combined
DELIVERY PROGRAM & operational plan 2013/2014
1
Combined Delivery Program & Operational Plan
about this plan.
what is this
document all about?
What is a Delivery Program? The Delivery Program is Council’s commitment towards actioning the goals outlined in the Community Strategic Plan (Ruby & Oliver) after considering available resources. The Delivery program is a four year plan aligned to the term of the elected Council.
What is an Operational Plan? The Operational Plan is a supporting document to the Delivery Program outlining projects and services to be delivered to achieve the commitments of the Delivery Program. The Operational Plan is a one year plan. Both the Delivery Program and Operational Plan items consider social, environmental, economic and civic leadership outcomes as well as apply the principles of access and equity and social justices.
2
Combined Delivery Program & Operational Plan
contents.
contents. Introduction 4 Financial overview 8
Delivery Program Budget
9
Capital Works 11 Contributions and Donations 19
We are an engaged & involved community 21 Delivery Program Items 22 Operational Items 22
We have a safe & healthy community
31
Delivery Program Items 32 Operational Items 32
we have a growing economy
34
Delivery Program Items 35 Operational Items 35
we have a sustainable natural & built environment 37 Delivery Program Items 38 Operational Items 38
REVENUE & PRICING POLICY
43
3
Combined Delivery Program & Operational Plan
reporting framework.
our
reporting framework. Integrated planning and reporting
Community Strategic Plan
Integrated Planning and Reporting (IP&R) is the planning and reporting framework that Wagga Wagga City Council uses to work towards achieving the community’s vision. Under NSW State legislation, Councils must prepare a number of plans which provide details on how Council intends to deliver works and services in the short and long term. This is based on the community’s priorities which have been identified through consultation and engagement as well as the resources available to council in delivering these items. The framework ensures Councils illustrate their various plans together, to understand how they interact in planning for the future. The framework opens the way for Council and our community to have important discussions about funding priorities, service levels and shaping local identity and to plan in partnership for a more sustainable future. As illustrated below, the plans are designed to flow so that the broader objectives in a high level plan are translated into specific targets, actions and measures.
The purpose of this plan is to identify the community’s main priorities and aspirations for the future and to plan for achieving these goals. The name of our Community Strategic Plan is Ruby & Oliver. The objectives are balanced across Social, Economic, Environment and Civic Leadership and will need to be addressed beyond the boundaries of our Council – the help of other partners, stakeholders and community members contribute to the implementation of this plan. The Community Strategic Plan reflects the Wagga Wagga community’s long term priorities and aspirations and forms the foundation for all Council operations and subsequent plans. The plan sets out the specific directions, strategies, targets and measures necessary for achieving the following outcomes: • We are an engaged and involved community • We are a safe and healthy community • We have a growing economy • We have a sustainable natural and built environment
Resourcing plans workforce
Asset Management
Long Term
2013/2017
2013/2017
2013/2014
PLAN
plan
1
4
Combined Delivery Program & Operational Plan
Workforce Plan 2013 - 2017
financial plan
1
Combined Delivery Plan & Operational Plan
reporting framework. The resourcing plans consist of three components: The Workforce Plan, Asset Management Plan and the LongTerm Financial Plan. Council’s resource plans illustrate Council’s capacity to deliver on goals identified in the Community Strategic Plan informing the development of the Delivery Program.
Annual Report
The Workforce Plan aims to ensure Council’s workforce has the right skills, at the right time and in the right quantities to ensure sustainable service delivery into the future. The Long-Term Financial Plan outlines the future finances of Council’s operations taking into consideration key elements such as rate movements, service levels to our community, major infrastructure, assets replacement and renewals as well as borrowings and cash reserves. The Asset Management Plan provides Council with a clear direction and goal for managing Council’s assets and physical infrastructure.
This Document - Combined Delivery Program and Operational Plan
The Annual Report outlines Council’s achievements in implementing the Delivery Program and Operational Plan. The report also contains the audited financial statements. In the year of an ordinary election, the annual report will also include an End of Term Report identifying progress against the measures identified in the Community Strategic Plan.
combined
DELIVERY PROGRAM & operational plan 2013/2014
1
Combined Delivery Plan & Operational Plan
Council’s Delivery Program is a statement of commitment to the community from each newly elected council and sets out a four year plan to respond to the community’s long-term vision as stated in Council’s 10 year Community Strategic Plan. In preparing a Delivery Program Council considers the available resources and its capacity to deliver services and projects to the community. The Operational Plan is a sub-plan of the Delivery Program and sets out the projects, programs and activities to be undertaken in a 12 month period. The Operational Plan includes a detailed budget and financial snapshot.
Quarterly Reporting quarterly report July - September 2013
Council produces a quarterly report outlining progress against the adopted Operational Plan, measuring the success of the implementation of Council’s Delivery Program. 5
Combined Delivery Program & Operational Plan
introduction
Mayor &
general manager welcome
2013/2014. Welcome to Wagga Wagga City Council’s Combined Delivery Program and Operation Plan 2013/2014. This plan outlines Council’s commitment to the community and planned actions for working towards achieving the goals outlined in the Community Strategic Plan (Ruby & Oliver). In 2012, conversations with the community regarding the development of a new Community Strategic Plan were initiated, and the campaign was given the identity of Ruby & Oliver. Ruby & Oliver were the most popular names for babies born in Wagga Wagga in 2011. Ruby & Oliver go to our schools, we work with them and they are seniors in our community who have led the way. Ruby & Oliver describe who we are as a community now and who we are into the future. The Delivery Program is Council’s four year forward planning document, which is then supported by a detailed Operational Plan outlining specific services and projects due to be delivered during the 2013/2014 financial year. Wagga Wagga City Council has a number of new and continuing projects over the coming 12 months to contribute to meeting the community’s goals, some of which include: • Expansion of the Glenfield Road Animal Shelter • Four year renewal program of Neighbourhood Parks in Ashmont, Tolland, Bourkelands, Lake Albert, Forest Hill and Mount Austin • City entrances improving the City image • Replacement and enhancement of amenities at Duke of Kent Oval • Further landscaping of Wollundry Lagoon • Construction of a Resource Recovery Centre at the Gregadoo Waste Management Centre • Implementation of Riverside Master Plan landscaping recommendations at the Wagga Beach 6
Combined Delivery Program & Operational Plan
• • • •
Redevelopment of the internal baggage claim and retail section of the Airport terminal Design work for the Levee Bank upgrade Remediation of the former gasworks site in Tarcutta Street Upgrade of Soccer grounds as part of the Implementation of the Soccer Strategy
Within the Delivery Program and Operational Plan is a focus on building strong partnerships and how Council plans to respond to the State and Commonwealth Governments’ encouragement to find innovative ways of delivering services. The commitment towards building partnerships is demonstrated through projects including: • • • •
Development of community equestrian facilities at the Riverina Regional Equestrian Centre in partnership with local equestrian groups and Charles Sturt University The redevelopment of Connolly Ruby Park in partnership with Wagga Wagga Rugby Union The development of the Multi Purpose Stadium including sports facilities and convention and exhibition facilities at Bolton Park and Equex in partnership with PCYC, Wagga Netball and the State Government The Riverina Intermodal Freight and Logistics project in partnership with the private sector, State and Commonwealth governments
Additionally, Council has a strong role to play in facilitating opportunities that may have a positive social and economic benefit to the broader community. In the coming year, two examples of this are with NSW Harness Racing and the Wuai Group of China. Council is looking forward to working closely with the NSW Harness Racing Authority as they advance their plans to establish one of their four planned sites across the State and
introduction
continuing ongoing dialogue with the Wuai Group on their plans to establish an International Wholesale Trade Centre in Wagga Wagga. The 2013/2014 capital budget includes an allocation of $23.7 million to the Riverina Intermodal Freight and Logistics Hub. Progress on this project this year will include the Eunony Bridge Road Deviation Project, the purchase of land at Bomen, Bomen Road northern extensions and Bomen link road crossing modifications. Although the Operational Plan budget has been balanced for the 2013/14 year Council acknowledges that it has forecast a deficit budget for the remaining three years of the Delivery Program. Council’s commitment to delivering a variety of projects and services for our growing community continues to be an ongoing challenge with a limited income base. In the short term, Council will review capital projects and service delivery across the organisation to ensure a balanced budget is achieved for the remaining three years of the Delivery Program. Additionally Council will seek input from the community on the provision of Council services and undertake a review of services and programs in 2013/14. As part of this
process Council will also seek community input on funding sources, including the possibility of Council applying to the Independent Pricing and Regulatory Tribunal (IPART) for a Special Rate Variation in the 2014/15 year. Funding options, together with matching project and service delivery to the needs of the community, must be considered to ensure that Council’s current satisfactory financial position is maintained for future generations. Council’s progress towards the projects and services outlined in the Operational Plan will be reported against on a quarterly basis. These reports are available for viewing on our website or from our Customer Service Counter. We look forward to working with the community to achieve short term goals and progress towards achieving the aspirational long term goals.
Rod Kendall Mayor 7
Phil Pinyon General Manager Combined Delivery Program & Operational Plan
finance.
financial
overview.
8
Combined Delivery Program & Operational Plan
finance.
delivery
program 4 year budget. This table displays Council’s net budget position for the period of the Delivery Program. Please see the following pages for more details on the budgeted Capital Works Program and a detailed 2013/2014 Operational Budget
revenue and expenses
Budget Budget Budget Budget 2013/2014 2014/2015 2015/2016 2016/17
Income from Continuing Operations Rates and Annual Charges
54,015,182
56,010,665
58,081,032
60,229,131
User Charges and Fees
22,648,395
24,527,578
26,330,016
27,702,952
Interest and Investment Revenue
4,386,393
4,508,329
4,636,688
4,731,975
Other Revenues
1,722,410
1,799,417
1,834,511
1,870,751
Grants and Contributions Provided for Operating Purposes
13,981,150
14,336,060
17,781,773
14,789,412
Grants and Contributions Provided for Capital Purposes
13,159,428
10,082,013
8,637,698
8,695,204
109,912,959
111,264,061
114,301,719
118,019,424
39,229,406
40,853,179
43,132,197
44,790,783
3,962,122
4,890,006
6,601,756
6,623,671
Materials and Contracts
28,888,054
24,890,542
25,534,275
25,410,015
Depreciation and Amortisation
21,332,118
22,517,582
23,774,206
25,106,734
Other Expenses
13,335,429
13,720,316
14,166,864
14,605,786
106,747,129
106,871,625
113,209,298
116,536,989
3,165,829
4,392,436
1,092,422
1,482,435
(49,621,938)
(44,250,915)
(20,038,590)
(24,363,355)
(1,939,716)
(2,564,504)
(3,526,906)
(3,792,701)
1,628,880
1,667,550
1,567,950
949,290
25,434,827
17,299,731
101,012
(2,608,660)
Total Income from Continuing Operations
Expenses from Continuing Operations Employee Benefits and On-Costs Borrowing Costs
Total Expenses from Continuing Operations
Net Operating Profit /(Loss) for the Year
Capital (Balance Sheet) and Reserve Movements Capital Expenditure Loan Repayments (External) Proceeds from Sale of intangible & tangible Assets Net Transfers (to)/from Reserves
9
Combined Delivery Program & Operational Plan
finance. Total Capital (Balance Sheet) and Reserve Movements
(24,497,947)
(27,848,137)
(27,896,534)
(29,815,426)
Net Result (including depreciation & other noncash items)
(21,332,118)
(23,455,701)
(26,804,112)
(28,332,991)
21,332,118
22,517,582
23,774,206
25,106,734
0
(938,120)
(3,029,907)
(3,226,257)
Add back Depreciation Expense (non-cash)
Cash Budget Surplus/(Deficit)
10
Combined Delivery Program & Operational Plan
finance.
delivery
program
new projects
capital works. This table displays new projects and capital work items to be undertaken for the period of the Delivery Program (4 years) displayed by directorate. This table also identifies the funding
source for the projects including General Purpose Revenue (GPR), Developer Service Plan (DSP) and Developer Contributions (S94).
Project Description
Funding Source
2013/14 2014/15 2015/16 2016/17
City Entrances
S94(Old Plan)*
Undertake review of Developer Contribution Plans
S94*
Implement Animal Shelter Expansion Design and construct
Borrowings (GPR Future Years Loan Repayments)
660,000
Airport Public Art Project - Stages 2 and 3
Public Art Reserve
180,000
Digital Infrastructure & Mapping Public Art Project
Public Art Reserve
60,000
Explorer Park at Amundsen Street Embellishment and landscape works
S94*
Lineal Park (Promenade - Amundsen) Corridor Recreation Improvements
S94*
Oasis Carpet Replacement
Oasis Building Renewal Reserve
Indoor Multi Purpose Facilities
2013/14 - S94A $500K + $S94 $1,000,111; 2014/15 - Borrowings $8,184,000 + S94 $610,000 PCYC Contribution $1,830,000 - potential RDAF funding and contribution from netball $250,000
Oasis - Replace Wave Ball with new recreational facility
GPR
Conolly Rugby Park expansion
2013/14 Internal Loans Reserve $200,000 + Partnership with SIRU Contribution $200,000, (2014/15 - GPR payback to Internal Loans Reserve)
90,000
90,000 107,252
365,186 1,014,556 55,550 1,500,000
10,874,111
272,700 400,000
11
Combined Delivery Program & Operational Plan
finance. Estella new playground - Local open space works
S94*
51,481
Lloyd new playground - Local open space works Construct Estella Community Centre
S94* S94* $600,000 + GPR $199,643 + S94 (Old Plan) $121,838 + Reserve $178,519 + Borrowings $100,000 (GPR - Future Years Loan Repayments)
1,200,000
S94*
54,481
Boorooma new playground - Open space works Construction for renewal of Ashmont Neighbourhood Park (Skate Park)
51,481
Parks and Recreation Reserve (Sale of 9 Saxon St Land)
Construction for renewal of Tolland Neighbourhood Park
S94A*
Construction for renewal of Bourkelands Neighbourhood Park
S94A*
Construction for renewal of Forest Hill Neighbourhood Park
S94A*
Construction for renewal of Lake Albert Neighbourhood Park
S94A*
Construction for renewal of Mt Austin Neighbourhood Park
S94A*
Implement recommendations from the Recreation and Open Space Strategy 2005-2015 (as per schedule)
S94 (Old Plan)*
Beautify roundabout at Tarcutta and Forsyth Streets
Public Art Reserve
Replace amenities building at Duke of Kent Oval (as part of adopted Soccer Strategy)
Borrowings (GPR Future Years Loan Repayments)
200,000
171,603 171,603 128,702 128,702 171,603 25,000
50,000 400,000
Development of community equestrian facilties in partnership with Charles Sturt University (stage 1 completion works)
Borrowings (GPR Future Years Loan Repayments)
100,000
Wollundry Lagoon landscaping
S94 (Old Plan)*
100,000
Bakers Lane and Inglewood Road Intersection improvements
S94*
17,675
Bakers Lane and Sturt Highway Intersection improvements
S94*
44,188
Bakers Lane widening
330,082
Bourke Street and Bourkelands Drive Intersection Upgrade
S94*
107,252
Glenfield Road Corridor – Widening/ duplication of rail bridge and associated drainage. (Note - includes additional work for Glenfield Road - Urana Street Intersection upgrade)
S94*
100,000
Kooringal Road widening to 4 lanes (Full length - 4km)
S94*
Red Hill Road – Widening to 4 lanes S94* Plumpton Road to Glenfield Plus widening at Dalman Parkway & Yentoo Drive 2.7km Red Hill Road and Hudson Drive – Intersection improvements
12
S94*
Combined Delivery Program & Operational Plan
1,179,768 144,790
820,475
16,088
91,164
finance. Red Hill Road West – Street lighting
S94*
Undertake stormwater drainage upgrade studies - Wagga West Developer Service Plan area
Stormwater DSP $225,228 + GPR $42,901
80,439 268,129
Upgrade the Main City Levee Bank - CBD Borrowings Flood Protection $6,566,665 ($1,333,333 for 4 years + $839,833 for year 5) + DNR Grant $13,133,335 ($2,666,667 for 4 years + $1,679,667 for year 5). Borrowing debt to be serviced by GPR
4,000,000
4,000,000
4,000,000
Eunony Bridge improvements to carry heavy mass vehicles
Roads to Recovery Grant
303,000
Underground petroleum storage system replacement
Plant Replacement Reserve
130,000
Depot - Additional 3 sheds to western side
Plant Replacement Reserve
45,450
Design and concept sewer scheme Oura
Sewer Reserve
Sewer Reticulation Scheme - Oura
Sewer Reserve
Sewer Reticulation Scheme - Humula
Sewer Reserve
Sewer Reticulation Scheme - San Isidore
Sewer Reserve
Install Sewage Pumping Station Glenfield East
Sewer Reserve
1,185,593
Install Sewage Pumping Station Glenfield West
Sewer Reserve
87,400
Install Sewage Pumping Station Storage Gracelands - SPS20
Sewer Reserve
Install Sewage Pumping Station Ladysmith - SPS47
Sewer Reserve
Install Sewage Pumping Station Lakehaven East - SPS25
Sewer Reserve
Renew Sewage Pumping Station - Smith Street - SPS21
Sewer Reserve
Renew Sewage Treatment Works Tarcutta
Sewer Reserve
25,344
Renew Sewage Treatment Works Uranquinty
Sewer Reserve
28,742
Sewer - Pump Station - SPS15 Hammond Avenue - New Assets
Sewer Reserve
2,185
Sewer Pump Station 08 Boorooma Increase pump capacity
Sewer Reserve
76,689
SPS 08 Boorooma - Emergency/wet weather detention storage
Sewer Reserve
255,631
SPS08 Boorooma growth storage upgrade
Sewer Reserve
SPS22 Elizabeth Street emergency/wet weather detention storage
Sewer Reserve
115,034
SPS22 Elizabeth Street new sewer pump station - Structural
Sewer Reserve
249,197
Sewer Pump Station 22 Elizabeth St new sewer pump station mechanical/ electrical
Sewer Reserve
216,240
123,882 535,010 555,742 1,573,598
116,3001 42,291 169,165 35,401
371,648
13
Combined Delivery Program & Operational Plan
finance. Sewer Pump Station 22 Elizabeth St New 360mm Rising Main
Sewer Reserve
522,182
Narrung St Treatment Plant -Flood Protection Infrastructure
Sewer Reserve
250,000
Bomen Industrial Sewerage Treatment Facility (BISTF) Land Acquisition
Sewer Reserve
656,500
Duplicate stormwater drainage - 1050 Copland St to proposed pumping station - Wagga East Developer Service Plan area
Stormwater DSP $262,825 + Civil Projects $26,755
289,580
Copland Street Industrial Land - Pump station for drainage purposes
S94 (Old Plan)*
100,000
Extend drainage trickle flow - Plumpton Road to 200m north of Stringy Bark Creek Culvert - Wagga East Developer Service Plan area
Stormwater DSP $159,000 + Drainage Reserve $17,832
176,832
Extend drainage trickle flow - West of Elizabeth Avenue Forest Hill
Stormwater DSP $144,000 + Drainage Reserve $98,513
242,513
Implement Road and drainage works Hammond Avenue - Industrial areas
S94A*
128,703
128,703
Implement Stormwater Drainage - Bomen Stormwater DSP - Trickle flow east of Hereford Street $496,258 + GPR under railway line to Byrnes Road $40,000
536,258
Implement Stormwater Drainage Fernleigh Road trickle flow from culvert north west of Rules Club to detention basins - Wagga West Developer Service Plan area
Stormwater DSP $357,306 + GPR $28,800
386,106
Implement Stormwater Drainage - New Estella western and southern subdivision piped drainage Pine Gully Road /Old Narrandera Road to Olympic Highway
Stormwater DSP $709,357 + Civil Projects $65,000
Implement Stormwater Drainage Tarcoola Road - Wagga East Developer Service Plan area
Stormwater DSP $314,405 + GPR $28,800 (Deferred from 12/13)
343,205
Implement Stormwater Drainage Improvements - Jubilee Oval to Red Hill Road - Wagga West Developer Service Plan area
Stormwater DSP $265,580 + $24,000 Civil Projects Reserve
289,580
Improve Stormwater drainage - Kincaid Street end to Flowerdale pumping station - Wagga West Developer Service Plan Area
Stormwater DSP $318,695 + Civil Projects $28,800
Undertake Stormwater Drainage Upgrade - Contour Ridge (Lloyd) approx 5km Wagga West Developer Service Plan Area
Stormwater DSP $119,102 + GPR $9,600
128,702
Undertake Stormwater Drainage Upgrade - Day, Higgins, Tarcutta Street - Wagga West Developer Service Plan Area
Stormwater DSP $248,129 + GPR $20,000
268,129
Gregadoo Waste Management Centre Construction of a new waste cell
Solid Waste Reserve
950,000
Gregadoo Waste Management Centre Construction of a new waste cell
Solid Waste Reserve
3,000,000
Gregadoo Waste Management Centre Complete Cap
Solid Waste Reserve
800,000
Visitor Information Centre exterior refurbishment
GPR
17,170
Implement Riverside Master Plan landscaping recommendations
S94A
697,136
14
Combined Delivery Program & Operational Plan
774,357
347,495
finance. Paint Civic Theatre auditorium
Civic Theatre Operating Reserve
Upgrade air-conditioning control - Civic Centre - Stage 2 (Level 0)
S94*
Upgrade air-conditioning control - Civic Centre - 14/15 Stage 3 (Level 1) & 15/16 Stage 4 (Level 2) 15/16
GPR
Buildings - Playsessions Venue - Renew airconditioning
Family Day Care Reserve
Buildings - Civic Theatre - Auditorium carpet replacement
Civic Theatre Operating Reserve
33,330
Buildings - Civic Theatre - Auditorium seat replacement
Civic Theatre Operating Reserve
151,500
Oura Reserve convert composting toilet to septic system
GPR
36-40 Gurwood Street airconditioning replacement
Gurwood St Property Reserve
Bolton Street Bridge Clubhouse asbestos roof replacement
GPR
Airport - Design and construct - Upgrade to Code C: Taxiways A, B, D, E
2013/14 - Airport Reserve, 2014/15 onwards - Borrowings (Airport Reserve Future Years Loan Repayments)
150,000
1,800,000
Airport - Redevelop terminal - Internal baggage claim and retail section
Airport Reserve
100,000
1,400,000
Livestock Marketing Centre - Computer network upgrades
LMC Reserve
Livestock Marketing Centre - Resurface roadway east of sheep yards and west of cattle yards
LMC Reserve
Livestock Marketing Centre - Road overlays
LMC Reserve
Airport - Airside faciltiies location
Borrowings (Airport Reserve - Future Years Loan Repayments)
Riverina Intermodal Freight & Logistics Hub
Borrowings $16.72M (GPR - Future Years Loan Repayments) + Grant funds $7M
Total Capital Works New Projects
40,400 68,940 84,184
84,184
15,000
35,401 60,000 27,775 2,500,000
50,000 100,000
165,000 404,000
23,720,000
35,344,731
25,997,200
9,953,485
8,482,614
* Timing of project is subject to receipt of sufficient Section 94 and Section 94A funds
15
Combined Delivery Program & Operational Plan
finance.
delivery
program recurrent
capital works. This table displays the recurrent projects and programs scheduled for over the period of the Delivery Program. This table also identifies the funding source for the projects including General Purpose
Project Description
Funding Source
Upgrade of backstage equipment - Civic Theatre
Civic Theatre Infrastructure Reserve
Acquire pieces for the Australian Print Collection
Revenue (GPR), Developer Service Plan (DSP) and Developer Contributions (S94).
2013/14 2014/15 2015/16 2016/17 10,000
10,000
10,000
10,000
GPR
8,000
8,000
8,000
8,000
Acquire pieces for the National Art Glass Collection
GPR
20,000
20,000
20,000
20,000
Implement outcomes from the Wagga Bicycle Plan (signage, linemarking, parking)
GPR
20,000
20,000
20,000
20,000
20,000
20,000
20,000
20,000
Implement Recreational Assets Capital Old Plan S94* - RF4 Works Plan (2013-14 Bolton Parkk Field 1 Safety Barrier, Victory Memorial Gardens -replace concrete pads under tables) Implement Sportsgrounds Lighting Program - Duke of Kent
GPR
Implement Sportsgrounds Lighting Program - Rawlings
GPR
90,000
Implement Sportsgrounds Lighting Program - Bolton Park Skatepark
GPR
90,000
Implement Sportsgrounds Lighting Program - Jubilee Park Touch Fields
GPR
Implement Sportsgrounds Lighting Program - Ashmont Oval
GPR
Renew Parks Facilities (2013/14 - Apex Park Car Park)
GPR
101,741
105,173
108,648
112,167
Renew Playground Equipment (2013/14 -Chambers, Webb, Jack Skeers, Lonergan)
GPR
159,135
163,909
168,826
173,891
Renew recreational facilities (Jubilee Park Sign, Wilks Park Shelter BBQ, Apex Park Bollards)
2013/14 - GPR $113,605 + S94 $9,653, 2014/15 onwards - S94 $9,653 + GPR balance
123,258
126,695
130,206
133,792
Renew street trees in line with condition and life expectancy
GPR
92,000
94,500
97,000
99,500
Implement unfunded Traffic Committee resolutions as adopted by Council
GPR
50,000
50,000
50,000
50,000
16
Combined Delivery Program & Operational Plan
180,000
180,000 180,000
finance. Upgrade existing bus shelters
GPR
20,000
20,000
Implement Street Lighting Improvements Program - Roads and traffic facilities (as per schedule)
GPR $50,000 + S94A* $19,714
69,714
69,714
69,714
69,714
Implement cycleways - Civil Infrastructure
GPR
92,987
96,677
100,477
104,392
Cycleways Program (Shared Pathways) Parks & recreation (as per priority list)
RTA Grant $30,000 + GPR $30,000
60,000
60,000
60,000
60,000
Replace plant and equipment
Plant Replacement Reserve $2,330,720 + Sale of Plant $998,880 (amounts adjusted slightly each future financial year)
3,329,600
3,458,500
3,826,500
3,164,300
Capital renewal - Reseal program
Regional Roads Block Grant $812,298 (increment by 3% each yr) + GPR $549,577 (incrementing each yr)
1,361,875
1,413,012
1,467,736
1,526,360
Conduct Heavy Patching Program
GPR
680,937
706,506
733,868
763,180
Conduct Urban Asphalt Program
GPR
596,862
646,968
701,797
761,813
Supplementary Regional Roads Block Grant
Block Grant -Supp
199,000
199,000
190,000
190,000
Rehabilitation of Pavement Program
GPR
2,723,750
2,826,023
2,935,471
3,052,720
Replace kerb and gutter
GPR
317,400
365,010
419,762
482,726
Conduct gravel resheets
R2R Grant
725,908
747,685
770,116
793,219
Conduct gravel resheets - Local major roads
GPR
59,270
70.710
83,294
97,136
Conduct gravel resheets - Local minor roads
GPR
278,300
306,130
336,743
370,417
Gravel resheet multi access roads
GPR
169,400
186,340
204,974
225,471
Maintain roads - Village and rural area
S94A*
14,479
14,479
14,479
14,479
Renew and replace culverts
GPR
500,000
500,000
500,000
500,000
Improve footpaths
S94A $16,088 + GPR $83,912
100,000
100,000
100,000
100,000
Eliminate sewer joint connections
Sewer Reserve
139,637
139,637
139,637
139,637
Implement renewal program for gravity sewer
Sewer Reserve
82,400
84,872
87,418
90,040
Implement Sewer Laterals Rehabilitation Program
Sewer Reserve
179,432
188,404
197,824
207,715
Implement Sewer Mains Rehabilitation Program
Sewer Reserve
1,057,282
1,057,282
1,057,282
1,057,282
Install sewer network extensions
Sewer Reserve
235,079
235,079
235,079
235,079
Renew Sewage Treatment Works - Forest Hill
Sewer Reserve
6,555
6,555
6,555
6,555
Replacement and renewal of sewer plant
Sewer Reserve
132,316
132,316
132,316
132,316
Replacement of manhole Lids - Sewer reticulation
Sewer Reserve
Upgrade sewer - Rising mains
Sewer Reserve
Sewer - Kooringal - Sewer Treatment Works renewals
Sewer Reserve
997,131
119,174
119,174
Sewer - Narrung - Sewer Treatment Works renewals
Sewer Reserve
119,174
119,174
357,520
41,633
41,633 300,000
17
Combined Delivery Program & Operational Plan
finance. Forest Hill - General improvements allowance
Sewer Reserve
7,669
7,669
7,669
7,669
Flood Pumps - Progressively upgrade pumps
GPR
40,400
40,400
40,400
40,400
Implement actions - Stormwater Management Plan/Stormwater Strategic Management Plan
Stormwater Levy
451,034
457,261
463,450
469,600
Stormwater pollution traps
Stormwater Levy
50,000
50,000
50,000
50,000
Install and maintain gross pollutant traps
Stormwater Levy
42,420
43,693
45,003
46,353
Upgrade of stormwater pit lids to lightweight lids
GPR
40,400
Renew community amenities at sporting grounds - Bosley Park
GPR
90,000
Renew community amenities at sporting grounds - Jubilee Park public toilets
S94*
90,000
Renew community amenities - Botanic Gardens Kidsville
GPR
Renew community amenities - Henwood Park services
GPR
40,400
185,400 190,962
Renew community amenities - Collingulllie GPR Oval Total Capital Recurrent Program
18
Combined Delivery Program & Operational Plan
196,690 14,277,207
15,894,276
16,085,105
15,880,741
finance.
contributions
and
donations. This table outlines proposed contributions and donations made by Council for the 2013/2014 financial year.
