
4,000,000.00
Pontevedra, Capiz, Brgy. Banate
4,000,000.00
4,000,000.00
Panitan, Capiz, Brgy. Conciencia Pilar, Capiz, Brgy. San Pedro
Construction/Concreting/Improve ment/of Farm to Market Road
4,000,000.00
4,000,000.00
Panitan, Capiz, Brgy. Bahit
3,000,000.00
4,000,000.00
4,000,000.00
1,500,000.00
3,000,000.00
3,000,000.00
1,500,000.00
4,000,000.00
4,000,000.00
B A L I K P R O B I N S YA , B AG O N G PAG - A S A P R O G R A M • W E S T E R N V I S AYA S R E G I O N A L AC T I O N P L A N
Pilar, Capiz, Brgy. Casanayan Pilar, Capiz, Brgy. Dulangan
4,000,000.00
4,000,000.00
4,000,000.00
4,000,000.00
4,000,000.00
Panay, Capiz, Brgy. Bago Chiquito Panay, Capiz, Brgy. Candual
4,000,000.00
4,000,000.00
1,500,000.00
1,500,000.00
Panay, Capiz, Brgy. Agojo
3,000,000.00
3,000,000.00
3,000,000.00
3,000,000.00
Mambusao, Capiz, Brgy. Poblacion Tabuc Panay, Capiz, Sitio Proper, Tanza Sur
3,000,000.00
3,000,000.00
Pontevedra, Capiz, Brgy. Agdalipe
Mambusao, Capiz, Brgy. Tumalalod
Construction/Concreting/Improve ment/of Farm to Market Road
3,000,000.00
1,500,000.00
Mambusao, Capiz, Brgy. Pang-pang Sur
3,000,000.00
2,000,000.00
2022 2,000,000.00
3,000,000.00
2021
3,000,000.00
2020
Annual Breakdown of Funding Requirements
3,000,000.00
(4)
Pontevedra, Capiz, Sitio Proper, Brgy. Bantigue
Maayon, Capiz, Brgy. Tuburan Mambusao, Capiz, Brgy. Bating
Construction/Improvement Facilities Construction/Repair/Improvement of Multi-Purpose Hall/MultiPurpose Building/Evacuation Center Construction/Concreting/Improve ment/of Farm to Market Road
2,000,000.00
2,000,000.00
Total Funding Requirement
(3)
Construction/Improvement Facilities Construction/Repair/Improvement of Multi-Purpose Hall/MultiPurpose Building/Evacuation Center Construction/Concreting/Improve ment/of Provincial Road Construction/Concreting/Improve ment/of Provincial Road Construction/Concreting/Improve ment/of Provincial Road Construction/Concreting/Improve ment/of Provincial Road Construction/Concreting/Improve ment/of Provincial Road Construction/Concreting/Improve ment/of Provincial Road Construction/Concreting/Improve ment/of Provincial Road Construction/Improvement Facilities Construction/Repair/Improvement of Multi-Purpose Hall/MultiPurpose Building/Evacuation Center Construction/Concreting/Improve ment/of Farm to Market Road
Maayon, Capiz, Carataya
Construction/Concreting/Improve ment/of Farm to Market Road
Location/Site
Maayon, Capiz, Brgy. Balighot
Priority Projects/Activities
(2)
Construction/Concreting/Improve ment/of Farm to Market Road
(1)
Beyond
(5) Funding Source
PGO,PEO
PGO,PEO
PGO,PEO
PGO,PEO
PGO,PEO
PGO,PEO
PGO,PEO
PGO,PEO
PGO,PEO
PGO,PEO
PGO,PEO
PGO,PEO
PGO,PEO
PGO,PEO
PGO,PEO
PGO,PEO
PGO,PEO
PGO,PEO
PGO,PEO
PGO,PEO
PGO,PEO
PGO,PEO
PGO,PEO
Implementing Agency
(6)
79
Timeline/ Implementation Period
(7)
Priority Projects/Activities
(2)
Location/Site
Sapian, Capiz, Brgy. Damayan
Sapian, Capiz, Sitio Guibongan, Lonoy
Sapian, Capiz, Brgy. Majanlod
Sapian, Capiz, Sitio Pulos, Maninang
Sigma, Capiz, Crossing OWIHAO-Pagnbunitan, Amaga Sigma, Capiz, Sitio Katamnan, Parian
Sigma, Capiz, Poblacion Sur
Sigma, Capiz, Brgy. Poblacion Norte Tapaz, Capiz, Brgy. Katipunan Tapaz, Capiz, Sitio Proper, Brgy. Roxas Tapaz, Capiz, Brgy. San Francisco Provincial Counterpart Maintenance of Provincial Roads Cuartero, Capiz, Upland Barangays
Cuaretero, Capiz, Poblacion
Construction/Concreting/Improve ment/of Farm to Market Road
Construction/Concreting/Improve ment/of Farm to Market Road
Construction/Concreting/Improve ment/of Farm to Market Road
Construction/Concreting/Improve ment/of Farm to Market Road
Construction/Concreting/Improve ment/of Farm to Market Road
Construction/Concreting/Improve ment/of Farm to Market Road
Construction/Improvement Facilities Construction/Concreting/Improve ment/of Provincial Road Construction/Concreting/Improve ment/of Provincial Road Construction/Concreting/Improve ment/of Provincial Road Construction/Improvement Facilities
Provision of potable water supply
Dao,Capiz
Dumalag, Capiz, Brgy. San Miguel Dumalag, Capiz, Brgy. Concepcion Dumalag, Capiz, Brgy. Consolacion Dumalag, Capiz, Brgy. San Miguel
Establishment of Sanitary Landfill
Construction of Septic Tank for Medical/Toxic Waste Construction of Footwalk(L=130 L.M) Construction of Two Units AgriFarm Bridge Construction of Public Comfort Room
Rehabilitation of the Public Market Cuartero, Capiz, Poblacion
Rehabilitation of road network
Construction/Concreting/Improve ment/of Farm to Market Road
Sapian, Capiz, Agtatacay, Sur
Construction/Concreting/Improve ment/of Farm to Market Road
Construction/Repair/Improvement Roxas City, Capiz, Sitio of Multi-Purpose Hall/MultiProper, Brgy. Tiza Purpose Building/Evacuation Center Construction/Concreting/Improve Roxas City, Capiz, Brgy. Bato ment/of Farm to Market Road
(1)
140,000.00 123,000.00 1,223,000.00 280,000.00
123,000.00 1,223,000.00 280,000.00
3,000,000.00
3,000,000.00
140,000.00
12,000,000.00
3,000,000.00
12,000,000.00
8,000,000.00
28,000,000.00
28,000,000.00
12,000,000.00
4,000,000.00
4,000,000.00
50,000,000.00
4,000,000.00
4,000,000.00
2,000,000.00
4,000,000.00
4,000,000.00
3,000,000.00
2,000,000.00
2,000,000.00
2,000,000.00
2,000,000.00
3,000,000.00
2022 3,500,000.00
4,000,000.00
50,000,000.00
2021
1,500,000.00
1,000,000.00
2020
Annual Breakdown of Funding Requirements
4,000,000.00
(4)
1,500,000.00
2,000,000.00
4,000,000.00
4,000,000.00
3,000,000.00
2,000,000.00
2,000,000.00
2,000,000.00
2,000,000.00
3,000,000.00
3,500,000.00
Total Funding Requirement
(3)
A N N E X A • L I S T O F P R O G R A M S , P R O J E C T S A N D AC T I V I T I E S P E R K E Y R E S U LT A R E A P E R AG E N C Y / O F F I C E
Beyond
Funding Source
Local Dumalag Local Dumalag Local Dumalag Local Dumalag
LGU Cuartero/DA/ DPWH LGU Cuartero/LW UA LGU Cuartero 20% DF 20%DF
(5)
Timeline/ Implementation Period
(7)
LGU - Dumalag Jan – Dec 2021
LGU - Dumalag Jan – Dec 2021
LGU - Dumalag Jan – Dec 2021
LGU - Dumalag Jan – Dec 2021
MPDO/MO/ME 2021-2024
LGU - Cuartero
LGU - Cuartero
LGU - Cuartero
PGO,PEO
PGO,PEO
PGO,PEO
PGO,PEO
PGO,PEO
PGO,PEO
PGO,PEO
PGO,PEO
PGO,PEO
PGO,PEO
PGO,PEO
PGO,PEO
PGO,PEO
PGO,PEO
PGO,PEO
Implementing Agency
(6)
80
Priority Projects/Activities
Pangabuan and Agambulong, Jamindan, Capiz
Ivisan, Capiz Ivisan, Capiz Ivisan, Capiz Ivisan, Capiz Jamindan, Capiz
500,000.00
500,000.00
1,500,000.00 2,000,000.00 4,624,226.80
3,150,000.00 4,200,000.00 9,710,876.28 20,000,000.00
10,000,000.00
15,000,000.00
B A L I K P R O B I N S YA , B AG O N G PAG - A S A P R O G R A M • W E S T E R N V I S AYA S R E G I O N A L AC T I O N P L A N
Construction of 3 Storey Maayon, Capiz Multipurposed Building ( Annex Building) that will house the Legislative, Function Halls and other Function Rooms. Purchase of Lot for the Maayon, Capiz Construction of Business Centers, Government Centers, Integrated Terminals, and Tourism Establishments.
10,000,000.00
10,000,000.00
20,000,000.00
Nitch Columbarioum
10,000,000.00
10,000,000.00
20,000,000.00
15,000,000.00
Construction of Slaugther House Maayon, Capiz to Upland areas and Purchasing of Equipments to Lowland Areas and improvement of Road Access
Maayon, Capiz
20,000,000.00
50,000,000.00
100,000,000.00
Maayon, Capiz Establish integrated terminal to the following routes: TuburanCabungahan-Maayon Route, East Villaflores- Maayon Route, Cuartero- Maayon Route, HiponaTuburan, Maayon Route
200,000,000.00
612,500,000.00
20,000,000.00
300,000.00
300,000.00
10,000,000.00
800,000.00
800,000.00
Dumalag, Capiz, Brgy. Sto. Rosario Dumalag, Capiz, Brgy. Sta. Carmen Basiao and Balaring, Ivisan, Capiz
400,000.00
500,000.00
400,000.00
2021 500,000.00
Dumalag, Capiz
2020
5,000,000.00
10,000,000.00
10,000,000.00
5,000,000.00
10,000,000.00
50,000,000.00
412,500,000.00
20,000,000.00
1,650,000.00 2,200,000.00 5,086,649.48 20,000,000.00
10,000,000.00
2022
Annual Breakdown of Funding Requirements
500,000.00
(4)
Dumalag, Capiz
Total Funding Requirement
(3)
500,000.00
Location/Site
Dumalag, Capiz
(2)
Construction of Pob. IlayaMaayon, Capiz Indayagan-Quinat-uyan- BalighotCabungahan- New- Guia- TuburanQuevedo- Alasaging- DuluanParallan- Sara Road. (BYPASS ROAD) Construction of Evacuation Maayon, Capiz Centers strategically position barangays.
Provision of potable water supply system to different housing sites
Construction of irrigation facilities
Rehabilitation of Suhot Springs and other Tourist Attraction Rehabilitation of Civic Center used as Evacuation Center Rehabilitation of Building to be used as Isolation Facilities Improvement/Rehabilitation of Water System Improvement of Access Road to Waterfalls Installation of Solar Powered water supply Internet Connectivity in Public Places Street Lighting Project Slope Protection Project Urban renewal project
(1)
Beyond
Funding Source
Timeline/ Implementation Period
(7)
LGU-Ivisan
2022 and onwards
LGU - Dumalag Jan – Dec 2021
LGU - Dumalag Jan – Dec 2021
LGU - Dumalag Jan – Dec 2021
LGU - Dumalag Jan – Dec 2021
LGU - Dumalag Jan – Dec 2021
Implementing Agency
(6)
MO, MEO
LGUMaayon/NGA and other funding Institutions LGUMaayon/NGA and other funding Institutions LGUMaayon/NGA and other funding Institutions LGUMaayon/NGA and other funding Institutions
LGU-Maayon
LGU-Maayon
LGU-Maayon
LGU-Maayon
LGULGU-Maayon Maayon/NGA and other funding Institutions LGULGU-Maayon Maayon/NGA and other funding Institutions
LGULGU-Maayon Maayon/NGA and other funding Institutions
NGA
2020-2022
2020-2022
2020-2022
2020-2022
2020-2022
2020-2022
2020-2022
81
Jan.-Dec. 2022
LGU-Ivisan, DICT2021 onwards LGU-Ivisan, DICT 20% DF MEO APR-SEP 20% DF MEO APR-SEP 20% DF MEO MAR-NOV NGA MO, MEO 2022 and beyond
Local Dumalag Local Dumalag Local Dumalag Local Dumalag Local Dumalag LGU-Ivisan, Natl Govt
(5)
30,000,000.00
50,000,000.00
21,000,000.00
15,000,000.00
Constrution of Mechanical Dryers Maayon, Capiz to strategic Barangays
Maayon, Capiz
Maayon, Capiz
Brgy. Aglimocon, Maayon, Capiz
Maayon, Capiz
Maayon, Capiz
Maayon, Capiz
Construction of Irrigation System
Provision of Potable Water Pump for upland Barangays
Repair of Tramline in Barangay Aglimocon
Improvement of Public Markets of Tuburan, Maayon and Cabungahan
Improvement of Tourism Spots with Recreational Center ( AgriTourism areas) East Villaflores, ( Falls) Bongbongan, (Falls) Guinbialan,(Falls) Batabat, (Silab) Jebaca, (Dam) Alayunan, (Silab)West Villaflores (Silbab) Tapulang ( Igang Cave). Improvement of Public Plaza
10,000,000.00
5,500,000.00
10,000,000.00
10,000,000.00
Maayon, Capiz
Provision of Lighting Facilities along 4 Lane National Highways with Center Island block (Pob. Tabuc Area)
250,000,000.00
Maayon, Capiz
Establishment of Tourism Park ( maayon- esplanade)
62,000,000.00
Total Funding Requirement
(3)
Road Opening/ Access to Tourism Maayon, Capiz Sites - East Villaflores,(Mag-olot falls) Guinbialan, Bongbongan Falls,and View Deck Area ( Silab, Batabat)
Location/Site 100,000,000.00
(2)
Maayon, Capiz
Priority Projects/Activities
Establishment of the Local Water District.
