_reece oliver
I see architecture + design as a responsibility rooted in placemaking and the contemporary vernacular, applied through considered material, socio-cultural and historic contexts.
contact born_ language_
awards
education
email_ mob_ insta_ 25/11/1995__UK
reecejoliver@gmail.com + (44) 7492 073 073
english, german A2 level
WINNER_ WINNER_ WINNER_ COMMENDED_ PUBLISHED_
@studio__blah
Nottingham Castle _ Young Painter Award
Glasgow School of Art _ Stage 4 Portfolio Prize
Glasgow School of Art _ W.O Hutcheson Prize
Glasgow School of Art _ Sustainability Prize
designboom _ Museum of Un-natural History
DipArch RIBA Part II Distinction
BA(Hons) Architecture RIBA Part I 1st Class Honours
Level 4 Art Foundation Diploma Merit Award
A-Level GCE (A) Maths / Physics / Graphic Design
Glasgow School of Art 2021 - 23
Newcastle University 2015 - 18
Nottingham College 2014 - 15
Trinity School 2012 - 14
_cv.txt
design skills
Studio Director studio blah!
30+ architecture and design projects across the UK in landscape, education, residential and commercial. Submitting fee proposals, managing projects, attending client meetings.
Part II Architectural Assistant
AJ100 practice. £50m youth education facility working with Department for Education. Document control, internal + external design development and visual outputs for RIBA Stage 2-3 reports.
Part I Architectural Assistant
Worked across multiple sectors including private residential, healthcare, education, mixed-use housing. RIBA Stages 0-4. Full planning applications / visuals / feasibility study. Solely set up + managed social media and marketing, boosting all to 1k+ followers.
Part I Architectural Assistant
£400m London 2012 Olympics regeneration site for 900+ residential units. Full RIBA Stage 2-3 re-design. Further commercial, retail and offce units as part of scheme.
RIBA Mentorship Scheme
Overseeing a student housing development, attending multiple site visits and introduc- tion to BIM. Created material specifcations and quality ensurance procedures for RIBA Stage 4-5
UK
2018 - 24
Keppie Glasgow, UK
2023 - 24
RaynerDavies Architects Nottingham, UK
2020 - 22
sprunt architects London, UK
2018 - 19
xsite architects Newcastle, UK
2017 - 18
_cv.txt
work
Drawing AutoCAD 2D Illustrator Vectorworks ArchiCAD 3D Sketchup Model-Making Revit Rhinoceros Visual Photoshop Lumion Enscape V-ray Document Indesign Word Pages Excel
+ Paper + 18mm-Plywood + Paint
04 / 21
!!!_Winner GSA Hutcheson Prize 2023 + 60 50 40 30 20 10 0 5 15 25 35 45 55 65 70
_Laser-Cut.dwg
DipArch
Glasgow School of Art Yr_5 (2022 - 23)
Synecdoche, Molenbeek explores the surrealism of architecture in cinema.
The thesis brings social prejudices to light by providing a centre for flm production, screenings and community workshops to showcase the multi-cultures in Molenbeek, Brussels. Through this platform, the thesis presents surrealist representations of architecture in flm and establishes Synecdoche as a concept to represent Molenbeek’s socio-cultural identity.
05 / 21
r=86 g=132 b=56 r=86 g=132 b=56 r=86 g=132 b=56 r=86 g=132 b=56 >>>>
synecdoche, molenbeek
_Synecdoche-EcplodedAxo.skp + AutoCAD.dwg + Photoshop.psd
06 / 21
_Film-Classroom-Axonometric.skp + AutoCAD.dwg + Photoshop.psd
(above) _Long-Section-A.dwg (below) _Elevation-RueDesQuatreVents.dwg
07 / 21
_
DipArch
Glasgow School of Art Yr_4 (2021 - 22)
Barras Youth Hub
r=85 g=70 b=65
r=183 g=194 b=86
r=50 g=162 b=210
r=250 g=45 b=80
r=250 g=245 b=80
The Barras Youth Hub provides a much-needed respite and opportunity space for the young people of Calton and the Barras.
