Portfolio

Page 1

RICKY LO PORTFOLIO



ACADEMIC PROJECTS


TRANSITIONAL SUPPORTIVE HOMELESS HOUSING HOMES FOR HOPE PROGRAM: LOCATION: TYPE: AFFILIATION: YEAR: STATUS: ROLE: TASKS: AWARDS:

HOUSING LOS ANGELES, CA, USA ACADEMIC PROJECT USC 2016 COMPETITION PROJECT ARCHITECT SD, DD, CD, CA 2017 WORLD FAST CHANGING IDEAS BY FAST COMPANY



COURTYARD

RENTING / OWNING HOME FOREVER PERMANENT SUPPORTIVE HOUSING 1-2 YEARS TRANSITIONAL HOUSING 3 - 6 MONTHS STREETS 7+ YEARS

HOUSING STAGES DIAGRAM


In a city with a vacancy rate of 2%, countless plots of

MANUFACTURING [OFF-SITE:SIPS/STEEL/MEP/FURNITURE]

SEMI-TRUCK

[3 PER LOAD x 17 TRIPS]

CARGO TRUCK

[20 PIERS/4 FILLERS x 4 TRIPS]

SITE DELIVERY [52 TOTAL UNITS:30-LIVING/6-RESTROOMS/16-COMMUNAL]

SHIPPING DIAGRAM


SITE MAP OF POTENTIAL DEPLOYMENT LOCATIONS



INTERIOR OVERLOOKING COURTYARD

PROTOTYPE OF LIVING UNIT (REAR)

PROTOTYPE OF LIVING UNIT (FRONT)


SECOND FLOOR BALCONIES

PROTOTYPE OF LIVING UNIT (INTERIOR)

LIVING UNIT COMPONENTS


COMMUNAL DINING



DOUBLE SHARED UNIT COMPONENTS

QUADRUPLE COMMUNAL UNIT COMPONENTS

DAY 2 - FOOTINGS

DAY 4 - ASSMBELY

ASSEMBLY PROCESS DIAGRAM

DAY 7 - AGGREGATION

DAY 9 - STAGE

DAY 12 - FINSHING


SITE PLAN

A1

A2

A3

A4

A5

B1

B2

C1

WALL TYPES


LIVING UNIT AXONOMETRIC

LIVING UNIT PLAN

LIVING UNIT SECTION


SHARED UNIT AXONOMETRIC

SHARED UNIT PLAN

SHARED UNIT SECTION


ADMINISTRATIVE UNIT AXONOMETRIC

ADMINISTRATIVE UNIT PLAN

ADMINISTRATIVE UNIT SECTION


COMMUNAL DINING UNIT AXONOMETRIC

COMMUNAL DINING UNIT PLAN

COMMUNAL DINING UNIT SECTION


GROUND FLOOR PLAN

SECOND FLOOR PLAN


GROUND FLOOR CIRCULATION DIAGRAM

GROUND FLOOR UTILITIES DIAGRAM

SECOND FLOOR CIRCULATION DIAGRAM

SECOND FLOOR UTILITIES DIAGRAM


LONGITUDINAL SECTION

TRANSVERSE SECTION



STACKING URBANISM 707 E. THIRD STREET PROGRAM: LOCATION: TYPE: AFFILIATION: YEAR: STATUS: ROLE: TASKS:

COMMERCIAL ARTS DISTRICT, LOS ANGELES, CA, USA ACADEMIC PROJECT USC 2017 DESIGN PROJECT ARCHITECT SD, DD


SITE

HUMAN SCALE

CITY SCALE

CLUSTERING

CONTEXT

TERRACING

SECOND CLUSTER

THIRD CLUSTER

ATRIUMS

FACADE PANELS

CONCEPT DIAGRAMS


Proposal VIEWS

Proposal WORKPLACE INTERACTION


COMPREHENSIVE STUDIO DOCUMENTATION: BUILDING ENCLOSURE SYSTEMS Page 63 of 110

Grade: HP P LP R

2.

10.

1.

EXTERIOR

INTERIOR

9. 5. 4. 6.

3.

8.

ARCH 500aL Student: Ricky 1.

Metal support frame

9.

Metal fixing bracket

2.

Glass fiber reinforced concrete

10.

Drop ceiling

3.

Fixing bolt

11.

Mullion

4.

Single glazing

12.

Grade beam

5.

Interior finish

13.

Footings @ 36”

6.

Floor slab

14.

Waterproof membrane

7.

Pressed metal parapet coping

15.

Concrete slab on grade 6”

8.

HVAC ducts

Instructor: Date Due:

Lo

Patrick Tighe 12/12/17

Coordinator: Wahlroos-Ritter Date Submitted: 12/12/17

COMPREHENSIVE STUDIO DOCUMENTATION: BUILDING ENCLOSURE SYSTEMS Page 64 of 110

Grade: HP P LP R

7.

WALL SECTION DETAIL

INTERIOR

ARCH 500aL Student: Ricky

Instructor: Date Due:

Lo

Patrick Tighe 12/12/17

EXTERIOR

Coordinator: Wahlroos-Ritter Date Submitted: 12/12/17

COMPREHENSIVE STUDIO DOCUMENTATION: BUILDING ENCLOSURE SYSTEMS Page 65 of 110

Grade: HP P LP R

EXTERIOR

INTERIOR

11.

1.

Metal support frame

9.

2.

Glass fiber reinforced concrete

10.

Drop ceiling

3.

Fixing bolt

11.

Mullion

4.

Single glazing

12.

Grade beam

5.

Interior finish

13.

Footings @ 36”

6.

Floor slab

14.

Waterproof membrane

7.

Pressed metal parapet coping

15.

Concrete slab on grade 6”

8.

HVAC ducts

Metal fixing bracket

15. 14.

ROOF-WALL SECTION DETAIL

12.

13.

1.

Metal support frame

9.

2.

Glass fiber reinforced concrete

10.

Drop ceiling

3.

Fixing bolt

11.

Mullion

4.

Single glazing

12.

Grade beam

5.

Interior finish

13.

Footings @ 36”

6.

Floor slab

14.

Waterproof membrane

Metal fixing bracket

DETAILS


Typical office building

Proposal

Typical office building

VIEWS

Proposal

WORKPLACE INTERACTION

ELEVATORS (2) Shear force resistance: Concrete core and shear walls

ATRIUM 3 Primary horizontal loads: 12”x14” transfer beams

ATRIUM 2

Seconday horizontal loads: 4”x8” interior ceiling beams

Elevators Restrooms

Primary vertical loads: 2’x2’ columns @ spacing 18” O.C.

ATRIUM 1

Emergency Staircases HVAC Shafts ENTRANCE

CORE LAYOUT DESIGN

CIRCULATION DIAGRAM

Entrance STRUCTURE DIAGRAM

CORE DESIGN DIAGRAM

CIRCULATION DIAGRAM

STRUCTURE DIAGRAM

ACCESSIBILITY DIAGRAM

LIFE/SAFETY DIAGRAM

ENVIRONMENTAL/HVAC DIAGRAM

MODEL PHOTOS


EXPLODED AXONOMETRIC


SECTION


GROUND FLOOR PLAN


MULTIPURPOSE CENTER BOYLE HEIGHTS CREATIVE OFFICE PROGRAM: LOCATION: TYPE: AFFILIATION: YEAR: STATUS: ROLE: TASKS:

COMMERCIAL LOS ANGELES, CA, USA ACADEMIC PROJECT USC 2014 DESIGN PROJECT ARCHITECT SD



EXTERIOR VIEW FROM THE STREET

PLAN

FUNCTIONAL PLAN


COURTYARD INSIDE THE PARK

SECTION GENERAL SECTION


HOLLYWOOD BARNSDALL ART PARK PAVILION PROGRAM: LOCATION: TYPE: AFFILIATION: YEAR: STATUS: ROLE: TASKS:

PUBLIC SPACE LOS ANGELES, CA, USA ACADEMIC PROJECT USC 2014 DESIGN PROJECT ARCHITECT SD

WOODEN PANELS

SUD-EAST ELEVATION

SUD-EAST ELEVATION

EAST ELEVATION

SECTION AA’

SECTION A-A SECTION AA’

ELEVATION / SECTION AA’

ELEVATION / SECTION AA’

ROM THE GARDEN

VIEW FROM THE STREET


INSIDE THE KINDERGARTEN

1- ENTRANCE ENTRANCE 2- CHECK POINT CHECK POINT 3- LOCK ROOM OCK ROOM 4- SINKS AREA INKS AREA 5- TOILETS OILETS HOWER / BATH AREA 6- SHOWER / BATH AREA 7- GYM ROOM GYM ROOM MALL CLASS ROOM 8- SMALL CLASS ROOM 9- SMALL MALL CLASS ROOM WITH SINK CLASS ROOM WITH SINK 10- REST ROOM REST ROOM 11PROJECTIONS ROOM PROJECTIONS ROOM 12- PEDESTRIAN ENTRANCE PEDESTRIAN ENTRANCE 13KISS AND RIDE ENTRANCE KISS AND RIDE ENTRANCE 14-ROOM TEACHERS’ CHANGING ROOM TEACHERS’ CHANGING 15TEACHERS’ TOILETS TEACHERS’ TOILETS 16- STORAGE STORAGE 17- OFFICE OFFICE 18- TEACHERS’ REST ROOM TEACHERS’ REST ROOM 19- WELCOME ZONE WELCOME ZONE 20- TOILETS TOILETS 21- KITCHEN KITCHEN LIBRARY / WORKSHOP22- LIBRARY / WORKSHOP 23- TERRACE TERRACE

S

GROUND FLOOR GROUND FLOOR

PLANS

FIRST FLOOR

FIRST FLOOR

GROUND FLOOR PLAN

SECOND FLOOR PLAN


OFFICE COMPLEX DUBAI BUSINESS CENTER PROGRAM: LOCATION: TYPE: AFFILIATION: YEAR: STATUS: ROLE: TASKS:

COMMERCIAL DUBAI, UAE ACADEMIC PROJECT USC 2016 DESIGN PROJECT ARCHITECT SD, DD

COGO Rotterdam Urban Culture Cluster

gardens and public passages

urban passage interior landscape

CONCEPT DIAGRAM

The building mass is segmented to gate, plinth and tower. Existing buildings and new structures are related by voids that consolidates visual and emotional images of historical value. Thus, a void above the gateway gives a visitor the ability to experience the multi-layered space where all 014 segments of building mingle together. Raw experience of in-between space is guiding one into the open and bright interior plaza. The other connection to the block is using Lijnbaan roofs as a green public recreational path. This roof-path is connected to the restaurant terraces below the gastronomy tower and continues 016 inside the lecture centre as an interior landscape. Ramps, bridges, open auditoria and terraces merge into the circulation scheme as continuity of public root. The loops of this public interior corridor pass by every storey of creative centre and plinth, whereas, the tower is fea-


Master Graduation project TU Delft 2012/13 | NO. 1

Master Graduation project TU Delft 2012/13 | NO. 1

14

The building mass is segmented to gate, plinth and tower. Existing buildings and new structures are related by voids that consolidates visual and emotional images of historical value. Thus, a void above the gateway gives a visitor the ability to experience the multi-layered space where all segments Monumental and historically valuable surrounding build- of building mingle together. Raw experience of ings such as the ABN-Amro bank, Lijnbaan group and Donin-between space is guiding one into the open and bright ner direct the idea of facade grid and gateway formation to the block interior. Project COGO is situated interior on the southplaza. entrance of the urban block between the ABN and Donner Thebank other and is directly connected to the former us- connection to the block is using Lijnbaan roofs Master Graduation project TU Delft 2012/13 | NO. buildings, 1 ing part of it for workshops and galleries of visual asarta centre. green public recreational path. This roof-path is conA Billboard-like gateway hovers above the central entrance nected to the restaurant terraces below the gastronomy into the glass gallery that leads to the interior plaza. tower and continues inside the lecture centre as an inteMonumental and historically valuable surrounding buildrior landscape. 013 open auditoria and terraces merge into ings such as the ABN-Amro bank, Lijnbaan group and DonRamps, bridges, ner direct the idea of facade grid and gateway formation to the circulation scheme as continuity of public root. The the block interior. Project COGO is situated on the south loops of this public interior corridor pass by every storey entrance of the urban block between the ABN and Donner of creative centre and plinth, whereas, the tower is feabuildings, and is directly connected to the former bank ustured with gardens and culinary school and serves a semiing part of it for workshops and galleries of visual art centre. public function. A Billboard-like gateway hovers above the central entrance into the glass gallery that leads to the interior plaza. 13

12

14

3

A

B

2

1

4

5

6

13

10

11

C

12

D

7

E

8

9

F

3

incl. angle is to big

incl. angle is to big

COGO Rotterdam Urban Culture Cluster

gardens and public passages

A

1 culinary centre reception 2 personal changing rooms 3 sculpture garden 4 urban passage 5 entrance to the bike storrage 6 open auditorium/gift shop 7 re-use centre reception 8 technical room 9 cloakroom 10 open garden 11 gallery/shop 12 entrance to the re-use centre 13 re-use centre reception 14 gallery/shop

B

2

1

4

5

1

2

3

4

6

5

6

7

8 10

9

10

11

C

D

7

E

8

9

F

incl. angle is to big

incl. angle is to big

1 culinary centre reception 2 personal changing rooms 3 sculpture garden 4 urban passage 5 entrance to the bike storrage 6 open auditorium/gift shop 7 re-use centre reception 8 technical room 9 cloakroom 10 open garden 11 gallery/shop 12 entrance to the re-use centre 13 re-use centre reception 14 gallery/shop

1

2

3

4

5

6

7

8 10

9

013

015 SECTION


COGO Rotterdam Urban Culture Cluster

INTERIOR LANDSCAPE

interior landscape

The facad sists of v stripes th several co into one change.

erdam Urban Culture Cluster

016

EXTERIOR RENDERS

Gardens the tower ergy theo ing clima storeys a ronment tion, gard nomical s providing to the cu rior part exploded of the p aiming to

The angle plane is c image of t around th brick ma dependin sition, w light. The low in the brown or It may lo an upper distance. Rotterdam small ob come tog and recog

Gardens are implemented into the tower plan as part of the synergy theory. They aid in regulating climate, connecting different storeys and rendering the environment more cosier. In addition, gardens are part of the economical scheme of urban culture, providing several species of food to the culinary centre. The exterior part of the tower forms an exploded view due to green spots of the plan where gardens are aiming towards the urban user.

