2017/2027 LONG TERM FINANCIAL PLAN
What is this document all about? What is the Long Term Financial Plan? The Long Term Financial Plan is a 10 year plan that outlines Council’s financial capacity to meet those objectives of the Community Strategic Plan that fall under the auspices of Council. The Long Term Financial Plan is formulated by using a number of estimates and assumptions to project the future revenue and expenditure required of Council to deliver those services and projects expected by the community. In doing so it addresses the resources that impact on Council’s ability to fund its services and capital works whilst remaining financially sustainable. The Long Term Financial Plan is one element of the resourcing strategy that ensures the community’s ideas and aspirations for the future are realistically achievable. The other elements of the resourcing strategy include the Asset Management Plan and the Workforce Plan. The Asset Management Plan aims to predict infrastructure consumption and renewal needs, as well as consider infrastructure requirements to meet future community needs. The Workforce Plan is designed to ensure that Council has the necessary staff to deliver current services and operational needs for the community now and in the future.
2
These interrelated plans give consideration to the capacity of Council to deliver on its responsibilities within the Community Strategic Plan. Each element informs the Delivery Plan which outlines the strategies in place to meet these responsibilities. Council has reviewed the previous Long Term Financial Plan and significant changes have been made to both operational and capital items in the formulation of this 2017/27 Long Term Financial Plan. Council reviews any significant changes to the Long Term Financial Plan via the Monthly Finance Report to Council. The Monthly Finance Report assesses Council’s performance against budget each month. Any ongoing changes to budget that result from this process are included in the Long Term Financial Plan and reported to Council. A comprehensive review of the Long Term Financial Plan is conducted annually during the Operational Plan process.
Table of contents ABOUT THIS PLAN. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 EXECUTIVE SUMMARY. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 FIT FOR THE FUTURE. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 SPECIAL RATE VARIATION. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 FINANCIAL STRATEGIES. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 Financial Financial Financial Financial Financial Financial
Strategy Strategy Strategy Strategy Strategy Strategy
1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11 2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 3. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 4. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 5. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 6. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
PLANNING ASSUMPTIONS. . . . . . . . . . . . . . . . . . . . . . . . . . . 14 FINANCIAL FORECAST ASSUMPTIONS. . . . . . . . 19 SENSITIVITY ANALYSIS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23 FINANCIAL SCENARIOS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25 Base Case Scenario. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26 Asset Management Scenarios.. . . . . . . . . . . . . . . . . . . . . . . . . . 28
APPENDICES. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29
Appendix 1 Budgeted Income Statement. . . . . . . . . . . . . . . . . . . . . . . . . . . . 31 Appendix 2 Balance Sheet Forecast. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32 Appendix 3 Cashflow Statement Forecast.. . . . . . . . . . . . . . . . . . . . . . . . . . . 34 Appendix 4 Financial Sustainability Indicators. . . . . . . . . . . . . . . . . . . . . . . 36 Appendix 5 Budgeted External Restrictions. . . . . . . . . . . . . . . . . . . . . . . . . . 37 Appendix 6 Budgeted Internal Restrictions. . . . . . . . . . . . . . . . . . . . . . . . . . . 38 Appendix 7 External Loan Projects and Debt Servicing. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41 Appendix 8 a) One-Off Capital Projects. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 51 b) Recurrent Capital Projects.. . . . . . . . . . . . . . . . . . . . . . . . . . . . 57 c) Capital Program Concepts List. . . . . . . . . . . . . . . . . . . . . . . 61 Appendix 9 Wagga Wagga Regional Airport Ten Year Financial Plan. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 65 Appendix 10 Livestock Marketing Centre Ten Year Financial Plan. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 66
Appendix 11 Sewerage Services Ten Year Financial Plan. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 68 Appendix 12 Solid Waste Services Ten Year Financial Plan. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 69 Appendix 13 Stormwater Levy Ten Year Financial Plan. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 71 Appendix 14 Budgeted Income Statement by Function. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 72
CONTACT US. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 75
WAGGA WAGGA CITY COUNCIL LONG TERM FINANCIAL PLAN
3
Our executive summary
4
The Long Term Financial Plan (LTFP) is an essential element of the resourcing strategy which details how the strategic aspirations of Council outlined in the Community Strategic Plan can be achieved in terms of time, money, assets and people. The Resourcing Strategy focuses on long term strategies in three key areas: • Financial Planning - addresses the financial resources that impact on Wagga Wagga City Council’s ability to fund its services and capital works whilst remaining financially sustainable. • Workforce Planning - ensures that Council has the staffing capacity with the required skills and experience to deliver current services and operational needs for the community now and in the future. • Asset Management Planning - aims to predict infrastructure consumption and renewal needs, as well as consider infrastructure requirements to meet future community needs. These interrelated plans give consideration to the capacity of Council to deliver its responsibilities within the Community Strategic Plan that fall under the auspices of Wagga Wagga City Council. Each element informs the Delivery Plan which outlines the strategies in place to meet these responsibilities. Wagga Wagga City Council’s Long Term Financial Plan is a 10 year financial planning document with an emphasis
on long-term financial sustainability. Financial sustainability is one of the key issues facing local government, due to several contributing factors, including growing demands for community services and facilities, constrained revenue growth and ageing infrastructure. The Long Term Financial Plan is formulated, using a number of estimates and assumptions, to project the future revenue and expenditure required of Wagga Wagga City Council to deliver those services and projects expected by the community. In doing so, it addresses the resources that impact Council’s ability to fund its services and capital works whilst remaining financially sustainable. Council have reviewed the previous Long Term Financial Plan and significant changes have been made as part of this process. The draft budget for the 10 years 2017/18 to 2026/27 are balanced, and this position has been achieved with significant changes to both operational and capital budgets, including savings over the 10 year period of $11.5M for salaries, $4.6M in utility costs and $9.1M in operating savings from Council’s continuous improvement program. These changes have been necessary to assist Wagga Wagga City Council in overcoming unfavourable adjustments to revenue sources, which have included: • The 2% reduction in the forecasted future year Federal Government’s Financial Assistance Grant ($7.2M) • Reduction of the rate peg from 1.8% to 1.5% ($16.3M) • A reduction of investment income of ($2.3M) for the 10 years of the Long Term Financial Plan due to sustained lower interest rates
the budget that result from this process they are reported to Council and adjusted in the Long Term Financial Plan.
Long Term Financial Plan Objectives The objectives of Wagga Wagga City Council’s Long Term Financial Plan are: • to provide a forecast financial position over 10 years to ensure that Council remains financially sustainable • to support the implementation of Wagga View: Community Strategic Plan 2040 • to identify and highlight future challenges, issues and financial trends to ensure that they are proactively addressed • to ensure compliance with legislative requirements of integrated planning and reporting contained in the Local Government Act and the guidelines produced by the NSW Office of Local Government • continuing trend towards meeting all seven of the ‘Fit for the Future’ ratios.
Wagga Wagga City Council have also reviewed changes to the Long Term Financial Plan via the Monthly Financial Performance Report presented to Council. This report assesses Wagga Wagga City Council’s performance against budget each month. If there are any changes to WAGGA WAGGA CITY COUNCIL LONG TERM FINANCIAL PLAN
5
Fit for the future
6
Fit for the Future The Minister for Local Government, in response to the findings of a comprehensive three-year independent review of local government, announced the ‘Fit for the Future’ Local Government reform package. As part of this package all councils were requested by 30 June 2015 to assess their current financial situation, consider whether or not they have the appropriate scale and capacity to meet the future needs of their communities and to develop a plan to ensure they are financially sustainable in the future.
increased revenue targets of $300K from 2016/17. Wagga Wagga City Council will direct these funds towards the renewal of infrastructure and maintenance of assets which will assist in reducing the infrastructure backlog. A key consideration in Council’s decision making, as part of this improvement plan is the ongoing commitment to improving our financial position and sustainability. This includes maintaining and improving the unrestricted cash and investments result whilst achieving a balanced or preferably a surplus budget each financial year.
A Fit for the Future council is one that is: • Sustainable • Efficient • Effectively manages infrastructure and delivers services for communities • Has the scale and capacity to engage effectively across community, industry and government. In October 2015, IPART deemed Wagga Wagga City Council ‘Fit for the Future’ as a stand-alone organisation based on the actions and strategies identified in Council’s improvement proposal. The action plan outlines how Wagga Wagga City Council is committed to a number of key improvement strategies to meet five of the benchmarks and trend towards the remaining two benchmarks by 2019/20. Council’s improvement proposal can be accessed on Wagga Wagga City Council’s internet page http://www.wagga.nsw.gov.au/__data/assets/pdf_ file/0007/35917/Fit-For-the-Future-Council-ImprovementProposal.pdf The key improvement strategies to be implemented to improve Council’s financial position and sustainability as part of the 2017/27 budget process include targeted efficiency (service) reviews of $800K annually and WAGGA WAGGA CITY COUNCIL LONG TERM FINANCIAL PLAN
7
Special rate variation
8
Wagga Wagga City Council has been planning an upgrade to the levee system since 2007, and recently completed detailed designs for the Main City and North Wagga Levee Upgrade Project. Following extensive community consultation, Council resolved to upgrade the Main City Levee to a 1 in 100 year level of protection. The full impact of upgrading the North Wagga Levee is still to be considered in a review of the Floodplain Risk Management Study. The upgrade of the Main City Levee will ensure the protection of both residences and businesses in Central Wagga in the event of a 1 in 100 year flood. This will reduce the likelihood that the area will need to be evacuated during a flood event, which can also have an immediate social and economic impact. In some flood events the upgrade will mean that flood levels in parts of the floodplain upstream and outside of the Main City Levee will increase slightly.
drought farmers have experienced over the past decade, Council resolved to charge the Farmland rate category a lower percentage than all other rate categories: Rates Category
SRV – Levee Upgrade component
Farmland
1.9%
All other rates categories
4.1%
As the SRV is a temporary variation, at the end of the five year period, rates payable in (2021/22) will revert back to the equivalent level to that if an SRV had not occurred.
The total estimated cost of upgrading the Main City Levee to a 1 in 100 year level of protection and upgrading the North Wagga Levee to a 1 in 20 year level of protection is $23.3M*: Location
Level of Protection Estimated cost
Main City Levee System
1 in 100 year
$14,598,443
North Wagga Levee System
1 in 20 year
$8,654,863
Total Estimated Cost
$23,253,306
*The above estimated project costs are based on estimates provided by NSW Public Works. The funding ratio for the project is 2:1, with two-thirds ($15.5M) funded by Federal and State Grants and one third ($7.78M) funded by Council via a temporary Special Rate Variation (SRV) over a five year period. This SRV commenced from 1 July 2016. Due to the extensive
WAGGA WAGGA CITY COUNCIL LONG TERM FINANCIAL PLAN
9
Our financial strategy
10
Wagga Wagga City Council is committed to operating in a financially sustainable framework, to ensure that its community and other stakeholders can rely upon the ongoing provision of a full and diverse range of high quality community services, facilities and infrastructure. Council plans to maintain its financial position and performance, to ensure resilience and a capacity to adapt and respond to arising community needs in a measured and equitable manner. The six key principles employed in Wagga Wagga City Council’s financial planning process are:
Financial Strategy 1 Financial sustainability is the ability for Council to provide the facilities, services and infrastructure that the community needs and expects over the medium to longer term.
positive unrestricted cash and investments balance. This position gives flexibility to maintain liquidity and fund any unforeseen expenditures or discretionary funding deficits. The Base Case budget detailed in the Long Term Financial Plan indicates Wagga Wagga City Council will maintain a balanced budget over the next 10 financial years. Arriving at this balanced position was a complex and challenging task with each area of the organisation having to contribute significant budget reductions and operational efficiencies to achieve this goal. These savings will have a substantial impact on the delivery of projects and services, which will require Wagga Wagga City Council to be highly innovative and efficient in delivering the Operational Plan and Delivery Plan items. Although Council has managed to arrive at balanced budgets for the next 10 financial years, it maintains a heavy reliance on Capital Grants and Contributions. The graph below details Council’s Operating Result (Surplus)/
Deficits before accounting for Capital Grants and Contributions and including Depreciation expense. Maintain Unrestricted Cash and Investments: Unrestricted cash and investments represent a measure of liquidity/ net financial position. Council’s unrestricted cash and investments allows for day to day liquidity and ensures the organisation is able to survive any budget shocks during the year – i.e. unforseen expenditure overruns and income shortfalls. Wagga Wagga City Council, as a prudent financial manager, has set a minimum level of $3.5M which should be maintained. This level ensures it retains an appropriate level of liquidity on an ongoing basis and is able to control/determine the value of its annual budget surplus or deficit. The forecasted available unrestricted cash and investments for the 10 years of the Long Term Financial Plan is maintained due to each year of the budget being balanced.
Over the past few years, Council has faced significant challenges in maintaining a stable position in previous Long Term Financial Plans. During the development of the 2014/24 Long Term Financial Plan, Wagga Wagga City Council implemented critical decision making processes adjusting its operations to ensure a more financially sustainable path. The announcement in May 2014 of the freeze on the indexation of the Financial Assistance Grant and the reduction of the rate peg in 2017/18 from 1.8% down to 1.5% has added additional pressure with remaining financially sustainable into the future. Council has again made significant budget savings for this 2017/27 Long Term Financial Plan, which demonstrates its commitment to remaining financially sustainable. Balanced Budgets: With each annual budget process Council aims at a minimum, to achieve a balanced budget which allows the organisation to maintain a WAGGA WAGGA CITY COUNCIL LONG TERM FINANCIAL PLAN
11
Financial Strategy 2
Financial Strategy 4
Prudent financial investment
Maintain tight control over expenditure and staff numbers, while still maintaining best value services, facilities and infrastructure
Wagga Wagga City Council will continue to carefully manage its cash reserves and investments, to ensure that appropriate financial reserves are available to meet Council’s liabilities and commitments, and manage cash flow demands to ensure responsible financial management control. While externally restricted reserves will be maintained in accordance with legislative requirements, a number of internally restricted reserves are used to ensure that funds are available to directly support the Community Strategic Plan initiatives and projects. Council will closely monitor its investment performance and publish a number of key financial indicators within its monthly and quarterly budget reviews to demonstrate its financial health and sustainability.
Financial Strategy 3 Effective utilisation of funding sources to fund capital works The Long Term Capital Works Program identifies the various funding sources proposed for each capital project. Council will utilise grant funding where available, internal reserves where applicable, and borrowings where valid. Wagga Wagga City Council as a result of being ‘deemed fit’ will also have access if approved to lower cost borrowings offered through T-Corp to fund capital works which will reduce future debt-servicing costs.
12
Wagga Wagga City Council is committed to the ongoing review of its service delivery as part of the continual improvement process. Specifically, Council is seeking to identify if the services it delivers are relevant and necessary to their community as well as appropriate in the current environment. This includes determining if the services meet the needs and expectations of the community articulated in the Community Strategic Plan. The Service Review process aims to achieve the following objectives: • Assist in informing Councillors, the community and Council’s staff on what, how and why it delivers the current list of services. It endeavours to answer questions surrounding the need to provide the service, service delivery alternatives such as contracting resources, outsourcing some activities, joint delivery with other councils, what can be provided at what cost and can any efficiencies be found. • Finding savings that are real, sustainable, and are able to be entrenched into future budgets. This strategic approach to budget management is to identify lasting solutions for the provision of services in contrast to common short term budget management strategies which include delaying the implementation of projects onto a concepts list or unfunded activities, or by making budget cuts that may not align with the Community Strategic Plan. • Continue moving the organisational culture to one of a “can do attitude & approach”. By creating an expectation of better service delivery, Council is
empowering its staff with the tools and processes to make better decisions. • Embedding the realisation of continuous improvement. In providing an environment where continuous improvement to service delivery is expected, staff are encouraged and supported to identify opportunities to make Wagga Wagga City Council services the best value for its community. • Identifying a clear set of recommendations on proposed changes following each service reviewed. These recommendations will include as a minimum consideration of options for costs and efficient service delivery which may include process, resourcing and delivery changes. A number of other initiatives have been implemented to assist in identifying budget efficiencies, which include: • Targeted savings for employee costs included in Wagga Wagga City Council’s recent organisational restructure • Controlled expenses • Review of fees and charges to ensure closer alignment with costs • Energy savings and carbon reduction initiatives • E-Business and online service initiatives • Improved information management systems and technology • Review of capital project processes, procedures and outcomes • Utilisation of allowable reserves for internal loans in preference to external borrowings where possible • Utilisation of lower cost borrowings where possible
Financial Strategy 5
Financial Strategy 6
Maintain/move towards above benchmark results against key performance indicators
Narrow the Infrastructure Funding Gap
As indicated in Wagga Wagga City Council’s Fit for the Future Criteria Results which was based on a three year average, Council did not meet three out of the seven benchmarks. The key improvement strategies to be implemented to improve our financial position and sustainability as part of the 2017/27 budget process have included targeted efficiency (service) reviews of $800K annually and increased revenue targets of $300K which was introduced as part of the 2016/17 budget process. Council will direct these funds towards the renewal of infrastructure and maintenance of assets which will assist in reducing the infrastructure backlog ratio.
Wagga Wagga City Council’s Asset Management Plan identifies a shortfall in current expenditure on the maintenance and renewal of infrastructure assets. This represents a risk to the organisation that a significant number of assets may fail due to inadequate maintenance. If this issue is not addressed it will have an adverse impact on Council’s financial position in the medium and longer term. Council is attempting to address this issue by: • Increasing recurrent levels of maintenance and renewal budgets by identifying budget savings and efficiency gains from all parts of the organisation • Maintaining a reserve for Infrastructure Replacement and allocating additional funds towards this reserve as a priority when budget improvements are realised, and allocating the proceeds from the sale of non-core assets • Increasing the use of low cost borrowings to fund infrastructure renewals through T-Corp as a result of being deemed ‘fit’ as part of Council’s Fit for the Future proposal. • Reassessing asset condition and what constitutes “satisfactory” condition.
WAGGA WAGGA CITY COUNCIL LONG TERM FINANCIAL PLAN
13
Our planning assumptions
14
Population and Demographics The level of population increase and population demographics have a significant impact on demand for services, and are key drivers for Wagga Wagga City Council’s planning for new infrastructure and the type of infrastructure incorporated in the Long Term Financial Plan. The forthcoming census data release from the Australian Bureau of Statistics is expected to show that Wagga Wagga’s population grew to 65,000 people in 2016, representing an annual growth rate of over 1%. This strong growth trend is expected to continue into the future, with a population of around 80,000 forecast by 2036 in a baseline scenario presented by the NSW Department of Planning and Environment. Between 2016 and 2026, the population age structure forecasts for the city indicate a 15.8% increase in population under working age, a 32.3% increase in population of retirement age, and a 7.0% increase in population of working age. This profile is reflected in Wagga Wagga City Council’s 10 year capital works program, committing resources to facilities and infrastructure designed to cater for a changing demographic.
Economic Conditions and Growth Economic conditions and growth have a significant external impact to Wagga’s financial position and the Long Term Financial Plan. Some key factors include the following: • The state of financial markets (including official interest rates) • Inflation rates
• Labour force and unemployment rate • Population growth rate Interest rate fluctuations will have a direct impact on the returns earned on Council’s investment portfolio. Inflation rate fluctuations impact both income and expenditure and what products can be purchased for in real terms. When the general price level rises, each unit of currency buys fewer goods and services. Consequently, inflation reflects a reduction in the purchasing power per unit of money. Wagga Wagga has a strong and diverse economy without a reliance on a single sector, allowing the city to maintain growth and prosperity. The local economy (as measured by the Gross Regional Product statistic) grew by 3.1% to stand at $3.6 billion in the most recent data released by the ABS for 2015. The labour force is also expanding, to stand at 35,200 in the final quarter of 2016, with an unemployment rate of 4.3%. This rate is lower than the NSW average unemployment rate of 5%, and the 5.8% rate measured nationally for this quarter.
Major Projects Included in Council’s 2017/27 Long Term Financial Plan are four significant projects: Project
Estimated year(s) of construction
Estimated cost
Riverina Intermodal Freight and Logistic - Bomen Roadworks Stage 1
2016/17 + 2017/18
$35.1M
Multi Purpose Stadiums Equex and Bolton Park
2016/17, 2017/18 + 2018/19
$14.9M
Levee Bank System Upgrades
2016/17 – 2019/20
$23.3M
Eunony Bridge Road Bridge 2016/17 + 2017/18 Replacement
$10.6M
The potential uncertainties around some of Council’s planned major projects have the ability to have a significant impact on the Long Term Financial Plan, both in regards to timing and costing. While the Bomen Road works Stage 1 project has commenced, the other three major projects are still in the initiation stages.
Riverina Intermodal Freight and Logistics
The Riverina Intermodal Freight and Logistics (RIFL) hub project involves the construction of new major rail and road infrastructure and a freight terminal on 95 hectares of land north of Wagga Wagga at the Bomen Business Park. The project also includes the development of an agricultural bulk goods facility (grain terminal) and will be a key economic driver of growth in the Riverina. Stage 1 construction has commenced in 2016/17 which includes the construction of enabling roads. Stage 2 construction includes land purchases and construction of rail tracks but is currently not budgeted in the Long Term Financial Plan. The uncertainties associated with the RIFL project continue to reduce as the project matures through the project phases.