(1)
(4)
2020
5,000,000.00
10,000,000.00
5,000,000.00
2,500,000.00
5,000,000.00
25,000,000.00
10,000,000.00
10,000,000.00
100,000,000.00
30,000,000.00
2021 50,000,000.00
10,000,000.00
11,000,000.00
5,000,000.00
3,000,000.00
5,000,000.00
25,000,000.00
20,000,000.00
150,000,000.00
32,000,000.00
2022 50,000,000.00
Annual Breakdown of Funding Requirements
A N N E X A • L I S T O F P R O G R A M S , P R O J E C T S A N D AC T I V I T I E S P E R K E Y R E S U LT A R E A P E R AG E N C Y / O F F I C E
Beyond
Funding Source
Implementing Agency
(6)
LGU-Maayon
LGU-Maayon
LGU-Maayon
LGU-Maayon
LGU-Maayon
LGU-Maayon
LGU-Maayon
LGU-Maayon
LGULGU-Maayon Maayon/NGA and other funding Institutions
LGUMaayon/NGA and other funding Institutions LGUMaayon/NGA and other funding Institutions LGUMaayon/NGA and other funding Institutions LGUMaayon/NGA and other funding Institutions LGUMaayon/NGA and other funding Institutions LGUMaayon/NGA and other funding Institutions LGUMaayon/NGA and other funding Institutions LGUMaayon/NGA and other funding Institutions
LGULGU-Maayon Maayon/NGA and other funding Institutions LGULGU-Maayon Maayon/NGA and other funding Institutions
(5)
2020-2022
2020-2022
2020-2022
2020-2022
2020-2022
2020-2022
2020-2022
2020-2022
2020-2022
2020-2022
2020-2022
Timeline/ Implementation Period
(7)
82
60,000,000.00
50,000,000.00
300,000,000.00
200,000,000.00
Maayon, Capiz
Construction of Sitio Tepacla Pob. Maayon, Capiz Ilaya- Sitio Badlan Pob. Ilawod Road
Construction of West Villaflores- Maayon, Capiz Lunayan Cuartero- Tapulang Road
Maayon, Capiz
Maayon, Capiz
Mambusao, Capiz
Construction of Pob. Tabuc to Pob.Ilaya Diversion Road
Construction of QuinabonglanGuinbialan- East Villaflores( Sitio Katan-agan Road)
Construction of Sitio Hinagdanan East Villaflores- West VillafloresJebaca Road
Constrution of School Buildings
All Barangays along the National Highway (Capiz East Road0 within the Municipality of Panay Intampilan, Panitan, Capiz
Construction of solar-powered streetlights 1,000,000.00
4,500,000.00
7,000,000.00
17,000,000.00
13,500,000.00
75,000,000.00
5,000,000.00
2020
260,000,000.00
15,000,000.00
200,000,000.00
(4)
1,000,000.00
4,500,000.00
5,000,000.00
85,000,000.00
5,000,000.00
100,000,000.00
50,000,000.00
100,000,000.00
50,000,000.00
25,000,000.00
30,000,000.00
50,000,000.00
5,000,000.00
2021 1,000,000.00
4,500,000.00
5,000,000.00
100,000,000.00
5,000,000.00
100,000,000.00
50,000,000.00
100,000,000.00
250,000,000.00
25,000,000.00
30,000,000.00
50,000,000.00
5,000,000.00
2022 4,000,000.00
Annual Breakdown of Funding Requirements
B A L I K P R O B I N S YA , B AG O N G PAG - A S A P R O G R A M • W E S T E R N V I S AYA S R E G I O N A L AC T I O N P L A N
Improvement of Eco-Park/MRF
All roads within the jurisdiction of the Municipality of Panay Calitan, Anhawon, tanza Sur, Agbanban, Bago Grande, Bago Chiquito, Libon, Calapawan, Cogon, Linao, Lus-onan, Daga, Magubilan
Concreting, Rehabilitation, Maintenance and Improvement of various FMRs Expansion, repair and maintenance of irrigation facilities
Construction of public transport Lomboy, Bagacay, Agbalo terminals, stops and waiting areas
100,000,000.00
Construction of IndayaganMaayon, Capiz Balighot- Quinat-uyan- Pob. TabucPob. Ilaya- Batabat Alternate Route
100,000,000.00
10,000,000.00
5,000,000.00
Total Funding Requirement
(3)
Maayon, Capiz
Location/Site
Installation of Solar Powered Energy System to LGU Bldgs
(2)
Maayon, Capiz
Priority Projects/Activities
Construction of LGU Maayon Satellite Office (Upland Area)
(1)
Beyond
Funding Source
LGU Panitan 20% DF
LGU Panay
LGU Panay, National Government LGU Panay, National Government LGU Panay, National Government
LGUMaayon/NGA and other funding Institutions LGUMaayon/NGA and other funding Institutions LGUMaayon/NGA and other funding Institutions LGUMaayon/NGA and other funding Institutions LGUMaayon/NGA and other funding Institutions LGUMaayon/NGA and other funding Institutions LGUMaayon/NGA and other funding Institutions LGUMaayon/NGA and other funding Institutions DPWH/DEPED
(5)
2020-2022
2020-2022
2020-2022
2020-2022
2020-2022
2020-2022
2020-2022
2020-2022
LGU Panitan
LGU Panay
LGU Panay, DPWH, DA, DILG LGU Panay, NIA
2022-2024
2022-2024
2022-2024
83
Timeline/ Implementation Period
(7)
DPWH/DEPED/ LGUMambusao LGU Panay, 2022-2024 DOTR
LGU-Maayon
LGU-Maayon
LGU-Maayon
LGU-Maayon
LGU-Maayon
LGU-Maayon
LGU-Maayon
LGU-Maayon
Implementing Agency
(6)
Priority Projects/Activities
Panitan, Capiz
Intampilan, Panitan, Capiz
10,000,000.00
5,000,000.00 20,000,000.00
5,000,000.00 20,000,000.00
7,000,000.00
28,000,000.00 7,200,000.00 6,000,000.00 5,000,000.00 2,000,000.00
31,200,000.00 20,000,000.00
Roxas City, Capiz
Roxas City, Capiz
Roxas City, Capiz
Roxas City, Capiz
Roxas City, Capiz
Roxas City, Capiz
Roxas City, Capiz
Sapian, Capiz
Construction Bato Concrete FMR
Construction of Culajao Concrete FMR Construction of level 3 water system
16,800,000.00
46,500,000.00
Roxas City, Capiz
10,000,000.00
31,200,000.00
16,800,000.00
2,000,000.00
5,000,000.00
6,000,000.00
7,200,000.00
28,000,000.00
46,500,000.00
12,000,000.00
12,000,000.00
Reclamation of Rock Causeway at Libas Fishing Port Phase 1 Reclamation of Rock Causeway at Libas Fishing Port Phase 2 Construction of SibaguanDinginan Farm to Market Road Construction of Sitio Guimba Concrete FMR Construction of Sition PinaypayanDulunan Concrete FMR with RipRap Shouldering of Sitio Switch FMR
20,000,000.00
17,000,000.00
20,000,000.00
7,000,000.00 17,000,000.00
Dulangan, Pilar, Capiz
35,000,000.00
CDF
5,000,000.00
5,000,000.00
35,000,000.00
CDF
4,965,000.00
4,965,000.00
External Source External Source External Source DILG/DPWH
External Source External Source External Source External Source External Source
CDF
CDF
CDF
CDF
CDF
CDF
CDF
CDF
CDF
CDF
LGU Panitan 20% DF LGU Panitan
LGU Panitan 20% DF LGU Panitan 20% DF
1,000,000.00
Beyond
2,500,000.00
Dayhagan, Pilar, Capiz
Brgy. Cayus, Olalo, San Silvestre, Tabun-Acan
Construction of Concrete RoadTabun -Acan, Pilar, Capiz Access Road Leading to Hinulugan Falls Construction of Slope Protection Pilar, Capiz Structure-along Iloilo East CoastCapiz Rd.(S00273PN) K0142+ 000 -K0169 +874
Construction/Improvement of Access Road in Brgy. Cayus-OlaloSan Silvestre-Tabun- Acan, Pilar, Capiz Construction/Improvement/Rehabil itation of Local Road Construction of Concrete RoadAccess leading to Agtaline Shrine,
2022
Funding Source
1,000,000.00
5,000,000.00
500,000.00
2,000,000.00
2021 5,250,000.00
(5)
2,500,000.00
2020
Annual Breakdown of Funding Requirements
2,500,000.00
(4)
2,500,000.00
5,000,000.00
500,000.00
2,000,000.00
Panitan, Capiz
Total Funding Requirement
(3)
5,250,000.00
Location/Site
Panitan, Capiz
(2)
Construction (Completion) of Multi- San Fernando, Pilar, Capiz Purpose Building, Construction of Multi-Purpose Balogo, Pilar, Capiz Building Rehabilitation of Multi-Purpose Blasco, Pilar, Capiz Building Construction of Multi Purpose Hall Casanayan, Pilar, Capiz & Evacuation Center Construction of Brgy. MultiPoblacion, Pilar, Capiz Purpose Building/Covered Gym Construction of Brgy. MultiTabun-Acan, Pilar, Capiz Purpose Building/Covered Gym Road Widening -along Iloilo East San Fernando, Pilar, Capiz Coast-Capiz Rd. (S00273PN) K0161 +300 -K0162+362
Various Infrastructure Development Projects Rehabilitation/Improvement of Farm -to-Market-road & other Development Projects Improvement of Municipal Cemetery Building Outlay/ DRR Peoples Hall
(1)
A N N E X A • L I S T O F P R O G R A M S , P R O J E C T S A N D AC T I V I T I E S P E R K E Y R E S U LT A R E A P E R AG E N C Y / O F F I C E
DPWH/LGU
CEO
CEO
CEO
CEO
CEO
CEO
LFP/CEO
LFP/CEO
DPWH
DPWH
DPWH
DPWH
DPWH
DPWH
DPWH
DPWH
DPWH
DPWH
DPWH
DPWH
LGU Panitan
LGU Panitan
LGU Panitan
LGU Panitan
Implementing Agency
(6)
01/01/2021 12/31/2021 01/01/2021 12/31/2021 01/01/2021 12/31/2021 Jan. 2021-Dec 2022
01/01/2021 12/31/2021 01/01/2021 12/31/2021 01/01/2021 12/31/2021 01/01/2021 12/31/2021 01/01/2021 12/31/2021
2021-2022
2021-2022
2021-2022
2021-2022
2021-2022
2021-2022
2021-2022
2021-2022
ON-GOING
ON-GOING
ON-GOING
ON-GOING
Timeline/ Implementation Period
(7)
84
Belison Belison
Electrification Electrification Project Installation of Streetlights within the Relocation Area
20,000,000.00 12,000,000.00 20,000,000.00 20,000,000.00 5,000,000.00 900,000.00
Anini-y Anini-y
Anini-y
Anini-y
Anini-y
12,000,000.00
Anini-y
Anini-y
14,000,000.00
Anini-y
9,000,000.00 2,800,000.00
12,000,000.00
Anini-y
Anini-y Anini-y
35,000,000.00
Anini-y
30,000,000.00
2,000,000.00 10,000,000.00
20,000,000.00
3,000,000.00
10,000,000.00
10,000,000.00
450,000.00
2,500,000.00
10,000,000.00
6,000,000.00 10,000,000.00
10,000,000.00
4,500,000.00 1,400,000.00
6,000,000.00
7,000,000.00
6,000,000.00
17,500,000.00
10,000,000.00
1,000,000.00
10,000,000.00
2,000,000.00
15,000,000.00
14,000,000.00
B A L I K P R O B I N S YA , B AG O N G PAG - A S A P R O G R A M • W E S T E R N V I S AYA S R E G I O N A L AC T I O N P L A N
Concreting of Tagaytay Road Concreting of Butuan - Cagbang Road Concreting of Magdalena Igtumarom Road Concreting of Milagrosa Road Concreting of Mabuyong Milagrosa Road Concreting of Igpalge - Igteryo Road Concreting of San Francisco Purok 1 - Dawis Road Concreting of Bayo Grande Sitio Calamnugan Road
Concreting of Tagaytay - San Ramon Road Concreting of Salvacion - San Ramon Road Concreting of Igtumarom Namuutan Road+ Concreting of Tagaytay crossing San Ramon - Igtumarom Road
Farm-to-Market Roads/Access Roads Development/Upgrading of Access Belison Roads
Brgy. Palma, Barbaza
Belison
30,000,000.00
15 waterless brgys. of Barbaza
Slaughterhouse, Livestock Auction Market Construction of Slaughter House and improvement of Palma Livestock Auction Market
Development/Installation of potable source of water
56,000,000.00
1,521,205,226.80
1,000,000.00
2021 5,000,000.00
3,513,741,876.28
92,500,000.00
2020
450,000.00
2,500,000.00
10,000,000.00
6,000,000.00 10,000,000.00
10,000,000.00
4,500,000.00 1,400,000.00
6,000,000.00
7,000,000.00
6,000,000.00
17,500,000.00
10,000,000.00
1,000,000.00 1,000,000.00
-
1,000,000.00
15,000,000.00
14,000,000.00
1,900,036,649.48
82,100,000.00
2022
Annual Breakdown of Funding Requirements
72,900,000.00
(4)
155,000,000.00
1,000,000.00
5,000,000.00
Total Funding Requirement
(3)
Municipal Wide - Tibiao
Bag-Ong Barrio, Tapaz, Capiz
Sapian, Capiz
Location/Site
Construction of post harvest facilities Extend 69 KV line from DAO, Capiz up to the Muniicipality of Tapaz and installed 5MW Sub Station,Line Rehabilitation, Procurements of Lots and Constructiion of Area Office Building. SUB-TOTAL 3. PROVINCE OF ANTIQUE Water Supply System Establishment of Solar pump potable water system Construction of Potable Water Supply System (Level III) or Level II
(2)
Sapian, Capiz
Priority Projects/Activities
Construction of Flood Control
(1)
0.00
Beyond
Funding Source
MLGU
LGU
MLGU
LGU/NGAs
CAPELCO
DPWH/LGU
DPWH/LGU
Implementing Agency
(6)
DPWH
DPWH
DPWH
DPWH DPWH
DPWH
DPWH DPWH
DPWH
DPWH
DPWH
DPWH
MEO
MEO
MEO
MEO MEO
MEO
MEO MEO
MEO
MEO
MEO
MEO
LGU/National LGU Gov't.