The facade of the COGO consists of vertical terracotta brick stripes that vissualy amalgamate several colours and green islands into one expression of constant

017


018

018 BUILDING ENVELOPE DETAIL + FLOOR PLANS



PROFESSIONAL PROJECTS


CASCADING TERRACES SEAPORT RESIDENCES PROGRAM: LOCATION: TYPE: AFFILIATION: YEAR: STATUS: ROLE: TASKS:

HOUSING NEW YORK, NY, USA PROFESSIONAL PROJECT HILL WEST ARCHITECTS 2019 DESIGN DESIGNER SD, DD



FACADE TERRACING VARIATIONS

option 01 | sketch

MASSING AND TERRACING CONCEPT DIAGRAMS

41ST FLOOR 462' - 9" 40TH FLOOR 451' - 9" 39TH FLOOR 440' - 9" 38TH FLOOR 429' - 9" 37TH FLOOR 418' - 9" 36TH FLOOR 407' - 9" 35TH FLOOR 396' - 9" 34TH FLOOR 385' - 9" 33RD FLOOR 374' - 9" 32ND FLOOR 363' - 9" 31ST FLOOR 352' - 9" 30TH FLOOR 341' - 9" 29TH FLOOR 330' - 9"

45TH FLOOR 506' - 9" 44TH FLOOR 495' - 9"

41ST FLOOR 462' - 9" 40TH FLOOR 451' - 9" 39TH FLOOR 440' - 9" 38TH FLOOR 429' - 9" 37TH FLOOR 418' - 9" 36TH FLOOR 407' - 9" 35TH FLOOR 396' - 9" 34TH FLOOR 385' - 9" 33RD FLOOR 374' - 9" 32ND FLOOR 363' - 9" 31ST FLOOR 352' - 9" 30TH FLOOR 341' - 9" 29TH FLOOR 330' - 9" 28TH FLOOR 319' - 9"

11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 10' - 0"10' - 0" 15' - 0"

28TH FLOOR 319' - 9"

46TH FLOOR 517' - 9"

43RD FLOOR 484' - 9" 42ND FLOOR 473' - 9"

27TH FLOOR 304' - 9" 26TH FLOOR 294' - 9" 25TH FLOOR 284' - 9" 24TH FLOOR 273' - 9" 23RD FLOOR 262' - 9" 22ND FLOOR 251' - 9" 21ST FLOOR 240' - 9" 20TH FLOOR 229' - 9" 19TH FLOOR 218' - 9" 18TH FLOOR 207' - 9" 17TH FLOOR 196' - 9" 16TH FLOOR 185' - 9" 15TH FLOOR 174' - 9" 14TH FLOOR 163' - 9" 13TH FLOOR 152' - 9" 12TH FLOOR 141' - 9" 11TH FLOOR 130' - 9" 10TH FLOOR 119' - 9" 9TH FLOOR 108' - 9" 8TH FLOOR 97' - 9" 7TH FLOOR 86' - 9" 6TH FLOOR 75' - 9"

26TH FLOOR 294' - 9" 25TH FLOOR 284' - 9" 24TH FLOOR 273' - 9"

22ND FLOOR 251' - 9" 21ST FLOOR 240' - 9" 20TH FLOOR 229' - 9" 19TH FLOOR 218' - 9" 18TH FLOOR 207' - 9" 17TH FLOOR 196' - 9" 16TH FLOOR 185' - 9" 15TH FLOOR 174' - 9" 14TH FLOOR 163' - 9" 13TH FLOOR 152' - 9" 12TH FLOOR 141' - 9" 11TH FLOOR 130' - 9" 10TH FLOOR 119' - 9" 9TH FLOOR 108' - 9" 8TH FLOOR 97' - 9" 7TH FLOOR 86' - 9" 6TH FLOOR 75' - 9" 5TH FLOOR 64' - 9"

15' - 0"

5TH FLOOR 64' - 9"

27TH FLOOR 304' - 9"

23RD FLOOR 262' - 9"

4TH FLOOR 49' - 9"

15' - 0"

4TH FLOOR 49' - 9"

DRIVE THRU

1ST FLOOR 5' - 9"

1

FACADE CONCEPT DIAGRAMS

ELEVATION - SOUTH (MAIDEN LANE) 3/64" = 1'-0"

2ND FLOOR 17' - 9"

12' - 0"

2ND FLOOR 17' - 9"

12' - 0"

12' - 0"

49TH FLOOR 550' - 9" 48TH FLOOR 539' - 9" 47TH FLOOR 528' - 9" 46TH FLOOR 517' - 9" 45TH FLOOR 506' - 9" 44TH FLOOR 495' - 9" 43RD FLOOR 484' - 9" 42ND FLOOR 473' - 9" 41ST FLOOR 462' - 9" 40TH FLOOR 451' - 9" 39TH FLOOR 440' - 9" 38TH FLOOR 429' - 9" 37TH FLOOR 418' - 9" 36TH FLOOR 407' - 9" 35TH FLOOR 396' - 9" 34TH FLOOR 385' - 9" 33RD FLOOR 374' - 9" 32ND FLOOR 363' - 9" 31ST FLOOR 352' - 9" 30TH FLOOR 341' - 9" 29TH FLOOR 330' - 9" 28TH FLOOR 319' - 9"

27TH FLOOR 304' - 9" 26TH FLOOR 294' - 9" 25TH FLOOR 284' - 9" 24TH FLOOR 273' - 9" 23RD FLOOR 262' - 9" 22ND FLOOR 251' - 9" 21ST FLOOR 240' - 9" 20TH FLOOR 229' - 9" 19TH FLOOR 218' - 9" 18TH FLOOR 207' - 9" 17TH FLOOR 196' - 9" 16TH FLOOR 185' - 9" 15TH FLOOR 174' - 9" 14TH FLOOR 163' - 9" 13TH FLOOR 152' - 9" 12TH FLOOR 141' - 9" 11TH FLOOR 130' - 9" 10TH FLOOR 119' - 9" 9TH FLOOR 108' - 9" 8TH FLOOR 97' - 9" 7TH FLOOR 86' - 9" 6TH FLOOR 75' - 9" 5TH FLOOR 64' - 9"

4TH FLOOR 49' - 9"

3RD FLOOR 34' - 9"

17' - 0"

3RD FLOOR 34' - 9"

17' - 0"

3RD FLOOR 34' - 9"

51ST FLOOR 571' - 9" 50TH FLOOR 561' - 9"

1ST FLOOR 5' - 9"

2

ELEVATION - EAST (SOUTH STREET) 3/64" = 1'-0"

2ND FLOOR 17' - 9" 1ST FLOOR 5' - 9"

3

ELEVATION - NORTH (FLETCHER STREET) 3/64" = 1'-0"

DRIVE THRU

646' - 0"

44TH FLOOR 495' - 9"

47TH FLOOR 528' - 9"

11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 10' - 0"10' - 0" 12' - 0" 12' - 0" 12' - 0" 12' - 0" 11' - 0" 11' - 0"

45TH FLOOR 506' - 9"

48TH FLOOR 539' - 9"

54TH FLOOR 605' - 9"

11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 10' - 0"10' - 0" 15' - 0"

46TH FLOOR 517' - 9"

43RD FLOOR 484' - 9" 42ND FLOOR 473' - 9"

49TH FLOOR 550' - 9"

55TH FLOOR 617' - 9"

53RD FLOOR 593' - 9" 52ND FLOOR 581' - 9"

15' - 0"

47TH FLOOR 528' - 9"

50TH FLOOR 561' - 9"

56TH FLOOR 629' - 9"

15' - 0"

48TH FLOOR 539' - 9"

51ST FLOOR 571' - 9"

57TH FLOOR 640' - 9"

17' - 0"

49TH FLOOR 550' - 9"

54TH FLOOR 605' - 9"

58TH FLOOR 651' - 9"

12' - 0"

50TH FLOOR 561' - 9"

55TH FLOOR 617' - 9"

53RD FLOOR 593' - 9" 52ND FLOOR 581' - 9"

PARAPET 666' - 9" T.O. BULKHEAD 663' - 9"

646' - 0"

51ST FLOOR 571' - 9"

56TH FLOOR 629' - 9"

11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 10' - 0"10' - 0" 12' - 0" 12' - 0" 12' - 0" 12' - 0" 11' - 0" 11' - 0"

54TH FLOOR 605' - 9"

57TH FLOOR 640' - 9"

11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 10' - 0"10' - 0" 15' - 0"

55TH FLOOR 617' - 9"

53RD FLOOR 593' - 9" 52ND FLOOR 581' - 9"

58TH FLOOR 651' - 9"

15' - 0"

56TH FLOOR 629' - 9"

12' - 0"

57TH FLOOR 640' - 9"

646' - 0"

11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 10' - 0"10' - 0" 12' - 0" 12' - 0" 12' - 0" 12' - 0" 11' - 0" 11' - 0"

58TH FLOOR 651' - 9"

15' - 0"

PARAPET 666' - 9" T.O. BULKHEAD 663' - 9"

12' - 0"

PARAPET 666' - 9" T.O. BULKHEAD 663' - 9"


AMENITY CONCEPT sidences 161 Maiden Lane

THE GREAT ROOM INTERIOR

MASTER BEDROOM INTERIOR

Seaport Residences 161 Maiden Lane Seaport Residences 161 Maiden Lane

DINING ROOM INTERIOR


WORKPLACE STRATEGY DELOITTE OFFICE RENOVATION PROGRAM: LOCATION: TYPE: AFFILIATION: YEAR: STATUS: ROLE: TASKS:

COMMERCIAL INTERIOR NEW YORK, NY, USA PROFESSIONAL PROJECT GENSLER 2019 DESIGN DESIGNER SD, DD

Copyright © 2018 Deloitte Development LLC. All rights reserved.


Rea


Final Layout

Reception / Waiting Are

(1) 18-Pers Conference

(1) 12-Pers Conference (1) 6-Perso Conference

(2) Team Ro

(30) Bench Workstation (4) Offices

Collaboratio zones Pantry

Copy/Print A

Coat Closets

Lateral Files Hoteling

Copyright © 2018 Deloitte Development LLC. All rights reserved.

Real Estate Services

FINAL FLOOR PLAN LAYOUT

Workstations | Typical Layout Front Privacy Screen

54” Answer Panel with Upholstered Fabric

Side Whiteboard

Dual Monitor Arm

Steelcase Think Chair

Mobile Pedestal

Convenience Outlets

End Panel

Copyright © 2018 Deloitte Development LLC. All rights reserved.

Real Estate Services

11

Work Café Coffee / Tea Storage + Cups

Ceramic Mugs and Plates / Cups

Flavored Coffee Machine

Paper Cups / Supplies Hot + Cold Water Dispenser

Undercounter Microwave

- Coffee / Tea Undercounter Condiments Dishwasher - Cutlery - Napkins Copyright © 2018 Deloitte Development LLC. All rights reserved.

Undercounter Ice Maker

Double Reach-In Refrigerator

Serving Trays

Undercounter Microwave

Serving Trays

- Cutlery - Food Condiments - Paper Plates Real Estate Services

12


Final Layout

RENDER OF RECEPTION LOUNGE

Copyright © 2018 Deloitte Development LLC. All rights reserved.

Real Estate Services

5

Reception / Waiting Area (1) 18-Person Conference Room (1) 12-Person Conference Room (1) 6-Person Conference Room (2) Team Rooms (30) Bench Workstations (4) Offices Collaboration zones Pantry Copy/Print Area Coat Closets Lateral Files Hoteling Whiteboards

Furniture | Reception Lounge

Copyright © 2018 Deloitte Development LLC. All rights reserved.

2018 Deloitte Development LLC. All rights reserved.

Real Estate Services 3 Copyright © 2018 Deloitte Development LLC. All rights reserved.

INTERIOR OFFICE FINISH PALETTE

Real Estate Services

7

PROGRAM LAYOUT

Furniture | Collaboration

sh Palette

Copyright © Real Estate Services 9 2018 Deloitte Development LLC. All rights reserved.

FURNITURE FOR COLLABORATION SPACES

Real Estate Services

FURNITURE FOR RECEPTION LOUNGE

8


SOUTH BRONX 101 LINCOLN PROGRAM: LOCATION: TYPE: AFFILIATION: YEAR: STATUS: ROLE: TASKS:

HOUSING NEW YORK, NY, USA PROFESSIONAL PROJECT HILL WEST ARCHITECTS 2019 DESIGN DESIGNER SD, DD, CD, CA



SOBRO - SUN STUDY - 101 LINCOLN AVENUE

Summer - 9AM

Summer - 1PM

Summer - 5PM

Fall (Spring) - 9AM

Fall (Spring) - 1PM

Fall (Spring) - 5PM

Winter - 9AM

Winter - 1PM

podium will also include market rate and

Winter - 5PM

SUN STUDY ANALYSIS DIAGRAMS

BRUCKNER STREET FACADE


METAL COPING METAL COPING

REINFORCED ALUMINUM REINFORCED ALUMINUM PANEL TYP. PANEL TYP. REINFORCED ALUMINUM REINFORCED ALUMINUM REINFORCED ALUMINUM PANEL TYP. PANEL TYP. PANEL TYP.

1 1

RESIDENTIAL RESIDENTIAL TERRACE TERRACE PARAPET PARAPET 1

2

RESIDENTIAL TERRACE TERRACE PARAPET REINFORCED ALUMINUM 2 1 RESIDENTIAL REINFORCED ALUMINUM 1 MODULAR BRICK TYP.RAILING PANEL TYP. PANEL TYP. MODULAR BRICK TYP. RAILING MTL PICKET MTL PICKET MODULAR BRICK TYP.