S356 Donations Community Community Leases Rental Subsidy
872,665
Rural Villages Community Development
15,450
Community Resource Centre
649
Wagga Womens Bowling Club
2,665
Regional Heritage Transport Association
543
Wagga Wagga Showground Society
9,145
Seniors Services
2,200
Childcare Kooringal Casual Child Care
10,000
Shaw Street Children’s Centre
10,000
Possums Playground
10,000
Cultural Eastern Riverina Arts Program Contribution
19,158
School of Arts Contribution
2,500
Eisteddfod Donation
3,090
Summer School for Strings
2,500
Scholarships TAFE Scholarship
5,150
University of NSW School of Rural Health Scholarship
5,000
Riverina Conservatorium Scholarship
8,727
Riverina Academy of Sport
4,000
Annual Grants Program - Various Community Development Grants
30,000
Developing Personal Excellence
5,000
Sustainable Environments Grants
7,000
Neighbourhood/Rural Village Grants
22,000
19
Combined Delivery Program & Operational Plan
finance. Arts and Culture Grants
25,000
Event Promotion Grants
20,000
Local Heritage Fund
25,338
Sporting and Cultural Facility Improvement Grants
30,000
Rural Halls Infrastructure Grants
26,055
Road Closures - Various ANZAC Day Parade
5,500
Lake to Lagoon Fun Run
10,000
Wagga Gold Cup Chariot Race
3,000
Remembrance Day
2,000
Reserve Forces Day
1,500
Christmas Toy Run
2,000
Other New Major Events Sponsorship
145,000
Wagga Chamber of Commerce
10,000
Donation of Council Fees & Charges
10,077
Parkes Touch Football Competition
1,000
Rural Counselling Service
5,150
Committee 4 Wagga
10,000
Total Section 356 Donations
1,379,062
HOW TO READ THE COMBINED DELIVERY PROGRAM & OPERATIONAL PLAN This relates to the Community Strategic Plan, Ruby & Oliver
tHIS IS THE DELIVERY PROGRAM ITEM (4 YEAR COMMITTMENT) This is the Operational Item (12 months) These are our measures
20
Combined Delivery Program & Operational Plan
Who is responsible for the Operational Item? First quarter target
Second quarter target
Third quarter target
Fourth quarter target
engaged & involved community.
we are an
engaged & involved community.
21
Combined Delivery Program & Operational Plan
engaged & involved community. Our Community has access to information
1.1 Actively engage with the community to ensure open communication 1.1.1 Distribute communication from Council across the entire Local Government Area on a regular basis using printed and digital media Rate notice inserts issued
1 Insert
Produce newsletters Implementation of the email newsletter
-
Manager, Executive Services
1 Insert
-
1 Insert
1 Newsletter
-
1 Newsletter
100%
-
-
-
1.1.2 Develop and action best fit communication and engagement plans in conjunction with responsible business owners
Manager, Executive Services
Respond to internal enquiries for communication and community engagement plans
100%
100%
100%
1.1.3 Coordinate and facilitate programmed village consultations Deliver programmed consultations at rural villages
100%
Manager, Corporate Governance -
3 Consultations
-
3 Consultations
1.1.4 Provide regular information and events to stakeholders on the local and regional economy Manager, Economic Development Coordinate business networking events to engage with local businesses
-
Wagga Big Business Breakfast
-
1 Event
-
1 Event
1 Event
-
1.1.5 Promote opportunities to build relationships with Planning stakeholder groups
Manager, Development Services
Monthly newsletter distributed
3 Newsletters
2 Newsletters
3 Newsletters
3 Newsletters
Planning Advisory Committee meeting held
1 Meeting
1 Meeting
1 Meeting
1 Meeting
1.1.6 Attend environmental stakeholder group meetings
Meetings attended by Environmental officers
Manager, Environmental Sustainability and Regulatory Services 2 Meetings
2 Meetings
2 Meetings
2 Meetings
1.2 Provide and deliver up to date information to Council stakeholders 1.2.1 Manage, store and retrieve Council’s digital and physical corporate records
Manager, Information Services and Corporate Strategy
Scan records according to quality standards
98%
98%
98%
98%
Incoming correspondence distributed within 48 hours of receipt
95%
95%
95%
95%
Incoming correspondence distributed to the appropriate staff member
95%
95%
95%
95%
Conduct archive retrieval requests for staff according to determined timeframes
100%
100%
100%
100%
Implement automated file retrieval process for staff
25%
100%
1.2.2 Provide spatial information and support to all stakeholders
-
-
Manager, Information Services and Corporate Strategy
Conduct spatial system training sessions for internal staff members as required
100%
100%
Upgrade Council’s web based mapping system
50%
100%
100%
100% -
-
1.2.3 Continue to provide online alternatives for promoting and disseminating information for visitors and residents to meet the demand of changing demographics of visitors
Manager, Tourism
Continue to monitor website
100%
100%
100%
100%
Update website content
1 Update
1 Update
1 Update
1 Update
1.3 Deliver excellence in customer service throughout the organisation 1.3.1 Develop, maintain and improve online services capabilities Implement process to publish development application documents on Council’s website
22
Combined Delivery Program & Operational Plan
25%
Manager, Information Services and Corporate Strategy 100%
-
-
engaged & involved community. Investigate and implement online lodgement capabilities for certain application types
-
-
-
100%
Enhance web recruitment interface and workflow processes
-
-
-
100%
Develop an online development consent register
-
-
Develop process to capture and present strata capabilities information online
25%
Implement a remote inspection solution for Health Officers and Building Surveyors
-
25%
100%
100%
-
-
100%
-
-
1.3.2 Develop, maintain and improve Council’s corporate applications
Manager, Information Services and Corporate Strategy
Upgrade Council’s electronic document management system
-
Implement a system to manage regulatory based applications
-
-
-
100%
Implement an internal search engine to retrieve corporate information
-
-
-
100%
Increase automated scanning capabilities in the Records section
25%
25%
50%
50%
75%
Implement electronic form functionality internally to reduce the use of paper and signatures
-
-
Investigate options to integrate the electronic document management system with the contract management system
-
-
Upgrade Council’s spatial document management system
25%
100%
100% -
50%
100%
100% 100%
-
-
1.3.3 Digitise corporate records to improve access to information and eliminate the need to retain original copies in archive facilities
Manager, Information Services and Corporate Strategy
Develop a process to manage development applications electronically
-
50%
100%
Review current process to manage and destroy scanned documents
-
-
50%
100%
Provide quality control services for scanned documents
-
-
25%
1.3.4 Maintain and promote Council’s Records Management Framework
-
100%
Manager, Information Services and Corporate Strategy
Conduct Records Management training courses
2 Sessions
2 Sessions
2 Sessions
2 Sessions
Conduct electronic document management system training courses
2 Sessions
2 Sessions
2 Sessions
2 Sessions
Attend meetings to promote Records Management handbook
1 Meeting
1 Meeting
1 Meeting
1 Meeting
1.3.5 Deliver a professional level of customer service via the customer service centre
Manager, Information Services and Corporate Strategy
Report on productivity of the Customer Service Centre
3 Reports
3 Reports
3 Reports
3 Reports
Implement Customer Service Strategy
25%
50%
75%
100%
1.3.6 Maintain, support and renew Council’s information and communication technology
Manager, Information Services and Corporate Strategy
Percentage of support tickets resolved on time
85%
85%
85%
85%
Upgrade Council’s sever operating systems to Windows Server 2008
-
-
-
100%
Upgrade Council’s Personal Computer operating systems to Windows 7
-
-
-
100%
Investigate different methods of deploying user environments including desktop virtualisation
-
-
-
100%
Review options for communications between Council sites
-
-
-
100%
23
Combined Delivery Program & Operational Plan
engaged & involved community. 1.4 Actively Implement and promote CounCil’s best practice governance policies and procedures 1.4.1 Deliver an annual program of internal audits focussing on adding value and improving Council’s operations Strategic internal audit plan and annual work program endorsed by the audit and risk committee Annual work program completed on schedule
25%
Manager, Internal Audit Services
50%
75%
1.4.2 Facilitate Council and Policy and Strategy meeting processes
100% 100%
Manager, Corporate Governance
Agenda distributed within legislative timeframes of three clear days prior to meeting
6 Agendas
6 Agendas
6 Agendas
6 Agendas
Minutes distributed within seven days
6 Minutes
6 Minutes
6 Minutes
6 Minutes
-
Complete annual review of Code of Meeting Practice
-
-
100%
1.4.3 Facilitate a legislatively compliant open access to information – Government Information (Public Access) Act (GIPAA)
Manager, Corporate Governance
Formal applications are responded to within 20 working days
100%
100%
100%
100%
Informal applications are responded to with 15 working days
100%
100%
100%
100%
Ensure Council is compliant with mandatory release requirements
100%
100%
100%
100%
Annual report is submitted to the Office Information Commission by 31 October
-
1 Report
1.4.4 Facilitate corporate support services to Councillors Training program delivered
-
-
Manager, Corporate Governance 100%
100%
100%
1.4.5 Review and manage the Good Governance Framework
100%
Manager, Corporate Governance
Review of the Good Governance Framework
-
-
-
100%
Review the Anti-Fraud Management Framework
-
-
-
100%
1.4.6 Review and manage Privacy Management Framework
Manager, Corporate Governance
Review Privacy Management Plan and associated documentation
-
-
-
1 Review
Facilitate Privacy Management training and awareness program
1 Session
1 Session
1 Session
1 Session
Ensure privacy breaches are reported to the Office Information Commission within legislative timeframes
100%
100%
100%
100%
1.5 Ensure Council’s Risk Management process reflects industry best practice across all of Council’s functions 1.5.1 Implement a program for organisational risk awareness Development of E-Learning module for risk management training
Manager, Corporate Governance -
-
1.5.2 Review and update annual Risk Management Plan Review and update Risk Management Plan
-
100%
Manager, Corporate Governance 100%
100%
100%
100%
1.5.3 Manage Corporate Business Continuity Plan and Disaster Management Framework
Manager, Corporate Governance
Review and update the Business Continuity Plan
100%
100%
Test the Business Continuity Plan and Disaster Recovery Plans annually
100% -
-
1.5.4 Review and manage corporate insurances Compliance with Statewide Insurance’s Risk Management 100% Action Plan
24
Combined Delivery Program & Operational Plan
100% -
100%
Manager, Corporate Governance 100%
100%
100%
engaged & involved community. Ensure Council’s insurance asset listing aligns with asset management register for Council buildings
100%
100%
100%
100%
1.6 Provide a sustainable workforce with the capability and capacity to support current and future service delivery 1.6.1 Communicate and implement actions from the Equal Employment Opportunity Management Plan
Manager, People and Culture
Review Aboriginal Employment Strategy
-
-
-
100%
Review Equal Employment Opportunities Action Plan
-
-
-
100%
1.6.2 Conduct the annual organisational engagement and culture survey and evaluate and implement improvement strategies
Manager, People and Culture
Conduct organisational engagement and culture survey
-
-
-
100%
Analyse data from the survey and recommend initiatives
-
-
-
100%
1.6.3 Design, develop and implement staff learning and development initiatives
Manager, People and Culture
Develop flexible E-Learning modules
-
-
-
2 Modules
Review and maintain Coaching and Mentoring Program
-
-
-
100%
Review and maintain a Workplace Health and Safety training plan
-
-
-
100%
1.6.4 Provide recruitment services to the organisation
Manager, People and Culture
Review and research current labour hire practices and initiatives
-
-
-
100%
Online recruitment stage one completed/released
-
-
-
100%
1.6.5 Review and monitor the implementation of the Workforce Plan Review Councils Workforce Action Plan
Manager, People and Culture -
-
1.6.6 Promote future workforce development with options such as traineeships,apprenticeships, cadetships and scholarships
-
100%
Manager, People and Culture
Complete scheduled contact and monitoring of Trainees and Apprentices
-
-
-
100%
Incorporate traineeships, apprenticeships, cadetships and scholarships into councils workforce
-
-
-
100%
1.6.7 Manage the Individual Performance and Development Plan (IPDP) process for all staff
Manager, People and Culture
Eligible staff have an active and up to date IPDP for the 2013/14 financial year
100%
100%
Review the Individual Performance Development Plan document and process
100% -
-
100% -
100%
1.7 Strive for zero harm and a culture of health and safety 1.7.1 Maintain Workplace Health and Safety (WHS) management system and action items identified in audits Review and redevelop WHS Management system Review and maintain WHS Risk Management system
100%
Develop and implement a consultation program Implement, review and maintain Councils Health and Wellbeing strategy
100%
25%
Review and maintain WHS injury management and return to work programs
Manager, People and Culture 100%
50%
-
100% -
75% -
25%
25% 100%
-
100%
1.8 Support and encourage innovative and continuous improvement 1.8.1 Provide and promote a framework that supports continuous improvement, change management and business improvement models
Manager, People and Culture
Promote and support ’Look Listen Do it Better’ the continuous improvement tool
100%
100%
100%
25
100%
Combined Delivery Program & Operational Plan
engaged & involved community. Support continuous improvement activities across Council
100%
100%
100%
100%
We provide the community opportunities to be involved in decisions impacting them
1.9 Conduct strategic and operational planning and reporting of performance 1.9.1 Prepare and publish Council’s Integrated Planning and Reporting documents
Manager, Information Services and Corporate Strategy
Produce quarterly performance report
1 Report
1 Report
1 Report
1 Report
Publish the 2012/2013 Annual Report
25%
100%
-
-
Update the Ruby & Oliver community engagement website
1 Article
1 Article
1 Article
1 Article
-
-
Prepare a Community Strategic Plan Engagement Plan for 2014
-
100%
Publish the 2014/2015 Operational Plan
-
-
50%
Review Council’s Delivery Program
-
-
100%
100% -
1.10 Ensure the long term financial sustainability of Council through effective and prudent financial management 1.10.1 Record assets in a timely and accurate manner to ensure proper custodianship of Council’s assets Ensure work papers are completed for Annual Financial Statements
1 Report
Maintain property plant and equipment register
100%
100%
1 Report
100%
1 Report
1 Report
6%
6%
1.10.4 Ensure Financial Statements are completed and lodged in accordance with statutory requirements -
6%
Manager, Finance
100%
-
1.10.5 Manage Council’s investment portfolio in accordance with investment strategies and policies
Manager, Finance
Report on Council’s investment portfolio
2 Reports
3 Reports
Annual review of Investment and Policy Strategy
1 Report
Manager, Finance
6%
Lodge Financial Statements
-
Manager, Finance
1.10.3 Ensure effective debt recovery processes are in place Outstanding rates and Annual Charges is less than 6%
100%
1.10.2 Prepare a quarterly report on Council’s budget position Quarterly budget report completed
Manager, Finance
3 Reports
-
-
-
-
3 Reports 100%
1.10.6 Pursue opportunities to apply for eligible grants from State and Federal Government that Manager, Finance meet the grant criteria for those programs that can be delivered with current capacity Publish a list of grants sourced
1 List
1 List
1 List
1.10.7 Annually review the Long Term Financial Plan Review and update the Operational and Long Term Financial Plan
1 List
Manager, Finance -
-
-
1.10.8 Ensure statutory requirements are met for taxation and reporting purposes
Manager, Finance
Reports are lodged with the Australia Tax Office
3 Reports
3 Reports
3 Reports
1.10.9 Undertake an annual review of Developer Contribution Plans and update as required Complete review
-
-
100%
3 Reports
Manager, Finance -
100%
We provide opportunities for people to connect
1.11 Facilitate identified Council events for the benefit of the wider community 1.11.1 Develop and coordinate the delivery of identified Council events that increase participation across all demographics
26
Combined Delivery Program & Operational Plan
Manager, Executive Services
engaged & involved community. Local Government Week
100%
Little Big Day Out
90%
A Very Wagga Christmas
-
-
100%
-
-
10%
100%
-
-
Australia Day
25%
70%
100%
Regenerate Youth Festival
15%
40%
85%
100%
5%
80%
100%
Walk of Honour
-
-
-
1.11.2 Provide advice to business units across Council in regards to event coordination, management and procedures
Manager, Executive Services
Respond to internal enquiries or requests
100%
100%
100%
1.11.3 Review opportunities to access additional grant funding to enhance existing events Source additional funding for Regenerate
-
-
Investigate sponsorship opportunities for Australia Day
-
-
Investigate sponsorship opportunities for Christmas
-
100%
Manager, Executive Services -
100%
100%
100%
-
-
1.12 Deliver a broad range of cultural services, community programs and events that support participation, lifelong learning and engagement by all 1.12.1 Deliver a broad range of library spaces, programs and activities
Manager, Community Services
Number of library visits per quarter
190,000 Visits
190,000 Visits
190,000 Visits
190,000 Visits
Number of programs for older people
3 Programs
3 Programs
3 Programs
3 Programs
Number of programs for youth
3 Programs
3 Programs
3 Programs
3 Programs
Number of programs for children
3 Programs
3 Programs
3 Programs
3 Programs
Number of programs for culturally and linguistically diverse communities
3 Programs
3 Programs
3 Programs
3 Programs
Number of programs for people with disabilities and their carers
3 Programs
3 Programs
3 Programs
3 Programs
Number of community activities and programs
12 Programs
12 Programs
12 Programs
12 Programs
Number of events per quarter on community learning
15 Events
15 Events
15 Events
15 Events
Number of display an exhibitions per quarter
5 Displays
5 Displays
5 Displays
5 Displays
Quarterly report on Home Library Service
4 Reports
4 Reports
4 Reports
4 Reports
Feedback report from program attendees
1 Report
1 Report
1 Report
1 Report
1.12.2 Present innovative visual arts exhibitions of regional and national significance
Manager, Community Services
Present a diverse range of Art Gallery exhibitions
7 Exhibitions
8 Exhibitions
7 Exhibitions
8 Exhibitions
Develop unique and creative visual arts products
2 Exhibitions
3 Exhibitions
2 Exhibitions
3 Exhibitions
Develop and promote regional visual arts culture and practice
3 Exhibitions
3 Exhibitions
3 Exhibitions
3 Exhibitions
1.12.3 Initiate and develop visual arts activities and programs that are accessible and relevant to the community
Manager, Community Services
Deliver Art Gallery public programs that develop and expand audience engagement
10 Programs
10 Programs
Present cross-disciplinary performances developing engagement with contemporary arts practice
11 Programs
-
-
-
11 Programs 3 Programs
1.12.4 Provide physical and online access to Wagga Wagga’s history through the Local Studies Collection
Manager, Community Services
History Week Event
1 Event
1 Event
1 Event
1 Event
Report on Local Studies purchases and donations
1 Report
1 Report
1 Report
1 Report
1.12.5 Increase access to quality artistic experiences for diverse groups in the community
Manager, Community Services
Develop Art Gallery Disability Action Plan
-
-
-
1 Plan
Develop partnerships between disability community groups and the Art Gallery
-
-
-
2 Projects
27
Combined Delivery Program & Operational Plan
engaged & involved community. Maintain and develop partnerships with Indigenous community groups and the Art Gallery
-
-
1.12.6 Develop and deliver a diverse annual theatre program of touring
-
2 Projects
Manager, Community Services
Select and present a range of performances in the annual subscription seasons
-
-
-
100%
Present a range of daytime performances for older audiences
-
-
-
100%
Present a range of performances for children and young people
-
-
-
100%
1.12.7 Initiate, develop, promote and maintain Civic Theatre education and public programs
Manager, Community Services
Deliver public programs in conjunction with the annual subscription season
-
-
-
100%
Deliver educational programs in conjunction with performances for children and young people
-
-
-
100%
Complete ongoing audience evaluations
-
-
-
25% Net Promoter Score
Complete annual audience evaluation report
-
-
-
1 Report
1.12.8 Encourage and support performing arts activity in Wagga Wagga by facilitating performances by community groups and commercial hirers
Manager, Community Services
Provide professional box office ticketing services for events in Wagga Wagga and surrounds
100%
100%
100%
100%
Facilitate performances at the Civic Theatre by community groups
100%
100%
100%
100%
Facilitate performances at the Civic Theatre by commercial hirers
100%
100%
100%
100%
1.12.9 Deliver a lively and diverse annual schedule of touring exhibitions to the residents of Wagga Wagga and their visitors
Manager, Community Services
Deliver quarterly exhibition schedule at both museums sites
4 Exhibitions
4 Exhibitions
4 Exhibitions
4 Exhibitions
1.12.10 Deliver the regional museum outreach services and assist in the development of a network of sustainable museum collections in the Riverina
Manager, Community Services
Deliver/evaluate quarterly museum outreach service (sector, education, disability & aged care)
4 Programs
4 Programs
4 Programs
4 Programs
1.12.11 Initiate, develop, promote and maintain museum education and public programs
Manager, Community Services
Number of education and public programs initiated and delivered
12 Programs
12 Programs
12 Programs
12 Programs
Complete ongoing audience evaluations
1 Report
1 Report
1 Report
1 Report
-
-
-
1 Report
Complete annual audience/visitor evaluation report 1.12.12 Implement Public Art Policy
Manager, Community Services
Publish the Cultural Guide
1 Guide
1 Guide
1 Guide
1 Guide
Hold Public Art Panel meetings
3 Meetings
3 Meetings
3 Meetings
3 Meetings
Complete Airport Public Art Project
-
-
-
100%
Partner in the Delivery of the dLux disstre` new media project
50%
75%
100%
Investigate and research potential locations for public art
100%
100%
100%
100%
Maintain Public Art collection
100%
100%
100%
100%
Update the Public Art Plan
100%
Participate as a member of the Eastern Riverina Arts Board
100%
100%
-
100%
100%
1.13 Provide, facilitate and maintain community and cultural infrastructure 1.13.1 Develop and maintain a relevant and accessible collection of digital and print media to inform and entertain the local community
28
Combined Delivery Program & Operational Plan
Manager, Community Services
engaged & involved community. Number of library loans per quarter
70,000 loans
70,000 loans
70,000 loans
70,000 loans
Report on downloads of digital media across
4 Reports
4 Reports
4 Reports
4 Reports
Report on customer feedback
1 Report
1 Report
1 Report
1 Report
1.13.2 Develop and care for Art Collections of national significance
Manager, Community Services
Acquire pieces for the Margaret Carnegie Print Collection
-
-
-
100%
Acquire pieces for the National Art Glass Collection
-
-
-
100%
1.13.3 Maintain Art Gallery infrastructure and operations to National Industry Standards
Manager, Community Services
Maintain and upgrade Art Gallery infrastructure to industry 100% best standards
100%
100%
100%
Maintain and review Art Gallery policies and procedures to industry best standards
100%
100%
100%
100%
1.13.4 Maintain and renew cultural infrastructure and technology to ensure that the Civic Theatre remains viable and effective
Manager, Community Services
Maintain technical equipment to a safe and professional standard
100%
100%
100%
100%
Implement Civic Theatre Asset Management Plan
100%
100%
100%
100%
1.13.5 Manage the collections of the Museum of the Riverina to National Standards framework
Manager, Community Services
Implement recommendations from the National Museum Standards 2012 program
-
-
-
100%
Annual review of the museum collection management policy
-
-
-
100%
Implement best practice collection management, research, collection storage and access programs
-
-
-
100%
1.13.6 Develop strong partner collaborations and utilise promotional tools to raise awareness of Manager, Community Services library services, programs and collections in the local community Report per quarter on collaborations and partnerships with local and external groups, service providers and organisations
5 Events
5 Events
5 Events
5 Events
Report per quarter on social media and more traditional activities to promote the library to the community
10 Events
10 Events
10 Events
10 Events
1.14 Advocate , partner and facilitate the delivery of affordable and accessible services and infrastructure 1.14.1 Plan and facilitate social and community capcity programs and activities including celebratory days across the Local Government Area
Manager, Community Services
Programs/activities for older people
4 Programs
4 Programs
4 Programs
4 Programs
Programs/activities for youth
2 Programs
2 Programs
2 Programs
2 Programs
Programs/activities for children
3 Programs
3 Programs
3 Programs
3 Programs
Programs/activities for culturally and linguistically diverse communities
2 Programs
2 Programs
2 Programs
2 Programs
Programs/activities for Aboriginal and Torres Strait Islander communities
2 Programs
2 Programs
2 Programs
2 Programs
Programs/activities for people with disabilities and their carers
2 Programs
2 Programs
2 Programs
2 Programs
Programs/activities for Rural Villages
2 Programs
2 Programs
2 Programs
2 Programs
General community support and engagement projects
2 Programs
2 Programs
2 Programs
2 Programs
1.14.2 Deliver Aboriginal Family Worker Program
Manager, Community Services
29
Combined Delivery Program & Operational Plan
engaged & involved community. Deliver in line with service agreement
100%
100%
100%
1.14.3 Deliver Home and Community Care Services Deliver in line with service agreement
100%
Manager, Community Services 100%
100%
100%
1.14.4 Promote and provide Family Day Care and in-home care as a quality child care options for all members of the community
100%
Manager, Community Services
All educators are actively studying or have attained Certificate III qualification in Children’s Services
-
-
-
100%
All educators participate in mandatory professional development opportunities
-
-
-
50%
Customer satisfaction is maintained
-
-
-
85%
We protect our heritage
1.15 manage local heritage 1.15.1 Liaise with Planners and external consultants to expedite delivery of heritage management inputs to assist development assessment processing
Manager, Strategic Planning
Respond to internal referals within five working days
100%
30
Combined Delivery Program & Operational Plan
100%
100%
100%
safe & healthy community.
we have a safe &
healthy
community.