ANTECO LGU LGU/National LGU Gov't.
MLGU, National Government (DBM-LGSF)
BeWD/Nation al Gov't.
DILG, Salin Tubig
NGAs
DOE
DILG/DPWH
DILG/DPWH
(5)
2021-2023
2021-2023 2021-2022
2020-2022
2021-2023
2021-2024
2021-2024
85
Jan. 2021-Dec 2022 Jan. 2021-Dec 2022 2021-2022
Timeline/ Implementation Period
(7)
Priority Projects/Activities
(2)
Construction of TESDA's Skills Training Center for (Welding, Driving, Massage, Cooking, Automotive, etc.) Establishment of Isolation Area
5,000,000.00
Belison
Municipal Wide - Pandan
130,000.00
2,000,000.00
239,500,000.00
15,000,000.00
Municipal Wide - Tibiao
Magtulis-BaghariBinangbang Bo.-CalapadaMayos-Mablad, LisubBinangbang Centro-Gua, Embranga an-Narirong-Tig alaran-Integasan-Yapo, Barbaza Brgy. Poblacion, Barbaza
500,000,000.00
Municipal Wide - Hamtic
Investment in agriculture infrastructure development Construction/Rehabilitation/ Improvement of Multi-Purpose Centers Construction of Multi-Purpose Center in housing projects. Construction of Community Centers Construction of Communicable/Infestious Diseases Center
35,000,000.00
3,000,000.00
Municipal Wide - Tibiao
Municipal Wide - Tibiao
10,000,000.00 4,000,000.00
3,000,000.00
239,500,000
500,000,000.00
520,000.00
Total Funding Requirement
(3)
Tobias Fornier Municipal Wide - Tibiao
Belison
Magtulis-BaghariBinangbang Bo.- CalapadanMayos-Mablad, LisubBinangbang Centro-Gua, Embranga-an-Narirong-Tigalaran-Integasan-Yapo, Barbaza
IGMAES ARC FMR, MagtulisBaghari-Binangbang Bo.Calapadan-Mayos-MabladCapoyu-an Circumferential Road, Poblacion-Embrangaan-Narirong-Ti alaranIntegasan-Yapo Circumferential FMR, LisubBinangbang Centro-Gua Road, Gua-Magtulis Bypass FMR, Ipil-Sitio Tumaytay FMR, Binangbang Bo.-LanasTig-alaran Bypass FMR, Palma-Beri-Capoyu-an Bypass FMR, Barbaza
Location/Site
Installation of solar irrigation pumps
Irrigation System Construction/ Rehabilitation of Irrigation System Rehabilitation of small diversion dam and irrigation system.
Drainage System Construction of Drainage System
Bridges Construction of Bridges/RCBC
Construction/Concreting/ Rehabilatation of Farm to Market Roads
Concreting of Casay Sebastian St. Anini-y
(1)
(4)
130,000.00
500,000.00
12,000,000.00
100,000,000.00
1,000,000.00
12,000,000.00
2020
500,000.00
50,000,000.00
2,500,000.00
200,000,000.00
7,000,000.00
1,500,000.00
5,000,000.00 2,000,000.00
1,000,000.00
50,000,000.00
2021 250,000.00
1,000,000.00
177,500,000.00
2,500,000.00
5,000,000.00
200,000,000.00
7,000,000.00
1,500,000.00
5,000,000.00 2,000,000.00
1,000,000.00
177,500,000.00
2022 260,000.00
Annual Breakdown of Funding Requirements
A N N E X A • L I S T O F P R O G R A M S , P R O J E C T S A N D AC T I V I T I E S P E R K E Y R E S U LT A R E A P E R AG E N C Y / O F F I C E
Beyond
Funding Source
LGU
DPWH/MLGU
DPWH
MEO
Implementing Agency
(6)
LGU-20% IRA
TESDA, MLGU
MLGU/ PLGU/ NGAs National Gov't. National Government (DILG-AM, DBM-LGSF, NGA's)
2020-2022
2023 and beyond
2021-2023
2021-2024
3 yrs
2021-2025
2021-2022
2021-2023 2021-2023
2021-2023
2023 and beyond
2022-2028
Timeline/ Implementation Period
(7)
MHO, Office of April 2020 the LCE December 2020
TESDA, MLGU
DPWH/MLGU
MLGU/ PLGU/ NGAs LGU
NIA/DA MLGU/ DA/ Line Agencies MLGU/ DA/ BSWM/ Line Agencies DA/ BSWM/ MLGU/ DA/ Line Agencies BSWM/ Line Agencies DA, DPWH DA, DPWH, LGU
PDRRMF/ National Gov't. DA,DAR,NIA DA/ Line Agencies DA/ BSWM/ Line Agencies
National Government (DILG-AM, DBM-LGSF, NGAs)
DPWH
DPWH
(5)
86
Priority Projects/Activities
Location/Site
Constancia or Cabungahan, San Lorenzo, Guimaras
Bacolod City
Pandan, Lambunao, Iloilo
7,500,000.00
50,000,000.00
50,000,000.00
3,000,000.00
132,802,000.00
193,131,000.00
35,000,000.00
225,000.00
50,000.00
2,000,000.00
700,000.00
30,000.00 597,000.00
100,000.00
100,000.00
9,000,000.00 50,000,000.00
10,000,000.00
32,000,000.00
2,000,000.00
30,000,000.00
2021 453,100,000.00
25,000,000.00 30,652,000.00
75,000.00
50,000.00
2,000,000.00
700,000.00
30,000.00 597,000.00
100,000.00
100,000.00
7,000,000.00 10,000,000.00
10,000,000.00
2020 145,630,000.00
4,500,000.00
50,000,000.00
50,000,000.00
29,677,000.00
15,000,000.00
100,000.00
50,000.00
2,000,000.00
700,000.00
30,000.00 597,000.00
100,000.00
100,000.00
10,000,000.00
1,000,000.00
30,000,000.00
30,000,000.00
2022 703,610,000.00
Annual Breakdown of Funding Requirements
25,000,000.00
35,000,000.00
(4)
B A L I K P R O B I N S YA , B AG O N G PAG - A S A P R O G R A M • W E S T E R N V I S AYA S R E G I O N A L AC T I O N P L A N
SUB-TOTAL 2. PROVINCE OF GUIMARAS Land Banking for Socialized Housing Project
Construction of Cold Storage Facility and Installation of its Amenities SUB-TOTAL LONG TERM 1. BACOLOD CITY construction of roads and bridges that will link the Housing Facility Site to other communities
Zarraga, Iloilo
15,000,000.00
150,000.00 400,000.00
Zarraga, Iloilo
Mostro, Palaypay, Poblacion, Anilao, Iloilo Pob. Ilawod, Lambunao, Iloilo
6,000,000.00
Zarraga, Iloilo
Establishment of Quarantine Facilities in every barangay De-clogging of Canals and Drainage Purchase of fuel and lubricants for use in MDRRMO Rescue Vehicle during COVID-19 response activities. Construction of Potable Water Supply System Construction of Transport Terminal
2,100,000.00
Municipal Evacuation Center, Zarraga, Iloilo
90,000.00 1,791,000.00
Zarraga, Iloilo Regional Evacuation Center
Construction/ improvement / upgrading/ rehabilitation and maintenance of common quarantine facilities/ designated isolation place/ facility
300,000.00 300,000.00
Internet and adequate power and water supply services Strengthen convergence of adequate transport infrastructure support Purchase of IT Equipment Installation of 3 Units 50 KVA Distribution transformer, including accessories, metering devices and other miscellaneous charges
26,000,000.00 60,000,000.00
Poblacion, Barotac Nuevo, Iloilo
Batad, Iloilo Batad, Iloilo
Concreting of Local Core Roads Construction of Public Market
21,000,000.00
62,000,000.00
2,000,000.00
60,000,000.00
1,630,850,000.00
Total Funding Requirement
(3)
Barotac Nuevo, Iloilo
Batad, Iloilo
Numancia, Aklan
Bagto, Mina, Ibao
(2)
SUB-TOTAL 5. PROVINCE OF ILOILO Concreting of Alapasco FMR
Purchase of Lot for Terminal of Tricycle
SUB-TOTAL 4. PROVINCE OF AKLAN Construction/Upgrading of barangay/farm to market roads
(1)
Beyond
Funding Source
MEO
MHO MEO
MDRRMO
Barangay Officials MENRO
LGU
LGU
LGU LGU
LGU
LGU
DPWH/ LGU
Implementing Agency
(6)
DPWH
20% Dev't, Others 20% Dev't, Other Funds
MEEDO
CEO,DPWH
MEEDO
2021
Jun 22
2021
87
2020-2022
2020-2022
2020-2022
2020-2022
2020-2022 2020-2022
3 Years
3 Years
2021
June, 2021-Dec. 2022
Timeline/ Implementation Period
(7)
LGU/DILG/DPWH LGU/DILG/DPWH2022
LGU
Barangay Fund LGU
LGU/ Province
LGU LGU/ Province/ NGA.
LGU
LGU/ DILG/ DPWH LGU/ DILG LGU/ Landbank/ DOR/ DTI LGU
LGU
DILG/DA
(5)
3 Barangays (Constancia, Sapal, Aguilar), San Lorenzo
Cuartero, Capiz
SUB-TOTAL 3. PROVINCE OF CAPIZ SALINTUBIG Project
5,000,000.00
Cuartero, Capiz, All Barangays
Cuartero, Capiz, Urban Barangays
Cuartero, Capiz, Poblacion
Expansion of Level III Water Supply
Establishment of a Transport Terminal
15,000,000.00
20,000,000.00
100,000,000.00
Dao,Capiz
Dumalag, Capiz
Concreting/Rehabilitation of Farm to Market Roads
Concreting of Farm and Market Roads
Construction of Bus/Food Terminal Dumalag, Capiz
Activation of Railway project
Purchase 5 ha lot for expansion of Pob Norte, Ivisan, Capiz commercial center with adequate parking aarea
Dumarao, Capiz
2,000,000.00
Dao,Capiz
Promotion of Solar Power Source
50,000,000.00
20,000,000.00
12,000,000.00
Provision of Potable Water System Dao,Capiz (SALINTUBIG) Level III
2,000,000.00
12,000,000.00
50,000,000.00
Cuartero, Capiz, All Barangays
Improvement of Road Network from the lowland to the upland barangays Establishment of power lines in the far-flung sitios
15,000,000.00
Cuartero, Capiz, Upland Barangays
15,000,000.00
79,500,000.00
45,000,000.00 3,000,000.00
15,000,000.00
5,000,000.00
10,000,000.00
5,000,000.00
2,000,000.00 3,000,000.00
2020 5,000,000.00
3,000,000.00
(4)
4,000,000.00
5,000,000.00
Total Funding Requirement
(3)
Water Source Development
Construction of Transport Terminal Land Banking for Public Transport M. Chavez, San Lorenzo Terminal Improvement/Expansion of Level 2 Barangays (Igcawayan and III Water System Sebario) of San Lorenzo
M. Chavez, San Lorenzo
Location/Site
Construction of Public Transport Terminal Construction of Water System Facility
(2)
La Paz, Cabalagnan, Lanipe, Igdarapdap, San Antonio, Salvacion, Igang, Sto. Domingo, San Roque Sebaste, Millan , Sibunag
Priority Projects/Activities
Improvement of Barangay Health Station
(1)
50,000,000.00
10,000,000.00
1,000,000.00
12,000,000.00
-
15,000,000.00 4,500,000.00
15,000,000.00
2022
50,000,000.00
50,000,000.00
20,000,000.00
15,000,000.00
10,000,000.00
1,000,000.00
2,000,000.00
12,000,000.00
5,000,000.00
50,000,000.00
15,000,000.00
15,000,000.00
5,000,000.00
5,000,000.00
2,000,000.00
2021
Annual Breakdown of Funding Requirements
A N N E X A • L I S T O F P R O G R A M S , P R O J E C T S A N D AC T I V I T I E S P E R K E Y R E S U LT A R E A P E R AG E N C Y / O F F I C E
Beyond
Funding Source
MLGU
PLGU/MLGU, Cooperative
Implementing Agency
(6)
Private investor LGU-Ivisan, PPP
LTO
DILG and Other NGA's,DF DPWH
LGU Dumarao/DIL G LGU Cuartero/LW UA LGU Cuartero/DA/ DPWH LGU Cuartero/CAP ELCO LGU Cuartero/LW UA LGU Cuartero20% DILG and Other NGA's,DF GF
LGSFSALINTUBIG
2021-2022
2024-2025
2023-2024
2023
2021-2023
Timeline/ Implementation Period
(7)
2021-beyond
Private Investor LGU-Ivisan
2023 onwards
2022-onwards
LGU- Dumalag Jan – Dec 2022 In partnership and beyond with concerned agencies
LGU- Dumalag Jan – Dec 2022 In partnership and beyond with concerned agencies
MPDO/MO/ME 2021-beyond
MO/ME
MPDO/MO/ME 2021-beyond
LGU - Cuartero
LGU - Cuartero
LGU - Cuartero
LGU - Cuartero
LGU - Cuartero
LGU - Cuartero
DILG/MLGU
MLGU, PLGU, Private Sector MLGU, PLGU, MLGU, PLGU, Private Private Sector Sector
DILG
MLGU
transport Cooperative
(5)
88
Priority Projects/Activities
Ivisan, Capiz and its barangays Ivisan, Capiz and its barangays Ivisan, Capiz Ondoy-Poblacion-Sta CuzCudian, Ivisan, Capiz Basiao, Ivisan, Capiz
Maayon, Capiz
Mambusao, Capiz
Pob. Tabuc, Mambusao, Capiz Bula, Bating, Calaagus, Caidquid, Balit, Mambusao, Capiz
Construction of Maayon Convention Center
Constrution of School Buildings
Rehab. of Public Market 25,000,000.00
200,000,000.00
200,000,000.00
100,000,000.00
25,000,000.00
300,000,000.00
2020
10,000,000.00
300,000,000.00
6,500,000.00
60,000,000.00
(4)
12,500,000.00
100,000,000.00
100,000,000.00
10,000,000.00
100,000,000.00
50,000,000.00
10,000,000.00
15,000,000.00
2,000,000.00
100,000,000.00
10,000,000.00
550,000.00
2021
12,500,000.00
100,000,000.00
100,000,000.00
100,000,000.00
15,000,000.00
200,000,000.00
50,000,000.00
10,000,000.00
100,000,000.00
35,000,000.00
50,000,000.00
40,000,000.00
20,000,000.00
5,000,000.00
450,000,000.00
10,000,000.00
2022 7,000,000.00
Annual Breakdown of Funding Requirements
B A L I K P R O B I N S YA , B AG O N G PAG - A S A P R O G R A M • W E S T E R N V I S AYA S R E G I O N A L AC T I O N P L A N
Installation of Cell Site/Internet
Maayon, Capiz
Construction of Drainage System along national highways namely Pob. Tabuc, Ilaya & Ilawod.