RESIDENTIAL RESIDENTIAL TERRACETERRACE PARAPETPARAPET 1 1 RESIDENTIAL TERRACE PARAPET RESIDENTIAL TERRACE PARAPETPARAPET RESIDENTIAL TERRACE PARAPET RESIDENTIAL TERRACE RESIDENTIAL TERRACE PARAPET RESIDENTIAL TERRACE TEMP LAM GLASS RAILING TEMP TEMPLAM LAMGLASS GLASSRAILING RAILING TEMP LAM GLASS RAILING 2 2 TEMP LAM PARAPET TEMP LAM TEMP LAM 1 2 GLASS RAILING

MP LAM GLASS RAILING

1

PING LAMLAM GLASS RAILING TEMP LAM GLASS RAILING TEMP GLASS RAILING NFORCED ALUMINUM NEL TYP.

REINFORCED ALUMINUM REINFORCED REINFORCEDALUMINUM ALUMINUM REINFORCED ALUMINUM PANEL TYP. PANEL PANELTYP. TYP. TEMP LAM PANEL TYP. TEMPTEMP LAM TEMP LAM LAM RAILING GLASS RAILING GLASS GLASS RAILING GLASS RAILING TERRACE PLANTER TERRACE PLANTER REINFORCED ALUMINUM REINFORCED ALUMINUM PANEL TYP. PANELREINFORCED TYP. ALUMINUM REINFORCED ALUMINUM REINFORCED ALUMINUM PANEL TYP. PANEL TYP. PANEL TYP. 3 COPING COPING METALBRICK COPING METAL COPING MODULAR TYP. METAL MODULAR BRICK TYP.METAL METAL COPING METAL COPING

2 77 TEMP LAM GLASS RAILING TERRACE PLANTER TERRACE PLANTER MTL PICKET RAILING MTL PICKET RAILING

LING

PING

3

2 1

BRICK TYP. RAILING MTL PICKET

2

TERRACE PLANTER TERRACERESIDEN PLANTER R METAL COPING METAL METALCOPING COPING 7 METAL

7

N

N

REINFORCED ALUMINUM REINFORCED ALUMINUM PANEL TYP. PANEL TYP.

KEY PLAN KEY PLAN

MECH. ROOF MECH. PARAPET ROOF PARAPET 3

MODULAR BRICK TYP. MODULAR MODULARBRICK BRICKTYP. TYP. MODULAR BRICK METAL COPING METALBRICK COPING METAL COPING MODULAR TYP. TYP. MODULAR BRICK TYP.METAL COPING

MECH. ROOF PARAPET

MODULAR BRICK TYP. MODULAR BRICK TYP. REINFORCED MODULARALUMINUM BRICK TYP. REINFORCED ALUMINUM

7

NO

REINFORCED ALUMINUM PANEL TYP.

TERRACE PLANTER TERRACE PLANTER TERRACE PLANTER TERRACE PLANTER

HST-M8/10

MODULAR BRICK TYP. MODULAR MODULARBRICK BRICKTYP. TYP. MODUL

NOTES: NOTES: MODULAR BRICK TYP. MODULAR BRICK TYP.

PANEL TYP.COPINGPANEL TYP.METAL COPING3 METAL

METAL COPING

TEMPERED LAM. GLASS TEMPERED LAM. GLASS TEMPERED LAM. GLASS W/ CONT. S.S. CAP

3

NO K

C

TEMPERED LAM. GLASS TEMPERED LAM. GLASS MECH. ROOF PARAPET (W/O RAILING) W/ CONT. S.S. CAP W/ CONT. S.S. CAP 4 ROOF MECH. ROOF MECH. PARAPET PARAPET 3 TEMPERED LAM. GLASS

W/ CONT.TERRACE S.S. CAP RESIDENTIAL RESIDENTIAL RESIDENTIAL RESIDENTIAL RESIDENTIAL TERRACE TERRACE PARAPETTERRACE PARAPET PARAPET WITH PLANTER PARAPET WITH WITHPLANTER PLANTER WITH PLANTER RESIDENTIAL RESIDENTIAL RESIDENTIAL TERRACE TERRACE TERRACE PARAPETTERRACE PARAPET PARAPETPARAPET METAL COPING 22 2 7 3 MECH. 77 ROOF7PARAPET METAL COPING METAL COPING RESIDENTIAL RESIDENTIAL TERRACE TERRACE PARAPET PARAPET WITH PLANTER WITH PLANTER 7 7 MODULAR BRICK TYP. MODULAR BRICK TYP. MODULAR BRICK TYP. MECH. ROOF MECH. PARAPET ROOF PARAPET MODULAR BRICK TYP.RESIDENTIAL MODULAR TERRACE BRICK TYP. MODULAR BRICK RESIDENTIAL TYP. MODULAR BRICK TYP. TERRACE PARAPETPARAPET WITH PLANTER WITH PLANTER RESIDENTIAL RESIDENTIAL TERRACE TERRACE PARAPETPARAPET 3 2 23 7 7 METAL COPING MTL-02 FIN (TYP.) MODULAR BRICK TYP.RAILING MODULAR TYP. MTL PICKET MTL MTLPICKET PICKET RAILING BRICK MTL PICKET RAILING MODULAR BRICK RAILING TYP. MODULAR BRICK TYP. MODULAR BRICK TYP. MODULAR BRICK RESIDENTIAL TYP. TERRACE PARAPET WITH PLANTER 7 TEMPERED LAM. GLASS TEMPERED LAM. GLASS MODULAR BRICK TYP.

RESIDENTIAL RESIDENTIAL TERRACE TERRACE PARAPET PARAPET RESIDENTIAL PARAPET PARAPET 2 2 RESIDENTIAL 2TERRACETERRACE RESIDENTIAL TERRACE PARAPET WITH PLANTER RESIDENTIAL TERRACE PARAPET WITH PLANTER 7

TEMPERED LAM. GLASS W/ CONT. S.S. CAP 4

W/ CONT. S.S. CAP

METAL COPING

TEMPERED LAM. GLASS W/ CONT. S.S. CAP MTL-02 FIN (TYP.)

W/ CONT. S.S. CAP

MTL-02 FIN (TYP.)

W/ CONT. S.S. CAP W/ CONT. S.S. CAPROOF MECH. PARAPET MECH. 3 ROOF PARAPET

MODULAR BRICK TYP. MODULAR BRICK TYP.

TEMPERED LAM. GLASS TEMPERED LAM. GLASS W/ CONT. S.S. CAPW/ CONT. S.S. CAP

RESIDENTIAL RESIDENTIAL TERRACE TERRACE PARAPET PARAPET WITH PLANTER WITH PLANTER RESIDENTIAL PARAPET PARAPET WITH PLANTER WITH PLANTER 7 7 RESIDENTIAL 7TERRACETERRACE METAL COPING METAL COPING HST-M8/10

Numbe

PR

09/04/2019 DOB 09/04/2019 DOB CONFORMED SETCONFORMED SET 08/23/2019 BULLETIN 1 1 08/23/2019 BULLETIN 1

1

MODULAR BRICK TYP. MODULAR BRICK TYP.

REINFORCED ALUMINUM REINFORCED REINFORCEDALUMINUM ALUMINUM REINFORCED ALUMINUM PANEL TYP. PANEL PANELTYP. TYP. PANEL TYP.

MTL PICKET RAILING MTL PICKET RAILING G MTL PICKET RAILING MREINFORCED ALUMINUM PANEL TYP.

B C

MTL-02 FIN (TYP.)

08/12/2019 EN RESUBMISSION 08/12/2019 EN RESUBMISSION

MTL-02 FIN (TYP.)

Numbe

HST-M8/10

MTL-02 FIN (TYP.) MTL-02 FIN (TYP.)

07/26/2019 100%DOCUMENTS CONSTRUCTION DOCUMENTS 07/26/2019 100% CONSTRUCTION MTL-02 FIN (TYP.)

PR

DOB & EN RESUBMISSION 06/13/2019 DOB &06/13/2019 EN RESUBMISSION 05/03/2019 50% DOCUMENTS CONSTRUCTION DOCUMENTS 05/03/2019 50% CONSTRUCTION

REINFORCED ALUMINUM REINFORCED ALUMINUM PANEL TYP. PANEL TYP.

HST-M8/10

03/08/2019 OER SUBMISSION 03/08/2019 OER SUBMISSION

4

OW

03/29/2019 03/29/2019 ADDENDUM 02 ADDENDUM 02

HST-M8/10

M

MECH. ROOF MECH. PARAPET ROOF PARAPET (W/O RAILING) (W/O RAILING) 4

5

BO

HST-M8/10

02/08/2019 100% DESIGN DEVELOPMENT 02/08/2019 100% DESIGN DEVELOPMENT

MTL-02 FIN (TYP.)

AMENITY 8TH AMENITY FL. TERRACE 8TH DOB FL.SUBMISSION TERRACE PARAPET PARAPET 01/21/2019 5 01/21/2019 DOB SUBMISSION 12/21/2018 50% DESIGN DEVELOPMENT

MTL-02 FIN (TYP.)

6

12/21/2018 50% DESIGN DEVELOPMENT Number:

MECH. ROOF PARAPET (W/O RAILING) HST-M8/10

4

HST-M8/10

HST-M8/10 HST-M8/10

4

MECH. ROOF PARAPET (W/O BRONX, NY 10451 BRONX, NY 10451RAILING)

3

R BRICK TYP.

METAL COPING

TEMPERED LAM. GLASS W/ CONT. S.S. CAP

PARAPET SECTION DETAILS

4

MODULAR BRICK TYP. MODULAR BRICK TYP.

MTL-02 FIN (TYP.)

MTL-02 MTL-02 FINFIN (TYP.) (TYP.)

MTL-02 FIN (TYP.)

MTL-02 FIN (TYP.)

11 BROADWAY 11 BROADWAY 17TH FLOOR 17TH FLOOR NEW YORK, NY 10004 NEW YORK, NY 10004 T. 212 213 8007 T. 212 213 8007

MTL-02 FIN (TYP.)

Interior Designer:Interior Designer:

LEONG LEONG LEONG LEONG 167 BOWERY, 3F167 BOWERY, 3F NEW YORK, NY NEW 10002YORK, NY 10002 (212) 920-7221 (212) 920-7221 Structural Engineer: Structural Engineer:

RULAR BRICK TYP.TYP. MODULAR BRICK TYP. BRICK

DESIMONE Consulting Engineers DESIMONE Consulting Engineers BROADWAY, 140 BROADWAY,140 25TH FLOOR 25TH FLOOR NEW YORK, NY NEW 10005YORK, NY 10005 (212) 532-2211 (212) 532-2211

MEP/FP Engineer: MEP/FP Engineer: HST-M8/10

HST-M8/10

HST-M8/10

HST-M8/10

Engineering Consulting Group VENTROPVENTROP Engineering Consulting Group

HST-M8/10

MTL-02 FIN (TYP.)

MTL-02 FIN (TYP.) MTL-02 FIN (TYP.)

WEST3RD 34TH STREET, 3RD FLOOR 365 WEST 34TH 365 STREET, FLOOR NEW YORK, NY NEW 10001YORK, NY 10001 (212) 244-5060 (212) 244-5060

MTL-02 FIN (TYP.)

TL-02 FIN (TYP.)

Civil Engineer:

AKRF

MECH. ROOF MECH. MECH. PARAPET ROOF ROOF MECH. PARAPET PARAPET (W/O ROOF RAILING) PARAPET (W/O (W/ORAILING) RAILING) (W/O RAILING) 4 44 4 AMENITY 8TH AMENITY FL. TERRACE 8TH FL. TERRACE PARAPET PARAPET 5 5 MECH. ROOF MECH. PARAPET ROOF PARAPET (W/O RAILING) (W/O RAILING) 4 4 AMENITY 8TH FL. TERRACE PARAPET 5

AMENITY AMENITY 8TH AMENITY FL. TERRACE 8TH AMENITY 8THFL. FL.TERRACE TERRACE PARAPET 8TH FL. TERRACE PARAPET PARAPETPARAPET 55 5 MECH. ROOF MECH. PARAPET ROOF PARAPET (W/O RAILING) (W/O RAILING) 6 6 AMENITY AMENITY 8TH FL. TERRACE 8TH FL. TERRACE PARAPETPARAPET 5 5 MECH. ROOF PARAPET (W/O RAILING) 6 5

6

Civil Engineer:

AKRF

(21 Inte

LE Str 167 DE

(21

6

M Str MECH. 6 RO DE ME

140 VE NE 365 (21 NE (21 ME

VE Civ 365 AK NE 440 (21 NE (21 Civ

AK Lan 440 M

NE 120 (21 NE (21 Lan

M Ge 120 LA

NE 21 (21 360 NE Ge (21

LA

440SOUTH PARK AVENUE SOUTH 440 PARK AVENUE MECH. ROOF MECH. MECH. PARAPET ROOF ROOF MECH. PARAPET PARAPET (W/O RAILING) PARAPET (W/O (W/ORAILING) RAILING) (W/O RAILING) YORK,ROOF NY 10016 NEW6 YORK, NY NEW 10016 66 (212) 696-0670 (212) 696-0670 Landscape Architect: Landscape Architect:

6

167 ME NE

NE 140 (21 NE

AMENITY FL. TERRACE PARAPET AMENITY 8TH FL. 8TH TERRACE PARAPET 5 5

MTL-02 FIN (TYP.)

HST-M8/10

Inte

LE

6

Architect:

Architect:

MECH. ROOF PARAPET (W/O RAILING) MECH. 4 ROOF PARAPET (W/O RAILING)

MTL-02 FIN (TYP.)

TEMPERED LAM.LAM. GLASS TEMPERED LAM. GLASS TEMPERED LAM. GLASS TEMPERED GLASS S.S. S.S. CAPCAPW/ CONT. S.S. CAP W/ CONT. S.S. CAPW/ CONT. W/ CONT.