As part of Glasgow City Council’s ‘Integrated Children Plan’, the council-funded scheme will offer accessible space for young residents aged between 10-19 years. The hub offers a variety of learning, leisure and performance environments to cover a wide scope of non-curriculum and creative interests the young user group may have, to encourage alternative modes of learning alongside and after their school life.
08 / 21
!!!_Winner GSA Portfolio Prize 2022 _Axonometric
+ colour pencil.hand + Photoshop.psd
_BarrasYouthHub-EXT-Night.skp + materials-v-ray.vrmat + Photoshop.psd
_ext wall
8mm polycarbonate galv. steel fxings
150mm insulation
120mm CLT
24mm plywood _foor type
203/102/23mm steel i-beam exposed services + ventilation channels
100mm CLT
24mm foor tile _foundation
220mm concrete foor slab w/ reinforced steel blockwork
140mm upstand
150mm insulation
09 / 21
_HousingCouncilSQ-BN-Model.skp + materials-v-ray.vrmat + Photoshop.psd
Bare Necessities!
Mixed-use Residential
DipArch
Glasgow School of Art
Yr_4 (2021 - 22)
!!!_Commended
GSA Sustainability Prize 2022
Joffre Dumazedier states – ‘Leisure is activity – apart from obligations of work, family and society, to which the individual turns at will’. This notion ties in directly with the relationship between Domesticity and Labour – one cannot exist without the other, but both are dependent upon Leisure as an outlet for their sustenance.
Bare Necessities! examines the requirement for Domesticity and Labour to exist within the typical residential unit, where such commodities are stripped back to a minimum to allow for an increase in Leisure activity within and beyond the dwelling.
010 / 21
_HousingCouncilSQ-BN-Model.skp + materials-v-ray.vrmat + Photoshop.psd
011 / 21 00 Drawing Title 1:100
XX 01 XX 01
_Context-Elevation-development_CAD.dwg
Happy Munchkins Pre-school Education-Retrofit_RIBA St. 0-3
studio blah! (2019 - 21)
An existing school pavilion building in the Green Belt of Nottingham, an adaptive re-use was proposed as an eco-pre-school for local childcare.
I was asked to produce a full planning application for the project including; design + access statement, material specifcations, construction phase plan, demolition plan. A public consultation was hosted where members of the local community came and gave feedback on the proposal.
_0002HappyMunchkins-X01-AutoCAD.dwg
dayView_nightView-Photoshop.psd
_0002HappyMunchkins-3DModel.skp + AutoCAD.dwg + 3D-Visual-Photoshop.psd
014 /
21
015 / 21 wild grass meadow existing driveway pond/reed bed staff room mud kitchen kitchen classroom pre-school play main entrance children w/c rear outdoor play baby care outdoor learning garden baby sleep car parking + drop-off _0002HappyMunchkins-GF-Plan.dwg
_AP24_Technical-section.3dm + illustrator.ai
Earthwor-m addresses the impact of construction and engineering practices on earthworms. The proposal represents the ever-increasing urbanisation of the natural landscape, which is being irreversibly altered due to industrial development – namely construction and agricultural cultivation. Through a contrast of linear and organic forms, a steel scaffolding structure shelters the entire site,suspending a pink, worm-like structure above the soil below.
016 / 21
earth wor-m Antepavilion 2024 studio blah!
_GF tunnel plan _1F worm plan _2F roof plan
_AP24_Visual_Rhino.3dm+Revit.rvt+V-ray+Photoshop.psd
_AP24_Worms-Eye-Axonometric_Rhino.3dm+AutoCAD.dwg+V-ray+Photoshop.psd
017 / 21
_1:100-model + 1.5mm-Card + 3mm-Wood
Alpha Kindergarten
Education_RIBA St. 0-5
RaynerDavies Architects riba part i
On a 1700sqm site of an existing public house, RDA were commissioned to design a new £1.5million childcare facility with provision for 92 places across age groups 1-4 years.
The scheme is based around a courtyard garden with a playful approach to massing, creating vaulted classroom spaces. I was involved with RIBA Stage 4 tender drawings.