Maayon, Capiz
Maayon, Capiz
100,000,000.00 20,000,000.00
Jamindan, Capiz
Linkaging of Barangay, Municipal and Provincial to National Roads.
60,000,000.00
Poblacion, Jamindan, Capiz
100,000,000.00
2,000,000.00
Jamindan, Capiz
Maayon, Capiz
50,000,000.00
Poblacion, Jamindan, Capiz
Construction of roads going to identified tourism sites
Establishment of Integrated Transport Terminal Provision of reliable and adequate internet services Provision of Additional funds for the construction of Jamindan Public Market Upgrading of Local roads/FMR to PCCP Construction of zipline
40,000,000.00
420,000,000.00
5,000,000.00
6,500,000.00 450,000,000.00
60,000,000.00
20,000,000.00
550,000.00
Ivisan, Capiz
Total Funding Requirement
(3)
7,000,000.00
Location/Site
Ivisan, Capiz
(2)
Construction and Operation of Basiao, Ivisan, Capiz Basiao Commercial Port Establishment and Construction of Pob Sur, Ivisan, Capiz Integrated transport terminal and business centers
Flood Control Project Construction of By-Pass road and bridge Cold and Storage facilities
Concreting of resilient Farm to Market Roads Concreting of Core Roads
Construction of AA slaughterhouse with improved facilities Rehabilitation of Slaughterhouse
(1)
Beyond
Funding Source
DICT
DBM
LGUMaayon/NGA and other funding Institutions LGUMaayon/NGA and other funding Institutions LGUMaayon/NGA and other funding Institutions LGUMaayon/NGA and other funding Institutions LGUMaayon//NGA and other funding Institutions DPWH/DEPED
LGUJamindan, NGA NGA
NGA
NGA
LGU-Ivisan, GAA GAA, PPA, DOTr LGU-Ivisan, GFI
DF GAA, DPWH
LGU-Ivisan, DA DOT
DF
LGU-Ivisan, NMIS
(5)
LGUMaayon/NGA and other funding Institutions LGUMaayon/NGA and other funding Institutions LGUMaayon/NGA and other funding Institutions LGUMaayon/NGA and other funding Institutions LGUMaayon//NGA and other funding Institutions DPWH/DEPED/ LGUMambusao LGUMambusao DICT
MO, MEO
MO, MEO
MO
MO, MEO
LGU-Ivisan
PPA, DOTr
DA
LGU-Ivisan DPWH
DPWH
LGU-Ivisan
MEO
LGU-Ivisan
Implementing Agency
(6)
89
2021 and beyond
2021 and beyond
2021 and beyond
2021 and beyond
2022 and beyond
2020-2022 and beyond
Jan.-Dec. 2021
2022 and beyond
2022 onwards
2020 onwards
2022 onwards
MAR-DEC 2022 onwards
2021 onwards
MAR-MAY
2022 onwards
Timeline/ Implementation Period
(7)
Priority Projects/Activities
Location/Site
17,500,000.00
31,250,000.00
45,000,000.00
Ambilay, Panitan, Capiz
Agkilo, Panitan, Capiz
Agloway, Panitan, Capiz
Ambilay, Panitan, Capiz
Bahit, Panitan, Capiz
Balatucan, Panitan, Capiz
Construction of Pasugue Bridge
Construction of Ambilay Bridge
Concreting of 850 Meters x 5.0 m x 0.2 m Thick Type 1 PCCP with 1.50 m width road shoulder both sides in barangay Agbabadiang
Concreting of 1.6 km x 5.0 m x 0.2 m Thick Type 1 PCCP with 1.50 m width road shoulder both sides in barangay Agkilo Concreting of 1.6 km x 5.0 m x 0.2 m Thick Type 1 PCCP with 1.50 m width road shoulder both sides in barangay Agloway Concreting of 1.4 km x 5.0 m x 0.2 m Thick Type 1 PCCP with 1.50 m width road shoulder both sides in barangay Ambilay Concreting of 2.5 km x 5.0 m x 0.2 m Thick Type 1 PCCP with 1.50 m width road shoulder both sides in barangay Bahit Concreting of 3.6 km x 5.0 m x 0.2 m Thick Type 1 PCCP with 1.50 m width road shoulder both sides in barangay Balatucan
Concreting of 1.7 km x 5.0 m x 0.2 Bangaan Panitan, Capiz m Thick Type 1 PCCP with 1.50 m width road shoulder both sides in barangay Bangaan
20,000,000.00
Pasugue, Panitan, Capiz
Agbabadiang, Panitan, Capiz 10,625,000.00
20,000,000.00
Balatucan, Panitan, Capiz
Balatucan River Control
21,250,000.00
50,000,000.00
50,000,000.00
50,000,000.00
50,000,000.00
Panitan, Capiz
Ambilay River Control
60,000,000.00
Panitan, Capiz 200,000,000.00
10,000,000.00
Panitan, Capiz
40,000,000.00
Panitan, Capiz
35,500,000.00
144,000,000.00
2020 115,000,000.00
(4)
500,000,000.00
100,000,000.00
Total Funding Requirement
(3)
Panitan, Capiz
Burias & Pob. Proper, Mambusao, Capiz All roads within the jurisdiction of the Municipality of Panay Pawa, Buntod, Pob. Ilawod, Pob. Ilaya, Tanza Sur
(2)
Construction of Salocon- Tabuc Norte Bypass Route
Construction/ re-development of Panitan’s Peoples Hall Construction and implementation of FMR to ten (10) feasible projected area Construction of Salocon - Tabuc Norte Bridge
Concreting, Rehabilitation, Maintenance and Improvement of various FMRs Tourism Infrastructure and Facilities Project
Housing 200 Household
(1)
48,000,000.00
185,000,000.00
2021
21,250,000.00
45,000,000.00
31,250,000.00
17,500,000.00
20,000,000.00
20,000,000.00
10,625,000.00
50,000,000.00
50,000,000.00
50,000,000.00
50,000,000.00
200,000,000.00
60,000,000.00
10,000,000.00
40,000,000.00
60,500,000.00
200,000,000.00
2022 100,000,000.00
Annual Breakdown of Funding Requirements
A N N E X A • L I S T O F P R O G R A M S , P R O J E C T S A N D AC T I V I T I E S P E R K E Y R E S U LT A R E A P E R AG E N C Y / O F F I C E
Beyond
Funding Source LGUMambusao LGU Panay, DPWH, DA, DILG LGU Panay, DPWH, TIEZA
Implementing Agency
(6)
LGU Panitan/DPWH/ PROVINCE
LGU Panitan/DPWH/ PROVINCE
LGU Panitan/DPWH/ PROVINCE
LGU Panitan/DPWH/ PROVINCE
LGU Panitan/DPWH/ PROVINCE
LGU Panitan/DPWH/ PROVINCE
DPWH
DPWH
DPWH
LGU Panitan
LGU Panitan
LGU Panitan
LGU LGU Panitan/DA/D Panitan/DPWH/ PWH/DILG/PR PROVINCE OVINCE
LGU Panitan/DA/D PWH/DILG/PR OVINCE LGU Panitan/DA/D PWH/DILG/PR OVINCE LGU Panitan/DA/D PWH/DILG/PR OVINCE LGU Panitan/DA/D PWH/DILG/PR OVINCE LGU Panitan/DA/D PWH/DILG/PR OVINCE
LGU Panitan/DPW H LGU Panitan/DPW H LGU Panitan/DPW H LGU Panitan/DPW H LGU Panitan/DPW H LGU Panitan/DPW H LGU Panitan/DA/D PWH/DILG/PR OVINCE
LGU LGU Panitan Panitan/DBM LGU LGU Panitan Panitan/DA
NHA/LGUMambusao LGU Panay, National Government LGU Panay
(5)
2025-2034
2025-2034
Timeline/ Implementation Period
(7)
90
Priority Projects/Activities
(2)
Location/Site Total Funding Requirement
(3)
18,750,000.00
2,500,000.00
Concreting of 1.5 km x 5.0 m x 0.2 Pasugue, Panitan, Capiz m Thick Type 1 PCCP with 1.50 m width road shoulder both sides in barangay Pasugue
Pob. Ilawod, Panitan, Capiz
Pob. Ilaya, Panitan, Capiz
Concreting of 200 meters x 5.0 m x 0.2 m Thick Type 1 PCCP with 1.50 m width road shoulder both sides in barangay Pob. Ilawod
Concreting of 250 meters x 5.0 m x 0.2 m Thick Type 1 PCCP with 1.50 m width road shoulder both sides in barangay Pob. Ilaya 25,000,000.00
B A L I K P R O B I N S YA , B AG O N G PAG - A S A P R O G R A M • W E S T E R N V I S AYA S R E G I O N A L AC T I O N P L A N
Concreting of 2.0 km x 5.0 m x 0.2 Quios, Panitan, Capiz m Thick Type 1 PCCP with 1.50 m width road shoulder both sides in barangay Quios
18,750,000.00
Concreting of 1.5 km x 5.0 m x 0.2 Intampilan, Panitan, Capiz m Thick Type 1 PCCP with 1.50 m width road shoulder both sides in barangay Intampilan
3,125,000.00
25,000,000.00
25,000,000.00
3,125,000.00
2,500,000.00
18,750,000.00
18,750,000.00
25,000,000.00
12,500,000.00
12,500,000.00
Concreting of 2.0 km x 5.0 m x 0.2 Ensenagan, Panitan, Capiz m Thick Type 1 PCCP with 1.50 m width road shoulder both sides in barangay Ensenagan
31,250,000.00
56,250,000.00
56,250,000.00
31,250,000.00
16,250,000.00
16,250,000.00
Concreting of 2.5 km x 5.0 m x 0.2 Cogon, Panitan, Capiz m Thick Type 1 PCCP with 1.50 m width road shoulder both sides in barangay Cogon Concreting of 1.0 km x 5.0 m x 0.2 Concencia, Panitan, Capiz m Thick Type 1 PCCP with 1.50 m width road shoulder both sides in barangay Concencia
18,750,000.00
12,500,000.00
2022 25,000,000.00
18,750,000.00
2021
Concreting of 1.5 km x 5.0 m x 0.2 Cadio, Panitan, Capiz m Thick Type 1 PCCP with 1.50 m width road shoulder both sides in barangay Cadio Concreting of 1.3 km x 5.0 m x 0.2 Calaan, Panitan, Capiz m Thick Type 1 PCCP with 1.50 m width road shoulder both sides in barangay Calaan Concreting of 4.5 km x 5.0 m x 0.2 Capagao, Panitan, Capiz m Thick Type 1 PCCP with 1.50 m width road shoulder both sides in barangay Capagao
2020
Annual Breakdown of Funding Requirements
12,500,000.00
(4)
Concreting of 1.0 km x 5.0 m x 0.2 Cabugao, Panitan, Capiz m Thick Type 1 PCCP with 1.50 m width road shoulder both sides in barangay Cabugao
Concreting of 2.0 km x 5.0 m x 0.2 Cabangahan, Panitan, Capiz 25,000,000.00 m Thick Type 1 PCCP with 1.50 m width road shoulder both sides in barangay Cabangahan
(1)
Beyond
Funding Source
Implementing Agency
(6)
LGU Panitan/DPWH/ PROVINCE
LGU Panitan/DPWH/ PROVINCE
LGU Panitan/DPWH/ PROVINCE
LGU Panitan/DPWH/ PROVINCE
LGU Panitan/DPWH/ PROVINCE
LGU LGU Panitan/DA/D Panitan/DPWH/ PWH/DILG/PR PROVINCE OVINCE
LGU LGU Panitan/DA/D Panitan/DPWH/ PWH/DILG/PR PROVINCE OVINCE
LGU LGU Panitan/DA/D Panitan/DPWH/ PWH/DILG/PR PROVINCE OVINCE
LGU LGU Panitan/DA/D Panitan/DPWH/ PWH/DILG/PR PROVINCE OVINCE
LGU LGU Panitan/DA/D Panitan/DPWH/ PWH/DILG/PR PROVINCE OVINCE