Multi Purpose Stadiums
The scope of the project is to deliver two Multi Purpose Stadiums (both sport and conference facilities), the first site located at The Exhibition Centre, consisting of a large sports building next to the existing Netball Clubhouse. The facility will provide three full sized indoor multi-purpose courts, change room amenities, office spaces, an elevated seating gallery, a function area and catering facilities. This project is currently scheduled to commence construction during 2017 with $9.1M funding allocated.
WAGGA WAGGA CITY COUNCIL LONG TERM FINANCIAL PLAN
15
The second site which is still in the concept phase for $4.6M in 2018/19 is an expansion to the Bolton Park Stadium’s existing gymnasium building. There is funding of $150K allowed in 2016/17 to investigate options and complete a masterplan for the Bolton Park precinct which will include the Oasis facility.
Levee Bank Upgrades - Upgrades of Main City Levee and North Wagga Levees
Wagga Wagga City Council recently completed detailed designs for the Main City and North Wagga Levee Upgrade Project and following extensive community consultation has resolved to proceed with the upgrade of the Main City Levee to a 1 in 100 year level of protection. The full impact of upgrading the North Wagga Levee to a 1 in 20 year level of protection is still to be considered in a review of the Floodplain Risk Management Study. The estimated cost of upgrading the Main City Levee to a 1 in 100 year level of protection and upgrading the North Wagga Levee to a 1 in 20 year level of protection is $23.3M. The total capital cost indexed over the five year period is as follows: Project
Indexed Grant Estimated funding Cost (proposed)
Council’s one-third share
Upgrade of Main City Levee System
$14.6M
$9.7M
$4.9M
Upgrade of North Wagga Levee System
$8.7M
$5.8M
$2.9M
$23.3M
$15.5M
$7.8M
Total
16
With the commitment of Federal and State funding for the project, Council is committed to funding its one-third share of the cost from a Special Rate Variation (SRV) commencing in 2016/17 which is maintained for five years. The modelling assumes a construction period of five years but this is conditional of the timing and conditions of funding from NSW OEH.
Eunony Bridge Road Bridge Replacement
This project is for the replacement of the existing Eunony Bridge with a structure capable of catering for Heavy Mass Limit (HML) vehicles. This project is key to the implementation of the Bomen Strategic Master Plan as the replacement of the bridge will facilitate increased productivity into the Bomen Business Park by allowing operators to use larger vehicles. The budget for this project is estimated at $10.6M with construction to commence in 2016/17. Wagga Wagga City Council has been successful in securing grant funding for the project of $9.8M, with Council contributing $0.8M towards the project.
Family Day Care Wagga Wagga City Council has recently been advised by the Australian Government Department of Education and Training that its annual Community Support Program will cease after 2017/18. This program provided $200,000 a year in grant funding for the Wagga Wagga Regional Family Day Care service. To ensure the sustainability and viability of this service into the future, structural changes are currently being implemented to reduce ongoing operational costs whilst still ensuring it continues to meet the needs of the community and facilitates a high level of care and education. The operational changes that have been made for the Family Day Care service have recently come into effect in April 2017. The service under this new funding model will continue to be sustainable until 2020/21. Ongoing reviews will occur over the next 4 years to determine whether further efficiencies can be made, increased revenue raised or new funding obtained for this service to continue into the future. There is also the option that Wagga Wagga City Council may resolve to subsidise this service. If this was to occur the current Family Day Care deficits included in the Long Term Financial Plan from 2021/22 which would impact on Council’s bottom line are as follows: 2017/18
2018/19 0
2022/23 121,262
2019/20 0
2023/24 190,541
2020/21 0
2024/25 258,047
2021/22 0
2025/26 323,556
50,420 2026/27 386,741
Contributions, Grants and Donations provided by Council to the Community
Ashmont Public School Learn to swim for disadvantaged youth
Wagga Wagga City Council contributes to the community utilising a variety of methods, via contributions, donations or grant program funding, totalling over $1.4M annually. The proposed 2017/18 contributions, grants and donations are shown in the below table:
Wagga Autism Support Group annual walk
Community Donations - Section 356 Community Leases Rental Subsidy Rural Villages Leaps and Bounds Early Childhood program Community Resource Centre
872,665 20,450 649
730
Friends of the Botanic Gardens - hire of play hall
1,000
Suicide Prevention Network meeting room hire
1,150
Wagga and Riverina Orienteers - annual school championships
85 150
Breast Cancer Group Inc. (Wagga Wagga)Mothers Day Walk
85
Country Hope - Walk for Hope
85
Melanoma Institute - March Walk
85
Wagga Wagga & District Family History Society
498
North Wagga Residents Association
498
Rotary Club of Wagga Wagga Shine Awards
240
Walk 4 William
80
CSU Photography Grad Show
600
Specialist Medical Resource Foundation
620
Make A Wish Foundation
200
Henwood Park Football Club
498
Total - Community Donations - Section 356 Cultural Donations - Section 356 Eastern Riverina Arts Program Contribution
2,500
Eisteddfod Donation
3,090
Summer School for Strings
2,500
Riverina Conservatorium of Music events
4,727
Cantelina Singers
1,000
ADFAS Riverina
1,836
Total - Cultural Donations - Section 356
3,700
Ladysmith Memorial Hall Committee
498
Regional Heritage Transport Association
1,085
Over 60’s Touch Football Group
550
Wagga Wagga Show Society
9,850
Cancer Council – Biggest Morning Tea
Senior Citizens Week Contributions
2,200
Mangoplah Cookardina Eastlakes United Football and Netball Club
550
Collingullie Soldiers Memorial Hall
498
Annual Grants Program - Various
110
Community Development Grants
Tolland Public School swimming lessons for the disadvantage youth
940
Riverina Down Syndrome hire of Music Bowl
170
Salvation Army Red Shield Appeal
Cancer Council hire of Paramore Park
570
Combined Riders of Wagga Bolton Park Stadium Toy Run
115
Uranquinty Neighbourhood Centre Management Committee
Kurrajong Waratah hire of Music Bowl and Civic Theatre -Christmas Spectacular
2,200
Rotary Circus Quirkus
2,200
Rotary Club Street Banners
115
Murrumbidgee Rotary Club Teddy Bears Picnic
390
Legacy Civic Theatre Hire Kurrajong Waratah hire of Links Art Gallery
2,500 280
1,170
Wagga Women’s Health Centre
850
Wagga Wagga Rescue Squad
100
Miss Wagga Sponsorship Motor Neurone Disease Research Wagga Wagga The Arbonne Charitable Foundation
2000 100 80
21,004
School of Arts Contribution
Wagga Women's Bowling Club
80
$933,954
$36,657
Scholarships Riverina Conservatorium Scholarship
2,000
Riverina Academy of Sport
4,000
Total - Scholarships
$6,000 30,000
Sustainable Environments Grants S356
7,000
Neighbourhood/Rural Village Grants
22,000
Arts & Culture Grants
25,000
Event Grants
20,000
Local Heritage Fund
16,000
Sporting and Cultural Facility Improvement Grants
30,000 25,000
Mini all-ympics disability Sports Event
385
Rural Hall Infrastructure Grants
EU3A
300
Total - Annual Grants Program - Various
$175,000
WAGGA WAGGA CITY COUNCIL LONG TERM FINANCIAL PLAN
17
Road Closures - Various ANZAC Day Parade Lake to Lagoon Fun Run
5,500 10,000
Wagga Gold Cup Chariot Race
3,000
Remembrance Day
2,000
Reserve Forces Day
1,500
Christmas Toy Run Total - Road Closures - Various
2,000 $24,000
Other New Major Events Sponsorship
100,000
Small Business (New Category)
12,500
Parkes Shire Council Event Rural Counselling Service Committee 4 Wagga Total - Other Total Contributions, Grants and Donations
1,000 10,000 7,500 $131,000 $1,306,611
In addition to the above $1.3M funding provided by Council to community groups and individuals, Council also currently offers community members Free Tip Days 4 times per year. The annual cost of the free tip days is currently costed at approximately $98,000 each year. This cost is in effect a fee waiver that Council’s community members receive. Council also offers Library members alternative methods to pay library book fines in December of each year, via the “Food for Fines Program”. It is currently estimated that $5,000 in fines are waived each year by Council offering this program to the community.
18
Financial forecast assumptions
WAGGA WAGGA CITY COUNCIL LONG TERM FINANCIAL PLAN
19
Operating Revenue The below chart represents Wagga Wagga City Council’s budgeted operating revenue for the 2017/18 financial year displayed as a percentage. Total Operating Revenue Budget $109M
the 2016/17 rate peg of 1.8%. The assumed increase in rates for 2018/19 onwards is in line with rate pegging of 1.8% with an additional 1% growth factor (for residential only) in additional rateable properties for the Long Term Financial Plan. The risk that Wagga Wagga City Council may incur in relation to the amount of rates revenue forecast in the Long Term Financial Plan is that the rate peg announced annually by IPART may be below the assumed annual forecasted percentages that have been used.
Annual Charges – Domestic & Commercial Waste
Annual charges for waste are modelled at recovering a reasonable estimated cost of providing the service which includes a component for future site rehabilitation. The rate used in the base case and all scenarios is an annual increase of 3%.
Rates & Annual Charges (including Special Rate Variation) Rates
The Independent Pricing and Regulatory Tribunal (IPART) determine the rate peg based on a Local Government Cost Index, a productivity factor, as well as any other pertinent legislative and industry factors. This is to ensure that a balance is made between Wagga Wagga City Council meeting the increasing costs of delivering services and that productivity gains are shared with ratepayers. The base case scenario includes an ordinary rate increase for 2017/18 of 1.5% as announced by IPART in December 2016, with a 1% growth in rateable properties for residential only. This was a significant reduction on
20
Sewer Charges
Sewer charges are also modelled at achieving full cost recovery including a component for future site rehabilitation and depreciation consistent with Council’s Return on Investment Policy for council businesses. The rate used in the base case scenario which is included in the 2017/27 Long Term Financial Plan is: For the first 4 years - 5% increase plus a 1% residential growth factor. For the remaining 6 years - 2% increase plus a 1% residential growth factor.
Stormwater Services
The maximum amount for annual stormwater services is prescribed by legislation. This is currently $25 per residential and business property per annum, which is the amount used in the base case and all scenarios of the Long Term Financial Plan.
User Fees & Charges
The base case scenario of the Long Term Financial Plan includes a projected increase in user fees and charges generally between 3%-5%. A number of fees are prescribed by legislation and some fees are set at a level to recover the actual cost of providing the service. All fees have been reviewed in line with Wagga Wagga City Council’s fees and charges policy. The key improvement strategies to be implemented to improve our financial position and sustainability as part of Wagga Wagga City Council’s Fit for the Future improvement proposal has included increased revenue targets of $300K.
Interest & Investment Revenue
Given the relatively low cash rate it is difficult for Wagga Wagga City Council to ascertain with certainty what actual returns are likely to be over the 10 years of the plan. It is not likely that Council can continue to rely on additional investment income over the life of the Long Term Financial Plan given the current balance of the portfolio, and the reserves that are identified to be expended. The reduction in investment income and overall portfolio balance places further funding pressures on Council in the future. Wagga Wagga City Council’s investment revenue is linked to the expected balance of the portfolio over the life of the Long Term Financial Plan. For the base case scenario, the projected interest rates are: Years
Financial Year
Predicted interest rate earnings
Years 1-5
2017/18 - 2021/22
2.81% - 3.21%
Years 6-10
2022/23 - 2026/27
2.86% - 3.35%
Grants & Contributions Grants
It is assumed in the base case scenario that the current level of grant funding from the State and Federal Governments will continue. Grants are a significant source of funding for local government and as such any fluctuation in current levels is likely to have a substantial effect on the delivery of services and projects identified in the Long Term Financial Plan. 2016/17 represented the third year of the three year freeze on indexation for the Financial Assistance Grant. The freeze has had a significant impact on Council’s previous Long Term Financial Plan’s, with adjustments to population and future assumptions resulting in a further $7.2M adjustment to the 2017/27 Long Term Financial Plan’s 10 year starting point. The base case and all scenarios assume that the indexation of the Financial Assistance Grant will recommence from 1 July 2017.
Developer Contributions
Developer contributions have been projected in line with each contribution plan over the life of the Long Term Financial Plan. These plans are subject to review annually with each year of the plan updated accordingly.
Other Revenues
Other revenue includes fines, income from sale of goods as well as diesel fuel rebates and income from insurance claims and rebates. Revenue from these sources is difficult to ascertain with any certainty as they are generally influenced by factors outside of Wagga Wagga City Council’s control. As a result, for the purposes of the Long Term Financial Plan other revenue has been projected at a 3% increase from the 2016/17 financial year budget which corresponds to historical trends.
WAGGA WAGGA CITY COUNCIL LONG TERM FINANCIAL PLAN
21
Operating Expenditure The below chart represents Wagga Wagga City Council’s budgeted operating expenses for the 2017/18 financial year, displayed as a percentage. Total Operating Expenditure- $119.8M
If rates increase substantially above the 7% then Wagga Wagga City Council will have to adjust the borrowings program as well as capital programs so that an affordable level of debt is always maintained. There is also the potential to source lower cost borrowings through T-Corp as part of Wagga Wagga City Council’s Fit for the Future proposal. All projects assumed term of loan is 10 years, other than the Multi Purpose Stadiums Projects (15 years) and Riverina Intermodal Freight Logistics Hub project (20 years).
Materials & Contracts
The cost of materials and contracts is to be maintained within existing budgets.
Employee Benefits and On Costs
Depreciation
Under the NSW Local Government Award, on average staff receive a 2.8% pay increase each year. Combining the award increase, performance based increase and the associated on costs, the budgeted employee costs increase is 4%.
Depreciation is forecast to increase by 5.5% each year of the Long Term Financial Plan. This is reflective of the new capital additions and purchases over the term of the Long Term Financial Plan. Depreciation levels are subject to ongoing review with each year of the plan.
In addition to the above, a salary cap of 2.5% was introduced in 2015/16 in the base case budget for three years of the Long Term Financial Plan, which then reverts back to the above award and salary progression system from 2018/19.
Other Expenses
Borrowing Costs
Borrowing costs have been conservatively forecast as follows: • 4% • 5% • 6% • 7% 22
-
2017/18 2018/19 to 2020/21 2021/22 to 2023/24 2024/25 to 2026/27
Insurance
It has been assumed that property insurance premiums will not increase for 2017/18 due to the removal of the Emergency Services Levy from Council’s premium. All other insurances have been incremented by 5% excluding liability insurance which factors in an increase of 7% for 2017/18. Future year increases for all insurances are 5% and 7% for liability insurance.
Other Operating Expenses
The cost of other operating expenses other than Utilities and Insurance costs are to be maintained within existing budgets. The below graph demonstrates the relationship between operating revenue and operating expenditure.
Utilities
An increase has been projected in the Long Term Financial Plan for electricity of 7% and gas and water costs of 5% per annum. Wagga Wagga City Council is actively pursuing efficient alternative sources of energy and other energy saving initiatives in order to reduce the effect of these costs where possible and these projected savings have been included in the Long Term Financial Plan.
As can be seen from the above graph, Wagga Wagga City Council’s operating expenditure including depreciation is greater than its operating income for the 10 years of the LTFP. This indicates that Council still has a long way to go to be able to fund depreciation and maintain financial sustainability.
Our sensitivity analysis
WAGGA WAGGA CITY COUNCIL LONG TERM FINANCIAL PLAN
23
Sensitivity Analysis Although the assumptions listed in the previous section are Wagga Wagga City Council’s current informed estimate based on a range of reliable sources, Long Term Financial Plans are inherently uncertain. They contain a wide range of assumptions, including assumptions about interest rate movements and the potential effect of inflation on revenues and expenditures which are largely outside of Council’s control.
Employee Costs
Salary growth is largely subject to the NSW Local Government Award. Council has factored in a 4% annual increase in employee expenses. If the Award increases by 0.5%, the effect on the Long Term Financial Plan base case budget deficits before Capital Grants and Contributions is shown below:
The below section illustrates the financial effect on the result if certain assumptions were to change.
Rates
Rates comprise 56% of Wagga Wagga City Council’s total operating income. As stated earlier, rates are capped by the State Government and Wagga Wagga City Council can only increase rates above the rate pegging percentage if a Special Rate Variation is submitted and approved. If rates are held 0.5% p.a. below the predicted rate pegging percentage, the effect on the Long Term Financial Plan base case budget deficits before Capital Grants and Contributions is shown below:
24
Combined impact
The chart below shows the combined impact of a 0.5% unfavourable variance in our assumptions for Rates and Employee Costs:
Financial scenarios
WAGGA WAGGA CITY COUNCIL LONG TERM FINANCIAL PLAN
25
Scenarios – Financial Modelling Base Case Scenario The commentary and analysis provided in the document to this point describe the base case model of the Long Term Financial Plan. It is this model inclusive of the previously detailed assumptions that will be recommended to Council for adoption. BUDGET 2017/18
BUDGET 2018/19
BUDGET 2019/20
BUDGET 2020/21
BUDGET 2021/22
BUDGET 2022/23
BUDGET 2023/24
BUDGET 2024/25
BUDGET 2025/26
BUDGET 2026/27
(61,594,518)
(63,549,361)
(65,580,046)
(67,690,089)
(69,430,948)
(71,218,328)
(73,053,512)
(74,937,818)
(76,872,604)
(78,859,261)
Special Rate Variation
(1,495,484)
(1,531,293)
(1,567,996)
(1,605,615)
0
0
0
0
0
0
User Charges & Fees
(25,947,798)
(27,193,118)
(28,382,024)
(29,632,855)
(30,808,320)
(31,827,551)
(32,883,024)
(33,978,223)
(34,838,674)
(35,412,530)
Interest & Investment Revenue
(3,154,163)
(3,547,537)
(4,090,189)
(4,575,550)
(5,192,762)
(5,160,225)
(5,764,824)
(6,397,672)
(7,170,418)
(8,259,789)
Other Revenues
Revenue From Continuing Operations Rates & Annual Charges
(2,984,954)
(3,051,550)
(3,106,855)
(3,177,714)
(3,250,055)
(3,324,623)
(3,401,487)
(3,480,738)
(3,539,427)
(3,596,172)
Grants & Contributions provided for Operating Purposes
(13,910,429)
(13,727,432)
(13,931,483)
(14,191,429)
(14,501,702)
(14,715,669)
(14,987,459)
(15,265,202)
(15,548,729)
(15,838,474)
Grants & Contributions provided for Capital Purposes
(13,704,984)
(11,356,285)
(10,771,077)
(11,024,043)
(7,638,053)
(7,706,010)
(7,640,721)
(7,702,737)
(7,766,614)
(7,832,407)
(122,792,330)
(123,956,576)
(127,429,670)
(131,897,296)
(130,821,840)
(133,952,405)
(137,731,025)
(141,762,390)
(145,736,466)
(149,798,634)
42,591,754
44,062,952
45,638,415
47,451,141
49,336,308
51,296,811
53,335,662
55,455,996
57,659,612
59,947,401
3,591,092
3,842,095
3,992,143
3,746,195
3,488,574
3,266,186
2,984,178
2,701,582
2,449,694
2,498,603
Materials & Contracts
30,138,577
29,751,202
29,979,922
30,397,381
30,624,614
30,751,592
31,247,159
31,540,893
31,140,143
30,853,860
Depreciation & Amortisation
34,477,729
36,364,189
38,373,584
40,472,317
42,689,627
45,047,216
47,566,161
50,180,940
52,956,788
53,025,049
9,015,285
9,435,103
9,883,776
10,659,410
10,862,195
11,393,800
11,956,007
12,850,711
13,109,332
13,702,170
Expenses From Continuing Operations
119,814,437
123,455,541
127,867,839
132,726,443
137,001,317
141,755,604
147,089,167
152,730,123
157,315,570
160,027,083
Net Operating (Profit)/Loss
(2,977,893)
(501,035)
438,169
829,147
6,179,477
7,803,199
9,358,142
10,967,732
11,579,104
10,228,449
Revenue From Continuing Operations
Expenses From Continuing Operations Employee Benefits & On-Costs Borrowing Costs
Other Expenses
26
Base Case Scenario continued BUDGET 2017/18
BUDGET 2018/19
BUDGET 2019/20
BUDGET 2020/21
BUDGET 2021/22
BUDGET 2022/23
BUDGET 2023/24
BUDGET 2024/25
BUDGET 2025/26
BUDGET 2026/27
Capital and Reserve Movements Capital Expenditure - Renewals
24,002,536
21,813,807
19,797,987
22,322,945
17,327,706
16,094,246
18,287,678
19,796,377
24,894,032
18,351,862
Capital Expenditure - New Projects
17,530,887
8,459,557
2,407,532
2,788,701
3,476,403
3,746,506
4,806,997
38,371
539,766
41,217
Capital Expenditure - Project Concepts
11,800,337
16,666,525
8,856,711
4,489,054
4,369,934
1,455,947
1,543,000
8,422,768
1,343,000
1,343,000
2,474,343
3,231,506
3,793,743
4,018,531
4,255,481
4,649,724
4,470,418
4,174,207
3,958,218
4,494,419
New Loan Borrowings
(7,215,980)
(6,762,097)
0
0
(750,000)
0
0
0
(4,200,000)
0
Proceeds from Sale of intangible & tangible Assets
(4,678,401)
(1,354,100)
(792,182)
(835,808)
(1,383,000)
(739,100)
(977,700)
(1,396,850)
(1,148,900)
(1,250,650)
Net Movements to/(from) Reserves
(6,458,101)
(5,189,974)
3,871,625
6,859,747
9,213,627
12,036,694
10,077,627
8,178,336
15,991,568
19,816,753
Total Capital and Reserve Movements
37,455,621
36,865,224
37,935,415
39,643,170
36,510,151
37,244,017
38,208,019
39,213,208
41,377,684
42,796,600
Net Result after Depreciation
34,477,728
36,364,189
38,373,585
40,472,317
42,689,627
45,047,216
47,566,161
50,180,940
52,956,788
53,025,049
Add back Depreciation Expense (non-cash)
34,477,729
36,364,189
38,373,584
40,472,317
42,689,627
45,047,216
47,566,161
50,180,940
52,956,788
53,025,049
Cash Budget (Surplus)/Deficit
0
0
0
0
0
0
0
0
0
0
Loan Repayments
WAGGA WAGGA CITY COUNCIL LONG TERM FINANCIAL PLAN
27
Financial Scenarios – Asset Management Renewal Shortfalls Wagga Wagga City Council has the following five asset management plans: • Buildings • Recreational assets • Sewer • Stormwater • Transport infrastructure networks Each plan sets out the level of service Wagga Wagga City Council provides the community in relation to its assets. The plans use financial information and technical asset data, compared to service levels to identify funding shortfalls in managing the assets. In order to eliminate Wagga Wagga City Council’s renewal shortfall, funds of $63,818,936 are required as detailed in the table below. Please note that this does not include maintenance (including condition assessments), upgrades or new asset funding gaps. Asset Category Transport
$50,945,895 $8,469,799
Buildings
$3,147,096
Stormwater**
$1,174,133
Total
$82,053 $63,818,936
* one off – allocate to one year of work ** this figure only relates to pipe renewal (4.6kms) identified in the 2013 condition assessment. AMP has advised that Council need to complete another condition assessment before producing a renewal plan to accurately determine the required renewal and the potential funding shortfall.