018 / 21
10 12 13 15 1100 1480 platform Single Entry (Long Side) D.07/SC/VP D.09/SC D.10/SC D.06/FD30S/SC/VP D.05/FD30S/SC/VP (21)X01 DE.08 D.01/FD30S/SC/VP DW DW DW D.16/FD30S/SC/VP 1190 2040 1510 777.5 1135 440 685 675 1002.5 1070 4170 552.5 1135 1115 910 1002.5 1070 910 1090 910 990 780 910 2190 1070 1630 1002.5 1902.5 1135 1810 1115 315 1320 1580 W.04(V) W.19(V) W.22(V) Kitchen and store layout indicative only. Final layout and specification by specialist Refer Only to Drawing 2505a(20)C01 For WC Details Drawing Refer Only to Drawing Refer Only to Drawing 2505a(20)C03 For Corridor Details Refer Only to Drawing 2505a(20)C02 Refer Only to Drawing 2505a(20)C02 Refer Only to W.39(IN) W.40(IN) Low wall (+1,300 from FFL) with gate 1F outside face above shown dashed 1F outside face above shown dashed Riser from kitchen available subject to input from M&E consultant and specialist sub-contractor/kitchen designer demolished. Survey by Others. be demolished. Survey by Others. rainscreen cladding to electrical meter Lighting to M&E Eng. Door on alarm-linked hold-open device 1628.5 Pre-School (24max) Rm.06 12.4m2 Child WC 29.8m3 22m3 Plant Baby (12max) CHG Rm.12 Reception Office Dis.WC Curtain track fixed to vaulted ceiling above with black-out Must provide manual retraction system to allow curtains to be opened towards external wall side. Acoustic 1. All survey information by others, please check dimensions on site. conjunction with structural and mechanical/electrical drawings by 3. Please notify RDA of any coordination issues/clashes as Drawing must be read in conjunction with specification notes 2505a(20) and type notes 2505a(20)K01 ... 02 etc. Manufacturer's instructions must proposals must be reviewed and approved by the client team. DIMENSION NOTES All external dims given to facing timber frame structure (not incl. sheathing board) unless given in (brackets) and therefore given to finished face* For horizontal S/Os refer only to GA plans For vertical S/Os refer only to GA *note, internal dims not given until internal wall specification finalised acoustic panels. Number reference [01] Ecophon, Akusto Wall panel, Ecophon Solo Rectangle, suspended acoustic ceiling rafts shown blue dashed. Staggered heights. RaynerDaviesArchitects 2 St. Peter's Gate Nottingham Kent 29/04/21 2505a(20)001 C Project Beta The Fenman GA Ground Floor PlanTender 01 GA Ground Floor Plan - 30/04/20 SC First Issue. Pre-release for discussion Legal Info from this drawing in either paper or digital form. Use written dimensions All survey information by others. Check all dimensions on site. Site not assume any liability any third party for the information herein. All demolition works subject to statutory approval and assessment by consent must NOT be carried out without statutory approval. NOT FOR CONSTRUCTION A 18/06/20 SC General issue, numerous items added/updated B 16/03/21 SC Additional notes added C 29/04/21 SC Change in height to low wall in Rm.05 noted. Additional note added regarding curtain track W.47 +5,035 S/O +6,000 Top of Parapet GF Top of Screed +2,185 S/O +3,750 Top of Timber Frame +5,250 Top of Brick +2,185 S/O Top of Brick GF Top of Screed Brick Opening Ecophon Solo Rectangle, 1200x1200x40mm suspended acoustic ceiling rafts shown blue dashed. Staggered heights. 2400 Passive ventilation stacks with PPC steel weathering cowl. Structural fixing by S.Eng. or specialist sub-contractor. Bird/Insect Mesh to be provided +2,775 Top of Timber Frame Suspended acoustic ceiling to corridor +2,8750 S/O W.27(CW) 900 250 W.33(CW) W.32(CW) W.31(CW) W.30(CW) W.29(CW) W.28(CW) W.34(CW) Reception sliding (30)D01 (30)D02 (30)D03 (30)D05 Top of Timber Frame +2,850 +5,250 Top of Brick +2,185 S/O +0,450 Brick Opening +3,825 Brick Opening +5,035 S/O +6,000 Top of Parapet +2,485 U/S Brick GF Top of Screed +0,850 S/O +2,185 S/O +2,850 Top of Brick +3,850 S/O +2,850 Brick Opening +2,875 S/O +5,035 