LGU LGU Panitan/DA/D Panitan/DPWH/ PWH/DILG/PR PROVINCE OVINCE
LGU Panitan/DA/D PWH/DILG/PR OVINCE LGU Panitan/DA/D PWH/DILG/PR OVINCE
LGU Panitan/DA/D PWH/DILG/PR OVINCE LGU Panitan/DA/D PWH/DILG/PR OVINCE LGU Panitan/DA/D PWH/DILG/PR OVINCE
LGU LGU Panitan/DA/D Panitan/DPWH/ PWH/DILG/PR PROVINCE OVINCE
LGU LGU Panitan/DA/D Panitan/DPWH/ PWH/DILG/PR PROVINCE OVINCE
(5)
91
Timeline/ Implementation Period
(7)
Sitio Palhi, Natividad, Pilar, Capiz Brgy Olalo-San Silvestre, Pilar, Capiz
Concreting of Barangay Road
Concreting of Barangay Road Olalo-San Silvestre
Concreting of Barangay Road
Improvements/ Cocreting of Barangay Road Concreting of Barangay Road
Concreting of Barangay Road
Concreting of Barangay Road Concreting of Barangay Road
Provincial Jct. Tomas Abelita Elem. School Balogo, Pilar Capiz Blasco,Pilar, Capiz Sitio Daan Patyo, Casanayan, Pilar Capiz Sitio Camarin, Cayus, Pilar, Capiz Sitio Takas, Dayhagan, Pilar, Capiz Sitio Lahab, Dulangan, Pilar, Capiz Sitio Calumpang, Monteflor, Pilar, Capiz
Concreting of Barangay Road
98,100,000.00
Concencia, Panitan, Capiz
Panitan, Capiz
12,500,000.00
Timpas, Panitan, Capiz
Construction of RHU-Annex Building
31,250,000.00
Timpas, Panitan, Capiz
5,000,000.00
20,000,000.00 10,000,000.00
10,000,000.00
10,000,000.00
50,000,000.00
98,100,000.00
12,500,000.00
31,250,000.00
56,250,000.00
25,000,000.00
12,500,000.00
1,250,000.00
2022 6,250,000.00
15,000,000.00
10,000,000.00
15,000,000.00
15,000,000.00
10,000,000.00
15,000,000.00
25,000,000.00
2021
25,000,000.00
2020
Annual Breakdown of Funding Requirements
20,000,000.00
(4)
20,000,000.00
5,000,000.00
20,000,000.00 10,000,000.00
10,000,000.00
10,000,000.00
50,000,000.00
56,250,000.00
Tinigban, Panitan, Capiz
Concreting of 4.5 km x 5.0 m x 0.2 m Thick Type 1 PCCP with 1.50 m width road shoulder both sides in barangay Tinigban Concreting of 2.5 km x 5.0 m x 0.2m Thick Type 1 PCCP with 1.50 m width road shoulder both sides in barangay Timpas Concreting of 1.0 km x 5.0 m x 0.2 m Thick Type 1 PCCP with 1.50 m width road shoulder both sides in barangay Timpas Rehabilitattiob of 9.81 kms. Conciencia-Tinigban Road to Poblacion Tabuc, Maayon
Timpas, Panitan, Capiz
25,000,000.00
Concreting of 2.0 km x 5.0 m x 0.2 Tincupon, Panitan, Capiz m Thick Type 1 PCCP with 1.50 m width road shoulder both sides in barangay Tincupon
Rehabilitatiob of Timpas -Mianay Road
12,500,000.00
1,250,000.00
6,250,000.00
Total Funding Requirement
(3)
Concreting of 1.0 km x 5.0 m x Tabuc Sur, Panitan, Capiz 0.2m Thick Type 1 PCCP with 1.50 m width road shoulder both sides in barangay Tabuc Sur
Tabuc Norte, Panitan, Capiz
Location/Site
Concreting of 100 meters x 5.0 m x 0.2 m Thick Type 1 PCCP with 1.50 m width road shoulder both sides in barangay Tabuc Norte
(2)
Salocon, Panitan, Capiz
Priority Projects/Activities
Concreting of 500 Meters x 5.0 m x 0.2 m Thick Type 1 PCCP with 1.50 m width road shoulder both sides in barangay Salocon
(1)
A N N E X A • L I S T O F P R O G R A M S , P R O J E C T S A N D AC T I V I T I E S P E R K E Y R E S U LT A R E A P E R AG E N C Y / O F F I C E
Beyond
Funding Source
Implementing Agency
(6)
D.A
D.A
D.A
D.A
D.A
D.A
D.A D.A
LGU Panitan/DA/D PWH/DILG/PR OVINCE LGU Panitan/DA/D PWH/DILG/PR OVINCE LGU Panitan/DA/D PWH/DILG/PR OVINCE LGU Panitan/DPW H/DILG/PROVI NCE LGU Panitan/DPW H/DILG/PROVI NCE LGU Panitan/DOH/ DPWH D.A
DPWH
DPWH
DPWH
DPWH
DPWH
DPWH
DPWH DPWH
DPWH
LGU Panitan/DPWH
DPWH/PROVIN CE
DPWH/PROVIN CE
LGU Panitan/DPWH/ PROVINCE
LGU Panitan/DPWH/ PROVINCE
LGU Panitan/DPWH/ PROVINCE
LGU LGU Panitan/DA/D Panitan/DPWH/ PWH/DILG/PR PROVINCE OVINCE
LGU LGU Panitan/DA/D Panitan/DPWH/ PWH/DILG/PR PROVINCE OVINCE
LGU LGU Panitan/DA/D Panitan/DPWH/ PWH/DILG/PR PROVINCE OVINCE
LGU LGU Panitan/DA/D Panitan/DPWH/ PWH/DILG/PR PROVINCE OVINCE
(5)
Timeline/ Implementation Period
(7)
92
Priority Projects/Activities
San Nicolas, Sinamongan, Pilar, Capiz Blasco, Pilar, Capiz
Road Improvement, San NicolasSinamongan, Pilar, Capiz Construction of Bridge at Brgy. Blasco, Pilar, Capiz Road Improvement, Dayhagan-San Nicolas via San Antonio, Pilar, Capiz(Prov. Road) Road Improvement of San Blas Road, Road Improvement, Cayus-Blasco, Pilar, Capiz Road Improvement, San RamonSta.Fe Pilar, Capiz Construction of Slaughter House at Government Complex
30,000,000.00 15,000,000.00
15,000,000.00 30,000,000.00 15,000,000.00
San Ramon, Sta. Fe, Pilar, Capiz -
B A L I K P R O B I N S YA , B AG O N G PAG - A S A P R O G R A M • W E S T E R N V I S AYA S R E G I O N A L AC T I O N P L A N
15,000,000.00
15,000,000.00
Cayus, Blasco, Pilar, Capiz
15,000,000.00
100,000,000.00
40,000,000.00
40,000,000.00 100,000,000.00
50,000,000.00
35,000,000.00
35,000,000.00 50,000,000.00
30,000,000.00
30,000,000.00
150,000,000.00
150,000,000.00
San Antonio, San Nicolas, San Pedro, Balogo, Dayhagan, Pilar, Capiz San Blas, Pilar, Capiz
Acquisition of Property for the Government Complex Construction of Evacuation Center -
30,000,000.00 50,000,000.00 60,000,000.00
30,000,000.00
10,000,000.00
30,000,000.00 50,000,000.00 60,000,000.00
30,000,000.00
30,000,000.00
30,000,000.00
10,000,000.00
200,000,000.00
30,000,000.00
30,000,000.00 200,000,000.00
10,000,000.00
10,000,000.00
20,000,000.00
20,000,000.00
20,000,000.00 20,000,000.00
10,000,000.00
30,000,000.00
10,000,000.00
30,000,000.00
Tabun-Acan, Dulangan, Natividad,San Silvestre, Olalo, Pilar, Capiz
San Silvestre-Olalo, Pilar, Capiz San Ramon, Casanayan, San Antonio, Balogo, Dayhagan, Pilar, Capiz -
20,000,000.00
10,000,000.00
2022 10,000,000.00
30,000,000.00
2021
30,000,000.00
2020
Annual Breakdown of Funding Requirements
20,000,000.00
(4)
20,000,000.00
20,000,000.00
10,000,000.00
10,000,000.00
Total Funding Requirement
(3)
-
Construction of Street Lights Construction of Municipal Plaza Construction of San SilvestreOlalo Road Road Improvement, San RamonDayhagan, Pilar, Capiz
Construction of Emergency Command Operation Center Development of Historical and Tourism Site (Hinulugan Falls, Agtalin, Balisong Hills, Kawa-Kawa Falls and Olalo View Deck)
Location/Site
Sitio Bulok, Rosario, Pilar, Capiz Sitio Casilyan, San Antonio, Pilar, Capiz Sitio Adlawan, San Blas, Pilar, Capiz Sitio Kabituhan, San Esteban, Pilar, Capiz Sitio, Pinamulutan, San Fernando, Pilar, Capiz Purok 7, San Nicolas, Pilar, Capiz Sitio Landing, San Pedro, Pilar, Capiz Sitio Hinulugan, San Ramon, Pilar, Capiz San Silvestre-Tabun-Acan, Pilar, Capiz Sitio Pinonggulan, Pilar, Capiz Sitio Graciosa, Tabun-Acan, Pilar, Capiz -
(2)
Construction of Public Market, Public Terminal and Municipal Hall at Government Complex Construction of Isolation Facility for Emerging & Reemerging Infectious Diseases
Construction of Farm to Market Road Concreting of Barangay Road
Concreting of Barangay Road
Construction of Farm to Market Road Concreting of Barangay Road
Concreting of Barangay Road
Concreting of Farm to Market Road Concreting of Barangay Road
Concreting of Barangay Road
Concreting of Barangay Road
Concreting of Barangay Road
(1)
Beyond
Funding Source
DPWH
DPWH
DPWH
DPWH
DPWH
DPWH
DPWH
DPWH
DPWH
DPWH
DPWH
Implementing Agency
(6)
DPWH
DPWH
DPWH
DPWH
DPWH
DPWH
D.A
DPWH
Provincial Govt. DPWH
D.A
D.A
Provincial Govt. DPWH
DILG
Provincial Govt. DPWH
OCD
National Govt.DPWH
Provincial Govt. DPWH
LGU DPWH National Govt.DPWH TOURISM DPWH
TOURISM
LGU
National Govt.DPWH
National Govt.DPWH
D.A
D.A
D.A
D.A
D.A
D.A
D.A
D.A
D.A
D.A
D.A
(5)
93
Timeline/ Implementation Period
(7)
Priority Projects/Activities
Location/Site Total Funding Requirement
(3)
120,000,000.00
Sapian, Capiz
Sigma, Capiz
Construction of public toilets & Urinals Concreting of Farm-to-Market Roads
Sigma, Capiz
Brgy. Daan Norte, Brgy. Mabini, Tapaz, Capiz
Establishment of Solar-powered Irrigation Facility
Opening/Construction of Brgy. Daan Norte to Brgy. Mabini FMR (5.44 km.) Concreted Brgy. Acuña to Brgy. Tacayan Farm to Market Road (2.0 km.) Concreted Brgy. Gebio-an to Brgy. Aglinab Farm to Market Road (2.60 km.) Opening/Construction of Brgy. Sinunod- Mabini- Aglupacan FMR
Concreting of 3.4 Km. Farm to Market Road at Brgy. Tacayan Access Road Improvement Project (1.40 KM) Concreting of resilient access roads network from Brgy. San Pedro to Brgy. San Antonio connecting cacao industry plantation to National Highway Concreting of resilient gravel paved road network from Brgy. Artuz leading to Pangilatan Falls
2,000,000.00
Pob. Norte or Pob. Sur, Sigma, Capiz Mianay & Amaga, Sigma, Capiz Brgy. Pagbunitan, Sigma, Capiz
Provision of Site for Banking Facility Establishment of Level II Water System Establishment of Sigma Memorial Park
2020
D.A.
60,000,000.00
Brgy. Artuz, Tapaz, Capiz
50,000,000.00
100,000,000.00
100,000,000.00
50,000,000.00
12,000,000.00
12,000,000.00
20,000,000.00
D.A.
36,000,000.00
DOT
DTI
DBM
D.A.
D.A.
