DELIVERY PROGRAM & operational plan 2016/2017
1
Combined Delivery Program & Operational Plan
about this plan.
what is this
document all about?
What is a Delivery Program? The Delivery Program is Council’s commitment towards actioning the goals outlined in the Community Strategic Plan (Ruby & Oliver) after considering available resources. The Delivery program is a four year plan aligned to the term of the elected Council.
What is an Operational Plan? The Operational Plan is a supporting document to the Delivery Program outlining projects and services to be delivered to achieve the commitments of the Delivery Program. The Operational Plan is a one year plan. Both the Delivery Program and Operational Plan items consider social, environmental, economic and civic leadership outcomes as well as apply the principles of access and equity and social justices.
2
Combined Delivery Program & Operational Plan
contents.
contents. Introduction Financial overview
6 8
9
Delivery Program Budget Capital Works
11
Contributions and Donations
22
We are an engaged & involved community
25
Delivery Program Items
26
Operational Items
26
We have a safe & healthy community
33
Delivery Program Items
33
Operational Items
34
we have a growing economy
38
Delivery Program Items
37
Operational Items
37
we have a sustainable natural & built environment
41
Delivery Program Items
42
Operational Items
42
Contact Us
47
REVENUE & PRICING POLICY
48 3
Combined Delivery Program & Operational Plan
reporting framework.
our
reporting framework.
HOW THE IP&R FRAMEWORK WORKS COMMUNITY PRIORITIES Community Strategic Plan 10 years
Clearly defines what we want as a community.
HOW COUNCIL CAN CONTRIBUTE Integrated planning and reporting Integrated Planning and Reporting (IP&R) is the planning and reporting framework that Wagga Wagga City Council uses to work towards achieving the community’s vision. Under NSW State legislation, Councils must prepare a number of plans which provide details on how Council intends to deliver works and services in the short and long term. This is based on the community’s priorities which have been identified through consultation and engagement as well as the resources available to council in delivering these items. The framework ensures Councils illustrate their various plans together, to understand how they interact in planning for the future. The framework opens the way for Council and our community to have important discussions about funding priorities, service levels and shaping local identity and to plan in partnership for a more sustainable future. As illustrated, the plans are designed to flow so that the broader objectives in a high level plan are translated into specific targets, actions and measures.
Resourcing Plans Workforce Plan Ensures we have the right people with the right skills at the right time.
Asset Management Plan Provide direction and goals for managing Council’s assets.
Long Term Financial Plan Outlines the future finances of Council’s operations.
OUR COMMITMENT Delivery Program 4 years
Identifies the elected Council’s priorities for their term of office.
SO, WHAT’S NEXT? Operational Plan 1 year
Identifies the projects, programs and services to be delivered.
WHAT WE DID Annual Report Annually
Highlights Council’s achievements throughout the year.
ONGOING MONITORING, EVALUATION AND REVIEW 4
Combined Delivery Program & Operational Plan
reporting framework. Community Strategic Plan
Combined Delivery Program and Operational Plan (THIS DCOUMENT) Council’s Delivery Program is a statement of commitment to the community from each newly elected council and sets out a four year plan to respond to the community’s long-term vision as stated in Council’s 10 year Community Strategic Plan.
The purpose of this plan is to identify the community’s main priorities and aspirations for the future and to plan for achieving these goals. The name of our Community Strategic Plan is Ruby & Oliver.
In preparing a Delivery Program Council considers the available resources and its capacity to deliver services and projects to the community.
The objectives are balanced across Social, Economic, Environment and Civic Leadership and will need to be addressed beyond the boundaries of our Council – the help of other partners, stakeholders and community members contribute to the implementation of this plan.
The Operational Plan is a sub-plan of the Delivery Program and sets out the projects, programs and activities to be undertaken in a 12 month period. The Operational Plan includes a detailed budget and financial snapshot.
The Community Strategic Plan reflects the Wagga Wagga community’s long term priorities and aspirations and forms the foundation for all Council operations and subsequent plans. The plan sets out the specific directions, strategies, targets and measures necessary for achieving the following outcomes:
Quarterly Reporting quarterly report July - September 2013
• We are an engaged and involved community • We are a safe and healthy community • We have a growing economy • We have a sustainable natural and built environment
Resourcing plans workforce
Asset Management
2013/2017
2013/2017
Annual Report The Annual Report outlines Council’s achievements in implementing the Delivery Program and Operational Plan. The report also contains the audited financial statements.
PLAN
plan
1
Council produces a quarterly report outlining progress against the adopted Operational Plan, measuring the success of the implementation of Council’s Delivery Program.
In the year of an ordinary election, the annual report will also include an End of Term Report identifying progress against the measures identified in the Community Strategic Plan.
Workforce Plan 2013 - 2017
The resourcing plans consist of three components: The Workforce Plan, Asset Management Plan and the LongTerm Financial Plan. Council’s resource plans illustrate Council’s capacity to deliver on goals identified in the Community Strategic Plan informing the development of the Delivery Program. The Workforce Plan aims to ensure Council’s workforce has the right skills, at the right time and in the right quantities to ensure sustainable service delivery into the future. The Long-Term Financial Plan outlines the future finances of Council’s operations taking into consideration key elements such as rate movements, service levels to our community, major infrastructure, assets replacement and renewals as well as borrowings and cash reserves. The Asset Management Plan provides Council with a clear direction and goal for managing Council’s assets and physical infrastructure.
5
Combined Delivery Program & Operational Plan
introduction toward creating further efficiencies. In doing so, Council has put together the Fit2Perform team as a commitment to reducing operational expenses and creating efficiencies.
Mayor &
general manager welcome
2016/2017.
Bomen Business Park A key part of Bomen Business Park’s growth is the creation of the Wagga Wagga High Productivity Freight Route. The route is already taking shape, following the Eunony Bridge Road Deviation Project in 2014-15 and the announcement of $4.9M Federal Government funding (Bridges for Renewal Programme) for the replacement of Eunony Bridge itself, this represents 50% of the total cost and we are continuing to finalise the remain 50% so we can progress to construction as soon as possible. The route will create a potential round trip saving of 36 minutes – or 21 kilometres – for Higher Mass Limits (HML) vehicles, encourage heavy vehicles to avoid the CBD and enable the proposed Riverina Intermodal Freight and Logistics (RiFL) Hub to move forward.
The Bomen Business Park and proposed High Productivity Freight Route will be transformative infrastructure for Wagga and provide significant and long-lasting benefit to current and future businesses, as well as the broader The coming 12 months will be an important time for Wagga community. Wagga as Council looks to undertake major projects that will define the future growth of our city.
Levee bank upgrade
Along with the many vital programs and services identified By now residents should be aware of Council’s application in the 2016/2017 Combined Delivery Program and for a special rate variation to fund Council’s share of the Operational Plan (DPOP), Council will be focusing on: levee bank upgrade cost. • The continued implementation of its Fit for the Future Council expects to hear the result of the application action plan, in May 2016. Although Council has secured $2M in •
The growth of Bomen Business Park
•
Developing the multi-purpose stadium (MPS) and;
•
Increasing the city’s flood protection
State Government funding, what is needed now is a commitment that all stages of the project will be funding.
This will allow the levee upgrade to be constructed as quickly as possible and allow Council to look at additional This year will also see Council focus its attention on our external funding opportunities. strategic planning framework and key planning documents. Stage one construction of this important project is due to A sound framework is fundamental to ensuring our business begin in late 2016. remains sustainable and efficient in years to come.
Multi-purpose Stadium Construction at the Exhibition Centre
Early in the financial year we will see the finalisation of the Community Strategic Plan review. This is the starting point of further planning and where residents can inform future Council has secured $4.4M from the Department of strategies and the direction for Wagga Wagga. Infrastructure and Regional Development’s National A major overhaul of the planning framework is also Stronger Regions Fund. Wagga Wagga City Council’s under way, with strategic documents such as the Local contribution is $4,515,869 along with Wagga Netball Environmental Plan, Development Control Plan and Section contribution of $250,000. 94 Developer Contributions Plan being reviewed in unison Construction tenders documents are currently being to set a strong direction for the city’s growth. written, with construction expected to commence approximately the second quarter of the 2016/17 financial year. Since being assessed as fit under the State Government’s Fit for the Future reform package, Council has been implementing the action plan put forward to IPART as part of the process.
Fit for the Future
As part of our commitment to providing value for money to Rod Kendall our ratepayers and residents, Council is continuing to work Mayor 6
Combined Delivery Program & Operational Plan
Allan Eldridge General Manager
introduction increase will be $59, Business Wagga properties will pay an extra $425. The average increase for residences and businesses in villages is less. After this initial increase rates will only increase by the rate peg as set by IPART each year, and the levee upgrade component will drop off rates at the end of the five year period. More information on the impact on rates is online, where you can also find a rate calculator to assess the impact on your individual property wagga.nsw.gov.au/srv
What does this pay for in 16/17?
Special
RATE
variation. To help protect the City of Wagga Wagga and safeguard its future prosperity, the City of Wagga Wagga is upgrading the main city levee to a 1 in 100 hundred year level of protection, and the North Wagga levee to a 1 in 20 year level of protection. The City has so far secured $2M in State Government funding and is seeking further funding commitments to cover two-thirds of the cost of the estimated $23.3M project. The City intends to fund its one-third share via a Special Rate Variation (SRV).
What is an SRV?
Together with grant funding from the State Government, the money raised from the SRV in 2016/17 will fund the first stage of the main city levee upgrade.
What is the benefit? An upgrade of the levee system dramatically improves the protection of the CBD and North Wagga against flood events. The CBD is home to thousands of homes and assets that are currently exposed and vulnerable to a catastrophic flood event, and as demonstrated in March 2012 an evacuation of this area even without the water topping the levee bank can have a significant social and economic impact on the city. As a result insurance premiums have skyrocketed and the business community and developers have withheld new investment in the CBD. The upgrade of the main city levee will unlock investment funding in new CBD developments which are currently on hold pending an upgrade of the levee system. The Insurance Council of Australia has advised that Insurance premiums for business and residential property owners protected by the levee system will be reduced following the levee upgrade. The levee upgrade will also provide a greater sense of security to all residents and business owners when river levels rise.