AMENITY 8TH

AMENITY AMENITY 8TH FL.2401 TERRACE 8TH FL. AVENUE TERRACE PARAPET PARAPET THIRD LLC LLC BOP THIRD AVENUE 5 2401BOP 250 VESEY STREET, 15TH FLOOR 250 VESEY STREET, 15TH FLOOR MECH. ROOF PARAPET (W/O RAILING) NEW YORK, NEW YORK 10281-1023 NEW YORK, NEW YORK 10281-1023 MECH. ROOF PARAPET (W/O RAILING) ROOF PARAPET (W/O RAILING) 6 6 MECH. 6

TEMPERED LAM. GLASS TEMPERED LAM. GLASS W/ CONT. S.S. CAP W/ CONT. S.S. CAP

METAL COPING

MTL-02 FIN (TYP.)

OPING AL COPING METAL COPING

Arc

5

5

HST-M8/10

N

MEC AMENITY AM 6 5 8TH 5

OWNER:

OWNER:

TEMPEREDLAM. LAM.GLASS GLASS TEMPERED LAM. GLASS TEMPERED LAM. GLASS TEMPERED MECH. ROOF MECH. PARAPET ROOF PARAPET (W/O RAILING) (W/O RAILING) MECH. ROOF MECH. PARAPET ROOF PARAPET CONT.S.S. S.S.CAP CAP W/ CONT. S.S. CAP W/ CONT. S.S. CAP 4 W/W/CONT. 4 3 METAL COPING METAL METALCOPING COPING METAL COPING TEMPERED LAM. GLASS TEMPERED LAM. GLASS AMENITY 8TH FL. TERRACE PARAPET MECH. ROOF PARAPET (W/O RAILING) MECH. ROOF PARAPET (W/O RAILING) AMENITY 8TH FL. TERRACE PARAPET MECH. PARAPET (W/O RAILING) AMENITY 8TH FL. TERRACE PARAPET S.S. CAP ROOF W/ CONT. S.S. CAP 4 4 W/ CONT. 5 4 5 5 MODULAR BRICK TYP. MODULAR MODULARBRICK BRICKTYP. TYP. MODULAR BRICK TYP. HST-M8/10

COPING

Revision:

2401 THIRD AVENUE 2401 THIRD AVENUE

HST-M8/10

EINFORCED ALUMINUM REINFORCED ALUMINUM MINUM REINFORCED ALUMINUM MECH. MECH. PARAPET ROOF ROOF MECH. PARAPET PARAPET ROOF PARAPET ANEL TYP.TYP. PANEL TYP.MECH. ROOF PANEL 3 33 3

Date:

Number: Date: AMENITY 8TH FL.Revision: TERRACE PARAPET PROJECT: PARAPET MECH. MECH. PARAPET ROOF (W/O RAILING) (W/O RAILING) PROJECT: 5 4ROOF 2401Ave Third Ave 2401 Third

MEC OW

Arc BO

HST-M8/10

- 100% SCHEMATIC 11/16/2018 100% SCHEMATIC DESIGN 11/16/2018 DESIGN

-

4

RE

K

TEMP LAM GLASS RAILING

TEMPTEMP LAMLAM TEMP LAM TEMP LAM RAILING GLASS RAILING GLASS GLASS RAILING GLASS RAILING

MODULAR BRICK TYP.MODULAR BRICK TYP. MODULAR BRICK TYP.

7

TEMP LAM GLASS RAILING

2

MTL PICKET RAILING MTL PICKET RAILING METAL COPING METAL COPING METAL COPING

2

A

A

7

TERRACE TERRACEPLANTER PLANTER TERRA

METAL COPING REINFORCED ALUMINUMREINFORCED ALUMINUM METAL COPING PANEL TYP. PANEL TYP.

MODULAR BRICK TYP. MODULAR BRICK TYP.

RESIDENTIAL RESIDENTIAL TERRACE TERRACE PARAPET PARAPET 2 RESIDENTIAL RESIDENTIAL TERRACETERRACE PARAPETPARAPET 1 MECH. ROOF PARAPET MECH. ROOF PARAPET RESIDENTIAL TERRACE PARAPET 3 3 MECH. 3 ROOF PARAPET

RESIDENTIAL RESIDENTIAL TERRACETERRACE PARAPETPARAPET 2 TEMP LAM TEMP TEMPLAM LAM TEMP LAM GLASS RAILING GLASS GLASSRAILING RAILING GLASS RAILING RESIDENTIAL TERRACE PARAPET WITH MTL PICKET RAILING RESIDENTIAL TERRACE PARAPET WITH PLANTER RESIDENTIAL TERRACE PARAPET WITHPLANTER PLANTER TERRACE PLANTER 7

B

MODULAR BRICK TYP.

RESIDENTIAL RESIDENTIAL TERRACE RESIDENTIAL TERRACE PARAPETTERRACE PARAPETPARAPET RESIDENTIAL TERRACE PARAPET FORCED ALUMINUM REINFORCED ALUMINUM REINFORCED M ALUMINUM 1 11 1 EL TYP.TYP. PANEL TYP. PANEL

2

REINFORCED ALUMINUM PANEL TYP. MTL PICKET RAILING MTL PICKET RAILING METAL COPING METAL COPING

TEMP LAM TEMP LAM GLASS RAILING GLASS RAILING

RESIDENT 3

METAL COPING

MODULAR BRICK TYP. RAILING MTL PICKET MTL PICKET MODULAR BRICK RAILING TYP. MODULAR BRICK TYP.

TEMP LAMREINFORCED ALUMINUMREINFORCED ALUMINUM RESIDENTIAL TERRACE PARAPET RESIDENTIAL TERRACE PARAPET 2 PANEL TYP. PANEL TYP.2 GLASS RAILING TERRACE PLANTER METALCOPING COPING METAL METAL METAL COPING METAL COPING COPING

METAL COPING

RES

RESIDENT 7 2

2

RESIDENTIAL TERRACE PARAPET

TEMPLAM LAM TEMP GLASSRAILING RAILING GLASS

GLASS RAILING GLASS RAILING

TEMP LAM TEMP LAM GLASS RAILING GLASS RAILING TEMP LAM GLASS RAILING TEMP LAM GLASS RAILING TEMP LAM PARAPETTEMP LAM RESIDENTIAL TERRACE RESIDENTIAL TERRACE PARAPET 1 MTL PICKET RAILING MTL PICKET 1 GLASS RAILING GLASS RAILING RAILING MTL PICKET RAILING METAL COPING TEMP LAM GLASS RAILING METAL COPING METAL COPING

METAL COPING

7

MODULAR BRICK TYP. MODULAR BRICK TYP. MODULAR BRICK TYP.MODULA MODULAR BRICK RES TYP.

MECH. ROOF PARAPET RESIDENTIAL TERRACE PARAPET 3 PARAPET

RESIDENTIAL TERRACE PARAPET

MTL PICKET RAILING

11

RESIDENTIAL RESIDENTIAL TERRACE TERRACE PARAPET PARAPET 2

LLCRAILING) MPFP LLCMPFP MECH. ROOF MECH. PARAPET ROOF PARAPET (W/O (W/O RAILING) 6 BROADWAY, 120 BROADWAY,120 20TH FLOOR 20TH FLOOR NEW YORK, NY NEW 10271YORK, NY 10271 (212) 477-6366 (212) 477-6366

21 Ma

360 M

NE 131 (21 NE

(21 Ma

DOBM S

131 NE (21

Engineer: Geotechnical/SOEGeotechnical/SOE Engineer:

LANGAN LANGAN

DOB S

21 PENN PLAZA 21 PENN PLAZA 360 W.8TH 31ST STREET, 8TH FLOOR 360 W. 31ST STREET, FLOOR NEW YORK, NY NEW 10001YORK, NY 10001 (212) 479-5400 (212) 479-5400

AMENITY AMENITY 8TH FL. TERRACE 8TH FL. TERRACE PARAPET PARAPET AMENITY 8TH FL. 8TH FL. TERRACE PARAPET PARAPET 5 5 AMENITY 5 TERRACE MECH. ROOF PARAPET (W/O RAILING) MECH. 6 ROOF PARAPET (W/O RAILING) 6

5

6

MECH. ROOF MECH. PARAPET ROOFRAILING) PARAPET (W/O RAILING) (W/O RAILING) MECH. MECH. ROOF PARAPET (W/O (W/O RAILING) 6 6 ROOF 6PARAPET

Marine Engineer: Marine Engineer:

M.G. McLAREN P.C. M.G. McLAREN P.C. 131 W.4TH 35TH STREET, 4TH FLOOR 131 W. 35TH STREET, FLOOR NEW YORK, NY NEW 10001YORK, NY 10001 (212) 324-6300 (212) 324-6300

DOB STAMPS & SIGNATURES: DOB STAMPS & SIGNATURES:

DWGDT

P

DWG T

P

SEAL &

SEAL &

D DWG TITLE:

DWG TITLE:

TYPICAL TYPICAL PARAPET AND SCREEN PARAPET AND SCREEN DETAILS DETAILS

CAD F

CAD SF

SEAL & SIGNATURE: SEAL & SIGNATURE: DATE: 09/04/2019 DATE: 09/04/2019 PROJECT #: 18A06PROJECT #: 18A06 SCALE:

SCALE:

DWG NO.

DWG NO.

A-544.00A-544.00

CAD FILE: J:\18A06_2401 Third Ave CAD FILE: J:\18A06_2401 Third Ave

NORTHEAST AERIAL VIEW

C


Update

1 ID-501 4' - 10"

7-13 39 SF

8' - 8"

PHONE

74

RESTRM 7-12 112 SF

PHONE

7-16 609 SF

7-14 39 SF

MTG RM 3 7-11 163 SF 14

8 1

ID-703

2

PHONE

9 ID-703 1

7-15 47 SF

7

12' - 8"

LIBRARY

ID-673

9

6

3

MTG RM 2

ID-671

TYPE 5J

7-10 222 SF 16

10 3.6sf

10

18

10

180

10 6.0sf 160

2 6.0sf

121

160

12 14

10

ID-673

168

2

7 ID-671

W/D

1 W/D

16

10

4 ID-705

3.6sf 160

INTERIOR COURTYARD

7-03 3331 SF

6' - 9"

CONVERGENT SOCIAL SPACE

144

6.8sf

16

180

16

16' - 7"

15

10

160

18

W/D

MTG RM 1

7-24 376 SF

5' - 5"

7-09 176 SF

TYPE 5G

TYPE 5G

5' - 10"

37' - 3"

2' - 7"

7' - 8"

8' - 9"

16 38

ID-673

11

32

3

14.0sf

PE7

1216

PE10

8

UP 19R

49 5 2 3

ID-702

CONVERGENT SOCIAL SPACE

-

7-03 3331 SF

34' - 4"

4

ST RE TC HE R

ID-671

R HE TC RE ST

2 ID-501

PE8

PE9 157.7 SQ. FT.

ID-660

3

73

LOUNGE BAR

STORAGE

7-23 132 SF

DN 21R

6-08 46 SF

LOUNGE PANTRY

CLUB LOBBY 7-02 668 SF 7

7-29 91 SF

CLUB VESTIBULE

4 FEET DEEP

NO DIVING

NO DIVING

4 FEET DEEP

INDOOR POOL 7-04 3567 SF

MAIN DRAIN

NO DIVING

9

7

ID-672

MAIN DRAIN

LOCKERS

3

RESERV.

7-17 982 S

11' - 8"

7 SETS OF VRF RISERS

4 FEET DEEP

BRANCH LOCATED AT CEILING WITH ACCESS DOOR HATCH

18 18

5'-0" CLEARANCE HOLD

NO DIVING

ID-670

7-07 102 SF

7-06 25 SF 4 FEET DEEP

1

7-01 367 SF 5

RESTRM

STOR. NO DIVING

6

4

1

4 FEET DEEP

ID-670

7-28 32 SF

18'-0"

2

2

4 FEET DEEP

4 FEET DEEP

NO DIVING

TL-43

11' 11'- -10" 7"

RESTRM 5'-0" CLEARANCE HOLD

60'-0"

5.4sf 324

VRF ROOM

8' - 6"

5'-0" CLEARANCE HOLD

EMERGENCY TELEPHONE EMERGENCY STOP BUTTON

4 FEET DEEP

5'-0" CLEARANCE HOLD

7-08 158 SF

POOL SIGNAGE

49

TERRACE STORAGE 6-09 118 SF

08

20' - 5"

19' - 10"

19' - 10"

19' - 10"

19' - 10"

8' - 9"

R FLOO '-8" ACE TERR EL.: + 74 T.O.S.

R FLOO '-8" ACE TERR EL.: + 74 T.O.S.

7TH FLOOR PLAN AMENITIES River Lobby Concierge

Urban Lobby Concierge

101 Lincoln

KEYNOTE 08

32 49 73 74 75

101 Lincoln

RIVER LOBBY CONCIERGE

9

RIVER LOBBY CONCIERGE

101 Lincoln

OPERABLE GLASS ENCLOSURE, PIVOT SLIDING GLASS DOORS, TO BE COORD AOR. EXTERIOR GLAZING NOT IN SCOPE. RE DRAWINGS. LINE OF SOFFIT ABOVE CUSTOM MILLWORK BAR CUSTOM MILLWORK SHELVING NO FINISH.

16


Urban Lobby Lounge

River Lobby Lounge

101 Lincoln

101 Lincoln

10

RIVER LOBBY LOUNGE

URBAN LOBBY LOUNGE

Bar View

Banquette View

BAR VIEW

101 Lincoln

37

101 Lincoln

36

101 Lincoln

38

Pool View

Convergent Social Space

CONVERGENT SOCIAL SPACE

BANQUETTE VIEW

17

101 Lincoln

Convergent Social Space SWIMMING POOL 28

Jr. Basketball Court

101 Lincoln

BASKETBALL COURT

56

ZEN GARDEN LOUNGE 101 Lincoln

29


250'-0" 250'-0" MAXIMUM PENTHOUSE HEIGHT 210'-0" 210'-0" MAXIMUM TOWER HEIGHT

LINCOLN AVENUE

GE THIR

D

AVE

BRID

BRUCKNER BOULEVARD

EAST 132ND STREET

9'-8"

HARL EM

0.42

9'-8"

0.42

V.G.

V.G.

V.G.

V.G.

V.G.

0.42

V.G.

0.42 V.G.

V.G.

A-WW12

V.G.

0.42 V.G.

V.G.

A-WW6

0.42

S.P.