S/O S/O GF Top of Screed +2,775 Top of Timber Frame Ecophon Solo Rectangle, 1200x1200x40mm suspended acoustic ceiling rafts shown blue dashed. Staggered heights. Passive ventilation stacks with PPC steel weathering cowl. Structural fixing by S.Eng. or specialist sub-contractor. Bird/Insect Mesh to be provided All survey information by others, please check dimensions on site. Drawing must be read in conjunction with structural and mechanical/electrical drawings by 3. Please notify RDA of any coordination issues/clashes as soon as they are noticed. Drawing must be read in conjunction with specification notes 2505a(20)N01 ... N02 etc. and type notes 2505a(20) K02 etc. be followed for all specified items. proposals must be reviewed and approved by the client team. DIMENSION NOTES Unless otherwise stated... 1. All dims in mm to nearest half All external dims given to facing brickwork or outside face of timber frame structure (not incl. sheathing board) 3. All internal dims given to C/L unless given in (brackets) and therefore given to finished face* For horizontal S/Os refer only to GA plans 5. For vertical S/Os refer only to GA sections in conjunction with (30) series details *note, internal dims not given until internal wall specification finalised RaynerDaviesArchitects 2 St. Peter's Gate Nottingham 01159473859 www.rd-architects.co.uk Nottingham Kent DWG NO. REV. 29/04/21 STATUS 2505a(21)X01 D Project Beta The Fenman GA Sections X01 and X02 SCTender A1 02 GA Section X02 1:50 Legal Info from this drawing either paper or digital form. Use written dimensions only. All dimensions are given in millimeters unless otherwise stated. All survey information by others. Check all dimensions on site. Site boundaries to be confirmed by client solicitors with reference title deeds. 3. This drawing is intended for use by the commissioning client only. RDA do not assume any liability to any third party for the information herein. This drawing is to be read conjunction with all relevant engineer's and specialist designers’ drawings and specifications. All demolition works subject to statutory approval and assessment by structural engineer. Works covered by pre-commencement conditions or works without consent must NOT be carried out without statutory approval. NOT FOR CONSTRUCTION 01 GA Section X01 1:50 - 30/04/20 SC First Issue. Pre-release for discussion A 18/06/20 SC General issue, numerous items added/updated, discussion status removed B 24/06/20 SC Revised to include further detailing at key junctions as marked C 17/03/21 SC Status Updated D 29/04/21 SC X02 Updated to show RWPs and Hoppers
Oakfields Road
Housing-NewBuild_RIBA St. 0-3
RaynerDavies Architects
riba part i
On 1000sqm site of a disused education building, RDA were commissioned to design a high density housing scheme on a restricted infll site bounded by overlooking issues, and a steep slope. The resultant scheme provides 9no. contemporary housing units. I was involved heavily in co-ordinating the massing and layouts of the scheme, RIBA Stages 0-3.
- GF+1F_ AutoCADdwg
_2990-OakfieldsRd-X01-AutoCAD.dwg
_2990-OakfieldsRd-3D.skp + AutoCAD.dwg + A3-Print + hand-sketch + Photoshop.psd
019 / 21
+32,930 Ridge Context +29,120 Eaves Context
Undercroft Parking +24,800 GF FFL +27,800 1F FFL +35,300 Existing +28,925 Eaves +31,940 Parapet +31,545 Parapet +23,450 Ground 03
+21,650
_
_2990-OakfieldsRd
Ailsa Wharf, London
Commercial/Residential/Office_RIBA
sprunt architects riba part i (2018-19)
St. 0-3
Landscape masterplan development of site in Stratford, London for +£400m value project for 952 unit mixed-use residential, offce and commercial space with a riverside park on the banks of the River Lea to support a new residential community. Worked as part of RIBA Stage 0-3 team - feasibility study and re-design of the scheme to amend previously approved planning permission. _AIL_Proposed-site-plan.rvt + AutoCAD.dwg
020 / 21