An SRV is an increase in rates above the rate peg set by the Independent Pricing and Regulatory Tribunal (IPART) each year. The City of Wagga Wagga has applied for a one off SRV to be applied in 2016/17 and maintained for five years before dropping off. Council is committed to funding its one third share of the levee upgrade. If the SRV application is not successful it will borrow the money and repay over 14 years.
What happens if the SRV application is not successful?
When will we know if the SRV has been successful/how do we find out? What happens if the levee project does IPART is expected to make a decision on Council’s application for an SRV in May 2016. This information will not proceed? be published on IPART’s website, Council’s website and promoted in local media. Ratepayers will also receive direct notification in 2016/17 rates notices, with the levee upgrade component of rates identified in a separate line on the notice.
In the unlikely scenario where the upgrade does not proceed with the Levee construction, the following year/s rates levy would be required to be adjusted downwards to reflect the amounts received that were collected to construct the levy but not expended.
What impact does this have on my rates? The impact on your rates will depend on what rate category your property is in and how much the land is worth. Under the proposed increase, property owners in the Farmland rate category will pay an additional 3.7% in 2016/17 (1.8% rate page, 1.9% levee upgrade component), or an average increase of $90. All other properties will see an increase of 5.9% in 2016/17 (1.8% rate peg, 4.1% levee upgrade component). For Residential Wagga properties the average 7
Combined Delivery Program & Operational Plan
finance. finance.
financial
overview.
8
Combined Delivery Program & Operational Plan
finance.
delivery
program 4 year budget. This table displays Council’s net budget position for the next four years. Please see the following pages for more details on the budgeted Capital Works Program and a detailed 2015/2016 Operational Budget
Revenue and Expenses
Budget 2016/17 Revenue From Continuing Operations Rates & Annual Charges
Budget 2017/18
Budget 2018/19
Budget 2019/20
(59,179,227)
(61,130,987)
(63,032,551)
(64,994,677)
Special Rate Variation
(1,463,059)
(1,508,325)
(1,555,027)
(1,603,211)
User Charges & Fees
(23,631,263)
(25,462,775)
(27,307,123)
(28,604,724)
Interest & Investment Revenue
(3,406,597)
(3,874,391)
(4,314,075)
(4,283,251)
Other Revenues
(3,123,096)
(3,154,522)
(3,191,933)
(3,246,042)
Grants & Contributions provided for Operating Purposes
(14,779,516)
(14,081,625)
(14,439,759)
(14,704,282)
Grants & Contributions provided for Capital Purposes
(33,968,294)
(19,210,178)
(11,006,285)
(10,721,077)
(139,551,052)
(128,422,802)
(124,846,752)
(128,157,263)
42,105,886
43,337,708
45,371,497
47,175,518
Borrowing Costs
3,953,084
4,587,705
4,887,669
4,779,210
Materials & Contracts
2,704,884
2,717,130
2,869,551
2,828,006
Depreciation & Amortisation
32,405,375
34,236,278
36,170,628
38,214,269
Other Expenses
37,510,505
37,122,286
37,969,771
38,789,712
Revenue From Continuing Operations
Expenses from Continuing Operations Employee Benefits & On-Costs
9
Combined Delivery Program & Operational Plan
finance. Revenue and Expenses
Budget 2016/17
Budget 2017/18
Budget 2018/19
Budget 2019/20
Expenses From Continuing Operations
118,679,733
122,001,107
127,269,116
131,786,715
Net Operating (Profit) /Loss for the Year
(20,871,319)
(6,421,695)
2,422,364
3,628,149
Capital Expenditure - Renewals
31,998,481
22,570,028
20,259,817
19,063,398
Capital Expenditure - New Projects
33,250,784
13,326,518
8,585,850
6,649,532
Capital Expenditure - Project Concepts
9,011,400
17,679,054
11,596,631
4,754,530
Loan Repayments
2,603,821
3,318,953
3,885,654
4,259,389
(13,859,917)
(8,791,573)
(2,100,157)
0
Proceeds from Sale of intangible & tangible Assets
(4,982,151)
(4,373,635)
(1,980,000)
(1,002,800)
Net Movements to/(from) Reserves
(4,745,724)
(3,072,370)
(6,499,531)
862,071
Total Capital and Reserve Movements
53,276,694
40,656,974
33,748,264
34,586,119
Net Result after Depreciation
32,405,375
34,236,278
36,170,628
38,214,269
Add back Depreciation Expense (noncash)
32,405,375
34,236,278
36,170,628
38,214,269
0
0
0
0
Capital and Reserve Movements
New Loan Borrowings
Cash Budget (Surplus)/Deficit
10
Combined Delivery Program & Operational Plan
finance.
delivery
program
new projects
capital works. This table displays new projects and capital work items to be undertaken in the next 4 years displayed by directorate. This table also identifies the funding source for the projects including General Purpose Revenue (GPR), Developer Service Plan (DSP) and Developer Contributions (S94).
Project Description
Funding Source
2016/17
2017/18 2018/19 2019/20
Wagga Wagga Lawn Cemetery & Crematorium Furnace Reline
Cemetery Capital Reserve
Northern Wagga Suburban Playground
S94*
Lineal Park (Promenade - Amundsen) - Corridor Recreation Improvements
S94*
Estella Sportsground Land Acquisition & Development (Acquisition 17/18 - OS22, Development 18/19 - OS4)
S94*
1,500,000
Land Adjacent Estella Sportsground Acquisition (OS28)
S94*
1,500,000
Estella - Neighbourhood Open Space Works
S94*
31,816
Upgrade Jubilee Park Clubhouse Ground Level Changeroom
S94*
100,000
100,000 150,000 99,816
1,100,000
625,000
Jubilee Park - Replace existing Hockey Association synthetic surfaces at the Jubilee Contribution $200,000 Park Hockey Complex + Infrastructure Reserve $200,000 + Borrowings $225,000 Construction of Forest Hill Neighbourhood Park (OS12)
S94A* $128,702 + S94* Southern Parks Fund $199,298
328,000
Construction of Mt Austin Neighbourhood Park (Harris Park - OS10)
S94A*
171,603
Construction of Ashmont Neighbourhood Park OS7 (Kokoda Park + Graham Park)
S94A*
60,000
11
100,000
Combined Delivery Program & Operational Plan
finance. Project Description
Funding Source
Boorooma New Playground Open Space Works
S94*
60,000
Irrigation for Tatton Park
S94* - Southern Parks Fund
50,000
Bedervale Park Upgrade Works (Shared Pathway & Picnic Node)
S94* - Southern Parks Fund
150,000
Replace Softfall - Botanic Gardens Adventure Playground
GPR
Equex Multi Purpose Stadium
NSRF Grant $4,400,000 + Borrowings $3,328,021 + S94* $1,187,848 + Netball Contribution $250,000
Exhibition Centre - Kooringal Road Exit
Borrowings (GPR Future Years Loan Repayments)
Marrambidya Wetland Enhancements
Contribution
Oasis - Diving Board Replacements
Oasis Building Renewal Reserve
Oasis - Pool Heating Systems (All Pools)
Oasis Plant Reserve
Oasis - 25m Pool Dive Starting Blocks
Oasis Building Renewal Reserve
Civic Theatre Auditorium & Foyer Refurbishment
S94* Civic Theatre Recoupment
310,000
Welcoming - Roundabouts
Public Art Reserve
25,000
Connecting - NightLights/ BrightLights
Public Art Reserve
50,000
Connecting - Exhibition Centre & Bolton Pk
Public Art Reserve
79,000
Placeshaping - VillageWorks
Public Art Reserve
25,000
Placeshaping - NeighbourWorks Public Art Reserve
25,000
Placeshaping - ArtWorks
Public Art Reserve
14,000
Graveyard Creek Bridge
Bridge Replacement Reserve
240,000
Tim Hedditch Bridge
R2R Grant
240,000
Upgrade Main City (1 in 100) + North Wagga (1 in 20) Levee Systems
Special Rate Variation (SRV) $7.78M + Grant $15.47M
Sewer - Pump Station - SPS06 Shaw Street - Renewals
Sewer Reserve
Sewer - Pump Station - SPS17 Cleardale - Renewals
Sewer Reserve
Sewer - Pump Station - SPS28 Equex - Renewals
Sewer Reserve
12
Combined Delivery Program & Operational Plan
2016/17
2017/18 2018/19 2019/20
84,840 9,165,869
1,775,157
30,000
30,000 30,300 200,000 17,853
4,208,262
4,418,675
4,639,609
230,000 300,000 280,000
4,871,590
finance. Project Description
Funding Source
Sewer - Pump Station - SPS12 CSU - New Assets
Sewer Reserve
Sewer - Pump Station - SPS22 Elizabeth Avenue, Forest Hill New Assets
Sewer Reserve
Sewer - Pump Station - SPS23 Ashmont - New Assets
Sewer Reserve
Sewer - Pump Station - SPS30 Bomen - New Assets
Sewer Reserve
2016/17
2017/18 2018/19 2019/20
50,000 1,032,585
1,337,543 1,816,072
Sewer Treatment Works - Forest Sewer Reserve Hill Plant - New Assets Sewer - Pump Station - SPS 08 Boorooma - Increase Pump Capacity
822,870
1,218,677
Sewer Reserve
76,689
Sewer - Pump Station - SPS 08 Sewer Reserve Boorooma - Emergency/Wet Weather Detention STG
254,414
Sewer - Pump Station - SPS01 + SPS02 Sewer Rising Main Network Diversion
Sewer Reserve
801,984
GWMC - Construction of a new Waste Cell (Design + Construction)
Solid Waste Reserve
GWMC - Road Rehabilitation
Solid Waste Reserve
GWMC - Purchase of Large Cardboard Compactor
Solid Waste Reserve
250,000
GWMC - Additional Leachate Pond
Solid Waste Reserve
1,500,000
GWMC - Progressive Site Rehabilitation
Solid Waste Reserve
Riverina Intermodal Freight & Logistics Hub
2016/17 - Grant Funds $8.1M + Borrowings $10.5M (GPR + S94A $200K - Future Years Loan Repayments) + Sale of Land $1.25M + Internal Loans Reserve $2.6M (Repaid in 2017/18 when land sales are realised)+ S94A $35K, 2017/18 - Grant Funds $3.52M + Borrowings $4.58M (GPR + S94A $200K - Future Years Loan Repayments) + Sale of Land $545K+ Internal Loans Reserve $1.1M (Repaid in 2017/18 when land sales are realised) + S94A $15K
22,480,117
9,775,134
Eunony Bridge Replacement
Grant + GPR + Fit for the Future Reserve
8,002,000
1,812,000
150,000
4,242,000
300,000
230,000
13
Combined Delivery Program & Operational Plan
finance. Project Description
Funding Source
Riverside - Hampden Bridge Legacy Project
GPR
Civic Building Energy Efficiency Project - Civic Building Solar Panels
Sustainable Energy Reserve
Upgrade Airconditioning - Civic Centre
S94* Civic Building Recoupment
500,000
Air Conditioning Treatment System (Civic Centre Air Conditioning Fresh Air Energy Recovery Ventilation Upgrade)
S94* Civic Building Recoupment
335,000
Buildings - Civic Theatre - AirConditioning Upgrade
Civic Theatre Operating Reserve
Civic Centre Southern Lift Control Upgrade
GPR
Airport - Design + Construct Upgrade to Code C: Taxiways A, B, D, E
Grant
TOTAL LTFP CAPITAL PROGRAM
2016/17
2017/18 2018/19 2019/20
283,400 125,000
500,000
Combined Delivery Program & Operational Plan
250,000
303,000 102,000 4,000,000
51,562,067
22,727,959
* Timing of project is subject to receipt of sufficient Section 94 and Section 94A funds
14
500,000
14,207,089
11,969,760
finance.
