2018/2028 Wagga Wagga City Council LONG TERM FINANCIAL PLAN
What is this document all about? What is the Long Term Financial Plan?
The Long Term Financial Plan is a 10 year plan that outlines Council’s financial capacity to meet those objectives of the Community Strategic Plan that fall under the auspices of Council. The Long Term Financial Plan is formulated by using a number of estimates and assumptions to project the future revenue and expenditure required of Council to deliver those services and projects expected by the community. In doing so it addresses the resources that impact on Council’s ability to fund its services and capital works whilst remaining financially sustainable. The Long Term Financial Plan is one element of the resourcing strategy that ensures the community’s ideas and aspirations for the future are realistically achievable. The other elements of the resourcing strategy include the Asset Management Plan and the Workforce Plan. The Asset Management Plan aims to predict infrastructure consumption and renewal needs, as well as consider infrastructure requirements to meet future community needs. The Workforce Plan is designed to ensure that Council has the necessary staff to deliver current services and operational needs for the community now and in the future.
2
These interrelated plans give consideration to the capacity of Council to deliver on its responsibilities within the Community Strategic Plan. Each element informs the Delivery Plan which outlines the strategies in place to meet these responsibilities. Council has reviewed the previous Long Term Financial Plan and significant changes have been made to both operational and capital items in the formulation of this 2018/28 Long Term Financial Plan. Council reviews any significant changes to the Long Term Financial Plan via the Monthly Finance Report to Council. The Monthly Finance Report assesses Council’s performance against budget each month. Any ongoing changes to budget that result from this process are included in the Long Term Financial Plan and reported to Council. A comprehensive review of the Long Term Financial Plan is conducted annually during the Operational Plan process.
Table of contents ABOUT THIS PLAN. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 EXECUTIVE SUMMARY. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 FIT FOR THE FUTURE. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 SPECIAL RATE VARIATION. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 FINANCIAL STRATEGIES. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 Financial Financial Financial Financial Financial Financial
Strategy Strategy Strategy Strategy Strategy Strategy
1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11 2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 3. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 4. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 5. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 6. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
PLANNING ASSUMPTIONS. . . . . . . . . . . . . . . . . . . . . . . . . . . 14 FINANCIAL FORECAST ASSUMPTIONS. . . . . . . . 20 SENSITIVITY ANALYSIS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24 FINANCIAL SCENARIOS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26 Base Case Scenario. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27 Asset Management Scenarios.. . . . . . . . . . . . . . . . . . . . . . . . . . 29
APPENDICES. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32
Appendix 1 Budgeted Income Statement. . . . . . . . . . . . . . . . . . . . . . . . . . . . 34 Appendix 2 Balance Sheet Forecast. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35 Appendix 3 Cashflow Statement Forecast.. . . . . . . . . . . . . . . . . . . . . . . . . . . 37 Appendix 4 Financial Sustainability Indicators. . . . . . . . . . . . . . . . . . . . . . . 39 Appendix 5 Budgeted External Restrictions. . . . . . . . . . . . . . . . . . . . . . . . . . 40 Appendix 6 Budgeted Internal Restrictions. . . . . . . . . . . . . . . . . . . . . . . . . . . 41 Appendix 7 External Loan Projects and Debt Servicing. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 44 Appendix 8 a) One-Off Capital Projects. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 55 b) Recurrent Capital Projects.. . . . . . . . . . . . . . . . . . . . . . . . . . . . 62 c) Capital Program Potential Projects List. . . . . . . . . . . . . 66 Appendix 9 Wagga Wagga Regional Airport Ten Year Financial Plan. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 71 Appendix 10 Livestock Marketing Centre Ten Year Financial Plan. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 72
Appendix 11 Sewerage Services Ten Year Financial Plan. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 73 Appendix 12 Solid Waste Services Ten Year Financial Plan. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 75 Appendix 13 Stormwater Levy Ten Year Financial Plan. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 76 Appendix 14 Budgeted Income Statement by Function. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 77
CONTACT US. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 80
WAGGA WAGGA CITY COUNCIL LONG TERM FINANCIAL PLAN
3
Our executive summary
4
The Long Term Financial Plan (LTFP) is an essential element of the resourcing strategy which details how the strategic aspirations of Wagga Wagga City Council (Council) as outlined in the Community Strategic Plan can be achieved in terms of time, money, assets and people. The Resourcing Strategy focuses on long term strategies in three key areas: • Financial Planning - addresses the financial resources that impact on Council’s ability to fund its services and capital works whilst remaining financially sustainable. • Workforce Planning - ensures that Council has the staffing capacity with the required skills and experience to deliver current services and operational needs for the community now and in the future. • Asset Management Planning - aims to predict infrastructure consumption and renewal needs, as well as consider infrastructure requirements to meet future community needs. These interrelated plans give consideration to the capacity to deliver its responsibilities within the Community Strategic Plan that fall under the auspices of Council. Each element informs the Delivery Plan which outlines the strategies in place to meet these responsibilities.
Wagga Wagga City Council’s Long Term Financial Plan is a 10 year financial planning document with an emphasis on long-term financial sustainability. Financial sustainability is one of the key issues facing local government, due to several contributing factors, including growing demands for community services and facilities, constrained revenue growth and ageing infrastructure. The Long Term Financial Plan is formulated, using a number of estimates and assumptions, to project the future revenue and expenditure required of Council to deliver those services and projects expected by the community. In doing so, it addresses the resources that impact Council’s ability to fund its services and capital works whilst remaining financially sustainable. Council has reviewed the previous Long Term Financial Plan and adjustments have been made as part of this process. The draft budget for 2018/19 is balanced with the financial years 2019/20 to 2024/25 showing projected deficits and 2025/26 to 2027/28 showing projected surplus positions. These projected positions highlight the significant issues that Council has been facing due to the unfavourable adjustments to revenue sources (Financial Assistance Grants and Rate Pegging restrictions) in previous financial years.
Long Term Financial Plan Objectives
The objectives of Wagga Wagga City Council’s Long Term Financial Plan are: • to provide a forecast financial position over 10 years to ensure that Council remains financially sustainable • to support the implementation of Wagga View: Community Strategic Plan 2040 • to identify and highlight future challenges, issues and financial trends to ensure that they are proactively addressed • to ensure compliance with legislative requirements of integrated planning and reporting contained in the Local Government Act 1993 and the guidelines produced by the NSW Office of Local Government • continuing the trend towards meeting all seven of the ‘Fit for the Future’ ratios
The Long Term Financial Plan is also reviewed during the year and changes adopted via the Monthly Financial Performance Report that is presented to Council. This report assesses Council’s performance against budget each month. If there are any changes to the budget that result from this process they are reported to Council and adjusted in the Long Term Financial Plan.
WAGGA WAGGA CITY COUNCIL LONG TERM FINANCIAL PLAN
5
Fit for the future
6
Fit for the Future
The Minister for Local Government, in response to the findings of a comprehensive three-year independent review of local government, announced the ‘Fit for the Future’ Local Government reform package in September 2014. As part of this package all councils were requested by 30 June 2015 to assess their current financial situation, consider whether or not they have the appropriate scale and capacity to meet the future needs of their communities and to develop a plan to ensure they are financially sustainable in the future. A Fit for the Future Council is one that is: • Sustainable • Efficient • Effectively manages infrastructure and delivers services for communities • Has the scale and capacity to engage effectively across community, industry and government In October 2015, IPART deemed the Wagga Wagga City Council ‘Fit for the Future’ as a stand-alone organisation based on the actions and strategies identified in Council’s improvement proposal. The improvement proposal outlines how Wagga Wagga City Council is committed to a number of key improvement strategies to meet five of the benchmarks and trend towards the remaining two benchmarks by 2019/20. Council’s Fit for the Future improvement proposal can be accessed on our website.
The key improvement strategies to be implemented to improve Council’s financial position and sustainability as part of the 2018/28 budget process include targeted efficiencies of $800K annually and increased revenue targets of $300K from 2016/17. Wagga Wagga City Council will direct these funds towards the renewal of infrastructure and maintenance of assets which will assist in reducing the infrastructure funding shortfall. A key consideration in Council’s decision making, as part of this improvement plan is the ongoing commitment to improving our financial position and sustainability. This includes maintaining and improving the unrestricted cash and investments result whilst achieving a balanced or preferably a surplus budget each financial year.