31
Combined Delivery Program & Operational Plan
safe & healthy community. We provide access to beautiful parks and recreational spaces throughout the commmunity
2.1 Enhance and maintain parks, recreational facilities and open space 2.1.1 Enhance and maintain parks and open spaces
Manager, Parks and Recreation
Complete annual fire trails program
-
100%
-
-
Deliver Roadside Mowing program
1 Cut
1 Cut
1 Cut
1 Cut
Deliver Parks Mowing Program
2 Cuts
2 Cuts
2 Cuts
2 Cuts
Deliver high presentation parks mowing program
6 Cuts
13 Cuts
13 Cuts
6 Cuts
Deliver cemetery maintenance program
100%
100%
100%
100%
2.1.2 Enhance and maintain streetscapes
Manager, Parks and Recreation
Deliver the annual new and replacement Street Tree program
650 Trees
Complete all street tree customer requests within 30 days
100%
100%
100%
2.1.3 Enhance and maintain recreational facilities
100%
Manager, Parks and Recreation
Complete erosion remediation works at Lake Albert
-
-
-
100%
Upgrade facilities at Bolton Park precinct
-
-
-
100%
Complete sportsground lighting at Duke of Kent Oval
-
-
-
100%
Complete Dressage Arena, office and toilet facilities at Charles Sturt University
-
-
-
100%
Implement outcomes from the Bike Plan
-
-
-
100%
Renew condition 4/5 assets
-
-
-
20%
Deliver annual Playground Replacement program - Webb Park Ashmont, Kessler Park Tolland, Jack Skeers Park Lake Albert, Wiradjuri Estate Central, Cochrane Street Park Kooringal
-
Continue fencing program at Willans Hill
-
-
-
100%
Plan and design the Multipurpose Stadium Project
-
-
-
100%
Redevelop new playing ground at Conolly Rugby Park
-
-
-
100%
75%
100%
-
2.2 Provide recreational programs 2.2.1 Provide aquatic facilities and programs Bookings for Swim and Survive program
Manager, Parks and Recreation 1,400 Bookings
Annual visitations to Oasis Regional Aquatic Centre
1,400 Bookings
-
1,400 Bookings
-
-
1,400 Bookings 300,000 Visitors
2.3 Implement the Riverside Master Plan 2.3.1 Facilitate the development and implementation of the Riverside Master Plan Develop a draft landscape master plan for the Wagga Beach precinct for review and consideration of Council
100%
Implementation strategy to Council for the development of the Wagga Beach Landscape Plan Commence implementation of the Wagga Beach Landscape Plan
Project Manager, Riverside
10%
-
-
-
-
25%
25%
100% 40%
We are a healthy community
2.4 Implement public health and safety initiatives 2.4.1 Deliver companion animal and livestock management services
Ensure compliance with legislative requirements for dangerous dogs
Manager, Environmental Sustainability and Regulatory Services -
-
-
1 report
Respond to customer requests within 72 hours
90%
90%
90%
90%
Maintain Glenfield Road Animal Shelter operations
100%
100%
100%
100%
32
Combined Delivery Program & Operational Plan
safe & healthy community. Respond to call out for stock and dangerous dogs in accordance with protocols
100%
100%
100%
2.4.2 Deliver regulatory services
100%
Manager, Environmental Sustainability and Regulatory Services
Maintain controls for parking enforcement
100%
100%
100%
100%
Respond to customer requests within 72 hours
90%
90%
90%
90%
Undertake investigations into legislative breaches
100%
100%
100%
100%
Process street activity applications
100%
100%
100%
100%
2.4.3 Deliver public health programs
Manager, Environmental Sustainability and Regulatory Services
Deliver immunisations services
6 Clinics
6 Clinics
6 Clinics
6 Clinics
Respond to customer requests for sharp collection within 48 hours
100%
100%
100%
100%
Produce annual food safety and compliance calendar
-
Produce newsletters to food business owners
-
1 Newsletter
2.4.4 Implement On-site Sewage Management Plan
-
1 Calendar
-
1 Newsletter
Manager, Environmental Sustainability and Regulatory Services
Assess and approve on-site sewerage management applications within 14 days
95%
95%
95%
95%
Inspections for onsite sewer management systems completed
100%
100%
100%
100%
Undertake investigations regarding customer complaints within 5 days
100%
100%
100%
100%
2.4.5 Undertake health inspections to enforce legislative requirements
Manager, Environmental Sustainability and Regulatory Services
In accordance with food regulations partnerships undertake food business inspections
100%
100%
100%
100%
Undertake legionella control inspections
100%
100%
100%
100%
Undertake commercial and semi-commercial swimming pool inspections
100%
100%
100%
100%
Undertake skin penetration/hairdressing inspections
100%
100%
100%
100%
Undertake mortuary inspections
100%
100%
100%
100%
Respond to customer requests with 5 days
100%
100%
100%
100%
2.5 Provide and implement an inspection framework that supports public safety 2.5.1 Carry out swimming pool inspection audits Number of residential premises inspected for swimming pool safety
Manager, Development Services 100 Inspections
100 Inspections
2.5.2 Ensure annual fire safety statements are submitted for applicable buildings Submitted Annual Fire Safety Statements are finalised by Council
100 Inspections
100 Inspections
Manager, Development Services
-
-
2.5.3 Implement provisions of the Awning Policy
-
100%
Manager, Development Services
Premises with awnings overhanging road reserves have provided structural certification and insurance to Council satisfaction
100%
100%
100%
100%
Premises with awnings overhanging road reserves that require development approval have approval in place
100%
100%
100%
100%
Premises with awnings overhanging road reserves that require Section 138 have approval in place
100%
100%
100%
100%
33
Combined Delivery Program & Operational Plan
growing economy.
we have a
growing economy.
34
Combined Delivery Program & Operational Plan
growing economy. We have a skilled workforce
3.1 Implement and devElop strategies to attract and retain highly skilled new residents to Wagga Wagga 3.1.1 Provide assistance for new residents including evocities relocaters Maintain local and project level Evocities web pages
1 Update
Respond to local Evocities enquiries
100%
Manager, Tourism 100%
1 Update 100%
100%
Report on Evocities Progress and achievements
-
1 Report
-
1 Report
Update Live Work Invest pack to satisfy local Evocities enquiries
-
-
-
1 Update
Work collaboratively with Evocities partners to monitor progress of marketing program
-
-
1 Meeting
1 Meeting
3.1.2 Meet with Charles Sturt University and TAFEto coordinate business workshops to encourage graduate placement in local enterprise
Manager, Council Business
Host and proide administrative support for collective group
1 Meeting
1 Meeting
1 Meeting
1 Meeting
There is growing business investment in our community
3.2 Ensure Wagga Wagga Airport is a market leader in delivering regional air services 3.2.1 Deliver Airport operations that are compliant with regulations
Manager, Council Businesses
Maintain safety compliance and operations of a certified aerodrome
100%
100%
100%
100%
Maintain security compliance with transport security program
100%
100%
100%
100%
3.2.2 Promote Wagga Wagga Airport as a regional business hub and key contributor to the regional economy
Manager, Council Businesses
Participate in the Australian Airports Association Annual Conference
-
-
-
1 Conference
Print media/industry journals and advertorials
-
-
-
2 Annually
Run industry networking events – Aviation after five
-
-
1 Event
1 Event
3.3 Ensure the Livestock Marketing Centre is a market leader in providing livestock sales and services 3.3.1 Deliver Livestock Marketing Centre operations in compliance with industry and stakeholder requirements
Manager, Council Businesses
Convene Livestock Marketing Centre User Group meetings
1 Meeting
1 Meeting
1 Meeting
3.3.2 Promote the Livestock Marketing Centre as a regional business hub and key contributor to the rural economy
1 Meeting
Manager, Council Businesses
Participate in Australian Livestock Markets Association annual conference
-
-
-
1 Conference
Print media advertorials
-
-
-
1 Advertorial
Provide specific content in Council’s Annual report
-
-
-
1 Report
3.3.3 Construct a new workshop building at the Livestock Marketing Centre Complete construction of the workshop building
Manager, Council Businesses
-
-
3.3.4 Implement site access control system at the Livestock Marketing Centre Install site access control system
-
100%
Manager, Council Businesses
-
-
-
100%
3.4 Implement Bomen Strategic Master Plan 3.4.1 Develop Bomen Business Park through implementing the Riverina Intermodal Freight and Logistics (RIFL) Hub Project Receive approval from the Division of Local Government (DLG) to proceed with the project
100%
Commence the construction of the Eunony Bridge Road project with a view of completing the project by June 2015 (as per the NSW Government Funding Agreement)
25%
Project Manager, Bomen Business Park
50%
35
75%
100%
Combined Delivery Program & Operational Plan
growing economy. Meet the Federal Government funding agreement milestones for the Riverina Intermodal Freight and Logistics (RIFL) Hub
25%
50%
75%
100%
Tourism is a large industry in our community
3.5 Promote a positive image of Council in both the local community and the broader region 3.5.1 Implement City Image Strategy Meetings regarding City Brand implementation
Manager, Executive Services 6 Meetings
6 Meetings
6 Meetings
6 Meetings
3.5.2 Coordinate photography needs and cataloguing as per branding guidelines and publishing requirements
Manager, Executive Services
Coordinate seasonal photo shoots
1 Photo Shoot
1 Photo Shoot
1 Photo Shoot
1 Photo Shoot
Coordinate Business Unit Photo Shoot
1 Photo Shoot
1 Photo Shoot
1 Photo Shoot
1 Photo Shoot
3.5.3 Maintain community registration system for widespread use of City Brand Meetings with community on using the City Brand
2 Meetings
Manager, Executive Services 2 Meetings
2 Meetings
2 Meetings
3.6 Develop and implement tourism activities and plans to attract visitors to Wagga Wagga 3.6.1 Assist and monitor product and industry development
Manager, Tourism
Work with key stakeholders to develop tourism product such as tours and trails
100%
100%
100%
100%
Respond to new business enquiries
100%
100%
100%
100%
Participate in the development of a Destination Management Plan
25%
50%
75%
100%
3.6.2 Provide a co-ordinated calendar of events
Manager, Tourism
Support events that have the potential to attract local, state and national participation
100%
100%
100%
100%
Strengthen and assist event organisers’ ability to conduct successful events
100%
100%
100%
100%
Maintain a comprehensive Calendar of Events and produce the monthly “Whats On�
100%
100%
100%
100%
3.6.3 Record visitor statistics
Manager, Tourism
Gather and record visitor enquiry statistics
1 Report
1 Report
1 Report
1 Report
Record Tourism Research Australia/Destination NSW Statistics on Visitation and spend
1 Report
1 Report
1 Report
1 Report
3.6.4 Provide opportunities to develop tourism services
Manager, Tourism
Conduct industry networking events Provide regular communication with stakeholders
1 Newsletter
1 Event 1 Newsletter
1 Newsletter
1 Event 1 Newsletter
3.6.5 Work in collaboration with state and regional partners to increase visitation to Wagga Wagga and the region
Manager, Tourism
Participate in regional campaigns and promotional activities
100%
100%
100%
100%
Update STDW (State Tourism Data Warehouse) to populate Visit NSW and visit Riverina Websites
100%
100%
100%
100%
There is government investment in our community
3.7 Provide financial assistance to community groups and projects 3.7.1 Implement the Annual Community Grants Program
Finalise payment of the 2013/2014 grants
Manager, Environmental Sustainability and Regulatory Services 100%
-
-
-
Advertise 2014/2015 Grants Program
-
-
Information workshops held
-
-
-
100%
Assess applications
-
-
-
100%
36
Combined Delivery Program & Operational Plan
100%
-
sustainable natural & built environment.
we have a
sustainable natural & built environment.
37
Combined Delivery Program & Operational Plan
sustainable natural & built environment. We monitor the quality of our environment
4.1 effectively manage water resources 4.1.1 Conduct water quality monitoring of local waterways
Monthly monitoring completed
Manager, Environmental Sustainability and Regulatory Services 100%
100%
100%
100%
We promote environmental sustainability through education and sustainable practices
4.2 Implement the Resource Recover Strategy 4.2.1 Provide community education on waste minimisation and recycling
Run waste related campaigns
1 Campaign
Manager, Environmental Sustainability and Regulatory Services 1 Campaign
4.2.2 Increase recovery and use of secondary materials
1 Campaign
1 Campaign
Manager, Environmental Sustainability and Regulatory Services
Increase municipal waste recovery
-
66%
-
-
Increase commercial and industrial waste recovery
-
63%
-
-
Increase construction and demolition waste
-
76%
-
-
4.2.3 Construct Resource Recovery Centre at the Gregadoo Waste Management Centre Detailed designs for Centre completed
100%
Manager, Waste and Stormwater -
Roads and drainage works completed
-
Construction of Centre completed
-
100% -
-
-
-
-
-
100%
4.3 Implement environmental practices and initiatives 4.3.1 Monitor Council’s energy and water consumption
Manager, Environmental Sustainability and Regulatory Services
Quarterly reports from Planet Footprint on Council’s energy usage
1 Report
1 Report
1 Report
1 Report
Quarterly reports from Planet Footprint on Council’s water usage
1 Report
1 Report
1 Report
1 Report
4.3.2 Implement energy and water reduction initiatives
Manager, Environmental Sustainability and Regulatory Services
Retrofit Council hot water systems
-
-
-
100%
4.4 Implement community programs to improve environmental sustainability 4.4.1 Coordinate national environmental events
Manager, Environmental Sustainability and Regulatory Services -
Coordinate Clean Up Australia Day Coordinate National Tree Day Coordinate Earth Hour promotion
100%
-
100%
-
-
-
100%
-
4.4.2 Coordinate community education initiatives focussing on environmental sustainability
Manager, Environmental Sustainability and Regulatory Services
Environmental sustainability education workshops/programs run
1 Program
38
Combined Delivery Program & Operational Plan
1 Program
1 Program
1 Program
sustainable natural & built environment. 4.4.3 Support initiatives to improve air quality
Manager, Environmental Sustainability and Regulatory Services
Woodsmoke advertising completed
-
-
-
100%
4.5 Minimise detrimental impacts in the environment 4.5.1 Comply with Environmental Legislation
Manager, Environmental Sustainability and Regulatory Services
Environmental complaints and breaches are investigated
100%
100%
100%
100%
Statutory requirements for Environmental Protection Licences are met
100%
100%
100%
100%
4.5.2 Reduce contamination from urban run-off
Manager, Environmental Sustainability and Regulatory Services -
The Drain is Just for Rain promotion
-
-
4 Promotions
4.5.3 Comply with all statutory requirements for solid waste management and sewage treatment works
Manager, Waste and Stormwater
Compliance with the Environmental Protection License
100%
100%
100%
100%
We improve the quality of our environment
4.6 Protect and enhance natural areas 4.6.1 Implement restoration and rehabilitation projects
Manager, Environmental Sustainability and Regulatory Services
Submit application for grant funding
-
-
-
1 Grant Application
Complete Narrung Street Wetland project
-
-
-
100%
4.6.2 Implement the noxious weed control programs
Manager, Environmental Sustainability and Regulatory Services
Roadsides sprayed for noxious weeds Private properties inspected
-
1,200kms
1,200kms
80 inspections
80 inspections
80 inspections
-
-
-
Awareness and extension activities conducted
80 inspections 4 activities
4.7 Manage contaminates sites 4.7.1 Rehabilitate the former Tarcutta Street Gasworks site
Project progress
Manager, Environmental Sustainability and Regulatory Services 50%
100%
-
4.7.2 Maintain the potentially contaminated land register
-
Manager, Strategic Planning
Annual review of register completed
-
-
-
100%
We maintain our current and future infrastructure
4.8 Plan, construct, maintain and manage sealed roads 4.8.1 Renew and maintain sealed roads Sealed road pavement rehabilitated
Manger, Program Integration 9,750m2
Sealed road resealed
-
Asphalt placed
-
26,000m2
19,500m2
9750m2
10,7500 m2
86,000m2
21,500m2
-
4.8.2 Renew and maintain kerb and gutter
-
Manger, Program Integration
Kerb and gutter replaced
-
480m
4.8.3 Maintain roadside drainage Routine maintenance undertaken as scheduled
100%
360m
360m
Manger, Program Integration 100%
100%
39
100%
100%
Combined Delivery Program & Operational Plan
sustainable natural & built environment. 4.8.4 Maintain car parks Reduction in customer service requests for car parks
Manger, Program Integration 10% Reduction
10% Reduction
4.8.5 Demolish Hampden Bridge Execution
10% Reduction
10% Reduction
Manager, Infrastructure Planning 50% -
Closure
100%
-
-
100%
-
-
4.9 Plan, construct, maintain and manage unsealed Roads 4.9.1 Renew and maintain unsealed roads Kilometers of unsealed road gravel resheeted
Manger, Program Integration 1km
2kms
1km
2kms
4.10 Plan, construct, maintain and manage streetscapes 4.10.1 Maintain bus shelters Routine maintenance undertaken as scheduled
Manger, Program Integration 100%
100%
100%
4.10.2 Construct bus shelters
100%
Manager, Infrastructure Planning
Initiation
100%
-
-
-
Planning
100%
-
-
-
Execution
-
-
-
100%
Closure
-
-
-
100%
4.11 Plan construct, maintain and manage pathways 4.11.1 Renew and maintain footpaths
Manger, Program Integration
Footpath to be replaced
-
1440m
1080m
4.11.2 Implement Pedestrian Access and Mobility Program (PAMP) Pedestrian access ramps constructed
Manger, Program Integration
20 Ramps
20 Ramps
4.11.3 Implement cycleways program (Shared pathways ) Initiation
1080m
20 Ramps
20 Ramps
Manager, Infrastructure Planning 100%
-
Planning
-
100%
Execution
-
-
Closure
-
-
-
-
-
-
100%
-
100%
4.12 Plan, construct, maintain and manage levees 4.12.1 Upgrade the main city levee bank flood protection Planning
Manager, Infrastructure Planning 25%
50%
75%
100%
4.13 Plan, construct, maintain and manage sewer systems 4.13.1 Implement renewal program for gravity sewer
Manager, Waste and Stormwater
Complete all identified renewals as per the priorities on the Black Spot list
-
-
4.13.2 Implement sewer laterals rehabilitation program -
-
4.13.3 Implement sewer mains rehabilitation program 1 Km
1 Km
1 Km
4.13.6 Rehabilitate wells sewer pump stations
40
Combined Delivery Program & Operational Plan
100%
1 Km
Manager, Waste and Stormwater -
-
4.13.5 Maintain sewer assets Maintenance of scheduled sewer assets completed
-
Manager, Waste and Stormwater
4.13.4 Install sewer network extensions Delivery of the diversion of reuse line from the former gas works site
100%
Manager, Waste and Stormwater
Implementation of Black Spot Program
Deliver a minimum of 5km of rehabilitated/re lined sewer main
-
-
100%
Manager, Waste and Stormwater -
-
-
100%
Manager, Waste and Stormwater
sustainable natural & built environment. Identify any potential manholes or pump station wells for rehabilitation
37 Pump Station inspections
-
4.13.7 Replace and renew sewer plant Renew broken equipment as required
100%
100%
100%
100%
Manager, Waste and Stormwater 30 Manhole lids 30 Manhole lids 30 Manhole lids 30 Manhole lids
4.13.9 Upgrade sewer pumping station pits Replace heavy well lids with light weight aluminium
-
Manager, Waste and Stormwater
4.13.8 Replace manhole lids – sewer reticulation Replacement of manhole lids
-
Manager, Waste and Stormwater 2 Lids
2 Lids
2 Lids
4.13.10 Upgrade sewerage pump station control system
2 Lids
Manager, Waste and Stormwater
Construct Estella pump station SPS91
-
-
-
100%
4.14 Plan, construct, maintain and manage drainage systems 4.14.1 Progressively upgrade flood pumps
Manager, Waste and Stormwater
Review and maintain compliant standards for flood pumps
-
-
4.14.2 Implement Stormwater Management Plan Implement Stormwater Management Plan
25%
50%
75%
25%
50%
75%
100%
Manager, Waste and Stormwater 25%
50%
75%
4.14.5 Upgrade stormwater pit lids to lightweight lids
100%
Manager, Waste and Stormwater
Replace Stormwater pit lids to lightweight lids
-
-
4.14.6 Renew and Maintain Culverts Program completed
100%
Manager, Waste and Stormwater
4.14.4 Maintain stormwater assets Completed schedule of maintenance for stormwater assets
100%
Manager, Waste and Stormwater
4.14.3 Install and maintain gross pollutant traps Install gross pollutant traps around the lagoon
-
-
30 Lids
Manger, Program Integration 25%
50%
75%
100%
4.15 Plan, construct, maintain and manage community buildings 4.15.1 Manage leasing and licensing of Council owned or controlled real property
Manager, Council Businesses
Initiate lease and licence renewals
20 Renewals
20 Renewals
20 Renewals
20 Renewals
Conduct rent reviews for lease and licences
24 Reviews
24 Reviews
24 Reviews
24 Reviews
4.15.2 Maintain and renew Council buildings
Manager, Council Businesses
Completion of works program schedule for community halls
25%
50%
75%
100%
Completion of works program schedule for Council buildings
25%
50%
75%
100%
Completion of works program schedule for community amenities at sporting grounds
25%
50%
75%
100%
4.16 Implement sustainable procurement practices 4.16.1 Provide procurement services
Manager, Procurement Services
Stock turnover ratio of Council stores
4.1 Ratio
4.1 Ratio
4.1 Ratio
4.1 Ratio
Average utilisation of major plant
75%
75%
75%
75%
We plan for resilient and sustainable built environments
4.17 Maintain and update strategic land use plans 4.17.1 Liaise with Assessment Planners, all Directorates and external applicants in relation to proposals to alter Local Environmental Plan (LEP) zonings Requests for rezoning to be included in the immediately following bi-annual grouping of Planning Proposals submitted to the Department of Planning
-
-
41
Manager, Strategic Planning -
100%
Combined Delivery Program & Operational Plan
sustainable natural & built environment. 4.17.2 Liaise with all Directorates and advisory committees to ensure consistent and ongoing review of the Wagga Wagga Development Control Plan 2010 Incorporate into next possible update of the Development Control Plan
-
-
4.17.3 Review the Local Environmental Plan (LEP) 2010 following the implementation of the Planning System Review LEP 2010 to be brought into line with mandated changes
-
95%
100%
95%
100%
4.17.6 Implement ecologically sustainable development principles and programs Planning instruments contain ecologically sustainable development objectives
100%
90%
Manager, Strategic Planning -
100%
Manager, Strategic Planning
4.17.5 Liaise with Planners and external consultant to expedite delivery of heritage management inputs to assist Development Assessment processing Respond to internal referral within 5 working days
-
-
4.17.4 Authorise issue of Section 149 (S149) Planning Certificates S149 Certificates are processed within 5 working days
Manager, Strategic Planning
95%
95%
Manager, Strategic Planning 100%
100%
Manager, Strategic Planning 100%
4.17.7 Review and manage land use plans for the Local Government Area
100%
100%
Manager, Strategic Planning
All Local Environmental Plan (LEP) zoning application submitted to the Department of Planning
100%
100%
100%
100%
Review the Development Control Plan
100%
100%
100%
100%
4.17.8 Assess and determine Plumbing and Drainage Applications and undertake inspections to ensure compliance
Manager, Strategic Planning
Assess and determine Section 68 applications within 7 days of receipt
70%
70%
70%
70%
4.17.9 Assess Council lodged Construction Certificate Applications and undertake the role of Principal Certifying Authority
Manager, Development Services
Percentage of Construction Certificates (CC) determined within 40 days from the date of approval of the Development Application or date the CC is lodged
60%
60%
60%
4.17.10 Assess and determine Development Applications Percentage of Development Applications determined within 40 days
60%
Manager, Development Services 70%
70%
70%
70%
4.17.11 Assess and determine Complying Development Certificate in a professional and timely manner
Manager, Development Services
Percentage of Council Complying Development Certificates determined within 10 days from date of lodgement
95%
42
Combined Delivery Program & Operational Plan
95%
95%
95%
revenue & pricing.
revenue &
pricing policy 2013/2014
43
Combined Delivery Program & Operational Plan
contents.
contents. contents rates and charges policy 50 waste management charges
52
Sewer charges 53 stormwater charges 55 Pricing Policy 56 fees and charges 57
Commercial and Economic Development
57
Corporate Services 62
Environmental and Community Services
65
Infrastructure Services 89
Planning and Development 97
44
Combined Delivery Program & Operational Plan
revenue & pricing.
rates
& charges policy. Rating Structure - Based On 3.4%. Rate Pegging As Advised By Independent Pricing & Regulatory Tribunal (Ipart) Rates are levied against properties in accordance with their classification as defined in the Local Government Act. Properties are classified as Residential, Business or Farmland based on their dominant use. Council has determined the rates for 2013/14 in line with the maximum permissible limits allowed by the Minister for Local Government which has been set at 3.4%. The 2013/14 rating increase was determined by IPART. The NSW Land & Property Management Authority (Valuer General’s office) completed a revaluation of all rateable properties in the Local Government area in 2010. This was undertaken as part of a four year revaluation cycle.
Rate Type Category
Sub-Category Minimum Rate
Ordinary
Residential
City and Suburbs
$616.00
0.008337
20,243,713
55.80%
Ordinary
Residential
Other
$278.00
0.006658
1,555,530
4.47%
Ordinary
Residential
Villages
$234.00
0.005104
410,598
0.79%
Ordinary
Business
City and Suburbs
$591.00
0.013855
9,427,606
26.18%
Ordinary
Business
Villages and Rural
$101.00
0.006619
93,318
0.24%
Ordinary
Farmland
$268.00
0.00364
4,459,437
12.52%
36,190,201
100.0%
Total
Ad Valorum Amount
Rate Yield % Total $
The rate categories and sub-categories for the purposes of the levying of the 2013/2014 rates are as follows: Area and Applicable Rate Type Wagga Wagga and Forest Hill Residential - City and Suburbs Business - City and Suburbs Villages of: San Isidore, Gumly Gumly, Tarcutta, Humula, Uranquinty, Mangoplah, Oura,Currawarna, Ladysmith, Galore, Collingullie and North Wagga Residential - Villages Business - Villages and Rural Farmland rates will be levied on all rateable land, which, in the Council’s opinion, qualifies as “Farmland” as defined in Section 515 of the Local Government Act 1993.