delivery
program recurrent
capital works. This table displays the recurrent projects and programs scheduled for the next four years. This table also identifies the funding source for the projects including General Purpose Revenue (GPR), Developer Service Plan (DSP) and Developer Contributions (S94).
Project Description
Funding Source 2016/17
2017/18
2018/19
2019/20
Implement Sportsgrounds Lighting Program - Frenchs Field (Mt Austin)
GPR $180,000 + Contributions $122,500
Implement Sportsgrounds Lighting Program - Harris Park (Mt Austin)
GPR $180,000 + Contributions $282,000
462,000
Implement Sportsgrounds Lighting Program McPherson Oval (Nth Wagga)
GPR $180,000 + Contributions $177,000
357,000
Renew Recreational Assets
GPR
20,800
21,632
22,497
23,397
Renew Parks Facilities
GPR
113,289
117,820
122,533
127,434
Renew Playground Equipment
GPR
185,000
140,000
325,000
100,000
Renew Recreational Facilities
S94A $9,653 + GPR balance
25,692
138,830
144,383
150,158
Upgrade of Backstage Equipment - Civic Theatre
GPR
10,400
10,816
11,249
11,699
Acquire pieces for the Australian Print Collection
GPR
8,280
8,571
8,874
9,189
Acquire pieces for the GPR National Art Glass Collection
20,700
21,428
22,185
22,973
302,500
Upgrade Existing Bus Shelters
GPR
20,000
Implement Street Lighting Improvements Program Roads and Traffic Facilities (as per schedule)
GPR
50,000
50,000
50,000
Capital renewal - reseal program
GPR + Regional Roads Block Grant $295,873 (incrementing 3% each yr)
1,589,229
1,656,715
1,729,233
1,526,360
15
20,000
Combined Delivery Program & Operational Plan
finance. Project Description
Funding Source 2016/17
Conduct Urban Asphalt Program
GPR
Pavement Rehabilitation Program
2016/17 - R2R Grant $2,360,973 + Regional Roads Block Grant $591,747, 2017/18 - R2R Grant $1,335,509 + Regional Roads Block Grant $609,499 + GPR $1,130,449, 2018/19 onwards R2R Grant $841,526 (incrementing 3% each year) + Regional Roads Block Grant $627,784 (incrementing 3% each year) + GPR Balance
Replace Kerb and Gutter
GPR
Gravel Resheets
2017/18
2018/19
2019/20
731,340
760,594
791,018
822,659
2,952,720
3,075,457
3,207,340
3,349,192
424,838
441,832
459,505
477,885
2016/17 - R2R Grant $781,123 + GPR $675,395, 2017/18 onwards GPR
1,456,518
1,514,779
1,575,370
1,638,385
Renew and Replace Culverts 2016/17 - GPR $20,000 + R2R Grant $500,000, 2017/18 onwards GPR
520,000
540,800
562,432
584,929
3,702,000
2,953,000
3,090,600
2,507,000
Replace Plant and Equipment
Plant Replacement Reserve $2,221,200 + Sale of Plant $1,480,800 (amounts vary each fin yr)
Eliminate Sewer Joint Connections
Sewer Reserve
140,809
140,809
140,809
140,809
Implement renewal program for Gravity Sewer
Sewer Reserve
130,000
130,000
130,000
130,000
Implement Sewer Mains Rehabilitation Program
Sewer Reserve
1,200,000
1,200,000
1,200,000
1,200,000
Replacement and Renewal of Sewer Plant
Sewer Reserve
50,000
50,000
50,000
50,000
Flood Pumps - Progressively GPR Upgrade Pumps
40,400
40,400
40,400
40,400
Upgrade of Stormwater pit lids to lightweight lids
40,400
16
GPR
Combined Delivery Program & Operational Plan
40,400
finance. Project Description
Funding Source 2016/17
Renew Community Amenities - Henwood Park
GPR
190,962
Renew Community Amenities - Collingulllie Oval
GPR
196,690
Renew Community Amenities - Bolton Park
GPR
Renew Community Amenities - Anderson Oval
GPR
Renew Community Amenities - Frenchs Fields
GPR
TOTAL LTFP CAPITAL PROGRAM
2017/18
2018/19
2019/20
202,590 208,668 214,928 13,687,199
17
13,168,586
14,638,578
13,743,169
Combined Delivery Program & Operational Plan
finance.
delivery
program concept
capital works. A comprehensive capital works review was conducted as part of the 2016/17 LTFP budget review process resulting in the ‘concepts’ category for capital projects being introduced. The principles established to determine the treatment and categorisation of capital works projects into the concepts list included any projects that are pending development; unclear project description; projects that had not been commenced; or projects where joint funding has not yet been confirmed. Projects can be transferred from the concepts list to the capital works delivery program during the 2016/17 financial year via budget variations presented to Council for adoption.
Project Description Funding Source
2016/17 2017/18
Bolton Park Stadium Upgrade
Borrowings $4,211,940 + S94* $68,657 + Royal Lifesaving NSW Contribution $300,000 + Sale of Land $400,000 + PCYC Contribution $1,830,000
Oasis Splash Pad water feature
S94* - Oasis Recoupment
680,000
Oasis Water Slide
S94* - Oasis Recoupment
850,000
Construct Estella Community Centre
S94* $600,000 + GPR $199,643 + S94 (Old Plan) $121,838 + Reserve $178,519 + Borrowings $100,000 (GPR - Future Years Loan Repayments)
Civic Theatre Auditorium & Foyer Refurbishment
S94* Civic Theatre Recoupment
Public Art Projects - TBA
Public Art Reserve
Farrer Road Widening & Reconstruction
S94*
Boorooma Street Slip Lane into Boorooma West
S94*
297,000
Amundsen Bridge Boorooma East to Boorooma
S94*
563,024
18
Combined Delivery Program & Operational Plan
2018/19
2019/20
6,810,597
1,200,000
332,000 100,000 1,137,182
100,000
100,000
finance. Project Description Funding Source
2016/17 2017/18
Glenfield Road Corridor – Works to improve traffic flow (RT16)
S94*
100,000
Glenfield Road/Pearson St - Red Hill Rd to Dobney Ave Widening to 4 lanes (Full length-3 km)
S94*
Bourke Street and Bourkelands Drive Intersection Upgrade
S94*
107,252
Harris Road/Pine Gully Road - Dual Lane Roundabout
S94*
1,211,564
Pine Gully Road/Old Narrandera Road Intersection Upgrade
S94*
Red Hill Road and Hudson Drive – Intersection improvements
S94*
Supplementary Regional Roads Block Grant project TBA
Block Grant -Supp
Regional Roads Repair Block Grant - project TBA
Repair Block Grant
Implement Pedestrian Access and Mobility Program (PAMP)
2018/19
2019/20
3,117,550
1,394,272
1,077,439
16,088
91,164
199,000
199,000
199,000
199,000
400,000
400,000
400,000
400,000
Grant $42,000 + GPR $42,000
84,000
84,000
84,000
84,000
Implement Cycleways
Grant $30,000 + GPR $30,000
60,000
60,000
60,000
60,000
Renew Sewage Treatment Works - Tarcutta
Sewer Reserve
Sewer - Pump Station SPS15 Hammond Avenue - New Assets
Sewer Reserve
150,000
401,016
Sewer - Pump Station SPS01 Sheppard Street Renewals
Sewer Reserve
150,000
350,000
Sewer - Pump Station SPS15 Hammond Avenue - Renewals
Sewer Reserve
Sewer - Pump Station SPS21 Smith Street Forest Hill - Renewals
Sewer Reserve
300,000
Sewer - Pump Station - SPS26 Kyeamba Renewals