DPWH
DPWH
MEO
DPWH
DPWH
DPWH
DPWH
Office of the Mayor/OMA/M EO MLGU Office of the Mayor MLGU/DILG Office of the Mayor/MEO LBP/Other Office of the Financial Inst. Mayor /SB/MEO MLGU/DA Office of the Mayor/OMA/M EO D.A. DPWH
MLGU/DA
Brgy. Gebio-an, Brgy. 36,000,000.00 Roosevelt, Brgy. Aglinab, Tapaz, Capiz Brgy.Sinunod, Brgy. Mabini, 60,000,000.00 Brgy. Aglupacan, Tapaz, Capiz Brgy. Tacayan, Tapaz, Capiz 20,000,000.00
Brgy. Lagdungan, Tapaz, Capiz Brgy. San Pedro, San Antonio, Tapaz, Capiz
Office of the Mayor/MEO
DPWH/LGU
DPWH/LGU
DPWH/LGU
DPWH/LGU
DPWH/LGU
M EO
DPWH
DPWH
Implementing Agency
(6)
MLGU/SFHC/ Office of the NHA Mayor
NGAs/DA/DIL G/DPWH NGAs/DILG/D PWH NGAs/DA/DIL G/DPWH NGAs/DILG/D PWH MLGU/PLGU/ DILG
NGAs/DOT
External Source External Source External Source
Funding Source
27,000,000.00
80,000,000.00
4,000,000.00
30,000,000.00
30,000,000.00
50,000,000.00
3,000,000.00
Beyond
(5)
Brgy. Tacayan, Tapaz, Capiz 27,000,000.00
34,000,000.00
2,000,000.00
70,000,000.00
10,000,000.00
10,000,000.00
20,000,000.00
10,000,000.00
100,000,000.00
100,000,000.00
10,000,000.00
12,000,000.00
2022 24,000,000.00
12,000,000.00
2021
Annual Breakdown of Funding Requirements
60,000,000.00
600,000.00
(4)
60,000,000.00
80,000,000.00
34,600,000.00
4,000,000.00
30,000,000.00
30,000,000.00
Establishment of Common Service Brgy Mianay & Mangoso, Facility for Rice & Corn Sigma, Capiz
Brgy. Amaga & Mianay, Sigma, Capiz
3,000,000.00
Sapian, Capiz
Establishment of Socialized Housing Project
10,000,000.00
Poblacion, Sapian, Capiz
Construction of Bridges
10,000,000.00
30,000,000.00
10,000,000.00
Sapian, Capiz
Poblacion, Sapian, Capiz
Sankal-Quiajo, Pres. Roxas, 24,000,000.00 Capiz Sankal-Pandan, Pres. Roxas, 24,000,000.00 Capiz Pres, Roxas, Capiz 200,000,000.00
(2)
Construction of farm to market roads Construction of Public Market
Construction of Brgy. Sangkal to Brgy.Quiajo FMR Construction of Brgy. Sangkal to Brgy. Pandan FMR Lot acquisition a nd construction of new housing units with amenities for Balik Probinsya beneficiaries Construction of Public Terminal
(1)
A N N E X A • L I S T O F P R O G R A M S , P R O J E C T S A N D AC T I V I T I E S P E R K E Y R E S U LT A R E A P E R AG E N C Y / O F F I C E
2021-2022
2021-2022
2021-2022
2021-2022
2021-2022
2021-2022
2021-2022
2021-2022
2022 -2025
2021-2023
2022 -2023
2021-2022
2022-2025
2022-2024
Jan. 2023-Dec 2026 Jan. 2023-Dec 2026 Jan. 2023-Dec 2026 Jan. 2023-Dec 2026 Jan. 2023-Dec 2026 2021-2024
2021-2024
2023-2024
2022
Timeline/ Implementation Period
(7)
94
Priority Projects/Activities
Location/Site Total Funding Requirement
(3)
27,031,257.50 51,491,950.30
34,764,034.00
59,451,853.50
114,765,375.00
Brgy. San Julian, Brgy. San Antonio, Tapaz, Capiz
Brgy San Miguel Ilaya, Tapaz, Capiz
Brgy. Candelaria, Tapaz, Capiz
Brgys of San Nicolas, Sta. Ana, Taslan, Tapaz, Capiz
Brgys of Taft, San Roque, San Miguel Ilawod, San Miguel Ilaya, Tapaz, Capiz
Pres. Roxas, Ca piz
Pres. Roxas, Ca piz
Pres. Roxas, Ca piz
Pres. Roxas, Ca piz
Brgy. Abangay, Brgy. Garcia, 79,768,936.00 Tapaz, Capiz
153,427,551.55
Brgys of Abangay, Lahug, Nayawan, Tapaz, Capiz
Brgys of Agcococ, Artuz, 358,339,670.00 Tabon, Rizal Sur, Rizal Norte, Maliao, Tapaz, Capiz
78,901,642.00
Brgy. Roxas,Brgy. Agpalali, Brgy. Tabon, Tapaz Capiz
79,768,936.00
114,765,375.00
59,451,853.50
34,764,034.00
51,491,950.30
27,031,257.50
153,427,551.55
358,339,670.00
78,901,642.00
212,300,000.00
212,300,000.00
200,000,000.00
2021 130,000,000.00
Brgy. Agcococ, Brgy. Artuz, Brgy. Tabon, Tapaz, Capiz
2020
2022
Annual Breakdown of Funding Requirements
155,116,650.00
(4)
Brgy. Camburanan, Brgy. 155,116,650.00 Agcococ, Brgy. Artuz, Tapaz, Capiz
Brgy. Abangay, Brgy. Lahug, 200,000,000.00 Tapaz, Capiz
Brgy. Taslan, Brgy. Sta, Ana, 130,000,000.00 Tapaz, Capiz
(2)
B A L I K P R O B I N S YA , B AG O N G PAG - A S A P R O G R A M • W E S T E R N V I S AYA S R E G I O N A L AC T I O N P L A N
Validation/Identification of bene ficiaries
Coordinating with key agencies and private sectors MOA signing
Concreting of resilient access Road network along Sitio BulodGarcia-Abangay (7Km.) OTHERS Organization of BP2 Committees in the loc aI leveI includi ng desination of BP2 FocaI Person
Concreting of resilient access Road Network from Brgy. Abangay going to Brgys Lahug- NayawanDaan Sur (18 km.) Concreting of resilient access Road network along CapSUMarugo Road (3Km.) Concreting of resilient access Road network along Brgy. San Miguel Ilaya (Banga Jimenez)(4.20Km.) Concreting of resilient access Road network along Brgy. Candelaria (Tara-Tara) Sitio Mawang (3Km.) Concreting of resilient access Road network along Brgy. San Nicolas- Ulilik- Sta. Ana- Taslan (7Km.) Concreting of resilient access Road network along Brgy. TaftSan Roque-San Miguel Ilawod-San Miguel Ilaya Boundary (10Km.)
Concreting of resilient access Road Network from Brgy. Camburanan- Agcococ - Artuz Road Concreting of resilient access Road Network from Brgy. Agcococ - Artuz- Tabon Road Concreting of access Road Network from Brgy. RoxasAgpalali- Tabon Concreting of resilient Access Road Network from Brgy. Agcococ - Artuz-Tabon-Rizal Sur- Rizal Norte - Maliao Road (48 km.)
Concreting of resilient access road network from Brgy. Taslan to Brgy. Sta. Ana connecting cacao industry plantation to National Highway Concreting of resilient access road network from Brgy. Abangay to Brgy.Lahug Brgy. Road (9 km.)
(1)
Beyond
Funding Source
OPAPP
OPAPP
OPAPP
OPAPP
OPAPP
OPAPP
OPAPP
OPAPP
OPAPP
OPAPP
OPAPP
OPAPP
DTI
(5)
2021-2022
2021-2022
2021-2022
2021-2022
2021-2022
2021-2022
2021-2022
2021-2022
2021-2022
2021-2022
2021-2022
2021-2022
2021-2022
Mayor's Ofce Mayor's Office Mayor's Office
2020
2020
2020
95
Timeline/ Implementation Period
(7)
Mayor's Office 2020
DPWH
DPWH
DPWH
DPWH
DPWH
DPWH
DPWH
DPWH
DPWH
DPWH
DPWH
DPWH
DPWH
Implementing Agency
(6)
150,000.00 150,000.00
C. Fish
SUB-TOTAL 5. PROVINCE OF AKLAN
150,000.00
B. Meat
Culasi
568,450,000.00
70,000,000.00
200,000,000.00
Anini-y
Brgy. Jinalinan, Barbaza
200,000,000.00
Anini-y
Construction of Seawall Protection at Barangay Casay Construction of Riverwall Protection at Barangay Casay Upgrading/Improvement of Municipal Fishing Port w/ Cold Storage Facility Establishment/Construction of Talipapa: A. Vegetable
70,000,000.00
3,750,000.00
Municipal Wide - Tibiao
Libertad
18,000,000.00
Municipal Wide - Tibiao
8,359,358,919.85
6,250,000.00
Province Wide Province Wide
Marketing Support Intensify Agricultural Extension Program Coordination and facilitation of National Rice, Corn, High Value Crops, Organic Agriculture, Agribusiness and Marketing, Fisheries and Agricultural Engineering Programs Organization of BP2 Beneficiaries into FCAs Capacity Building (for social preparation, values formation and livelihood skills training) Technical Support to DA banner programs Facilitate support for the provision of infrastructure such as irrigation and FMR SUB-TOTAL 4. PROVINCE OF ANTIQUE Construction/ Road Opening/ Upgrading of access road connecting to housing sites/ evacuation center a. Road opening/ construction to evacuation center (270 linear meters) b. Upgrading of access road to San Francisco Norte People's Village - Yolanda Housing Project (1,200 linear meters) c. Upgrading of access road to importante housing site (250 linear meters) Seawall/RiverWall Protection
Total Funding Requirement
(3)
Municipal Wide - Tibiao
Sigma, Capiz
Forging of MOA with SHFC
Location/Site
Sigma, Capiz
(2)
Sigma, Capiz
Priority Projects/Activities
Profilling of BP2 beneficiaries & LSIs Organization of BP2 Council
(1)
(4)
-
527,600,000.00
2020
35,000,000.00
100,000,000.00
100,000,000.00
35,000,000.00
3,750,000.00
18,000,000.00
6,250,000.00
4,767,350,000.00 0.00
2022
100,000 DSWD 50,000 LGU 100,000 DSWD 50,000 LGU 150,000 DSWD 100,000 DSWD 50,000 LGU 270,450,000.00 298,450,000.00 150,000 DSWD
150,000 DSWD
35,000,000.00
100,000,000.00
100,000,000.00
35,000,000.00
3,064,408,919.85
2021
Annual Breakdown of Funding Requirements
A N N E X A • L I S T O F P R O G R A M S , P R O J E C T S A N D AC T I V I T I E S P E R K E Y R E S U LT A R E A P E R AG E N C Y / O F F I C E
Beyond
Funding Source
OPA
OPA
OPA
OPA
OPA
DSWD/LGU
DSWD/LGU
DSWD/LGU
DOTR/BFAR
DPWH
DSWD/LGU
DSWD/LGU
DSWD/LGU
DOTR/DPWH
DPWH
DPWH
NEDA/DTI
MLGU/ PLGU/ MLGU/ PLGU/ DPWH DPWH
PLGU/ DPWH PLGU/ DPWH
National Gov't DPWH
Timeline/ Implementation Period
(7)
2021-2022
2021-2022
2021-2022
2022-2025
2021-2029
2022
2022
2022
MLGU/MSWDO 44136 /MDRRMO Office of the Nov. 2020 Mayor Office of the Nov -Dec 2020 Mayor /SB/MPDC OPA OPA
Implementing Agency
(6)
MLGU/ PLGU/ MLGU/ PLGU/ DPWH DPWH
GF GF
(5)
96
Poblacion-Marianos Section
Marianos-Albasan Section
Laguinbanua West
Construction of Revetment Wall
Construction of Revetment Wall
Construction of Revetment Wall
Municipal Wide - Hamtic
Culasi
Municipal Wide - Pandan
100,000,000.00
50,000.00 343,000.00
75,000.00
10,000,000.00
95,000.00
95,000.00
75,200,000.00 1,112,182,397.76
35,650,000.00
5,000,000.00
9,550,000.00
15,000,000.00
60,000,000.00
50,000.00 248,000.00
75,000.00
35,000.00
88,000.00
113,950,000.00 6,021,742,146.65
38,000,000.00
10,000,000.00
9,650,000.00
30,000,000.00
1,300,000.00
B A L I K P R O B I N S YA , B AG O N G PAG - A S A P R O G R A M • W E S T E R N V I S AYA S R E G I O N A L AC T I O N P L A N
c. School on air radio and TV program d. Meeting with Partners SUB-TOTAL MEDIUM TERM 1. PROVINCE OF ANTIQUE Provision of reliable internet
a. MDRRMO Community coordination and linkaging, information updating, communication and advisory program b. Communication expenses
541,250,000.00 16,103,808,193.89
111,650,000.00
35,000.00
Lambunao, Iloilo
Construction of Potable Water System ( Level III & II)
25,000,000.00
Municipal Wide - Pandan
Lambunao, Iloilo
Construction of Slope Protection
85,000,000.00 192,000,000.00
183,000.00
Lambunao, Iloilo
Construction of Drainage System
2,600,000.00
Municipal Wide - Pandan
Lambunao, Iloilo
Road Upgrading
SUB-TOTAL KRA 4 TOTAL CROSS-CUTTING: SHORT TERM 1. PROVINCE OF ANTIQUE Coordination, Linkaging, Information Updating, Meetings
Brgy. Balagiao Lambunao, Iloilo
Balagiao Agri-Tourism Development Project
25,000,000.00
30,000,000.00
50,000.00 50,000.00
123,950,000.00 8,244,173,649.48
38,000,000.00
10,000,000.00
9,650,000.00
40,000,000.00
1,300,000.00
25,000,000.00
-
NGA
NGA
NGA
NGA
LGU
DPWH/LGU
DPWH/LGU
DPWH/LGU
DPWH/LGU
LGU
2022-beyond
2022-beyond
2022
2022
2022
Timeline/ Implementation Period
(7)
MEO
DICT
LGU
DepEd
DepEd
January 2020December 2021
2020-2022
2020-2022
2020-2022
2020-2022
2021-2022
2020-2022
2024-2025
DICT, LGU
3 yrs.