45
Combined Delivery Program & Operational Plan
revenue & pricing.
46
Combined Delivery Program & Operational Plan
revenue & pricing.
waste
management charges. CHARGES
Waste Management Service Charge – Vacant Land
Council may levy and recover an annual charge for any service it provides for which it could otherwise levy a special rate.
To be applied to each parcel of undeveloped rateable land within the waste collection service areas of Wagga Wagga (including Gumly Gumly and Forest Hill), Tarcutta Mangoplah and Ladysmith - $27.50.
WASTE MANAGEMENT Domestic Waste Management Service Charge – Urban Residential
The estimated yield from Domestic Waste Management Service Charges is $6,201,985 and this income will be applied towards providing waste management services within the Council area.
To be applied to all developed residential properties in the waste collection service areas of Wagga Wagga (including Gumly Gumly and Forest Hill), Tarcutta, Mangoplah and Ladysmith - $270.00. Domestic Waste Management Service Charge – Rural Residential To be applied to all properties utilising a waste collection service managed by Council, but outside Council’s defined waste collection service areas - $270.00. Additional Domestic Bin Service Charge All properties requesting an additional general waste, recycle or greenwaste bin will be charged an additional service fee $90.00 per bin per year. Domestic Waste Management Charge To be applied to all developed and undeveloped residential properties in the waste collection service of rural areas including Lake Albert and Springvale not utilising Council’s Waste management collection service - $25.50. Commercial Waste Management Charge – Urban Commercial To be applied to all developed commercial properties within Council’s waste collection service areas of Wagga Wagga (including Gumly Gumly and Forest Hill), Tarcutta, Mangoplah and Ladysmith $270.00. Each additional service $178.00. A recycle bin service may be available subject to council and contractor approval at a cost of $90.00 per bin per year. Commercial Waste Management Charge – Small Strata Properties To be applied to all commercial strata Multi Unit Dwelling (MUD) properties with a parcel area of less than 70 square metres not utilising a Council commercial waste service, and capable of using a waste service funded by the body corporate - $90.00.
47
Combined Delivery Program & Operational Plan
revenue & pricing.
sewer
charges. Introduction of Best – Practice Sewer Charging With increasing demands on the limited water resources of NSW, it is vital that these resources are managed in an efficient and sustainable manner. Best-practice management is essential for efficient and sustainable management of water resources and the environment. It enables a Local Water Utility (LWU) to achieve sustainable water supply and sewerage businesses and comply with the Australian Government’s National Competition Policy (NCP) and National Water Initiative (NWI). LWUs that achieve the outcomes required by these guidelines will have demonstrated best-practice management of these businesses. Best-practice management involves a triple bottom line focus that provides a balanced view of the long-term sustainability of NSW water utilities. Triple bottom line accounting (social, environmental and economic) involves consideration of a LWU’s business plan together with its social and environmental management practices. Best-practice management of water supply and sewerage involves the following 6 criteria: • Strategic Business Planning • Pricing (including Developer Charges, Liquid Trade Waste Policy and Approvals) • Water Conservation • Drought Management • Performance Reporting • Integrated Water Cycle Management Best-practice sewerage pricing involves a uniform annual sewerage bill for residential customers. For non-residential customers an appropriate sewer usage charge is required for the estimated volume discharged to the sewerage system, together with an access charge based on the capacity requirements that their loads place on the system relative to residential customers. The volume based charge and access charges are detailed below: Residential Properties (Developed) Annual residential sewer charge of $434.00 per dwelling unit. Multiple residence properties are charged $434.00 per residence. Residential Properties (Vacant) Vacant land which can be connected to the sewer system will be charged an annual residential sewer charge of $434.00.
48
Combined Delivery Program & Operational Plan
Non Residential Two Part Tariff Best Practice Sewer Charging From July 1 2012 Council introduced two part tariff sewer charging for Non Residential Customers. Non Residential customers include commercial, industrial, schools, small community properties, hospitals etc. The Non residential Sewer Charge will comprise an Access Charge based on the water meter size used on the property (see schedule below) and a consumption charge of $2.00 per kl which is reduced proportionally by the applicable discharge factor for the Non Residential customer.
revenue & pricing. Name of Charge
Type of Service
Number of $ Charge Services Amount
Residential Properties
Sewerage Services
Pump Service Agreement
Pressure Sewer Pump Maintainence
8 Non-residential includes Non Res Strata, Non Resadditional services and small Community Property
Sewerage Services
Per kl charge consumption non-residential: including Non-Res Strate and Non Res additional services and small community property
Sewerage Services
Access Charge based on Meter size - Non Res
Access Charge Sewerage Services - 20mm
63.00
Access Charge based on Meter size - Non Res
Access Charge Sewerage Services - 25mm
98.44
Access Charge based on Meter size - Non Res
Access Charge Sewerage Services - 32mm
161.28
Access Charge based on Meter size - Non Res
Access Charge Sewerage Services - 40mm
252.00
Access Charge based on Meter size - Non Res
Access Charge Sewerage Services - 50mm
393.75
Access Charge based on Meter size - Non Res
Access Charge Sewerage Services - 80mm
1,008.00
Access Charge based on Meter size - Non Res
Access Charge Sewerage Services - 100mm
1,575.00
Access Charge based on Meter size - Non Res
Access Charge Sewerage Services - 150mm
3,543.75
Total
$ Yield
23,071
434.00
10,012,814
453
138.00
62,514
1,736
Based on water meter size and consumption - See access meter charges below
1,691,559
2.00
25,260
11,766,887
Note: In accordance with best practice non-residential sewer guidelines the minimum non-residential sewer charge must not be less then the residential charge for 2013/14 ie. $434.00 Properties Serviced by Pressure Sewer - Additional charges of $138.00 per pump installed for the fault response and replacement service. Sewer Connection in Existing Pressure Sewer Area: New Developments - $18,216.00 per lot Note: Council does not approve of the use of pressure sewer systems for new developments. These systems will only be approved under special circumstances and cost is not a consideration in the approval of their use. Gravity mains are the preferred installation for all urban areas. Liquid Trade Waste - Council’s Liquid Trade waste charges are calculated according to Appendix 1 of the NSW Office of Water Liquid Trade Waste Regulation Guidelines. Council is required to apply these charges to reflect the costs of providing the services and comply with the NSW Independent Pricing and Regulatory Tribunal’s (IPART) Pricing Principles for Local Water Authorities (1996). The IPART Pricing Principles are consistent with the Council of Australian Government’s (COAG) Strategic Framework for Water Reform (1994). All Australian governments agreed to comply with this framework by 1998 and such compliance is required under National Competition Policy. Buildover Sewer Encumbrance Charge - Actual Cost The preferred option for encumbering a Council main or easements to relocate the main or easement clear of the proposed development, at full cost to the developer. If relocation of the main cannot be achieved, application can be made to encumber the main. Any required upgrades to a main are at full cost to the developer.
49
Combined Delivery Program & Operational Plan
revenue & pricing.
stormwater
charges. STORMWATER
Development Contributions System
Stormwater charges will be applicable to all properties, with the following exceptions, which are exempt from the charge:
The Developer Contributions have been determined through the development of the Section 94 Contributions Plan adopted in April 2010 and Section 94A Contributions Plan, and Sewerage and Stormwater Development Servicing Plans adopted in February 2007. These plans provide for quarterly increases in contributions based on Consumer Price Index increases.
• Crown Land, • Council Owned Land, • Land held under lease for private purposes granted under the Housing Act 2001 or the Aboriginal Housing Act 1998, • Vacant Land, • Rural Residential land or Rural Business land, not located in a village, town or city, • Land belonging to a Charity or Public Benevolent Institution Residential Standard Stormwater - Charge of $25.00 - To be applied to all Residential properties (including rural residential lands) that are not exempt from the charge. Residential Medium/High Density Stormwater - Charge of $12.50 per occupancy - To be applied to all, Residential Strata, Community Title, Multiple Occupancy properties (flats and units), and Retirement Village style developments, that are not exempt from the charge. Subject to a Maximum charge of $250.00. Business Stormwater - Charge of $25.00 - To be applied to all Business properties (including rural business lands) that are not exempt from the charge. Properties are charged on a basis of $25.00 per 350 square metres of land area of the property. Subject to a Maximum charge of $250.00. Business Strata Stormwater - Charge of $12.50 - To be applied to all Business Strata Title properties that are not exempt from the charge. Subject to maximum charge of $250.00
PROPOSED FEES Council may charge a fee for any service it provides. The purpose of raising these fees is to recover, or assist the Council in recovering, the cost of providing these services. Council proposes to charge the fees shown in the following pages during the 2013/2014 financial year. It should be noted that if the cost of providing these goods and services rises due to increases in statutory fees or increases in other costs beyond Council’s control then the Council will pass on to users the increased costs, or part thereof, via a Council resolution to increase the fees for the affected goods and services.
50
Combined Delivery Program & Operational Plan
revenue & pricing.
pricing
policy. Where it is legally permissible Council intends to charge fees for the provision of all goods and services that it provides. These fees will be charged to all Council’s clients that avail themselves of Council’s goods and services. The particular pricing policy Council applies to the various fees is as follows: (A) (B) (C) (D) (E)
these items are priced at the figure stipulated by legislation as applicable to this activity; these items are priced at the maximum recommended by the Local Government Association; these items are priced so as to return a total cost recovery for the activities provided; these items are priced to cover the cost of the item plus normal commercial mark-ups; these items are priced at below the cost of providing this activity as Council considers that full cost recovery would deprive the members of the community of the ability to participate/enjoy these activities.
The pricing policy identifier (A, B, C, etc.) appears beside the various fees shown in Council’s list of fees to be charged in 2013/2014.
Notes 1. If the cost of providing these goods and services rises due to increases in statutory fees or increases in other costs beyond Council’s control then the Council will pass on to users the increased costs, or part thereof, via a Council resolution to increase the fees for the affected goods and services. 2. The list of fees and charges also shows the GST payable on Council fees and charges. Those items not showing a GST component have been determined to be GST exempt.
51
Combined Delivery Program & Operational Plan
commercial & economic development. Item Particulars No
Pricing Policy ID
Basis
2012/2013 2013/2014 GST Existing Fee Excl Fee (including GST
2013/14 Total Fee
GST as applicable)
Property Management 1
Community Licence/ Community Lease preparation fee (new licences or renewals)
E
Each Occasion
265.00
150.00
15.00
165.00
2
Minimum Community Licence Fee
A/E
Annual
Aligned with Crown Lands Fees
Aligned with Crown Lands Fees
Aligned with Crown Lands Fees
3
Commercial Lease or Licence fee
C/E
Annual
Refer Council’s Leasing & Licensing Policy
Determined by Council’s Leasing & Licensing Policy
Determined by Council’s Leasing & Licensing Policy
4
Administration fee for processing assignment or variation to existing Commercial Lease or Commercial Licence
C
Each Occasion
300.00
30.00
330.00
5
Administration fee for acquisition of Easement across Public Land
C
Each Occasion
450.00
45.00
495.00
6
Advertising of proposed Commercial Lease or Commercial Licence (refer Local Government Act s47 &s47A)
C
Each Occasion
Cost +5%
7
Commercial dealing administration fee (e.g. new Commercial lease or Licence, commercial Lease or Licence renewal deed etc)
C
Cost +5%
300.00
30.00
330.00
Airport 8
Passenger Head Tax Wagga/Sydney up to base passengers threshold combined
C
per Passenger
10.66
9.90
0.99
10.89
9
Passenger Head Tax Wagga/Sydney greater than base threshold passengers combined
C
per Passenger
5.34
4.96
0.50
5.45
10
Passenger Head Tax Wagga/Melbourne up to base passengers threshold combined
C
per Passenger
10.66
9.90
0.99
10.89
11
Passenger Head Tax Wagga/Melbourne greater than base passengers threshold combined
C
per Passenger
5.34
4.96
0.50
5.45
12
Fixed Wing Landing Fee - Locally based operators or regular operators (i.e. more than 25 landings per year) per tonne > 5700Kg MTOW > 5 landings per month (Charges apply from 6th landing)
C
Tonne or part thereof
9.54
8.93
0.89
9.82
52
Combined Delivery Program & Operational Plan
commercial & economic development. 13
Fixed Wing Landing Fee - Locally based operators or regular operators (i.e. more than 25 landings per year) per tonne < 5700Kg MTOW > 5 landings per month (Charges apply from 6th landing)
C
Tonner or part thereof
7.63
7.15
0.71
7.86
14
Itinerant aircraft landing fee (per tonne) > 5700Kg MTOW
C
Tonne or part thereof
10.48
9.82
0.98
10.80
15
Itinerant aircraft landing fee (per tonne) < 5700Kg MTOW
C
Tonne or part thereof
8.39
7.86
0.79
8.65
16
Rotary Wing Landing Fee - Locally based operators or regular operators (i.e. more than 25 landings per year) > 5 landings per month (Charges apply from 6th landing). Charged per tonne at 50% of <5700Kg Fixed Wing rate.
C
Tonne or part thereof
3.81
3.57
0.36
3.93
17
Rotary Wing Itinerant aircraft > 5700Kg - (per tonne)
C
Tonne or part thereof
5.24
4.91
0.49
5.40
18
Rotary Wing Itinerant aircraft < 5700Kg - (per tonne)
C
Tonne or part thereof
4.20
3.93
0.39
4.33
19
ILS Approach
C
Each
11.75
11.14
1.11
12.25
20
ILS Approach - Locally based training organisation with >400 ILS approaches per year - charge per ILS approach
C
Each
8.23
7.80
0.78
8.58
21
Promotional Days (community events, Not For Profit Organisations)
E
Each
No Charge
No Charge
No Charge
22
Angel Flights, Care Flight and Other Not For Profit Charitable Organisation Flights
E
Each
No Charge
No Charge
No Charge
23
Locally based Freight Operations Annual landing Agreement (per Engine)
E
Each
150.29
140.73
14.07
154.80
24
Car Parking - Hourly
D
Hour
2.20
2.06
0.21
2.27
25
Car Parking - Daily
D
Day
11.00
10.30
1.03
11.33
26
Car Parking - Weekly
D
Week
55.00
51.50
5.15
56.65
27
Car Parking - Monthly
D
Month
250.94
150.00
15.00
165.00
28
Car Parking - Annual
D
Annual
1,900.00
1,350.00
135.00
1,485.00
29
Landing Charge - Aircraft maintenance: Where an aircraft is being serviced by a locally based MRO, only one applicable landing charge will apply for the duration of the maintenance visit
E
Each
Nil
Nil
Nil
Nil
Livestock Marketing Centre (LMC) 30
Annual office rental
C
Year
1,772.86
1,692.29
169.23
1,861.52
31
Annual paddock rental
C
Each
1,180.00
1,072.73
107.27
1,180.00
53
Combined Delivery Program & Operational Plan
commercial & economic development. 32
Casual paddock rental (per day)
C
Day
30.00
28.64
2.86
31.50
33
Telephone accounts (per unit)
C
Each
0.42
0.42
0.04
0.46
34
Vendors Yard Dues - cattle - $1 and under $400
C
Each
4.49
4.21
0.42
4.63
35
Vendors Yard Dues - cattle - $400 and under $600
C
Each
5.33
4.99
0.50
5.49
36
Vendors Yard Dues - cattle - $600 and under $800
C
Each
6.16
5.77
0.58
6.35
37
Vendors Yard Dues - cattle - $800 and under $1000
C
Each
7.00
6.55
0.66
7.21
38
Vendors Yard Dues - cattle - $1000 and under $1200
C
Each
7.83
7.33
0.73
8.06
39
Vendors Yard Dues - cattle - $1200 and under $1400
C
Each
8.66
8.11
0.81
8.92
40
Vendors Yard Dues - cattle - $1400 and over
C
Each
9.50
8.88
0.89
9.77
41
Vendors Yard Dues - store cattle per head
C
Each
3.14
0.31
3.45
42
Vendor Lot Fees - central display cattle (all lots)
C
Each
6.18
5.77
0.58
6.35
43
Vendor Lot Fees - store cattle
C
Each
3.77
3.53
0.35
3.88
44
Vendor Lot Fees - bulls
C
Each
5.81
5.43
0.54
5.97
45
Yard Fees - pigs
C
Each
0.89
2.27
0.23
2.50
46
Yard Fees - sheep and lambs - $0 and under $20
C
Each
0.43
0.40
0.04
0.44
47
Yard Fees - sheep and lambs - $20 and under $40
C
Each
0.55
0.51
0.05
0.56
48
Yard Fees - sheep and lambs - $40 and under $60
C
Each
0.67
0.62
0.06
0.68
49
Yard Fees - sheep and lambs - $60 and under $80
C
Each
0.78
0.73
0.07
0.80
50
Yard Fees - sheep and lambs - $80 and under $100
C
Each
0.90
0.84
0.08
0.92
51
Yard Fees - sheep and lambs - $100 and under $120
C
Each
1.02
0.96
0.10
1.06
52
Yard Fees - sheep and lambs - $120 and over
C
Each
1.14
1.06
0.11
1.17
53
Yard Fees - rams and stud sheep - under $30
C
Each
0.85
0.80
0.08
0.88
54
Yard Fees - rams and stud sheep - $30 and over
C
Each
1.08
1.01
0.10
1.11
55
Cattle buyer delivery fee until 23 September 2013. New charge commences 24 September 2013.
C
Each
1.90
1.86
0.19
2.05
56
Agents Fees - central display cattle (all lots)
C
Each
4.05
3.86
0.39
4.25
57
Agents Fees - central display cattle (per head)
C
Each
0.37
0.36
0.04
0.40
58
Agents Fees - bulls and pen sold - cattle (per head)
C
Each
0.65
0.62
0.06
0.68
54
Combined Delivery Program & Operational Plan
commercial & economic development. 59
Agents Fees - calves in dairy pen
C
Each
0.20
0.20
0.02
0.22
60
Agents Fees - store cattle (per head)
C
Each
0.70
0.67
0.07
0.74
61
Agents Fees - pigs (per head)
C
Each
1.23
1.17
0.12
1.29
62
Agents Fees - horses (per head)
C
Each
2.42
2.31
0.23
2.54
63
Agents Fees - all sheep, lambs and rams (per head)
C
Each
0.13
0.13
0.01
0.14
64
Store cattle Weigh Fee (per head per vendor)
C
Each
0.18
0.02
0.20
65
Private Weighs
C
Each
5.47
5.12
0.51
5.63
66
National Livestock Identification System (NLIS)
C
Each
1.99
1.86
0.19
2.05
67
Feeding all cattle in delivery yards per day
C
Each
0.22
0.20
0.02
0.22
68
Rental - Trucking Yard
C
Year
950.00
863.64
86.36
950.00
69
Bus Tours
D
Each
110.00
118.18
11.82
130.00
70
Avdata Truck Wash Avdata key
C
Each
34.00
30.91
3.09
34.00
71
Avdata Truck Wash - water charge per minute
C
Other
0.41
0.41
0.04
0.45
72
Agents Yard Dues (Dairy & Stores)
C
Each
0.72
0.68
0.07
0.75
73
Destruction and disposal fee of non-sale cattle (Sale cattle are cattle consigned to the LMC for sale on Monday and whilst on the site between arrival on Sunday and until 48 hours post sale time) and non marketable cattle
C
Each
211.69
202.07
20.21
222.28
74
Special Sale (Weekday) Facility Hire
C
Each
1,176.07
1,069.15
106.92
1,176.07
75
Special Sale (Weekend) Facility Hire
C
Each
2,352.13
2,138.30
213.83
2,352.13
76
LMC Systems Administration Fee - per head (Store Sale)
C
Each
0.55
0.05
0.60
77
Destruction/Disposal of non Marketable Sheep and Lambs
C
Each
33.41
3.34
36.75
78
Transit Cattle
C
Each
1.82
0.18
2.00
79
Transit Sheep
C
Each
0.27
0.03
0.30
80
Sal Cattle post Tuesday 12pm
C
Each
1.82
0.18
2.00
35.00
Visitor Information Centre (VIC) 82
Visitor Information Centre - Consignment Sale of Goods
D
Each
11% of value of Goods
10%-12% of value of Goods
10%-12% of value of Goods
82
Visitor Information Centre - Sales
D
Each
In accordance with VIC Schedule
In accordance with VIC Schedule
In accordance with VIC Schedule
55
Combined Delivery Program & Operational Plan
commercial & economic development. 83
Visitor Information Centre - Commission on accommodation bookings
D
Each
12% of booking fee
12% of Value of Booking
12% of Value of Booking
84
Visitors Information Centre - Administration costs incurred through the retail sales system
D
Each
2 - 5% of sale
2 - 5% of sale
2 - 5% of sale
85
Visitor Information Centre Advertising
D
Year
Commercial Advertising Rates - Cooperative marketing
Commercial Advertising Rates Cooperative marketing
Commercial Advertising Rates Cooperative marketing
86
Visitor Information Centre Guided City Tours
D
Each
132.00
1.09.09
10.91
120.00
97
Visitor Information Centre - Guided City Tours Surcharge Public Holidays
D
Each
33.00
27.27
2.73
30.00
88
Visitor information Centre Commission on tickets
D
Each
11% of Ticket Value
10% of Ticket Value
10% of Ticket Value
89
Visitor Information Centre Hire of Event Resources
E
Each
In accordance with VIC Schedule
In accordance with VIC Schedule
In accordance with VIC Schedule
Civic Centre 90
Council Meeting Room – Weekdays - full day hire (9.00am to 5.00pm)
E
Day
187.50
175.45
17.55
193.00
91
Council Meeting Room – Weekdays - half day hire (i.e. 4 hours)
E
Half Day
94.00
88.18
8.82
97.00
92
Council Meeting Room – Weekdays – after 5.00pm – per hour`
E
Hour
82.50
77.27
7.73
85.00
93
Council Meeting Room – Saturday – per hour from 9.00am
E
Hour
82.50
77.27
7.73
85.00
94
Council Meeting Room – Sunday – per hour from 9.00am
E
Hour
82.50
77.27
7.73
85.00
95
Council Meeting Room – Setting up charge (seating, equipment, etc)
E
Each
82.50
77.27
7.73
85.00
96
Committee Room – Weekdays - full day hire (9.00am to 5.00pm)
E
Day
116.50
109.09
10.91
120.00
97
Committee Room – Weekdays - half day hire (i.e. 4 hours)
E
Half Day
59.00
55.45
5.55
61.00
98
Committee Room – Weekdays – after 5.00pm – per hour
E
Hour
82.50
77.27
7.73
85.00
99
Committee Room – Saturday – per hour from 9.00am
E
Hour
82.50
77.27
7.73
85.00
100
Committee Room – Sunday – per hour from 9.00am
E
Hour
82.50
77.27
7.73
85.00
101
Committee Room – Setting up charge (seating, equipment, etc)
E
Each
82.50
77.27
7.73
85.00
102
Civic Arcade - per day (for commercial activities)
E
Day
321.50
300.91
30.09
331.00
56
Combined Delivery Program & Operational Plan
corporate services. Civic Arcade - per day Item Particulars (for approved community No activities) 100
E Day No Charge No Charge No Charge Pricing Basis 2012/2013 2013/14 GST 2013/14 Policy Existing Fee Fee Total Fee (including GST ID excluding as applicable) GST
Access to Information 1
Formal access to Information Government Information Public Access (GIPA) Application fee
A
Each
30.00
30.00
3.00
33.00
2
Formal access to Information GIPA Processing Fee (personal affairs after first 20 hours - per hour rate)
A
Hour
30.00
30.00
3.00
33.00
3
Formal access to Information - GIPA Processing fee (Non personal after first hour - per hour rate)
A
Hour
30.00
30.00
3.00
33.00
4
Formal access to Information GIPA Internal Review
A
Each
40.00
40.00
4.00
44.00
5
Formal access to Council Information GIPA Informal
C
Each
No Fee
No Fee
6
Access to Information Information copies sent via email (per page after the first 10 pages)
C
Each
0.30
0.03
0.33
7
Access to Information Provision of information for which Council holds copyright. (B&W capped at $100)
C
Each
1.00
0.10
1.10
8
Access to Information Provision of information for which Council holds copyright. (Colour capped at $200)
C
Each
2.00
0.20
2.20
9
Access to Information Acceleration fee
30.00
3.00
33.00
No Fee
Customer Service 10
Print/Copy A4 single sided Black & White
C
Each
0.40
0.41
0.04
0.45
11
Print/Copy A4 single sided Colour
C
Each
2.10
2.18
0.22
2.40
12
Print/Copy A3 single sided Black & White
C
Each
0.80
0.82
0.08
0.90
13
Print/Copy A3 single sided Colour
D
Each
2.75
2.82
0.28
3.10
14
Print/Copy A2 Line Drawing Standard Paper
D
each
3.10
3.18
0.32