Sewer Reserve
180,000
Sewer - Pump Station Sewer Reserve SPS27 Tarcoola - Renewals
170,000
Sewer - Gravity Network Extension - New Assets
Sewer Reserve
GWMC - Constuct RRC
Solid Waste Reserve
100,000
1,000,000
897,803 1,785,920 19
Combined Delivery Program & Operational Plan
finance. Project Description Funding Source GWMC - Alternate Waste Solid Waste Reserve Treatment Facility (Business Case 15/16 + Construction 16/17)
2016/17 2017/18
2018/19
1,750,000
Implement Road and Drainage Works - Hammond Avenue Industrial Areas
S94A*
128,703
Implement Stormwater Drainage Improvements Jubilee Oval to Red Hill Rd - Wagga West DSP Area
Stormwater DSP * $265,580 + Civil Projects Reserve $24,000
289,580
Undertake Stormwater Drainage Upgrade Contour Ridge (Lloyd) approx 5 km - Wagga West DSP Area
Stormwater DSP * $119,102 + Stormwater Drainage Reserve $9,600
128,702
Undertake Stormwater Drainage Upgrade - Day, Higgins, Tarcutta St Wagga West DSP Area
Stormwater DSP * $248,129 + Stormwater Drainage Reserve $20,000
268,129
Murray St Stormwater Project
Stormwater Levy
Wollundry Lagoon Levee Bank
S94* Civic Building Recoupment
Riverside - Continuation of Shared Path Network
GPR $152K + Pedestrian River Crossing Reserve $198K
Riverside - Wagga Beach CBD Carparking Car Park upgrade including Reserve $110K + Grant CCTV and lighting funding $224K
3,200,000 50,000
200,000
150,000
100,000
334,582
Civic Building Energy Efficiency Project - Library Lights
S94* Civic Building Recoupment
29,200
Civic Building Energy Efficiency Project - Historic Council Chambers Lights
S94* Civic Building Recoupment
88,809
Civic Building Energy Efficiency Project - Art Gallery & Glass Gallery Lights
S94* Civic Building Recoupment
399,278
LMC - Treatment of Re-use Water
LMC Reserve
275,000
LMC - Alterations to cattle selling ring
LMC Reserve
39,655
LMC - Layback Kerb to Cattle Load in
LMC Reserve
LMC - New Cattle Draft
LMC Reserve
498,520
LMC - New Cattle Stacking LMC Reserve Pens
765,002
20
Combined Delivery Program & Operational Plan
16,995
100,000
2019/20
finance. Project Description Funding Source
2016/17 2017/18
LMC - New Cattle Delivery Pens
LMC Reserve
1,586,200
LMC - Calf Pens
LMC Reserve
226,600
LMC - New Pedestrian Bridge to Site Services
LMC Reserve
339,900
LMC - Linemarking & Signage
LMC Reserve
11,330
LMC install new fan draft for receivals
LMC Reserve
45,320
LMC CCTV & security (partial)
LMC Reserve
33,990
LMC new cow draft and selling pens
LMC Reserve
LMC new light vehicle parking
LMC Reserve
736,450
LMC fencing (partial)
LMC Reserve
67,980
Airport - Redevelop terminal - Internal Baggage Claim and Retail Section
Grant
TOTAL LTFP PROJECT CONCEPTS
2018/19
2019/20
1,439,819
2,000,000
9,011,400
17,679,054
11,596,631
4,754,530
* Timing of project is subject to receipt of sufficient Section 94, Section 94A and DSP funds
21
Combined Delivery Program & Operational Plan
finance.
contributions
and
donations. This table outlines proposed contributions and donations made by Council for the 2015/2016 financial year.
S356 Donations Community Community Leases Rental Subsidy Rural Villages Leaps and Bounds Early Childhood program Community Resource Centre
872,665 20450 649
Wagga Women's Bowling Club
3,700
Regional Heritage Transport Association
1,085
Wagga Wagga Show Society
9,850
Senior Citizens Week Contributions
2,200
Tolland Public School swimming lessons for the disadvantage youth
940
Riverina Down Syndrome hire of Music Bowl
170
Cancer Council hire of Paramore Park
570
Combined riders of Wagga Bolton Park Stadium Toy Run
115
Kurrajong Waratah hire of Music Bowl and Civic Theatre -Christmas Spectacular
2,200
Australian Scrabble Association - Hire of Senior Citizens Centre
200
Rotary Youth Drivers Course
800
Rotary Circus Quirkus
2,200
Rotary Club Street Banners
115
Murrumbidgee Rotary Club Teddy Bears Picnic
390
Legacy Civic Theatre Hire
2,500
Kurrajong Waratah hire of Links Art Gallery
280
Ashmont Public School Learn to swim for disadvantaged youth
730
Friends of the Botanic Gardens - hire of play hall
540
Suicide Prevention Network meeting room hire Wagga Autism Support Group annual walk
1,150 85
Wagga and Riverina Orienteers - annual school championships
150
Breast Cancer Group Inc. (Wagga Wagga)- Mothers Day Walk
85
Country Hope - Walk for Hope
85
Melanoma Institute - March Walk
85
Wagga Wagga & District Family History Society
22
Combined Delivery Program & Operational Plan
474
finance. North Wagga Residents Association
474
Rotary Club of Wagga Wagga Shine Awards
240
Walk 4 William
80
Ladysmith Memorial Hall Committee
474
Over 60’s Touch Football Group
550
Cancer Council – Biggest Morning Tea
80
Mangoplah Cookardina Eastlakes United Football and Netball Club
550
Collingullie Soliders Memorial Hall
474
Salvation Army Red Shield Appeal
110
Uranquinty Neighbourhood Centre Management Committee
515
Wagga Women’s Health Centre
850
Cultural Eastern Riverina Arts Program Contribution
19,158
School of Arts Contribution
2,500
Eisteddfod Donation
3,090
Summer School for Strings
2,500
Riverina Conservatorium of Music events
4,891
Cantelina Singers
1,850
ADFAS Riverina
1,836
Scholarships Riverina Conservatorium Scholarship
2,000
Riverina Academy of Sport
4,000
Annual Grants Program - Various Community Development Grants
30,000
Sustainable Environments Grants S356
7,000
Neighbourhood/Rural Village Grants
22,000
Arts & Culture Grants
25,000
Event Grants
20,000
Local Heritage Fund
16,000
Sporting and Cultural Facility Improvement Grants
30,000
Rural Hall Infrastructure Grants
25,000
Road Closures - Various ANZAC Day Parade
5,500
Lake to Lagoon Fun Run
10,000
Wagga Gold Cup Chariot Race
3,000
Remembrance Day
2,000
Reserve Forces Day
1,500
Christmas Toy Run
2,000
Other
23
Combined Delivery Program & Operational Plan
finance. New Major Events Sponsorship
100,000
Small Business (New Category)
12,500
Parkes Shire Council Event
1,000
Donation of Council Fees & Charges
6,000
Rural Counselling Service
5,150
Committee 4 Wagga
7,500
Total CONTRIBUTIONS AND DONATIONS
1,301,835
HOW TO READ THE COMBINED DELIVERY PROGRAM & OPERATIONAL PLAN This relates to the Community Strategic Plan, Ruby & Oliver
tHIS IS THE DELIVERY PROGRAM ITEM (4 YEAR COMMITMENT) This is the Operational Item (12 months) These are our measures
24
Combined Delivery Program & Operational Plan
Who is responsible for the Operational Item? First quarter target
Second quarter target
Third quarter target
Fourth quarter target
engaged & involved community.
we are an
engaged & involved community.