28
2017/18
2018/19
2019/20
2020/21
2021/22
2022/23
2023/24
2024/25
2025/26
2026/27
$7,512,178 $5,336,704 $5,035,094 $4,890,960 $6,122,205 $5,516,507 $4,479,868 $4,249,475 $4,020,480 $3,782,424
Wagga Wagga City Council’s current external loan borrowings assumptions used in the Long Term Financial Plan are as follows: • 4% • 5% • 6% • 7%
-
2016/17 2018/19 2021/22 2024/25
to to to to
2017/18 2020/21 2023/24 2026/27
– – – –
10 10 10 10
year year year year
term term term term
Scenario 1 – Fund 10 year Transport only Renewal Shortfall from External Loan Borrowings If Wagga Wagga City Council was to fund the Transport renewal shortfall of $51M from external borrowings, this would result in an increase to the bottom line for debt servicing repayments of $33M as follows: 2017/18 $0
2018/19
2019/20
2020/21
2021/22
2022/23
2023/24
2024/25
2025/26
2026/27
$926,183 $1,617,310 $2,269,378 $2,902,780 $3,734,591 $4,484,108 $5,092,779 $5,697,808 $6,270,234
Scenario 2 – Fund 10 year All Assets Renewal Shortfall from External Loan Borrowings
Shortfall
Recreational Assets
Sewer*
The Transport renewal shortfall of $50,945,895 is allocated across the 10 years of the Long Term Financial Plan as follows:
If Wagga Wagga City Council was to fund all Asset category’s renewal shortfall of $63,818,936 from external borrowings, this would result in an increase to Council’s bottom line for debt servicing repayments of $40.6M over 10 years as follows: 2017/18
2018/19
2019/20
2020/21
2021/22
2022/23
2023/24
2024/25
2025/26
2026/27
$0 $1,084,896 $1,942,735 $2,761,515 $3,561,629 $4,568,343 $5,492,763 $6,276,337 $7,064,649 $7,820,358
Long term financial plan appendices
WAGGA WAGGA CITY COUNCIL LONG TERM FINANCIAL PLAN
29
Appendices The following summary documents are provided as appendixes to the Long Term Financial Plan document. They provide a summary of the financial projections of Wagga Wagga City Council over the next 10 years. It is important that these documents are considered as a total package and not in isolation to gain a clear picture of Council’s budgeted financial position over the next 10 years. Appendix 1 Budgeted Income Statement Appendix 2 Balance Sheet Forecasts Appendix 3 Cash Flow Statement Forecasts Appendix 4 Financial Sustainability Indicators Appendix 5 Budgeted External Restrictions Appendix 6 Budgeted Internal Restrictions Appendix 7 External Loan Projects and Debt Servicing Appendix 8 Capital Works Program + Concepts List Appendix 9 Wagga Wagga Regional Airport Ten Year Financial Plan Appendix 10 Livestock Marketing Centre Ten Year Financial Plan
30
Appendix 11 Sewerage Services Ten Year Financial Plan Appendix 12 Solid Waste Services Ten Year Financial Plan Appendix 13 Stormwater Levy Ten Year Financial Plan Appendix 14 Budgeted Income Statement by Function
Appendix 1 - Budgeted Income Statement BUDGET 2017/18
BUDGET 2018/19
BUDGET 2019/20
BUDGET 2020/21
BUDGET 2021/22
BUDGET 2022/23
BUDGET 2023/24
BUDGET 2024/25
BUDGET 2025/26
BUDGET 2026/27
(61,594,518)
(63,549,361)
(65,580,046)
(67,690,089)
(69,430,948)
(71,218,328)
(73,053,512)
(74,937,818)
(76,872,604)
(78,859,261)
Special Rate Variation
(1,495,484)
(1,531,293)
(1,567,996)
(1,605,615)
0
0
0
0
0
0
User Charges & Fees
(25,947,798)
(27,193,118)
(28,382,024)
(29,632,855)
(30,808,320)
(31,827,551)
(32,883,024)
(33,978,223)
(34,838,674)
(35,412,530)
Interest & Investment Revenue
(3,154,163)
(3,547,537)
(4,090,189)
(4,575,550)
(5,192,762)
(5,160,225)
(5,764,824)
(6,397,672)
(7,170,418)
(8,259,789)
Other Revenues
(2,984,954)
(3,051,550)
(3,106,855)
(3,177,714)
(3,250,055)
(3,324,623)
(3,401,487)
(3,480,738)
(3,539,427)
(3,596,172)
Grants & Contributions provided for Operating Purposes
(13,910,429)
(13,727,432)
(13,931,483)
(14,191,429)
(14,501,702)
(14,715,669)
(14,987,459)
(15,265,202)
(15,548,729)
(15,838,474)
Grants & Contributions provided for Capital Purposes
(13,704,984)
(11,356,285)
(10,771,077)
(11,024,043)
(7,638,053)
(7,706,010)
(7,640,721)
(7,702,737)
(7,766,614)
(7,832,407)
(122,792,330)
(123,956,576)
(127,429,670)
(131,897,296)
(130,821,840)
(133,952,405)
(137,731,025)
(141,762,390)
(145,736,466)
(149,798,634)
42,591,754
44,062,952
45,638,415
47,451,141
49,336,308
51,296,811
53,335,662
55,455,996
57,659,612
59,947,401
3,591,092
3,842,095
3,992,143
3,746,195
3,488,574
3,266,186
2,984,178
2,701,582
2,449,694
2,498,603
Materials & Contracts
30,138,577
29,751,202
29,979,922
30,397,381
30,624,614
30,751,592
31,247,159
31,540,893
31,140,143
30,853,860
Depreciation & Amortisation
34,477,729
36,364,189
38,373,584
40,472,317
42,689,627
45,047,216
47,566,161
50,180,940
52,956,788
53,025,049
Other Expenses
9,015,285
9,435,103
9,883,776
10,659,410
10,862,195
11,393,800
11,956,007
12,850,711
13,109,332
13,702,170
119,814,437
123,455,541
127,867,839
132,726,443
137,001,317
141,755,604
147,089,167
152,730,123
157,315,570
160,027,083
Net Operating Result (Surplus)/Deficit
(2,977,893)
(501,035)
438,169
829,147
6,179,477
7,803,199
9,358,142
10,967,732
11,579,104
10,228,449
Net Operating Result before Grants and Contributions provided for Capital Purposes
10,727,091
10,855,250
11,209,246
11,853,189
13,817,530
15,509,209
16,998,862
18,670,470
19,345,718
18,060,857
Revenue From Continuing Operations Rates & Annual Charges
Revenue From Continuing Operations
Expenses From Continuing Operations Employee Benefits & OnCosts Borrowing Costs
Expenses From Continuing Operations
WAGGA WAGGA CITY COUNCIL LONG TERM FINANCIAL PLAN
31
Appendix 2 - Balance Sheet Forecast BUDGET 2017/18
BUDGET 2018/19
BUDGET 2019/20
BUDGET 2020/21
BUDGET 2021/22
BUDGET 2022/23
BUDGET 2023/24
BUDGET 2024/25
BUDGET 2025/26
BUDGET 2026/27
Cash & Cash Equivalents
10,985,803
12,158,171
13,139,550
14,388,616
15,958,701
17,463,096
18,877,843
20,400,035
22,314,163
24,341,307
Investments
45,766,500
50,650,546
54,738,941
59,942,511
66,483,434
72,750,696
78,644,483
84,985,888
92,960,083
101,405,102
Receivables
12,334,877
12,435,244
12,699,004
13,025,006
12,903,249
13,116,887
13,347,918
13,588,346
13,724,042
13,794,895
Inventories
2,631,610
2,597,785
2,617,756
2,654,207
2,674,049
2,685,136
2,728,407
2,754,055
2,719,063
2,694,066
518,752
519,182
528,157
543,964
549,661
558,387
572,401
588,147
586,264
590,326
72,237,541
78,360,928
83,723,408
90,554,305
98,569,095
106,574,203
114,171,052
122,316,471
132,303,616
142,825,696
53,105,724
58,772,988
63,517,008
69,555,035
77,144,876
84,417,171
91,256,100
98,614,427
107,867,383
117,666,665
Infrastructure, Property, Plant & Equipment
1,394,646,774
1,403,868,375
1,395,764,838
1,384,057,413
1,365,158,829
1,340,669,212
1,316,763,026
1,293,442,751
1,266,113,862
1,231,574,241
Investments Accounted for using the equity method
1,865,352
1,865,352
1,865,352
1,865,352
1,865,352
1,865,352
1,865,352
1,865,352
1,865,352
1,865,352
Investment Property
3,330,000
3,330,000
3,330,000
3,330,000
3,330,000
3,330,000
3,330,000
3,330,000
3,330,000
3,330,000
Total Non-Current Assets
1,452,947,851
1,467,836,715
1,464,477,198
1,458,807,800
1,447,499,056
1,430,281,735
1,413,214,477
1,397,252,530
1,379,176,597
1,354,436,258
TOTAL ASSETS
1,525,185,391
1,546,197,643
1,548,200,606
1,549,362,106
1,546,068,151
1,536,855,938
1,527,385,529
1,519,569,001
1,511,480,213
1,497,261,954
14,427,431
13,885,020
12,466,626
12,511,375
12,150,270
11,886,047
12,369,747
12,904,886
12,799,210
12,189,464
Borrowings
3,231,506
3,793,743
4,018,531
4,255,481
4,649,724
4,470,418
4,174,207
3,958,218
4,494,419
4,718,389
Provisions
12,614,560
12,614,560
12,614,560
12,614,560
12,614,560
12,614,560
12,614,560
12,614,560
12,614,560
12,614,560
Total Current Liabilities
30,273,497
30,293,323
29,099,718
29,381,416
29,414,554
28,971,025
29,158,514
29,477,663
29,908,189
29,522,413
ASSETS Current Assets
Other Total Current Assets Non-Current Assets Investments
LIABILITIES Current Liabilities Payables
32
Appendix 2 - Balance Sheet Forecast continued BUDGET 2017/18
BUDGET 2018/19
BUDGET 2019/20
BUDGET 2020/21
BUDGET 2021/22
BUDGET 2022/23
BUDGET 2023/24
BUDGET 2024/25
BUDGET 2025/26
BUDGET 2026/27
Non-Current Liability Borrowings
66,673,982
69,642,336
65,623,805
61,368,324
57,468,601
52,998,183
48,823,976
44,865,759
44,571,340
39,852,951
Provisions
1,578,115
1,578,115
1,578,115
1,578,115
1,578,115
1,578,115
1,578,115
1,578,115
1,578,115
1,578,115
Total Non-Current Liabilities
68,252,097
71,220,451
67,201,920
62,946,439
59,046,716
54,576,298
50,402,092
46,443,874
46,149,455
41,431,066
TOTAL LIABILITIES
98,525,594
101,513,774
96,301,638
92,327,855
88,461,270
83,547,323
79,560,606
75,921,537
76,057,644
70,953,479
1,426,659,797
1,444,683,869
1,451,898,968
1,457,034,250
1,457,606,882
1,453,308,615
1,447,824,924
1,443,647,464
1,435,422,569
1,426,308,474
Retained Earnings
853,088,135
871,112,207
878,327,307
883,462,588
884,035,219
879,736,953
874,253,261
870,075,802
861,850,907
852,736,812
Revaluation Reserves
573,571,662
573,571,662
573,571,662
573,571,662
573,571,662
573,571,662
573,571,662
573,571,662
573,571,662
573,571,662
1,426,659,797
1,444,683,869
1,451,898,969
1,457,034,250
1,457,606,881
1,453,308,615
1,447,824,923
1,443,647,464
1,435,422,569
1,426,308,474
NET ASSETS EQUITY
TOTAL EQUITY
WAGGA WAGGA CITY COUNCIL LONG TERM FINANCIAL PLAN
33
Appendix 3 - Cash Flow Statement Forecast BUDGET 2017/18
BUDGET 2018/19
BUDGET 2019/20
BUDGET 2020/21
BUDGET 2021/22
BUDGET 2022/23
BUDGET 2023/24
BUDGET 2024/25
BUDGET 2025/26
BUDGET 2026/27
Rates & Annual Charges
62,925,724
64,959,078
67,021,780
69,164,539
69,422,688
71,109,166
72,941,431
74,822,737
76,754,440
78,737,929
User Charges & Fees
25,560,723
27,032,622
28,233,359
29,476,018
30,666,510
31,714,222
32,765,522
33,856,030
34,758,012
35,381,674
3,135,859
3,335,480
3,933,635
4,441,538
5,040,645
4,957,528
5,569,737
6,213,086
6,972,470
8,000,366
28,845,105
25,234,359
24,725,240
25,184,952
22,322,768
22,404,903
22,615,892
22,947,723
23,294,672
23,649,726
2,092,274
2,968,482
3,007,153
3,050,768
3,190,775
3,208,140
3,282,411
3,356,242
3,438,813
3,505,073
Cash Flows from Operating Activities Receipts:
Interest & Investment Revenue Received Grants & Contributions Other Payments: Employee Benefits & On-Costs
(42,591,754) (44,062,952) (45,638,415) (47,451,141) (49,336,308) (51,296,811) (53,335,662) (55,455,996) (57,659,612) (59,947,401)
Materials & Contracts
(32,588,287) (32,945,402) (33,727,515) (34,344,622) (34,860,248) (35,352,874) (35,669,886) (35,644,362) (35,087,412) (35,295,578)
Borrowing Costs
(3,591,092)
(3,842,095)
(3,992,143)
(3,746,195)
(3,488,574)
(3,266,186)
(2,984,178)
(2,701,582)
(2,449,694)
(2,498,603)
Other
(7,792,689)
(8,175,829)
(8,586,724)
(9,323,446)
(9,486,152)
(9,976,476) (10,496,164) (11,347,073) (11,605,694) (12,198,531)
Net Cash provided/(used in) Operating Activities
35,995,862
34,503,743
34,976,369
36,452,412
33,472,105
33,501,613
34,689,102
36,046,804
38,415,995
39,334,654
39,569,451
34,364,748
19,830,333
18,774,697
16,342,447
14,252,453
16,638,983
18,363,972
6,044,689
4,495,071
4,678,401
1,354,100
792,182
835,808
1,383,000
739,100
977,700
1,396,850
1,148,900
1,250,650
Cash Flows from Investing Activities Receipts: Sale of Investment Securities Sale of Infrastructure, Property, Plant & Equipment Payments: Purchase of Investment Securities
(30,000,000) (25,000,000) (20,000,000) (20,000,000) (20,000,000) (20,000,000) (20,000,000) (20,000,000) (20,000,000) (18,000,000)
Purchase of Infrastructure, Property, Plant & Equipment
(50,995,265) (46,321,542) (29,526,710) (29,459,356) (24,745,943) (20,921,724) (24,960,779) (28,607,589) (26,633,599) (19,055,174)
Contributions Paid to Joint Ventures & Associates Net Cash provided/(used in) Investing Activities
34
(1,222,595)
(1,259,273)
(1,297,052)
(1,335,964)
(1,376,043)
(1,417,323)
(1,459,843)
(1,503,638)
(1,503,638)
(1,503,638)
(37,970,009) (36,861,967) (30,201,247) (31,184,815) (28,396,539) (27,347,494) (28,803,939) (30,350,405) (40,943,649) (32,813,091)
Appendix 3 - Cash Flow Statement Forecast continued BUDGET 2017/18
BUDGET 2018/19
BUDGET 2019/20
BUDGET 2020/21
BUDGET 2021/22
BUDGET 2022/23
BUDGET 2023/24
BUDGET 2024/25
BUDGET 2025/26
BUDGET 2026/27
Cash Flows from Financing Activities Receipts: Proceeds from Borrowings & Advances
7,215,980
6,762,097
0
0
750,000
0
0
0
4,200,000
0
(2,474,343)
(3,231,506)
(3,793,743)
(4,018,531)
(4,255,481)
(4,649,724)
(4,470,418)
(4,174,207)
241,782
(4,494,419)
4,741,637
3,530,591
(3,793,743)
(4,018,531)
(3,505,481)
(4,649,724)
(4,470,418)
(4,174,207)
4,441,782
(4,494,419)
2,767,489
1,172,367
981,380
1,249,066
1,570,086
1,504,395
1,414,746
1,522,192
1,914,129
2,027,144
8,218,314
10,985,803
12,158,170
13,139,550
14,388,616
15,958,702
17,463,097
18,877,842
20,400,035
22,314,163
Cash & Cash Equivalents - end of the year
10,985,803
12,158,170
13,139,550
14,388,616
15,958,702
17,463,097
18,877,842
20,400,035
22,314,163
24,341,307
Cash & Cash Equivalents - end of the year
10,985,803
12,158,170
13,139,550
14,388,616
15,958,702
17,463,097
18,877,842
20,400,035
22,314,163
24,341,307
Investments - end of the year
98,872,224 109,423,535 118,255,950 129,497,547 143,628,310 157,167,867 169,900,583 183,600,315 200,827,466 219,071,767
Payments: Repayment of Borrowings & Advances Net Cash provided/(used in) in Financing Activities
Net Increase/(Decrease) in Cash & Cash Equivalents
plus: Cash & Cash Equivalents - beginning of year
Cash, Cash Equivalents & Investments - end of the year
109,858,027 121,581,705 131,395,500 143,886,163 159,587,012 174,630,964 188,778,425 204,000,350 223,141,629 243,413,074
WAGGA WAGGA CITY COUNCIL LONG TERM FINANCIAL PLAN
35
Appendix 4 - Financial Sustainability Indicators ACTUALS 2015/16 -13.90%
BUDGET 2017/18 Operating Performance Ratio
-9.83%
BUDGET 2018/19 -9.64%
BUDGET 2019/20 -9.61%
BUDGET 2020/21 -9.81%
BUDGET 2021/22 -11.22%
BUDGET 2022/23 -12.28%
BUDGET 2023/24 -13.07%
BUDGET 2024/25 -13.93%
BUDGET 2025/26 -14.02%
BUDGET 2026/27 -12.72%
Office of Local Government Benchmark >= 0.00%
69.27%
Revenue from Continuing Operations excluding Capital Grants & Contributions less Operating Expenses
(10,727,091) (10,855,250) (11,209,246) (11,853,189) (13,817,530) (15,509,209) (16,998,862) (18,670,470) (19,345,718) (18,060,857)
Revenue from Continuing Operations excluding Capital Grants & Contributions
109,087,346 112,600,291 116,658,593 120,873,253 123,183,787 126,246,395 130,090,305 134,059,653 137,969,852 141,966,226
Own Source Operating Revenue Ratio
77.51%
79.76%
80.61%
80.88%
83.08%
83.26%
83.57%
83.80%
84.00%
84.20%
Office of Local Government Benchmark >= 60.00% Revenue from Continuing Operations excluding all Grants & Contributions Revenue from Continuing Operations 3.39
95,176,917
98,872,859 102,727,110 106,681,824 108,682,085 111,530,727 115,102,846 118,794,451 122,421,123 126,127,753
122,792,330 123,956,576 127,429,670 131,897,296 130,821,840 133,952,405 137,731,025 141,762,390 145,736,466 149,798,634
Unrestricted Current Ratio
2.92
3.15
3.57
3.79
4.10
4.52
4.78
5.03
5.31
5.83
Current Assets less all External Restrictions
48,489,140
52,353,692
55,784,274
60,156,078
65,180,124
70,261,589
75,097,685
80,277,909
86,578,476
93,207,253
Current Liabilities less Specific Purpose Liabilities
16,608,727
16,624,984
15,646,228
15,877,220
15,904,393
15,540,700
15,694,441
15,956,143
16,309,174
15,992,838
4.50
4.98