WAGGA WAGGA CITY COUNCIL LONG TERM FINANCIAL PLAN
7
Special rate variation
8
Levee Upgrade Project – Existing Special Rate Variation - 2016/17 to 2020/21
Wagga Wagga City Council has been planning an upgrade to the levee system since 2007 for the Main City and North Wagga Levees. Following extensive community consultation, Council resolved to upgrade the Main City Levee to a 1 in 100 year level of protection. The full impact of upgrading the North Wagga Levee is still to be considered as part of the Floodplain Risk Management Study. The upgrade of the Main City Levee will ensure the protection of both residences and businesses in Central Wagga in the event of a 1 in 100 year flood. This will reduce the likelihood that the area will need to be evacuated during a flood event, which can also have an immediate social and economic impact. In some flood events the upgrade will mean that flood levels in parts of the floodplain upstream and outside of the Main City Levee will increase slightly. The upgrade of the Main City Levee Bank project commenced in October 2017. The total estimated cost of upgrading the Main City Levee to a 1 in 100 year level of protection and upgrading the North Wagga Levee to a 1 in 20 year level of protection is $23.3M* as shown in Table 1. The funding ratio for the project is 2:1, with two-thirds ($15.5M) funded by Federal and State Grants and one third ($7.78M) funded by Council via a temporary Special Rate Variation (SRV) over a five year period. This SRV commenced on 1 July 2016. Due to the extensive drought farmers have experienced over the past decade, Council resolved to charge the Farmland rate category a lower percentage than all other rate categories as shown in Table 2.
As the SRV is a temporary variation, at the end of the five year period, rates payable in 2021/22 will revert back to the equivalent level to that if an SRV had not occurred.
Infrastructure Maintenance and Renewal Shortfall – Potential Special Rate Variation – 2021/22 ongoing As part of the 2018/28 Long Term Financial Review process, and ongoing discussions with Council’s Asset Management division, it has been identified that Wagga Wagga City Council requires funds of $80,020,292 over the next 10 years of the Long Term Financial Plan to address it’s Infrastructure Maintenance and Renewal Shortfall. The Infrastructure shortfall of $80M is allocated across the 10 years of the Long Term Financial Plan as shown in Table 3. In order to eliminate this shortfall, funding options are to be investigated which include the option of a potential Special Rate Variation (SRV) commencing in 2021/22 following on from the conclusion of the 2016/17 – 2020/21 SRV for the Levee Upgrade Project. By partly funding the infrastructure shortfall from 2021/22 to 2027/28 of $59M this would also move towards meeting the Fit for the Future benchmarks in future years of the Long Term Financial Plan.
Location
Level of Protection Estimated cost
Main City Levee System
1 in 100 year
$14,598,443
North Wagga Levee System
1 in 20 year
$8,654,863
Total Estimated Cost
$23,253,306 Table 1: Levee system estimated cost Estimated project costs are based on estimates provided by NSW Public Works.
SRV – Levee Upgrade component
Rates Category Farmland
1.9%
All other rates categories
4.1% Table 2: SRV farmland rate comparison.
2018/19
2019/20
2020/21
2021/22
2022/23
$6,697,731
$6,957,919
$7,228,468
$7,509,794
$7,802,324
2023/24
2024/25
2025/26
2026/27
2027/28
$8,106,506
$8,422,806
$8,751,705
$9,093,706
$9,449,333
Table 3: Infrastructure maintenance and renewal shortfall
There will be further community engagement and development of the Asset Management Plans undertaken over the next 2 years before starting the consultation process for this potential 2021/22 Special Rate Variation (SRV). A scenario has been included in the LTFP Financial Scenarios section.
WAGGA WAGGA CITY COUNCIL LONG TERM FINANCIAL PLAN
9
Our financial strategies
10
Wagga Wagga City Council is committed to operating in a financially sustainable framework, to ensure that its community and other stakeholders can rely upon the ongoing provision of a full and diverse range of high quality community services, facilities and infrastructure. Council plans to maintain its financial position and performance, to ensure resilience and a capacity to adapt and respond to arising community needs in a measured and equitable manner. The six key principles employed in Council’s financial planning process are:
Financial Strategy 1 Financial sustainability
Financial sustainability is the ability for Council to provide the facilities, services and infrastructure that the community needs and expects over the medium to longer term. This includes being able to manage likely developments and unexpected financial shocks in the future. Over the past few years, Council has faced significant challenges in maintaining a stable position in previous Long Term Financial Plans. During the development of the 2014/24 Long Term Financial Plan, the Wagga Wagga City Council implemented critical decision making processes adjusting its operations to ensure a more financially sustainable path. The announcement in May 2014 of the freeze on the indexation of the Financial Assistance Grant, along with continual lower than anticipated allowable rate peg increases has added additional pressure for Council to remain financially sustainable into the future. Council has again made significant budget savings for this 2018/28 Long Term Financial Plan, which demonstrates its commitment to remaining financially sustainable.
Balanced Budgets
With each annual budget process Council aims at a minimum, to achieve a balanced budget which allows the organisation to maintain a positive unrestricted cash and investments balance. This position gives flexibility to maintain liquidity and fund any unforeseen expenditures or discretionary funding deficits. The Base Case budget detailed in this Long Term Financial Plan indicates Council will maintain a balanced budget for 2018/19 only. Arriving at this balanced position was a complex and challenging task with each area of the organisation having to contribute significant budget reductions and operational efficiencies to achieve this goal. These savings will have a substantial impact on the delivery of projects and services, which will require Council to be highly innovative and efficient in delivering the Operational Plan and Delivery Plan items. As the future year budgets in 2019/20 to 2024/25 are showing projected deficits and 2025/26 to 2027/28 are showing projected surplus positions, these figures as shown in Table 4 will again be reviewed as part of the 2019/29 Long Term Financial Plan to ensure that a balance budget for at least the 2019/20 financial year is achieved.
Maintain Unrestricted Cash and Investments
Unrestricted cash and investments represent a measure of liquidity/net financial position. Council’s unrestricted cash and investments allows for day to day liquidity and ensures the organisation is able to manage any budget shocks during the year which may include unforseen expenditure overruns and income shortfalls.
2018/19 $0
2023/24 $355,147
2019/20 $995,043
2024/25 $467,639
2020/21 $398,373
2025/26 ($90,555)
2021/22 $307,404
2026/27
2022/23 $703,257
2027/28
($402,280) ($1,567,768)
Table 4: Council’s 10-year budgeted surplus/(deficits).
2018/19
2019/20
2020/21
2021/22
$3,338,000
$2,342,957
$1,944,584
$1,637,180
2023/24
2024/25
2025/26
2026/27
$578,776
$111,137
$201,692
$603,972
2022/23 $933,923
2027/28 $2,171,740
Table 5: Forecasted available unrestricted cash and investments.
appropriate level of liquidity on an ongoing basis and is able to control/determine the value of its annual budget surplus or deficit. The forecasted available unrestricted cash and investments as shown in Table 5 is impacted significantly in years 2019/20 to 2024/25 due to the projected deficit positions shown in Table 4. These deficits will be addressed as part of the annual budget review process for the 2019/29 Long Term Financial Plan.
Wagga Wagga City Council, as a prudent financial manager, has set a minimum level of $3.5M which should be maintained. This ensures it retains an
WAGGA WAGGA CITY COUNCIL LONG TERM FINANCIAL PLAN
11
Financial Strategy 2
Financial Strategy 4
Wagga Wagga City Council will continue to carefully manage its cash reserves and investments, to ensure that appropriate financial reserves are available to meet Council’s liabilities and commitments, and manage cash flow demands to ensure responsible financial management control. While externally restricted reserves will be maintained in accordance with legislative requirements, a number of internally restricted reserves are used to ensure that funds are available to directly support the Community Strategic Plan initiatives and projects.
Wagga Wagga City Council is committed to the ongoing review of its service delivery as part of the continuous improvement process. Specifically, Council is seeking to identify if the services it delivers are relevant and necessary to the community as well as appropriate in the current environment. The continual improvement process includes determining if the services meet the needs and expectations of the community as set out in the Community Strategic Plan.
Prudent financial investment
Council will closely monitor its investment performance and publish a number of key financial indicators within its monthly and quarterly budget reviews to demonstrate its financial health and sustainability.
Financial Strategy 3
Effective utilisation of funding sources to fund capital works
The Long Term Capital Works Program identifies the various funding sources proposed for each capital project. Council will utilise grant funding where available, internal reserves where applicable, and borrowings where it is deemed necessary. Wagga Wagga City Council as a result of being ‘deemed fit’ will have access, if approved, to lower cost borrowings offered through NSW T-Corp to fund capital works which will reduce future debt-servicing costs.
12
Maintain tight control over expenditure and staff numbers, while still maintaining best value services, facilities and infrastructure
The continuous improvement process aims to achieve the following objectives: • Assist in informing Councillors, the community and Council’s staff on what, how and why it delivers the current list of services. It endeavours to answer questions surrounding the need to provide the service, service delivery alternatives such as contracting resources, outsourcing some activities, joint delivery with other councils, what can be provided at what cost and can any efficiencies be found. • Finding savings that are real, sustainable, and are able to be entrenched into future budgets. This strategic approach to budget management is to identify lasting solutions for the provision of services in contrast to common short term budget management strategies which include delaying the implementation of projects onto a potential projects list or unfunded activities, or by making budget cuts that may not align with the Community Strategic Plan.