3.50
15
Print/Copy A2 Line Drawing High Quality Paper/Film
D
Each
6.75
6.95
0.70
7.65
16
Print/Copy A2 Image Drawing Standard Paper
D
Each
10.75
11.09
1.11
12.20
17
Print/Copy A2 Image Drawing High Quality Paper/Film
D
Each
16.50
17.00
1.70
18.70
18
Print/Copy A1 Line Drawing Standard Paper
D
Each
6.25
6.45
0.65
7.10
19
Print/Copy A1 Line Drawing High Quality Paper/Film
D
Each
11.25
11.59
1.16
12.75
57
Combined Delivery Program & Operational Plan
corporate services. 20
Print/Copy A1 Image Drawing Standard Paper
D
Each
26.75
30.00
3.00
33.00
21
Print/Copy A1 Image Drawing High Quality Paper/Film
D
Each
33.00
34.00
3.40
37.40
22
Print/Copy B1 Line Drawing Standard Paper
D
Each
8.75
9.00
0.90
9.90
23
Print/Copy B1 Line Drawing High Quality Paper/Film
D
Each
16.50
17.00
1.70
18.70
24
Print/Copy B1 Image Drawing Standard Paper
D
Each
46.50
47.91
4.79
52.70
25
Print/Copy B1 Image Drawing High Quality Paper/Film
D
Each
51.50
52.05
5.20
57.25
26
Print/Copy A0 Line Drawing Standard Paper
D
Each
12.50
12.86
1.29
14.15
27
Print/Copy A0 Line Drawing High Quality Paper/Film
D
Each
22.75
23.41
2.34
25.75
28
Print/Copy A0 Image Drawing Standard Paper
D
Each
62.00
63.86
6.39
70.25
29
Print/Copy A0 Image Drawing High Quality Paper/Film
D
Each
67.00
69.00
6.90
75.90
30
Scanning per Page placed on CD/DVD
D
Each
7.75
8.00
0.80
8.80
31
Sale of Retail Products
D
Each
Purchase price plus commercial markup
Purchase price plus commercial markup
Purchase price plus commercial markup
Financial Services Rates 32
Certificate pursuant to Section 603 LGA
A
Each
65.00
0.00
70.00
33
Urgent Section 603 Certificate â&#x20AC;&#x201C; additional fee
C
Each
45.00
40.91
4.09
45.00
34
Copy of Rate Notice/ Instalment Notice
C
Each
11.00
10.00
1.00
11.00
35
Copy of Financial Data on Rates Properties
C
Each
10.00
9.09
0.91
10.00
36
Copy of 603 Certificate administration
C
Each
11.00
10.00
1.00
11.00
37
Fee for Reallocation of Electronic Payment
C
Each
10.00
10.00
N/A
10.00
38
Cheque Fee plus administration charge
C
Each
39
Merchant Fee - Mastercard and Visa
C
Each
0.006
0.0075
0.0075
39b
Merchant Fee - Amex
C
Each
0.01
0.01
0.01
40
Auspice Administration Fee
E
Other
58
Combined Delivery Program & Operational Plan
Cost to Council plus $22.73 Admin fee
2% (GST incl) of the amount auspiced
Cost to Council plus $22.73 Admin fee
2% (GST incl) of the amount auspiced
Cost to Council plus $22.73 Admin fee
2% (GST incl) of the amount auspiced
corporate services. Geographical Information Services (GIS) 41
GIS - Consultancy - External
C
Hour
85.75
77.95
7.80
85.75
42
GIS - Map extract (A3)
E
Each
30.50
27.73
2.77
30.50
43
GIS - Rural Addressing Provision of excess plate
C
Each
9.25
8.41
0.84
9.25
44
GIS - Rural Addressing Determination of rural address
C
Each
56.75
51.59
5.16
56.75
Bob Osborne Skills Centre 45
External Hire Charges Bob Osborne Skills Centre – Leavenworth Room – full day
E
Day
280.00
261.82
26.18
288.00
46
External Hire Charges Bob Osborne Skills Centre – Leavenworth Room – half day
E
Half Day
220.00
206.36
20.64
227.00
47
External Hire Charges Bob Osborne Skills Centre – Nordlingen Room – full day
E
Day
220.00
206.36
20.64
227.00
48
External Hire Charges Bob Osborne Skills Centre – Nordlingen Room – half day
E
Half Day
160.00
150.00
15.00
165.00
49
External Hire Charges Bob Osborne Skills Centre – Combined Rooms – full day
E
Day
460.00
431.82
43.18
475.00
50
External Hire Charges Bob Osborne Skills Centre – Combined Rooms – half day
E
Half Day
340.00
318.18
31.82
350.00
51
External Hire Charges Bob Osborne Skills Centre – Kunming Room – full day
E
Day
400.00
374.55
37.45
412.00
52
External Hire Charges Bob Osborne Skills Centre – Kunming Room – half day
E
Half Day
280.00
261.82
26.18
288.00
53
Software installation
E
Each
80.00
74.55
7.45
82.00
54
Print/Copy A4 single sided Black & White
E
Each
0.35
0.36
0.04
0.40
55
Tea and Coffee / Cleaning Charge (mandatory) per person (per day)
E
Day
3.00
3.18
0.32
3.50
56
Booking Cancellation Fee
E
Each
20% Booking Fee minimum $15.00
59
20% Booking Fee minimum $15.00
20% Booking Fee minimum $15.00
Combined Delivery Program & Operational Plan
environment & community services. Item Particulars No
Pricing Basis 2012/2013 2013/14 GST Policy ID Existing Fee Fee (including GST excl GST as applicable)
2013/14 Total Fee
Oasis Entry Fees 1
Adult Swim - Casual Entry
E
Each
6.00
5.45
0.55
6.00
2
Child of school age / Student casual entry
E
Each
3.50
3.18
0.32
3.50
3
Pensioner / Concession casual entry
E
Each
3.50
3.18
0.32
3.50
4
Child entry - under 2 years casual entry
E
Each
5
Child entry - not of school age casual entry
E
Each
3.50
3.18
0.32
3.50
6
Family casual entry
E
Each
17.00
15.45
1.55
17.00
7
Spectator entry
E
Each
1.00
1.36
0.14
1.50
8
Spectator annual membership entry (no swim)
E
Each
75.00
70.00
7.00
77.00
9
Learn to Swim (1st child)
E
Each
12.00
12.50
N/A
12.50
10
Learn to Swim (2nd child)
E
Each
11.50
12.00
N/A
12.00
11
Learn to Swim (3rd child)
E
Each
11.00
11.50
N/A
11.50
12
Private Learn to Swim Lesson per child
E
1/2 hour
40.00
45.00
N/A
45.00
13
Sport & Recreation / Department of Education / Special Olympics & swim club casual entry
E
Each
3.30
3.00
0.30
3.30
14
School Learn to Swim lesson 30 minutes
E
Each
7.50
8.00
N/A
8.00
15
School Learn to Swim lesson - 1 hour
E
Each
11.00
11.50
N/A
11.50
16
School Learn to Swim lesson - 30 minutes (Winter off peak Term 2 or 3)
E
Each
7.00
N/A
7.00
17
School Learn to Swim lesson 1 hour (Winter off peak - Term 2 or 3)
E
Each
10.50
N/A
10.50
18
Adult Learn to Swim
E
Hour
28.00
30.00
N/A
30.00
19
Seniors Card Holder - Learn to Swim
E
Each
20.00
22.00
N/A
22.00
20
Private Adut Learn to Swim Lesson
E
Hour
65.00
N/A
65.00
21
Swim Vouchers 10 visits
E
Each
54.00
50.00
5.00
55.00
22
Swim Vouchers 20 visits
E
Each
96.00
90.00
9.00
99.00
23
Swim Voucher - Children / Pensioner / Student 10 visits
E
Each
31.50
30.00
3.00
33.00
24
Swim Voucher - Children / Pensioner / Student 10 visits
E
Each
56.00
54.55
5.45
60.00
60
Combined Delivery Program & Operational Plan
Free
Free
Free
environment & community services. 25
Carnivals - Swim - Outdoor / Indoor student entry (unlimited access)
E
Student
3.50
3.64
0.36
4.00
26
Aqua-Aerobics per class
E
Each
12.00
10.91
1.09
12.00
27
Aqua-Aerobics voucher - 10 visits
E
Each
108.00
100.00
10.00
110.00
28
Aqua-Aerobics voucher - 20 visits
E
Each
192.00
180.00
18.00
198.00
29
Aqua-Aerobics Concession
E
Each
8.50
8.18
0.82
9.00
30
Swim and Survive Squad
E
Each
13.50
14.00
N/A
14.00
Memberships 31
Individual Memberships - 3 months
E
Quarter
200.00
190.91
19.09
210.00
32
Individual Memberships - 6 months
E
Half Year
265.00
250.00
25.00
275.00
33
Individual Memberships - 12 months
E
Year
420.00
400.00
40.00
440.00
34
Group Memberships - 10 to 19 memberships - per member
E
Year
340.00
318.18
31.82
350.00
35
Group Memberships - 20 to 49 memberships - per member
E
Year
300.00
286.36
28.64
315.00
36
Group Memberships - 50 plus memberships - per member
E
Year
240.00
254.55
25.45
280.00
37
Concession Card Holder Memberships
E
Year
341.00
318.18
31.82
350.00
38
Family Membership (2 adults 3 children)
E
Year
810.00
772.73
77.27
850.00
39
Additional children for family membership
E
Year
165.00
160.00
16.00
176.00
40
Family Memberships 20 or more families (Aimed at DA Promotion)
E
Year
5,550.00
550.00
55.00
605.00
41
Family Memberships (4 members, max 2 adults)
E
Year
710.91
71.09
782.00
42
Winter off Peak membership (April - September) (9am 3pm)
E
Year
136.36
13.64
150.00
43
Oasis Staff Membership for fitness training
E
Year
44
Oasis - Membership card replacement
C
Each
2.20
3.00
0.30
3.30
45
Photos - promotional
E
Each
15.00
13.64
1.36
15.00
46
School Instructor Hire Charge
E
Each
40.00
40.00
4.00
44.00
47
Private Function rate includes: 1 Duty Manager, 2 Life Guards
E
Each
1,100.00
1,100.00
110.00
1,210.00
48
Additional staff for functions
E
Hour
44.00
50.00
5.00
55.00
49
Oasis Promotion Days - A number of promotional days will be held during 2013/14 which may vary the normal pricing. These days and charges will be advertised in the media
E
Each
Free
Free
Free
Other
0.00
61
Combined Delivery Program & Operational Plan
environment & community services. 50
Adult All Day Carnival Pass
E
Each
6.00
7.27
0.73
8.00
51
Spectator All Day Carnival Pass
E
Each
2.00
2.27
0.23
2.50
52
Aqua Concession Book 10
E
Each
76.51
71.82
7.18
79.00
53
Aqua Concession Book 20
E
Each
136.00
127.27
12.73
140.00
54
Liberty Swimming Access (no Swim)
E
Each
Free
Free
55
Group exercise class for membership holder
E
Each
6.50
6.36
0.64
7.00
56
Group exercise class for membership holder (10 visit pass)
E
Each
59.09
5.91
65.00
57
Group exercise class for membership holder (20 visit pass)
E
Each
109.09
10.91
120.00
58
All inclusive unlimited membership (Swimming and Classes)
E
Each
750.00
700.00
70.00
770.00
59
Zoggs Merchandise (Market Value)
E
Each
Market Value
Market Value
60
Zoggs Merchandise Membership discount (10% off set prices)
E
Each
61
Zoggs Merchandise Swim and Survive discount (10% off set prices)
E
Each
62
Defence Force Discount (10% off set price)
E
Each
63
Major Events 50m Pool ( State and National level Events) No individual entry
E
Each
1,100.00
1,100.00
Free
Market Value
110.00
1,210.00
Rotary Learn to Swim 64
Entry for participants for the duration of 4 week program
E
Each
Free
Free
Free
65
One instructor to oversee program for the duration of the 4 week program
E
Each
Free
Free
Free
Dive-in Movies 66
Adult
E
Each
10.51
10.00
1.00
11.00
67
Child
E
Each
7.50
7.27
0.73
8.00
68
Family
E
Each
27.50
27.27
2.73
30.00
Natural Environment 69
Health Inspection Fee (excluding food) per hour
D
Hour
270.90
253.64
25.36
279.00
70
Health Inspection Fee (excluding food) minimum
D
Each
91.80
85.95
8.60
94.55
71
Food Shop inspection fee charged pro rata with a minimum charge of 30 minutes
D
Hour
187.50
175.55
17.55
193.10
72
Food Shop re-inspection fee charged pro rata with a minimum charge of 20 minutes
D
Hour
184.30
172.59
17.26
189.85
73
Annual Administration Charge for Food shop classification P4
D
Each
Free
Free
62
Combined Delivery Program & Operational Plan
Free
environment & community services. 74
Annual Administration Charge for Food shop classification P3 (Non Profit and Community Organisations exempt)
D
Each
67.40
63.09
6.31
69.40
75
Annual Administration Charge for Food shop classification P2 (Non Profit and Community Organisations exempt
D
Each
161.50
151.23
15.12
166.35
76
Annual Administration Charge for Food shop classification P1 (Non Profit and Community Organisations exempt)
D
Each
322.00
301.50
30.15
331.65
77
Food Business Notification and Registration Fee (State Database)
A
Each
56.20
52.59
5.26
57.85
78
Water sampling/testing
D
Each
Cost plus commercial mark up
Cost plus commercial mark up
79
Mortuary (5 yearly or new approval)
D
5 Year
387.00
362.36
36.24
398.60
80
Mortuary Inspection
D
Hour
270.90
253.64
25.36
279.00
81
Mortuary Inspection (minimum fee)
D
Each
91.80
85.95
8.60
94.55
82
Undertaker (5 yearly or new approval)
D
5 year
101.70
95.23
9.52
104.75
83
Undertaker Inspection
D
Hour
270.90
253.64
25.36
279.00
84
Undertaker (minimum fee)
D
Each
91.80
85.95
8.60
94.55
85
Consulting Fees (Health and Building)
D
Each
Cost plus commercial markup
Cost plus commercial mark-up
86
Septic Tanks - Application to install (includes 3 inspections)
D
Each
460.80
431.50
43.15
474.65
87
Septic Tanks - Amended application (includes 2 inspections)
D
Each
301.30
282.14
28.21
310.35
88
Septic Tanks - Licence to operate
C
Each
50.00
46.82
4.68
51.50
89
Septic Tanks - Operational inspection
C
Each
151.70
142.05
14.20
156.25
90
Septic tank re-inspection
C
Each
96.50
90.36
9.04
99.40
91
Septic Tanks - Operational Licence Search
C
Each
51.60
48.32
4.83
53.15
92
Caravan Parks - approval (5 yearly or new approval) per site
A
5 Year
5.50
5.14
0.51
5.65
93
Caravan Parks - inspections (per hour)
D
Hour
270.90
253.64
25.36
279.00
94
Caravan Parks - inspections (minimum)
D
Each
91.80
85.95
8.60
94.55
95
Monitoring Services
C
Hour
143.45
134.32
13.43
147.75
96
Environmental Impact Statements
A
Copy
39.00
36.50
3.65
40.15
97
Environmental Studies
E
Copy
39.10
36.64
3.66
40.30
98
Deposited Plans - per DP
C
Each
9.80
9.18
0.92
10.10
99
Deposited Plans - faxed
C
Each
32.50
30.45
3.05
33.50
63
Cost plus commercial mark up
Cost plus commercial mark-up
Combined Delivery Program & Operational Plan
environment & community services. 100
Native Vegetation - Fee for Calculating Revegetation & Fencing Contributions DCP11
C
Each
273.50
256.09
25.61
281.70
101
Native Vegetation - Rural Residential Developer Contributions (Fencing) DCP11 - per kilometre
C
Km
2,141.40
2,005.14
200.51
2,205.65
102
Native Vegetation - Rural Residential Developer Contributions (Revegetation) DCP11 - per seedling
C
Each
1.40
1.32
0.13
1.45
103
Native Vegetation - Rural Residential - Assessment costs - DCP11 - per hour
C
Hour
196.60
184.09
18.41
202.50
104
Water sampling
C
Each
150.70
141.09
14.11
155.20
105
Swimming Pool Safety Posters
D
Each
19.20
17.95
1.80
19.75
Noxious Weeds Inspection 106
Noxious Weeds - Reinspection fee after notice (per hour)
D
Hour
106.30
99.55
9.95
109.50
107
Noxious Weeds - Reinspection fee after notice (minimum fee)
D
Each
31.00
29.04
2.91
31.95
108
Weed Notice Certificate (Section 64)
C
Each
53.70
50.27
5.03
55.30
109
Noxious Weeds - Private works
D
Each
Actual Cost plus 10%
Actual Cost plus 10%
Actual Cost plus 10%
Ranger Services 110
Street Furniture CBD Fee - per chair
D
Each
50.00
46.82
4.68
51.50
111
Street Furniture Application Fee - CBD
D
Each
432.40
404.86
40.49
445.35
112
Street Furniture - Outside CBD Application Fee
D
Each
140.00
131.09
13.11
144.20
113
Street Furniture - Outside CBD per chair
D
Each
25.00
23.41
2.34
25.75
114
Display of Goods - Application
D
Each
139.60
130.73
13.07
143.80
115
Display of Goods - Lease fee (per square metre)
D
m2
43.00
40.27
4.03
44.30
116
Business promotion/display on footpath
C
Day
80.90
75.77
7.58
83.35
117
Bulk Bin - permit fee
D
Each
30.50
28.55
2.85
31.40
118
Bulk Bin - placement fee per week (less than 5m3)
D
Week
18.60
17.41
1.74
19.15
119
Bulk Bin - placement fee per week (more than 5m3)
D
Week
26.90
25.18
2.52
27.70
120
Stock Impounding - cattle, horses and other per head
D
Each
28.90
27.05
2.70
29.75
121
Stock Impounding - sheep, goats, pigs & other - per head for first 3
D
Each
28.90
27.05
2.70
29.75
122
Stock Impounding - sheep, goats, pigs & other subsequent stock
D
Each
1.30
1.23
0.12
1.35
123
Stock Impounding sustenance per head per day
D
Each
4.60
4.32
0.43
4.75
64
Combined Delivery Program & Operational Plan
environment & community services. 124
Stock Impounding sustenance for sheep, goats, pigs & other per head per day
D
Each
0.80
0.77
0.08
0.85
125
Ranger Services administration charge
D
Each
53.70
50.27
5.03
55.30
126
Impounding Animals / stock investigation - vehicle rate per hour
D
Hour
24.80
23.23
2.32
25.55
127
Impounding Animals / stock investigation - ranger rate per office hour
D
Hour
36.10
33.82
3.38
37.20
128
Impounding animals / stock investigation - ranger rate after hours (Mon - Sat noon) - First 2 hours per hour
D
Hour
48.50
45.41
4.54
49.95
129
Impounding Animals / stock investigation - ranger rate after hours (Mon - Sat noon) Subsequent hours
D
Hour
60.90
57.05
5.70
62.75
130
Stock Impounding - Walking of stock to pound / saleyards / ownerâ&#x20AC;&#x2122;s premises / etc
D
Cost
Cost+ GST
Cost + GST
Cost + GST
131
Stock Impounding - Driving of stock via transport vehicle
D
Cost
Cost + GST
Cost + GST
Cost + GST
132
Stock Impounding - Veterinary fees
D
Cost
Cost + GST
Cost + GST
Cost + GST
133
Stock Impounding - Damage caused by trespassing of impounded stock
D
Cost
Cost + GST
Cost + GST
Cost + GST
134
Stock Impounding - Destroy and dispose of injured / diseased / distressed stock
D
Cost
Cost + GST
Cost + GST
Cost + GST
135
Stock Impounding - Portable stockyards (per day or part thereof)
D
Day
278.60
260.86
26.09
286.95
136
Abandoned Vehicles - Fee plus towing cost
D
Each
68.10
63.77
6.38
70.15
137
Abandoned Vehicles - Towing Cost plus Fee above
D
Cost
Cost + GST
Cost + GST
138
Abandoned Vehicles - Storage fee per week
D
Week
26.80
25.09
2.51
27.60
139
Abandoned Vehicles Impounding fee
D
Each
137.30
128.55
12.85
141.40
140
Serving of Notices Administration charge (Recovery)
D
Each
32.10
30.05
3.00
33.05
141
Impounding Fee - General
D
Each
78.40
73.41
7.34
80.75
142
Impounding Fee - Signs
D
Each
78.40
73.41
7.34
80.75
143
Impounded Shopping Trolleys Release fee
D
Each
70.20
65.73
6.57
73.20
Cost + GST
Companion Animals 144
Dog & Cat Registration Lifetime Registration
A
Each
As per legislation
As per legislation
As per legislation
145
Dog & Cat Registration Desexed
A
Each
As per legislation
As per legislation
As per legislation
146
Dog & Cat Registration Desexed animal owned by pensioner etc
A
Each
As per legislation
As per legislation
As per legislation
65
Combined Delivery Program & Operational Plan
environment & community services. 147
Dog Registration - Entire animal kept by recognised breeder
A
Each
As per legislation
As per legislation
As per legislation
148
Dog Registration - Assistance dogs
A
Each
As per legislation
As per legislation
As per legislation
149
Dog & Cat - Maintenance fee (pound) per day
D
Each
25.40
23.77
2.38
26.15
150
Dog & Cat Impounding fee
A
Each
27.30
25.55
2.55
28.10
151
Dog & Cat - Euthanasia of animal for outside organisations / people (per animal)
D
Each
96.60
90.45
9.05
99.50
152
Dog Desexing - Male
D
Each
116.00
108.59
10.86
119.45
153
Dog Desexing - Female
D
Each
138.00
129.23
12.92
142.15
154
Cat Desexing - Male
D
Each
70.00
65.55
6.55
72.10
155
Cat Desexing - Female
D
Each
97.50
91.32
9.13
100.45
156
Cat Vaccinations
D
Each
17.90
16.77
1.68
18.45
157
Dog Vaccinations
D
Each
37.00
34.64
3.46
38.10
158
Dog Heart Worm Test
D
Each
34.00
31.82
3.18
35.00
159
Dog & Cat Worming
D
Each
7.50
7.05
0.70
7.75
160
Dog - Hire of citronella collar (per week)
D
Week
81.00
75.86
7.59
83.45
161
Dog & Cat - Microchipping
D
Each
33.00
30.91
3.09
34.00
162
Dog & Cat - Microchipping for Accredited Rescue Group
C
Each
21.00
19.68
1.97
21.65
163
Cats - Hire of cat cages per day
D
Day
18.00
16.86
1.69
18.55
164
Dogs - Parvo Test
D
Each
26.00
24.32
2.43
26.75
165
Certificate of compliance dangerous and restricted dog enclosures
A
Each
112.30
105.14
10.51
115.65
Community Services Family Day Care 166
Family Day Care Educator Levy per quarter
C
Quarter
80.00
85.00
N/A
85.00
167
Family Day Care Parent Administration Fee - New Registration
C
Each
60.00
65.00
N/A
65.00
168
Family Day Care Parent Administration Fee - per family per week
C
Week
20.00
22.50
N/A
22.50
169
Family Day Care New Educator Registration Fee
C
Each
200.00
250.00
N/A
250.00
170
Family Day Care Scanned Timesheets - per 100
D
Per 100
22.50
10.91
1.09
12.00
171
Family Day Care Educator Training
Presenters cost less subsidy from service grant
Presenters cost less subsidy from service grant
Senior Community Centre
66
Combined Delivery Program & Operational Plan
Each
Presenters cost less subsidy from service grant
environment & community services. 171
Senior Centre Community Group Hire (Wiradjuri Hall) Saturday, Sunday & Public Holidays
E
Day
136.00
127.27
12.73
140.00
172
Senior Centre Community Group Hire (Wiradjuri Hall) Friday night
E
Day
136.00
127.27
12.73
140.00
173
Senior Centre (Wiradjuri Hall) Evenings (weekdays)
E
Day
93.00
87.27
8.73
96.00
174
Senior Centre (Wiradjuri Hall) Daytime (weekdays)
E
Day
68.00
63.64
6.36
70.00
175
Booking Cancellation Fee
E
Each
20% Booking Fee minimum $15.00
176
Senior Centre (Sturt, Wollundry & Murrumbidgee Meeting Rooms) - Half Day or Evening Full Room
E
Half Day
93.00
87.27
8.73
96.00
177
Senior Centre (Sturt, Wollundry & Murrumbidgee Meeting Rooms) - Weekend Full Day Full Room
E
Day
136.00
127.27
12.73
140.00
178
Senior Centre (Sturt, Wollundry & Murrumbidgee Meeting Rooms) - Two Rooms Separately - Full Day
E
Day
93.00
87.27
8.73
96.00
179
Senior Centre (Sturt, Wollundry & Murrumbidgee Meeting Rooms) - Two Rooms Separately - Half Day
E
Half Day
68.00
63.64
6.36
70.00
180
Senior Centre - A senior Special Activity rate
E
20% Booking Fee minimum $15.00
20% Booking Fee minimum $15.00
Free
Free
Glenfield Community Centre 181
Social / Community Group Half Day (approx 4 hours)
E
Half Day
21.00
20.00
2.00
22.00
182
Social / Community Group Full Day
E
Day
41.00
38.18
3.82
42.00
183
Private business e.g. Karate class
D
Half Day
33.00
30.91
3.09
34.00
184
Private business e.g. Karate class
D
Day
55.00
51.82
5.18
57.00
185
Progress (Glenfield) Association - Fee waived in return for management contribution
E
186
Private function eg Birthdays - Bond
E
Day
460.00
430.91
43.09
474.00
187
Private function eg Birthdays
E
Half Day
245.00
229.09
22.91
252.00
188
Training Venue - Half Day
E
Half Day
85.00
79.09
7.91
87.00
189
Training Venue - Full Day
E
Day
130.00
121.82
12.18
134.00
190
Organisations providing a service from offices - Enter into a shared licence agreement with Council
E
Each
Contribution pro rata to running costs
Contribution pro rata to running costs
Contribution pro rata to running costs
191
Booking Cancellation Fee
E
Each
20% Booking Fee Minimum $15.00
20% Booking Fee Minimum $15.00
20% Booking Fee Minimum $15.00
No Charge
No Charge
No Charge
CIVIC THEATRE 67
Combined Delivery Program & Operational Plan
environment & community services. Civic Theatre - Hire by Commercial Groups (these fees include no staff - minimum supervision requirements apply) 192
Full-Day Hire Rate (8am Midnight) or 12% of the Gross Box Office takings (which ever is greater)
C
Each
2,000.00
200.00
2,200.00
193
Access fee per additional Hour outside regular hire period (Between Midnight and 8am)
C
Hour
100.00
10.00
110.00
Civic Theatre - Hire by Community Groups (these fees include no staff - minimum supervision requirements apply) 194
Half-day hire rate (8 hours, 8am - 4pm or 4pm - Midnight)
E
Each
545.46
54.54
600.00
195
Access fee per additional Hour outside 8 hour hire period
E
Hour
81.82
8.18
90.00
196
Full-Day Hire Rate (8am Midnight)
E
Each
1,100.00
100.00
1,200.00
197
Rehearsal blocks (4 hours, no public access. Dates by negotiation, only one per season)
E
Each
200.00
20.00
220.00
198
Additional rehearsal hours
E
Hour
45.45
4.55
50.00
Civic Theatre - Event Staff (Monday to Friday inclusive) 199
Additional Staff (backstage, followspot, box office, ushers, programme sellers, administration, bar supervisor) (per hour). Minimum 3 hour call.
C
Hour
31.82
3.18
35.00
200
Duty Technician / Front of House Manager (per hour)
C
Hour
38.19
3.81
42.00
Civic Theatre - Event Staff (Saturday inclusive) 201
Additional Staff (backstage, followspot, box office, ushers, programme sellers, administration, bar supervisor) (per hour). Minimum 3 hour call.
C
Hour
38.18
3.82
42.00
202
Duty Technician / Front of House (per hour)
C
Hour
45.45
4.55
50.00
Civic Theatre - Event Staff (Sunday inclusive) 203
Additional Staff (backstage, followspot, box office, ushers, programme sellers, administration, bar supervisor) (per hour). Minimum 3 hour call.
C
Hour
47.28
4.72
52.00
204
Duty Technician / Front of House Manager (per hour)
C
Hour
54.55
5.45
60.00
Civic Theatre - General 205
Marketing / Advertising handling
D
Hour
Cost plus 10%
Cost plus 10%
Cost plus 10%
206
Consumables (tape, gels, etc)
D
Hour
Cost plus 20%
Cost plus 20%
Cost plus 20%
207
Daily Technical Equipment fees
D
Each
68
Combined Delivery Program & Operational Plan
109.09
10.91
120.00
environment & community services. 208
Weekly Technical Equipment fee
D
Each
318.18
31.82
350.00
Civic Theatre - Hire of Foyers, including Balcony These fees include room hire, cleaning, use of lectern and portable p.a. system (no staff) 209
Hire per 4 hours
E
Each
400.00
236.36
23.64
260.00
210
Additional hourly rate
E
Hour
100.00
54.55
5.45
60.00
1.50
1.36
0.14
1.50
4.37
0.43
4.80
Booking Office Booking Fees - Community Hirers 211
Tickets under $10.00
D
Each
212
Civic Theatre Season Performance
D
Each
213
All other tickets (i.e. $10 or over)
D
Each
2.50
2.55
0.25
2.80
214
Complimentary tickets
D
Each
0.35
0.32
0.03
0.35
215
Printing of ticket for door sale
D
Each
0.35
0.32
0.03
0.35
216
Cancellation of ticket (per booking)
D
Each
5.60
5.09
0.51
5.60
3.00
3.45
0.35
3.80
Booking Fees - Commercial Hirers 217
All Tickets
D
Each
218
Credit card handling charge. 0.6% (60 cents per $100) to the total amount paid for Visa & Mastercard and 1.0% ($1 per $100) for American Express.