V.G.

V.G.

S.P.

V.G.

SLAB COVER

V.G.

V.G.

0.42 V.G.

V.G.

A-WW13

0.42

V.G.

V.G.

SLAB COVER

0.42 V.G.

V.G.

RIVER

0.42

A-WW6

V.G.

V.G.

0.42

V.G.

V.G.

V.G.

V.G.

SLAB COVER

A-WW13

V.G.

V.G.

0.42

V.G.

V.G.

V.G.

V.G.

SLAB COVER

A-WW13

V.G.

0.42

V.G.

V.G.

V.G.

V.G.

SLAB COVER

0.42

V.G.

V.G.

V.G.

V.G.

SLAB COVER

NOTES: OITC 28: OITC 33: OITC 35:

A-WW14 0.42

V.G.

V.G.

V.G.

V.G.

SLAB COVER

N

V.G.

V.G.

V.G.

V.G.

V.G.

V.G.

BASE OITC

SLAB COVER

METAL PANEL SLAB COVER

9'-8"

BRICK

A-PW3

A-PW4

0.42

SPR

A-PW4

0.42 V.G.

V.G.

V.G.

V.G.

A-PW1

0.42

S.P.

V.G.

V.G.

A-PW5

0.42

V.G.

A-PW1

0.42 V.G.

V.G.

A-PW5

0.42 V.G.

V.G.

A-PW5

0.42 V.G.

V.G.

A-PW6

0.42 V.G.

V.G.

M.P.

0.42 V.G.

V.G.

V.G.

V.G.

METAL PANEL DARK

GLASS VISION (NO-HATCH)

V.G.

M.P. V.G.

GROUND/ BUILDING CUT

GLASS SPANDREL

9'-8"

S.P.

A-WW11

A-WW12 SPR

0.42

A-WW12

0.42

A-WW6

0.42

A-WW13

0.42

A-WW6

0.42

A-WW13

0.42

A-WW13

0.42

A-WW14

0.42

GLASS CERAMIC FRIT

0.42

CONCRETE C.F.

V.G.

V.G.

V.G.

V.G.

V.G.

V.G.

V.G.

SLAB COVER

V.G.

V.G.

V.G.

V.G.

V.G.

V.G.

V.G.

V.G.

V.G.

SLAB COVER

V.G.

V.G.

V.G.

V.G.

SLAB COVER

V.G.

V.G.

V.G.

V.G.

SLAB COVER

V.G.

V.G.

V.G.

V.G.

SLAB COVER

V.G.

V.G.

V.G.

V.G.

SLAB COVER

V.G.

V.G.

V.G.

V.G.

V.G.

V.G.

MARINE GRADE GLASS VISION

GRANITE WATER TABLE

SLAB COVER

9'-8"

MARINE GRADE GLASS SPANDREL

A-PW4

SPR

A-PW4

0.42 V.G.

V.G.

V.G.

V.G.

A-PW1

0.42

S.P.

V.G.

V.G.

A-PW5

0.42

V.G.

A-PW1

0.42 V.G.

V.G.

0.42 V.G.

V.G.

A-PW5

A-PW5

0.42 V.G.

V.G.

0.42 V.G.

V.G.

METAL LOUVER

A-PW6

MTL-01

0.42 V.G.

V.G.

V.G.

V.G.

V.G.

9'-8"

NOT FOR CONSTRUCTION

A-WW11

A-WW12 SPR

0.42

V.G.

V.G.

V.G.

V.G.

V.G.

SLAB COVER

S.P.

V.G.

V.G.

S.P.

V.G.

SLAB COVER

A-WW6

A-WW13

A-WW6

A-WW13

A-WW13

A-WW14

0.42

0.42

0.42

0.42

0.42

0.42

0.42

A-PW4

0.42

0.42

V.G.

V.G.

V.G.

V.G.

V.G.

V.G.

SPR

S.P.

V.G.

V.G.

V.G.

V.G.

V.G.

V.G.

V.G.

V.G.

SLAB COVER

A-PW3

V.G.

A-WW12

0.42

V.G.

V.G.

9TH FLOOR T.O.S. EL. +97'-4" POOL MECH ROOF T.O.S. EL. +90'-8" 8TH FLOOR T.O.S. EL. +87'-8"

V.G.

V.G.

V.G.

V.G.

SLAB COVER

V.G.

V.G.

V.G.

V.G.

SLAB COVER

V.G.

V.G.

V.G.

V.G.

SLAB COVER

V.G.

V.G.

SLAB COVER

SLAB COVER

V.G.

V.G.

V.G.

V.G.

V.G.

V.G.

SLAB COVER

A-PW4

A-PW1

A-PW5

A-PW1

A-PW5

A-PW5

A-PW6

0.42

0.42

0.42

0.42

0.42

0.42

0.42

V.G.

V.G.

V.G.

V.G.

V.G.

V.G.

V.G.

V.G.

V.G.

V.G.

V.G.

V.G.

V.G.

V.G.

V.G.

V.G.

V.G.

V.G.

MTL-02

V.G.

V.G.

BR-01

V.G.

V.G.

V.G.

V.G.

V.G.

V.G.

V.G.

8TH FL MECH ROOF TERRACE T.O.S. EL. +86'-8"

V.G.

V.G.

V.G.

V.G.

V.G.

V.G.

V.G.

B-WW14

B-WW15 SPR

0.42

0.42

V.G.

V.G.

7TH FLOOR T.O.S. EL. +75'-8"

V.G.

D

S.P.

V.G.

B-WW15

B-WW6

0.42

0.42

V.G.

V.G.

V.G.

V.G.

V.G.

V.G.

B-WW16

B-WW6

0.42

0.42

D

V.G.

V.G.

V.G.

RL-01 MTL-01

V.G.

B-WW16

B-WW16

0.42

0.42

D

V.G.

V.G.

V.G.

B-WW17 DL

0.42

V.G.

V.G.

V.G.

MTL-01 V.G.

01/10/2020 DOB SUBMISISON

-

01/10/2020 80% DESIGN DEVELOPMENT

Revision #

Date

PROJECT:

101 Lincoln Ave 101 Lincoln Avenue Bronx, NY 10451 OWNER:

V.G.

V.G.

7TH FLOOR TERRACE T.O.S. EL. +74'-8"

12'-0"

V.G.

S.P.

SLAB COVER

0.42

8TH FL AMENITY TERRACE T.O.S. EL. +87'-2"

S.P.

V.G.

SLAB COVER

A-PW3

9'-8" 12'-0"

V.G.

0.42

V.G.

V.G.

10TH FLOOR T.O.S. EL. +107'-0"

V.G.

V.G.

V.G.

B-WW11

S.P.

S.P.

V.G.

V.G.

B-WW12 SPR

0.42

V.G.

V.G.

V.G.

V.G.

B-WW12

0.42

S.P.

V.G.

V.G.

V.G.

B-WW12 SPMR

0.42

S.P.

S.P.

V.G.

B-WW12 SPR

0.42

V.G.

BOP 101 LINCOLN AVENUE LLC

V.G.

250 Vesey Street, 15th Floor New York, NY 10281-1023

B-WW13

0.42

0.42

Architect:

6TH FLOOR T.O.S. EL. +63'-8"

V.G.

V.G.

V.G.

V.G.

V.G.

V.G.

V.G.

V.G.

V.G.

V.G.

SLAB COVER

9'-8"

SLAB COVER

M.P.

A-WW8

A-WW9

0.42

0.42

S.P.

S.P.

S.P.

S.P.

SLAB COVER

V.G.

V.G.

V.G.

V.G.

SLAB COVER

M.P.

SPR

V.G.

V.G.

V.G.

V.G.

SLAB COVER

V.G.

V.G.

V.G.

V.G.

SLAB COVER

M.P.

A-WW8

A-WW9

0.42

0.42

S.P.

V.G.

S.P.

V.G.

SLAB COVER

V.G.

V.G.

V.G.

V.G.

SLAB COVER

M.P.

SPMR

A-WW9

S.P.

S.P.

S.P.

S.P.

SLAB COVER

V.G.

V.G.

V.G.

V.G.

V.G.

V.G.

SLAB COVER

SPR

11 BROADWAY 17TH FLOOR NEW YORK, NY 10004 T. 212 213 8007

A-WW10

0.42

0.42

Interior Designer:

V.G.

V.G.

5TH FLOOR T.O.S. EL. +54'-0"

V.G.

V.G.

V.G.

V.G.

V.G.

V.G.

V.G.

A-WW9

0.42

0.42

S.P.

S.P.

SLAB COVER

V.G.

V.G.

V.G.

V.G.

V.G.

V.G.

SLAB COVER

M.P.

SPR

V.G.

V.G.

SLAB COVER

V.G.

V.G.

V.G.

S.P.

V.G.

S.P.

SLAB COVER

M.P.

A-WW8

A-WW9

0.42

0.42

V.G.

V.G.

SLAB COVER

V.G.

V.G.

V.G.

S.P.

V.G.

S.P.

SLAB COVER

M.P.

SPMR

S.P.

A-WW9

S.P.

SLAB COVER

V.G.

V.G.

V.G.

V.G.

V.G.

MTL-02

A-WW10 0.42

V.G.

V.G.

V.G.

V.G.

S.P.

S.P.

V.G.

V.G.

V.G.

V.G.

V.G.

V.G.

S.P.

V.G.

V.G.

V.G.

S.P.

S.P.

V.G.

V.G.

V.G.

V.G.

V.G.

V.G.

V.G.

S.P.

S.P.

V.G.

V.G.

V.G.

V.G.

V.G.

V.G.

S.P.

V.G.

V.G.

V.G.

S.P.

S.P.

V.G.

V.G.

V.G.

SLAB COVER

M.P.

A-WW8

A-WW9

0.42

SLAB COVER

SLAB COVER

M.P.

SPR

SLAB COVER

SLAB COVER

M.P.

A-WW8

0.42

A-WW9

0.42

SLAB COVER

SLAB COVER

M.P.

SPMR

A-WW9

0.42

167 BOWERY, 3F NEW YORK, NY 10002 (212) 920-7221

SLAB COVER

SPR

0.42

V.G. SLAB COVER

LEONG LEONG

V.G.

V.G.

SLAB COVER

140 BROADWAY, 25TH FLOOR NEW YORK, NY 10005 (212) 532-2211 MEP/FP Engineer:

VENTROP Engineering Consulting Group

SLAB COVER

SPR

Structural Engineer:

DESIMONE Consulting Engineers

GL-02 GL-01

A-WW10

0.42

0.42

365 WEST 34TH STREET, 3RD FLOOR NEW YORK, NY 10001 (212) 244-5060 Civil Engineer:

V.G.

V.G.

V.G.

V.G.

V.G.

V.G.

SLAB COVER

V.G.

V.G.

V.G.

V.G.

SLAB COVER

0.42

DESIGN FLOOD ELEVATION EL. +12'-0" BASE FLOOD ELEVATION EL. +11'-0"

S.P. M.P.

A-WW8

M.P.

A-WW8

2ND FL TOWNHOUSES T.O.S. EL. +23'-8"

S.P.

SLAB COVER

9'-8"

4TH FLOOR T.O.S. EL. +44'-4" 4TH FLOOR TERRACE T.O.S. EL. +43'-4" 3RD FLOOR T.O.S. EL. +34'-8"

9'-8"

V.G.

SLAB COVER

9'-8"

70'-0" 70'-0" MAXIMUM BASE HEIGHT

S.P.

A-WW12 SPR

SLAB COVER

11TH FLOOR T.O.S. EL. +116'-8"

12'-0"

0.42

KEY PLAN

12TH FLOOR T.O.S. EL. +126'-4"

12'-0"

V.G.

V.G.

A-WW11

13TH FLOOR T.O.S. EL. +136'-0"

11'-0"

V.G.

V.G.

14TH FLOOR T.O.S. EL. +145'-8"

0.42

V.G.

V.G.

2ND FLOOR T.O.S. EL. +25'-0"

A-WW9 S

0.42

V.G.

V.G.

SLAB COVER

V.G.

S.P.

S.P.

S.P.

S.P.

SLAB COVER

V.G.

V.G.

V.G.

V.G.

SLAB COVER

M.P.

SPR

V.G.

V.G.

V.G.

SLAB COVER

V.G.

V.G.

V.G.

V.G.

SLAB COVER

M.P.

A-WW8

S

0.42

M.P.

V.G.

S.P.

S.P.

SLAB COVER

V.G.

V.G.

A-WW8 S

0.42

M.P.

V.G.

V.G.

SLAB COVER

V.G.

V.G.

S.P.

V.G.

S.P.

V.G.

SLAB COVER

V.G.

V.G.

V.G.

V.G.

SLAB COVER

M.P.

SPMR

A-WW9

S

0.42

M.P.

S.P.

V.G.

SLAB COVER

V.G.

V.G.

S.P.

S.P.

S.P.

S.P.

SLAB COVER

V.G.

V.G.

V.G.

V.G.

V.G.

V.G.

S

0.42

M.P.

MTL-01

A-WW10

S.P.

S.P.

SLAB COVER

AKRF 440 PARK AVENUE SOUTH NEW YORK, NY 10016 (212) 696-0670

SLAB COVER

SPR

V.G.

V.G.

S

V.G.

MTL-03 MTL-02

Landscape Architect:

MPFP LLC 120 BROADWAY, 20TH FLOOR NEW YORK, NY 10271 (212) 477-6366 Geotechnical/SOE Engineer:

SLAB COVER

LANGAN

ALTERNATE HEIGHT 12'-0" ABOVE ACL EL. +18'-8 3/16" (6.68')

GL-04 GL-03 GL-05 ST-01

V.G. V.G.

GROUND FLOOR T.O.S. EL. +13'-0"

V.G.

M.G.

V.G.

V.G.

V.G.

V.G.

V.G.

S.P.

V.G.

V.G.

V.G.

V.G.

V.G.

V.G.

V.G.

V.G.

V.G.

V.G.

V.G.

V.G.

V.G.

M.G.

M.G.

M.G.

M.G.

M.G.

M.G.

M.G.

M.G.

M.G.

M.G.

M.G.

M.G.

M.G.