• Continue moving the organisational culture to one of a “can do attitude and approach”. By creating an expectation of better service delivery, Council is empowering its staff with the tools and processes to make better decisions. • Embedding the realisation of continuous improvement. In providing an environment where continuous improvement to service delivery is expected, staff are encouraged and supported to identify opportunities to make the services that Wagga Wagga City Council provides the best value for its community. • Identifying a clear set of recommendations on proposed changes following each service reviewed. These recommendations will include as a minimum consideration of options for costs and efficient service delivery which may include process, resourcing and delivery changes. A number of other initiatives have been implemented to assist in identifying budget efficiencies, which include: • Controlled expenses • Review of fees and charges that are deemed cost recovery to ensure a closer alignment with actual costs • Energy savings and carbon reduction initiatives • E-Business and online service initiatives • Improved information management systems and technology • Review of capital project processes, procedures and outcomes • Utilisation of allowable reserves for internal loans in preference to external borrowings where possible • Utilisation of lower cost borrowings where possible
Financial Strategy 5
Maintain/move towards above benchmark results against key performance indicators
As indicated in Council’s Fit for the Future criteria results which was based on a three year average, Council did not meet three out of the seven benchmarks. The key improvement strategies to be implemented to improve our financial position and sustainability as part of the 2018/28 budget process have included targeted efficiency (service) reviews of $800K annually and increased revenue targets of $300K which was introduced from 2016/17. Council will direct these funds towards the renewal of infrastructure and maintenance of assets which will assist in reducing the infrastructure backlog ratio.
Financial Strategy 6
Narrow the Infrastructure Funding Gap
Wagga Wagga City Council’s Asset Management Plans identify a shortfall in current expenditure on the maintenance and renewal of infrastructure assets. This represents a risk to the organisation that a significant number of assets may fail due to inadequate maintenance. If this issue is not addressed it will have an adverse impact on Council’s financial position in the medium and longer term. Council is attempting to address this issue by: • Increasing recurrent levels of maintenance and renewal budgets by identifying budget savings and efficiency gains from all parts of the organisation • Maintaining a reserve for infrastructure replacement and allocating additional funds towards this reserve as a priority when budget improvements are realised, and allocating the proceeds from the sale of non-core assets • Increasing the use of low cost borrowings to fund infrastructure renewals through T-Corp as a result of being deemed ‘fit’ as part of Council’s Fit for the Future proposal • Reassessing asset condition and what constitutes “satisfactory” condition
WAGGA WAGGA CITY COUNCIL LONG TERM FINANCIAL PLAN
13
Our planning assumptions
14
Population and demographics
Data from the Australian Bureau of Statistics 2016 Census shows that the population of Wagga Wagga (ERP statistical measure) grew by 0.89% between 2015 and 2016 to stand at 64,085. The age structure of the local population shows strong growth in the population aged over 55, those between 25 and 34 and those aged from 5-9. In contrast, the population aged 15 to 24 recorded a loss between 2011 and 2016. Looking ahead, population growth is expected to remain strong over the next 20 years in line with stronger population growth in Australia, as population shifts continue between more congested major cities and larger regional cities. Forecasts show Wagga Wagga’s population growing to 66,635 in 2018 and to 80,984 in 2036 in a baseline scenario. Population growth is expected to accelerate to an average 1.64% per annum to 2021, before easing to average 1.2% gains between 2021 and 2026. Figure 1 shows the forecast changes in the age structure profile expected in Wagga Wagga between 2016 and 2026, which has driven the design of the 10-year capital works program aimed at committing resources to facilities and infrastructure.
Economic conditions and growth
• Economic conditions and growth have a significant
2016-2026 2026-2036
+1000
Number of persons
As the population of Wagga Wagga grows, so does the demand for services provided by Council. It is therefore essential to map in the Long Term Financial Plan this increasing service demand, with planning for investment in existing and new types of infrastructure.
+1200
+800
+600
+400
+200
0-4
5-9
10-14
15-19
20-24
25-29
30-34
35-39
40-44
45-49
50-54
55-59
60-64
65-69
70-74
75-79
80-84
85+
Age group (years) Figure 1: Forecast change in age structure, Wagga Wagga - 5 year age groups.
external impact to Wagga’s financial position and the Long Term Financial Plan. Some key factors include the following: • The state of financial markets (including official interest rates) • Inflation rates • Labour force and unemployment rate • Population growth rate Interest rate fluctuations and inflation will have a direct impact on the returns earned on Council’s investment portfolio with a low rate scenario reducing investment income but also lowering debt service repayments. Inflation rate fluctuations impact both income and expenditure and what products can be purchased
for in real terms. When the general price level rises, each unit of currency buys fewer goods and services. Consequently, inflation reflects a reduction in the purchasing power of money. Wagga Wagga has a strong and diverse economy without a reliance on a single sector, allowing the city to maintain growth and prosperity. The local economy (as measured by the Gross Regional Product statistic) grew by 1.5% to stand at $3.7 billion in the most recent data released by the ABS for 2016. The local labour force is also expanding, to stand at 34,501 in the third quarter of 2017, with an unemployment rate of 4.8%. This rate is in line with the NSW average unemployment rate, and below the 5.5% rate measured nationally for this quarter.
WAGGA WAGGA CITY COUNCIL LONG TERM FINANCIAL PLAN
15
Major projects
Included in Council’s 2018/28 Long Term Financial Plan Capital Works Program are four significant projects shown in Table 6. The potential uncertainties around some of Council’s planned major projects have the ability to have a significant impact on the Long Term Financial Plan, both in regards to timing and costing.
Multi-Purpose Stadium
The scope of the project is to deliver a Multi Purpose Stadium (both sport and conference facilities), with the site located at The Exhibition Centre, consisting of a large sports building next to the existing Netball Clubhouse. The facility will provide three full sized indoor multi-purpose courts, change room amenities, office spaces, an elevated seating gallery, a function area and catering facilities. The project commenced construction during 2018.
Levee bank upgrades - upgrades of Main City Levee and North Wagga Levees Wagga Wagga City Council recently completed detailed designs for the Main City and North Wagga Levee Upgrade Project and following extensive community consultation has resolved to proceed with the upgrade of the Main City Levee to a 1 in 100 year level of protection.
The full impact of upgrading the North Wagga Levee to a 1 in 20 year level of protection is still to be considered in a review of the Floodplain Risk Management Study. The estimated cost of upgrading the Main City Levee to a 1 in 100 year level of protection and upgrading the North Wagga Levee to a 1 in 20 year level of protection is $23.3M. The total capital cost indexed over the five year period is demonstrated in Table 7. 16
With the commitment of Federal and State funding for the project, Council is funding its one-third share of the cost from a Special Rate Variation (SRV) which commenced in 2016/17 and is maintained for five years. The modelling assumes a construction period of five years but this is conditional of the timing and conditions of funding from NSW Office of Environment and Heritage.
Eunony Bridge Road Bridge Upgrade
This project is for the upgrade of the existing Eunony Bridge with a structure capable of catering for Heavy Mass Limit (HML) vehicles. This project is key to the implementation of the Bomen Strategic Master Plan as the replacement of the bridge will facilitate increased productivity into the Bomen Business Park by allowing operators to use larger vehicles. The budget for this project is estimated at $10.6M with construction to commence in 2018/19. Wagga Wagga City Council has been successful in securing grant funding for the project of $9.8M, with Council contributing $0.8M towards the project.
Active Transport Plan
Roads and Maritime Services announced the availability of $11.7M in grant funding for Wagga Wagga City Council to be the lead agency in the development of the Wagga Wagga Cycling towns Project as part of the NSW Cycling Infrastructure Fund. These funds are to be utilised for the delivery of a cycleway network spanning five corridors connecting the suburbs of Wagga Wagga to the CBD. This equates to approximately 45km of cycleways including end of trip facilities at the Visitors Information Centre, Oasis and Hospital. The project also involves a new bridge across the Murrumbidgee on the North Link.
Project Multi Purpose Stadium – Equex
Estimated year(s) of construction
2017/18 + 2018/19
Estimated cost $10.2M
Levee Bank System Upgrades
2017/18 – 2019/20
$23.3M
Eunony Bridge Road Bridge Replacement
2018/19
$10.6M
Active Transport Plan
2018/19 + 2019/20
$11.7M
Table 6: Major capital works projects
Project Upgrade of Main City Levee System Upgrade of North Wagga Levee System Total
Indexed Grant Estimated funding Cost (proposed)
Council’s one-third share
$14.6M
$9.7M
$4.9M
$8.7M
$5.8M
$2.9M
$23.3M
$15.5M
$7.8M
Table 7: Levee bank project budget.
The $11.7M total project budget includes $400,000 in 2017/18 for the development and detailed design of the Active Travel Plan with construction to occur in 2018/19 and 2019/20 with a budget of $11.3M.
Riverina Intermodal Freight & Logistics Hub
The Riverina Intermodal Freight and Logistics (RIFL) hub project involves the construction of new major rail and road infrastructure and a freight terminal on land north of Wagga Wagga at the Bomen Business Park. The project will be a key economic driver of growth in the Riverina. Stage 1 construction (Bomen Enabling Roads) was
completed in 2017/18. Council is currently negotiating with private parties regarding the delivery of Stage 2 which is the construction of rail tracks and an intermodal terminal. Should negotiations be successful, it is proposed that the project will be predominantly funded by grant funding and private investment. Further consideration of the project and funding sources will occur during 2018/19.
