Portfolio_Yangsihang Wang

Page 1

YANGSIHANG WANG

Architectural Portfolio 2021-2023

A Construction Skills Centre Stoke on Trent A Children's Cinema Istanbul A Cohousing for 'Mixabled' People Sheffield Work Experence 03-06 07-10 11-12 13-14
CONTENT

01

RE:MAKING A CONSTRUCTION SKILLS CENTRE

The objective of this project is to design a Construction Skills Centre that integrates biophilic design principles. This educational building will provide a platform for individuals to acquire timber construction skills and green wall construction skills. By incorporating biophilic design principles, we aim to foster stronger connections and engagement with nature. This approach allows people to not only learn about biophilic design in a workshop setting but also experience it firsthand throughout the space.

The site currently consists of two existing buildings. The China Hall will undergo a retrofit to serve as the workshop area for woodworking and green wall construction. On the other hand, the Gorden House will be demolished, and its materials will be repurposed and utilized in the new design.

The retrofit project is situated on Kingsway in Stoke-on-Trent, right in the city center and adjacent to Spode's China Halls. These halls hold significant historical value to Stoke's pottery industry, which relied heavily on the waterways as the primary transportation networks.
TRANSPORT FUNCTION PUBLIC & PRIVATE SITE ANALYSIS FOOD RETAIL CULTURE CHINA HALL
Stock on Trent

ISTANBUL CINEMA CLUB

A CHILDREN'S CINEMA IN ISTANBUL

Istanbul could be described as a crossroads of the world, being famous for connecting the east and the west since the days of the Silk Route. It is also a strategic point on the important shipping routes along the Bosphorus from Russia and the Black Sea to the Mediterranean and beyond. It is the only major city in the world that straddles two continents, exemplifying the rich breadth of the different cultural traditions that form an integral part of its history, which have infused all of the arts, from architecture and music, to literature and film.

The aim of the project is to design a cinema for children and families. According to urban analysis, there is an underrepresentation of children and lack of green space. Therefore, I want this cinema to be a playful building for families to enjoy their time, with an outdoor playground for children, which could also be a social and relaxing space for citizens.

02

open space. Therefore, Istanbul does not offer enough open public space. Moreover, based on the green space analysis, there is a lack of green space and open park around the site, and it appears to be difficult access to most of the open park.

DOMIANS OF THE BUILT ENVIRONMENT REGARDS TO CHILDRE'S WELLBEING

THE BUILT ENVIRONMENT

OUTDOOR & INDOOE SPACES

-Green Space

- Local Services

- Street Layouts

- Housing

COMMUNITY

- Trust

- Security

- Sense of Community

WELLBEING OF CHILDREN

CARE GIVER

- Wellbeing of adult - Adult's preceptions about safety

N
LEVEL 0 FLOOR PLAN
1. box office 2. cafe 3. family activities centre 4. office 5. kitchen
1 2 3 4 5 6
6. toliet

COMMUNITY

A COHOUSING FOR 'MIXABLED' PEOPLE

This project is a cohousing for 'mixabled' people, which aims to support the rights of people with disability. According to the demographics, 19 percent of people in Sheffield are considered disabled, and most of them struggle to find suitable houses. Thus, a sustainable and disabled-friendly housing community is designed to meet their requirements and help them embrace better lives. Facilities in this project play a vital role, delicately designed for the special cares and support for people with disabilities. A community centre and a workshop provide a place for socialising. A therapy centre offers support and a disabled community centre open to the public helps enrich their life experience. In order to build a green housing community, different strategies are used in this project, such as using recycled materials, solar panels, rainwater collecting systems and so on. A ramp system is carefully laid out in this project with the aim of making wheelchair users' life more convenient. The dwellings for people who live independently are flexible and accessible.