97
DepEd Pandan January 2021 December 2021 DepEd Pandan January 2021 December 2021 LGU 2020
LGU-70% MDRRMO MDRRM Fund
National, Province, 20% DF
MDRRMO
MEO
MEO
Engineering/ MEEDO/ Tourism MEO, MENRO
LGU/DPWH 20%DF Nat'l.,Provinc e General Fund,20% Dev't Fund, National, Others 20%DF/ Province GF, National, Province, 20% DF General Fund/ Others
10,000,000.00
180,000,000.00
Beyond
Implementing Agency
(6)
60,000,000.00
15,000,000.00
50,000,000.00
50,000,000.00
50,000,000.00
15,000,000.00
2022 15,000,000.00
Funding Source
LGU/DILG/DPWH LGU/DILG/DPWH2023
-
15,000,000.00
2021
(5)
LGU/DPWH
2020
Annual Breakdown of Funding Requirements
15,000,000.00
(4)
50,000,000.00
195,000,000.00
50,000,000.00
50,000,000.00
50,000,000.00
30,000,000.00
15,000,000.00
Total Funding Requirement
(3)
SUB-TOTAL 6. PROVINCE OF ILOILO Construction of JNR-PalaypayPalaypay, Guipis, Anilao, Iloilo Guipis-Nazuni, Dingle Road Socialized Housing Sambag Culob, Serallo, Anilao, Iloilo Program/Acquisition of Lot for Resettlement Mari-it Eco- Tourism Development Jayobo, Lambunao, Iloilo Project
Numancia, Aklan
Location/Site
Construction of Drainage System
(2)
Numancia, Aklan
Priority Projects/Activities
Purchase of Lot for the Expansion of Municipal Cemetery
(1)
Priority Projects/Activities
300,000.00 100,000.00
20,000,000.00
Belison
Municipal Wide - Tibiao
Municipal Wide - Tibiao
Total Funding Requirement
(3)
500,000.00
Location/Site
Belison
(2)
(4)
2020
> Delivery of Technical Assistance Services No. of TAS rendered to clienteles > Capacity Building No. of mandatory seminars conducted > Capacity Building
regionwide
regionwide
regionwide No. of cooperatives registered > Referral and Linkaging No. of clienteles referred/linked to Coops/LGAs/LGUs at all levels in the region (Provincial/City/ Municipal/Barangays)
B) Formative and Development Stage > Social Preparation and Integration Pre-registration Seminars regionwide conducted for BP2 beneficiaries
SUB-TOTAL 120,900,000.00 10,000,000.00 CROSS-CUTTING TOTAL 121,243,000.00 10,095,000.00 B. REGIONAL LINE AGENCIES KEY RESULT AREA 1 EMPOWERMENT OF LOCAL INDUSTRIES SHORT TERM 1. COOPERATIVE DEVELOPMENT AUTHORITY Individual Beneficiaries are Mainstreamed into the Cooperative Sector and have Benefitted in the BP2 National Program A) Initial/Preliminary Stage > Identification & Coordination with Local Government Units, Line Government Agencies and Cooperatives at all levels (Regional/Provincial/City/ Municipal/ Barangays) with BP2 Program Coops/LGAs/LGUs regionwide 4,930,000.00 1,500,000.00 identified/coordinated
Social Preparation Activities: Conduct of Family conferences/meetings Capacity Development Interventions Conduct orientation with entrepreneurs to encourage them to register their business/ enterprises with the Investment Incentives Board of the municipality to avail fiscal and nonfiscal incentives provided in the Municipal Investment Incentives Code. Access to technology and innovation to improve productivity and efficiency of the community through Small Enterprise Technology Upgrading Program and Shared Service Facilities extended by line NGAs.
(1)
35,450,000.00 35,500,000.00
1,815,000.00
1,650,000.00
5,000,000.00
50,000.00
150,000.00
2022 250,000.00
70,450,000.00 70,698,000.00
10,000,000.00
50,000.00
150,000.00
2021 250,000.00
Annual Breakdown of Funding Requirements
A N N E X A • L I S T O F P R O G R A M S , P R O J E C T S A N D AC T I V I T I E S P E R K E Y R E S U LT A R E A P E R AG E N C Y / O F F I C E
Beyond
Funding Source
MLGU
MSWDO
MSWDO
Implementing Agency
(6)
GAA
CDA
MLGU/ NGAs MLGU/ NGAs
MLGU
DSWD
DSWD
(5)
January December for 2021 -2022, except for 2020 wich is July to December
2021-2023
2021-2022
2021-2022
2021-2022
Timeline/ Implementation Period
(7)
98
Priority Projects/Activities
(2)
Location/Site
Regionwide
109,905,000.00
DTI 6
DSWD
3,209,173.00
35,740,892.79
363,447,294.79
1,200,000.00
600,000.00 375,880,000.00 65,000,000.00 225,528,000.00
1,815,000.00
111,555,000.00
B A L I K P R O B I N S YA , B AG O N G PAG - A S A P R O G R A M • W E S T E R N V I S AYA S R E G I O N A L AC T I O N P L A N
38,950,065.79 734,994,589.58
3,209,173.00 To be coordinated with DOLE Central Office
35,740,892.79 To be coordinated with DOLE Central Office
363,447,294.79
DTI 6
DOLE VI GAA DOLE VI
DOLE VI GAA DOLE VI
DOLE VI GAA DOLE VI
3,209,173.00 To be coordinated with DOLE Central Office
DOLE VI GAA DOLE VI
GOP
DOLE Central DOLE VI Office, GAA
GAA
3,209,173.00
-
-
Implementing Agency
(6)
DOLE Central DOLE VI Office, GAA
Beyond
Funding Source
324,497,229.00 To be coordinated with DOLE Central Office
-
1,815,000.00
2022
(5)
324,497,229.00
35,740,892.79
109,905,000.00
109,905,000.00
To be coordinated with DOLE Central Office
-
1,650,000.00
2021
Annual Breakdown of Funding Requirements
35,740,892.79 To be coordinated with DOLE Central Office
324,497,229.00
324,497,229.00 109,905,000.00
6,600,000.00 324,497,229.00
6,600,000.00
1,500,000.00
2020
6,600,000.00
(4)
324,497,229.00
6,600,000.00
4,930,000.00
Total Funding Requirement
(3)
SUB-TOTAL 38,950,065.79 KRA 1 TOTAL 848,329,589.58 KEY RESULT AREA 2 FOOD SECURITY AND AGRICULTURAL PRODUCTIVITY SHORT TERM 1. DEPARTMENT OF TRADE AND INDUSTRY DTI Pangkabuhayan Para sa Pagbangon at Ginhawa (PPG) Regionwide no budget yet SUB-TOTAL MEDIUM TERM 2. DEPARTMENT OF AGRICULTURE HVCDP Vegetable Seeds Regionwide 1,800,000.00 Rice Program Hybrid Seeds Regionwide 375,880,000.00 Certified Seeds Regionwide 65,000,000.00 Fertlizer (Hybrid Seeds) Regionwide 225,528,000.00
Job Search Assistance thru Public Regionwide Employment Service
SUB-TOTAL LONG TERM 1. DEPARTMENT OF LABOR AND EMPLOYMENT Provision of Livelihood Assistance Regionwide
Tulong Panghanapbuhay sa Ating Regionwide Disadvantaged/Displaced Workers (TUPAD) Job Search Assistance thru Public Regionwide Employment Service
SUB-TOTAL MEDIUM TERM 1. DEPARTMENT OF LABOR AND EMPLOYMENT Provision of Livelihood Assistance Regionwide
SUB-TOTAL 3. DEPARTMENT OF LABOR AND EMPLOYMENT Tulong Panghanapbuhay sa Ating Regionwide Disadvantaged/Displaced Workers (TUPAD) SUB-TOTAL 4. DEPARTMENT OF SOCIAL WELFARE AND DEVELOPMENT Community Grant Support to Binalbagan, Calatrava, Receiving Communities Cauayan, Enrique B. Magalona, Hinigaran, Hinobaan, Ilog, Isabela, La Castellana, Manapla
Establishment of Shared Service Facility
No. of mandatory seminars conducted regionwide C) Progam Review and Evaluation No. of review and evaluation conducted regionwide SUB-TOTAL 2. DEPARTMENT OF TRADE AND INDUSTRY
(1)
99
Jan-Dec 2021
January to December 2021
Procurement until Dec. 2020 Establishment & operationalization, 2nd sem 2021
Timeline/ Implementation Period
(7)
Priority Projects/Activities
(2)
Location/Site Total Funding Requirement
(3)
(4)
Coordinate with Local InterAgency Committees (LIAC) of Local Government Units (LGUs) for possible assistance to the BP2 Applicants
SUB-TOTAL 2. NATIONAL HOUSING AUTHORITY Update of Informal Settler Families in the Region which will include the BP2 Applicants
Facilitate matching and access of identified program beneficiaries to available housing projects and/or house financing program of the KSA.
Evaluate the applicants’ affordability vis-a- vis housing availability Inventory of available housing units from among the projects of NHA, SHFC and Pag-IBIG (unoccupied/abandoned, unawarded, foreclosed) Repairs of existing units to make it ready for occupancy, including power and water facilities
Identify applicants who need housing assistance.
308,700
54,000
362,700.00
2020 Fertlizer (Certified Seeds) Regionwide 26,000,000.00 Mushroom Production Training 600,000.00 Regionwide (with provision of basic kit) Organi Agriculture Program Lowland Vegetables Pakbet Regionwide 30,000.00 Compost/Vermicast Regionwide 36,000.00 SUB-TOTAL 694,874,000.00 LONG TERM SUB-TOTAL KRA 2 TOTAL 694,874,000.00 KEY RESULT AREA 3 HOUSING, SOCIAL WELFARE, HEALTH, EMPLOYMENT AND HUMAN RESOURCE DEVELOPMENT SHORT TERM 1. DEPARTMENT OF HUMAN SETTLEMENTS AND URBAN DEVELOPMENT
(1)
-
123,300
18,000
141,300.00
67,800
85,800.00
1,200,000.00
693,674,000.00
c/o applicants
18,000
1,200,000.00
2022
30,000.00 36,000.00 693,674,000.00
2021 26,000,000.00 600,000.00
Annual Breakdown of Funding Requirements
A N N E X A • L I S T O F P R O G R A M S , P R O J E C T S A N D AC T I V I T I E S P E R K E Y R E S U LT A R E A P E R AG E N C Y / O F F I C E
117,600
18,000
135,600.00
Beyond
Funding Source
Timeline/ Implementation Period
(7)
DHSUD/SHFC/ Pag-IBIG Fund
1st and 2nd Quarter 2021 continuing DHSUD/NHA 2nd to 4th Quarter 2021 continuing DHSUD/NHA/ 2nd to 4th SHFC/ Quarter Pag-IBIG FUND 2021
DHSUD/NHA
Implementing Agency
(6)
NHA Program NHA2021-2022 Resettlement and Development Unit (RDU) NHA Program NHA2021 Resettlement and Development Unit (RDU) and Community Support Services and Development Unit (CSSDU)
(5)
100
Priority Projects/Activities
(2)
Location/Site
(4)
2020
-
36,000
21,600 19,800
36,000
21,600 81,000 138,600.00
2021
77,400.00
2022
Annual Breakdown of Funding Requirements
B A L I K P R O B I N S YA , B AG O N G PAG - A S A P R O G R A M • W E S T E R N V I S AYA S R E G I O N A L AC T I O N P L A N
276,800.00
Total Funding Requirement
(3)
SUB-TOTAL MEDIUM TERM 1. DEPARTMENT OF HUMAN SETTLEMENTS AND URBAN DEVELOPMENT Coordinate with LGU and NHA in 108,000 planning and program convergence and budgeting for the development of new resettlement sites. Identify idle government lands 68,000 that are suitable as housing site for the BP2 program. Provide technical assistance to 100,800 LGU-led housing projects SUB-TOTAL 2. NATIONAL HOUSING AUTHORITY Orientation of LGUs to Resettlement Assistance Program (RAP-LGU)
Assistance to draft Relocation and Resettlement Action Plans of LGUs to integrate BP2 Applicants and Programs
(1)
21,600
36,000
57,600.00
Beyond
Funding Source
Implementing Agency
(6)
Timeline/ Implementation Period
(7)
NHA Program NHA-Forward Planning of NHA Districts 1,2,& 3 and Resettlement and Development Unit (RDU)
DHSUD DHSUD
DHSUD
101
2021 and beyond
NHA Program NHA2021 Resettlement and Development Unit (RDU) and Community Support Services and Development Unit (CSSDU)
(5)
Priority Projects/Activities
(2)
Location/Site
SUB-TOTAL KRA 3 TOTAL KEY RESULT AREA 4 INFRASTRUCTURE DEVELOPMENT SHORT TERM 1. DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS Poblacion to Barangay Guadalupe Libacao, Aklan leading to Mangayaw Waterfalls, Barangay Guadalupe, Libacao, Aklan 25,000,000.00
1,308,000.00 1,947,500.00
-
25,000,000.00
464,800.00 744,700.00
464,800.00 628,000.00
64,800.00
64,800.00
2022
108,000.00
2021
400,000.00
2020
Annual Breakdown of Funding Requirements
400,000.00
(4)
1,200,000.00
Total Funding Requirement
(3)
SUB-TOTAL LONG TERM 1. DEPARTMENT OF HUMAN SETTLEMENTS AND URBAN DEVELOPMENT Assist LGUs in the review and Western Visayas updating of their comprehensive land use plans (CLUPs) and Local Shelter Plans to support the objectives of the BP2 program (Training) Promote the development of regional growth centers and subregional growth centers by providing incentives and subsidies to developers Conduct of periodic monitoring of status of project implementation
Implementation of RAP-LGU to local government who accepted the program through Memorandum of Agreement (MOA)
(1)
A N N E X A • L I S T O F P R O G R A M S , P R O J E C T S A N D AC T I V I T I E S P E R K E Y R E S U LT A R E A P E R AG E N C Y / O F F I C E
464,800.00 658,000.00
64,800.00
400,000.00
Beyond 1. Assistance of Php 25,000,000.00 for all municipalities, 5th and 6th class cities and provinces; 2. Assistance of Php 50,000,000.00 for 1st to 4th class cities and provinces. The 50% of NHA contribution shall be treated as grant and the remaining balance shall be extended as a noninterest-bearing loan to the LGU payable over a period of seven (7) years inclusive of a oneyear moratorium period.