2018/19
2019/20 0
2020/21 0
2021/22 0
2,190
2022/23 70,836
2023/24 69,255
2024/25 67,465
2025/26 65,448
2026/27
2027/28
63,104
61,562
Table 8: Wagga Wagga Regional Family Day Care 10-year deficits.
Family Day Care
Wagga Wagga City Council was advised by the Australian Government (Department of Education and Training) that its annual Community Support Program will cease after 2017/18. This program provided $200,000 a year in grant funding for the Wagga Wagga Regional Family Day Care service. To ensure the sustainability and viability of this service into the future, structural changes have been implemented to reduce ongoing operational costs whilst still ensuring it continues to meet the needs of the community and facilitates a high level of care and education. Under this new funding model, the Family Day Care service will continue to be sustainable until 2020/21. Ongoing reviews will occur over the next 4 years to determine whether further efficiencies can be made, increased revenue raised or new funding obtained for this service to continue into the future. There is also the option that Wagga Wagga City Council may resolve to subsidise this service. If this was to occur the current Family Day Care Reserve deficits included in the Long Term Financial Plan from 2021/22 would impact on Council’s bottom line. These figures are demonstrated in Table 8.
WAGGA WAGGA CITY COUNCIL LONG TERM FINANCIAL PLAN
17
Contributions, Grants and Donations provided by the Wagga Wagga City Council to the community
Wagga Wagga City Council contributes to the community utilising a variety of methods, via contributions, donations, fee waivers and grant program funding, totalling over $2.1M annually. The proposed 2018/19 contributions, grants, donations and fee waivers are shown in Table 9. Community Donations - Section 356 ADFAS Riverina
1,836
Motor Neurone Disease Reasearch Wagga Wagga
103
Murrumbidgee Rotary Club Teddy Bears Picnic
118
North Wagga Residents Association
522
Over 60’s Touch Football Group
567
Regional Heritage Transport Association
1,200
Riverina Conservatorium of Music events
1,500
Riverina Down Syndrome hire of Music Bowl
175
Rotary Club of Wagga Wagga Shine Awards
247
Rotary Club Street Banners
118
Salvation Army Red Shield Appeal
113
Ashmont Public School Learn to swim for disadvantaged youth
752
Breast Cancer Group Inc. (Wagga Wagga) - Mothers Day Walk
88
Suicide Prevention Network meeting room hire
1,185
Cancer Council – Biggest Morning Tea
82
Task Force 72 - Scale Model Ship Association
742
Cancer Council hire of Paramore Park
587
Tolland Public School swimming lessons for the disadvantage youth
970
Cantelina Singers
500
Uranquinty Neighbourhood Centre Management Committee
536
Collingullie Soliders Memorial Hall
522
Wagga and Riverina Orienteers - annual school championships
155
Combined riders of Wagga Bolton Park Stadium Toy Run
118
Country Hope - Walk for Hope
88
CSU Photography Grad Show
618
Estella Progress Group Friends of the Botanic Gardens
85 1,030
Henwood Park Football Club
522
Kurrajong Waratah hire of Links Art Gallery
288
Kurrajong Waratah hire of Music Bowl and Civic Theatre - Christmas Spectacular
2,774
Ladysmith Memorial Hall Committee
522
Legacy
135
Legacy Civic Theatre Hire Leukamia Foundation Mangoplah Cookardina Eastlakes United Football and Netball Club Melanoma Institute - March Walk Mini all-ympics disability Sports Event
18
2,500 95 567 88 397
Specialist Medical Resource Foundation
Wagga Autism Support Group annual walk Wagga Wagga & District Family History Society Wagga Wagga Rescue Squad Wagga Wagga Show Society Wagga Women's Bowling Club
639
88 852 110 11,755 3,800
Total - Community Donations - Section 356
39,689
Eastern Riverina Arts Program Contribution
21,004
Cultural Donations - Section 356 Eisteddfod Donation
3,090
Riverina Conservatorium of Music events
6,727
School of Arts Contribution
2,500
Summer School for Strings
2,500
Total - Cultural Donations - Section 356
35,821
Scholarships - Section 356
Other - Section 356
Southern Sports Academy
4,000
Riverina Conservatorium Scholarship
2,000
Community Leases Rental Subsidy
1,518,741
Total - Cultural Donations - Section 356
6,000
Committee 4 Wagga - Contribution
7,500
Kerbside Waste Services
4,400
Annual Grants Program - Various - Section 356
Rural Villages Leaps and Bounds Early Childhood program
20,450
Arts & Culture
25,000
Library Food for Fines
5,000
Community Programs & Projects
30,000
Mayoral Discretionary Fund
1,030
Events
20,000
Miss Wagga - Sponsorship
2000
Local Heritage
16,000
Medical Flights - Landing Fees
Neighbourhood & Rural Villages
22,000
Rotary Circus Quirkus - Contribution
Recreational Facilities
30,000
New Major Events Sponsorship
Natural Environment
7,000
500 2,200 100,000
Oura Septic Upgrade Financial Assistance Program
42,090
Rural Halls
25,000
Parkes Shire Council Event
Youth Led Performance Initiatives
15,000
Rural Counselling Service
10,000
San Isidore Septic Upgrade Financial Assistance Program
84,870
Small Business Grant Program
12,500
Waste Subsidy for Charitable Organisations & Community Groups
10,300
Total - Annual Grants - Various - Section 356
Road Closures - Various - Section 356 ANZAC Day Parade
190,000 12,000
Lake Run & Ride
5,500
Liberty from Violence Parade
2,500
Remembrance Day
2,000
Riverina Truck Show
2,500
Town & Gown
2,500
Wagga Gold Cup Total - Road Closures - Various - Section 356
1,000
Total - Other - Section 356
1,822,581
Total Section 356 Contributions and Donations
2,123,091
2,000 29,000
WAGGA WAGGA CITY COUNCIL LONG TERM FINANCIAL PLAN
19
Financial forecast assumptions
20
Operating Revenue
Figure 2 represents Wagga Wagga City Council’s budgeted operating revenue by category for the 2018/19 financial year.
3% 3%
12%
Rates & annual charges $64.5M User charges & fees $26M
Rates & Annual Charges (including Special Rate Variation) Rates
The Independent Pricing and Regulatory Tribunal (IPART) determines the rate peg based on the Local Government Cost Index, a productivity factor, as well as any other pertinent legislative and industry factors. This is to ensure that a balance is made between Council meeting the increasing costs of delivering services and that productivity gains are shared with ratepayers. The base case scenario includes an ordinary rate increase for 2018/19 of 2.3% as announced by IPART in December 2017 as well as a 1% growth in rateable residential properties. This was an increase on the 2016/17 rate peg of 1.8%. The budgeted increase in rates for 2019/20 onwards is 2% with an additional 1% growth factor in rateable residential properties for the Long Term Financial Plan. The risk that Council may incur in relation to the amount of rates revenue forecast in the Long Term Financial Plan is that the rate peg announced annually by IPART may be below the budgeted annual percentages that have been forecasted.
Annual charges – domestic & commercial waste
Annual charges for waste are modelled at recovering a reasonable estimated cost of providing the service which includes a component for future site rehabilitation. The rate used in the base case scenario which is included in the 2018/28 Long Term Financial Plan is: • 2018/19 to 2020/21 – 5% annual increase • 2021/22 to 2027/28 – 3% annual increase
Sewer charges
Sewer charges are also modelled at achieving full cost recovery including a component for future site rehabilitation and depreciation consistent with Council’s Return on Investment Policy for council businesses. The rate used in the base case scenario which is included in the 2018/28 Long Term Financial Plan is: • 2018/19 to 2020/21 - 5% increase plus a 1% residential growth factor. • 2021/22 to 2027/28 - 3% increase plus a 1% residential growth factor.
Grants & contributions provided for operating purposes $13.9M
24%
57%
Interest & Investment Revenue $3.2M Other Revenues $3M Special Rate Variation $1.6M
1%
Figure 2: Total Operating Revenue Budget $112.6M
Stormwater management service charge
The maximum amount for annual stormwater services is prescribed by legislation. These charges are as follows: • Residential - $25.00 per property • Residential Strata - $12.50 per occupancy • Business - $25.00 per 350 m2 • Business Strata - $5.00 per strata title This is the basis for which the base case and all scenarios of the Long Term Financial Plan are forecasted.
User Fees & Charges
The base case scenario of the Long Term Financial Plan includes a projected increase in user fees and charges generally between 3%-5%. A number of fees are prescribed by legislation and some fees are set at a level to recover the actual cost of providing the service. The key improvement strategies to be implemented to improve our financial position and sustainability as part of Council’s Fit for the Future improvement proposal has included annual increased revenue targets of $300K.
WAGGA WAGGA CITY COUNCIL LONG TERM FINANCIAL PLAN
21
Interest & Investment Revenue
Given the relatively low cash rate it is difficult for Council to ascertain with any certainty what actual returns are likely to be over the 10 years of the plan. It is not likely that Council can continue to rely on additional investment income over the life of the Long Term Financial Plan given the current balance of the portfolio, and the reserves that are identified to be expended. The reduction in investment income and overall portfolio balance places further funding pressure on Council in the future.