Office of Local Government Benchmark >= 1.50
4.03
Debt Service Cover Ratio
4.51
4.15
4.00
4.17
4.18
4.14
5.63
5.36
Office of Local Government Benchmark >= 2.00 Operating Result before Capital excluding Interest and Depreciation Principal Repayments plus Borrowing Costs
36
27,341,730
29,351,035
31,156,481
32,365,322
32,360,671
32,804,193
33,551,477
34,212,053
36,060,764
37,462,796
6,065,435
7,073,601
7,785,886
7,764,726
7,744,055
7,915,909
7,454,596
6,875,788
6,407,912
6,993,022
Appendix 4 - Financial Sustainability Indicators continued ACTUALS 2015/16 5.91%
BUDGET 2017/18 Rates, Annual Charges, Interest & Extra Charges Outstanding Percentage
BUDGET 2018/19
6.37%
BUDGET 2019/20
BUDGET 2020/21
BUDGET 2021/22
BUDGET 2022/23
BUDGET 2023/24
BUDGET 2024/25
BUDGET 2025/26
BUDGET 2026/27
6.36%
6.36%
6.36%
6.36%
6.36%
6.35%
6.36%
6.36%
6.35%
4,301,224
4,436,938
4,577,885
4,724,303
4,733,524
4,855,380
4,980,496
5,108,960
5,240,866
5,376,309
67,574,951
69,748,255
71,967,845
74,273,682
74,573,349
76,388,764
78,365,465
80,395,433
82,458,683
84,577,246
56.96%
83.49%
57.25%
53.50%
33.82%
35.19%
35.44%
32.88%
32.62%
31.23%
Wagga Wagga City Council Organisational Target <= 6.00% Rates, Annual & Extra Charges Outstanding Rates, Annual & Extra Charges Collectible 31.31%
Building & Infrastructure Renewals Ratio
Office of Local Government Benchmark >= 100.00% Asset Renewals (Building & Infrastructure Assets)
17,061,875
26,423,934
19,143,590
18,900,429
12,622,130
13,876,715
14,763,021
14,470,277
15,169,525
15,341,678
Depreciation of Building and Infrastructure Assets
29,956,121
31,648,642
33,436,791
35,325,969
37,321,887
39,430,573
41,658,400
44,012,100
46,498,784
49,125,965
Appendix 5 - Budgeted External Restrictions RESERVE NAME
ESTIMATED CLOSING BALANCE 2016/17
CLOSING BALANCE 2017/18
CLOSING BALANCE 2018/19
CLOSING BALANCE 2019/20
CLOSING BALANCE 2020/21
CLOSING BALANCE 2021/22
CLOSING BALANCE 2022/23
CLOSING BALANCE 2023/24
CLOSING BALANCE 2024/25
CLOSING BALANCE 2025/26
CLOSING BALANCE 2026/27
Sewer Reserve
15,374,507
14,194,516
13,762,241
16,627,956
19,366,885
22,777,018
28,049,837
32,443,804
39,475,862
47,122,173
55,351,680
Solid Waste Reserve
11,780,049
6,902,040
8,674,523
7,349,983
9,726,697
12,812,499
16,271,818
19,426,509
17,287,059
21,493,080
26,063,933
2,601,864
3,189,069
583,775
583,775
583,775
583,775
583,775
583,775
583,775
583,775
583,775
11,737,967
8,140,371
3,252,311
2,015,657
2,417,604
2,624,744
5,088,590
7,669,761
9,195,500
11,828,763
14,501,155
S94A Developer Contributions
611,128
334,475
124,822
165,169
105,516
(54,137)
(13,790)
26,557
66,904
107,251
147,598
S94 (Old Plan 1993-2004) Developer Contributions
244,257
244,257
122,419
122,419
122,419
122,419
122,419
122,419
122,419
122,419
122,419
4,056,118
4,556,118
4,423,307
4,923,307
4,604,612
4,604,612
4,604,612
4,604,612
4,604,612
4,604,612
4,604,612
46,405,890
37,560,847
30,943,398
31,788,266
36,927,508
43,470,930
54,707,262
64,877,437
71,336,131
85,862,073
101,375,173
Stormwater Levy Reserve S94 Developer Contributions
S64 Developer Contributions (Stormwater) TOTAL
* Unexpended Grants are also classified as externally restricted funds - however these are not shown in this table WAGGA WAGGA CITY COUNCIL LONG TERM FINANCIAL PLAN
37
Appendix 6 - Budgeted Internal Restrictions RESERVE NAME Airport Reserve
ESTIMATED CLOSING BALANCE 2016/17
CLOSING BALANCE 2017/18
CLOSING BALANCE 2018/19
CLOSING BALANCE 2019/20
CLOSING BALANCE 2020/21
CLOSING BALANCE 2021/22
CLOSING BALANCE 2022/23
CLOSING BALANCE 2023/24
CLOSING BALANCE 2024/25
CLOSING BALANCE 2025/26
CLOSING BALANCE 2026/27
(300,017)
(686,677)
(528,892)
(474,474)
(412,987)
(802,202)
(1,050,393)
(1,528,419)
(1,912,549)
(23,811)
(400,130)
(34,490)
(55,490)
(58,990)
(62,490)
(65,990)
(69,490)
(72,990)
(76,490)
(79,990)
(83,490)
(86,990)
Ashmont Community Facility Reserve
(4,500)
(6,000)
(7,500)
(9,000)
(10,500)
(12,000)
(13,500)
(15,000)
(16,500)
(18,000)
(19,500)
Bridge Replacement Reserve
(86,667)
(186,667)
(286,667)
(386,667)
(486,667)
(586,667)
(686,667)
(786,667)
(886,667)
(986,667)
(1,086,667)
(969,958)
(969,958)
(969,958)
(969,958)
(969,958)
(969,958)
(969,958)
(969,958)
(969,958)
(969,958)
(969,958)
CCTV Reserve
(64,476)
(74,476)
(84,476)
(66,476)
(48,476)
(30,476)
(12,476)
0
0
0
0
Cemetery Perpetual Reserve
(13,521)
(138,667)
(268,046)
(401,777)
(539,979)
(682,778)
(840,693)
(1,052,052)
(1,318,671)
(1,585,291)
(1,851,911)
Cemetery Reserve
(173,734)
(335,064)
(411,774)
(604,171)
(812,567)
(1,065,598)
(1,182,950)
(1,268,632)
(1,321,263)
(839,401)
(825,321)
Civic Theatre Operating Reserve
(100,000)
(150,000)
(200,000)
(98,500)
(148,500)
(198,500)
(248,500)
(298,500)
(348,500)
(398,500)
(448,500)
Civic Theatre Technical Infrastructure Reserve
(105,450)
(155,450)
(205,450)
(255,450)
(305,450)
(355,450)
(405,450)
(455,450)
(505,450)
(555,450)
(605,450)
Civil Projects Reserve
(155,883)
(155,883)
(131,883)
(131,883)
(103,083)
(103,083)
(103,083)
(103,083)
(103,083)
(103,083)
(103,083)
(5,685)
(5,685)
(5,685)
(5,685)
(5,685)
(5,685)
(5,685)
(5,685)
(5,685)
(5,685)
(5,685)
Council Election Reserve
(181,058)
(254,153)
(326,891)
(399,262)
(161,253)
(232,854)
(304,053)
(374,838)
(135,197)
(195,117)
(255,036)
Economic Development Incentives Reserve
(19,500)
(19,500)
(19,500)
(19,500)
(19,500)
(19,500)
(19,500)
(19,500)
(19,500)
(19,500)
(19,500)
0
0
0
0
0
0
0
0
0
0
0
(3,352,639)
(3,352,639)
(3,352,639)
(3,352,639)
(3,352,639)
(3,352,639)
(3,352,639)
(3,352,639)
(3,352,639)
(3,352,639)
(3,352,639)
Estella Community Centre Reserve
(230,992)
(230,992)
(52,473)
(52,473)
(52,473)
(52,473)
(52,473)
(52,473)
(52,473)
(52,473)
(52,473)
Family Day Care Reserve
(121,002)
(244,946)
(169,632)
(95,198)
(21,792)
50,420
121,262
190,541
258,047
323,556
386,741
Fit for the Future Reserve
(2,823,284)
(5,089,009)
(5,381,416)
(5,367,454)
(5,778,342)
(6,157,361)
(5,449,006)
(4,996,534)
(4,588,684)
(4,338,612)
(4,157,020)
Generic Projects Reserve
(627,116)
(607,116)
(607,116)
(607,116)
(282,015)
104,191
156,995
156,995
156,995
156,995
156,995
Art Gallery Reserve
CBD Carparking Facilities Reserve
Community Amenities Reserve
Emergency Events Reserve Employee Leave Entitlements Gen Fund Reserve
38
Appendix 6 - Budgeted Internal Restrictions continued RESERVE NAME
ESTIMATED CLOSING BALANCE 2016/17
CLOSING BALANCE 2017/18
CLOSING BALANCE 2018/19
CLOSING BALANCE 2019/20
CLOSING BALANCE 2020/21
CLOSING BALANCE 2021/22
CLOSING BALANCE 2022/23
CLOSING BALANCE 2023/24
CLOSING BALANCE 2024/25
CLOSING BALANCE 2025/26
CLOSING BALANCE 2026/27
Glenfield Community Centre Reserve
(17,704)
(19,704)
(21,704)
(23,704)
(25,704)
(27,704)
(29,704)
(31,704)
(33,704)
(35,704)
(37,704)
Grassroots Cricket Reserve
(60,942)
(60,942)
(60,942)
(60,942)
(60,942)
(60,942)
(60,942)
(60,942)
(60,942)
(60,942)
(60,942)
(738,010)
(738,010)
(738,010)
(738,010)
(738,010)
(738,010)
(738,010)
(738,010)
(738,010)
(738,010)
(738,010)
(50,454)
(50,454)
(50,454)
(50,454)
(50,454)
(50,454)
(50,454)
(50,454)
(50,454)
(50,454)
(50,454)
Industrial Land Development Reserve
(328,851)
(328,851)
(328,851)
(328,851)
(328,851)
(328,851)
(328,851)
(328,851)
(328,851)
(328,851)
(328,851)
Information Services / E-Business Reserve
(378,713)
(128,713)
(160,856)
(439,851)
(536,696)
(491,392)
(817,935)
(1,134,323)
(1,482,556)
(1,283,631)
(1,252,962)
Infrastructure Replacement Reserve
(50,142)
(98,213)
(107,738)
(139,200)
(165,366)
(192,411)
(196,471)
(198,648)
(219,568)
(254,306)
(289,044)
Insurance Variations Reserve
(28,644)
(28,644)
(28,644)
(28,644)
(28,644)
(28,644)
(28,644)
(28,644)
(28,644)
(28,644)
(28,644)
(1,474,205)
(2,325,999)
(3,168,241)
(4,010,263)
(4,902,057)
(5,685,740)
(6,409,547)
(7,111,816)
(7,801,151)
(8,125,154)
(8,203,563)
(182)
(50,182)
(100,182)
(150,182)
(200,182)
(250,182)
(300,182)
(350,182)
(400,182)
(450,182)
(500,182)
(17,181)
(2,545)
(2,545)
(2,545)
(2,545)
(2,545)
(2,545)
(2,545)
(2,545)
(2,545)
(2,545)
(3,574,732)
(4,754,749)
(6,311,765)
(8,095,027)
(10,123,253)
(12,418,585)
(12,021,055)
(11,138,370)
(13,828,925)
(16,662,436)
(19,411,056)
Lloyd E2 Environmental Works Reserve
(101,371)
(101,371)
(101,371)
(101,371)
(101,371)
(101,371)
(101,371)
(101,371)
(101,371)
(101,371)
(101,371)
Museum Acquisitions Reserve
(39,378)
(39,378)
(39,378)
(39,378)
(39,378)
(39,378)
(39,378)
(39,378)
(39,378)
(39,378)
(39,378)
Oasis Building Renewal Reserve
(51,000)
(83,147)
(56,147)
(75,847)
(75,847)
(75,847)
(114,747)
(164,747)
(214,747)
(264,747)
(314,747)
(1,115,347)
(1,025,347)
(835,347)
(745,347)
(520,347)
(630,347)
(740,347)
(655,347)
(765,347)
(875,347)
(985,347)
(5,288)
(5,288)
(5,288)
(5,288)
(5,288)
(5,288)
(5,288)
(5,288)
(5,288)
(5,288)
(5,288)
(48,031)
0
0
0
0
0
0
0
0
0
0
(5,138,305)
(3,333,372)
(3,042,426)
(3,501,458)
(2,831,925)
(1,771,261)
(2,195,695)
(1,900,709)
(9,893)
(750,536)
(1,088,753)
Gravel Pit Restoration Reserve Gurwood Street Property Reserve
Internal Loans Reserve Lake Albert Improvements Reserve LEP Preparation Reserve Livestock Marketing Centre Reserve
Oasis Plant Reserve Parks & Recreation Projects Reserve Pedestrian River Crossing Reserve Plant Replacement Reserve
WAGGA WAGGA CITY COUNCIL LONG TERM FINANCIAL PLAN
39
Appendix 6 - Budgeted Internal Restrictions continued RESERVE NAME
ESTIMATED CLOSING BALANCE 2016/17
CLOSING BALANCE 2017/18
CLOSING BALANCE 2018/19
CLOSING BALANCE 2019/20
CLOSING BALANCE 2020/21
CLOSING BALANCE 2021/22
CLOSING BALANCE 2022/23
CLOSING BALANCE 2023/24
CLOSING BALANCE 2024/25
CLOSING BALANCE 2025/26
CLOSING BALANCE 2026/27
Playground Equipment Replacement Reserve
(51,230)
(156,909)
(87,415)
(253,142)
(369,498)
(616,907)
(895,814)
(1,126,676)
(1,269,973)
(1,266,202)
(1,615,880)
Public Art Reserve
(10,711)
(34,379)
(34,099)
(6,316)
20,344
39,915
33,835
15,746
29,959
(34,690)
(24,897)
Robertson Oval Redevelopment Reserve
(86,697)
(86,697)
(86,697)
(86,697)
(86,697)
(86,697)
(86,697)
(86,697)
(86,697)
(86,697)
(86,697)
Senior Citizens Centre Reserve
(13,627)
(15,627)
(17,627)
(19,627)
(21,627)
(23,627)
(25,627)
(27,627)
(29,627)
(31,627)
(33,627)
Silverlite Reserve
(29,980)
(29,980)
(29,980)
(29,980)
(29,980)
(29,980)
(29,980)
(29,980)
(29,980)
(29,980)
(29,980)
Sister Cities Reserve
(35,914)
(45,914)
(55,914)
(65,914)
(75,914)
(85,914)
(95,914)
(105,914)
(115,914)
(125,914)
(135,914)
Stormwater Drainage Reserve
(173,678)
(173,678)
(144,078)
(144,078)
(144,078)
(144,078)
(144,078)
(144,078)
(144,078)
(144,078)
(144,078)
Strategic Real Property Reserve
(319,209)
(319,209)
(319,209)
(319,209)
(319,209)
(319,209)
(319,209)
(319,209)
(319,209)
(319,209)
(319,209)
(74,755)
(104,755)
(134,755)
(164,755)
(194,755)
(224,755)
(254,755)
(284,755)
(314,755)
(344,755)
(374,755)
Subdivision Tree Planting Reserve
(155,795)
(175,795)
(195,795)
(215,795)
(175,795)
(195,795)
(215,795)
(235,795)
(255,795)
(275,795)
(295,795)
Sustainable Energy Reserve
(520,442)
(485,442)
(515,442)
(547,842)
(582,834)
(610,442)
(610,442)
(610,442)
(610,442)
(610,442)
(610,442)
(50,000)
(100,000)
(150,000)
(200,000)
(250,000)
(300,000)
(350,000)
(400,000)
(450,000)
(500,000)
(550,000)
(163,087)
(163,087)
(163,087)
(163,087)
(163,087)
(163,087)
(163,087)
(163,087)
(163,087)
(163,087)
(163,087)
(24,273,575)
(27,784,752)
(30,162,973)
(34,112,974)
(36,707,846)
(40,201,630)
(41,830,486)
(42,568,226)
(45,072,919)
(47,037,127)
(51,519,327)
Street Lighting Replacement Reserve
Traffic Committee Reserve Unexpended External Loans Reserve TOTAL
40
Appendix 7 - External Loan Projects and Debt Servicing BORROW YEAR
CAPITAL PROJECT
Amount Borrowed
2016/17
2017/18
2018/19
2019/20
2020/21
2021/22
2022/23
2023/24
2024/25
2025/26
2026/27
TOTALS
General Fund Capital Projects 2011/12
2011/12
2011/12
2011/12
2011/12
Wiradjuri Boat Ramp - 6.44% - 15 years
Replace Substation Jubilee Park - 6.44% - 15 years
Replace Bridge Over Model Railway at Botanic Gardens 6.44% - 15 years
Upgrade Docker Street Pedestrian Rail Crossing 6.44% - 15 years
Upgrade Tarcutta Main Street 6.44% - 15 Years
421,603 Interest
21,710
20,350
18,616
16,986
15,203
13,298
11,268
9,163
6,781
4,341
1,718
139,433
Principal
22,363
23,723
25,457
27,087
28,870
30,774
32,805
34,910
37,292
39,732
42,355
345,367
44,073
44,073
44,073
44,073
44,073
44,073
44,073
44,073
44,073
44,073
44,073
484,801
Interest
17,199
16,122
14,748
13,457
12,044
10,535
8,927
7,259
5,372
3,439
1,361
110,461
Principal
17,716
18,794
20,167
21,459
22,871
24,380
25,988
27,656
29,543
31,476
33,554
273,605
34,915
34,915
34,915
34,915
34,915
34,915
34,915
34,915
34,915
34,915
34,915
384,066
Interest
2,730
2,559
2,341
2,136
1,912
1,673
1,417
1,152
853
546
216
17,537
Principal
2,813
2,984
3,202
3,407
3,631
3,871
4,126
4,391
4,690
4,997
5,327
43,437
5,543
5,543
5,543
5,543
5,543
5,543
5,543
5,543
5,543
5,543
5,543
60,973
Interest
20,892
19,584
17,915
16,346
14,630
12,798
10,844
8,818
6,525
4,177
1,653
134,183
Principal
21,521
22,829
24,498
26,067
27,783
29,615
31,569
33,595
35,888
38,236
40,760
332,361
42,413
42,413
42,413
42,413
42,413
42,413
42,413
42,413
42,413
42,413
42,413
466,544
Interest
15,448
14,480
13,247
12,087
10,818
9,463
8,018
6,520
4,825
3,089
1,222
99,217
Principal
15,913
16,880
18,114
19,274
20,543
21,898
23,343
24,841
26,536
28,272
30,139
245,753
31,361
31,361
31,361
31,361
31,361
31,361
31,361
31,361
31,361
31,361
31,361
344,970
334,000
51,306
400,000
300,000
WAGGA WAGGA CITY COUNCIL LONG TERM FINANCIAL PLAN
41
Appendix 7 - External Loan Projects and Debt Servicing continued BORROW YEAR
CAPITAL PROJECT
2011/12
Upgrade Civic Theatre Sound Systems - 6.44% - 15 years
2011/12
2011/12
2012/13
2011/12
2013/14
42
Australian Carbon Trust Project - 5% - 4 years
Robertson Oval - 6.44% - 15 years
Robertson Oval - 5.42% - 10 years
Equestrian Audit Recommendations - 6.44% 15 years
Equestrian Audit Recommendations - 4.84% 5 years + 6% 5 years
Amount Borrowed
2016/17
2017/18
2018/19
2019/20
2020/21
2021/22
2022/23
2023/24
2024/25
2025/26
2026/27
TOTALS
172,000 Interest
8,857
8,302
7,595
6,930
6,202
5,425
4,597
3,738
2,766
1,771
701
56,884
Principal
9,123
9,678
10,386
11,051
11,778
12,555
13,383
14,242
15,214
16,209
17,280
140,898
17,980
17,980
17,980
17,980
17,980
17,980
17,980
17,980
17,980
17,980
17,980
197,783
Interest
2,224
377
0
0
0
0
0
0
0
0
0
2,601
Principal
38,863
20,030
0
0
0
0
0
0
0
0
0
58,893
41,087
20,407
0
0
0
0
0
0
0
0
0
61,494
Interest
172,144
161,362
147,612
134,688
120,550
105,448
89,349
72,657
53,767
34,419
13,619
1,105,614
Principal
177,324
188,106
201,856
214,780
228,918
244,021
260,119
276,811
295,701
315,049
335,849
2,738,535
Interest
7,939
6,902
5,875
4,818
3,661
2,451
1,192
0
0
0
0
32,838
Principal
17,580
18,617
19,644
20,701
21,859
23,068
30,707
0
0
0
0
152,175
374,987
374,987
374,987
374,987
374,987
374,987
381,367
349,468
349,468
349,468
349,468
4,029,163
Interest
12,873
12,067
11,039
10,072
9,015
7,886
6,682
5,433
4,021
2,574
1,018
82,681
Principal
13,261
14,067
15,095
16,062
17,119
18,248
19,452
20,701
22,113
23,560
25,116
204,794
Interest
9,835
8,639
7,466
8,146
6,701
5,169
3,545
1,824
0
0
0
51,325
Principal
22,745
23,940
25,114
24,084
25,529
27,060
28,684
28,581
0
0
0
205,737
58,714
58,714
58,714
58,364
58,364
58,364
58,364
56,539
26,134
26,134
26,134
544,537
211,909
3,343,032
200,000
250,000
250,000
Appendix 7 - External Loan Projects and Debt Servicing continued BORROW YEAR