25
Combined Delivery Program & Operational Plan
engaged & involved community. Our Community has access to information
1.1 Actively engage with the community to ensure open communication Manager, Corporate Strategy Communications and Governance
1.1.1 Manage Council’s internet and intranet Design concept for Council’s website completed
-
-
-
-
-
10%
Manager, Corporate Strategy Communications and Governance
1.1.4 Facilitate Neighbourhood meetings Deliver the council endorsed schedule of meetings
100%
Manager, Corporate Strategy Communications and Governance
1.1.2 Coordinate and administer Council’s Your Say webpage Increase Your Say membership
-
100%
100%
100%
100%
1.2 Provide and deliver up to date information to Council stakeholders 1.2.1 Provide regular information and events to stakeholders on the local and regional economy Business events held
Manager, Economic Development and Visitor Economy
3 events
3 events
3 events
3 events
Business Wagga website updates
3 updates
3 updates
3 updates
3 updates
Social media posts
12 posts
12 posts
12 posts
12 posts
Economic Pulse publication
1 Publication
1.2.2 Promote opportunities to build relationships with Planning stakeholder groups Planning Advisory Committee Meetings held Monthly Industry Newsletter created and distributed
Manager, Development Services
1 meetings
1 meeting
1 meeting
1 meeting
2 Newsletters
3 Newsletters
3 Newsletters
3 Newsletters
1.3 Deliver excellence in customer service throughout the organisation Manager, Information and Customer Services
1.3.1 Develop, maintain and improve Council’s corporate application systems Maintain online services system availability
99%
99%
1.3.2 Maintain, support and renew Council’s information and communication technology Percentage of support requests resolved on time
85%
85%
99%
99%
Manager, Information and Customer Service 85%
85%
Manager, Information and Customer Services
1.3.3 Provide quality customer service from the Customer Service Centre First Call resolutions
60%
60%
60%
60%
Customer Satisfaction
95%
95%
95%
95%
1.3.4 Facilitate a legislatively compliant open access information - Government Information Public Access Act
Manager, Information and Customer Services
Formal Applications are responded to within 20 working days
100%
100%
100%
100%
Informal applications are responded to within 25 days
100%
100%
100%
100%
Manager, Corporate Strategy, Communications and Governance
1.3.5 Provide community communication through traditional and social media Weekly Council news published
12 publications
12 publications
12 publications
12 publications
Increase social media followers
-
-
-
Facebook 20% Twitter 5% Instagram 10%
26
Combined Delivery Program & Operational Plan
engaged & involved community. 1.4 Actively Implement and promote Council’s best practice governance policies and procedures 1.4.1 Work in partnership with the Electoral Commission to deliver the Council Pre-Election Program Compliance with Electoral Commission requirements
-
-
Delivery of Pre-Election Program
Manager, Corporate Strategy, Communications and Governance 100%
Delivery of councillors Induction Program
100%
1.4.2 Implement the action Plan from the Diversity Strategy Actions identified within the Diversity Strategy for 16/17 are implemented
100%
Manager, People and Culture 100%
100%
100%
100%
Manager, Corporate Strategy, Communications and Governance
1.4.3 Facilitate Council and Standing Committee meeting processes Percentage of agendas available on Council's website 3 days prior to the meeting
100%
100%
100%
100%
Percentage of minutes posted to Council's website within 5 working days
100%
100%
100%
100%
1.5 Ensure Council’s Risk Management process reflects industry best practice across all of Council’s functions 1.5.1 Implement Council's Governance and Risk Management Framework and Action Plan
Manager, Corporate Strategy, Communications and Governance
Facilitate review of council’s risk register
-
100%
-
100%
Review and implement insurance renewal
-
-
-
100%
Manager, Corporate Strategy, Communications and Governance
1.5.2 Review and update Annual Risk Management Action Plan Plan submitted to Council's insurer StateWide Critical issues reviewed by Executive Management Team and Audit and Risk Committees
-
-
-
1 Plan
1 report
1 report
1 report
1 report
1.5.3 Coordinate the review of the Corporate Business Continuity Plan, Divisional Disaster Recovery and Emergency Response Plans Annual test and review of business Continuity Plan
-
-
Manager, Corporate Strategy, Communications and Governance -
1 Test
1.6 Provide a sustainable workforce with the capability and capacity to support current and future service delivery 1.6.1 Develop & Implement the Learning & Development Strategy
Manager, People and Culture -
-
-
100%
100%
100%
100%
100%
100% of staff are on electronic Timesheets
-
-
--
100%
Learning & Development Aurion Module Reviewed and project plan developed for system changes
-
100%
-
-
Strategy is developed and implemented 75% of staff have access & functionality to mobile solutions for processing of personnel information through councils Human Resource Information System
1.6.2 Review and implement the Workforce Plan Implement planned actions for 2016/17 from the Workforce Action Plan
Manager, People and Culture 100%
100%
100%
100%
1.7 Strive for zero harm and a culture of health and safety 1.7.1 Maintain Workplace Health and Safety management system Audit program actions implemented
Manager, People and Culture
100%
100%
Implementation of all WHS Procedures as Identified
100%
85% 100%
27
Combined Delivery Program & Operational Plan
engaged & involved community. 1.8 Support and encourage innovative and continuous improvement 1.8.1 Deliver Council’s Annual Internal Audit Program in accordance with Council’s four year Internal Audit Strategy Annual work program completed
25%
50%
Manager, Internal Audit Services 75%
100%
We provide the community opportunities to be involved in decisions impacting them
1.9 Conduct strategic and operational planning and reporting of performance Manager, Corporate Strategy, Communications and Governance
1.9.1 Implement Council’s Integrated Planning and Reporting Framework Quarterly Performance Report Council
1 report
1 report
1 report
1 report
Combined Delivery Plan & Operational Plan adopted by Council
-
-
-
100%
Annual Report published
-
1 report
-
-
100%
-
-
-
Implement the community survey action plan
-
-
100%
-
Prepare End of Term Report
-
-
-
60%
Review Community Strategic Plan
Manager, Corporate Strategy, Communications and Governance
1.9.2 Implement the Asset Management Framework Develop a concept brief for the review of the Asset Management Plans
-
-
-
100%
Complete the revaluation of community assets, other assets and land improvements
-
-
-
100%
1 meeting
1 meeting
1 meeting
1 meeting
Asset Management Steering Committee meetings held 1.9.3 Undertake a review of Council’s planning framework
Manager, Executive Services
Review Development Control Plan
-
-
-
100%
Review Local Enviromental Plan
-
-
-
100%
Review Section 94 and 94A Developer Contributions Plan
-
-
-
100%
1.10 Ensure the long term financial sustainability of Council through effective and prudent financial management 1.10.1 Report on Council's Financial position and performance
Manager, Finance
Revise the Long Term Financial Plan
-
-
-
100%
Complete the 2014/15 Financial Statements
-
100%
-
-
Unqualified audit report received
-
1 Report
3 reports
4 reports
4 reports
4 reports
Financial performance reports submitted to Council 1.10.2 Achieve Budget Control An overall balanced or surplus budget position is achieved for the year
Manager, Finance -
-
1.10.3 Complete Treasury activities Rates and annual charges levied including arrears is collected in the financial year
≥ $0
-
Manager, Finance -
94%
-
-
Investments are managed in accordance with Council's Investment Policy and Strategy
100%
100%
100%
100%
Percentage of creditors are paid within their payment terms
100%
100%
100%
100%
28
Combined Delivery Program & Operational Plan
engaged & involved community. Rates and annual charges are levied in accordance with statutory limits and requirements
100%
100%
1.10.4 Implement Fit For the Future Action Plan and Report on performance against the Fit For the Future benchmarks
100%
100%
Manager, Finance
Operating Performance Ratio
-
-
-
≥5.3%
Own Source Revenue
-
-
-
≥60%
Building and Asset Renewal Ratio
-
-
-
≥100%
Infrastructure Backlog Ratio
-
-
-
<9.65%
Asset Maintenance Ratio
-
-
-
≥59.53%
Debt Service Ratio
-
-
-
<20%
We provide opportunities for people to connect
1.11 Facilitate identified Council events for the benefit of the wider community 1.11.1 Deliver Council community events
Manager, Events
Little Big Day Out
-
100%
-
-
Australia Day
-
-
100%
-
1.11.2 Provide advice and support to assist in securing a variety of events Response to requests
Manager, Events
100%
100%
1.11.3 Develop an event toolkit and update resources for internal and external event organisers Review, Update and maintain event toolkit and resources for internal and external event organisers
-
-
-
5 events
5 events
5 events
5 events
Manager, Executive Services 3 ceremonies
3 ceremonies
3 ceremonies
3 ceremonies
Manager, Executive Services
Implement the Fit 2 Perfom Strategy Action items completed
100% Manager, Events
1.15.6 Market Events outside the Wagga Wagga Local Government Area Market Events in See Canberra, Out & About Destination Magazines
100%
Manager, Events
1.11.5 Coordinate Citizenship ceremonies Citizenship ceremonies conducted
100%
Manager, Events
1.11.4 Provide advice and support to existing events Number of existing events support
100%
3 Adverts
3 Adverts
3 Adverts
3 Adverts
1.12 Deliver a broad range of cultural services, community programs and events that support participation, lifelong learning and engagement by all 1.12.1 Deliver library services and collections
Manager, Community Services
Number of visitors to the library per quarter
45,000 visitors
45,000 visitors
45,000 visitors
45,000 visitors
Number of new members per quarter
800 members
800 members
800 members
800 members
Number of library collection item loans including hardcopy and electronic.
63,500 loans
63,500 loans
63,500 loans
63,500 loans
Number of people attending library events inhouse and offsite
3,500 visitors
3,500 visitors
3,500 visitors
3,500 visitors
1.12.2 Deliver learning and community programs, events, exhibitions and partnerships through the Wagga Wagga City Library Number of diverse children, adults and youth programs delivered
Manager, Community Services
10 programs
11 programs
11 programs
10 programs
Community partnerships activities delivered
5 activities
5 activities
5 activities
5 activities
Number of displays and exhibitions
6 displays/ exhibitions
6 displays/ exhibitions
6 displays/ exhibitions
6 displays/ exhibitions
29
Combined Delivery Program & Operational Plan
engaged & involved community. Average satisfaction rating from the library programs/ services Outreach Services provided Bulk deliveries to hostels and facilities and individual access to specialist collections and services.
85%
85%
85%
85%
4 services
4 services
4 services
4 services
20 deliveries
20 deliveries
20 deliveries
20 deliveries
1.12.3 Riverina Regional Library (RRL) provides centralised library services to 13 member Councils in accordance with agreed Service Levels and a Deed of Agreement
Director, Riverina Regional Library
Council meets the obligations of the Executive Council as prescribed in the RRL Deed of Agreement.
100%
100%
100%
100%
Riverina Regional Library provides agreed services to Wagga Wagga City Council as prescribed in the Service Level Agreement between Council and RRL.