9% Employee Benefits & On-Costs $44.2M
34%
28%
Wagga Wagga City Councils investment revenue is linked to the expected balance of the portfolio over the life of the Long Term Financial Plan. For the base case scenario, the projected interest rates are a 2.77% - 3.82% return on investment over the life of the plan.
Depreciation & Amortisation $35.4M Materials & Contracts $33M Other Expenses $12.1M Borrowing Costs $3.8M
3% 26%
Grants & contributions
Figure 3: Total Operating Expenditure $128.5M
Grants
It is assumed in the base case scenario that the current level of grant funding from the State and Federal Governments will continue. Grants are a significant source of funding for local government and as such any fluctuation in current levels is likely to have a substantial impact on the delivery of services and projects identified in the Long Term Financial Plan.
Developer Contributions
Developer contributions have been projected in line with each contribution plan over the life of the Long Term Financial Plan. These plans are subject to review annually with each year of the plan updated accordingly.
Other Revenues
Other revenue includes fines, income from sale of goods, diesel fuel rebates and income from insurance claims and rebates. Revenue from these sources is difficult to ascertain with any certainty as they are generally influenced by factors outside of Council’s control. As a result, for the purposes of the Long Term Financial Plan other revenue has been projected at a 3% increase on the 2017/18 financial year budget which corresponds to historical trends.
22
Operating expenditure
Figure 3 represents the Wagga Wagga City Council’s budgeted operating expenses by category for the 2018/19 financial year.
Employee Benefits and On Costs
Under the NSW Local Government Award, on average staff receive a 2.5% pay increase each year. Combining the award increase, performance based increase and the associated on costs, the budgeted employee costs increase is 4%.
Borrowing Costs
Borrowing costs have been conservatively forecast as follows: • 4% • 4.5% • 5% • 6% • 7%
- 2018/19 - 2018/19 - 2019/20 to 2020/21 - 2021/22 to 2023/24 - 2024/25 to 2027/28
10 15 10 10 10
year year year year year
term term term term term
There is also the potential to source lower cost borrowings through NSW T-Corp as part of Council’s Fit for the Future proposal. All projects assumed term of loan is 10 years, other than the PCYC Contribution which is budgeted at 15 years.
Materials & Contracts
The cost of materials and contracts is to be maintained within existing annual budget allocations.
Depreciation
The forecasted depreciation expense is reflective of the new capital additions and purchases over the term of the Long Term Financial Plan. Depreciation levels are subject to ongoing review with each year of the plan.
160
Millions
If rates increase substantially above the 7% then Wagga Wagga City Council will have to adjust the borrowings program as well as capital programs so that an affordable level of debt is always maintained.
140 120 Grants & contributions provided for operating purposes
100
Other Revenues
80
Interest & Investment Revenue 60
User Charges & Fees Special Rate Variation (pending successful IPART determination)
40 20 0
Rates & Annual Charges Expenses from continuing pperations 2018/19
2019/20 2020/21
2021/22
2022/23
2023/24
2024/25
2025/26
2026/27
2027/28
Financial Year Figure 4: Operating Revenue and Expenditure
Other Expenses Utilities
An increase has been projected in the Long Term Financial Plan for electricity of 7% and gas and water costs of 5% per annum. Wagga Wagga City Council is actively pursuing efficient alternative sources of energy and other energy saving initiatives in order to reduce the effect of these costs where possible and these projected savings have been included in the Long Term Financial Plan.
Insurance
It has been assumed that all insurances will increment by 5% excluding liability insurance which factors in an increase of 7% for 2018/19. Future year increases for all insurances are 5% with 7% increases for liability insurance.
Other Operating Expenses
The cost of other operating expenses other than Utilities and Insurance costs are to be maintained within existing budgets. Figure 4 demonstrates the relationship between operating revenue and operating expenditure. Wagga Wagga City Council’s operating expenditure including depreciation is greater than its operating income for the 10 years of the LTFP. This indicates that Council still has a long way to go to be able to fund depreciation and maintain financial sustainability. WAGGA WAGGA CITY COUNCIL LONG TERM FINANCIAL PLAN
23
Our sensitivity analysis
24
Millions
Although the assumptions listed in the previous section are Wagga Wagga City Council’s current informed estimate based on a range of reliable sources, Long Term Financial Plans are inherently uncertain. They contain a wide range of assumptions, including assumptions about interest rate movements and the potential effect of inflation on revenue and expenditure which are largely outside of Council’s control.
(4) (6) (8) (10) (12)
The following section illustrates the financial effect on the result if certain assumptions were to change.
(14) (16) (18)
Rates
If rates are held 0.5% p.a. below the predicted rate pegging percentage, the effect on the Long Term Financial Plan base case budget deficits before Capital Grants and Contributions is shown in Figure 5.
2018/19
2019/20
2021/22
2022/23
2023/24
2024/25
2025/26
2026/27
2027/28
Forecast Rates @ 0.5% pa under Rate Peg
Figure 5: Rates analysis 0 (2) (4) (6) (8)
Employee costs
(10)
Salary growth is largely subject to the NSW Local Government Award. Wagga Wagga City Council has factored in a 4% annual increase in employee expenses. If the Award increases by 0.5%, the effect on the Long Term Financial Plan base case budget deficits before Capital Grants and Contributions is shown in Figure 6.
(12) (14) (16) (18)
2018/19
2019/20
2020/21
2021/22
Employee Costs @ 4%
Combined impact
2022/23
2023/24
2024/25
2025/26
2026/27
2027/28
Employee Costs @ 4.5%
Figure 6: Employee costs analysis Millions
Figure 7 shows the combined impact of a 0.5% unfavourable variance in our assumptions for Rate Income and Employee Costs:
2020/21
Forecast Rates @ Rate Peg
Millions
Rates comprise 57% of Council’s total operating income. As stated earlier, rates are capped by the State Government and Council can only increase rates above the rate pegging percentage if a Special Rate Variation is submitted and approved.
0 (2)
0 (2) (4) (6) (8) (10) (12) (14) (16) (18)
2018/19
2019/20
2020/21
2021/22
Existing budget
2022/23
2023/24
2024/25
2025/26
2026/27
2027/28
Forecast rates and employee costs varying by 0.5%
Figure 7: Combined impact of rates and employee costs analysis WAGGA WAGGA CITY COUNCIL LONG TERM FINANCIAL PLAN
25
Financial scenarios
26
Scenarios – Financial Modelling Base Case Scenario
The commentary and analysis provided in the document to this point describe the base case model of the Long Term Financial Plan. It is this model inclusive of the previously detailed assumptions that will be recommended to Council for adoption. BUDGET 2018/19
BUDGET 2019/20
BUDGET 2020/21
BUDGET 2021/22
BUDGET 2022/23
BUDGET 2023/24
BUDGET 2024/25
BUDGET 2025/26
BUDGET 2026/27
BUDGET 2027/28
(64,445,164)
(66,761,504)
(69,176,244)
(71,195,862)
(73,277,926)
(75,424,469)
(77,637,591)
(79,919,464)
(82,272,335)
(84,698,524)
Special Rate Variation
(1,553,807)
(1,594,203)
(1,635,686)
0
0
0
0
0
0
0
User Charges & Fees
(26,376,667)
(27,601,118)
(28,824,925)
(30,008,402)
(31,036,587)
(32,102,010)
(33,208,208)
(34,368,278)
(35,603,982)
(36,848,207)
Interest & Investment Revenue
(3,283,829)
(3,714,376)
(4,295,443)
(4,889,249)
(5,595,905)
(6,252,646)
(6,916,956)
(8,018,465)
(9,076,504)
(10,505,033)
Other Revenues
(3,084,604)
(3,135,393)
(3,191,367)
(3,257,771)
(3,333,777)
(3,412,115)
(3,492,877)
(3,574,143)
(3,668,716)
(3,759,626)
Grants & Contributions provided for Operating Purposes
(13,894,989)
(14,044,404)
(14,293,979)
(14,592,901)
(14,797,122)
(15,056,371)
(15,376,696)
(15,607,973)
(15,899,565)
(16,228,800)
Grants & Contributions provided for Capital Purposes
(36,517,290)
(17,367,984)
(11,631,905)
(8,060,822)
(8,336,674)
(8,129,856)
(8,099,004)
(8,153,261)
(8,209,016)
(8,266,313)
(149,156,350)
(134,218,981)
(133,049,549)
(132,005,006)
(136,377,992)
(140,377,466)
(144,731,333)
(149,641,584)
(154,730,118)
(160,306,503)
44,219,258
46,113,492
47,853,059
49,765,914
51,755,328
53,824,363
55,976,206
58,213,392
60,536,611
62,938,577
3,752,580
3,806,299
3,678,105
3,439,489
3,215,987