CAPITAL PROJECT
2011/12
Develop Botanic Gardens & Zoo - 6.44% - 15 years
2012/13
2012/13
2012/13
2012/13
2012/13
Develop Botanic Gardens & Zoo - 5.42% - 10 years
Jubilee Park Amenities Building - 5.42% - 10 years
Higgins Avenue Rehabilitation (LIRS) - 5.42% - 10 years
Reinstate Road Failures (LIRS) - 5.42% - 10 years
Soccer Development City Wide Strategy (LIRS) - 5.42% - 10 years
Amount Borrowed
2016/17
2017/18
2018/19
2019/20
2020/21
2021/22
2022/23
2023/24
2024/25
2025/26
2026/27
TOTALS
97,581 Interest
5,149
4,827
4,416
4,029
3,606
3,154
2,673
2,173
1,608
1,030
407
33,072
Principal
5,304
5,627
6,038
6,425
6,848
7,299
7,781
8,280
8,845
9,424
10,046
81,918
Interest
7,939
6,902
5,875
4,818
3,661
2,451
1,192
0
0
0
0
32,838
Principal
17,580
18,617
19,644
20,701
21,859
23,068
30,707
0
0
0
0
152,175
35,973
35,973
35,973
35,973
35,973
35,973
42,352
10,454
10,454
10,454
10,454
300,003
Interest
11,909
10,353
8,813
7,228
5,491
3,677
1,788
0
0
0
0
49,258
Principal
26,370
27,926
29,466
31,051
32,788
34,601
46,061
0
0
0
0
228,262
38,279
38,279
38,279
38,279
38,279
38,279
47,848
0
0
0
0
277,520
Interest
10,917
9,490
8,078
6,625
5,033
3,371
1,639
0
0
0
0
45,153
Principal
24,172
25,599
27,011
28,463
30,056
31,718
42,222
0
0
0
0
209,241
35,089
35,089
35,089
35,089
35,089
35,089
43,861
0
0
0
0
254,393
Interest
23,381
20,326
17,302
14,190
10,780
7,220
3,510
0
0
0
0
96,709
Principal
51,773
54,828
57,852
60,963
64,373
67,934
90,433
0
0
0
0
448,155
75,154
75,154
75,154
75,154
75,154
75,154
93,942
0
0
0
0
544,865
Interest
7,145
6,212
5,288
4,337
3,294
2,206
1,073
0
0
0
0
29,555
Principal
15,822
16,755
17,680
18,631
19,673
20,761
27,636
0
0
0
0
136,957
200,000
300,000
275,000
589,000
180,000
WAGGA WAGGA CITY COUNCIL LONG TERM FINANCIAL PLAN
43
Appendix 7 - External Loan Projects and Debt Servicing continued BORROW YEAR
CAPITAL PROJECT
2013/14
Soccer Development City Wide Strategy (LIRS) - 5.39% - 10 years
2014/15
2012/13
2013/14
Soccer Development City Wide Strategy (LIRS) - 4.19% - 10 years
Implement Tarcutta Street Gasworks Remediation 5.42% - 10 years (transferred from RIFL)
Implement Tarcutta Street Gasworks Remediation 4.84% 5 years + 6% 5 years
Amount Borrowed
2019/20
2020/21
2021/22
2022/23
2023/24
2024/25
2025/26
2026/27
TOTALS
20,596
18,345
15,973
13,576
10,809
8,033
5,117
2,021
0
0
0
94,469
Principal
40,956
43,207
45,579
47,976
50,743
53,519
56,435
59,531
0
0
0
397,946
Interest
13,337
12,023
10,684
9,279
7,767
6,246
4,577
2,898
1,145
0
0
67,956
Principal
30,950
32,263
33,602
35,008
36,520
38,041
39,710
41,389
43,142
0
0
330,625
128,806
128,806
128,806
128,806
128,806
128,806
134,548
105,839
44,287
0
0
1,057,509
Interest
30,169
26,227
22,325
18,310
13,910
9,316
4,528
0
0
0
0
124,786
Principal
66,803
70,745
74,647
78,662
83,063
87,657
116,687
0
0
0
0
578,265
73,354
64,437
55,682
60,755
49,977
38,553
26,443
13,607
0
0
0
382,807
169,640
178,557
187,312
179,627
190,405
201,829
213,939
213,169
0
0
0
1,534,479
339,966
339,966
339,966
337,355
337,355
337,355
361,598
226,776
0
0
0
2,620,336
873
759
646
530
403
270
131
0
0
0
0
3,612
1,934
2,048
2,161
2,277
2,404
2,537
3,378
0
0
0
0
16,739
360,155
760,000
1,864,610
22,000 Interest Principal
44
2018/19
Interest
Principal
New Amenities Building - Duke Kent Oval - 5.42% - 10 years
2017/18
473,500
Interest
2012/13
2016/17
Appendix 7 - External Loan Projects and Debt Servicing continued BORROW YEAR
CAPITAL PROJECT
2013/14
New Amenities Building - Duke Kent Oval - 4.84% 5 years + 6% 5 years
2012/13
2012/13
2017/18
2018/19
2013/14
Multi Purpose Stadium Facilities - 5.42% - 10 years
Multi Purpose Stadium Facilities - 5.42% - 10 years
Equex Multi Purpose Stadium Facility - 5% - 15 years
Bolton Park Multi Purpose Stadium Facility - 5% - 15 years
Oasis Energy Co-Generation Project - 4 years
Amount Borrowed
2016/17
2017/18
2018/19
2019/20
2020/21
2021/22
2022/23
2023/24
2024/25
2025/26
2026/27
TOTALS
31,680 Interest
1,246
1,095
946
1,032
849
655
449
231
0
0
0
6,503
Principal
2,882
3,033
3,182
3,051
3,234
3,428
3,634
3,621
0
0
0
26,066
6,935
6,935
6,935
6,890
6,890
6,890
7,592
3,852
0
0
0
52,920
Interest
2,421
2,105
1,792
1,470
1,116
748
363
0
0
0
0
10,016
Principal
5,362
5,678
5,991
6,314
6,667
7,036
9,366
0
0
0
0
46,413
Interest
3,970
3,451
2,938
2,409
1,830
1,226
596
0
0
0
0
16,419
Principal
8,790
9,309
9,822
10,350
10,929
11,534
15,354
0
0
0
0
76,087
Interest
0
0
166,401
158,690
150,593
142,091
133,164
123,791
113,949
103,615
92,764
1,185,056
Principal
0
0
154,228
161,940
170,036
178,538
187,465
196,838
206,680
217,014
227,865
1,700,606
Interest
0
0
0
210,597
200,837
190,590
179,830
168,532
156,669
144,213
131,135
1,382,404
Principal
0
0
0
195,191
204,950
215,198
225,958
237,256
249,119
261,575
274,653
1,863,899
20,543
20,543
341,172
746,960
746,960
746,960
752,096
726,417
726,417
726,417
726,417
6,280,902
234
0
0
0
0
0
0
0
0
0
0
234
18,782
0
0
0
0
0
0
0
0
0
0
18,782
19,016
0
0
0
0
0
0
0
0
0
0
19,016
61,000
100,000
3,328,021
4,211,940
200,912 Interest Principal
WAGGA WAGGA CITY COUNCIL LONG TERM FINANCIAL PLAN
45
Appendix 7 - External Loan Projects and Debt Servicing continued BORROW YEAR
CAPITAL PROJECT
2013/14
Equestrian Audit Recommendations - 4.84% 5 years + 6% - 5 years
2013/14
RRL Headquarters - $12K per year for 10 years
Amount Borrowed
2013/14
2014/15
2013/14
2013/14
46
Implement Animal Shelter Expansion (LIRS) - 4.19% - 10 years
City Levee Project - 4.84% - 5 years + 6% - 5 years
Rehabilitation Lakeside Drive (LIRS) - 5.39% - 10 years
2017/18
2018/19
2019/20
2020/21
2021/22
2022/23
2023/24
2024/25
2025/26
2026/27
TOTALS
100,000 Interest
3,934
3,456
2,986
3,258
2,680
2,068
1,418
730
0
0
0
20,530
Principal
9,098
9,576
10,046
9,633
10,212
10,824
11,474
11,432
0
0
0
82,295
13,032
13,032
13,032
12,892
12,892
12,892
12,892
12,162
0
0
0
102,825
12,000
12,000
12,000
12,000
12,000
12,000
12,000
12,000
0
0
0
96,000
12,000
12,000
12,000
12,000
12,000
12,000
12,000
12,000
0
0
0
96,000
Interest
5,127
4,567
3,976
3,380
2,691
2,000
1,274
503
0
0
0
23,517
Principal
10,195
10,756
11,346
11,943
12,632
13,323
14,049
14,819
0
0
0
99,062
Interest
20,076
18,098
16,083
13,968
11,691
9,401
6,890
4,362
1,724
0
0
102,292
Principal
46,588
48,565
50,581
52,696
54,973
57,262
59,774
62,302
64,940
0
0
497,680
81,986
81,986
81,986
81,986
81,986
81,986
81,986
81,986
66,664
0
0
722,550
Interest
7,858
6,903
5,965
6,508
5,354
4,130
2,833
1,458
0
0
0
41,009
Principal
18,173
19,128
20,066
19,243
20,398
21,621
22,919
22,836
0
0
0
164,384
26,031
26,031
26,031
25,751
25,751
25,751
25,751
24,294
0
0
0
205,393
Interest
22,776
20,287
17,665
15,014
11,953
8,883
5,658
2,235
0
0
0
104,471
Principal
45,292
47,781
50,404
53,055
56,116
59,185
62,410
65,834
0
0
0
440,077
120,000 Principal
Implement Animal Shelter Expansion (LIRS) - 5.39% - 10 years
2016/17
117,870
542,130
199,750
523,630
Appendix 7 - External Loan Projects and Debt Servicing continued BORROW YEAR
CAPITAL PROJECT
2014/15
Rehabilitation Lakeside Drive (LIRS) - 4.19% - 10 years
2016/17
2017/18
2016/17
2021/22
2017/18
RIFL Stage 1 - 3.25% - 20 years
RIFL Stage 1 - 3.25% - 20 years
Lawn Cemetery Master Plan Works - 4% - 10 years
Lawn Cemetery Master Plan Works - 6% - 10 years
Footpath Construction Program - 4% - 10 years
Amount Borrowed
2016/17
2017/18
2018/19
2019/20
2020/21
2021/22
2022/23
2023/24
2024/25
2025/26
2026/27
TOTALS
112,370 Interest
4,161
3,751
3,334
2,895
2,423
1,949
1,428
904
357
0
0
21,203
Principal
9,656
10,066
10,484
10,923
11,394
11,869
12,390
12,914
13,460
0
0
103,157
81,886
81,886
81,886
81,886
81,886
81,886
81,886
81,886
13,818
0
0
668,907
Interest
0
50,047
48,232
46,357
44,422
42,423
40,360
38,229
36,029
33,758
31,413
411,270
Principal
0
55,867
57,682
59,557
61,493
63,491
65,555
67,685
69,885
72,156
74,501
647,871
Interest
0
0
94,769
91,331
87,781
84,116
80,332
76,424
72,390
68,225
63,924
719,293
Principal
0
0
105,788
109,227
112,776
116,442
120,226
124,133
128,168
132,333
136,634
1,085,728
0
105,914
306,472
306,472
306,472
306,472
306,472
306,472
306,472
306,472
306,472
2,864,162
Interest
0
7,687
7,046
6,381
5,688
4,968
4,219
3,440
2,630
1,787
911
44,757
Principal
0
16,006
16,646
17,312
18,004
18,724
19,473
20,252
21,062
21,905
21,870
191,254
Interest
0
0
0
0
0
0
45,000
41,586
37,967
34,131
30,065
188,749
Principal
0
0
0
0
0
0
56,901
60,315
63,934
67,770
71,836
320,756
0
23,692
23,692
23,692
23,692
23,692
125,593
125,593
125,593
125,593
124,682
745,516
Interest
0
0
40,000
36,668
33,203
29,600
25,852
21,955
17,901
13,686
9,302
228,167
Principal
0
0
83,291
86,623
90,087
93,691
97,439
101,336
105,390
109,605
113,989
881,451
0
0
123,291
123,291
123,291
123,291
123,291
123,291
123,291
123,291
123,291
1,109,619
1,539,922
2,915,980
192,165
750,000
1,000,000
WAGGA WAGGA CITY COUNCIL LONG TERM FINANCIAL PLAN
47
Appendix 7 - External Loan Projects and Debt Servicing continued BORROW YEAR
CAPITAL PROJECT
2018/19
Construct Estella Community Centre - 5% - 10 years
2018/19
2018/19
Jubilee Park Synthetic Hockey Fields Replace - 5% - 10 years
Exhibition Centre Kooringal Road Exit - 5% - 10 years
TOTAL GENERAL DEBT SERVICING
Amount Borrowed
2016/17
2017/18
2018/19
2019/20
2020/21
2021/22
2022/23
2023/24
2024/25
2025/26
2026/27
TOTALS
100,000 Interest
0
0
0
5,000
4,602
4,185
3,747
3,287
2,803
2,296
1,763
27,684
Principal
0
0
0
7,950
8,348
8,765
9,204
9,664
10,147
10,654
11,187
75,920
0
0
0
12,950
12,950
12,950
12,950
12,950
12,950
12,950
12,950
103,604
Interest
0
0
0
11,250
10,356
9,416
8,430
7,395
6,308
5,166
3,968
62,289
Principal
0
0
0
17,889
18,783
19,722
20,708
21,744
22,831
23,972
25,171
170,820
0
0
0
29,139
29,139
29,139
29,139
29,139
29,139
29,139
29,139
233,108
Interest
0
0
0
88,758
81,701
74,292
66,512
58,343
49,765
40,759
31,303
491,432
Principal
0
0
0
141,133
148,190
155,599
163,379
171,548
180,126
189,132
198,588
1,347,695
0
0
0
229,891
229,891
229,891
229,891
229,891
229,891
229,891
229,891
1,839,128
Interest
568,426
572,094
813,668
1,074,309
975,237
871,382
806,862
690,667
586,156
503,021
418,461
7,880,284
Principal
997,342
1,083,584
1,466,081
1,879,782
1,978,854
2,082,709
2,334,842
2,004,626
1,654,706
1,613,073
1,696,722
18,792,322
1,565,769
1,655,678
2,279,749
2,954,091
2,954,091
2,954,091
3,141,704
2,695,294
2,240,862
2,116,094
2,115,183
26,672,606
Interest
191,487
173,457
154,800
136,257
113,620
90,565
65,868
39,269
11,208
0
0
976,531
Principal
245,818
263,848
282,505
301,048
323,685
346,740
371,437
398,036
316,770
0
0
2,849,887
437,305
437,305
437,305
437,305
437,305
437,305
437,305
437,305
327,979
0
0
3,826,418
225,000
1,775,157
28,203,222
Airport Masterplan Projects 2009/10
48
Airport Pavement Upgrade 6.94% - 10 years (refinanced in 2014/15)
3,133,340
Appendix 7 - External Loan Projects and Debt Servicing continued BORROW YEAR
CAPITAL PROJECT
2011/12
Develop Precinct 2A - 6.44% 15 years
2016/17
2017/18
2018/19
2025/26
Airport Masterplan - 4% - 10 years
Airport Masterplan - 4% - 10 years
Airport Masterplan - 5% - 10 years
Airport Masterplan - 7% - 10 years
TOTAL AIRPORT DEBT SERVICING
Amount Borrowed
2016/17
2017/18
2018/19
2019/20
2020/21
2021/22
2022/23
2023/24
2024/25
2025/26
2026/27
TOTALS
6,015,614 Interest
309,765
290,363
265,621
242,364
216,923
189,747
160,779
130,742
96,751
61,935
24,507
1,989,496
Principal
319,085
338,487
363,229
386,486
411,927
439,102
468,071
498,108
532,099
566,915
604,343
4,927,853
628,850
628,850
628,850
628,850
628,850
628,850
628,850
628,850
628,850
628,850
628,850
6,917,349
Interest
0
32,280
29,591
26,795
23,887
20,863
17,718
14,446
11,044
7,506
3,827
187,958
Principal
0
67,216
69,904
72,701
75,609
78,633
81,778
85,049
88,451
91,989
91,842
803,173
0
99,496
99,496
99,496
99,496
99,496
99,496
99,496
99,496
99,496
95,669
991,131
Interest
0
0
132,000
121,006
109,571
97,680
85,313
72,451
59,074
45,163
30,695
752,953
Principal
0
0
274,860
285,855
297,289
309,180
321,547
334,409
347,786
361,697
376,165
2,908,788
0
0
406,860
406,860
406,860
406,860
406,860
406,860
406,860
406,860
406,860
3,661,741
Interest
0
0
0
22,500
20,711
18,833
16,861
14,790
12,615
10,332
7,935
124,577
Principal
0
0
0
35,777
37,566
39,444
41,416
43,487
45,662
47,945
50,342
341,639
0
0
0
58,277
58,277
58,277
58,277
58,277
58,277
58,277
58,277
466,216
Interest
0
0
0
0
0
0
0
0
0
0
294,000
294,000
Principal
0
0
0
0
0
0
0
0
0
0
303,986
303,986
0
0
0
0
0
0
0
0
0
0
597,986
597,986
Interest
501,252
496,100
582,012
548,921
484,713
417,688
346,538
271,698
190,693
124,936
360,964
4,325,515
Principal
564,903
669,550
990,498
1,081,867
1,146,075
1,213,100
1,284,250
1,359,090
1,330,768
1,068,547
1,426,678
12,135,326
1,066,155
1,165,651
1,572,511
1,630,788
1,630,788
1,630,788
1,630,788
1,630,788
1,521,462
1,193,483
1,787,642
16,460,841
807,000
3,300,000
450,000
4,200,000
17,905,954
WAGGA WAGGA CITY COUNCIL LONG TERM FINANCIAL PLAN
49
Appendix 7 - External Loan Projects and Debt Servicing continued BORROW YEAR
CAPITAL PROJECT
Amount Borrowed
2016/17
2017/18
2018/19
2019/20
2020/21
2021/22
2022/23
2023/24
2024/25
2025/26
2026/27
TOTALS
Stormwater Levy Projects 2011/12
Remediate Wollundry Lagoon 6.44% - 15 years
1,005,000 Interest
51,751
48,510
44,376
40,491
36,240
31,700
26,861
21,842
16,164
10,347
4,094
332,376
Principal
53,308
56,549
60,683
64,568
68,819
73,359
78,198
83,217
88,895
94,712
100,965
823,273
105,059
105,059
105,059
105,059
105,059
105,059
105,059
105,059
105,059
105,059
105,059
1,155,648
2,365,447
2,319,305
2,269,721
2,216,438
2,159,180
2,097,651
2,031,531
1,960,479
1,884,127
1,802,078
1,713,909
22,819,866
618,517
664,659
714,243
767,526
824,784
886,313
952,433
1,023,485
1,099,837
1,181,886
1,270,055
10,003,738
2,983,964
2,983,964
2,983,964
2,983,964
2,983,964
2,983,964
2,983,964
2,983,964
2,983,964
2,983,964
2,983,964
32,823,604
2,365,447
2,319,305
2,269,721
2,216,438
2,159,180
2,097,651
2,031,531
1,960,479
1,884,127
1,802,078
1,713,909
22,819,866
618,517
664,659
714,243
767,526
824,784
886,313
952,433
1,023,485
1,099,837
1,181,886
1,270,055
10,003,738
2,983,964
2,983,964
2,983,964
2,983,964
2,983,964
2,983,964
2,983,964
2,983,964
2,983,964
2,983,964
2,983,964
32,823,604
Interest
3,486,876
3,436,009
3,709,777
3,880,159
3,655,370
3,418,421
3,211,791
2,944,687
2,677,140
2,440,382
2,497,428
35,358,041
Principal
2,234,071
2,474,343
3,231,506
3,793,743
4,018,531
4,255,481
4,649,724
4,470,418
4,174,207
3,958,218
4,494,419
41,754,658
5,720,946
5,910,352
6,941,283
7,673,902
7,673,902
7,673,902
7,861,515
7,415,104
6,851,347
6,398,600
6,991,847
77,112,699
TOTAL STORMWATER LEVY DEBT SERVICING Sewer Fund Projects 2007/08
Sewer 2010 - 7.1% - 30 years
36,000,000 Interest Principal
TOTAL SEWER DEBT SERVICING Total Debt Servicing Costs TOTAL SEWER DEBT SERVICING
36,000,000 Interest Principal
TOTAL CONSOLIDATED DEBT SERVICING
50
83,114,176
Appendix 8a - One-Off Capital Projects 2017/18 - 2026/27 Ref
Project Title
Funding Source
2017/18
2018/19
2019/20
2020/21
2021/22
2022/23
2023/24
2024/25
2025/26
2026/27
Financial Sector 1
Northern Wagga (Estella/Boorooma) Suburban Playground
2
Estella Sportsground Land Acquisition & Development (Acquisition 17/18 S94* OS22, Development 18/19 - OS4)
1,500,000
3
Land Adjacent Estella Sportsground Acquisition (OS28)
S94*
1,500,000
4
Estella - Neighbourhood Open Space S94* Works
31,816
5
Upgrade Jubilee Park Clubhouse Ground Level Changeroom - S94 Plan - Lloyd Community Centre C2
