Facility Plan - Phase 1 and 2 Wallingford, CT June 19, 2018
AECOM
Introductions --
-
-
- Public Utilities Commission • Bob Beaumont, Chairman • Patrick Birney, Vice Chair • Joel Reinbold, Secretary
- AECOM • Dennis Setzko, P.E., Project Manager • Ken Bradstreet, P.E., Design Engineer
- Town of Wallingford Staff • Richard A. Hendershot, Director of Public Utilities • Neil H. Amwake, P.E., General Manager - Water and Sewer Divisions • Bill Phelan, Business Manager - Water and Sewer Divisions
2
A:COM
-
--
-
--
Fa ci Ii ty Plan Goals and Objectives
,
- Determine what plant upgrades are needed to achieve present and future wastewater treatment discharge requirements - Evaluate adequacy of existing plant processes, equipment and structures and make recommendations for improvements - Ensure that the sewage disposal and growth needs of the Town are met for present and future flows and pollutant loadings • 20-year planning period
- Two-phase approach • Phase 1 (Fast Tack): Phosphorus removal and related equipment • Phase 2: Assessment of remaining plant processes and Nitrogen removal improvements
4
A:COM
-
----
-
Phase 1 - Phosphorus Treatment Evaluation -
-
- Performed piloting to determine most effective phosphorus treatment option - Reviewed existing unit processes to determine effect on them with the addition of tertiary phosphorus treatment -Also reviewed additional processes and tankage needed for consistent operation. Includes: • Fine screening • Multi-point chemical addition • Secondary pump station • Electrical/SCADA upgrades • Gravity thickener improvements • Return Activated Sludge (RAS) pumps • Anaerobic tank with mixers • Secondary settling tank addition with launder covers
- Included relocation of the UV and Post Aeration system as part of the project to replace aging equipment and address current flooding issues - Miscellaneous piping and site modifications 5
A:-COM
Wallingford Plant Proposed TP Project Phase 1
'.--•• ~'!'t'11 lia ....:-_·,
....
;· _
Phase 1 Project Elements • Anaerobic Tank • Electrical Upgrades • Instrumentation • Secondary Settling Tank • Tertiary Phosphorus • Pump Station • Fine Screening • UV and Post Aeration • Thickener Mechanism • Site Work
-
I
Schedule for Phase 1 - Phosphorus Removal - -
--
----
-
- December 15, 2017 • Retain a consultant to prepare the study, design and oversight necessary to achieve phosphorus limits set in the NPDES permit - October 31, 2018 • Submit Engineering Report
- July 1, 2019 • Enter into a construction contract to be eligible for 50% project grant for phosphorus removal costs (design and construction)
- April 1, 2020 (No later than) • Begin construction of the phosphorus removal project
- April 1, 2022 • Com lete hos horus treatment construction project such that the treatment process is fully operational and effluent meets new phosphorus effluent requirements 7
AS'COM
-
--
-
-
--
-
-
-
- -
-
-
Phase 2 Project -WPCF Evaluation - Reviewed all existing treatment plant processes and structures - Detailed evaluation of solids handling needs - Performed process modeling to evaluate potential improvements to nitrogen and biological phosphorus removal - Building evaluation • Laboratory improvements • Administration, Personnel and other building improvements • HVAC and lighting systems
- General plant upgrades • Equipment (tank mechanisms, RBC improvements, obsolete equipment replacement)
- Communications, security, fire alarm - Electrical and instrumentation/SCADA 8
A:COM
-
--
-
-
Phase 2 - Conclusions - Solids handling systems at the end of their useful life • Anaerobic digestion as currently practiced not cost effective • Storage for sludge needed. Reuse two digester tanks for storage and provide new covers • Replace 1988 vintage dewatering facilities with screw presses. Likely to improve solids capture and reduce operating costs • Building and structures upgrades (electrical, ventilation) necessary to meet building code and process needs • Replace sludge pumping and polymer systems
- Modeling shows additional TN removal possible and better biological phosphorus removal if primary tanks bypassed • Added fine screens to Phase 1 project to capture fine solids that will affect RBC • Provide ability to bypass primary tanks 9
A:COM
Phase 2 - Conclusions (continued)
,
- Expand Administration Building to include additional lab space • Lab undersized based on current standards • Lab used for both Sewer and Water Divisions operation and compliance testing • Include additional lab equipment and workspace
- Upgrade Administration Building • Windows and exterior upgrades • Interior facilities_(HVAC, lighting, coatings, restrooms)
- Personnel and other buildings • Locker rooms, finishes, and lighting improvements • Security systems lacking • In-plant communications spotty and needs upgrading • Heat and ventilation improvements • Fire alarm replacement and upgrade to code 10
A:COM
-
-
-
-
Phase 2 - Conclusions (continued) -
-
- General Plant Process Upgrades • Existing electrical distribution systems in need of replacement o Motor control centers outdated and parts hard to get o Improve SCADA at the time of new equipment installation
• Grit system updates - aging and deteriorated equipment (future annual capital project) • Primary tank mechanism replacement • RBC structure repair (future annual capital project) o Concrete damage from water intrusion and/or differential expansion
• Secondary settling tank mechanism replacement • Miscellaneous site improvements o Storm drainage to alleviate floodin o Repaving where needed
11
AE'COM
Phase 2 Work
.
r,.:•;::::::..: • ..._ •
-
-a.. --#,.., ---· •-. , : _
...."'
Solids handling
Building & HVAC Upgrades
Phase 2 Project Elements • Solids Handling • Electrical Upgrades • SCADA • Lab • Administration Building upgrades • Grit system improvements • Building upgrades • HVAC upgrades • RBC area repairs • Mechanism and Equipment Replacement Electrical Upgrades
Admin Building
. •·· . 1 I
...