100%
100%
100%
100%
1.12.4 Maintain Council's online Community Directory and produce annual publication Community Directory published annually
-
-
1.12.5 Provide diverse program of exhibitions from the Historic Council Chambers and Botanical Gardens Museum sites Number of visits
6,500 visits
85%
85%
85%
85%
Manager, Community Services 10 programs
10 programs
10 programs
10 programs
Manager, Community Services
450 hours
450 hours
450 hours
450 hours
33 museums
33 museums
33 museums
33 museums
1.12.8 Deliver an annual schedule of Cultural Programs
Manager, Community Services
Community satisfaction rating
-
-
1.12.9 Deliver educational programs in conjunction with theatre seasons Customer satisfaction rating
85%
Number of tickets purchased
-
85%
12,000 tickets
1.12.11 Facilitate performances at the Civic Theatre by commercial and community hirers Theatre hire revenue
$10,000
-
85%
Manager, Community Services
1.12.10 Deliver the annual subscription season, children's season and senior's season
$15,000
1.12.12 Deliver Twilight by the Lagoon, Hall-a-Day Adventures and Music at Midday Attendance
Manager, Community Services 6,500 visits
1.12.7 Provide outreach museum advisory service to Riverina regional volunteer run museums
Number participating museums
100%
6,500 visits
1.12.6 Provide museum education and public programs
Hours of service provided
-
6,500 visits
Customer satisfaction
Number of education and public programs delivered
Manager, Community Services
85% Manager, Community Services
-
12,000 tickets
Manager, Community Services $15,000
$15,000
Manager, Community Services
1000 attendees
300 attendees
200 attendees
-
-
85%
-
-
Average participant satisfaction rating with program 1.12.13 Produce and deliver an annual community production
Manager, Community Services
Number of tickets purchased
-
1,500 tickets
-
-
Average participant satisfaction rating with program
-
85%
-
-
1.12.14 Improve access to quality artistic experiences for diverse groups in the community Community Partnership Activities
-
-
1.12.15 Present a diverse range of Art Gallery exhibitions of regional and national significance Art Gallery exhibitions
Manager, Community Services -
6 activities
Manager, Community Services
7 exhibitions
8 exhibitions
7 exhibitions
8 exhibitions
Visitor satisfaction
-
-
-
85%
Visitor attendance
-
-
-
30,000 attendances
3 exhibitions
3 exhibitions
3 exhibitions
3 exhibitions
Exhibitions by local and regional artists
30
Combined Delivery Program & Operational Plan
engaged & involved community. 1.12.16 Deliver a diverse range of Art Gallery events and programs that are accessible and relevant to the community
Manager, Community Services
10 events/ programs
11 events/ programs
10 events/ programs
11 events/ programs
Participant satisfaction
-
-
-
85%
Participant attendance
-
-
-
10,000 attendances
Art Gallery events and public programs
1.12.17 Acquire pieces for the Australian Print Collection
Manger, Community Services
Items are selected in accordance with Art Gallery Collections Management Policy
100%
100%
1.12.18 Acquire pieces for the National Art Glass Collection
100%
100%
Manager, Community Services
Items are selected in accordance with Art Gallery Collections Management Policy
100%
100%
100%
100%
1.13 Provide, facilitate and maintain community and cultural infrastructure Capital Projects 1.13.1 Civic Theatre Auditorium & Foyer Refurbishment
Manager of Community Services
1.13.2 Public Art Welcoming Project - Roundabouts
Manager of Community Services
1.13.3 Public Art Connecting Project - NightLights/BrightLights
Manager of Community Services
1.13.4 Public Art Connecting Project - Exhibition Centre & Bolton Pk
Manager of Community Services
1.13.5 Public Art Placeshaping Project - VillageWorks
Manager of Community Services
1.13.6 Public Art Placeshaping Project - NeighbourWorks
Manager of Community Services
1.13.7 Public Art Placeshaping Project - ArtWorks
Manager of Community Services
1.13.8 Develop and care for Art Collections of national significance
Manager, Community Services
Develop acquisition report
-
-
-
1 report
Conduct annual Art Gallery collections audit
-
-
-
1 report
1.13.9 Provide museum collection management process Number of objects accessioned and de-accessioned
Manager, Community Services -
-
1.13.10 Maintain and renew cultural infrastructure and technology to ensure that the Civic Theatre remains viable and effective
-
20 objects
Manager, Community Services
Maintain technical equipment to a safe and professional standard
100%
100%
100%
100%
Implement Civic Theatre Asset Management Plan
100%
100%
100%
100%
1.13.11 Upgrade of Backstage Equipment - Civic Theatre
Manager, Community Services
Replacement of Onstage Wash Lights
100%
1.14 Advocate, partner and facilitate the delivery of affordable and accessible services and infrastructure 1.14.1 Promote and provide education and care via the Family Day Care and In Home Care programs Number of accredited Educators
Manager, Community Services
45 educators
45 educators
45 educators
45 educators
850 places
850 places
850 places
850 places
80%
80%
80%
80%
Number of facilitated professional development sessions per quarter
120 sessions
120 sessions
120 sessions
120 sessions
Number of play sessions delivered in rural villages per term
90 sessions
10 sessions
10 sessions
10 sessions
Weekly number of education and care places available Percentage of places filled
1.14.2 Work with Senior Citizens and Ngurra Hub to increase usage of their facilities Percentage increase in usage rating against available hours
-
Manager, Community Services -
31
-
10%
Combined Delivery Program & Operational Plan
engaged & involved community. We protect our heritage
1.15 Manage local heritage There is no proposed actions for Local Heritage across the 2016/17 Opertional Plan
We have a variety of transport options
1.16 Support active transport Manager, Environment and Recreation Services
1.16.1 Develop a Active Trasport Cycling Plan Produce Wagga Wagga Intergrated Transport Strategy
32
Combined Delivery Program & Operational Plan
100%
-
-
-
safe & healthy community.
safe & healthy community.
we have a safe &
healthy
community.
33
Combined Delivery Program & Operational Plan
safe & healthy community. We have access to beautiful parks and recreational spaces throughout the commmunity
2.1 Enhance and maintain parks, recreational facilities and open space Capital Projects 2.1.1 Complete Lineal Park (Promenade - Amundsen) - Corridor Recreation Improvements
Manager, Enviroment and Recreation Services
2.1.2 Construct of Forest Hill Neighbourhood Park (OS12)
Manager, Enviroment and Recreation Services
2.1.3 Construct of Mt Austin Neighbourhood Park (Harris Park - OS10)
Manager, Enviroment and Recreation Services
2.1.4 Construct of Ashmont Neighbourhood Park OS7 - (Kokoda Park + Graham Park)
Manager, Enviroment and Recreation Services
2.1.5 Construct Boorooma New Playground - Open Space Works
Manager, Enviroment and Recreation Services
2.1.6 Implement Irrigation for Tatton Park
Manager, Enviroment and Recreation Services
2.1.7 Complete Bedervale Park Upgrade Works (Shared Pathway & Picnic Node)
Manager, Enviroment and Recreation Services
2.1.8 Complete Exhibition Centre - Kooringal Road Exit
Manager, Enviroment and Recreation Services
2.1.9 Complete Marrambidya Wetland Enhancements
Manager, Enviroment and Recreation Services
2.1.10 Deliver burial and cremation services at Wagga Wagga Lawn Cemetery, Monumental Cemetery and four rural cemeteries
Manager, Parks Strategic Operations
Respond to customer requests within 5 business days
100%
100%
100%
100%
Deliver scheduled maintenance
100%
100%
100%
100%
Manager, Parks Strategic Operations
2.1.11 Deliver Open Space Mowing programs Mowing cuts undertaken Community satisfaction with the presentation of our parks
4 cuts
5 cuts
4 cuts
4 cuts
-
85%
-
85%
Manager, Parks Strategic Operations
2.1.12 Deliver Roadside Mowing programs Roadside mowing cuts undertaken
1 cut
1 cut
2.1.13 Deliver parks mowing program at high profile parks (Botanic Gardens, Collins Park, Victory Memorial Gardens, Baylis Street and Civic Precinct) Number of mowing cuts undertaken
10 cuts
10 cuts
2.1.14 Deliver horticultural programs at high profile parks (Botanic Gardens, Collins Park, Victory Memorial Gardens, Baylis Street and Civic Precinct) Community satisfaction with the presentation of our parks
85%
-
1 cut
1 cut
Manager, Parks Strategic Operations 10 cuts
9 cuts
Manager, Parks Strategic Operations 85%
-
Manager, Parks Strategic Operations
2.1.15 Manage Council's street trees Customer requests completed within 21 days
90%
90%
90%
90%
Number of new and replacement trees planted
550 trees
-
-
-
90%
90%
90%
90%
Percentage of trees replaced within useful life expectancy
Manager, Parks Strategic Operations
2.1.16 Provide tree management services Percentage of requests completed within 7 days
100%
100%
34
Combined Delivery Program & Operational Plan
100%
Manager, Parks Strategic Operations
2.1.17 Maintain Wagga Wagga Zoo Maintain zoo compliance
100%
100%
100%
100%
100%
safe & healthy community. Manager, Environment and Recreation Services
2.1.18 Review Council's Recreation and Open Space Strategy -
Strategy adopted by Council
-
-
100%
Manager, Environment and Recreation Services
2.1.19 Deliver Annual Playground Replacement Program Replace Croker Park playground
-
-
-
100%
Refurbish Emblem Park playground
-
-
-
100%
Refurbish Hardy Avenue playground
-
-
-
100%
Replace Lake Village playground
-
-
-
100%
Refurbish Nathan Park playground
-
-
-
100%
Replace Tennyson Playground
-
-
-
100%
Manager, Environment and Recreation Services
2.1.20 Replacement of recreation assets and facilities identified as poor or very poor Number of condition 4 / 5 assets renewed
8 renewals
8 renewals
8 renewals
8 renewals
Number of condition 4/5/ facilities renewed
2 renewals
2 renewals
2 renewals
2 renewals
Manager, Environment and Recreation Services
2.1.21Renew Park facilities identified as poor or very poor Number of condition 4/5/ facilities renewed
2 renewals
2 renewals
2 renewals
Manager, Environment and Recreation Services
2.1.22 Conduct the Playgrounds inspection and maintenance program Number of playgrounds inspections undertaken
2 renewals
93 inspections
93 inspections
93 inspections
93 inspections
Manager, Council Businesses and Property
2.1.23 Renew Community Amenities Henwood Park
-
-
-
100%
Collingullie Oval
-
-
-
100%
2.2 Provide recreational programs Manager, Environment and Recreation Services
2.2.1 Provide aquatic facilities and programs Number of visitations Swim and Survive bookings
60,000 visits
85,000 visits
1,200 bookings 1,600 bookings 1,600 bookings
1 workshop
60,000 visits 1,200 bookings
Manager, Environment and Recreation Services
2.2.2 Run professional development workshops for recreation and sporting clubs Workshops undertaken
95,000 visits
1 workshop
1 workshop
1 workshop
2.3 Implement the Riverside Master Plan Manager, Strategic Commercial and Economic Development
2.3.1 Riverside - Hampden Bridge Legacy Project
We are a healthy community
2.4 Implement public health and safety initiatives Manager, Environment and Recreation Services
2.4.1 Deliver food safety and health education program Number of resource developed and distributed
1 resource
1 resource
2.4.2 Investigate reported incidents or complaints of roaming livestock, dog attacks and nuisance animals Percentage of incidents attended / investigated within 5 business days
100%
35
100%
1 resource
1 resource
Manager, Regulatory Services 100%
100%
Combined Delivery Program & Operational Plan
safe & healthy community. Percentage of reported dog attack incidents investigated with 2 business days
100%
100%
100%
100%
Percentage of reported incidents investigated within 5 business days
100%
100%
100%
100%
2.4.3 Maintain Glenfield Road Animal Shelter operations Animals released from shelter
Manager, Regulatory Services 80%
80%
2.4.4 Provide regulatory service for parking enforcement and abandon vehicles Respond to regulatory requests within 3 working days
100%
80%
80%
Manager, Regulatory Services 100%
2.4.5 Administer street furniture licenses and display of goods
100%
100%
Manager, Regulatory Services
Percentage of alfresco dining furniture licenses issued within 3 business days
90%
90%
90%
90%
Percentage of activity applications approved/processed within 3 business days
90%
90%
90%
90%
2.4.6 Provide development compliance services Respond to regulatory requests within 3 business days
Manager, Regulatory Services 90%
90%
90%
90%
Manager, Environment and Recreation Services
2.4.7 Implement regulatory and compliance programs Retail food business premises inspected
25%
50%
75%
100%
Skin penetration, hairdressing and mortuary business premises inspected
25%
50%
75%
100%
-
50%
100%
-
100%
100%
100%
100%
Swimming pools and cooling towers inspected Customer complaints responded to within 5 days
Manager, Environment and Recreation Services
2.4.8 Conduct the Safe Sharps Disposal Program Scheduled inspections/collections undertaken
100%
100%
100%
100%
Customer requests responded to within 24 hours
100%
100%
100%
100%
2.5 Provide and implement an inspection framework that supports public safety 2.5.1 Undertake swimming pool compliance inspections 100% of applications in each respective reporting quarter for these of swimming pool inspections are initiated within 7 days of application.