C
Ticket
219
Complimentary tickets
D
Each
0.35
0.32
0.03
0.35
220
Printing of ticket for door sale
D
Each
0.35
0.32
0.03
0.35
221
Cancellation of ticket (per booking)
D
Each
5.60
5.09
0.51
5.60
0.6% (60 cents per $100) to the total amount paid for Visa & Mastercard and 1.0% ($1 per $100) for American Express.
1.5% ($1.50 per $100) to the toal amount paid for Visa & Mastercard and American Express
ART GALLERY 222
Exhibition hire - Links Gallery weekly rate
E
Weekly
25.00
27.27
2.73
30.00
223
Exhibition hire - E3 art space weekly rate
C
Weekly
100.00
90.91
9.09
100.00
224
Exhibition hire - E3 art space - Educational Institutions weekly rate
C
Weekly
100.00
90.91
9.09
100.00
225
Exhibition hire - E3 art space - Riverina Incorporated Arts Bodies and Riverina NGOs weekly rate
C
Weekly
25.00
22.73
2.27
25.00
226
Hire - Main Gallery - All lower level excluding Links Gallery Monday to Sunday 5:30pm to 11:30pm - flat 6-hour rate
E
Each
800.00
772.73
77.27
850.00
227
Hire - Main Gallery - Lower ceiling area only - Monday to Sunday 5:30pm to 11:30pm flat 6-hour rate
E
Each
400.00
409.09
40.91
450.00
228
Hire - Margaret Carnegie Gallery - Monday to Sunday 5:30pm to 11:30pm - flat 6-hour rate
E
Each
400.00
409.09
40.91
450.00
69
Combined Delivery Program & Operational Plan
environment & community services. 229
Hire - Artist in Residence Studio - Monday to Sunday 5.00pm to 11.00pm - Nonvisual art/craft activities and functions - Hourly rate
E
Hour
55.00
54.55
5.45
60.00
230
Hire - Artist in Residence Studio - Monday to Friday 9.00am - 5.00pm - Flat 8-hour rate
E
Each
220.00
227.27
22.73
250.00
231
Hire - Artist in Residence Studio - Saturday 10:00am to 5:00pm - Hourly rate
E
Hour
40.00
40.91
4.09
45.00
232
Hire - Artist in Residence Studio - Sunday 12:00pm to 4:00pm - Hourly rate
E
Hour
40.00
40.91
4.09
45.00
233
Hire - E3 art space - Monday to Friday 8.30am to 5.30pm Flat 8-hour rate
C
Each
220.00
227.27
22.73
250.00
234
Hire - E3 art space - Monday to Sunday 5:00pm to 11:00pm - Hourly rate
C
Hour
55.00
50.00
5.00
55.00
235
Hire - E3 art space - Saturday 10:00am to 5:00pm - Hourly rate
C
Hour
40.00
40.91
4.09
45.00
236
Hire - E3 art space - Sunday 12:00pm to 4:00pm - Hourly rate
C
Hour
40.00
40.91
4.09
45.00
237
Staff - per hour per staff member Monday to Friday
E
Hour
45.00
40.91
4.09
45.00
238
Staff - per hour per staff member Saturday
E
Hour
70.00
63.64
6.36
70.00
239
Staff - per hour per staff member Sunday
E
Hour
90.00
81.82
8.18
90.00
240
Security deposit (Bond) - E3 art space - all exhibitions
C
Each
200.00
200.00
N/A
200.00
241
Workshop fee - Adult workshops
E
Each
60.00
60.00
N/A
60.00
242
Workshop fee - ArtBlast! childrenâ&#x20AC;&#x2122;s art classes - First child booked from family
E
Each
20.00
20.00
N/A
20.00
243
Workshop fee - ArtBlast! childrenâ&#x20AC;&#x2122;s art classes Additional children booked from same family
E
Each
15.00
15.00
N/A
15.00
244
Gallery Shop - Sales
D
Each
Cost plus commercial mark-up
Cost plus commercial mark-up
Cost plus commercial mark-up
245
Gallery Shop - Commission on exhibition sales - all exhibition spaces
D
Each
Commercial commission of 27.5% on all works sold during the exhibition period.
Commercial commission of 27.5% on all works sold during the exhibition period.
Commercial commission of 27.5% on all works sold during the exhibition period.
246
Gallery Shop - Commission on exhibition sales - E3 art space exhibitions - works by students in Educational Institution Exhibitions
D
Each
Nil
70
Combined Delivery Program & Operational Plan
Nil
Nil
environment & community services. 247
Gallery Shop - Commission on exhibition sales - E3 art space exhibitions - works in exhibitions from Riverina Incorporated Arts Bodies and Riverina NGOs
D
Each
Nil
Nil
Nil
248
Gallery Shop - Discount Council POL001 provides that a 10% discount will be offered to: Seniors, Members of the Friends of Wagga Wagga Art Gallery; Wagga Wagga Art Gallery volunteers; WWCC Council Staff; Councillors of the City of Wagga Wagga
E
Each
Nil
Nil
Nil
249
Gallery Shop - Discount Council POL001 provides that a 5% discount will be offered to the following: Members of Australian Association of Gallery Guides Organisation, Members of Museums Australia Inc., Members of National Gallery of Australia
E
Each
Nil
Nil
Nil
250
Special Needs Scholarship Program for 4 participants with special needs, to attend one workshop each per year. Limit of one scholarship per person per workshop
E
Each
Nil
Nil
Nil
251
Waiver of admission and/ or booking fees for the carer of a person with disability in accordance with the Companion Card Program initiated by the NSW Department of Aging, Disability and Home Care
E
Each
Nil
Nil
Nil
MUSEUMS HISTORIC COUNCIL CHAMBERS 252
Historic Council Chambers - Weekdays - full day hire (10.00am - 5.00pm)
E
Hour
54.00
50.91
5.09
56.00
253
Historic Council Chambers Weekdays - after 5.00pm
E
Hour
80.00
74.55
7.45
82.00
254
Historic Council Chambers Weekdays - after 7.00pm - per hour
E
Hour
80.00
74.55
7.45
82.00
255
Historic Council Chambers - Saturday - before 10.00am per hour
E
Hour
80.00
74.55
7.45
82.00
256
Historic Council Chambers Saturday - 10.00am - 5.00pm - per hour
E
Hour
80.00
74.55
7.45
82.00
257
Historic Council Chambers Saturday - after 5.00pm - per hour or part thereof
E
Hour
107.00
100.00
10.00
110.00
258
Historic Council Chambers Sunday/Public Holiday - before 12.00 noon - per hour
E
Hour
107.00
100.00
10.00
110.00
259
Historic Council Chambers Sunday/Public Holiday - 12.00 noon - 4.00pm - per hour
E
Hour
107.00
100.00
10.00
110.00
71
Combined Delivery Program & Operational Plan
environment & community services. 260
Historic Council Chambers Sunday/Public Holiday - after 4.00pm - per hour
E
Hour
107.00
100.00
10.00
110.00
261
Historic Council Chambers - Setting up charge (seating, equipment, crockery/urn, etc + After hours supervision of museum exhibition spaces and security - per staff member per hour
E
Each
59.00
55.45
5.55
61.00
262
Reproduction of Images
E
Each
33.00
30.91
3.09
34.00
263
Research Fee
E
Hour
55.00
51.82
5.18
57.00
WILLANS HILL MUSEUM 264
Willans Hill Museum Weekdays - Full day hire (10.00am - 5.00pm)
E
Hour
80.00
74.55
7.45
82.00
265
Willans Hill Museum Weekdays - before 10.00am - per hour
E
Hour
80.00
74.55
7.45
82.00
266
Willans Hill Museum Weekdays - after 5.00pm - first two hours
E
Each
80.00
74.55
7.45
82.00
267
Willans Hill Museum Weekdays - after 7.00pm - per hour
E
Hour
80.00
74.55
7.45
82.00
268
Willans Hill Museum - Saturday - before 10.00am - per hour
E
Hour
80.00
74.55
7.45
82.00
269
Willans Hill Museum - Saturday - 10.00am - 5.00pm - per hour
E
Hour
80.00
74.55
7.45
82.00
270
Willans Hill Museum - Sunday / Public Holiday - before 12.00 noon - per hour
E
Hour
80.00
74.55
7.45
82.00
271
Willans Hill Museum - Sunday / Public Holiday - 12.00 noon 4.00pm - per hour
E
Hour
80.00
74.55
7.45
82.00
272
Willans Hill Museum - Sunday / Public Holiday - after 4.00pm - per hour
E
Hour
80.00
74.55
7.45
82.00
273
Willans Hill Museum - Sunday / Public Holiday - Setting up/ Cleaning charge (seating, equipment, crockery/urn, etc) + After hours supervision of museum exhibition spaces and security system per staff member
E
Each
59.00
55.45
5.55
61.00
LIBRARY 274
Public Library - Inter Library Loan search fee
C
Each
4.40
4.00
0.40
4.40
275
Public Library - Inter Library Loan: additional fee for specialist items
C
Each
16.50
15.00
1.50
16.50
276
Public Library - Inter Library Loan from Overseas
C
Each
277
Public Library - Inter Library Loan - Rush fee
C
Each
33.00
30.00
3.00
33.00
278
Public Library - Inter Library Loan - Express fee
C
Each
49.50
45.00
4.50
49.50
72
Combined Delivery Program & Operational Plan
Cost recovery
Cost recovery
Cost recovery
environment & community services. 279
Public Library - Reservation fee
C
Each
1.00
1.00
1.00
280
Public Library - Replace member card
C
Each
2.00
2.00
2.00
281
Public Library - Replacement charge (lost/damaged collection item under $10 purchase cost) - Flat Fee plus replacement cost
C
Each
$5.00 plus replacement cost
$5.00 plus replacement cost
$5.00 plus replacement cost
282
Public Library - Replacement charge (lost/damaged collection item over $10 purchase cost) - Flat Fee plus replacement cost
C
Each
$9.50 plus replacement cost
$9.50 plus replacement cost
$9.50 plus replacement cost
283
Lost or damaged CD/DVD Cases
C
Each
3.30
284
Replacement of lost/damaged E-Readers
C
285
Replacement of lost/damaged E-Reader charger
286
3.00
0.30
3.30
Each
150.00
15.00
165.00
C
Each
33.00
3.30
36.30
Public Library - Overdue items fines - Flat fee per item plus charge per work day
C
Total Fines
Maximum $11.00 per item
287
Public Library - Periods of amnesty apply when no overdue item fines are charged for specified periods - Specific days to be announced
C
Each
Nil
Nil
Nil
288
Public Library - an exemption applies to fines on overdue items borrowed from the mobile library. This exemption does not extend to lost or damaged items.
Nil
Nil
Nil
289
Public Library - Library bags
D
Each
2.00
1.82
0.18
2.00
290
Public Library - Library Backpacks
D
Each
5.00
4.55
0.45
5.00
291
Public Library - Programs
E
Each
292
Professional Research Fee - per hour includes photocopying & postage
C
Hour
55.00
50.00
5.00
55.00
293
Public Library - Visitorâ&#x20AC;&#x2122;s Fee (non-refundable) - one month
C
Month
33.00
30.00
3.00
33.00
294
Public Library - Visitorâ&#x20AC;&#x2122;s Fee (non-refundable) - three months
C
3 Months
88.00
80.00
8.00
88.00
295
RRL Book Club membership fee (per club of 10 members)
C
per book club
400.00
363.64
36.36
400.00
296
Public Library - Replacement charge for lost or damaged book club collection items
36.36
3.64
40.00
297
Additional storytime pack
D
Other
44.00
40.00
4.00
44.00
298
Additional holiday program
D
Other
242.00
220.00
22.00
242.00
299
Processing Fee for additional items - processed book item with cataloguing
D
Per item
7.50
6.82
0.68
7.50
$2 - $10 depending on content
73
Maximum $11.00 per item
Maximum $11.00 per item
$2 - $10 depending on content
$2 - $10 depending on content
Combined Delivery Program & Operational Plan
environment & community services. 300
Processing fee for additional items - Processed non book item with cataloguing
C
per item
9.50
8.64
0.86
9.50
301
Additional computer terminal & associated peripherals
D
Each
3,025.00
2,750.00
275.00
3,025.00
302
Additional Libero licences
D
Each
1,000.00
909.09
90.91
1,000.00
303
Public Library - Internet Lessons
C
per Hour
5.50
5.45
0.55
6.00
304
Public Library - Photocopying Black and white - A4
C
Each
0.25
0.23
0.02
0.25
305
Public Library - Photocopying Black and white - A3
C
Each
0.40
0.36
0.04
0.40
306
Public Library - Photocopying Colour - A4
C
Each
2.50
2.27
0.23
2.50
307
Public Library - Photocopying Colour - A3
C
Each
3.50
3.18
0.32
3.50
308
Public Library - Photocopy card
C
Each
2.00
1.82
0.18
2.00
309
Public Library - Fax transmission (local call and STD) A4 - First Sheet
C
Each
3.05
2.77
0.28
3.05
310
Public Library - Fax transmission A4 - Subsequent Sheets
C
Each
1.70
1.55
0.15
1.70
311
Public Library - Fax transmission (ISD Call) A4 - per sheet
C
Each
7.40
6.73
0.67
7.40
312
Public Library - Express Computer Booking Fee members (per 30 minutes)
C
Half Hour
1.70
1.55
0.15
1.70
313
Public Library - Local Studies reproduction of images
E
Each
32.00
29.09
2.91
32.00
314
Public Library - Setting Up Charge (seating, equipment, crockery/urn/glasses etc)
C
Each Hire
56.65
54.55
5.45
60.00
315
Public Library - Provide staff for RSA/Supervision per hour per staff for a Community/External Event
C
Each
30.90
29.09
2.91
32.00
316
Public Library - Community Learning Space - Social / Community half day ( up to 4 hrs)
E
19.09
1.91
21.00
317
Public Library - Community Learning Space - Social Community full day
E
37.27
3.73
41.00
318
Public Library - Community Learning Space - Private business e.g. Yoga class/ English Class - Half day (up to 4 hrs)
D
30.00
3.00
33.00
319
Public Library - Community Learning Space - Private business e.g. Yoga class/ English Class - Full day
D
54.55
5.45
60.00
320
Public Library - Community Learning Space - Commercial rate - half day ( up tp 4 hrs)
D
77.27
7.73
85.00
74
Combined Delivery Program & Operational Plan
environment & community services. 321
Public Library - Community Learning Space - Commercial rate - full day
D
118.18
11.82
322
Public Library - Community Learning Space - Commercial rate - full day
D
323
Public Library - Club Celluloid - Annual Subscription
D
100.00
10.00
110.00
324
Public Library - Club Celluloid - Session Price
D
15.00
1.50
16.50
20% of Booking Fee
130.00
20% of Booking Fee
PARKS, RECREATION & BUILDINGS PARKS & SPORTSGROUNDS 325
Access across Council Land inspection fee
D
Each
67.00
62.73
6.27
69.00
326
Banner raising and removal across the main street
D
Each
99.00
92.73
9.27
102.00
327
Banner retrieval from archives
D
Each
38.00
35.59
3.56
39.15
328
CBD Pole Banners
D
Each
13.50
12.64
1.26
13.90
329
Display Banner at Jubilee Park (corner of Red Hill Road and Bourke Street) - 1 week period
E
Each
25.00
23.41
2.34
25.75
330
Display of Banner at Bolton Park Underpass and Western Gateway site booking fee - 1 week period
C
Each
28.00
26.21
2.62
28.83
331
Park Booking fee for Weddings, Naming days and Christenings etc
E
Each
83.00
77.27
7.73
85.00
332
Parks Booking Fee for non-profit organisations and community groups
E
Each
66.00
61.82
6.18
68.00
333
Recreation Reserves - casual hire - per reserve
E
Each
36.00
33.64
3.36
37.00
334
Sportsgrounds and Reserves casual hire - e.g. Trade Show, Car Show per ground
E
Day
215.00
200.91
20.09
221.00
335
Sportsgrounds and Reserves Large Commercial Events hire per ground
C
Day
1,950.00
1,827.27
182.73
2,010.00
336
Sportsgrounds and Parks - casual hire - per ground (includes schools outside LGA)
E
Each
68.00
63.64
6.36
70.00
337
Sportsgrounds and Parks- Hire by professional coaches
C
Season
190.00
78.18
17.82
196.00
338
Sportsgrounds and Parks- Hire by personal trainer
C
Annual
190.00
178.18
17.82
196.00
339
Sportsgrounds and Parks bond - casual hire - small sized events (deposit paid prior to occupation)
C
Each
550.00
560.00
N/A
560.00
340
Sportsgrounds and Parks bond - casual hire - medium sized events (deposit paid prior to occupation)
C
Each
1,200.00
1,240.00
N/A
1,240.00
341
Sportsgrounds and Parks bond - casual hire - large sized events (deposit paid prior to occupation)
C
Each
6,500.00
6,700.00
N/A
6,700.00
75
Combined Delivery Program & Operational Plan
environment & community services. 342
Sportsgrounds and Parks Allocated groups Senior (per person/per season)
E
Season
20.00
18.64
1.86
20.50
343
Sportsgrounds and ParksAllocated groups Juniors (per person/per season)
E
Season
14.00
13.18
1.32
14.50
345
Sportsgrounds Parks and Reserves - Extra garbage bin provision and removal
E
Each
17.00
16.36
1.64
18.00
346
Sportsgrounds - Key Administration fee
C
Each
70.00
45.45
4.55
50.00
347
Sportsgrounds - key deposits
C
Each
20.00
2.00
22.00
348
Jubilee Park Athletics Track track marking
E
Season
630.00
590.91
59.09
650.00
349
Jubilee Park Athletics Track special events (school carnivals etc)
E
Event
275.00
259.09
25.91
285.00
350
Jubilee Park Athletics Track Amenities cleaning fee
C
Each
49.50
4.95
54.45
351
Cost Recovery for specific works provided to Community Groups on Council parks & sportsgrounds at request of Community Group
C
Each
352
Tree Management Application
E
Each
353
Developer Contribution - Street tree establishment
C
354
Developer Contribution - Street tree establishment Lloyd development
Actual Cost plus 10%
66.00
Actual Cost plus 10%
Actual Cost plus 10%
61.82
6.18
68.00
Each
450.00
45.00
495.00
C
Each
700.00
70.00
770.00
Lighting Fees 355
Sportsgrounds - lighting call out fee for manual lighting operation
E
Each
68.00
63.64
6.36
70.00
356
Anderson Oval lighting fee
C
Hour
9.75
9.75
0.98
10.73
357
Ashmont Oval lighting fee
C
Hour
4.29
4.29
0.43
4.72
358
Bolton Park - Training lighting fee
C
Hour
10.80
10.79
1.08
11.87
359
Bolton Park Lighting Competition Lighting fee
C
Hour
21.60
21.60
2.16
23.76
360
Conolly Park field 1 Competition Standard lighting fee
C
Hour
10.45
10.45
1.05
11.50
361
Conolly Park field 1 Training Standard lighting fee
C
Hour
6.71
6.71
0.67
7.38
362
Conolly Park field 2 lighting fee
C
Hour
7.65
7.65
0.77
8.42
363
Conolly Park field 3 lighting fee
C
Hour
3.48
3.48
0.35
3.83
364
Duke of Kent lighting fee
C
Hour
2.48
2.48
0.25
2.73
365
Forest Hill amenities building lighting fee
C
Hour
1.80
1.80
0.18
1.98
366
French Fields lower ground lighting fee
C
Hour
12.55
12.55
1.26
13.81
367
French Fields upper ground lighting fee
C
Hour
0.90
0.90
0.09
0.99
368
Gissing Oval training goal area lighting fee
C
Hour
2.65
2.65
0.27
2.92
76
Combined Delivery Program & Operational Plan
environment & community services. 369
Gissing Oval training area south per area lighting fee
C
Hour
6.95
6.95
0.70
7.65
370
Gissing Oval training area east per area lighting fee
C
Hour
3.63
3.63
0.36
3.99
371
Gissing Main Oval lighting fee
C
Hour
16.21
16.21
1.62
17.83
372
Harris Park lighting fee
C
Hour
7.80
7.80
0.78
8.58
373
Henwood Park lower lighting fee per ground
C
Hour
6.15
6.15
0.62
6.77
Henwood Park upper field lighting fee per ground
C
Hour
4.70
4.70
0.47
5.17
374
Jubilee Park - Touch Fields lighting fee per ground (Fields 1-4)
C
Hour
5.04
5.04
0.50
5.54
375
Jubilee Park - Fields 9 and 10 lighting fee per ground
C
Hour
7.23
7.23
0.72
7.95
376
Jubilee Park Synthetic Hockey Field lighting fee per ground
C
Hour
37.17
37.17
3.72
40.89
377
Kessler Park - Main Field
C
Hour
9.06
9.06
0.91
9.97
378
Kessler Park - Western training
C
Hour
3.33
3.33
0.33
3.66
379
Kessler Park - Eastern
C
Hour
3.10
3.10
0.31
3.41
380
Lake Albert Oval lighting fee
C
Hour
8.23
8.23
0.82
9.05
381
McDonalds Park (Exhibition Centre) training lighting
C
Hour
8.87
8.87
0.89
9.76
382
McDonalds Park (Exhibition Centre) Competition lighting
C
Hour
17.72
17.72
1.77
19.49
383
McPherson Oval lighting fee
C
Hour
8.35
8.38
0.84
9.22
384
Parramore Park (Exhibition Centre) 3 Fields
C
Hour
20.88
20.88
2.09
22.97
385
Parramore Park - West Lights
C
Hour
10.44
10.44
1.04
11.48
386
Parramore Park - East Lights
C
Hour
10.44
10.44
1.04
11.48
387
Rawlings Park lighting fee
C
Hour
6.41
6.41
0.64
7.05
388
Robertson Oval - Training lighting fee (250 lux)
C
Hour
32.17
32.16
3.22
35.38
389
Robertson Oval - Competition lighting fee (500 lux)
C
Hour
64.34
64.34
6.43
70.77
390
Uranquinty Oval lighting fee
C
Hour
2.10
2.10
0.21
2.31
391
Wagga Cricket Ground cycle track lighting fee
C
Hour
11.88
11.88
1.19
13.07
392
Wagga Cricket Ground lighting fee
C
Hour
22.00
22.00
2.20
24.20
EXHIBITION CENTRE 393
Use of Dressage area for commercial groups
E
Site per Day
615.00
575.45
57.55
633.00
394
Use of Dressage area and amenities building by Wagga Dressage Club
E
Site per Day
245.00
229.09
22.91
252.00
495
Use of Field 2 for community groups
E
Site per Day
245.00
229.09
22.91
252.00
396
Use of Camping Areas for Community Groups
E
Site per Day
245.00
229.09
22.91
252.00
397
Use of Camping Areas for Commercial Groups
E
Site per Day
365.00
341.82
34.18
376.00
77
Combined Delivery Program & Operational Plan
environment & community services. 398
Use of Building facility at field 2A for community groups
E
Site per Day
165.00
154.55
15.45
170.00
399
Use of Building facility at field 2A for commercial groups
E
Site per Day
320.00
300.00
30.00
330.00
400
Use of Building facility at field 2A for meetings for Equex Outdoor Association
E
Site per Day
Free
Free
401
Use of Building facility at field 2A for regular (10+ bookings per 6 month period social/ community group booking per half day
E
Site per half Day
23.00
21.82
2.18
24.00
402
Use of Building facility at field 2A for regular (10+ bookings per 6 month period social/ community group booking - full day
E
Site per Day
45.00
41.82
4.18
46.00
403
Bond on use of Building on field 2A
E
Each
320.00
330.00
33.00
363.00
404
Use of Rodeo area at field 2B for community groups
E
Site per Day
245.00
229.09
22.91
252.00
405
Use of Rodeo area at field 2B for commercial groups
E
Site per Day
1,800.00
1,685.45
168.55
1,854.00
406
Exhibition Centre Club Building Social/Community Group half day regular booking. 10 bookings per 6 month period
E
per Booking
23.00
21.82
2.18
24.00
407
Exhibition Centre Club Building Social/Community Group full day regular booking. 10 bookings per 6 month period
E
per Booking
45.00
41.82
4.18
46.00
Free
MUSIC BOWL 408
Music Bowl 1 (non-profit organisations, weddings, educational, sporting groups, community based performing groups - per day hire)
C
Day
120.00