12
<
f
A:COM
~------
- - -
-
Phase 2 WWTP Improvements - Proposed Schedule and Packages _
__
- Complete as discrete projects in the future. Some portions will likely be completed as part of another project. â&#x20AC;˘ For 2023-2025 o Solids Handling Improvements â&#x20AC;˘ For 2024-2026 o Plant Wide Electrical, SCADA, and Instrumentation Systems
13
A.:COM
~
Phase 2 WWTP Improvements - Proposed Schedu~e and Packages - Complete as discrete projects in the future. Some portions will likely be completed as part of another project. â&#x20AC;˘ For 2027-2029 o Building Upgrades - Office, Laboratory, Personnel Building o Upgrade of Plant Lighting, Fire Alarm, Communications & Security Systems o Upgrade of Plant HVAC Systems â&#x20AC;˘ For 2031-2033 o Replacement of Aging Mechanical Equipment & Systems
14
A.:COM
-
-
--
-- -
Phase 1 Cost Estimate Elements - - - - -- -- -
-
-
-
-
--
-- -
-
--
-
--
- Adjustments From Prior Presentation on March 15, 2018 • Further detail provided that increased costs for o Building over UV (Item 3) o RAS pumps (Item 6) o Gravity thickener (Item 10) o Civil site/yard piping (Item 12)
• Refinement of cost estimate • Includes fine screens to replace existing aging screens (based on modeling results) • Includes a project contingency- See next slide
15
A:COM
-
-
Phase 1 Project Contingency -
--
-
- Project Contingency is a cushion provided to: • Include project unknowns • Address current bid climate (multiple projects bidding at the same time) • Capture current wage and material inflation expectations • Address EPA/DEEP requirements for US iron and steel purchases • Address lack of float in the schedule o Avoiding a situation of being unable to execute an agreement before the July 1, 2019 deadline and missing out on 50% grant funding
16
A:COM
- -
1
-
--
-
-
Phase 1 Project Estimated Costs -
Item
Description
Current Capital Cost Estimate
Previous Capital Cost Estimate
1
Tertiary Phosphorus Process
$11,867,000
$11,826,000
2
Secondary Effluent Pump Station
$5,480,000
$5,240,000
3
Ultraviolet Disinfection and Post Aeration
$5,512,000
$5,382,000
4
Demolition of Existing UV and Post Aeration
$139,000
$138,000
5
Secondary Settling Tanks #5 & #6
$6,490,000
$6,450,000
6
RAS Pumps
$1,053,000
$737,000
7
Plant Water System
$348,000
$348,000
8
Anaerobic Basin
$2,531,000
$2,514,000
9
Rehabilitate Drain Pump Station
$326,000
$326,000
10
Replace Gravity Thickener Mechanism
$570,000
$347,000
11
Secondary Settling Tank Launder Covers
$209,000
$208,000
12
Civil Site/Yard Piping
$1,213,000
$984,000
13
SCADA and Instrumentation
$633,000
$630,000
14
Fine Screens
$2,403,000
0
15
Electrical Upgrade
$3,920,000
$3,909,000
Total Estimated Construction Cost
$42,694,000
$39,039,000
$3,400,000
$3,400,000
$4,600,000
$4,600,000
$5,069,000
0
Engineering Design Services Construction Phase Services
Project Contingency of 10% of Total 17
-
Total Estimated Cost Phase 1
$55,763,000
$47,039,000
Phase 2 Project Estimated Costs (escalated to midpoint of project execution year at 3.5% inflation per year) Capjtal Cost
Description I
•
-
•
I
I
,
I
111
Electrical Upgrades (2025)
$2 ,605,000
3
SCADA Completion (2025)
$1,391,000
4
Administration Building and Lab (2028)
$3,513,000
5
Lighting, Fire Alarm, Security and Communications (2028)
$2,643,000
6
HVAC (2028)
$2 ,315,000
7
Equipment Replacement (2032)
$7,203,000
Total Estimated Construction Cost
18
', •
$29,377,000
Engineering Services
(included in above)
Project Contingency of 5%
$1,469,000
Total Estimated Cost Phase 2
$30,846,000
A:COM
I
'
Funding Sources - Phosphorus Project Elements (Phase 1 work) • 50% state grant on phosphorus related items • 30% state grant on nutrient removal related items • 20% state grant on other eligible items • 2% - 20 year state loan on remainder of eligible work • Utility incentives for energy efficiency (motor drives, lighting)
- Other Plant Upgrades (Phase 2 work) • Fund some through annual Capital budget o Break projects into smaller subprojects that can be funded through the annual budget process
• Utility incentives for energy efficiency (VFD's, lighting, heating)
19
A.:COM
- - -
--
-
Wrap up - WWTP has not had any major upgrades or improvements since substantial completion of the present facility was achieved on July 1, 1989 â&#x20AC;˘ Grit facilities have been partially upgraded within the past two years â&#x20AC;˘ Nitrogen removal processes included in 2005
- Most existing systems and equipment are near the end of their useful life - Many of the upgrades necessary in Phase 1 will be eligible for 50% grant and utility incentives - Packaging of other projects in future years to help level the rate impacts
20
A.:COM
-
'
--
Public Workshop
I
- There will be a public workshop on June 26 to discuss the project in an open forum
- Details: - Location: Room 315 Town Hall, 45 South Main Street, Wallingford, CT - Date: June 26, 2018 - Time: 6:30 pm
21
AS'COM
A
~r.oiA~
.1-1;:;'-,'
Discussion
22
~~I
lma_gine it. Delivered.