2,932,136
2,782,314
2,512,483
2,248,403
2,009,177
Materials & Contracts
32,951,581
32,341,052
32,844,206
33,110,633
33,298,973
33,807,770
34,104,511
33,540,065
33,765,789
34,050,629
Depreciation & Amortisation
35,418,997
36,025,921
37,381,243
37,702,405
37,877,879
37,972,195
37,319,096
38,545,941
38,583,972
38,598,632
Other Expenses
12,125,204
10,465,144
11,256,466
11,501,286
12,050,853
12,632,281
13,547,557
13,846,812
14,483,663
15,159,529
Expenses From Continuing Operations
128,467,620
128,751,908
133,013,079
135,519,726
138,199,019
141,168,745
143,729,682
146,658,692
149,618,439
152,756,544
Net Operating (Profit)/Loss
(20,688,730)
(5,467,073)
(36,470)
3,514,721
1,821,028
791,279
(1,001,650)
(2,982,892)
(5,111,680)
(7,549,959)
Net Operating Result before Grants and Contributions provided for Capital Purposes
15,828,561
11,900,911
11,595,435
11,575,543
10,157,702
8,921,135
7,097,354
5,170,369
3,097,336
716,354
Revenue From Continuing Operations Rates & Annual Charges
Revenue From Continuing Operations
Expenses From Continuing Operations Employee Benefits & On-Costs Borrowing Costs
WAGGA WAGGA CITY COUNCIL LONG TERM FINANCIAL PLAN
27
Base Case Scenario continued BUDGET 2018/19
BUDGET 2019/20
BUDGET 2020/21
BUDGET 2021/22
BUDGET 2022/23
BUDGET 2023/24
BUDGET 2024/25
BUDGET 2025/26
BUDGET 2026/27
BUDGET 2027/28
Capital and Reserve Movements Capital Expenditure - Renewals
33,260,752
20,508,987
23,235,930
17,581,184
15,571,406
18,265,133
19,075,920
18,568,657
19,028,862
18,140,405
Capital Expenditure - New Projects
30,094,732
8,807,289
3,570,584
4,772,403
3,659,763
4,020,755
88,371
589,766
91,217
92,725
Capital Expenditure - Potential Projects
26,286,088
14,778,573
10,083,813
3,262,269
1,504,350
5,708,965
8,897,768
2,577,062
1,908,475
1,729,945
3,129,777
3,666,593
4,056,703
4,321,334
4,713,671
4,550,139
4,419,942
4,218,443
4,535,944
3,149,330
(6,108,672)
(2,203,157)
(385,000)
(750,000)
0
(2,227,693)
0
0
0
0
(952,795)
(822,182)
(835,808)
(1,383,000)
(739,100)
(977,700)
(1,651,850)
(1,148,900)
(1,250,650)
(631,200)
(29,602,157)
(2,248,066)
(1,910,137)
6,690,899
12,050,018
8,196,465
7,958,234
16,633,250
18,979,525
22,099,618
Total Capital and Reserve Movements
56,107,727
42,488,037
37,816,086
34,495,089
36,760,108
37,536,063
38,788,385
41,438,278
43,293,372
44,580,824
Net Result after Depreciation
35,418,997
37,020,964
37,779,616
38,009,809
38,581,136
38,327,342
37,786,735
38,455,386
38,181,692
37,030,864
Add back Depreciation Expense (non-cash)
35,418,997
36,025,921
37,381,243
37,702,405
37,877,879
37,972,195
37,319,096
38,545,941
38,583,972
38,598,632
0
995,043
398,372
307,404
703,257
355,147
467,639
(90,555)
(402,280)
(1,567,767)
Loan Repayments New Loan Borrowings Proceeds from Sale of intangible & tangible Assets Net Movements to/(from) Reserves
Cash Budget (Surplus)/Deficit
28
Financial Scenarios – Infrastructure Renewal and Maintenance Shortfalls
In order to eliminate the Wagga Wagga City Council’s renewal and maintenance shortfall, funds of $80,020,292 are required over the 10 years of the Long Term Financial Plan. The Infrastructure renewal and maintenance shortfall of $80M is allocated across the 10 years of the Long Term Financial Plan as follows: 2018/19
2019/20
2020/21
2021/22
2022/23
2023/24
2024/25
2025/26
$6,697,731
$6,957,919
$7,228,468
$7,509,794
$7,802,324
$8,106,506
$8,422,806
$8,751,705
2026/27
2027/28
$9,093,706
$9,449,333
Wagga Wagga City Council’s current external loan borrowings assumptions used in the Long Term Financial Plan are as follows: • 4% • 5% • 6% • 7%
-
2018/19 2019/20 2021/22 2024/25
– 10 year term to 2020/21 – 10 year term to 2023/24 – 10 year term to 2027/28 – 10 year term
Scenario 1 – Fund 10 year Infrastructure Shortfall from External Loan Borrowings
If Wagga Wagga City Council was to fund the Infrastructure shortfall of $80M from external borrowings, this would result in an increase to the bottom line for debt servicing repayments of $44M as follows: 2018/19 $0
2019/20 $825,770
2020/21
2021/22
2022/23
2023/24
2024/25
2025/26
2026/27
2027/28
$1,726,852
$2,662,972
$3,683,312
$4,743,398
$5,844,812
$7,044,030
$8,290,076
$9,584,815
This additional funding from loan borrowings would result in the following changes to a number of Councils financial performance ratios:
Base Case Scenario: ACTUALS 2016/17 -6.38% 5.37 39.74%
BUDGET 2018/19 Operating Performance Ratio Debt Service Cover Ratio Infrastructure Renewals Ratio
BUDGET 2019/20
BUDGET 2020/21
BUDGET 2021/22
BUDGET 2022/23
BUDGET 2023/24
BUDGET 2024/25
BUDGET 2025/26
BUDGET 2026/27
BUDGET 2027/28
-14.05%
-10.18%
-9.55%
-9.34%
-7.93%
-6.75%
-5.19%
-3.65%
-2.11%
-0.47%
3.39
3.74
3.81
3.81
3.90
4.27
4.58
5.33
5.56
7.73
117.24%
70.69%
64.59%
42.27%
45.29%
53.69%
46.90%
49.12%
50.57%
52.62%
WAGGA WAGGA CITY COUNCIL LONG TERM FINANCIAL PLAN
29
Scenario 1 – Borrowings: ACTUALS 2016/17 -6.38%
BUDGET 2018/19 Operating Performance Ratio
5.37
Infrastructure Renewals Ratio
BUDGET 2020/21
BUDGET 2021/22
BUDGET 2022/23
BUDGET 2023/24
BUDGET 2024/25
BUDGET 2025/26
BUDGET 2026/27
BUDGET 2027/28
-16.13%
-12.49%
-12.11%
-12.18%
-11.04%
-10.10%
-8.75%
-7.44%
-6.08%
-4.58%
3.05
3.23
3.09
2.90
2.79
2.85
2.86
3.11
3.09
3.76
132.10%
85.93%
80.21%
58.36%
61.95%
70.97%
64.77%
67.67%
69.85%
72.66%
Debt Service Cover Ratio
39.74%
BUDGET 2019/20
• The Office of Local Government benchmark for the Operating Performance Ratio is >=0%. As a result of the increased interest and operating maintenance expenditure included for the 10 years of the LTFP for this scenario, this ratio is negatively impacted for the life of the LTFP. • The Office of Local Government benchmark for the Debt Service Cover Ratio is >=2%. Due to the increased external borrowings utilised in this scenario, the ratio is negatively impacted but is still above the required benchmark for each year of the LTFP. • The Office of Local Government benchmark for the Infrastructure Renewals Ratio is >=100%. Based on the additional renewal expenditure included in this scenario, this ratio shows a significant increase each financial year for the Long Term Financial Plan of between 15%-20% annually. This increase means that Council is steadily moving towards meeting this benchmark for future LTFP’s. Scenario 2 – Fund 10 year Infrastructure Shortfall from Special Rate Variation – If Wagga Wagga City Council was to fund the Infrastructure shortfall from 2021/22 to 2027/28 of $59M with a Special Rate Variation then this would result in an average increase to rates of approximately 19% for 2021/22 (following on from the Levee Bank project SRV) and then maintained along with the budgeted rate peg amount of 2% for the remaining years of the Long Term Financial Plan. This scenario would equate to additional rates income of $56M as follows: 2018/19
2019/20 $0
2020/21 $0
$0
2021/22
2022/23
2023/24
2024/25
2025/26
2026/27
2027/28
$7,509,697
$7,659,891
$7,813,089
$7,969,351
$8,128,738
$8,291,313
$8,457,139
The additional funding from the SRV would result in the following changes to the Councils operating and infrastructure performance ratios:
30
Base Case Scenario: ACTUALS 2016/17
BUDGET 2018/19
BUDGET 2019/20
BUDGET 2020/21
BUDGET 2021/22
BUDGET 2022/23
BUDGET 2023/24
BUDGET 2024/25
BUDGET 2025/26
BUDGET 2026/27
BUDGET 2027/28
-6.38%
Operating Performance Ratio
-14.05%
-10.18%
-9.55%
-9.34%
-7.93%
-6.75%
-5.19%
-3.65%
-2.11%
-0.47%
39.74%
Infrastructure Renewals Ratio
117.24%
70.69%
64.59%
42.27%
45.29%
53.69%
46.90%
49.12%
50.57%
52.62%
Scenario 2 – SRV: ACTUALS 2016/17
BUDGET 2018/19
BUDGET 2019/20
BUDGET 2020/21
BUDGET 2021/22
BUDGET 2022/23
BUDGET 2023/24
BUDGET 2024/25
BUDGET 2025/26
BUDGET 2026/27
BUDGET 2027/28
-6.38%
Operating Performance Ratio
-14.05%
-10.18%
-9.55%
-5.08%
-3.84%
-2.80%
-1.41%
-0.04%
-1.33%
-2.80%
39.74%
Infrastructure Renewals Ratio
117.24%
70.69%
64.59%
58.36%
61.95%
70.97%
64.77%
67.67%
69.85%
72.66%
• The Office of Local Government benchmark for the Operating Performance Ratio is >=0%. As a result of the increased operating maintenance expenditure and proposed SRV income from 2021/22 this ratio is positively impacted due to the significance of the additional income generated from the SRV. This scenario moves Council towards meeting the Office of Local Government benchmark by 2026/27. • The Office of Local Government benchmark for the Infrastructure Renewals Ratio is >=100%. Based on the additional renewals expenditure included in this scenario, this ratio shows a significant increase each financial year for the Long Term Financial Plan of between 15%-20% annually. This increase means that Council is steadily moving towards meeting the benchmark for future LTFP’s.