03
Elevation Roof Garden Render Garden Render Living Room Render

RIBA Stage 1&2

Heyford Park New Primary School

04 WORK EXPERIENCE
Elevation 01 Elevation 02 4515 000 6416 0 5365 7 676     2 .7 12 03                                                                                                                                                                                                                 05 10 m Cantay House Park End Street Oxford OX1 1JD +44 (0) 1865 248045 oxford@adp-architecture.com REVISION: DRAWING NUMBER: JOB CODE: A1 www.adp-architecture.com 200 PROPOSED GROUND FLOOR PLAN New Primary School Heyford Park Dorchester Living HPVC3 A-1025 ADP-00-00-DR32 17 263 29 3 4 6 4 8 9 26 25 51 23643 62 33 295 28 11 52 This line should measure 100mm along and axis when printed DRAWING TITLE: Cantay House Park End Street Oxford OX1 1JD +44 (0) 1865 248045 oxford@adp-architecture.com JOB TITLE: A3 www.adp-architecture.com SCALE: DRAWING SHEET SIZE: REVISION: DRAWING NUMBER: JOB CODE: 1000 Unnamed JOB NAME JOB NAME LINE JOB NAME LINE JOBCODE 0006 REVISIO DATEDESCRIPTION ARCHITEC PARTNE 0 50 m Key views Secure line Pedestrian/ cycle route Connection to external play Main entrance Secondary entrance Deliveries/ Maintenance Planting Buffer Feature Wall Soft play Hard Play Parking Landscaped arrival Habitat Planted Early Years KS1 & 2 Halls Ext.dining Forest School Orchard MUGA Taxiway CarPark Sports Pitches Covered Play
Hall Hall WC ST ST Kitchen Dining Living Kitchen Dining Living WC Bed Bed Bed Landing 5.42 Landing measurements given are indicative, dimensions must measured site brought architect's attention. 59300 59300 56600 65422 56600 65422 Natural Slate Tiles Untreated Timber Cladding -Vertical Channel Profile PPC Aluminium Trim Bike Stores, Entrance Bay Window Canopies Timber Party Fence (1800mm high) ‐MEADOW LANE HOUSING 001260 RIBA - - -100 ROOF BLOCK GROUND FLOOR BLOCK 100 FIRST FLOOR BLOCK A 100 NORTH EAST ELEVATION BLOCK A 100 NORTH WEST ELEVATION BLOCK SOUTH EAST ELEVATION BLOCK SOUTH WEST ELEVATION BLOCK 62900 Roof 69766 62900 Roof 69766 00 60200 62900 02 Roof 69766 60200 62900 Roof 69766 15 Living Dining Kitchen WC Living Dining WC Bed Bed Bed Bathroom Landing Bed Bed Bed Bathroom Landing ST Landing Bed Landing Bed GENERAL NOTES: measurements given indicative, site dimensions discrepancies between indicative dimensions given and those measured brought architect's attention. drawings specifiications from the architect and other consultants. Zinc Cladding Dormer Stone Dwarf Garden (600mm high) Timber Party Fence (1800mm high) ‐A1 ‐indicated MEADOW LANE HOUSING RIBA - - -ROOF BLOCK K SOUTH WEST ELEVATION BLOCK SOUTH EAST ELEVATION BLOCK NORTH EAST ELEVATION BLOCK NORTH WEST ELEVATION BLOCK GROUND FLOOR BLOCK FIRST FLOOR BLOCK K SECOND FLOOR BLOCK K
RIBA Stage 3 Meadow Lane
                                                                                                                                            Cantay House Park End Street Oxford oxford@adp-architecture.com A1 50 S3 SETTING OUT_GROUND FLOOR 1/5 Bedford SEN School FS0818 A-0090 ADP-ZZ-00-DP1 50 SETTING OUT_GROUND FLOOR 1/5 1                             NOTE: PLEASE REFER TO: FS818 - - 2200SERIES -0090 TO -0099 (SETTING OUT PLANS) WALL TYPE LOCATION N GTEC Intumescent Acoustic Sealant Boards Studs specification GTEC Intumescent Acoustic Sealant IWT_03 ‐‐Bedford SEN School - - -IWT_02 Render Housing Type 1 Housing Type 2 Elevation Interior Wall Type Wall Joint Detail Setting out Plan - Ground Floor
RIBA Stage 4 SEN Bedford School

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.