112.73
11.27
124.00
409
Music Bowl 1 (non-profit organisations, weddings, educational, sporting groups, community based performing groups - hourly charge) Minimum charge 2 hrs
C
Hour
18.00
16.82
1.68
18.50
410
Music Bowl 2 (profit making commercial group - per day hire)
C
Day
600.00
561.82
56.18
618.00
411
Music Bowl 2 (profit making commercial group - hourly charge) Minimum charge 3 hrs
C
Hour
80.00
74.55
7.46
82.01
412
Outdoor access and cleaning of toilet facilities - Mon-Fri 9.00am-5.00pm
C
Day
80.00
74.55
7.46
82.01
413
Outdoor access and cleaning of toilet facilities - After hours
C
Day
128.00
120.00
12.00
132.00
E
Hour
45.00
41.82
4.18
46.00
BOLTON PARK 414
78
Bolton Park Stadium Competition all users (seniors - per hour per court)
Combined Delivery Program & Operational Plan
environment & community services. 415
Bolton Park Stadium Competition all users (juniors - per hour per court)
E
Hour
31.00
29.09
2.91
32.00
416
Bolton Park Stadium - Training all users (senior - per hour per court)
E
Hour
34.00
31.82
3.18
35.00
417
Bolton Park Stadium - Training all users (junior - per hour per court)
E
Hour
21.00
20.00
2.00
22.00
418
Bolton Park Stadium - Inter school competition (per hour per court)
E
Hour
38.00
35.45
3.55
39.00
419
Bolton Park Stadium - Inter school competition (per hour full stadium)
E
Hour
65.00
60.91
6.09
67.00
420
Bolton Park Stadium - Other school hire (per hour per court)
E
Hour
25.00
23.64
2.36
26.00
421
Bolton Park Stadium - Special events (user groups) (per day full stadium - 8 hours hire)
C
Day
650.00
609.09
60.91
670.00
422
Bolton Park Stadium - Special events (user groups) (per day full stadium - after 8 hours per hour)
C
Hour
62.00
58.18
5.82
64.00
423
Bolton Park Stadium - Meeting room per hour
E
Hour
17.00
15.91
1.59
17.50
424
Bolton Park Stadium -Social Sport (per head)
E
Each
5.50
5.45
0.55
6.00
LAKE ALBERT HALL 425
Lake Albert Hall - Hire fee per day
E
Day
165.00
154.55
15.45
170.00
426
Lake Albert Hall - Half day hire fee
E
Half Day
83.00
77.27
7.73
85.00
427
Lake Albert Hall - Deposit against damage (per hire)
E
Each
345.00
355.00
N/A
355.00
428
Lake Albert Hall - Weekly users (per session 2hrs)
E
Each
13.50
12.73
1.27
14.00
429
Lake Albert Hall Social/ Community Group half day hire
E
Half Day
15.50
14.55
1.46
16.01
430
Lake Albert Hall Social/ Community Group full day hire
E
Day
30.00
28.18
2.82
31.00
431
Hall Cleaning Fee
E
Each
122.00
114.55
11.46
126.01
432
Private business e.g. Karate class
D
Half Day
33.00
30.91
3.09
34.00
433
Private business e.g. Karate class
D
Day
55.00
51.82
5.18
57.00
CREMATORIUM AND CEMETERIES 434
Crematorium - Cremation Fee - Adult
C
Each
1,125.00
1,054.55
105.45
1,160.00
435
Crematorium - Cremation Fee - Foetus over 20 weeks / Infant / Baby
C
Each
325.00
304.55
30.45
335.00
436
Crematorium - Chapel
C
Each
145.00
136.36
13.64
150.00
437
Crematorium - Interment of Ashes (lawn, monumental or rural)
C
Each
180.00
168.18
16.82
185.00
79
Combined Delivery Program & Operational Plan
environment & community services. 438
Crematorium - Postage of Ashes - Intrastate or Interstate
C
Each
85.00
80.00
8.00
88.00
439
Crematorium â&#x20AC;&#x201C; Reservation Deposit
C
Each
95.00
90.91
9.09
100.00
440
Crematorium - Cremation of materials following an Exhumation
C
Each
235.00
220.00
22.00
242.00
441
Lawn Cemetery - Infant interment (Forget-Me-Not Garden) - Single without plaque
C
Each
960.00
899.09
89.91
989.00
442
Lawn Cemetery (Sections 1-10) - 1st interment (adult or child) - without plaque
C
Each
2,340.00
2,190.91
219.09
2,410.00
443
Lawn Cemetery - 2nd interment (all sections) without plaque
C
Each
1,715.00
1,604.55
160.45
1,765.00
444
Lawn Cemetery â&#x20AC;&#x201C; Reservation Deposit
C
Each
640.00
600.00
60.00
660.00
445
Lawn Cemetery (Sections 3 & 7) - 1st interment - Prepaid with Funeral Director prior to 30/6/97
C
Each
1,760.00
1,650.00
1656.00
1,815.00
446
Lawn Cemetery (Sections 3 & 7) - 1st Interment - Prepaid with Funeral Director 1/7/97 to 30/6/04
C
Each
2,200.00
2,059.09
205.91
2,265.00
447
Lawn Cemetery - 2nd interments - Prepaid with Funeral Director prior to 30/6/97
C
Each
1,180.00
1,104.55
110.45
1,215.00
448
Lawn Cemetery - 2nd interments - Prepaid with Funeral Director 1/7/97 to 30/6/04
C
Each
1,555.00
1,454.55
145.45
1,600.00
449
Lawn Cemetery - Exhumation Fee (includes both Adult and Baby exhumations in all cemeteries)
C
Each
3,095.00
2,895.45
289.55
3,185.00
450
Natural Burial Interment without plaque
C
Each
1,715.00
1,604.55
160.45
1,765.00
451
Monumental Cemetery - Sale of Land (all sections)
C
Each
1,465.00
1,372.73
137.27
1,510.00
452
Monumental Cemetery - Sale of Land - Prepaid with Funeral Director prior to 30/6/97
C
Each
1,085.00
1,018.18
101.82
1,120.00
453
Monumental Cemetery - Sale of Land - Prepaid with Funeral Director 1/7/97 to 30/6/04
C
Each
1,180.00
1,104.55
110.45
1,215.00
454
Monumental Cemetery - Grave Digging - Infant/Baby/Child (by hand 1.2m deep)
C
Each
1,065.00
995.45
99.55
1,095.00
455
Monumental Cemetery - Grave Digging - Infant/Baby/Child (by machine 1.2m deep)
C
Each
980.00
918.18
91.82
1,010.00
456
Monumental Cemetery - Grave Digging - Adult (by hand 1.5m deep)
C
Each
1,650.00
1,545.45
154.55
1,700.00
80
Combined Delivery Program & Operational Plan
environment & community services. 457
Monumental Cemetery - Grave Digging - Adult (by hand 1.5m deep) - Prepaid with Funeral Director prior to 30/6/97
C
Each
1,085.00
1,018.18
101.82
1,120.00
458
Monumental Cemetery - Grave Digging - Adult (by hand 1.5m deep) - Prepaid with Funeral Director 1/7/97 to 30/6/04
C
Each
1,180.00
1,104.55
110.45
1,215.00
459
Monumental Cemetery - Grave Digging - Adult (by machine 1.5 deep)
C
Each
1,465.00
1,372.73
137.27
1,510.00
460
Monumental Cemetery - Grave Digging - Adult (by machine - 1.5 or 2.1m deep) - Prepaid with Funeral Director prior to 30/6/97
C
Each
905.00
845.45
84.55
930.00
461
Monumental Cemetery - Grave Digging - Adult (by machine - 1.5 or 2.1m deep) - Prepaid with Funeral Director 1/7/97 to 30/6/04
C
Each
1,180.00
1,104.55
110.45
1,215.00
462
Monumental Cemetery - Grave Digging - Adult (by machine 2.1m deep)
C
Each
1,755.00
1,640.91
164.09
1,805.00
463
Monumental Cemetery Reservation fee
C
Each
640.00
600.00
60.00
660.00
464
Rural Cemeteries - Sale of Land
C
Each
1,465.00
1,372.73
137.27
1,510.00
465
Rural Cemeteries - Sale of Land - Prepaid with Funeral Director prior to 30/6/97
C
Each
1,085.00
1,018.18
101.82
1,120.00
466
Rural Cemeteries - Sale of Land - Prepaid with Funeral Director 1/7/97 - 30/6/04
C
Each
1,180.00
1,104.55
110.45
1,215.00
467
Rural Cemeteries - Grave Digging - Infant/Baby/Child (by hand 1.2m deep)
C
Each
1,730.00
1,618.00
161.82
1,780.00
468
Rural Cemeteries - Grave Digging - Infant/Baby/Child (by machine 1.2m deep)
C
Each
1,410.00
1,318.18
131.82
1,450.00
469
Rural Cemeteries - Grave Digging - Adult (by hand 1.5m deep)
C
Each
2,250.00
2,109.09
210.91
2,320.00
470
Rural Cemeteries - Grave Digging - Adult (by machine 1.5m deep)
C
Each
1,840.00
1,722.73
172.27
1,895.00
471
Rural Cemeteries - Grave Digging - Adult (by machine 1.5m or 2.1m deep) Prepaid with Funeral Director prior to 30/6/97
C
Each
905.00
850.00
85.00
935.00
472
Rural Cemeteries - Grave Digging - Adult (by machine 1.5m or 2.1m deep) Prepaid with Funeral Director 1/7/97 - 30/6/04
C
Each
1,180.00
1,104.55
110.45
1,215.00
473
Rural Cemeteries - Grave Digging - Adult (by hand 1.5m deep) Prepaid with Funeral Director prior to 30/6/97
C
Each
1,085.00
1,018.18
101.82
1,120.00
81
Combined Delivery Program & Operational Plan
environment & community services. 474
Rural Cemeteries - Grave Digging - Adult (by hand 1.5m deep) Prepaid with Funeral Director 1/7/97 30/6/04
C
Each
1,180.00
1,104.55
110.45
1,215.00
475
Rural Cemeteries - Grave Digging - Adult (by machine 2.1m deep)
C
Each
2,110.00
1,977.27
197.73
2,175.00
476
Rural Cemeteries â&#x20AC;&#x201C; Reservation fee
C
Each
640.00
600.00
60.00
660.00
477
Monumental / Rural Cemeteries - shallow interment - concrete handling
C
Each
565.00
527.27
52.73
580.00
478
Contract grave digging - single depth
C
Each
850.00
795.45
79.55
875.00
479
Crematorium positions - Peace Rose Garden 1 & 2 (single), Rustic Niche Wall (single)
C
Each
425.00
400.00
40.00
440.00
480
Crematorium positions Memorial Walk, North Drive, Rock Pool (double)
C
Each
480.00
450.00
45.00
495.00
481
Crematorium positions Serenity Garden - kerb (single)
C
Each
300.00
281.82
28.18
310.00
482
Crematorium positions - Lincoln Rose and Remembrance Rose Gardens (double)
C
Each
690.00
645.45
64.55
710.00
483
Crematorium positions - Shrub Gardens - individual Shrub Gardens 1 and 2 (double)
C
Each
690.00
645.45
64.55
710.00
484
Crematorium positions Individual Shrub Gardens 3 & 4 (single) E/Court Niche Wall (single)
C
Each
245.00
227.27
22.73
250.00
485
Crematorium positions - Maple Garden (single)
C
Each
530.00
495.45
49.55
545.00
486
Crematorium positions Camellia Garden - kerb (double)
C
Each
425.00
400.00
40.00
440.00
487
Crematorium positions - Pine Garden - kerb (single)
C
Each
385.00
359.09
35.91
395.00
488
Crematorium positions - Niche Wall - Forget-Me-Not (single)
C
Each
480.00
450.00
45.00
495.00
489
Crematorium positions - Rose Arbor (single)
C
Each
480.00
450.00
45.00
495.00
490
Crematorium positions Australian Garden
C
Each
480.00
450.00
45.00
495.00
491
Crematorium positions Eastern & Western Memorials
C
Each
690.00
645.45
64.55
710.00
492
Crematorium positions Eastern Court Camellias
C
Each
690.00
645.46
64.55
710.00
493
Crematorium positions Eastern Rock Pool
C
Each
515.00
481.82
48.18
530.00
494
Crematorium positions Forget-Me-Not Garden
C
Each
370.00
345.45
34.55
380.00
495
Crematorium positions - Lily Wall
C
Each
235.00
218.18
21.82
240.00
496
Crematorium positions - Mixed Rose Gardens
C
Each
425.00
400.00
40.00
440.00
82
Combined Delivery Program & Operational Plan
environment & community services. 497
Crematorium positions Western Rock Pool
C
Each
515.00
481.82
48.18
530.00
498
Crematorium positions Individual Camellias
C
Each
470.00
440.91
44.09
485.00
499
Crematorium positions Individual Rose Gardens
C
Each
690.00
645.45
64.55
710.00
500
Crematorium positions Individual Rose Stands
C
Each
690.00
645.45
64.55
710.00
501
Crematorium positions Memorial Hill
C
Each
800.00
750.00
75.00
825.00
502
Crematorium positions Serenity Garden Rose Stands
C
Each
690.00
645.45
64.55
710.00
503
Crematorium positions - Silver Birch Garden 1
C
Each
480.00
450.00
45.00
495.00
504
Crematorium positions - Silver Birch Garden 2
C
Each
480.00
450.00
45.00
495.00
505
Crematorium positions - Silver Birch Garden 3
C
Each
436.36
43.64
480.00
506
Crematorium positions Magnolia Garden (double)
C
Each
690.00
645.45
64.55
710.00
507
Crematorium positions Magnolia Garden Memorial Only (single)
C
Each
60.00
56.18
5.62
61.80
508
Administration fee to recover cremated remains
C
Each
175.00
163.64
16.36
180.00
509
Bronze Plaques, Granite Headstones and Panels, Ceramic and Aluminium Photos
C
Each
Cost + Cost + administration and administration installation fees and installation fees
510
Monumental Permit to carry out work in the Monumental Cemetery
C
Each
109.09
10.91
120.00
511
Late fee for burial and crematorium paperwork
C
Each
90.91
9.09
100.00
83
Cost + administration and installation fees
Combined Delivery Program & Operational Plan
infrastructure services. Item Particulars No
Pricing Basis Policy ID
2013/2012 2013/14 Existing Fee Fee (including GST excl GST as applicable)
GST
2013/14 Total Fee
SERVICE PLANNING - DESIGN 1
Engineering consulting fees
D
Each
Cost plus 25%
Cost plus 25%
Cost plus 25%
C
Each
D
Per Item
Negotiated Commercial Rate plus 10%
Negotiated Commercial Rate plus 10%
Negotiated Commercial Rate plus 10%
Cost plus 25%
Cost plus 25%
Cost plus 25%
PROCUREMENT SERVICES CONTRACT SERVICES 2
Tender Documents collection fee
110.00
100.00
10.00
110.00
FLEET/SUPPLY SERVICES 3
The use of Council plant for external hire is to be done by negotiation and only under commercial terms, via agreement with Management.
CIVIL INFRASTRUCTURE SERVICES 4
Private Works Inspection Fee (per hour)
C
Hour
5
Street Sweeping
D
Hour
6
Supply of Materials
D
Each
Cost plus 25%
Cost plus 25%
Cost plus 25%
7
Roadworks
D
Each
Cost plus 25%
Cost plus 25%
Cost plus 25%
8
Earthworks
D
Each
Cost plus 25%
Cost plus 25%
Cost plus 25%
9
Civil Works
D
Each
Cost plus 25%
Cost plus 25%
Cost plus 25%
10
Asset Management staff call out
C
Actual Cost plus 10%
Cost plus 25%
Cost plus 25%
Cost plus 25%
11
Approved Concrete Contractors Annual licence fee
C
Each
114.00
106.36
10.64
117.00
12
Approved Concrete Contractors Bond - to be held in trust
C
Each
750.00
770.00
N/A
770.00
C
Each
175.00
204.55
20.45
225.00
Urban Road Network 13
Street Closure with Barricades - for Special Event
14
Road Closure Advertising Charge
C
Each
416.50
Nil
Nil
Nil
15
Road Closure (Permanent) Fee
C
Each
1,177.85
Nil
Nil
Nil
16
Road Closure advertising
C
Each
400.00
Cost plus 25%
Cost plus 25%
17
Road Closure advertising each additional insertion
C
Each
200.00
Cost plus 25%
Cost plus 25%
84
Combined Delivery Program & Operational Plan
Cost Recovery
Cost Recovery
Cost Recovery
infrastructure services. 18
Community groups holding events that require road closure or crowd control often cannot afford to hire the signs and barricades needed. The proposal is to allow the hire of the signs as arranged with the Traffic Engineer with the hire cost being the cost
E
Each
Sign replacement or repair cost if lost or damaged
Sign replacement or repair cost if lost or damaged
Sign replacement or repair cost if lost or damaged
Public Works Plant Hire 19
A) Work on public roads and public property
D
Cost
Cost plus 25%
Cost plus 25%
Cost plus 25%
20
B) Private Hire (No Dry Hire)
D
Cost
Cost plus 25%
Cost plus 25%
Cost plus 25%
NOTE: 1 Not including operator costs NOTE: 2 Plant not hired without operator 21
Data from existing Traffic Counts
C
Per Site
50.00
45.45
4.55
50.00
22
New traffic counts 1 - 5 sites
C
Per Site
160.00
145.45
14.55
160.00
23
New traffic counts 6 - 20 sites
C
Per Site
140.00
127.27
12.73
140.00
24
New traffic counts 20 plus sites
E
Per Site
120.00
109.09
10.91
120.00
25
Community Facility Signs
E
Per Site
275.00
250.00
25.00
275.00
77.00
71.82
7.18
79.00
WASTE AND STORMWATER ACTIVITIES IN ROAD RESERVES 26
Section 138 Permit - Application Fee (nonrefundable)
E
Each
27
Section 138 Permit Fee - Urban - Landscaping (domestic)
E
Each
28
Section 138 Inspection Fee
E
Each
29
Section 138 Bond (as applicable per POL-008)
E
Each
30
Section 138 Permit - Annual Charge (Utilities as outlined in POL-008)
E
Each
114.00
106.36
10.64
117.00
31
Section 68 Part E(1)Swing or hoist goods across or over any part of a public road by means of a lift, hoist or tackle projecting over the footway (including hoarding approvals) (includes site inspection only other inspections as per fees and charges schedule)
C
Each
150.00
136.36
13.64
150.00
No Charge
No Charge
77.00 Amount varies dependant on works and associated risks
71.82
No Charge
7.18
Amount varies dependant on works and associated risks
79.00 Amount varies dependant on works and associated risks
STORMWATER 32
Stormwater Charge Residential Urban
E
Property
25.00
25.00
N/A
25.00
33
Stormwater Charge Residential Rural
E
Property
25.00
25.00
N/A
25.00
34
Stormwater Charge Residential Village
E
25.00
25.00
N/A
25.00
Property
85
Combined Delivery Program & Operational Plan
infrastructure services. 35
Stormwater Charge Residential Strata/Community Title
E
Property
12.50
36
Stormwater Charge Business
E
Property
$25.00 per 350sq meters - Min charge $25.00, Max $250.00
$25.00 per 350sq meters - Min charge $25.00, Max $250.00
$25.00 per 350sq meters Min charge $25.00, Max $250.00
37
Stormwater Charge Business Village
E
Property
$25.00 per 350sq meters - Min charge $25.00, Max $250.00
$25.00 per 350sq meters - Min charge $25.00, Max $250.00
$25.00 per 350sq meters Min charge $25.00, Max $250.00
38
Stormwater Charge Business Strata
E
Property
E
Each
12.50
12.50
12.50
N/A Min charge $12.50, Max $250.00
N/A
12.50
SEWERAGE 39
Effluent supply
2/3 cost of alternative supply
2/3 cost of alternative supply
2/3 cost of alternative supply
LIQUID TRADE WASTE 40
Application Fee - Category 1, 2, S and Cat 3 with volumes < 20kl per day
A
Each
65.17
67.00
N/A
67.00
41
Application Fee - Category 3 and volumes > 20kl per day
A
Each
259.50
267.00
N/A
267.00
42
Annual Trade Waste Fee (minimum)
A
Year
89.42
92.00
N/A
92.00
43
Annual Trade Waste Fee (Large Discharger >20kL per day)
A
Year
602.89
620.00
N/A
620.00
44
Re-inspection Fee
A
Each
84.00
86.50
N/A
86.50
45
Trade Waste Usage Charges for Dischargers with appropriate pre-treatment
A
kl
1.65
1.70
N/A
1.70
46
Trade waste Usage Charges for Dischargers without appropriate pre-treatment
A
kl
14.95
15.40
N/A
15.40
47
ph charge where is it outside the approved rate for the discharger
A
Coefficient
0.40
0.38
0.04
0.42
48
*****Non residential sewer usage charge
A
kl
2.00
2.00
N/A
2.00
EXCESS MASS CHARGES Charges marked with an (*), Council has the option of either levying these charges (indexed by CPI) for pollutants for large trade waste dischargers and for dischargers of industrial waste or calculating appropriate charges for their sewerage and trade waste system. These charges apply for all waste exceeding the concentration of pollutants in domestic sewerage. 49
Aluminium
A
kg
0.72
0.74
N/A
0.74
50
Ammonia (as N)*
A
kg
2.16
2.22
N/A
2.22
51
Arsenic
A
kg
73.01
75.20
N/A
75.20
52
Barium
A
kg
36.49
37.58
N/A
37.58
53
Biochemical oxygen demand (BOD)*
A
kg
0.72
0.74
N/A
0.74
54
Boron
A
kg
0.72
0.74
N/A
0.74
55
Bromine
A
kg
17.36
17.88
N/A
17.88
86
Combined Delivery Program & Operational Plan
infrastructure services. 56
Cadmium
A
kg
338.12
348.26
N/A
348.26
57
Chloride
A
kg
No Charge
No Charge
N/A
No Charge
58
Chlorinated hydrocarbons
A
kg
36.49
37.58
N/A
37.58
59
Chlorinated phenolics
A
kg
1,459.92
1,503.72
N/A
1,503.72
60
Chlorine
A
kg
1.49
1.53
N/A
1.53
61
Chromium
A
kg
24.33
25.06
N/A
25.06
62
Cobalt
A
kg
14.86
15.31
N/A
15.31
63
Copper
A
kg
14.86
15.31
N/A
15.31
64
Cyanide
A
kg
73.01
75.20
N/A
75.20
65
Fluoride
A
kg
3.64
3.75
N/A
3.75
66
Formaldehyde
A
kg
1.49
1.53
N/A
1.53
67
Oil & Grease (Total O & G)*
A
kg
1.31
1.35
N/A
1.35
68
Herbicides/defoliants
A
kg
730.55
752.47
N/A
752.47
69
Iron
A
kg
1.49
1.53
N/A
1.53
70
Lead
A
kg
36.49
37.58
N/A
37.58
71
Lithium
A
kg
7.31
7.53
N/A
7.53
72
Manganese
A
kg
7.31
7.53
N/A
7.53
73
Mercaptans
A
kg
73.01
75.20
N/A
75.20
74
Mercury
A
kg
2,433.20
2,506.20
N/A
2,506.20
75
Methylene blue active substances (MBAS)
A
kg
0.72
0.74
N/A
0.74
76
Molybdenum
A
kg
0.72
0.74
N/A
0.74
77
Nickel
A
kg
24.33
25.06
N/A
25.06
78
Nitrogen (N) (Total Kjeldahl Nitrogen-TKN)*
A
kg
0.20
0.21
N/A
0.21
79
Organoarsenic compounds
A
kg
730.55
752.47
N/A
752.47
80
Pesticides general (excludes organochlorides and organophosphates)
A
kg
730.55
752.47
N/A
752.47
81
Petroleum hydrocarbons (non-flammable)
A
kg
2.44
2.51
N/A
2.51
82
Phenolic compounds (nonchlorinated)
A
kg
7.31
7.53
N/A
7.53
83
Phosphorus (Total P)*
A
kg
1.49
1.53
N/A
1.53
84
Polynuclear aromatic hydrocarbons
A
kg
14.86
15.31
N/A
15.31
85
Selenium
A
kg
51.37
52.91
N/A
52.91
86
Silver
A
kg
1.34
1.38
N/A
1.38
87
Sulphate (SO4)*
A
kg
0.15
0.15
N/A
0.15
88
Sulphide
A
kg
1.49
1.53
N/A
1.53
89
Sulphite
A
kg
1.62
1.67
N/A
1.67
90
Suspended Solids (SS)*
A
kg
0.94
0.97
N/A
0.97
91
Thiosulphate
A
kg
0.27
0.28
N/A
0.28
92
Tin
A
kg
7.31
7.53
N/A
7.53
93
Total dissolved solids (TDS)*
A
kg
0.06
0.06
N/A
0.06
94
Uranium
A
kg
7.31
7.53
N/A
7.53
95
Zinc
A
kg
14.86
15.31
N/A
15.31
87
Combined Delivery Program & Operational Plan
infrastructure services. CHARGES FOR TANKERED WASTE 96
Chemical Toilet
C
kl
16.22
15.45
1.55
17.00
97
Septic Tank Waste - Effluent
C
kl
2.37
2.22
0.22
2.45
98
Septic Tank Waste - Septage
C
kl
23.79
15.40
1.54
16.94
134.00
138.00
N/A
138.00
PRESSURE SEWER 99
Pressure sewer pump maintenance agreement Annual fee
C
Year
100
Pressure sewer - Connection of residential and commercial properties in an existing pressure sewer area. Including areas of East Wagga Wagga, Gumly Gumly and Collingullie.
C
Each
Actual Cost
Actual Cost
Actual Cost
101
Maintenance and repair of Pressure Sewer Systems outside of Municipality
C
Each
Actual Cost + 13%
Actual Cost + 15%
Actual Cost + 15%
C
Each
756.80
688.00
68.80
756.80
132.00
120.00
12.00
132.00
JOINT SEWER ELIMINATION 102
Elimination of joint sewer connections - As per Sewer Policy 5
BUILD OVERS 103
Build over Council service or easement application
C
Each
104
Build over Council service or easement encumbrance charge.