M.G.

M.G.

M.G.

M.G.

M.G.

M.G.

F.G.

F.G.

21 PENN PLAZA 360 W. 31ST STREET, 8TH FLOOR NEW YORK, NY 10001 (212) 479-5400 Marine Engineer:

M.G. McLAREN P.C. 131 W. 35TH STREET, 4TH FLOOR NEW YORK, NY 10001 (212) 324-6300

M.S.G.

DOB STAMPS & SIGNATURES:

AVERAGE CURB LEVEL EL. +6'-8 3/16" (6.68') CELLAR FLOOR T.O.S. EL. +2'-0" NAVD 88 ELEVATION +0'-0"

V.G. V.G.

F.G.

DWG TITLE:

TOWER S SOUTHEAST 1ST FLOOR - 13TH FLOOR ENLARGED ELEVATION

SEAL & SIGNATURE:

DATE: 01/10/2020 PROJECT #: 18A05

1

ENLARGED ELEVATION - TOWER S SOUTHEAST, 1ST FLOOR - 13TH FLOOR

SCALE:

3/16" = 1'-0"

NOT FOR CONSTRUCTION

SOUTH TOWER ELEVATION SOUTHEAST, 1ST FLOOR - 13TH FLOOR

A-321.00

DWG NO.

CAD FILE: J:\18A05.00_101 Lincoln Ave_SoBro

OF


G BRID AVE D THIR

KEY

UPPER ROOF T.O.S. EL. +287'-6"

METAL PANEL

9'-0"

MTL-01

BRICK

MTL-04

ELEVATOR MACHINE ROOM T.O.S. EL. +278'-6"

GLASS VISION (NO-HATCH)

MTL-02

MECH. ROOF TERRACE T.O.S. EL. +267'-4"

GLASS CERAMIC FRIT

SLAB COVER V.G.

M.P.

SLAB COVER V.G.

V.G.

M.P. V.G.

V.G.

SLAB COVER S.P.

M.P. V.G.

V.G.

SLAB COVER S.P.

M.P. V.G.

V.G.

MARINE GRADE GLASS VISION

SLAB COVER S.P.

V.G.

V.G.

0.42

V.G.

V.G.

V.G.

V.G.

SLAB COVER

M.P.

V.G.

V.G.

V.G.

V.G.

R

0.42

V.G.

S.P.

S.P.

V.G.

SLAB COVER

M.P.

0.42

V.G.

V.G.

V.G.

V.G.

SLAB COVER

M.P.

S.P.

V.G.

V.G.

S.P.

V.G.

V.G.

SLAB COVER

M.P.

S.P.

V.G.

V.G.

S.P.

V.G.

V.G.

SLAB COVER

V.G.

V.G.

V.G.

V.G.

V.G.

V.G.

V.G.

M.P.

V.G.

V.G.

V.G.

S.C.

SLAB COVER

10'-4"

SLAB COVER

S.P.

M.P.

S.P.

S.C.

SLAB COVER

V.G.

V.G.

S.P.

V.G.

V.G.

M.P.

S.P.

V.G.

V.G.

S.C.

SLAB COVER

V.G.

V.G.

V.G.

V.G.

V.G. M.P.

R

0.42 V.G.

V.G.

V.G.

S.P.

V.G.

V.G.

M.P.

S.P.

V.G.

V.G.

S.C.

SLAB COVER

V.G.

V.G.

V.G.

V.G.

S.P.

S.P. M.P.

V.G.

V.G.

V.G.

V.G.

SLAB COVER

M.P.

S.P.

V.G.

V.G.

S.P.

V.G.

V.G.

SLAB COVER

M.P.

S.P.

V.G.

V.G.

S.P.

V.G.

V.G.

SLAB COVER

NOT

V.G.

V.G. SLAB COVER

C-PW1

0.42

0.42

V.G.

V.G.

V.G.

V.G.

C-WW2

0.42

V.G.

V.G.

V.G.

C-PW1

C-WW2

SLAB COVER

R

V.G.

SLAB COVER

0.42

V.G.

SLAB COVER

B-WW10

V.G.

S

C-WW1

23RD FLOOR T.O.S. EL. +235'-8"

V.G.

V.G.

B-WW10

C-WW1

24TH FLOOR T.O.S. EL. +246'-0"

V.G.

V.G.

MARINE GRADE GLASS SPANDREL

B-WW5

10'-4"

25TH FLOOR T.O.S. EL. +256'-4"

22'-2" OVERHEAD

10'-2"

GLASS SPANDREL

MECHANICAL ROOF T.O.S. EL. +268'-4" 12'-0"

NOTE OITC 2 OITC 3 OITC 3

0.42

V.G.

V.G.

V.G.

V.G.

SLAB COVER

V.G.

V.G.

V.G.

V.G.

RL-01 MTL-01 BR-01

SLAB COVER

-

Revision #

10'-4"

V.G.

22ND FLOOR T.O.S. EL. +225'-4"

V.G.

V.G.

V.G.

V.G.

SLAB COVER

12'-0"

V.G.

M.P.

0.42

V.G.

V.G.

V.G.

V.G.

V.G.

S.P.

S.P. M.P.

V.G.

V.G.

V.G.

V.G.

V.G.

V.G.

SLAB COVER

S.P.

M.P.

V.G.

V.G.

S.P.

V.G.

V.G.

S.P.

V.G.

V.G.

SLAB COVER

S.P.

M.P.

V.G.

V.G.

S.P.

V.G.

V.G.

S.P.

V.G.

V.G.

PROJECT

C-WW2 D

1

0.42

V.G.

V.G.

V.G.

SLAB COVER

S.P.

OWNER: V.G.

V.G.

V.G.

V.G.

B-WW5

B-WW6

0.42

0.42

V.G.

BOP 1

V.G.

B-WW7 R

0.42

R

Architect: V.G.

V.G.

V.G.

V.G.

V.G.

V.G.

V.G.

V.G.

V.G.

V.G.

M.P.

SLAB COVER

S.C.

SLAB COVER

9'-8"

SLAB COVER

S.P.

S.P. M.P.

SLAB COVER

S.C.

SLAB COVER

V.G.

V.G.

V.G.

V.G.

S.P.

V.G.

V.G.

S.P.

V.G.

V.G.

M.P.

SLAB COVER

S.C.

SLAB COVER

S.P.

V.G.

V.G.

S.P.

V.G.

V.G.

M.P.

SLAB COVER

S.C.

SLAB COVER

V.G.

V.G.

V.G.

V.G.

SLAB COVER

A-WW5 0.42

V.G.

V.G.

A-PW1 S

V.G.

V.G.

SLAB COVER

MTL-01

A-PW2

0.42

0.42

Interior De

V.G.

V.G.

V.G.

V.G.

SLAB COVER

V.G.

V.G.

V.G.

V.G.

V.G.

V.G.

9'-8"

20TH FLOOR T.O.S. EL. +203'-8"

S.P.

V.G.

V.G.

S.P.

V.G.

S.P.

V.G.

V.G. M.P.

SLAB COVER

M.P.

V.G.

V.G.

V.G.

V.G.

V.G.

V.G.

V.G.

S.P.

V.G.

V.G.

S.P.

V.G.

V.G.

V.G.

V.G.

V.G.

S.P.

V.G.

V.G.

S.P.

V.G.

V.G.

V.G.

V.G.

V.G.

S.P.

V.G.

V.G.

S.P.

V.G.

V.G.

V.G.

V.G.

SLAB COVER

M.P.

SLAB COVER

M.P.

SLAB COVER

SLAB COVER

V.G.

V.G.

V.G. M.P.

0.42

S.P.

S.P. M.P.

V.G.

V.G.

V.G.

V.G.

SLAB COVER

M.P.

S.P.

V.G.

V.G.

S.P.

V.G.

V.G.

SLAB COVER

M.P.

S.P.

V.G.

V.G.

S.P.

V.G.

V.G.

V.G.

V.G.

V.G.

V.G.

V.G.

S.P.

S.P. M.P.

V.G.

V.G.

V.G.

V.G.

SLAB COVER

M.P.

S.P.

V.G.

V.G.

S.P.

V.G.

V.G.

SLAB COVER

M.P.

V.G.

AKRF

440 PARK NEW YOR (212) 696

S.P.

V.G.

V.G.

S.P.

V.G.

V.G.

SLAB COVER

V.G.

V.G.

V.G.

V.G.

SLAB COVER

A-WW7

Landscap

0.42

MPFP

V.G.

120 BROA NEW YOR (212) 477

V.G.

V.G.

V.G.

Geotechn

SLAB COVER

9'-8"

LANG A-PW1 S

V.G.

V.G.

V.G.

V.G.

S.P.

V.G.

V.G.

V.G.

V.G.

V.G.

S.P.

S.C.

SLAB COVER

S.C.

9'-8"

SLAB COVER

V.G.

V.G.

V.G.

S.P.

V.G.

V.G.

S.P.

V.G.

V.G.

V.G.

S.P.

V.G.

V.G.

S.P.

V.G.

V.G.

V.G.

V.G.

V.G. M.P.

V.G.

S.P.

V.G.

V.G.

S.P.

V.G.

V.G.

S.P.

V.G.

V.G.

S.P.

V.G.

V.G.

SLAB COVER

S.C.

SLAB COVER

S.C.

M.G.

V.G.

V.G.

V.G.

V.G.

V.G.

V.G.

SLAB COVER

M.P.

S.P.

V.G. M.P.

V.G.

V.G.

V.G.

V.G.

V.G.

V.G.

V.G.

V.G.

SLAB COVER

M.P.

SLAB COVER

M.P.

SLAB COVER

0.42 V.G.

V.G.

V.G.

V.G. SLAB COVER

V.G.

DOB STAMPS V.G.

V.G.

V.G.

SLAB COVER

A-WW5

A-PW1

A-PW2

0.42

0.42

0.42

V.G.

S.P.

S.P.

V.G.

SLAB COVER

M.P.

SLAB COVER

V.G.

V.G.

V.G.

V.G. M.P.

S.P.

V.G.

V.G.

S.P.

V.G.

V.G.

SLAB COVER

M.P.

S.P.

V.G.

V.G.

S.P.

V.G.

V.G.

V.G.

V.G.

131 W. 35 NEW YOR (212) 324

A-WW7

0.42

S.P.

V.G.

SLAB COVER

A-WW6

V.G.

SLAB COVER

9'-8"

SLAB COVER

V.G.

V.G.

Marine En

0.42

V.G.

0.42 V.G.

V.G.

21 PENN 360 W. 31 NEW YOR (212) 479

A-PW2

0.42

V.G.

A-WW5

V.G.

V.G.

SLAB COVER

DWG TITLE:

9'-8"

14TH FLOOR T.O.S. EL. +145'-8"

V.G.

0.42

V.G.

VENT

365 WES NEW YOR (212) 244

Civil Engi

SLAB COVER

A-WW6

SLAB COVER

0.42

15TH FLOOR T.O.S. EL. +155'-4"

V.G.

V.G.

MEP/FP E

SLAB COVER

A-PW2

V.G.

140 BROA NEW YOR (212) 532

V.G.

0.42

V.G.

Structural

DESI

V.G.

A-PW1

A-WW5

16TH FLOOR T.O.S. EL. +165'-0"

V.G.

V.G.

0.42

SLAB COVER

LEON

V.G.

A-WW5

0.42

V.G.

SLAB COVER

V.G.

167 BOW NEW YOR (212) 920

A-WW5

17TH FLOOR T.O.S. EL. +174'-8"

V.G.

V.G.

0.42

V.G.

V.G.

V.G.

S.P.

A-WW7

V.G.

V.G.

S.P.

0.42

V.G.

SLAB COVER

V.G.

A-WW6

V.G. M.P.

V.G.

0.42

V.G.

SLAB COVER

V.G.

V.G.

A-WW5

V.G.

9'-8"

18TH FLOOR T.O.S. EL. +184'-4"

S.P.

V.G.

9'-8"

19TH FLOOR T.O.S. EL. +194'-0"

250'-0" 250'-0" MAXIMUM PENTHOUSE HEIGHT

0.42

V.G.

22ND FLOOR TERRACE T.O.S. EL. +224'-4" 21ST FLOOR T.O.S. EL. +213'-4"

C-WW2

SLAB COVER

V.G.

V.G.

C-WW1

A-WW5

A-WW6

A-WW7

0.42

0.42

0.42

14TH ENL

SEAL & SIGN

1

ENLARGED ELEVATION - TOWER S SOUTHWEST, 14TH FLOOR - BULKHEAD 3/16" = 1'-0"

NOT FOR CONSTRUCTION

SOUTH TOWER ELEVATION SOUTHWEST, 14TH FLOOR - BULKHEAD

CAD FILE: J:


GARDEN OFFICE TOWER CHINA TAIPING FINANCIAL TOWER PROGRAM: LOCATION: TYPE: AFFILIATION: YEAR: STATUS: ROLE: TASKS:

COMMERCIAL SHENZHEN, CHINA PROFESSIONAL PROJECT HILL WEST ARCHITECTS 2019 DESIGN DESIGNER SD

Qianhai Taiping Finace To 2019

11 26

November 26, 2


Qianhai Taiping Finace Tower 2019

will stand as a landmark which the community will

SIMPLE EXTRUDED FORM

CURVED ALL SIDES OF EXTERIOR

11 26

November 26, 2019 47

CONCAVE CURVED INTERIOR SURFACES

SUBTRACT TO CREATE ATRIUM ON THE WEST

CONCEPT DIAGRAMS

ARTICULATED FLOOR SLABS FOR GREEN SPACES

INT


28

Program & Planning There are 38 occupied floors of office program and their accessory uses. The tower is divided in to 2 main zone. The Low / Mid rise Zone, spanning for Level 4 to Level 26 while the High Rise Zone spans from level 28 to level 38. Each zone has dedicated elevators. The area of each floor is 1,650 square meters. It is important to note that the High Zone net useable increases as the elevators serving the Low / Mid zone drop off. The Core configuration has been located to optimize structure, planning efficiency but to also enable 360 degree views, flexibility in planning in both single and multi-tenant configurations.