S94*
6
Jubilee Park - Replace existing synthetic surfaces at the Jubilee Park Hockey Complex
Hockey Association Contribution $200,000 + Infrastructure Reserve $200,000 + Borrowings $225,000
7
Construction of Ashmont Neighbourhood Park OS7 - (Kokoda Park + Graham Park)
S94A*
8
Replace Softfall - Botanic Gardens Adventure Playground
GPR
9
Riverside - Continuation of Shared Path Network
GPR $52K + Pedestrian River Crossing Reserve $48K
10
Exhibition Centre - Kooringal Road Exit
Borrowings (GPR Future Years Loan Repayments)
S94*
Total Capital Works - Financial Sector
150,000 1,100,000
200,000
100,000
625,000
100,000 84,840 100,000
1,775,157 300,000
5,431,973
1,334,840
200,000
0
0
0
0
0
0
Community Sector 11
Narrung Street Wetlands Contribution Marrambidya Wetland Enhancements
30,000
12
Connecting - Exhibition Centre & Bolton Pk
79,200
Public Art Reserve
WAGGA WAGGA CITY COUNCIL LONG TERM FINANCIAL PLAN
51
Appendix 8a - One-Off Capital Projects 2017/18 - 2026/27 continued Ref
Project Title
Disability Inclusion Access Plan 13 Implementation - Art Gallery and Museum Access Upgrades 14
Civic Theatre Auditorium & Foyer Refurbishment
Funding Source S94* Civic Building Recoupment S94* Civic Theatre Recoupment $642K + Grant Funding $45K
Total Capital Works - Community Sector
2017/18
2018/19
2019/20
2020/21
2021/22
2022/23
2023/24
2024/25
2025/26
2026/27
37,800
687,317 834,317
0
0
0
0
0
0
0
0
Commercial Operations Sector 15
Lawn Cemetery Master Plan Stage 2A Works
Borrowings (Cemetery Capital Reserve Future Years Loan Repayments)
16
Wagga Wagga Lawn Cemetery & Crematorium Office Refurbishment
Cemetery Capital Reserve
17
Wagga Wagga Lawn Cemetery & Crematorium Furnace Reline
Cemetery Capital Reserve
18
Sewer - Pump Station - SPS03 Simmons Street - New Assets
Sewer Reserve
19
Sewer - SPS04 Bolton Park - New Assets
Sewer Reserve
80,000
20
Sewer - Pump Station - SPS02 Forsyth Street - Renewals
Sewer Reserve
600,000
21
Sewer - Pump Station - SPS06 Shaw Sewer Reserve Street - Renewals
22
Sewer - Pump Station - SPS09 Cartwrights Hill - Renewals
Sewer Reserve
23
Sewer - Pump Station - SPS17 Cleardale - Renewals
Sewer Reserve
24
Sewer - Pump Station - SPS18 Industrial - Renewals
Sewer Reserve
Sewer - Pump Station - SPS22 25 Elizabeth Avenue, Forest Hill - New Assets
Sewer Reserve
1,032,585
Sewer - Pump Station - SPS23 Ashmont - New Assets
Sewer Reserve
100,000
26
52
750,000
500,000 100,000 420,000 550,000
280,000 250,000 300,000 300,000
1,237,543
822,870
0
Appendix 8a - One-Off Capital Projects 2017/18 - 2026/27 continued Ref
Project Title
Funding Source
2017/18
2018/19
2019/20
2020/21
2021/22
2022/23
27
Sewer - Pump Station - SPS24 Lakehaven West - New Assets
Sewer Reserve
28
Sewer - Pump Station - SPS29 Gobba - New Assets
Sewer Reserve
29
Sewer - Pump Station - SPS30 Bomen - New Assets
Sewer Reserve
30
Sewer - Pump Station - SPS31 Uranquinty - New Assets
Sewer Reserve
56,743
31
Sewer - Pump Station - SPS39 Copland Street - New Assets
Sewer Reserve
414,910
32
Sewer - Pump Station - SPS41 Glenfield East - New Assets
Sewer Reserve
33
Sewer - Pump Station - SPS49 Springvale - New Assets
Sewer Reserve
34
Sewer Treatment Works - Forest Hill Plant - New Assets
Sewer Reserve
35
Sewer - Pump Station - SPS31 Uranquinty - Renewals
Sewer Reserve
36
Sewer Treatment Works - Collingullie Villages - Renewals
Sewer Reserve
37
Sewer - Pump Station - SPS 08 Boorooma - Increase Pump Capacity
Sewer Reserve
76,689
Sewer - Pump Station - SPS 08 38 Boorooma - Emergency/Wet Weather Sewer Reserve Detention STG
254,414
Sewer - Pump Station - SPS01 + 39 SPS02 Sewer Rising Main Network Diversion 40
Sewer Reserve
2024/25
2025/26
2026/27
61,421 286,242 1,816,072
1,810,893
1,076,386 15,352
100,000
581,105
1,118,677 520,000 40,781
801,984
Sewer - Ashmont SPS, Rising Main & Sewer Reserve Gravity Main Upgrade
41 Install Sewer Network Extensions
2023/24
654,671
Sewer Reserve
1,224,096
42
Wollundry Lagoon Levee Bank and Pump Out from theatre
S94* Civic Building Recoupment
200,000
43
Upgrade Airconditioning - Civic Centre
S94* Civic Building Recoupment
500,000
500,000
250,000
250,000
WAGGA WAGGA CITY COUNCIL LONG TERM FINANCIAL PLAN
53
Appendix 8a - One-Off Capital Projects 2017/18 - 2026/27 continued Ref
Project Title
Funding Source
2017/18
44
Civic Building Energy Efficiency Project - Civic Building Solar Panels
Sustainable Energy Reserve
45
Buildings - Civic Theatre - AirConditioning Upgrade
Civic Theatre Operating Reserve
46
Civic Centre Southern Lift Control Upgrade
GPR
102,000
47
Accessible Adult Changeroom Stage 1
GPR
171,993
48
Accessible Adult Changeroom Stage 2
GPR
2019/20
2020/21
6,331,730
51 New Footpaths
GPR $100K + Borrowings $1M
1,100,000
52 Eunony Bridge Replacement
Grant + GPR
2,330,493
Special Rate Variation (SRV) $6.22M + Grant $12.73M
4,418,675
4,639,609
4,871,590
5,115,169
19,157,753
8,418,823
6,527,460
8,500,734
Total Capital Works - Commercial Operations Sector
2023/24
3,152,684
1,167,005
2,237,347
Commercial Development Sector 54 GWMC - Road Rehabilitation 55
GWMC - Purchase of Large Cardboard Compactor
56 GWMC - Additional Leachate Pond 57
GWMC - Progressive Site Rehabilitation
Solid Waste Reserve
300,000
Solid Waste Reserve
250,000
Solid Waste Reserve
1,500,000
Solid Waste Reserve
230,000
58 LMC - Layback Kerb to Cattle Load in LMC Reserve
16,995
59 LMC - Landscaping
70,000
54
LMC Reserve
2024/25
2025/26
2026/27
191,891
2017/18 - Borrowings $2.92M (GPR + S94A Riverina Intermodal Freight & Logistics $500K - Future Years 50 Hub Loan Repayments) + Sale of Land $3.42M
Upgrade Main City (1 in 100) + North Wagga (1 in 20) Levee Systems
2022/23
303,000
27,220
53
2021/22
125,000
GPR $13,610 + Grant $13,610
49 Lake Albert Hall Accessible Ramp
2018/19
0
500,000
0
Appendix 8a - One-Off Capital Projects 2017/18 - 2026/27 continued Ref
Project Title
Funding Source
2017/18
2018/19
2019/20
2020/21
2021/22
2022/23
2023/24
60 LMC install new fan draft for receivals LMC Reserve
45,320
61 LMC CCTV & security (partial)
LMC Reserve
33,990
62 LMC new sheep drafts
LMC Reserve
63 LMC new cow draft and selling pens
LMC Reserve
64 LMC new sheep stacking pens
LMC Reserve
83,467
65 LMC new sheep delivery pens
LMC Reserve
2,274,496
LMC Light Vehicle Traffic Management
LMC Reserve
1,307,660
LMC Reserve
2,086,693
66
67 LMC new circulating road (partial)
69 Airport Acquisition
Borrowings (Airport Reserve - Future Years Loan Repayments)
1,300,000
70 Airport - Reseal roads/line marking
Airport Reserve
100,000
71 Airport - Taxiway C shoulders
Airport Reserve
55,000
72 Airport - Bays 1-3 concrete pads
Airport Reserve
45,000
Airport Reserve
100,000
74 Airport - Bay 6 reconstruct
Borrowings (Airport Reserve - Future Years Loan Repayments)
450,000
75 Airport - Terminal Refresh
Airport Reserve
Airport - Car park reseal (southern section)
76
Airport - Taxiways A, B, D, E, F enrichment
Airport Reserve
77
Airport - Car park system replacement
Airport Reserve
Airport - Runway 05/23 and Taxiway C overlay
Airport Reserve $2.8M + Borrowings $4.2M (Airport Reserve Future Years Loan Repayments)
78
2026/27
461,298
2,000,000
73
2025/26
41,734
Borrowings (Airport Airport - Redevelop terminal - Internal Reserve - Future Years Baggage Claim and Retail Section Loan Repayments)
68
2024/25
75,000 220,000 200,000
7,000,000
WAGGA WAGGA CITY COUNCIL LONG TERM FINANCIAL PLAN
55
Appendix 8a - One-Off Capital Projects 2017/18 - 2026/27 continued Ref
Project Title
Funding Source
Electrical motors for the roller doors at GPR 79 the Depot workshop
2017/18
2018/19
2019/20
2020/21
Oasis Building Renewal Reserve
81 Oasis - Diving Board Replacements
Oasis Building Renewal Reserve
82 Oasis - Filter Sand for All Pools
Oasis Plant Reserve
Oasis - Chemical Controller Equipment (All Pools)
Oasis Plant Reserve
130,000
Oasis Plant Reserve
145,000 60,000
84 Oasis - Circulation pumps (All Pools) 85
Oasis - Chlorine & Acid pumps (All Pools)
Oasis Plant Reserve
86
Oasis - Pool Heating Systems (All Pools)
Oasis Plant Reserve
87 Oasis - 25m Pool Dive Starting Blocks
Oasis Building Renewal Reserve
2023/24
2024/25
2025/26
2026/27
111,100 30,300 195,000
200,000 17,853
Total Capital Works - Commercial Development Sector
20,642,370
6,156,500
5,654,890
5,700,169
75,000
3,039,261
3,931,087
200,000
7,000,000
0
TOTAL LTFP CAPITAL PROGRAM
25,827,328 14,675,796
8,092,600
9,035,734
3,227,684
4,206,266
6,168,434
200,000
7,500,000
0
* Timing of project is subject to receipt of sufficient Section 94, Section 94A and DSP funds
56
2022/23
35,000
80 Oasis Pool Joint Replacement
83
2021/22
Appendix 8b - Recurrent Capital Projects 2017/18 - 2026/27 Ref
Project Title
Funding Source
2017/18
2018/19
2019/20
2020/21
2021/22
2022/23
2023/24
2024/25
2025/26
2026/27
Financial Sector 1
2
3
4
5
6
Implement Sportsgrounds Lighting Program Anderson Oval (Mt Austin)
GPR $180,000 + Contributions $144,500
Implement Sportsgrounds Lighting Program - Frenchs Field (Mt Austin)
GPR $180,000 + Contributions $122,500
Implement Sportsgrounds Lighting Program - Harris Park (Mt Austin)
GPR $180,000 + Contributions $282,000
462,000
Implement Sportsgrounds Lighting Program - McPherson Oval (Nth Wagga)
GPR $180,000 + Contributions $177,000
357,000
Implement Sportsgrounds Lighting Program Estella
GPR $180,000 + Contributions $150,000
Implement Sportsgrounds Lighting Program Jack Misson Oval (Ashmont)
GPR $180,000 + Contributions $144,500
7
Renew Recreational GPR Assets
8
Renew Parks Facilities
9
Renew Playground Equipment
324,500
302,500
330,000
324,500
21,632
22,497
23,397
24,333
25,306
26,319
27,371
28,466
29,605
30,789
GPR
117,820
122,533
127,434
132,532
137,833
143,346
149,080
155,043
161,245
167,695
GPR
140,000
325,000
100,000
160,000
40,000
20,000
80,000
180,000
340,000
WAGGA WAGGA CITY COUNCIL LONG TERM FINANCIAL PLAN
57
Appendix 8b - Recurrent Capital Projects 2017/18 - 2026/27 continued Ref 10 11
12
Project Title
Funding Source
Renew Recreational S94A $9,653 + GPR Facilities balance Replace Plant and Equipment
Plant Replacement Reserve $3,922,950 + Sale of Plant $1,262,650 (amounts vary each fin yr)
Corporate Hardware GPR Purchases Total Capital Works - Financial Sector
2017/18
2018/19
2019/20
2020/21
2021/22
2022/23
2023/24
2024/25
2025/26
2026/27
138,830
144,383
150,158
156,164
162,411
168,907
175,664
182,690
189,998
197,598
5,185,600
3,412,300
2,591,600
3,837,000
4,850,600
2,799,000
3,836,600
5,933,400
3,013,100
3,475,000
505,000
695,000
433,000
645,000
757,000
415,000
395,000
393,000
910,000
732,000
6,108,882
5,540,713
3,728,090
5,279,529
6,303,150
3,897,072
4,663,715
6,872,600
4,643,948
4,603,082
Community Sector 13
Upgrade of Backstage Equipment - Civic Theatre
GPR
10,816
11,249
11,699
12,167
12,653
13,159
13,686
14,233
14,802
15,394
14
Acquire pieces for the Australian Print Collection
GPR
8,571
8,874
9,189
9,517
9,857
10,212
10,580
10,963
11,362
11,776
15
Acquire pieces for the National Art Glass Collection
GPR
3,928
22,185
22,973
23,791
24,643
25,529
26,450
27,408
28,404
29,440
23,315
42,308
43,860
45,475
47,154
48,900
50,716
52,604
54,568
56,611
Total Capital Works - Community Sector Commercial Operations Sector 16
Upgrade Existing Bus Shelters
GPR
20,000
17
Implement Street Lighting Improvements Program - Roads and Traffic Facilities (as per schedule)
GPR
50,000
50,000
50,000
50,000
50,000
50,000
50,000
50,000
50,000
50,000
Capital renewal reseal program
GPR + Regional Roads Block Grant $295,873 (incrementing 3% each yr)
1,589,229
1,656,715
1,729,233
1,807,233
1,891,210
1,981,709
2,076,539
2,176,212
2,274,142
2,376,478
Conduct Urban Asphalt Program
GPR
754,971
786,313
818,440
851,852
886,599
922,737
960,320
999,406
1,040,041
1,082,297
18
19
58
20,000
20,000
20,000
20,000
Appendix 8b - Recurrent Capital Projects 2017/18 - 2026/27 continued Ref
Project Title
Funding Source
2017/18
2018/19
2019/20
2020/21
2021/22
2022/23
2023/24
2024/25
2025/26
2026/27
3,075,457
3,181,543
3,326,060
3,481,553
3,649,011
3,829,525
4,018,713
4,209,302
4,381,282
4,560,126
Pavement Rehabilitation Program
2017/18 - R2R Grant $2,465,958 + Regional Roads Block Grant $609,499, 2018/19 onwards - R2R Grant $841,526 (incrementing 3% each year) + Regional Roads Block Grant $627,784 (incrementing 3% each year) + GPR Balance
21
Replace Kerb and Gutter
GPR
436,705
455,215
474,038
493,614
513,973
535,147
557,167
580,067
603,870
628,622
22
Gravel Resheets
GPR
1,482,383
1,548,264
1,614,079
1,682,525
1,753,709
1,827,738
1,904,728
1,984,797
2,067,981
2,154,476
23
Renew and Replace GPR Culverts
527,914
551,650
575,261
599,816
625,353
651,911
679,531
708,256
738,094
769,119
24
Eliminate Sewer Joint Connections
Sewer Reserve
50,000
50,750
51,511
52,284
53,068
53,864
54,672
55,492
56,325
57,169
25
Implement renewal program for Gravity Sewer
Sewer Reserve
133,900
137,917
142,055
146,316
150,706
155,227
159,884
164,680
169,621
174,709
26
Implement Sewer Mains Rehabilitation Sewer Reserve Program
1,200,000
1,236,000
1,273,080
1,311,272
1,350,611
1,391,129
1,432,863
1,475,849
1,520,124
1,565,728
27
Replacement and Renewal of Sewer Plant
Sewer Reserve
50,750
51,511
52,284
53,068
53,864
54,672
55,492
56,325
57,169
58,027
28
Renew Community Amenities - Bolton Park
GPR
29
Renew Community Amenities Anderson Oval
GPR
30
Renew Community Amenities - Frenchs GPR Fields
20
202,590
214,928
208,668
WAGGA WAGGA CITY COUNCIL LONG TERM FINANCIAL PLAN
59
Appendix 8b - Recurrent Capital Projects 2017/18 - 2026/27 continued Ref
Project Title
Funding Source
31
Renew Community Amenities - Kessler Park
GPR
32
Renew Community Amenities Ashmont Oval
GPR
33
Renew Community Amenities - Forest Hill Oval
GPR
34
Renew Community Amenities Uranquinty Sports Ground
GPR
35
Renew Community Amenities - Jubilee/ Connolly Park
GPR
36
Renew Community Amenities - Gissing Oval
GPR
37
Renew Community Amenities - Tarcutta GPR Public Convenience
38
Renew Community Amenities - Apex Park
2017/18
2018/19
2020/21
2021/22
2022/23
2023/24
2024/25
2025/26
2026/27
221,375
228,016
234,856
241,901
249,158
256,633
GPR
256,633
Total Capital Works - Commercial Operations Sector
15,426,643
14,208,538
13,559,587
15,434,548
17,043,285
15,120,322
16,669,789
19,271,238
17,402,948
18,194,594
TOTAL LTFP CAPITAL PROGRAM
15,706,095
15,497,568
14,112,919
16,075,913
17,576,424
15,634,487
16,926,240
19,634,748
17,933,798
18,393,078
* Timing of project is subject to receipt of sufficient Section 94, Section 94A and DSP funds
60
2019/20
Appendix 8c - Capital Program Concepts List 2017/18 - 2026/27 Ref
Project Title
Funding Source
2017/18
2018/19
2019/20
2020/21
2021/22
2022/23
2023/24
2024/25
2025/26
2026/27
Financial Sector 1
Riverside - Continuation of Shared Path Network
GPR
Total Project Concepts Financial Sector
100,000 0
100,000
0
0
0
0
0
0
0
0
100,000
100,000
100,000
100,000
100,000
100,000
100,000
100,000
100,000
1,300,000
100,000
100,000
100,000
100,000
100,000
100,000
100,000
100,000
Community Sector
2
Construct Estella Community Centre
S94* $600,000 + GPR $199,643 + S94 (Old Plan) $121,838 + Reserve $178,519 + Borrowings $100,000 (GPR - Future Years Loan Repayments)
3
Public Art Projects - TBA
Public Art Reserve
Total Project Concepts - Community Sector
1,200,000
0
Commercial Operations Sector 4
Boorooma Street Slip Lane into Boorooma West