WAGGA WAGGA CITY COUNCIL LONG TERM FINANCIAL PLAN
31
Long term financial plan appendices
32
Appendices
The following summary documents are provided as appendixes to the Long Term Financial Plan document. They provide a summary of the financial projections of Wagga Wagga City Council over the next 10 years. It is important that these documents are considered as a total package and not in isolation to gain a clear picture of Council’s budgeted financial position over the next 10 years. Appendix 1 Budgeted Income Statement
Appendix 9 Airport - Ten Year Financial Plan
Appendix 2 Balance Sheet Forecasts
Appendix 10 Livestock Marketing Centre - Ten Year Financial Plan
Appendix 3 Cash Flow Statement Forecasts
Appendix 11 Sewerage Services - Ten Year Financial Plan
Appendix 4 Financial Sustainability Indicators
Appendix 12 Solid Waste Services - Ten Year Financial Plan
Appendix 5 Budgeted External Restrictions
Appendix 13 Stormwater Levy - Ten Year Financial Plan
Appendix 6 Budgeted Internal Restrictions
Appendix 14 Budgeted Income Statement by Function
Appendix 7 External Loan Projects and Debt Servicing Appendix 8 a) Capital Works Program – One off projects b) Capital Works Program – Recurrent projects c) Potential Projects List
WAGGA WAGGA CITY COUNCIL LONG TERM FINANCIAL PLAN
33
Appendix 1 - Budgeted Income Statement BUDGET 2018/19
BUDGET 2019/20
BUDGET 2020/21
BUDGET 2021/22
BUDGET 2022/23
BUDGET 2023/24
BUDGET 2024/25
BUDGET 2025/26
BUDGET 2026/27
BUDGET 2027/28
(64,445,164)
(66,761,504)
(69,176,244)
(71,195,862)
(73,277,926)
(75,424,469)
(77,637,591)
(79,919,464)
(82,272,335)
(84,698,524)
Special Rate Variation
(1,553,807)
(1,594,203)
(1,635,686)
0
0
0
0
0
0
0
User Charges & Fees
(26,376,667)
(27,601,118)
(28,824,925)
(30,008,402)
(31,036,587)
(32,102,010)
(33,208,208)
(34,368,278)
(35,603,982)
(36,848,207)
Interest & Investment Revenue
(3,283,829)
(3,714,376)
(4,295,443)
(4,889,249)
(5,595,905)
(6,252,646)
(6,916,956)
(8,018,465)
(9,076,504)
(10,505,033)
Other Revenues
(3,084,604)
(3,135,393)
(3,191,367)
(3,257,771)
(3,333,777)
(3,412,115)
(3,492,877)
(3,574,143)
(3,668,716)
(3,759,626)
Grants & Contributions provided for Operating Purposes
(13,894,989)
(14,044,404)
(14,293,979)
(14,592,901)
(14,797,122)
(15,056,371)
(15,376,696)
(15,607,973)
(15,899,565)
(16,228,800)
Grants & Contributions provided for Capital Purposes
(36,517,290)
(17,367,984)
(11,631,905)
(8,060,822)
(8,336,674)
(8,129,856)
(8,099,004)
(8,153,261)
(8,209,016)
(8,266,313)
(149,156,350)
(134,218,981)
(133,049,549)
(132,005,006)
(136,377,992)
(140,377,466)
(144,731,333)
(149,641,584)
(154,730,118)
(160,306,503)
44,219,258
46,113,492
47,853,059
49,765,914
51,755,328
53,824,363
55,976,206
58,213,392
60,536,611
62,938,577
3,752,580
3,806,299
3,678,105
3,439,489
3,215,987
2,932,136
2,782,314
2,512,483
2,248,403
2,009,177
Materials & Contracts
32,951,581
32,341,052
32,844,206
33,110,633
33,298,973
33,807,770
34,104,511
33,540,065
33,765,789
34,050,629
Depreciation & Amortisation
35,418,997
36,025,921
37,381,243
37,702,405
37,877,879
37,972,195
37,319,096
38,545,941
38,583,972
38,598,632
Other Expenses
12,125,204
10,465,144
11,256,466
11,501,286
12,050,853
12,632,281
13,547,557
13,846,812
14,483,663
15,159,529
128,467,620
128,751,908
133,013,079
135,519,726
138,199,019
141,168,745
143,729,682
146,658,692
149,618,439
152,756,544
(20,688,730)
(5,467,073)
(36,470)
3,514,721
1,821,028
791,279
(1,001,650)
(2,982,892)
(5,111,680)
(7,549,959)
15,828,561
11,900,911
11,595,435
11,575,543
10,157,702
8,921,135
7,097,354
5,170,369
3,097,336
716,354
Revenue From Continuing Operations Rates & Annual Charges
Revenue From Continuing Operations
Expenses From Continuing Operations Employee Benefits & OnCosts Borrowing Costs
Expenses From Continuing Operations
Net Operating Result (Surplus)/Deficit
Net Operating Result before Grants and Contributions provided for Capital Purposes 34
Appendix 2 - Balance Sheet Forecast BUDGET 2018/19
BUDGET 2019/20
BUDGET 2020/21
BUDGET 2021/22
BUDGET 2022/23
BUDGET 2023/24
BUDGET 2024/25
BUDGET 2025/26
BUDGET 2026/27
BUDGET 2027/28
ASSETS Current Assets Cash & Cash Equivalents
11,392,237
12,758,176
13,985,795
15,533,208
17,072,141
18,464,064
20,334,941
22,675,249
24,906,701
27,418,485
Investments
43,007,344
48,163,963
52,798,404
58,640,111
64,449,806
69,704,515
76,767,347
85,602,351
94,026,406
103,508,754
Receivables
14,179,403
12,775,589
12,583,691
12,413,614
12,663,343
12,903,453
13,127,102
13,315,626
13,547,098
13,756,828
Inventories
2,709,863
2,659,655
2,701,033
2,722,943
2,738,432
2,780,274
2,804,678
2,758,259
2,776,822
2,800,247
618,236
587,094
604,848
611,860
621,981
636,933
653,556
649,919
661,750
674,926
71,907,083
76,944,477
82,673,772
89,921,737
97,545,702
104,489,239
113,687,624
125,001,405
135,918,778
148,159,239
59,522,786
66,659,622
73,073,755
81,158,762
89,199,464
96,472,057
106,247,119
118,474,893
130,133,907
143,257,613
Infrastructure, Property, Plant & Equipment
1,447,916,555
1,455,163,300
1,453,836,576
1,440,367,026
1,422,485,567
1,411,530,524
1,400,621,638
1,382,662,282
1,363,856,213
1,344,589,457
Investments Accounted for using the equity method
1,937,524
1,937,524
1,937,524
1,937,524
1,937,524
1,937,524
1,937,524
1,937,524
1,937,524
1,937,524
Investment Property
2,800,000
2,800,000
2,800,000
2,800,000
2,800,000
2,800,000
2,800,000
2,800,000
2,800,000
2,800,000
Total Non-Current Assets
1,512,176,865
1,526,560,446
1,531,647,855
1,526,263,312
1,516,422,555
1,512,740,106
1,511,606,281
1,505,874,698
1,498,727,644
1,492,584,594
TOTAL ASSETS
1,584,083,948
1,603,504,923
1,614,321,627
1,616,185,049
1,613,968,257
1,617,229,345
1,625,293,905
1,630,876,103
1,634,646,421
1,640,743,833
19,318,012
14,832,780
14,389,106
13,428,189
13,117,788
13,997,020
14,218,322
13,657,750
13,765,170
13,860,283
Borrowings
3,666,593
4,056,703
4,321,334
4,713,671
4,550,139
4,419,942
4,218,443
4,535,944
3,149,330
2,599,907
Provisions
11,603,689
11,603,689
11,603,689
11,603,689
11,603,689
11,603,689
11,603,689
11,603,689
11,603,689
11,603,689
Total Current Liabilities
34,588,295
30,493,173
30,314,129
29,745,549
29,271,616
30,020,652
30,040,454
29,797,383
28,518,189
28,063,879
Other Total Current Assets Non-Current Assets Investments
LIABILITIES Current Liabilities Payables