Manager, Development Services 100%
100%
2.5.2 Implement provisions of the Awnings Policy Premises on the Council's Awning Register are forwarded annual awnings maintenance reminder letters
100%
100%
Manager, Development Services -
-
2.5.3 Administer Annual Fire Safety Certificate Statements Program
100%
-
Manager, Development Services
Percentage of All Annual Fire Safety Statement reminder letters distributed by 28 November annually
-
100%
-
-
Percentage of Annual Fire Safety Statement reminder letters are received by 28 February annually
-
-
90%
-
2.6 Provide waste management services Capital Projects 2.6.1 Gregadoo Waste Management Centre Road Rehabilitaion
Manager, Waste and Stormwater Services
2.6.2 Provision of kerbside waste collection
Manager, Waste and Stormwater Services
Kerbside missed bins do not breach contractual conditions to ensure level of service 2.6.3 Provide Landfill Waste Operations
36
Combined Delivery Program & Operational Plan
<215
<215
<215 Manager, Waste and Stormwater Services
<215
safe & healthy community. 100%
Compliance with Environmental Protection Licence
100%
100%
100%
Manager, Environmental and Community Services
2.6.4 Conduct on-site sewage management inspection Percentage of scheduled on-site management system inspected
100%
100%
100%
100%
There is reduced crime in our community
2.7 Improve community safety and reduce incidence of crime through community partnerships, environmental design and monitoring of high risk areas Manager, Information and Customer Service
2.7.1 Maintain the CCTV Operation network Maintain system uptime
99%
99%
99%
99%
Police requests for footage provided within 2 working days
100%
100%
100%
100%
Arrangements are in place to respond to and recover from natural disasters
2.8 Collaborate with local emergency organisations to ensure effective emergency and disaster plans are in place 2.8.1 Lead and support the Local Emergency Management Committee Local Emergency Management Plan reviewed Local Emergency Management committee held
Manager, Engineering services -
-
-
100%
1 Meeting
1 Meeting
1 Meeting
1 Meeting
2.9 Partner with State Government to manage the Wagga Wagga district flood plain 2.9.1 Facilitate the Floodplain Risk Management Advisory Committee Floodplain Risk Management Advisory Committee meetings held
Manager, Engineering services
1 Meeting
1 Meeting
2.9.2 Undertake Community consultation for review of the Riverine Floodplain Risk Management Plan Outcomes reported to Council
-
-
2.9.3 Deliver major overland flow flood risk management plan Final report /model document published
1 Meeting
1 Meeting
Manager, Engineering services -
1 Report
Manager, Engineering services -
-
37
-
100%
Combined Delivery Program & Operational Plan
growing economy.
we have a
growing economy.
38
Combined Delivery Program & Operational Plan
growing economy. We have a skilled workforce
3.1 Implement and devElop strategies to attract and retain highly skilled new residents to Wagga Wagga Manager, Economic Development and Visitor Economy
3.1.1 Provide assistance to prospective residents and new residents Business Wagga and Evocities website updates Welcome to Wagga Wagga events Evocities Operations meetings
3 updates
3 updates
3 updates
3 updates
1 event
-
1 event
-
1 meeting
1 meeting
1 meeting
1 meeting
There is growing business investment in our community
3.2 Ensure Wagga Wagga Airport is a market leader in delivering regional air services Capital Projects 3.2.1 Upgrade Airport Taxiways A, B, D, E to Code C
Manager, Council Bussinesses and Property
3.2.2 Promote Wagga Wagga Airport as a regional business hub and key contributor to the regional economy
Manager, Council Businesses and Property
Develop a Marketing Strategy
25%
50%
75%
100%
3.3 Ensure the Livestock Marketing Centre is a market leader in providing livestock sales and services 3.3.1 Ensure the Livestock Marketing Centre is a market leader in providing livestock sales and services Implement the 2015/2016 Livestock Marketing Centre Strategic Master Plan actions
-
-
3.3.2 Manage Livestock Marketing Centre operations in accordance with industry regulations and stakeholder requirements Maintain National Saleyard Quality Assurance accreditation Number of user group meetings held
Manager, Council Businesses and Property -
100%
Manager, Council Businesses and Property
100%
100%
100%
100%
1 meeting
1 meeting
1 meeting
1 meeting
3.3.3 Implement scheduled capital works from the Livestock Marketing Centre Strategic Master Plan Scheduled works completed
25%
50%
Manager, Council Businesses and Property 75%
100%
3.4 Implement Bomen Strategic Master Plan Capital Projects 3.4.1 Eunony Bridge Replacement
Manager, Strategic Commercial and Economic Development
3.4.2 Riverina Intermodal Freight and Logistics (RIFL) Hub Project
Manager, Strategic Commercial and Economic Development
Tourism is a large industry in our community
3.5 Promote a positive image of Council in both the local community and the broader region Manager, Corporate Strategy Communications and Governance
3.5.1 Provide organisational graphic design Review, design, complete corporate graphic design requests within agreed deadlines
100%
100%
100%
100%
Respond to requests to develop material and support usage of the of the City Brand across Council and the community
100%
100%
100%
100%
-
-
-
100%
Review Corporate Brand guidelines
39
Combined Delivery Program & Operational Plan
growing economy. 3.6 Develop and implement tourism activities and plans to attract visitors to Wagga Wagga Manager, Economic Development and Visitor Economy
3.6.1 Assist with tourism product and industry promotion What's On Guides produced
3 guides
3 guides
3 guides
3 guides
Visit Wagga website updates
3 updates
3 updates
3 updates
3 updates
Social media posts
12 posts
12 posts
12 posts
12 posts
-
1 update
-
1 update
Visitor Economy Guides updated
3.6.2 Collaborate with state and regional partners to increase visitation to Wagga Wagga and the Manager, Economic Development region and Visitor Economy Update visit NSW listings of accomodation and attractions Riverina Regional Tourism meetings
20 updates
20 updates
20 updates
20 updates
1 meeting
1 meeting
1 meeting
1 meeting
3.6.3 Advocate for and support the delivery of regional, state and national sporting events Events held
2 events
2 events
Manager, Environment and Recreation Services 2 events
2 events
There is government investment in our community
3.7 Provide financial assistance to community groups and projects 3.7.1 Administer the Community Grants Program
Manager, Community Services
Finalise payment of the 2016/2017 grants
-
100%
-
-
Advertise the 2017/2018 grants program
-
-
100%
-
Information workshops held
-
-
-
100%
Assess applications
-
-
-
100%
40
Combined Delivery Program & Operational Plan
we have a
sustainable natural & built environment.