C
Each
Actual Cost
Actual Cost
Actual Cost
SOLID WASTE 105
Kerbside Waste Collection - replacement for missing/ stolen 120 litre MGB
E
Each
57.00
41.20
N/A
41.20
106
Kerbside Waste Collection - replacement for missing/ stolen 240 litre recycling MGB
E
Each
108.00
51.35
N/A
51.35
107
Kerbside Waste Collection - replacement for missing/ stolen 240 litre greenwaste MGB
E
Each
69.00
51.35
N/A
51.35
108
Kerbside Waste Collection - replacement for missing/ stolen 240 litre commercial MGB
E
Each
70.00
51.35
N/A
51.35
109
Gregadoo Waste Disposal minimum disposal charge per load
E
Each
9.90
9.27
0.93
10.20
110
Gregadoo Waste Disposal domestic waste per tonne
C
Tonne
73.50
69.00
6.90
75.90
111
Gregadoo Waste Disposal commercial waste per tonne
C
Tonne
90.00
84.55
8.45
93.00
112
Gregadoo Waste Disposal - clean & separated rubble, scrap steel or commingled recycling material - per tonne
C
Tonne
35.20
33.00
3.30
36.30
88
Combined Delivery Program & Operational Plan
infrastructure services. 113
Gregadoo Waste Disposal - specialist wastes: e.g. Industrial wastes, medical and asbestos wastes (minimum charge 1 tonne) - per tonne
D
Tonne
216.00
201.50
20.15
221.65
114
Gregadoo Waste Disposal Car bodies
D
Each
45.00
41.91
4.19
46.10
115
Gregadoo Waste Disposal Tyres - Large Tractor
D
Each
114.00
104.64
10.46
115.10
116
Gregadoo Waste Disposal Tyres - Small Tractor
D
Each
82.00
75.45
7.55
83.00
117
Gregadoo Waste Disposal Tyres - Super Single
D
Each
51.00
47.36
4.74
52.10
118
Gregadoo Waste Disposal Tyres - Truck
D
Each
34.00
31.91
3.19
35.10
119
Gregadoo Waste Disposal Tyres - Truck Small
D
Each
17.00
16.00
1.60
17.60
120
Gregadoo Waste Disposal Tyres - Passenger
D
Each
11.35
10.64
1.06
11.70
121
Gregadoo Waste Disposal Tyres - Bicycle
D
Each
6.80
6.36
0.64
7.00
122
Gregadoo Waste Disposal Dead animals - cats & dogs
D
Each
10.25
9.41
0.94
10.35
123
Gregadoo Waste Disposal Dead animals - small stock
D
Each
18.15
17.00
1.70
18.70
124
Gregadoo Waste Disposal Dead animals - large stock
D
Each
85.15
79.00
7.90
86.90
125
Gregadoo Waste Disposal Refrigerative equipment CFC removal (per unit)
D
Each
34.00
31.91
3.19
35.10
126
Gregadoo Waste Disposal - Unauthorised or Dumping waste - Cleanup Costs
D
Each
Actual Cost + 10% Admin
127
Gregadoo Waste Disposal - Unsorted recyclables including rubble, scrap steel or commingled recycling material
E
Tonne
114.00
118.64
128
Gregadoo Waste Disposal - 2 free landfill entry days, dates to be determined by Council for domestic waste only
E
Free
Free
129
Rural Waste Disposal general putrescible waste, greenwaste, and mixed rubble - minimum charge
E
Each
9.90
9.27
130
Rural Waste Disposal Recyclables (Tarcutta and Mangoplah only)
E
Each
No Charge
No Charge
No Charge
131
Rural Waste Disposal Recyclables (Uranquinty, Galore, Humula, Collingullie and Currawarna only)
E
No Charge
No Charge
No Charge
132
Rural Waste Disposal general putrescible waste, greenwaste, and mixed rubble -utility, single axle trailer (1.8m Ă&#x2014; 1.2m)
E
19.85
18.45
Each
89
Actual Cost + 10% Admin
Actual Cost + 10% Admin 11.86
130.50
Free
0.93
1.80
10.20
20.25
Combined Delivery Program & Operational Plan
infrastructure services. 132
Gregadoo Waste Disposal non specified industrial waste (minimum charge 1 tonne) per tonne
C
Tonne
136.00
127.64
12.76
140.40
133
Gregadoo Waste Disposal Mattresses
E
Each
15.50
16.00
1.60
17.60
134
Gregadoo Waste Disposal - Gas Bottles up to and including 9kg
E
Each
14.75
13.73
1.37
15.10
135
Gregadoo Waste Disposal Gas Bottles over 9kg
E
Each
18.75
17.34
1.71
19.05
136
Gregadoo Waste Disposal Computers
E
Each
9.00
8.50
0.85
9.35
137
Gregadoo Waste Disposal Televisions less than 46cm
E
Each
8.25
7.73
0.77
8.50
138
Gregadoo Waste Disposal Non flat televisions (e.g. CRT) screen 46cm and greater
E
Each
13.40
12.41
1.24
13.65
139
Gregadoo Waste Disposal - TV under the National Television Recycling Scheme
A
Each
140
On call Bulky Waste Collection Pick up fee (certain waste items will be additional cost)
E
Each
Free
Free
22.50
30.45
3.05
33.50
434.00
434.00
N/A
434.00
RESIDENTIAL AND NON-RESIDENTIAL SEWER CHARGES 141
Residential Sewer Charge Pricing Policy
C
Each
142
Non-Residential per kl Charge Consumption
C
kl
2.00
2.00
N/A
2.00
143
Access Charge Based on Meter Size - Non-Residential
C
20mm
63.00
63.00
N/A
63.00
144
Access Charge Based on Meter Size - Non-Residential
C
25mm
98.44
98.44
N/A
98.44
145
Access Charge Based on Meter Size - Non-Residential
C
32mm
161.28
161.28
N/A
161.28
146
Access Charge Based on Meter Size - Non-Residential
C
40mm
252.00
252.00
N/A
252.00
147
Access Charge Based on Meter Size - Non-Residential
C
50mm
393.75
393.75
N/A
393.75
148
Access Charge Based on Meter Size - Non-Residential
C
80mm
1,008.00
1,008.00
N/A
1,008.00
149
Access Charge Based on Meter Size - Non-Residential
C
100mm
1,575.00
1,575.00
N/A
1,575.00
150
Access Charge Based on Meter Size - Non-Residential
C
150mm
3,543.75
3,543.75
N/A
3,543.75
NOTE: In accordance with best practice non-residential sewer guidelines the minimum non-residential sewer charge must not be less then the residential charge for 2012/2013 ie $434.00
WASTE MANAGEMENT ANNUAL CHARGES 151
Domestic Waste Management Service Charge - Urban Residential (charge is per service supplied)
C
Each
262.50
270.00
N/A
270.00
152
Domestic Waste Management Service Charge - Rural Residential (charge is per service supplied)
C
Each
262.50
270.00
N/A
270.00
90
Combined Delivery Program & Operational Plan
infrastructure services. 153
Domestic Waste Management Service Charge - Additional Bin Service (either General, Recyle or Greenwaste)
C
Each
87.50
90.00
N/A
90.00
154
Domestic Waste Management Service Charge - Lake Albert/ Springvale not using Council service
C
Each
25.00
27.50
N/A
25.50
155
Commercial Waste Management Service Charge - Urban Commercial
C
Each
262.50
270.00
N/A
270.00
156
Commercial Waste Management Service Charge - Additional Urban Commercial Service
C
Each
173.00
178.00
N/A
178.00
157
Commercial Waste Management Service Charge - Small Strata Properties
C
Each
87.50
90.00
N/A
90.00
158
Waste Management Service Charge - Vacant Land
C
Each
27.00
27.50
N/A
27.50
91
Combined Delivery Program & Operational Plan
planning & development. IteM Particulars No
Pricing Basis Policy ID
2013/2012 2013/14 Existing Fee Fee excl GST
GST
2013/14 Total Fee
(including GST as applicable)
PLANNING & DEVELOPMENT STRATEGIC PLANNING Planning Proposal Consideration (LEP/DCP Preparation Fees) 1
Planning Proposal (PP) preparation relating to rezoning request. Minimum lodgement fee of $5,000 (GST INCL) but actual cost to be determined by a Policy of Practice Note in relation to a request(s) to prepare rezoning LEP and DCP amendments.
C
Each
5,000.00
4,545.45
454.55
5,000.00
2
Development Control Plan (DCP) preparation
C
Each
4,000.00
3,636.36
363.64
4,000.00
Document Fees 3
Wagga Wagga Local Environmental Plan 2010 (written document)
E
Each
57.00
57.00
N/A
57.00
4
Wagga Wagga Local Environmental Plan 2010 map set (A3 set)
E
Each
247.00
247.00
N/A
247.00
5
Wagga Wagga Local Environmental Plan 2010 map set (A1 set)
E
Each
98.00
98.00
N/A
98.00
6
Additional A1 sheets
E
Each
17.00
17.00
N/A
17.00
7
Wagga Wagga Development Control plan 2010 (written document)
E
Each
72.00
72.00
N/A
72.00
8
Wagga Wagga LEP & DCP documents and maps on CD
E
Each
26.00
26.00
N/A
26.00
9
Development Contribution Plans Section 94, Section 94A, Stormwater and Sewerage DSP - copy
E
Each
52.00
52.00
N/A
52.00
C
Each Space
25,300.00
23,000.00
2,300.00
25,300.00
285.00+
285.00+
N/A
285.00+
Miscellaneous Fees 10
Car Parking Cash Contribution - CBD
Development Application (DA) Fees 11
92
D.A. Fee for Advertisements - $285, plus $93 for each advertisement in excess of one
A
Combined Delivery Program & Operational Plan
Each
planning & development. 12
D.A. Fee (not involving erection of building, carrying out of work or subdivision of land)
A
Each
285.00
285.00
N/A
285.00
13
D.A. Fee (Dwelling with estimated construction cost $100,000 or less)
A
Each
455.00
455.00
N/A
455.00
14
D.A. Fee - Subdivisions not involving opening of public road ($330.00 plus $53.00 for each additional lot created by the subdivision)
A
Each
330.00+
330.00+
N/A
330.00+
15
D.A. Fee Subdivisions involving opening of public road ($665.00 plus $65.00 for each additional lot created by the subdivision)
A
Each
665.00+
665.00+
N/A
665.00+
16
D.A. Fee Strata Subdivision ($330.00 plus $65.00 for each additional lot created by the subdivision)
A
Each
330.00+
330.00+
N/A
330.00+
17
D.A. Fee (estimated cost up to $5,000)
A
Each
110.00
110.00
N/A
110.00
18
D.A. Fee (estimated cost $5,001 to $50,000) $170, plus an additional $3 for each $1,000 (or part of $1,000) of the estimated cost
A
Each
170.00+
170.00+
N/A
170.00+
19
D.A. Fee (estimated cost $50,001 - $250,000) $352, plus an additional $3.64 for each $1,000 (or part of $1,000) by which the estimated cost exceeds $50,000
A
Each
352.00+
352.00+
N/A
352.00+
20
D.A. Fee (estimated cost $250,001 $500,000) - $1,160, plus an additional $2.34 for each $1,000 (or part of $1,000) by which the estimated cost exceeds $250,000
A
Each
1,160.00+
1,160.00+
N/A
1,160.00+
21
D.A. Fee (estimated cost $500,001 $1,000,000) - $1,745, plus an additional $1.64 for each $1,000 (or part of $1,000) by which the estimated cost exceeds $500,000
A
Each
1,745.00+
1,797.00+
N/A
1,797.00
22
D.A. Fee (estimated cost $1,000,001 $10,000,000) - $2,615, plus an additional $1.44 for each $1,000 (or part of $1,000) by which the estimated cost exceeds $1,000,000
A
Each
2,615.00
2,615.00
N/A
2,615.00
93
Combined Delivery Program & Operational Plan
planning & development. 23
D.A. Fee (estimated cost of more than $10,000,000) $15,875, plus an additional $1.19 for each $1,000 (or part of $1,000) by which the estimated cost exceeds $10,000,000
A
Each
24
D.A. Fee - Modification of plans, documents, etc. prior to issue of consent (plus advertising fee if required)
C
Each
25
Director General Fee (formerly PlanFirst) (estimated cost > $50,000) (in addition to D.A. Fee)
A
Other
26
Concurrence Fee for Concurrence Authority per Body (in addition to D.A. Fee)
A
Each
27
Integrated Development Approval Fee for approval body - per body (in addition to D.A. Fee)
A
Each
28
Administration Fee for Integrated Development or Development Requiring Concurrence (in addition to D.A. Fee and concurrence/ integrated fee)
A
Each
29
Residential flat development (required to be referred to a design review panel under SEPP 65) (in addition to D.A. Fee)
A
30
Site Compatibility Certificate (required to be referred to Director General Under SEPP Affordable Rental) $265.00 plus $42.00 for each dwelling (must not exceed $5,580.00)
31
Site Compatibility Certificate (required to be referred to Director General Under SEPP Infrastructure) $265.00 plus $265.00 for each hectare (must not exceed $5,580.00)
94
15,875.00
15,875.00
N/A
15,875.00
Minimum $55 or 25% of original fee (whichever is the greater) + GST
Minimum $55 or 25% of original fee (whichever is the greater) + GST
N/A
Minimum $55 or 25% of original fee (whichever is the greater) + GST
0.064 in the $
0.064 in the $
N/A
0.064 in the $
320.00
N/A
320.00
320.00
N/A
320.00
140.00
140.00
N/A
140.00
Each
760.00
760.00
N/A
760.00
A
Each
265.00+
265.00+
N/A
265.00+
A
Each
265.00+
265.00+
N/A
265.00+
Combined Delivery Program & Operational Plan
320.00
planning & development. 32
Site Compatibility Certificate (required to be referred to Director General Under SEPP Seniors Housing) $280.00 plus $45.00 per bed in residential care facility or $45.00 per dwelling in the development (must not exceed $5,580.00)
A
Each
280.00+
280.00+
N/A
280.00+
33
Designated Development (in addition to D.A. Fee)
A
Each
920.00
920.00
N/A
920.00
34
Advertising - basic fee (in addition to D.A. Fee) Clause 252 of EPA Regs 2000
C
Each
330.00
330.00
N/A
330.00
35
Advertising - designated development (in addition to D.A. Fee)
A
Each
2,220.00
2,220.00
N/A
2,220.00
36
Extension of Consent (S.95A)
D
Each
55.00
57.00
N/A
57.00
Modification of Consent Fees 37
D.A. Modification of consent: S.96(1) (minor error, misdescription or miscalculation)
A
Each
71.00
71.00
N/A
71.00
38
D.A. Modification of consent: S.96(1) (Council error)
A
Each
Nil
Nil
N/A
Nil
39
D.A. Modification of consent: S.96(1A) or S.96AA(1) (minimal environmental impact)
A
Each
50% of original DA fee or $645 whichever is the lesser
50% of original DA fee or $645 whichever is the lesser
N/A
50% of original DA fee or $645 whichever is the lesser
40
D.A. Modification of consent: S.96(2) (not of minimal environmental impact) where fee for original DA was less than $100
A
Each
50% of original DA fee
50% of original DA fee
N/A
50% of original DA fee
41
D.A. Modification of consent: S.96(2) (not of minimal environmental impact) not involving the erection of a building, the carrying out of a work or the demolition of a work or building
A
Each
50% of original DA fee
50% of original DA fee
N/A
50% of original DA fee
42
D.A. Modification of consent: S.96(2) (not of minimal environmental impact) for the erection of a dwelling-house with an estimated cost of construction of $100,000 or less
A
Each
190.00
190.00
N/A
190.00
43
D.A. Modification of consent: S.96(2) (not of minimal environmental impact) (estimated cost up to $5,000)
A
Each
55.00
55.00
N/A
55.00
95
Combined Delivery Program & Operational Plan
planning & development. 44
D.A. Modification of consent: S.96(2) (not of minimal environmental impact) (estimated cost $5,001 - $250,000) $85, plus an additional $1.50 for each $1,000 (or part of $1,000) of the estimated cost
A
Each
85.00+
85.00+
N/A
85.00+
45
D.A. Modification of consent: S.96(2) (not of minimal environmental impact) (estimated cost $250,001–$500,000) $500, plus an additional $0.85 for each $1,000 (or part of $1,000) by which the estimated cost exceeds $250,000
A
Each
500.00+
500.00+
N/A
500.00+
46
D.A. Modification of consent: S.96(2) (not of minimal environmental impact) (estimated cost $500,001–$1,000,000) $712, plus an additional $0.50 for each $1,000 (or part of $1,000) by which the estimated cost exceeds $500,000
A
Each
712.00+
712.00+
N/A
712.00+
47
D.A. Modification of consent: S.96(2) (not of minimal environmental impact) (estimated cost $1,000,001– $10,000,000) - $987, plus an additional $0.40 for each $1,000 (or part of $1,000) by which the estimated cost exceeds $1,000,000
A
Each
987.00+
987.00+
N/A
987.00+
48
D.A. Modification of consent: S.96(2) (not of minimal environmental impact) (estimated cost more than $10,000,000) - $4,737, plus an additional $0.27 for each $1,000 (or part of $1,000) by which the estimated cost exceeds $10,000,000
A
Each
4,737.00+
4,737.00+
N/A
4,737.00+
Review of Determination Fees 49
D.A. Review of determination: S.82A for the erection of a dwelling-house with an estimated cost of construction of $100,000 or less
A
Each
190.00
190.00
N/A
190.00
50
D.A. Review of determination: S.82A not involving the erection of a building, the carrying out of a work or the demolition of a work or building
A
Each
50% of original DA fee
50% of original DA fee
N/A
50% of original DA fee
96
Combined Delivery Program & Operational Plan
planning & development. 51
D.A. Review of determination: S.82A (estimated cost up to $5,000)
A
Each
55.00
55.00
N/A
55.00
52
D.A. Review of determination: S.82A (estimated cost $5,001 - $250,000) - $85, plus an additional $1.50 for each $1,000 (or part of $1,000) of the estimated cost
A
Each
85.00+
85.00+
N/A
85.00+
53
D.A. Review of determination: S.82A (estimated cost $250,001–$500,000) $500, plus an additional $0.85 for each $1,000 (or part of $1,000) by which the estimated cost exceeds $250,000
A
Each
500.00+
500.00+
N/A
500.00+
54
D.A. Review of determination: S.82A (estimated cost $500,001 - $1,000,000) - $712 plus an additional $0.50 for each $1,000 (or part of $1,000) by which the estimated cost exceeds $500,000
A
Each
712.00+
712.00+
N/A
712.00+
55
D.A. Review of determination: S.82A (estimated cost $1,000,001– $10,000,000) - $987, plus an additional $0.40 for each $1,000 (or part of $1,000) by which the estimated cost exceeds $1,000,000
A
Each
987.00+
987.00+
N/A
987.00+
56
D.A. Review of determination: S.82A (estimated cost more than $10,000,000) - $4,737, plus an additional $0.27 for each $1,000 (or part of $1,000) by which the estimated cost exceeds $10,000,000
A
Each
4,737.00+
4,737.00+
N/A
4,737.00+
57
D.A. Review of Decision - to reject a Development Application (estimated cost of development less than $100,000)
A
Each
55.00
N/A
55.00
58
D.A. Review of Decision - to reject a Development Application (estimated cost of development $100,000 - $1,000,000)
A
Each
150.00
N/A
150.00
97
Combined Delivery Program & Operational Plan
planning & development. 59
D.A. Review of Decision - to reject a Development Application (estimated cost of development greater than $1,000,000)
A
Each
250.00
N/A
250.00
Construction Certificates (CC) and Complying Development Certificates (CDC) Application Fees - Building 60
CC or CDC Fee (estimated cost up to $5,000) - $140 plus an additional 0.5% of the estimated cost
C
Each
140.00+
144.00+
N/A
144.00+
61
CC or CDC Fee (estimated cost exceeding $5,000 but not exceeding $100,000) - $175 plus an additional 0.3% of the estimated cost exceeding over $5,000
C
Each
175.00+
180.00+
N/A
180.00+
62
CC or CDC Fee (estimated cost exceeding $100,000 but not exceeding $250,000) - $491 plus an additional 0.2% of the estimated cost over $100,000
C
Each
491.00+
506.00+
N/A
506.00+
63
CC or CDC Fee (estimated cost exceeding $250,000 but not exceeding $1,000,000) - $822 plus an additional 0.1% of the estimated cost over $250,000
C
Each
822.00+
847.00+
N/A
847.00+
64
CC or CDC Fee (estimated cost exceeding $1,000,000) - $1,645 plus an additional 0.05% of the estimated cost over $1,000,000
C
Each
1,645.00+
1,694.00+
N/A
1,694.00+
65
Amendment to Application for a CC or CDC
C
Each
40% original fee with minimum of $62
N/A
40% original fee with minimum of $62
66
Registration fee for CDC & Part 4A Certificate (per certificate)
A
Each
36.00
36.00
N/A
36.00
67
Fee for Council to act as the Principal Certifying Authority for construction certificates/ complying development certificates (where Council doesnâ&#x20AC;&#x2122;t issue construction certificate) (application fee only)
C
Each
350.00
327.27
32.73
360.00
Construction Certificate Inspection Fees - Building 98
Combined Delivery Program & Operational Plan
planning & development. 68
Building Inspection fee (including reinspections) - within 30 kms of Council Chambers
C
Each
135.30
126.36
12.64
139.00
69
Building Inspection fee (including reinspections) - outside of 30 kms of Council Chambers
C
Each
198.00
185.45
18.55
204.00
70
Boarding House Inspection Fee
C
Each
$250.00 plus an additional 50 cents per m2 over 200m2
$250.00 plus an additional 50 cents per m2 over 200m2
Construction Certificate Application Fees - Subdivision 71
CC Fee - $150 plus 0.5% of the first $5,000 of the estimated cost plus 0.3% of next $95000 of the estimated cost plus 0.2% of the next $150,000 of the estimated cost plus 0.1% of the estimated cost in excess of $250,000
C
Each
150.00+
155.00+
N/A
155.00+
Construction Certificate Inspection Fees - Subdivision 72
Quality control inspections subdivisions (and associated works) (per inspection)
C
Each
220.00
226.36
22.64
249.00
Subdivision Certificate Application Fees 73
Subdivision Certificate $240 plus $50 per lot
C
Each
240.00+
247.00+
N/A
247.00+
74
Subdivision Certificate resigning (per sheet)
C
Each
143.00
139.09
13.91
153.00
Building Certificates Application Fees 75
Building Certificate for part of a building (consisting of an external wall only or does not otherwise have a floor area)
A
Each
250.00
250.00
N/A
250.00
76
Building Certificate (Class 1 or 10 buildings)
A
Each
250.00
250.00
N/A
250.00
77
Building Certificate (Class 2 to 9 buildings) (<= 200m2)
A
Each
250.00
250.00
N/A
250.00
78
Building Certificate (Class 2 to 9 buildings) (> 200m2 and <= 2000m2) - $210, plus an additional 50 cents per m2 over 200
A
Each + per m2
79
Building Certificate (Class 2 to 9 buildings) (> 2000m2) - $1,165, plus an additional 7.5 cents per m2 over 2,000
A
Each + per m2
$250 plus an additional 50 cents per m2 over 200m2
$250 plus an additional 50 cents per m2 over 200m2
1,165.00+
99
1,165.00+
N/A $250 plus an additional 50 cents per m2 over 200m2
N/A
1,165.00+
Combined Delivery Program & Operational Plan
planning & development. 80
Building Certificate copy (duplicate)
A
Each
13.00
13.00
N/A
13.00
Each
90.00
90.00
N/A
90.00
Building Certificates Inspection Fees 81
Building Certificate Reinspection Fee
A
Section 68 Approval Fees - Building 82
Part A(1) - Install a manufactured home, moveable dwelling or associated structure on land
C
Each
330.00
330.00
N/A
330.00
83
Part F(4) - Install a domestic oil or solid fuel heating appliance, other than a portable appliance
C
Each
160.00
206.00
N/A
206.00
Section 68 Inspection Fees - Building 84
Inspection fee (reinspections) - within 30 kms of Council Chambers
C
Each
147.40
138.18
13.82
152.00
85
Inspection fee (reinspections) - outside of 30 kms of Council Chambers
C
Each
218.90
204.54
20.46
225.00
Section 68 Approval Fees - Plumbing 86
Private Internal Sewer/ Drainage Works under Part B(4) - Carry out sewerage work and/ or Part B(5) - Carry out stormwater drainage work and/or Part B(6) Connect a private drain or sewer with a public drain or sewer under the control of a Council or with a drain or sewer which connects with such a public drain or sewer (Note 1: Section 68 Plumbing Approvals (Part B) include 3 inspections - additional required inspections and re-inspections charged at nominated rate) (Note 2: Section 68 Plumbing Approvals (Part B) include 9 fixtures additional fixtures charged at nominated rate)
C
Each
330.00
300.00
30.00
330.00
87
Additional Plumbing/ Drainage fixtures (per fixture/per application). Note: Standard Section 68 Plumbing Approvals (Part B) include 9 fixtures per application
C
Each
27.00
28.00
N/A
28.00
Section 68 Plumbing Inspection Fees 100
Combined Delivery Program & Operational Plan
planning & development. 88
Sewer and Plumbing Permits - inspection of un-permitted work (per hour)
C
Per Hour
231.00
216.36
21.64
238.00
89
Sewer and Plumbing Inspection Fee Commercial/Industrial (per hour)
C
Per Hour
253.00
236.36
23.64
260.00
90
Sewer and Plumbing Inspection Fee - within 30 kms of Council Chambers
C
Each
126.50
118.18
11.82
130.00
91
Sewer and Plumbing Inspection Fee - outside of 30 kms of Council Chambers
C
Each
187.00
175.45
17.55
193.00
92
Minor Works Permit Private (Plumbing) - 1 fixture only or less than 10 metres of stormwater pipe. Fee includes 2 inspections
C
Each
165.00
154.55
15.45
170.00
93
Amended Section 68 Application (Parts A, B, E and F) - 50% of original base application fee
C
Each
N/A
50% of original cost
94
CCTV Inspection for sewer and stormwater
C
Linear metre
1.82
0.18
2.00
300.00
30.00
330.00
50.00
N/A
50.00
50% of original cost
Section 68 Approval Fees - Engineering 95
Public Sewer/Drainage Infrastructure Works under Part B(4) - Carry out sewerage work and/ or Part B(5) - Carry out stormwater drainage work and/or Part B(6) Connect a private drain or sewer with a public drain or sewer under the control of a Council or with a drain or sewer which connects with such a public drain or sewer (includes site inspection only - other inspections as per fees and charges schedule)
C
Each
96
Kerb and Gutter/ Footpath Bond administration fee
C
Each
330.00
Section 68 Engineering Inspection Fees 97
Quality control inspections (per inspection)
C
Each
220.00
200.00
20.00
220.00
Section 68 Approval Fees - Planning 98
Part F(1) - Operate a public car park
C
Each
330.00
330.00
N/A
330.00
99
Part F(2) - Operate a caravan park or camping ground
C
Each
330.00
330.00
N/A
330.00
101
Combined Delivery Program & Operational Plan
planning & development. 100
Part F(3) - Operate a manufactured home estate
C
Each
101
Inspection fee (reinspections) - within 30 kms of Council Chambers for Part F1,2 and 3 of Section 68 LGA 1993
C
102
Inspection fee (reinspections) - outside 30 kms of Council Chambers for Part F1,2 and 3 of Section 68 LGA 1993
103
330.00
N/A
330.00
Each
133.64
13.36
147.00
C
Each
133.64
13.36
147.00
Section 735A Certificate Fee
D
Each
120.00
120.00
N/A
120.00
104
Section 149(2) Certificate Fee
A
Each
53.00
53.00
N/A
53.00
105
Section 149(5) Certificate (in addition to 149(2) Certificate Fee)
A
Each
80.00
80.00
N/A
80.00
106
Sewer Diagrams
C
Each
96.00
96.00
N/A
96.00
107
Certified copy of a document, map or plan (S.262 of Regs)
A
Each
53.00
53.00
N/A
53.00
108
Annual Fire Safety Administration/ Registration Fee
C
Each
80.00
80.00
N/A
80.00
109
Occupation of Uncompleted Building (Inspection)
C
Each
150.00
136.36
13.64
150.00
110
Occupation of Temporary Dwellings or Occupation of Land upon which Dwelling House is to be erected
C
Each
150.00
136.36
13.64
150.00
111
Swimming Pool Compliance Certificate (included initial inspection only)
C
Each
150.00
136.36
13.64
150.00
112
NSW Swimming pool Registration Fee Council to Register
C
Each
10.00
N/A
10.00
113
Swimming Pool Exemption Application
C
Each
136.36
13.64
150.00
114
Swimming Safety Mandatory Inspection Fee (includes two inspections per certificate)
A
Per Certificate
136.36
13.64
150.00
115
Shadow Diagram Kit (Shadow Diagram Wagga LGA Shadow Diagrams)
C
Each
181.82
18.18
200.00
116
Long Service Leave Levy (0.35% of estimated cost of all building and subdivision work valued $25,000 and over)
A
102
Combined Delivery Program & Operational Plan
330.00
150.00
200.00
0.35% of estimated cost of works over $25,000
N/A
0.35% of estimated cost of works over $25,000
planning & development. 117
Section 94, Section 94A and Section 64 Contributions are charged as per the current S94, S94A and S64 Plans (figures are updated quarterly in accordance with CPI movements)
C
As Legislated
118
Quality control inspections - for works not requiring construction certificate or section 68 approval subdivisions (and associated works) (per inspection)
C
Each
220.00
200.00
20.00
220.00
119
NSW Fire and Rescue Fire Assessment Fee
A
Each
2,860.00
2,860.00
286.00
3,146.00
120
BAL (Bush Fire Attack level) Assessment Certificate Fee
C
Each
450.00
421.82
42.18
464.00
121
Awning Structural Safety Review and Annual Registration Fee
C
Each
95.00
86.36
8.64
95.00
122
Principal Certifier Signage
C
Each
5.00
4.68
0.47
5.15
103
As Legislated
N/A
As Legislated
Combined Delivery Program & Operational Plan
contact us.
questions?
comments? contact us. contact us Wagga Wagga City Council PO Box 20 Cnr Baylis & Morrow Sts Wagga Wagga NSW Ph: 1300 292 442 Fax: (02) 6926 9199 Email: council@wagga.nsw.gov.au
www.wagga.nsw.gov.au
104
Combined Delivery Program & Operational Plan