S94*
5
Glenfield Road Corridor â&#x20AC;&#x201C; Works to improve traffic flow (RT16)
S94*
6
Glenfield Road/Pearson St - Red Hill Rd to Dobney Ave Widening S94* to 4 lanes (Full length-3 km)
100,000
7
Bakers Lane Widening + Intersection Upgrades Sturt Hwy S94* & Inglewood Rd)
50,000
8
Bourke Street and Bourkelands Drive Intersection Upgrade
S94*
107,252
9
Kooringal Road - Works to improve traffic flow (RT30)
S94*
100,000
10
Harris Road/Pine Gully Road Dual Lane Roundabout
S94*
1,211,564
11
Old Narrandera Road - Second Carriageway for 600m
S94A* $100,000 + S94* $737,428
297,000 3,117,550
100,000
1,294,272
341,945
1,079,768
637,428
100,000
WAGGA WAGGA CITY COUNCIL LONG TERM FINANCIAL PLAN
61
Appendix 8c - Capital Program Concepts List 2017/18 - 2026/27 continued Ref 12
Project Title Old Narrandera Road/Olympic Highway Roundabout
13 Pine Gully Road - Bike Track
Funding Source S94A* $100,000 + S94* $577,886 S94*
2017/18
2018/19
577,886
30,000
96,510
Pine Gully Road - Second Carriageway for 1.2km
S94A* $100,000 + S94* $1,840,965
100,000
15
Pine Gully Road/Old Narrandera Road - Intersection Upgrade
S94*
100,000
16
Red Hill Rd – Widen to 4 lanes Plumpton Rd to Glenfield Plus widening at Dalman & Yentoo 2.7km
S94*
100,000
17
Red Hill Road and Hudson Drive – Intersection improvements
S94*
16,088
91,164
18
Supplementary Regional Roads Block Grant - project TBA
Block Grant -Supp
199,000
199,000
19
Regional Roads Repair Block Grant - project TBA
Repair Block Grant
400,000
20
Implement Pedestrian Access and Mobility Program (PAMP)
Grant $42,000 + GPR $42,000 Grant $30,000 + GPR $30,000
2021/22
2022/23
2023/24
2024/25
2025/26
2026/27
1,840,965 977,439
144,790
620,475
100,000
199,000
199,000
199,000
199,000
199,000
199,000
199,000
199,000
400,000
400,000
400,000
400,000
400,000
400,000
400,000
400,000
400,000
84,000
84,000
84,000
84,000
84,000
84,000
84,000
84,000
84,000
84,000
60,000
60,000
60,000
60,000
60,000
60,000
60,000
60,000
60,000
60,000
22
Renew Sewage Treatment Works Sewer Reserve - Tarcutta
100,000
23
Sewer - Pump Station - SPS15 Sewer Reserve Hammond Avenue - New Assets
401,016
24
Sewer - Pump Station - SPS01 Sheppard Street - Renewals
Sewer Reserve
25
Sewer - Pump Station - SPS15 Hammond Avenue - Renewals
Sewer Reserve
Sewer - Pump Station - SPS21 26 Smith Street Forest Hill Renewals
Sewer Reserve
300,000
27
Sewer - Pump Station - SPS26 Kyeamba - Renewals
Sewer Reserve
180,000
28
Sewer - Pump Station - SPS27 Tarcoola - Renewals
Sewer Reserve
170,000
62
2020/21
100,000
14
21 Implement Cycleways
2019/20
12,947
350,000 1,000,000
Appendix 8c - Capital Program Concepts List 2017/18 - 2026/27 continued Ref 29
Project Title Sewer - Gravity Network Extension - New Assets
Implement Stormwater Drainage Improvements - Jubilee Oval to 30 Red Hill Rd - Wagga West DSP Area
Funding Source Sewer Reserve
2017/18 100,000
2018/19
289,580
Undertake Stormwater Drainage Stormwater DSP * $119,102 Upgrade - Contour Ridge (Lloyd) + Stormwater Drainage 31 approx 5 km - Wagga West DSP Reserve $9,600 Area
128,702
Undertake Stormwater Drainage Stormwater DSP * $248,129 32 Upgrade - Day, Higgins, Tarcutta + Stormwater Drainage St - Wagga West DSP Area Reserve $20,000
268,129
34
Stormwater DSP Project Allocation - TBA
2020/21
797,803
Stormwater DSP * $265,580 + Civil Projects Reserve $24,000
Improve Stormwater drainage - Kincaid St end to Flowerdale 33 pumping station - Wagga West DSP Area
2019/20
2021/22
2022/23
2023/24
2024/25
2025/26
2026/27
265,494
Stormwater DSP * $318,695 + Civil Projects $28,800
347,495
Stormwater DSP*
500,000
500,000
500,000
500,000
500,000
500,000
500,000
3,389,054
4,069,934
1,355,947
1,243,000
2,322,768
1,243,000
1,243,000
35 Murray St Stormwater Project
Stormwater Levy
Civic Building Energy Efficiency 36 Project - Library Lights
S94* Civic Building Recoupment
29,200
Civic Building Energy Efficiency 37 Project - Historic Council Chambers Lights
S94* Civic Building Recoupment
88,809
Civic Building Energy Efficiency 38 Project - Art Gallery & Glass Gallery Lights
S94* Civic Building Recoupment
399,278
39 Bolton Park Accessible Toilet
GPR
136,209
40 Bolton Park Stadium Upgrade
Borrowings $4,211,940 + S94* $68,657 + Royal Lifesaving NSW Contribution $300,000
Total Project Concepts - Commercial Operations Sector
3,200,000
4,580,597 4,409,417 14,216,525
4,014,711
WAGGA WAGGA CITY COUNCIL LONG TERM FINANCIAL PLAN
63
Appendix 8c - Capital Program Concepts List 2017/18 - 2026/27 continued Ref
Project Title
Funding Source
2017/18
2018/19
2019/20
2020/21
2021/22
2022/23
2023/24
2024/25
2025/26
2026/27
Commercial Development Sector GWMC - Construction of a 41 new Waste Cell (Design + Construction)
Solid Waste Reserve
42 GWMC - Constuct RRC
Solid Waste Reserve
150,000
4,242,000
500,000
GWMC - Asset Renewals 44 (Transfer Stations, Leachate systems)
Solid Waste Reserve
45 GWMC Solar Panels
Solid Waste Reserve
30,000
Solid Waste Reserve
40,000
Solid Waste Reserve
400,000
48 GWMC Organic Processing Plant Solid Waste Reserve
3,000,000
GWMC Gas Flare Extension Mini Station
47 GWMC Hook Truck & Bins
200,000
49 GWMC Asphalting
Solid Waste Reserve
125,000
50 GWMC Office Space
Solid Waste Reserve
50,000
51
GWMC Renewal of the Rural Transfer
Solid Waste Reserve
200,000
52
GWMC Leachate Solar Evaporator
Solid Waste Reserve
30,000
53
Airport - Implementation of the Masterplan
Airport Reserve
54
Oasis Initiatives from the Energy Audit Review
Oasis Plant Reserve
200,000
55 Oasis Splash Pad water feature
S94* - Oasis Recoupment
680,000
56 Oasis Water Slide
S94* - Oasis Recoupment
850,000
Total Project Concepts - Commercial Development Sector TOTAL LTFP PROJECT CONCEPTS
200,000
500,000
500,000
500,000
8,144,417 11,414,811
5,742,000
1,847,495
965,494
500,000
700,000
6,500,000
500,000
500,000
11,800,337 16,766,525
8,856,711
4,489,054
4,369,934
1,455,947
1,543,000
8,422,768
1,343,000
1,343,000
* Timing of project is subject to receipt of sufficient Section 94, Section 94A and DSP funds
64
6,000,000
1,785,920
43 GWMC - Weighbridge Relocation Solid Waste Reserve
46
200,000
300,000
Appendix 9 - Wagga Wagga Regional Airport Ten Year Financial Plan BUDGET 2017/18 Estimated Reserve Balance at start of the year
BUDGET 2018/19
BUDGET 2019/20
BUDGET 2020/21
BUDGET 2021/22
BUDGET 2022/23
BUDGET 2023/24
BUDGET 2024/25
BUDGET 2025/26
BUDGET 2026/27
300,017
686,677
528,892
474,474
412,987
802,202
1,050,393
1,528,419
1,912,549
23,811
0
0
0
0
0
0
0
0
0
0
(4,224,702)
(4,534,878)
(4,645,748)
(4,759,610)
(4,876,574)
(4,996,739)
(5,120,208)
(5,247,088)
(5,376,643)
(5,488,321)
0
0
0
0
0
0
0
0
0
0
(237,883)
(243,810)
(249,887)
(255,420)
(261,785)
(268,308)
(274,994)
(281,846)
(283,996)
(278,808)
Grants & Contributions provided for Operating Purposes
0
0
0
0
0
0
0
0
0
0
Grants & Contributions provided for Capital Purposes
0
0
0
0
0
0
0
0
0
0
Revenue From Continuing Operations Rates & Annual Charges User Charges & Fees Interest & Investment Revenue Other Revenues
Revenue From Continuing Operations
(4,462,585) (4,778,687) (4,895,635) (5,015,030) (5,138,360) (5,265,048) (5,395,201) (5,528,933) (5,660,639) (5,767,129)
Expenses From Continuing Operations Employee Benefits & On-Costs
514,085
534,508
555,744
577,827
600,791
624,670
649,502
675,324
702,175
727,034
Borrowing Costs
496,100
582,012
548,921
484,713
417,688
346,538
271,698
190,693
124,936
360,964
Materials & Contracts
2,003,609
1,932,178
1,995,609
2,083,353
2,140,314
2,220,307
2,295,743
2,385,534
2,468,517
2,466,750
Depreciation & Amortisation
1,198,781
1,204,981
1,227,881
1,227,881
1,227,881
1,242,881
1,286,881
1,286,881
1,300,214
1,368,475
237,580
252,276
267,912
284,549
302,252
321,092
341,143
362,484
385,201
409,384
4,450,155
4,505,955
4,596,067
4,658,323
4,688,925
4,755,488
4,844,965
4,900,916
4,981,044
5,332,608
Net Operating (Profit)/Loss
(12,430)
(272,733)
(299,568)
(356,707)
(449,434)
(509,560)
(550,236)
(628,017)
(679,595)
(434,522)
Net Operating Result before Grants and Contributions provided for Capital Purposes
(12,430)
(272,733)
(299,568)
(356,707)
(449,434)
(509,560)
(550,236)
(628,017)
(679,595)
(434,522)
Capital Expenditure - Renewals
2,155,000
595,000
0
0
75,000
220,000
0
200,000
7,000,000
0
Capital Expenditure - New Projects
1,300,000
0
0
0
0
0
0
0
0
0
0
500,000
500,000
500,000
0
0
0
0
0
0
669,550
990,498
1,081,867
1,146,075
1,213,100
1,284,250
1,359,090
1,330,768
1,068,547
1,426,678
0
0
0
0
0
0
(4,200,000)
0
Other Expenses Expenses From Continuing Operations
Capital and Reserve Movements
Capital Expenditure - Project Concepts Loan Repayments New Loan Borrowings
(3,300,000)
(450,000)
WAGGA WAGGA CITY COUNCIL LONG TERM FINANCIAL PLAN
65
Appendix 9 - Wagga Wagga Regional Airport Ten Year Financial Plan continued BUDGET 2017/18 Proceeds from Sale of intangible & tangible Assets
BUDGET 2018/19
BUDGET 2019/20
BUDGET 2020/21
BUDGET 2021/22
BUDGET 2022/23
BUDGET 2023/24
BUDGET 2024/25
BUDGET 2025/26
BUDGET 2026/27
0
0
0
0
0
0
0
0
0
0
386,660
(157,785)
(54,418)
(61,487)
389,215
248,190
478,027
384,130
(1,888,738)
376,319
Total Capital and Reserve Movements
1,211,210
1,477,713
1,527,449
1,584,588
1,677,315
1,752,440
1,837,117
1,914,898
1,979,809
1,802,997
Net Result
1,198,781
1,204,980
1,227,880
1,227,881
1,227,880
1,242,880
1,286,880
1,286,880
1,300,214
1,368,475
Add back Depreciation Expense (non-cash)
1,198,781
1,204,981
1,227,881
1,227,881
1,227,881
1,242,881
1,286,881
1,286,881
1,300,214
1,368,475
0
(0)
(0)
0
(0)
(0)
(0)
(0)
(0)
(0)
686,677
528,892
474,474
412,987
802,202
1,050,393
1,528,419
1,912,549
23,811
400,130
Net Movements to/(from) Reserves
Cash Budget (Surplus)/Deficit Estimated Reserve Balance at end of the year
Appendix 10 - Livestock Marketing Centre Ten Year Financial Plan BUDGET 2017/18 Estimated Reserve Balance at start of the year
BUDGET 2018/19
BUDGET 2019/20
BUDGET 2020/21
BUDGET 2021/22
BUDGET 2022/23
BUDGET 2023/24
BUDGET 2024/25
BUDGET 2025/26
BUDGET 2026/27
3,574,732
4,754,749
6,311,765
8,095,027
10,123,253
12,418,585
12,021,055
11,138,370
13,828,925
16,662,436
0
0
0
0
0
0
0
0
0
0
(5,137,171)
(5,493,261)
(5,875,158)
(6,284,783)
(6,724,203)
(6,978,893)
(7,243,593)
(7,518,702)
(7,804,632)
(7,804,632)
0
0
0
0
0
0
0
0
0
0
(40,986)
(42,535)
(41,648)
(40,724)
(42,360)
(44,062)
(45,832)
(47,674)
(49,589)
(50,422)
Grants & Contributions provided for Operating Purposes
0
0
0
0
0
0
0
0
0
0
Grants & Contributions provided for Capital Purposes
0
0
0
0
0
0
0
0
0
0
(5,178,157) (5,535,796) (5,916,806) (6,325,507)
(6,766,563)
(7,022,955)
(7,289,426)
(7,566,376)
(7,854,221)
(7,855,054)
Revenue From Continuing Operations Rates & Annual Charges User Charges & Fees Interest & Investment Revenue Other Revenues
Revenue From Continuing Operations Expenses From Continuing Operations Employee Benefits & On-Costs
990,547
1,030,020
1,071,070
1,113,760
1,158,155
1,204,324
1,252,337
1,302,269
1,354,195
1,407,348
0
0
0
0
0
0
0
0
0
0
Materials & Contracts
2,695,706
2,794,110
2,898,168
3,008,934
3,127,543
3,199,707
3,274,078
3,350,718
3,429,595
3,447,200
Depreciation & Amortisation
717,366
757,897
800,718
845,959
893,755
944,252
997,603
1,053,967
1,113,516
1,113,516
Borrowing Costs
66
Appendix 10 - Livestock Marketing Centre Ten Year Financial Plan continued BUDGET 2017/18 Other Expenses
BUDGET 2018/19
BUDGET 2019/20
BUDGET 2020/21
BUDGET 2021/22
BUDGET 2022/23
BUDGET 2023/24
BUDGET 2024/25
BUDGET 2025/26
BUDGET 2026/27
145,581
154,650
164,306
174,587
185,534
197,192
209,609
222,833
236,920
251,887
4,549,200
4,736,677
4,934,262
5,143,240
5,364,987
5,545,476
5,733,627
5,929,787
6,134,226
6,219,951
Net Operating (Profit)/Loss
(628,957)
(799,119)
(982,544)
(1,182,268)
(1,401,576)
(1,477,479)
(1,555,799)
(1,636,588)
(1,719,995)
(1,635,104)
Net Operating Result before Grants and Contributions provided for Capital Purposes
(628,957)
(799,119)
(982,544) (1,182,268)
(1,401,576)
(1,477,479)
(1,555,799)
(1,636,588)
(1,719,995)
(1,635,104)
16,995
0
0
0
0
0
83,467
0
0
0
149,310
0
0
0
0
2,819,261
3,352,620
0
0
0
Capital Expenditure - Project Concepts
0
0
0
0
0
0
0
0
0
0
Loan Repayments
0
0
0
0
0
0
0
0
0
0
New Loan Borrowings
0
0
0
0
0
0
0
0
0
0
Proceeds from Sale of intangible & tangible Assets
0
0
0
0
0
0
0
0
0
0
Net Movements to/(from) Reserves
1,180,017
1,557,016
1,783,262
2,028,226
2,295,331
(397,530)
(882,685)
2,690,555
2,833,511
2,748,620
Total Capital and Reserve Movements
1,346,322
1,557,016
1,783,262
2,028,226
2,295,331
2,421,731
2,553,402
2,690,555
2,833,511
2,748,620
Net Result
717,366
757,897
800,718
845,959
893,755
944,252
997,603
1,053,967
1,113,516
1,113,516
Add back Depreciation Expense (non-cash)
717,366
757,897
800,718
845,959
893,755
944,252
997,603
1,053,967
1,113,516
1,113,516
0
(0)
(0)
(0)
(0)
(0)
(0)
(0)
(0)
(0)
4,754,749
6,311,765
8,095,027
10,123,253
12,418,585
12,021,055
11,138,370
13,828,925
16,662,436
19,411,056
Expenses From Continuing Operations
Capital and Reserve Movements Capital Expenditure - Renewals Capital Expenditure - New Projects
Cash Budget (Surplus)/Deficit Estimated Reserve Balance at end of the year
WAGGA WAGGA CITY COUNCIL LONG TERM FINANCIAL PLAN
67
Appendix 11 - Sewerage Services Ten Year Financial Plan Estimated Reserve Balance at start of the year
BUDGET 2017/18
BUDGET 2018/19
BUDGET 2019/20
BUDGET 2020/21
BUDGET 2021/22
BUDGET 2022/23
BUDGET 2023/24
BUDGET 2024/25
BUDGET 2025/26
BUDGET 2026/27
15,374,507
14,144,516
13,712,241
16,577,956
19,366,885
22,777,018
28,049,837
32,443,804
39,475,862
47,122,173
Revenue From Continuing Operations Rates & Annual Charges User Charges & Fees Interest & Investment Revenue Other Revenues Grants & Contributions provided for Operating Purposes Grants & Contributions provided for Capital Purposes Revenue From Continuing Operations
(12,851,872) (13,614,408) (14,422,311) (15,278,287) (15,732,961) (16,201,183) (16,683,358) (17,179,901) (17,691,242) (18,217,822) (4,963,046)
(5,205,594)
(5,460,263)
(5,727,659)
(5,868,377)
(6,012,623)
(6,160,486)
(6,312,056)
(6,466,636)
(6,625,080)
(283,698)
(366,077)
(390,145)
(478,668)
(580,366)
(619,209)
(695,701)
(811,038)
(970,370)
(1,128,327)
0
0
0
0
0
0
0
0
0
0
(160,185)
(169,796)
(179,984)
(190,783)
(196,506)
(202,401)
(208,473)
(214,728)
(221,169)
(227,804)
(1,289,000)
(1,305,000)
(1,319,000)
(1,301,000)
(1,315,000)
(1,330,000)
(1,349,000)
(1,349,000)
(1,349,000)
(1,349,000)
(19,547,801) (20,660,874) (21,771,702) (22,976,396) (23,693,209) (24,365,416) (25,097,018) (25,866,723) (26,698,418) (27,548,033)
Expenses From Continuing Operations Employee Benefits & On-Costs
2,092,252
2,175,130
2,261,317
2,350,947
2,444,156
2,541,087
2,641,890
2,746,718
2,855,052
2,967,719
Borrowing Costs
2,319,305
2,269,721
2,216,438
2,159,180
2,097,651
2,031,531
1,960,479
1,884,127
1,802,078
1,713,909
Materials & Contracts
9,337,918
9,168,656
9,506,442
9,591,493
9,984,036
10,104,316
10,472,579
10,649,085
10,666,747
10,725,039
Depreciation & Amortisation
5,837,167
6,166,967
6,515,401
6,883,521
7,272,440
7,683,333
8,117,441
8,576,076
9,060,625
9,060,625
477,352
504,095
532,463
562,559
594,494
628,386
664,360
702,552
743,105
786,170
20,063,994
20,284,569
21,032,062
21,547,699
22,392,777
22,988,652
23,856,750
24,558,558
25,127,607
25,253,462
516,193
(376,305)
(739,640)
(1,428,697)
(1,300,433)
(1,376,763)
(1,240,268)
(1,308,165)
(1,570,811)
(2,294,571)