Funding Source
GAA 2020
(5)
Timeline/ Implementation Period
(7)
DPWH
DHSUD
DHSUD
DHSUD
1 year 2020
NHA-Technical 2021 and beyond Forward Planning of NHA Districts 1,2,& 3
Implementing Agency
(6)
102
170,000,000.00
350,420,000.00 640,000,000.00
170,000,000.00
512,400,000.00 7,544,000,000.00 2,286,000,000.00
Valderrama, Antique
San Remigio and Valderrama, Antique Oton and Tigbauan, Iloilo
Pavia and Leganes, Iloilo
Sta. Barbara and Dumangas, Iloilo Sara, Iloilo
Panay East-West Road, Iloilo
San Remigio-Bugo-Gen. Fullon Road Iloilo R-1 Bypass Road
Iloilo Circumferential Road 2
Iloilo Circumferential Road 3
22,637,360,000.00 23,234,260,000.00 55,146,079,241.87
5,382,334,000.00 5,799,754,000.00 10,498,935,721.74
305,000,000.00
803,861,000.00 941,648,000.00 13,749,208,671.65
50,000,000.00
105,000,000.00
142,429,000.00
50,000,000.00
90,000,000.00
70,000,000.00
75,055,000.00
75,000,000.00
30,000,000.00
57,579,000.00
58,798,000.00
120,287,000.00
30,287,000.00
10,000,000.00
20,000,000.00
60,000,000.00
17,500,000.00
7,500,000.00
2021 10,000,000.00
-
1,505,000,000.00 1,546,693,000.00 15,347,340,583.48
120,000,000.00
130,000,000.00
105,000,000.00
110,000,000.00
130,000,000.00
105,000,000.00
110,000,000.00
105,000,000.00
120,000,000.00
170,000,000.00
300,000,000.00
41,693,000.00
14,693,000.00
2,000,000.00
25,000,000.00
2022
Annual Breakdown of Funding Requirements
B A L I K P R O B I N S YA , B AG O N G PAG - A S A P R O G R A M • W E S T E R N V I S AYA S R E G I O N A L AC T I O N P L A N
SUB-TOTAL KRA 4 TOTAL GRAND TOTAL
363,974,000.00
Candoni and Hinoba-an, Negros Occidental Himamaylan City, Negros Occidental
Candoni-Gatuslao-Basay Boundary Road Himamaylan City – Negros Oriental Boundary - Tayasan Road
506,200,000.00
220,000,000.00
1,045,000,000.00
881,200,000.00
Passi City, Iloilo
659,160,000.00 430,000,000.00
2,300,000,000.00
545,000,000.00
Maayon, Capiz
710,000,000.00
1,534,160,000.00
491,000,000.00
461,000,000.00
1,748,000,000.00 981,000,000.00
560,000,000.00
3,063,000,000.00
Maayon-Sara Road, Maayon, Capiz Passi Bypass Road
Maayon-Sara Road, Sara, Iloilo
41,020,000.00
86,000,000.00
746,000,000.00
103,000,000.00
20,000,000.00
42,000,000.00
113,000,000.00
16,400,000.00
101,400,000.00
NRJ Batad-Lumbia-TanzaCarles, Iloilo Estancia Road leading to Gigantes Islands, Carles, Iloilo La Carlota - La Carlota Sugar La Carlota City, Negros Central Road leading to Occidental muscovado sugar mill brick chimneys, Canman-og, La Carlota City, Negros Occidental Jct. Martesan leading to Lakawon Cadiz City, Negros Island Resort, Barangay Cadiz Occidental Viejo, Cadiz City, Negros Occidental SUB-TOTAL LONG TERM 1. DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS Panay East-West Road, Antique Lambunao, Iloilo
67,000,000.00
2020 32,000,000.00
84,500,000.00
(4)
10,000,000.00
Total Funding Requirement
(3)
17,500,000.00
Location/Site
NRJ leading to Balicaocao Kabankalan City, Negros Highland Resort, Kabankalan City, Occidental Negros Occidental SUB-TOTAL MEDIUM TERM 1. DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS Access Road leading to Agtalin Pilar, Capiz Shrine, Barangay Dulangan, Pilar, Capiz Sitio Calubihan-Sitio Manlud Road Ajuy, Iloilo leading to Manlud Water Falls, Barangay Sto. Rosario, Ajuy, Iloilo
(2)
42,000,000.00
Priority Projects/Activities
Construction/Improvement of Bacolod City Access Road leading to Declared Tourism Destinations along ArceoAlegria Road leading to Murcia Proper Gateway to various Mountain Resort Bacolod City,Negros Occidental
(1)
-
-
658,000.00
Beyond
Funding Source
GAA
GAA
GAA
GAA
GAA
GAA
GAA
GAA
GAA
GAA
GAA
GAA 2020
(5)
DPWH
DPWH
DPWH
DPWH
DPWH
DPWH
DPWH
DPWH
DPWH
DPWH
DPWH
DPWH
Implementing Agency
(6)
103
10 years 2017-2026 8 years 2017-2024 10 years 2017-2025 7 years 2018-2024 6 years 2018-2023 9 years 2016-2024 5 years 2018-2022 5 years 2019-2023 8 years 2017-2023 8 years 2018-2025 8 years 2018-2025
3 years 2018-2020
3 years 2020-2022
4 years 2018-2021
3 years 2020-2022
3 years 2020-2022
2 years 2020 - 2021
2 years 2020 - 2021
Timeline/ Implementation Period
(7)
Annex B
Summary of Investement Requirements by Source of Funds
Table 1 - Summary of Investment Requirements by Source of Funds
Source of Fund
Investment Requirements (PhP)
Number of PPAs
Short
Medium
Total Investment Requirement (PhP)
Long
Key Result Area 1: Empowerment of Local Industries Agency Reg. Budget
260
1,286,840,829.00
2,900,582,294.79
3,463,900,065.79
7,651,323,189.58
LGU Funds
135
381,219,600.00
28,788,000.00
844,955,000.00
1,254,952,600.00
11
35,040,000.00
110,000,000.00
290,040,000.00
435,080,000.00
Private Sector
Key Result Area 2: Food Security and Agricultural Productivity Agency Reg. Budget
140
864,045,327.00
1,329,370,700.00
609,011,140.00
2,802,427,167.00
LGU Funds
84
164,161,434.16
90,854,089.00
48,238,000.00
303,253,523.16
5
7,000,000.00
25,000,000.00
–
32,000,000.00
Private Sector
Key Result Area 3: Housing, Social Welfare, Health, Employment and Human Resource Development Agency Reg. Budget
186
1,457,262,723.24
458,386,800.00
1,151,048,000.00
3,066,697,523.24
LGU Funds
165
182,648,122.00
71,065,000.00
146,215,000.00
399,928,122.00
–
–
100,000,000.00
100,000,000.00
Private Sector
1
Key Result Area 4: Infrastructure Development Agency Reg. Budget
290
416,000,000.00
5,521,411,000.00
31,731,368,919.85
37,668,779,919.85
LGU Funds
196
210,132,320.76
478,211,876.28
520,050,000.00
1,208,394,197.04
–
2,000,000.00
100,000,000.00
102,000,000.00
Private Sector
5
Cross-Cutting Interventions Agency Reg. Budget
6
110,000.00
120,800,000.00
–
120,910,000.00
LGU Funds
3
233,000.00
100,000.00
–
333,000.00
Private Sector
–
–
–
–
–
5,004,693,356.16
11,136,559,760.07
39,004,826,125.64
55,146,079,241.87
TOTAL
1,487
W E S T E R N V I S AYA S R E G I O N A L AC T I O N P L A N
107
Annex C
Other Relevant Tables
Table C-1 - Yolanda permanent housing projects located within danger/hazard zones and Environmentally Critical Areas (ECAs) Project Details
Issue/Remarks
San Jose Ville Housing Project Site 2/Angel Ville Subdivision Location: Brgy. San Jose, Roxas City, Capiz Cost: PhP 289.48 Million No. of houses: 1,000
The site is within the 200 to 500 meter buffer zone between residential and agro-industrial areas of Roxas City, Capiz. Its proximity to the compound of Cal’s Poultry Supply Corp. poses a significant health risk to the housing beneficiaries.
New Washington Homes Sites 1 and 2 Location: Brgy. Fatima, New Washington, Aklan Cost: PhP 144.73 Million No. of houses: 500
The projects are within the coastal area of Brgy. Fatima, making the row houses and its residents vulnerable to flooding and storm surge during typhoons.
New Washington Housing Project Location: Brgy. Fatima, New Washington, Aklan Cost: PhP 289.7 Million No. of houses: 1,000
This project is only a few meters away from the coast of Barangay Fatima making it vulnerable to flooding and storm surge.
Olympus Residences Sites 1-4 Location: Brgy. Ochando, New Washington, Aklan Cost: PhP 487.75 Million No. of houses: 1,683
The projects are near the coast of Brgy. Ochando and within a swampy plain with mangroves and other vegetation. Some of the blocks of Olympus Residences Sites 1 and 2 were flooded during the RPMC site/field inspection.
Batan Permanent Housing Sites 1-4 Location: Brgy. Bay-Ang, Batan, Aklan Cost: PhP 594.7 Million No. of houses: 1,305
The projects were constructed on a hilltop. Some of the houses are vulnerable to erosion and landslide, particularly those near/beside the edge of the hill. The children, elderly, and physically/ mentally challenged individuals living at the site may accidentally fall off the edge of the hill if unsupervised.
W E S T E R N V I S AYA S R E G I O N A L AC T I O N P L A N
111
Table C-2 - Projects with Small to Moderate Risks/Exposure to Hazards within environmentally Critical Areas Project Details
112
Issue/Remarks
Villa Lugta Nuevo Location: Brgy. Lugta, Laua-an, Antique Cost: PhP 223.2 Million No. of houses: 770
The site lot is low lying and near the Guisijan-Lugta Communal Irrigation System (CIS) of NIA. During our site visit, we were able to document the five incheshigh floodwater affecting many of the completed bungalow row housing units. The flooding problem is the main reason for the suspension of the awarding of housing units and the transfer of the beneficiaries despite its substantial completion in 2018.
Jamindan Ville Location: Brgy. Pangabuan, Jamindan, Capiz Cost: PhP 154.78 Million No. of houses: 535
The site lot is low-lying and flood-prone. The project is affected by perennial flooding, particularly during continuous heavy rainfall and typhoons.
Bugasong New Paradise Villages 1 and 2 Location: Brgy. Lacayon, Bugasong, Antique Cost: PhP 517.84 Million No. of houses: 1,787
The projects are located in a contiguous and sloping lot. Despite being within the allowed 10-15% slope, the monitors had difficulty traversing the uphill subdivision roads particularly at village 2 during the rainy site visit. Living at the blocks at the upper portion of the villages will be a challenge for the children, elderly, pregnant women, and physically challenged individuals.
Poblacion Village Location: Brgy. Poblacion, Patnongon, Antique Cost: PhP 72.5 Million No. of houses: 201
A portion of the site-lot is beside a hill. During the RPMC site inspection, the unpaved subdivision road on the hillside was already eroded by stormwater running from the hilltop, bringing sand, rocks, and debris down the village. Many of the subdivision roads already have cracks and minor damages.
B A L I K P R O B I N S YA , B AG O N G PAG - A S A P R O G R A M
Project Details
Issue/Remarks
San Rafael Prosperity Homes Development Project Location: Brgy. San Rafael, Patnongon, Antique Cost: PhP 88.4 Million No. of houses: 232
A portion of the site-lot is also beside a hill making it vulnerable to erosion and landslide. In the second RPMC site visit, the monitors found out that a landslide damaged the project’s riprap.
Villa Lindero Nuevo Site 1 Location: Brgy. Lindero, Laua-an, Antique Cost: PhP 86.9 Million No. of houses: 241
The project is located on a hillside. The housing units and the residents are vulnerable to erosion and landslide.
St. Vincent Village Location: Brgy. Vito, Sagay, City Cost: PhP 289.8 Million No. of houses: 1,000
A portion of the site lot is alongside/adjacent to a tributary/creek with mangroves and vegetation. Aside from being an ECA, the lot is also vulnerable to flooding during continuous heavy rainfall and typhoons. One unit was already flooded during the RPMC site inspection.
Escalante Heights 1 Location: Brgy. Old Poblacion, Escalante, Negros Occidental Cost: PhP 161.9 Million No. of houses: 559
There is a graveyard at the southwestern part of the site-lot from its landmark/entrance. The presence of these graves will affect the acceptance and living conditions of the beneficiaries, particularly those who will be awarded with units at the side of the graveyard.
W E S T E R N V I S AYA S R E G I O N A L AC T I O N P L A N
113
Table C-3 - List, Location and Status of Available AFP/PNP Housing Facilities in the Region
Name of Project
114
Location
Mode of Payments
Remarks
Linz Ville (AFP/PNP Housing Project)
Brgy Cruz, Barotac Nuevo, Iloilo
Collection Servicing Arrangement
Must be a Pag-ibig member
Ajuy Housing Project
Brgy Luca and Poblacion. Ajuy, Iloilo
Grant
Must be included in LGU Masterlist
Balasan People’s Village
Brgy Manhut, Balasan, Iloilo
Grant
Must be included in LGU Masterlist
Banate People’s Village
Brgy Carmelo, Banate
Grant
Must be included in LGU Masterlist
Batad People’s Village
Brgy. Batad Viejo
Grant
Must be included in LGU Masterlist
Survivor Village, Site 2
Brgy Bacjawan Sur, Conception, Iloilo
Grant
Must be included in LGU Masterlist
Barasan-Bolilao People’s Village
Brgy Bolilao, Dumangas, Iloilo
Grant
Must be included in LGU Masterlist
San Agustin Village
Bgry Capaliz, Dumangas, Iloilo
Grant
Must be included in LGU Masterlist
Ploc-Sool People’s Village
Brgy Paloc-Sool, Dumanags, Iloilo
Grant
Must be included in LGU Masterlist
1Gogo People’s Village Site 2
Brgy. Gogo, Estancia
Grant
Must be included in LGU Masterlist
Granville Residences, Sites 1,2 and 3
Brgy. Bagacay, San Dionisio, Iloilo
Grant
Must be included in LGU Masterlist
San Rafael Housing Project
Brgy. Poscolon, San Rafael, Iloilo
Grant
Must be included in LGU Masterlist
EMBONGA Lemery Village
Brgy. Dalipe, Lemery, Iloilo
Grant
Must be included in LGU Masterlist
Sara Resettlement Project
Brgy Feraris, Sara, Iloilo
Grant
Must be included in LGU Masterlist
B A L I K P R O B I N S YA , B AG O N G PAG - A S A P R O G R A M
Republic of the Philippines
WESTERN VISAYAS REGIONAL DEVELOPMENT COUNCIL National Economic and Development Authority Region VI Fort San Pedro, Iloilo City 5000 Philippines