PROGRAM DISTRIBUTION

LOBBY

OFFICE HIGH ZONE

PODIUM REATAIL/CONFERENCE CENTER/CANTEEN

SKY HALL/ZEN ROOF GARDEN

OFFICE LOW ZONE

MECHANICAL RO

OFFICE MID ZONE

GREENERY

PROGRAM DIAGRAM

12

Atrium Much attention, thought and investigation has been given to understanding the importance of each side of the building. The corner location of Block 2 has made evident that the site and the proposed building are a “gateway”. A gateway functions as a connector, forging relationships, but with equal importance it acts as a transition, promoting transformation. These are the challenges and opportunities the building on Block 2 which it must successfully meet. With this in mind, it was evident that the importance of the west side of the building discernibly transcends the other sides, visually, physically and symbolically. The west has visibility toward the water and is more visible. The Meng Hai Boulevard and the continuous green space along the Meng Hai provide a wider setback from other buildings to the west as it connects the south to the north. Symbolically the west side also faces and connects to the Pearl River Delta but also to the rest of the world to the west. Symbolically connecting with the rest of the world and echoing the international presence of the China Taiping Finance Tower. Locating the atrium and allowing the building to unfold and reveal itself, on the west side of the building was a natural choice. The exterior façade on the west folds in to itself and much like a fabric to create a vertical atrium centrally along that façade to connect spaces and adjacencies and transform them in to an increasingly communal elements such as meeting areas, lounge areas and spaces which facilitate interaction. It is further punctuated intermittently with Green zones Levels 12 and 27 terminating into a large protected roof Garden at the top of the building. The atrium exterior wall is a double skin façade allowing for superior insulation, temperature consistency and more efficient use of the building’s mechanical systems. The atrium itself is an interface at which the surrounding area “enters” the building and the interior reaches out to the community. It softly opens at the bottom and the top of the building tapering in the center connecting the ground and the sky. It is the spirit of the building connecting, creating unions and transformations.

FACADE CONCEPT

Extrusion and Foundation

Heaven and Earth

Onward and Upward


VISION GLAZING

VISION GLAZING

VISION GLAZING

VISION GLAZING

VISION GLAZING

VISION GLAZING

SHADOW BOX

SHADOW BOX

SHADOW BOX

SHADOW BOX

SHADOW BOX

SHADOW BOX

VISION GLAZING

VISION GLAZING

VISION GLAZING

VISION GLAZING

VISION GLAZING

VISION GLAZING

SHADOW BOX

SHADOW BOX

SHADOW BOX

SHADOW BOX

SHADOW BOX

SHADOW BOX

VISION GLAZING

VISION GLAZING

VISION GLAZING

VISION GLAZING

VISION GLAZING

VISION GLAZING

SHADOW BOX

SHADOW BOX

SHADOW BOX

SHADOW BOX

SHADOW BOX

SHADOW BOX

VISION GLAZING

VISION GLAZING

VISION GLAZING

VISION GLAZING

VISION GLAZING

VISION GLAZING

CL OF MULL.

CL OF MULL.

LOW E INSULATED GLAZING UNIT SHADOW BOX WITH PTD. ALUM BACK PAN CONCEALED ROLLER SHADE

DROP CEILING

METAL PANEL COVE TRIM

LOW E INSULATED GLAZING UNIT STACKING JOINT PTD. METAL MULLION RAISED FLOOR

CL OF MULL.

CL OF MULL.

LOW E INSULATED GLAZING UNIT SHADOW BOX WITH PTD. ALUM BACK PAN CONCEALED ROLLER SHADE

DROP CEILING

METAL PANEL COVE TRIM

LOW E INSULATED GLAZING UNIT STACKING JOINT PTD. METAL MULLION RAISED FLOOR CL OF MULL.

CL OF MULL.

Partial Section

Partial Elevation

PTD. METAL MULLION

INSIDE

PTD. METAL SILL

LOW E INSULATED GLAZING UNIT

CL OF MULLIO

N CL OF MULLIO

N

C L OF MULLION

OUTSIDE

C L OF MULLION

CL OF MULLION

CL OF MULLION

Partial Plan

CL OF MULLION

Perspective View

WALL TYPE A FACADE DETAIL

STAINLESS STEEL POINT SUPPORT FITTINGS

HIGH DENSITY 110MM STEEL CABLE TENSILE SUPPORT STRUCTURE

LOW IRON LAMINATED HIGH STRENGTH GLAZING POINT SUPPORTED

STAINLESS STEEL GRATING

STAINLESS STEEL POINT SUPPORT FITTINGS

HIGH DENSITY 110MM STEEL CABLE TENSILE SUPPORT STRUCTURE

LOW IRON LAMINATED HIGH STRENGTH GLAZING POINT SUPPORTED

STAINLESS STEEL GRATING

STAINLESS STEEL POINT SUPPORT FITTINGS

HIGH DENSITY 115MM STEEL CABLE TENSILE SUPPORT STRUCTURE

LOW IRON LAMINATED HIGH STRENGTH GLAZING POINT SUPPORTED

STAINLESS STEEL GRATING

LAMINATED GLAZING VERTICAL LOUVERS STAGGERED SPACE PTD. ALUMINUM METAL CLADDING PTD. ALUMINUM MECHANICAL STORM LOUVERS

LOW IRON LAMINATED HIGH STRENGTH GLAZING POINT SUPPORTED

LOW IRON LAMINATED HIGH STRENGTH GLAZING POINT SUPPORTED

STAINLESS STEEL GRATING

HIGH DENSITY 110MM STEEL CABLE TENSILE SUPPORT STRUCTURE

STAINLESS STEEL POINT SUPPORT FITTINGS

WALL TYPE B FACADE DETAIL


FE-1 FE-1

The main entrance of the China Taiping Tower is located on the South of site from where the lobby extends around and to all sides of the building. To the West, the lobby transforms to a serene sculptural garden and termination of the atrium above. To the East the lobby becomes an art gallery. Finally to the North the lobby connects with a vibrant retail component on the ground floor of the podium and the Sub grade level concourse. The north lobby also acts as secondary entrance for pedestrians approaching the site from the north. There is an additional entry lobby on the north at Level B1 to accommodate concourse population arriving via metro public transit system.

Office Circulation Public Circulation

Vehicular Circulation

GROUND FLOOR PLAN


LEVEL 12 FLOOR PLAN

LEVEL 30 FLOOR PLAN

LEVEL 17 FLOOR PLAN

LEVEL 39 FLOOR PLAN

TYPICAL FLOOR PLANS


SOUTH ELEVATION

EAST ELEVATION

TOP OF BULKHEAD +190.75M

26700

6000

4500

6000 6000 5000 5000

31500 7 FLRS @ 4.5M

6000

4500

36000 8 FLRS @ 4.5M

180000

4500

28500 6 FLRS @ 4.5M

6000

4500

49850 11 FLRS @ 4.5M

MAIN ROOF / ROOF GARDEN (LV 39) +179.85M OFFICE ZONE 3 (LV 38) +175.00M OFFICE ZONE 3 (LV 37) +170.50M OFFICE ZONE 3 (LV 36) +166.00M OFFICE ZONE 3 (LV 35) +161.50M OFFICE ZONE 3 (LV 34) +157.00M OFFICE ZONE 3 (LV 33) +152.50M OFFICE ZONE 3 (LV 32) +148.00M OFFICE ZONE 3 (LV 31) +143.50M OFFICE ZONE 3 (LV 30) +139.00M OFFICE ZONE 3 (LV 29) +134.50M OFFICE ZONE 3 (LV 28) +130.00M MECHANICAL/REFUGE (LV 27) +124.00M OFFICE ZONE 2 (LV 26) +119.50M OFFICE ZONE 2 (LV 25) +115.00M OFFICE ZONE 2 (LV 24) +110.50M OFFICE ZONE 2 (LV 23) +106.00M OFFICE ZONE 2 (LV 22) +101.50M OFFICE ZONE 2 (LV21) +97.00M REFUGE (LV 20) +89.50M OFFICE ZONE 2 (LV 19) +85.00M OFFICE ZONE 2 (LV 18) +80.50M OFFICE ZONE 2 (LV 17) +76.00M OFFICE ZONE 2 (LV 16) +71.50M OFFICE ZONE 2 (LV 15) +67.00M OFFICE ZONE 2 (LV 14) +62.50M OFFICE ZONE 2 (LV 13) +58.00M OFFICE ZONE 2 (LV 12) +53.50M MECHANICAL/REFUGE (LV 11) +47.50M OFFICE ZONE 1 (LV 10) +43.00M OFFICE ZONE 1 (LV 09) +38.50M OFFICE ZONE 1 (LV 08) +34.00M OFFICE ZONE 1 (LV 07) +29.50M OFFICE ZONE 1 (LV 06) +25.00M OFFICE ZONE 1 (LV 05) +20.50M OFFICE ZONE 1 (LV 04) +16.00M PODIUM (LV 03) +11.00M PODIUM (LV 02) +6.00M

175.000 170.500 166.000 161.500 157.000 152.500 148.000 143.500 139.000 134.500 130.000

124.000 119.500 115.000 110.500 106.000 101.500 97.000

89.500 85.000 80.500 76.000 71.500 67.000 62.500 58.000 53.500

47.500 43.000 38.500 34.000 29.500 25.000 20.500 16.000 11.000 6.000

LOBBY (LV 01) 0.00 M (T.O.F.F) BASEMENT 1 -6.00 M (T.O.F.F) BASEMENT 2 -10.80 M (T.O.F.F) BASEMENT 3 -14.70 M (T.O.F.F)

BASEMENT 4 -26.70 M (T.O.F.F)

EAST-WEST SECTION

NORTH ELEVATION

TOP OF BULKHEAD +217.45M

179.850

MAIN ROOF / ROOF GARDEN (LV 39) +206.55M OFFICE ZONE 3 (LV 38) +201.70M OFFICE ZONE 3 (LV 37) +197.20M OFFICE ZONE 3 (LV 36) +192.70M OFFICE ZONE 3 (LV 35) +188.20M OFFICE ZONE 3 (LV 34) +183.70M OFFICE ZONE 3 (LV 33) +179.20M OFFICE ZONE 3 (LV 32) +174.70M OFFICE ZONE 3 (LV 31) +170.20M OFFICE ZONE 3 (LV 30) +165.70M OFFICE ZONE 3 (LV 29) +161.20M OFFICE ZONE 3 (LV 28) +156.70M MECHANICAL (LV 27) +150.70M OFFICE ZONE 2 (LV 26) +146.20M OFFICE ZONE 2 (LV 25) +141.70M OFFICE ZONE 2 (LV 24) +137.20M OFFICE ZONE 2 (LV 23) +132.70M OFFICE ZONE 2 (LV 22) +128.20M OFFICE ZONE 2 (LV21) +123.70M REFUGE (LV 20) +116.20M OFFICE ZONE 2 (LV 19) +111.70M OFFICE ZONE 2 (LV 18) +107.20M OFFICE ZONE 2 (LV 17) +102.70M OFFICE ZONE 2 (LV 16) +98.20M OFFICE ZONE 2 (LV 15) +93.70M OFFICE ZONE 2 (LV 14) +89.20M OFFICE ZONE 2 (LV 13) +84.70M OFFICE ZONE 2 (LV 12) +80.20M MECHANICAL/REFUGE (LV 11) +74.20M OFFICE ZONE 1 (LV 10) +69.70M OFFICE ZONE 1 (LV 09) +65.20M OFFICE ZONE 1 (LV 08) +60.70M OFFICE ZONE 1 (LV 07) +56.20M OFFICE ZONE 1 (LV 06) +51.70M OFFICE ZONE 1 (LV 05) +47.20M OFFICE ZONE 1 (LV 04) +42.70M

6000 5000 5000

WEST ELEVATION

PODIUM (LV 03) +37.70M PODIUM (LV 02) +32.70M

179.850 175.000 170.500 166.000 161.500 157.000 152.500 148.000 143.500 139.000 134.500 130.000

124.000 119.500 115.000 110.500 106.000 101.500 97.000

89.500 85.000 80.500 76.000 71.500 67.000 62.500 58.000 53.500

47.500 43.000 38.500 34.000 29.500 25.000 20.500 16.000 11.000 6.000

LOBBY (LV 01) 26.70 M (T.O.F.F) -6.000 -10.600 -14.600

BASEMENT 1 20.70 M (T.O.F.F) BASEMENT 2 15.90 M (T.O.F.F) BASEMENT 3 12.00 M (T.O.F.F)

-6.000 -10.600 -14.600

BASEMENT 4 0.00 M (T.O.F.F)

SOUTH-NORTH SECTION


SEMI-INDOOR ROOF GARDEN

DOUBLE SKIN FACADE WITH SHADING Enhanced Indoor Air Quality Strategies

Maintain comfort temperature in any weath er and season. -

FACADE ARTICULATION

Scalloped Facade Articulation helps to prevent undesired west and east direct sun AIR CIRCULATION THROUGH TWO LAYERS OF FACADE SKIN

SHADING DEVIDE BETWEEN TWO LAYERS OF FACADE SKIN

LOUVERS ON WEST ATRIUM SURFACE

84

4

1

Bicycle Facilities

7

- Located on Basement Floor

2

Reduced Parking Footprint

MATERIALS AND RESOURCES

WATER EFFICIENCY

LOCATION AND TRANSPORTATION

Outdoor Water Use Reduction

15

Building Life-Cycle Impact Reduction

- Water Efficient Landscaping

8

- Underground Parking System

Indoor Water Use Reduction

- Recycled Content

16

- Low Flow Fixtures, Black & Grey Water Filtration

9

- Use As A Grey Water

3

- Submetering

4

5

Heat Island Reduction

- High Albedo Surfaces on Sidewalk

6

ENERGY AND ATMOSPHERE 11

Rainwater Management - Water Catchment, Porous Paving

Light Pollution Reduction - Minimize Uplighit. Set Up A Lighting Boundary And Its Rating Within A Site