1,805,193
928,695
579,360
(127,697)
14,567
(46,763)
108,732
40,835
(221,811)
(945,571)
Capital Expenditure - Renewals
1,434,650
1,852,867
1,798,930
2,467,612
1,649,030
2,254,892
2,522,911
1,752,346
1,803,239
1,855,633
Capital Expenditure - New Projects
3,850,641
2,610,634
822,870
2,230,893
2,361,903
567,005
1,417,347
0
0
0
Capital Expenditure - Project Concepts
601,016
1,797,803
1,000,000
0
265,494
12,947
0
0
0
0
Loan Repayments
664,659
714,243
767,526
824,784
886,313
952,433
1,023,485
1,099,837
1,181,886
1,270,055
Other Expenses Expenses From Continuing Operations Net Operating (Profit)/Loss Net Operating Result before Grants and Contributions provided for Capital Purposes Capital and Reserve Movements
68
Appendix 11 - Sewerage Services Ten Year Financial Plan continued BUDGET 2017/18
BUDGET 2018/19
BUDGET 2019/20
BUDGET 2020/21
BUDGET 2021/22
BUDGET 2022/23
BUDGET 2023/24
BUDGET 2024/25
BUDGET 2025/26
BUDGET 2026/27
New Loan Borrowings
0
0
0
0
0
0
0
0
0
0
Proceeds from Sale of intangible & tangible Assets
0
0
0
0
0
0
0
0
0
0
(1,229,992)
(432,275)
2,865,716
2,788,929
3,410,133
5,272,819
4,393,966
7,032,058
7,646,311
8,229,507
Total Capital and Reserve Movements
5,320,974
6,543,272
7,255,041
8,312,218
8,572,872
9,060,096
9,357,709
9,884,241
10,631,436
11,355,196
Net Result
5,837,167
6,166,967
6,515,401
6,883,521
7,272,440
7,683,333
8,117,441
8,576,076
9,060,625
9,060,625
Add back Depreciation Expense (non-cash)
5,837,167
6,166,967
6,515,401
6,883,521
7,272,440
7,683,333
8,117,441
8,576,076
9,060,625
9,060,625
0
0
0
0
(0)
0
0
0
0
0
14,144,516
13,712,241
16,577,956
19,366,885
22,777,018
28,049,837
32,443,804
39,475,862
47,122,173
55,351,680
BUDGET 2022/23
BUDGET 2023/24
BUDGET 2024/25
BUDGET 2025/26
BUDGET 2026/27
17,287,059
21,493,080
Net Movements to/(from) Reserves
Cash Budget (Surplus)/Deficit Estimated Reserve Balance at end of the year
Appendix 12 - Solid Waste Services Ten Year Financial Plan BUDGET 2017/18 Estimated Reserve Balance at start of the year
BUDGET 2018/19
BUDGET 2019/20
BUDGET 2020/21
BUDGET 2021/22
11,780,049
6,902,040
8,674,523
7,349,983
9,726,697
12,812,499
16,271,818
19,426,509
Rates & Annual Charges
(7,956,892)
(8,195,598)
(8,441,466)
(8,694,710)
(8,955,552)
(9,224,218)
(9,500,945)
(9,785,973) (10,079,552) (10,381,939)
User Charges & Fees
(3,823,429)
(3,965,872)
(4,113,710)
(4,267,151)
(4,426,409)
(4,591,707)
(4,763,096)
(4,941,359)
(5,048,212)
(5,159,340)
Interest & Investment Revenue
(77,882)
(88,390)
(101,569)
(116,048)
(132,715)
(131,294)
(147,564)
(169,532)
(191,663)
(222,862)
Other Revenues
(64,229)
(65,710)
(67,227)
(68,783)
(70,378)
(72,012)
(73,687)
(75,405)
(75,405)
(75,405)
(108,886)
(112,152)
(115,517)
(118,983)
(122,552)
(126,229)
(130,015)
(133,916)
(137,933)
(142,071)
0
0
0
0
0
0
0
0
0
0
Revenue From Continuing Operations
Grants & Contributions provided for Operating Purposes Grants & Contributions provided for Capital Purposes Revenue From Continuing Operations
(12,031,317) (12,427,722) (12,839,490) (13,265,675) (13,707,606) (14,145,460) (14,615,309) (15,106,184) (15,532,765) (15,981,616) WAGGA WAGGA CITY COUNCIL LONG TERM FINANCIAL PLAN
69
Appendix 12 - Solid Waste Services Ten Year Financial Plan continued BUDGET 2017/18
BUDGET 2018/19
BUDGET 2019/20
BUDGET 2020/21
BUDGET 2021/22
BUDGET 2022/23
BUDGET 2023/24
BUDGET 2024/25
BUDGET 2025/26
BUDGET 2026/27
Expenses From Continuing Operations Employee Benefits & On-Costs
979,250
1,018,360
1,059,034
1,101,335
1,145,328
1,191,080
1,238,663
1,288,149
1,339,615
1,393,139
0
0
0
0
0
0
0
0
0
0
8,497,069
9,033,536
8,838,319
9,261,534
9,248,882
9,465,872
9,691,075
9,924,809
9,952,546
9,981,016
275,425
290,987
307,427
324,797
343,148
362,536
383,019
404,660
427,523
427,523
22,086
23,343
24,677
26,092
27,594
29,188
30,880
32,676
34,583
36,609
9,773,830
10,366,226
10,229,457
10,713,758
10,764,952
11,048,676
11,343,637
11,650,294
11,754,267
11,838,286
Net Operating (Profit)/Loss
(2,257,487)
(2,061,496)
(2,610,033)
(2,551,917)
(2,942,654)
(3,096,784)
(3,271,672)
(3,455,890)
(3,778,498)
(4,143,330)
Net Operating Result before Grants and Contributions provided for Capital Purposes
(2,257,487)
(2,061,496)
(2,610,033)
(2,551,917)
(2,942,654)
(3,096,784)
(3,271,672)
(3,455,890)
(3,778,498)
(4,143,330)
0
230,000
0
0
0
0
300,000
0
0
0
Capital Expenditure - New Projects
1,750,000
0
0
0
0
0
0
0
0
0
Capital Expenditure - Project Concepts
5,660,920
350,000
4,242,000
500,000
200,000
0
200,000
6,000,000
0
0
Loan Repayments
0
0
0
0
0
0
0
0
0
0
New Loan Borrowings
0
0
0
0
0
0
0
0
0
0
Proceeds from Sale of intangible & tangible Assets
0
0
0
0
0
0
0
0
0
0
(4,878,008)
1,772,483
(1,324,540)
2,376,714
3,085,802
3,459,320
3,154,691
(2,139,450)
4,206,021
4,570,853
2,532,912
2,352,483
2,917,460
2,876,714
3,285,802
3,459,320
3,654,691
3,860,550
4,206,021
4,570,853
Net Result
275,425
290,986
307,427
324,797
343,148
362,536
383,019
404,660
427,523
427,523
Add back Depreciation Expense (non-cash)
275,425
290,987
307,427
324,797
343,148
362,536
383,019
404,660
427,523
427,523
(0)
(0)
0
(0)
(0)
(0)
(0)
(0)
(0)
(0)
6,902,040
8,674,523
7,349,983
9,726,697
12,812,499
16,271,818
19,426,509
17,287,059
21,493,080
26,063,933
Borrowing Costs Materials & Contracts Depreciation & Amortisation Other Expenses Expenses From Continuing Operations
Capital and Reserve Movements Capital Expenditure - Renewals
Net Movements to/(from) Reserves Total Capital and Reserve Movements
Cash Budget (Surplus)/Deficit Estimated Reserve Balance at end of the year
70
Appendix 13 - Stormwater Levy Ten Year Financial Plan BUDGET 2017/18 Estimated Reserve Balance at start of the year
BUDGET 2018/19
2,601,864
BUDGET 2019/20
BUDGET 2020/21
BUDGET 2021/22
BUDGET 2022/23
BUDGET 2023/24
BUDGET 2024/25
BUDGET 2025/26
BUDGET 2026/27
3,189,069
583,775
583,775
583,775
583,775
583,775
583,775
583,775
583,775
(692,265)
(699,765)
(707,265)
(714,765)
(722,265)
(729,765)
(737,265)
(744,765)
(752,265)
(759,765)
User Charges & Fees
0
0
0
0
0
0
0
0
0
0
Interest & Investment Revenue
0
0
0
0
0
0
0
0
0
0
Other Revenues
0
0
0
0
0
0
0
0
0
0
Grants & Contributions provided for Operating Purposes
0
0
0
0
0
0
0
0
0
0
Grants & Contributions provided for Capital Purposes
0
0
0
0
0
0
0
0
0
0
(692,265)
(699,765)
(707,265)
(714,765)
(722,265)
(729,765)
(737,265)
(744,765)
(752,265)
(759,765)
0
0
0
0
0
0
0
0
0
0
48,510
44,376
40,491
36,240
31,700
26,861
21,842
16,164
10,347
4,094
Materials & Contracts
0
0
602,206
609,706
617,206
624,706
632,206
639,706
647,206
654,706
Depreciation & Amortisation
0
0
0
0
0
0
0
0
0
0
Other Expenses
0
0
0
0
0
0
0
0
0
0
48,510
44,376
642,696
645,946
648,906
651,566
654,048
655,869
657,553
658,800
Net Operating (Profit)/Loss
(643,755)
(655,389)
(64,568)
(68,819)
(73,359)
(78,198)
(83,217)
(88,895)
(94,712)
(100,965)
Net Operating Result before Grants and Contributions provided for Capital Purposes
(643,755)
(655,389)
(64,568)
(68,819)
(73,359)
(78,198)
(83,217)
(88,895)
(94,712)
(100,965)
Capital Expenditure - Renewals
0
0
0
0
0
0
0
0
0
0
Capital Expenditure - New Projects
0
0
0
0
0
0
0
0
0
0
Capital Expenditure - Project Concepts
0
3,200,000
0
0
0
0
0
0
0
0
56,549
60,683
64,568
68,819
73,359
78,198
83,217
88,895
94,712
100,965
Revenue From Continuing Operations Rates & Annual Charges
Revenue From Continuing Operations Expenses From Continuing Operations Employee Benefits & On-Costs Borrowing Costs
Expenses From Continuing Operations
Capital and Reserve Movements
Loan Repayments
WAGGA WAGGA CITY COUNCIL LONG TERM FINANCIAL PLAN
71
Appendix 13 - Stormwater Levy Ten Year Financial Plan continued BUDGET 2017/18
BUDGET 2018/19
BUDGET 2019/20
BUDGET 2020/21
BUDGET 2021/22
BUDGET 2022/23
BUDGET 2023/24
BUDGET 2024/25
BUDGET 2025/26
BUDGET 2026/27
New Loan Borrowings
0
0
0
0
0
0
0
0
0
0
Proceeds from Sale of intangible & tangible Assets
0
0
0
0
0
0
0
0
0
0
Net Movements to/(from) Reserves
587,206
(2,605,294)
0
0
0
0
0
0
0
0
Total Capital and Reserve Movements
643,755
655,389
64,568
68,819
73,359
78,198
83,217
88,895
94,712
100,965
Net Result
0
0
0
0
0
0
0
0
0
0
Add back Depreciation Expense (non-cash)
0
0
0
0
0
0
0
0
0
0
Cash Budget (Surplus)/Deficit
0
0
0
0
0
0
0
0
0
0
3,189,069
583,775
583,775
583,775
583,775
583,775
583,775
583,775
583,775
583,775
Estimated Reserve Balance at end of the year
Appendix 14 - Budgeted Income Statement by Function BUDGET 2017/18
BUDGET 2018/19
BUDGET 2019/20
BUDGET 2020/21
BUDGET 2021/22
BUDGET 2022/23
BUDGET 2023/24
BUDGET 2024/25
BUDGET 2025/26
BUDGET 2026/27
Revenue From Continuing Operations Governance
(3,750)
0
0
0
0
0
0
0
0
0
Administration
(1,191,317)
(1,195,277)
(1,199,356)
(1,203,557)
(1,207,884)
(1,212,341)
(1,216,932)
(1,221,661)
(1,226,531)
(1,231,547)
Public Order & Safety
(1,326,157)
(1,363,313)
(1,401,622)
(1,441,117)
(1,481,839)
(1,523,826)
(1,567,116)
(1,611,753)
(1,649,388)
(1,688,153)
(195,160)
(201,951)
(209,006)
(216,337)
(223,086)
(231,784)
(239,947)
(248,418)
(256,314)
(264,525)
(15,810,327)
(16,350,338)
(16,957,144)
(17,588,558)
(14,579,733)
(15,029,206)
(15,510,806)
(16,013,572)
(16,450,937)
(16,910,671)
Community Services & Education
(1,838,416)
(1,654,410)
(1,671,159)
(1,688,701)
(1,707,075)
(1,726,322)
(1,746,487)
(1,767,614)
(1,788,899)
(1,811,202)
Housing & Community Amenities
(5,469,424)
(5,575,399)
(5,688,641)
(5,807,602)
(5,933,574)
(6,041,313)
(6,175,889)
(6,322,463)
(6,403,712)
(6,499,008)
(19,547,801)
(20,660,874)
(21,771,702)
(22,976,396)
(23,693,209)
(24,365,416)
(25,097,018)
(25,866,723)
(26,698,418)
(27,548,033)
Recreation & Culture
(3,796,932)
(4,715,650)
(3,971,552)
(4,099,163)
(4,205,115)
(4,302,362)
(4,266,439)
(4,379,772)
(4,480,144)
(4,584,852)
Mining, Manufacturing & Construction
(1,440,389)
(1,510,464)
(1,584,026)
(1,661,248)
(1,742,312)
(1,827,411)
(1,916,745)
(2,010,526)
(2,011,503)
(2,013,350)
Health Environment
Sewerage Services
72
Appendix 14 - Budgeted Income Statement by Function continued BUDGET 2017/18 Transport & Communication
BUDGET 2018/19
BUDGET 2019/20
BUDGET 2020/21
BUDGET 2021/22
BUDGET 2022/23
BUDGET 2023/24
BUDGET 2024/25
BUDGET 2025/26
BUDGET 2026/27
(11,590,126)
(8,241,540)
(8,440,294)
(8,643,960)
(8,854,099)
(9,070,214)
(9,292,489)
(9,521,120)
(9,749,101)
(9,954,742)
(6,101,337)
(6,529,482)
(6,870,690)
(7,295,106)
(7,807,841)
(8,036,469)
(8,325,741)
(8,626,090)
(8,924,199)
(8,940,315)
Revenue From Continuing Operations
(68,311,135)
(67,998,700)
(69,765,194)
(72,621,746)
(71,435,768)
(73,366,661)
(75,355,609)
(77,589,712)
(79,639,146)
(81,446,397)
General Purpose Income
(54,481,195)
(55,957,876)
(57,664,476)
(59,275,550)
(59,386,072)
(60,585,744)
(62,375,416)
(64,172,678)
(66,097,321)
(68,352,237)
Economic Affairs
Total Revenue From Continuing Operations
(122,792,330) (123,956,576) (127,429,670) (131,897,296) (130,821,840) (133,952,405) (137,731,025) (141,762,390) (145,736,466) (149,798,634)
Expenses From Continuing Operations Governance
2,294,896
2,159,620
2,059,650
2,432,023
2,186,768
2,253,981
2,323,758
2,706,202
2,473,999
2,544,456
10,218,611
10,566,048
11,312,460
12,022,113
12,804,349
13,631,572
14,545,447
15,487,619
16,570,227
17,299,888
Public Order & Safety
2,882,882
2,944,268
3,023,375
3,109,364
3,189,986
3,277,715
3,368,667
3,467,387
3,548,798
3,634,634
Health
1,442,804
1,469,597
1,511,643
1,539,055
1,567,291
1,596,381
1,626,805
1,662,862
1,548,685
1,602,327
14,456,265
15,207,193
15,851,751
16,531,490
16,787,495
17,285,903
17,806,076
18,348,557
18,700,400
18,863,750
Community Services & Education
2,416,619
2,431,909
2,468,055
2,504,731
2,542,323
2,581,945
2,623,361
2,666,447
2,711,287
2,758,339
Housing & Community Amenities
6,110,231
6,121,074
6,384,609
6,598,182
6,855,536
7,178,991
7,487,510
7,750,044
8,087,348
8,377,396
Sewerage Services
20,063,994
20,284,569
21,032,062
21,547,699
22,392,777
22,988,652
23,856,750
24,558,558
25,127,607
25,253,462
Recreation & Culture
21,075,041
21,940,712
22,852,065
23,520,876
24,230,851
24,939,458
25,700,212
26,493,768
27,217,098
27,828,731
1,469,011
1,437,066
1,487,022
1,525,559
1,579,558
1,635,704
1,694,086
1,754,798
1,817,935
1,883,599
29,952,150
31,113,440
32,017,464
33,262,920
34,376,522
35,708,686
37,131,299
38,600,254
40,071,560
40,566,773
7,431,934
7,780,046
7,867,683
8,132,431
8,487,861
8,676,616
8,925,196
9,233,625
9,440,627
9,413,728
119,814,437
123,455,541
127,867,839
132,726,443
137,001,317
141,755,604
147,089,167
152,730,123
157,315,570
160,027,083
(2,977,893)
(501,035)
438,169
829,147
6,179,477
7,803,199
9,358,142
10,967,732
11,579,104
10,228,449
0
0
0
0
0
0
0
0
0
0
5,760,254
4,181,227
3,100,882
4,562,890
5,693,388
3,304,990
4,326,558
6,403,057
4,004,411
4,293,293
59,321
61,927
64,639
67,604
70,585
73,822
77,121
64,940
0
0
Administration
Environment
Mining, Manufacturing & Construction Transport & Communication Economic Affairs Expenses From Continuing Operations Net Operating (Profit)/Loss Capital and Reserve Movements Governance Administration Public Order & Safety
WAGGA WAGGA CITY COUNCIL LONG TERM FINANCIAL PLAN
73
Appendix 14 - Budgeted Income Statement by Function continued BUDGET 2017/18 Health
BUDGET 2018/19
BUDGET 2019/20
BUDGET 2020/21
BUDGET 2021/22
BUDGET 2022/23
BUDGET 2023/24
BUDGET 2024/25
BUDGET 2025/26
BUDGET 2026/27
249,302
261,959
258,290
273,468
289,486
330,626
213,169
0
0
0
7,487,499
3,840,683
4,306,568
568,819
273,359
78,198
583,217
6,088,895
94,712
100,965
Community Services & Education
0
0
0
0
0
0
0
0
0
0
Housing & Community Amenities
16,006
16,646
17,312
18,004
18,724
76,374
80,567
84,996
89,675
93,706
Sewerage Services
6,550,966
6,975,547
4,389,326
5,523,289
5,162,740
3,787,277
4,963,742
2,852,183
2,985,124
3,125,688
Recreation & Culture
2,854,049
1,593,334
1,706,201
1,941,763
1,891,193
1,978,008
1,817,369
1,681,548
1,873,805
1,613,501
0
0
0
0
0
0
0
0
0
0
32,608,534
30,076,601
19,743,971
20,289,126
15,850,115
13,312,085
13,418,444
15,058,051
21,482,800
14,792,209
222,172
3,163,471
1,268,784
374,269
179,933
3,005,042
3,627,906
198,053
204,489
211,135
New Loan Borrowings
(7,215,980)
(6,762,097)
0
0
(750,000)
0
0
0
(4,200,000)
0
Proceeds from Sale of intangible & tangible Assets
(4,678,401)
(1,354,100)
(792,182)
(835,808)
(1,383,000)
(739,100)
(977,700)
(1,396,850)
(1,148,900)
(1,250,650)
Net Movements to/(from) Reserves
(6,458,101)
(5,189,974)
3,871,625
6,859,747
9,213,627
12,036,694
10,077,627
8,178,336
15,991,568
19,816,753
Total Capital and Reserve Movements
37,455,621
36,865,224
37,935,415
39,643,170
36,510,151
37,244,017
38,208,019
39,213,208
41,377,684
42,796,600
Net Result after Depreciation
34,477,728
36,364,189
38,373,585
40,472,317
42,689,627
45,047,216
47,566,161
50,180,940
52,956,788
53,025,049
Add back Depreciation Expense (noncash)
34,477,729
36,364,189
38,373,584
40,472,317
42,689,627
45,047,216
47,566,161
50,180,940
52,956,788
53,025,049
(0)
0
0
0
0
0
0
0
0
0
Environment
Mining, Manufacturing & Construction Transport & Communication Economic Affairs
Cash Budget (Surplus)/Deficit
74
questions? comments? contact us. Wagga Wagga City Council PO Box 20 Cnr Baylis & Morrow Sts Wagga Wagga NSW Ph: 1300 292 442 Fax: (02) 6926 9199 Email: council@wagga.nsw.gov.au
Wagga Wagga City Council Long Term Financial Plan
Follow @WaggaCouncil on Twitter to get the news, events and emergency information straight from the source.
www.wagga.nsw.gov.au