41
Combined Delivery Program & Operational Plan
sustainable natural & built environment. We monitor the quality of our environment
4.1 effectively manage water resources 4.1.1 Undertake water quality monitoring of Lake Albert, Wollundry Lagoon and the Murrumbidgee River Water quality monitoring of local waterways
Manager, Environment and Recreation Services
3 samples
3 samples
4.1.2 Undertake monitoring of groundwater levels and salinity of bores Groundwater bores monitored and recorded
3 samples
3 samples
Manager, Environment and Recreation Services
200 Bores
200 Bores
200 Bores
200 Bores
We promote environmental sustainability through education and sustainable practices
4.2 Implement the Resource Recover Strategy 4.2.1 Implement the Resource Recovery Strategy
Manager, Waste and Stormwater Services
Complete the Local Government Waste and Resource Recovery Data Survey
-
-
-
100%
4.3 Implement environmental practices and initiatives 4.3.1 Identify and implement resource efficiency initiatives
Manager, Environment and Recreation Services
Resource efficiency initiatives to be completed
-
-
4.3.2 Monitor and report on Councilâ&#x20AC;&#x2122;s environmental performance
1 Initiative
1 Initiative
Manager, Environment and Recreation Services
Utility consumption data provided to facility managers
1 Report
1 Report
1 Report
1 Report
State of the Environment Report completed
1 Report
-
-
-
4.4 Implement community programs to improve environmental sustainability 4.4.1 Coordinate events, workshops and educational material for the community on environmental sustainability Number of events Number of workshops
Manager, Environment and Recreation Services
1 event
1 event
1 event
1 event
2 workshops
2 workshops
2 workshops
2 workshops
4.5 Minimise detrimental impacts in the environment 4.5.1 Coordinate environmental compliance activities Percentage of breaches investigated within two weeks Number of dumped rubbish sites cleaned up Number of industrial trade waste to sewer samples taken
Manager, Regulatory Services 90%
90%
90%
90%
50 sites
50 sites
50 sites
50 sites
9 samples
9 samples
9 samples
9 samples
We improve the quality of our environment
4.6 Protect and enhance natural areas 4.6.1 Renew Lake Albert Management Plan Plan adopted by Council
Manager, Environment and Recreation Services -
-
4.6.2 Implement a program of improvements to natural areas Revegetation/restoration project undertaken
4.6.4 Implement the noxious weed control program
42
Combined Delivery Program & Operational Plan
100%
Manager, Environment and Recreation Services 100%
-
4.6.3 Undertake condition surveys of Council managed reserve Number of surveys completed
-
-
-
Manager, Environment and Recreation Services 5 surveys
5 surveys
5 surveys
5 surveys
Manager, Environment and Recreation Services
sustainable natural & built environment. Number of kilometres of roadside sprayed Number of hectares of reserves sprayed
-
1200kms
1200kms
-
400ha
400ha
400ha
400ha
4.6.5 Undertake the noxious weed inspection program Number of inspections completed
Manager, Environment and Recreation Services 80 inspections
80 inspections
80 inspections
80 inspections
4.7 Manage contaminates sites 4.7.1 Monitor contaminated sites Contaminated sites monitored
Manager, Environment and Recreation Services 100%
100%
100%
100%
We maintain our current and future infrastructure
4.8 Plan, construct, maintain and manage sealed roads Capital Projects 4.8.1 Graveyard Creek Bridge Replacement
Manager, Engineering
4.8.2 Tim Hedditch Bridge Replacement
Manager, Engineering
4.8.3 Construct, maintain and renew sealed roads
Manager, Engineering
Sealed road resealed
-
-
4.8.4 Conduct road pavement rehabilitation program Sealed road pavement rehabilitation
250,000 m2
Manager, Engineering -
-
4.8.5 Construct, maintain and renew kerb and gutters Kerb and gutters replaced
-
-
40,000m2
Manager, Engineering -
-
4.8.6 Conduct Urban Asphalt Program
-
1,500m2
Manager, Engineering
Trail/Johnston roundabout
-
-
-
100%
Trail/Gurwoood roundabout
-
-
-
100%
Fernleigh/Bourke Intersection
-
-
-
100%
4.8.7 Renew and Replace Culverts
Manager, Engineering
Westbrook Road Culvert replacment
-
-
-
100%
Oura Road Culvert Renewal
-
-
-
100%
4.9 Plan, construct, maintain and manage unsealed roads 4.9.1 Construct, maintain and renew unsealed roads Kilometres of road gravel resheeted
Manager, Engineering -
-
-
40km
4.10 Plan, construct, maintain and manage streetscapes 4.10.1 Provide and maintain bus and taxi shelters and other associated infrastructure Routine maintenance undertaken as scheduled
100%
Manager, Engineering 100%
100%
100%
4.11 Plan construct, maintain and manage pathways 4.11.1 Construct, maintain and renew footpaths, shared paths and cycleway Number of footpath trip points removed
-
Manager, Engineering -
-
2,000 trip points
4.12 Plan, construct, maintain and manage levees Capital Projects 4.12.1 Upgrade Main City (1 in 100) + North Wagga (1 in 20) Levee Systems
Manager, Engineering
4.13 Plan, construct, maintain and manage sewer systems Capital Projects
43
Combined Delivery Program & Operational Plan
sustainable natural & built environment. 4.13.1 Sewer - Pump Station - SPS06 Shaw Street - Renewals
Manager, Waste and Stormwater
4.13.2 Sewer - Pump Station - SPS28 Equex - Renewals
Manager, Waste and Stormwater
4.13.3 Sewer - Pump Station - SPS12 Charles Sturt University - New Assets
Manager, Waste and Stormwater
4.13.4 Provision of sewage treatment plant operations
Manager, Waste and Stormwater Services
Compliance with Environmental Protection Licence Standards for Treatment of Sewage
100%
100%
4.13.5 Provision of sewer operations, reticulation
100%
100%
Manager, Waste and Stormwater
Percentage of all call outs within 1hr during business hours or 2hrs outside of business hours
90%
90%
90%
90%
Kilometres of sewer main and associated house connections rehabilitated
-
-
-
3km
4.13.6 Process liquid trade waste discharges into the sewerage system in accordance with the NSW Office of Waters Liquid Trade Waste Regulation Guidelines Percentage of liquid trade waste discharges into the sewerage system in accordance with the NSW Office of Waters Liquid Trade Waste Regulation Guidelines
100%
100%
4.13.7 Eliminate Sewer Joint Connections
Manager, Waste and Stormwater Services 100%
Manager, Waste and Stormwater Services
Complete wrks and undertake works within the annual budgetary parameters
100%
4.13.8 Implement renewal program for Gravity Sewer
Manager, Waste and Stormwater Services
Complete Campell Place sewer diversion
100%
4.13.9 Replacement and renewal of sewer plant and equipment Percentage of identified items replaced within manufacturers timeframes
100%
Manager, Waste and Stormwater Services 100%
100%
100%
100%
4.14 Plan, construct, maintain and manage drainage systems Manager, Waste and Stormwater Services
4.14.1 Deliver annual Stormwater and flood mitigation network works program System inspected and cleaned
500m
500m
500m
500m
Number of Flood gates inspections
-
1 inspection
-
1 inspection
Number of Levee bank inspections
-
1 inspection
-
1 inspection
Manager, Waste and Stormwater Services
4.14.2 Flood Pumps - Progressively Upgrade Pumps Complete Pump upgrade at flood gate 7 & 8 at Wiradujri Bridge
-
-
100%
Manager, Waste and Stormwater Services
4.14.3 Upgrade of Stormwater pit lids to lightweight lids Percentage of identified Lids replaced within 1 day
-
100%
100%
100%
100%
4.15 Plan, construct, maintain and manage community buildings Capital Projects 4.15.1 Upgrade Airconditioning Civic Centre
Manager, Council Businesses and Property
4.15.2 Air Conditioning Treatment System (Civic Centre Air Conditioning Fresh Air Energy Recovery Ventilation Upgrade)
Manager, Council Bussinesses and Property
4.15.3 Equex Multi Purpose Stadium
Manager, Enviroment and Recreation Services
4.15.4 Deliver appropriately maintained buildings fit for purpose
Manager, Council Businesses and Property
44
Combined Delivery Program & Operational Plan
sustainable natural & built environment. Percentage of complaints responded to within 48 hours
100%
100%
4.15.5 Administer leasing and licensing of Council owned or Council controlled property Council properties vacancy rate under 5%
<5%
<5%
<5%
<5%
Manager, Council Businesses and Property 100%
100%
4.15.7 Deliver Civic Theatre maintenance program Percentage of schedule maintenance performance
100%
Manager, Council Businesses and Property
4.15.6 Administer real property dealings Percentage of occasions when response actions are initiated within 10 working days
100%
100%
100%
Manager, Community Services 100%
100%
4.15.8 Maintain Art Gallery infrastructure and operations to National Industry standards
100%
100%
Manager, Community Services
Conduct annual review of Art Gallery infrastructure
-
-
-
1 review
Review Art Gallery policies and procedures
-
-
-
1 review
4.16 Implement sustainable procurement practices 4.16.1 Manage Council's Stores Services
Manager, Procurement Services
Stock turnover ratio of Council stores
4.1
4.1
4.1
4.1
Average utilisation of major plant
75%
75%
75%
75%
4.16.2 Replace Plant and Equipment Replace plant and vehicles in line with the endorsed program
Manager, Procurement Services 100%
100%
100%
100%
We plan for a growing community
4.17 Maintain and update strategic land use plans 4.17.1 Prepare amendments to the Wagga Wagga Local Environmental Plan (LEP) 2010 and Development Control Plan (DCP) 2010
Manager, Strategic Planning
Number of planning proposals prepared and submitted to the Department of Planning & Environment
-
-
-
1 proposal
Number of amendments to the Development Control Plan are prepared
-
-
-
1 amendment
4.17.2 Implement the Wagga Wagga Spatial Plan 2013/43 short term actions
Manager, Strategic Planning
Prepare a Rural Land Strategy to inform LEP and DCP amendments
-
-
-
50%
Prepare a Residential Strategy to inform LEP and DCP amendments
-
-
-
85%
4.17.3 Implement actions from the Section 94 Developer Contributions review Complete the Wagga Wagga Integrated Transport Strategy Commence planning necesary to identify main street upgrade projects consistent with the Wagga Wagga Retail Growth Strategy 2010-2015
Manager, Strategic Planning
100%
-
-
-
-
-
-
25%
4.18 Assess and determine Planning and Development applications 4.18.1 Process and issue Section 149 (2) and 149 (5) Planning Certificates Applications processed within 5 working days
Manager, Strategic Planning
90%
90%
4.18.2 Assess and determine Development applications, Construction Certificates and Building Certificates
90%
90%
Manager, Development Services
Development applications determined within 40 days of receipt
80%
80%
80%
80%
Construction Certificates (CC) applications determined within 40 days of approval of Development Application
70%
70%
70%
70%
Building Certificate Applications determined within 21 business days
70%
70%
70%
70%
45
Combined Delivery Program & Operational Plan
sustainable natural & built environment. 4.18.3 Administer Subdivision Certificate and Sewerage and Drainage applications
Manager, Development services
Subdivision Certificate Applications are determined within 10 days business timeframe
70%
70%
70%
70%
Assess and determine Section 68 (Public) Sewerage and Drainage applications within 7 business days
80%
80%
80%
80%
4.18.4 Assess and deter Section 68 Plumbing and Drainage (Private) applications Assess and deter Section 68 Plumbing and Drainage (Private) applications
46
Combined Delivery Program & Operational Plan
85%
85%
Manager, Development Services 85%
85%
contact us.
questions?
comments? contact us. contact us Wagga Wagga City Council PO Box 20 Cnr Baylis & Morrow Sts Wagga Wagga NSW Ph: 1300 292 442 Fax: (02) 6926 9199 Email: council@wagga.nsw.gov.au Follow @WaggaCouncil on Twitter to get the news, events and emergency information straight from the source.
www.wagga.nsw.gov.au