![](https://static.isu.pub/fe/default-story-images/news.jpg?width=720&quality=85%2C50)
1 minute read
POTENTIAL CONFLICTS
by REA site
Some issues involving this strategy are as follows:
/ Can get costly if road reconstruction or realignments are required and land acquisition is needed to address it;
Advertisement
/ Some intersection approaches might give the perception of higher approach speeds and result in unintended outcomes;
![](https://assets.isu.pub/document-structure/230203171648-9ccf97d50e595b3c5744cc0ba88bb2fc/v1/2a34095be7a88124aa328febf1a0a354.jpeg?width=720&quality=85%2C50)
/ Reducing sight distances in specific areas could encourage reduced approach speeds, but careful maintenance must be taken with this approach;
/ Intersections often have a larger sight line because of the location and angle, requiring the driver to look outside of the “normal” viewpoint (side windows); and
/ Make sure and maintain that all traffic signs and signals are not obstructed by vegetation or street furniture.
Cost
Low to medium cost depending on the level of construction required.