20

INDOOR ENVIRONMENTAL QUALITY 17

18

Enhanced Indoor Air Quality Strategies 14

13

Optmize Energy Performance

19

Thermal Comfort - Double Skin Facade System, Solar Shading

Advanced Energy Metering

20

21

9 1 2 7 3

5

4 3

Daylight

- Open Office Space Layout

Enhanced Refrigerant Management - Reduce Green House Effects

Interior Lighting - Individual Controls

Demand Response(Optional) - Reduce Energy Consumption During Peak Time

14

8 17

Low-Emitting Materials - V - Low VOC Paint

-

12

21

19

- Install Permanent Entryway Syetem, Natural Ventilation

Open Space - Green Space

22

Building Product Disclosure and Optimization - Certified Building Raw Material Selection

Cooling Tower Water Use

10 Water Metering

SUSTAINABLE SITES

9

22

Quality Views

10 6

Qianhai Taiping Finace Tower

SUSTAINABLE DESIGN STRATEGIES November 26, 2019 2019 11 26

85


RETAIL REDEVELOPMENT GARDEN STATE PLAZA PROGRAM: LOCATION: TYPE: AFFILIATION: YEAR: STATUS: ROLE: TASKS:

RETAIL PARAMUS, NJ, USA PROFESSIONAL PROJECT WESTFIELD 2017 DESIGN DESIGNER SD

ESTFIELD GARDEN STATE PLAZA

PARAMUS, NJ

04.18.2


2017


PLANNING STRATEGIES

EXISTING PARK WESTFIELD GARDEN STATE PLAZA

PARAMUS, NJ

WESTFIELD GARDEN STATE PLAZA

PLANNING STRATEGIES

CREATE PEDESTRIAN ZONES ON BOTH SIDES OF SPROUT BROOK

PEDESTRIAN FRIENDLY WESTFIELD GARDEN STATE PLAZA

PARAMUS, NJ

WESTFIELD GARDEN STATE PLAZA

PLANNING STRATEGIES

PARAMUS, NJ

04.18.2017

LINE WITH PROGRAM

PLANNING STRATEGIES

ALIGN WITH PROGRAM

04.18.2017

ROOM TO GROW

WESTFIELD GARDEN STATE PLAZA

PARAMUS, NJ

CREATE NEW MAIN STREET WITH RESTAURANTS, ENTERTAINMENT & PLAZAS

PARAMUS, NJ

04.18.2017

COMMERCIAL INTERFACE

PLANNING STRATEGIES

ALLOWS COMMERCIAL GROWTH & ADDITIONAL DIALOGUE W/THE MALL

PHASING ALLOWS ADDITIONAL BULK AT EDGES FOR FUTURE EXPANSION

RESIDENTIAL GROWTH

PLANNING STRATEGIES

REVITALIZE PARK

04.18.2017

ADD NEW CROSSINGS

FOCUS ON SPROUT BROOK ORGANIZE AROUND KEY SITE FEATURE & LANDSCAPE AMENITY

COMMERCIAL GROWTH WESTFIELD GARDEN STATE PLAZA

04.18.2017

RESIDENTIAL

PARAMUS, NJ

04.18.2017

PROGRAM ELEMENTS

COMMERCIAL

1,500,000 SQUARE FEET / 1,400 UNITS

PROGRAM ELEMENTS

75,000 SQUARE FEET

PROPOSED RESIDENTIAL WESTFIELD GARDEN STATE PLAZA

PARAMUS, NJ

04.18.2017

PROPOSED COMMERCIAL WESTFIELD GARDEN STATE PLAZA

PARAMUS, NJ

04.18.2017


PULL THE GREEN

PLANNING STRATEGIES

CONNECT SPROUT BROOK TO PERIPHERAL SITES

CONNECTING THE PARK WESTFIELD GARDEN STATE PLAZA

PARAMUS, NJ

TRAFFIC FLOW

04.18.2017

NEIGHBORHOOD STREETS

WESTFIELD GARDEN STATE PLAZA

PLANNING STRATEGIES

CONNECT “MAIN STREET” TO EXISTING HIGHWAYS AND ARTERIAL ROADS

FREEWAY CONNECTION WESTFIELD GARDEN STATE PLAZA

PARAMUS, NJ

CUT THE LOOP

PLANNING STRATEGIES

REDIRECT MALL TRAFFIC TO CREATE WALKABLE STREETS

PARAMUS, NJ

04.18.2017

FILL IN THE BLOCKS

PLANNING STRATEGIES

RESIDENTIAL DEVELOPMENT CREATES PUBLIC STREETS & PRIVATE COURTS

PUBLIC STREETS AND COURTYARDS WESTFIELD GARDEN STATE PLAZA

04.18.2017

EXPANDED ZONING

PLANNING STRATEGIES

PARAMUS, NJ

04.18.2017

RESTAURANTS/SERVICE/RETAIL

PROGRAM ELEMENTS

160,000 SQUARE FEET

EXPANDED ZONING WESTFIELD GARDEN STATE PLAZA

PARAMUS, NJ

PARKS/PLAZAS/LANDSCAPE

WESTFIELD GARDEN STATE PLAZA

PROGRAM ELEMENTS

35 ACRES OF OPEN SPACE

PARAMUS, NJ

04.18.2017

PARKING

PROGRAM ELEMENTS

1,090,000 SQUARE FEET / 3,500 PARKING SPACES

THE GREEN WESTFIELD GARDEN STATE PLAZA

PROPOSED RESTAURANTS AND RETAIL

04.18.2017

PROPOSED PARKING PARAMUS, NJ

04.18.2017

WESTFIELD GARDEN STATE PLAZA

PARAMUS, NJ

04.18.2017


SECTION PERSPECTIVE

WESTFIELD GARDEN STATE PLAZA SECTION PERSPECTIVE

PARAMUS, NJ

04.18.


.2017


RETAIL FIT-OUT FRANK & CO. JEWELRY STORE PROGRAM: LOCATION: TYPE: AFFILIATION: YEAR: STATUS: ROLE: TASKS:

INTERIOR DESIGN BALIKPAPAN, INDONESIA PROFESSIONAL PROJECT FREELANCE (COMMISSIONED) 2015 BUILT PROJECT ARCHITECT SD, DD, CD, CA



150

150

110

110

CTA4-70 150

150

120

2138 710

150 120

150

2170

SHOPFRONT ELEVATION

CTA10-80

3893

706

650 8201

SHOPFRONT ELEVATION

CTA4-90

200

1175

1175

722

SKALA 1 : 50

2400 2700

150

3600

150

1650

1650

3600

120

120

775

1813

743




8400

5172

60

731

2994

800

200

1800

200

800

640 100

55

60

200

597

3602

800 200 200

1001

800

10797

MD

3302

11346

702

MD

200 1706 592

MD

MD

1625 1001

MD

TD1

MD

959 200

52

600x600 H :200

995

A

1033

1915

52

WALL DISPLAY

496

1812

1010

200

1892

800

2521

706

TD1

800

200

1052

800 200

500x500 H :300

1159

D

B 890

200 WALL DISPLAY

375

400x400 H :400

WD

3504

WD

50

200 450

COUNTER TOP

475

863

MAC AREA MINI LAB

ZINK WASTAFEL

1001

225

STOREFRONT DISPLAY

550

ENTRANCE

2295

860

550

225

80

HANGING DISPLAY

225

225

611

1892

1034

3633

OFFICE

BENCH

3302

575

WD

C

711 GANTUNGAN BAJU

3633 KULKAS

9970

100

50

1001

600

1100x600 H :200 MD

1400x500 H :200

723

WALL DISPLAY

2504 MANAGER

992

899

CASHIER AREA

BRANKKAS

550

200

550

723

FD

WALL DISPLAY

800

550

821

850

MEN MD

WALL DISPLAY

200

723

550x550 H :400

464

1155 TUKANG

200

603

200

2954

3353

1225

FD

WD 400x900 H :600

CREDENZA & TV

550

488

1068

WD 400x900 H :600

SF

860

721

2783

600

1720 40

40

100

8300

1001

1001

IMPORTANT: 1. Contractor to verify all site dimensions. Do not scale drawings. 2. Contractor is responsible for notifying CENTRAL MEGA KENCANA if confusion arises on site or if dimensions and / or details are missing from drawing set before proceeding at site. 3. All designs ate the sole properties of CENTRAL MEGA KENCANA and may not be use without their written permission. 4. All prints, specifications and their copyrights are the property of CENTRAL MEGA KENCANA and shall be returned attending of the project. 5. All dimensions shall be checked on site before commencing any work or shop drawings. Any discrepansies occuring in these drawings must be referred to the office before the commencement of any work or the contractor shall bearfull responsibility for the same. 6. Figured dimensions shall be taken in preference to scaled drawings.

PENTA CITY

-

RICKY

AS SHOWN

INT-

LAYOUT PLAN SKALA 1 : 50

FLOOR PLAN


465 334

2572

1165

150

150

150

150

150

150 120

120

3000

2350

110

150

200

200

110

2800

3600

150

3600

120

120

650

600

503

2500 1341

2782

SECTION - A

606

1813

560

2170

1165

2572

1165

1199

SKALA 1 : 50

7057

1271

465 334

150

150

2500 IMPORTANT: 1. Contractor to verify all site dimensions. Do not scale drawings. 2. Contractor is responsible for notifying CENTRAL MEGA KENCANA if confusion arises on site or if dimensions and / or details are missing from drawing set before proceeding at site. 3. All designs ate the sole properties of CENTRAL MEGA KENCANA and may not be use without their written permission. 4. All prints, specifications and their copyrights are the property of CENTRAL MEGA KENCANA and shall be returned attending of the project. 5. All dimensions shall be checked on site before commencing any work or shop drawings. Any discrepansies occuring in these drawings must be referred to the office before the commencement of any work or the contractor shall bearfull responsibility for the same. 6. Figured dimensions shall be taken in preference to scaled drawings.

150

110

200

1572

606

800

130 602

150

1341

2782

SECTION - A SKALA 1 : 50

800 8402

120

200

120

2666

2350

200

200

845

200

SECTION - B SKALA 1 : 50

150

3600

150

110

200

150

3000

120

2800 1200

3600

150

200

WD1

120

WD1

3600

650

LCD TV 42"

531

3600

6001869

503

560

1813

2170

1165

PENTA CITY

-

RICKY

AS SHOWN

INT-

-

RICKY

AS SHOWN

INT-

1199

7057

531

SECTION - B SKALA 1 : 50

200

845

200

2666

3600

LCD TV 42"

WD1

1200

3600

1869

1271

WD1

200

200

800

200

1572

800

130 602

8402 IMPORTANT: 1. Contractor to verify all site dimensions. Do not scale drawings. 2. Contractor is responsible for notifying CENTRAL MEGA KENCANA if confusion arises on site or if dimensions and / or details are missing from drawing set before proceeding at site. 3. All designs ate the sole properties of CENTRAL MEGA KENCANA and may not be use without their written permission. 4. All prints, specifications and their copyrights are the property of CENTRAL MEGA KENCANA and shall be returned attending of the project. 5. All dimensions shall be checked on site before commencing any work or shop drawings. Any discrepansies occuring in these drawings must be referred to the office before the commencement of any work or the contractor shall bearfull responsibility for the same. 6. Figured dimensions shall be taken in preference to scaled drawings.

PENTA CITY



URBAN DESIGN ONEHUB METLAND CYBER CITY PROGRAM: LOCATION: TYPE: AFFILIATION: YEAR: STATUS: ROLE: TASKS:

MASTERPLAN TANGERANG, INDONESIA PROFESSIONAL PROJECT AECOM 2016 DESIGN URBAN DESIGNER SD

SITE MASTERPLAN


SECTION OF URBAN DESIGN LANDSCAPE


PLAN FOR DAYTIME STREETSCAPE FOR TROPICAL AVENUE

PLAN FOR DAYTIME STREETSCAPE FOR TROPICAL GREEN DRIVE

PLAN FOR NIGHTTIME STREETSCAPE FOR TROPICAL AVENUE

PLAN FOR NIGHTTIME STREETSCAPE FOR TROPICAL GREEN DRIVE


PLAN FOR DAYTIME STREETSCAPE FOR BUSINESS COURT

PLAN FOR DAYTIME STREETSCAPE FOR GREEN COURT

PLAN FOR NIGHTTIME STREETSCAPE FOR BUSINESS COURT

PLAN FOR NIGHTTIME STREETSCAPE FOR GREEN COURT


MODERN LIVING, MODERN TOWER SIMATUPANG APARTMENTS PROGRAM: LOCATION: TYPE: AFFILIATION: YEAR: STATUS: ROLE: TASKS:

HOUSING SINGAPORE, SINGAPORE PROFESSIONAL PROJECT AIRMAS ASRI ARCHITECTS 2015 DESIGN DESIGNER SD


ONE-BEDROOM APARTMENT TYPE A

TWO-BEDROOM APARTMENT TYPE A

TWO-BEDROOM APARTMENT TYPE B

TWO-BEDROOM APARTMENT TYPE C

TWO-BEDROOM TOWNHOUSE TYPE A

TWO-BEDROOM TOWNHOUSE TYPE B


LUXURY LIVING ONE EAST RESIDENCES PROGRAM: LOCATION: TYPE: AFFILIATION: YEAR: STATUS: ROLE: TASKS:

HOUSING SURABAYA, INDONESIA PROFESSIONAL PROJECT AIRMAS ASRI ARCHITECTS 2015 BUILT DESIGNER SD, DD


LOBBY INTERIOR

RECEPTION LOUNGE

RESIDENT LOUNGE


MAIN ENTRANCE

REAR ENTRANCE



A PUBLIC SQUARE REGENERATION OLD TOWN PLAZA PROGRAM: LOCATION: TYPE: AFFILIATION: YEAR: STATUS: ROLE: TASKS:

PUBLIC SPACE JAKARTA, INDONESIA PROFESSIONAL PROJECT AIRMAS ASRI ARCHITECTS 2015 DESIGN PROJECT ARCHITECT SD

1

BUILDING SCHEME / SECTION AA’

2

3


4- AERATION GRIDS

9- THE EXIBITION PAVILION

5- PARKING ENTRANCE

10- ACCESS FOR DISABLED PEOPLE

SITE PLAN PLANIVOLUMETRIC

V


INTERIOR



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.