WAGGA WAGGA CITY COUNCIL LONG TERM FINANCIAL PLAN
35
Appendix 2 - Balance Sheet Forecast continued BUDGET 2018/19
BUDGET 2019/20
BUDGET 2020/21
BUDGET 2021/22
BUDGET 2022/23
BUDGET 2023/24
BUDGET 2024/25
BUDGET 2025/26
BUDGET 2026/27
BUDGET 2027/28
Non-Current Liabilities Borrowings
55,610,111
53,756,564
49,820,230
45,856,559
41,306,420
39,114,171
34,895,728
30,359,785
27,210,455
24,610,548
1,619,514
1,619,514
1,619,514
1,619,514
1,619,514
1,619,514
1,619,514
1,619,514
1,619,514
1,619,514
Total Non-Current Liabilities
57,229,625
55,376,078
51,439,744
47,476,073
42,925,934
40,733,685
36,515,242
31,979,298
28,829,969
26,230,062
TOTAL LIABILITIES
91,817,919
85,869,251
81,753,873
77,221,623
72,197,550
70,754,336
66,555,696
61,776,681
57,348,158
54,293,941
1,492,266,029
1,517,635,672
1,532,567,753
1,538,963,426
1,541,770,707
1,546,475,008
1,558,738,209
1,569,099,422
1,577,298,264
1,586,449,892
Accumulated Surplus
972,689,701
998,059,344
1,012,991,425
1,019,387,098
1,022,194,379
1,026,898,680
1,039,161,881
1,049,523,094
1,057,721,936
1,066,873,564
Revaluation Reserves
519,576,328
519,576,328
519,576,328
519,576,328
519,576,328
519,576,328
519,576,328
519,576,328
519,576,328
519,576,328
1,492,266,029
1,517,635,672
1,532,567,753
1,538,963,426
1,541,770,707
1,546,475,008
1,558,738,209
1,569,099,422
1,577,298,264
1,586,449,892
Provisions
NET ASSETS EQUITY
TOTAL EQUITY
36
Appendix 3 - Cash Flow Statement Forecast BUDGET 2018/19
BUDGET 2019/20
BUDGET 2020/21
BUDGET 2021/22
BUDGET 2022/23
BUDGET 2023/24
BUDGET 2024/25
BUDGET 2025/26
BUDGET 2026/27
BUDGET 2027/28
Rates & Annual Charges
65,817,154
68,216,279
70,666,617
71,173,148
73,154,749
75,297,477
77,506,660
79,784,466
82,133,136
84,554,988
User Charges & Fees
26,301,810
27,458,383
28,685,408
29,878,895
30,936,674
31,998,330
33,100,249
34,253,901
35,479,598
36,725,500
3,245,894
3,654,732
4,133,806
4,756,934
5,417,769
6,074,948
6,754,303
7,804,765
8,812,746
10,222,654
48,736,922
32,888,316
26,352,080
22,907,907
23,096,504
23,182,154
23,453,214
23,739,054
24,081,599
24,465,087
2,226,705
3,224,125
3,137,393
3,211,033
3,219,706
3,298,882
3,373,492
3,451,720
3,534,635
3,625,733
Cash Flows from Operating Activities Receipts:
Interest & Investment Revenue Received Grants & Contributions Other Payments: Employee Benefits & On-Costs
(44,219,258) (46,113,492) (47,853,059) (49,765,914) (51,755,328) (53,824,363) (55,976,206) (58,213,392) (60,536,611) (62,938,577)
Materials & Contracts
(32,678,090) (32,503,328) (32,768,601) (33,088,007) (33,251,895) (33,750,739) (34,023,590) (33,528,520) (33,706,930) (33,987,085)
Borrowing Costs Other Net Cash provided/(used in) Operating Activities
(3,752,580)
(3,806,299)
(3,678,105)
(3,439,489)
(3,215,987)
(2,932,136)
(2,782,314)
(2,512,483)
(2,248,403)
(2,009,177)
(10,865,931)
(9,168,092)
(9,920,502) (10,125,243) (10,633,529) (11,172,438) (12,043,918) (12,343,173) (12,980,025) (13,655,890)
54,812,627
43,850,625
38,755,037
35,509,265
36,968,664
38,172,115
39,361,891
42,436,339
44,569,746
47,003,232
46,169,144
19,298,393
22,862,497
14,166,332
10,242,287
19,696,635
19,849,047
15,622,288
13,413,226
14,393,973
952,795
822,182
835,808
1,383,000
739,100
977,700
1,651,850
1,148,900
1,250,650
631,200
Cash Flows from Investing Activities Receipts: Sale of Investment Securities Sale of Infrastructure, Property, Plant & Equipment Payments: Purchase of Investment Securities
(10,000,000) (20,000,000) (20,000,000) (20,000,000) (20,000,000) (25,000,000) (25,000,000) (30,000,000) (30,000,000) (35,000,000)
Purchase of Infrastructure, Property, Plant & Equipment
(93,247,753) (39,844,772) (36,218,056) (24,563,807) (20,280,124) (28,672,239) (28,068,330) (21,145,137) (20,962,588) (19,863,653)
Contributions Paid to Joint Ventures & Associates Net Cash provided/(used in) Investing Activities
(1,259,273)
(1,297,052)
(1,335,964)
(1,376,043)
(1,417,323)
(1,459,843)
(1,503,638)
(1,503,638)
(1,503,638)
(1,503,638)
(57,385,087) (41,021,250) (33,855,714) (30,390,518) (30,716,059) (34,457,747) (33,071,071) (35,877,588) (37,802,350) (41,342,119)
WAGGA WAGGA CITY COUNCIL LONG TERM FINANCIAL PLAN
37
Appendix 3 - Cash Flow Statement Forecast continued BUDGET 2018/19
BUDGET 2019/20
BUDGET 2020/21
BUDGET 2021/22
BUDGET 2022/23
BUDGET 2023/24
BUDGET 2024/25
BUDGET 2025/26
BUDGET 2026/27
BUDGET 2027/28
Cash Flows from Financing Activities Receipts: Proceeds from Borrowings & Advances
6,108,672
2,203,157
385,000
750,000
0
2,227,693
0
0
0
0
Payments: (3,129,777)
(3,666,593)
(4,056,703)
(4,321,334)
(4,713,671)
(4,550,139)
(4,419,942)
(4,218,443)
(4,535,944)
(3,149,330)
Net Cash provided/(used in) in Financing Activities
Repayment of Borrowings & Advances
2,978,894
(1,463,436)
(3,671,703)
(3,571,334)
(4,713,671)
(2,322,446)
(4,419,942)
(4,218,443)
(4,535,944)
(3,149,330)
Net Increase/(Decrease) in Cash & Cash Equivalents
406,434
1,365,939
1,227,619
1,547,413
1,538,933
1,391,923
1,870,877
2,340,309
2,231,452
2,511,784
plus: Cash & Cash Equivalents - beginning of year
10,985,803
11,392,237
12,758,176
13,985,795
15,533,208
17,072,141
18,464,064
20,334,941
22,675,249
24,906,701
Cash & Cash Equivalents - end of the year
11,392,237
12,758,176
13,985,795
15,533,208
17,072,141
18,464,064
20,334,941
22,675,249
24,906,701
27,418,485
Cash & Cash Equivalents - end of the year
11,392,237
12,758,176
13,985,795
15,533,208
17,072,141
18,464,064
20,334,941
22,675,249
24,906,701
27,418,485
Investments - end of the year
102,530,131 114,823,586 125,872,159 139,798,873 153,649,270 166,176,573 183,014,466 204,077,244 224,160,313 246,766,367
Cash, Cash Equivalents & Investments - end of the year
113,922,367 127,581,762 139,857,955 155,332,081 170,721,411 184,640,636 203,349,407 226,752,493 249,067,015 274,184,852
38
Appendix 4 - Financial Sustainability Indicators ACTUALS 2016/17 -6.38%
BUDGET 2018/19 Operating Performance Ratio
-14.05%
BUDGET 2019/20 -10.18%
BUDGET 2020/21 -9.55%
BUDGET 2021/22 -9.34%
BUDGET 2022/23
BUDGET 2023/24
BUDGET 2024/25
BUDGET 2025/26
BUDGET 2026/27
BUDGET 2027/28
-7.93%
-6.75%
-5.19%
-3.65%
-2.11%
-0.47%
Revenue from Continuing Operations excluding Capital Grants & Contributions less Operating Expenses
(15,828,561) (11,900,911) (11,595,435) (11,575,543) (10,157,702)
(8,921,135)
(7,097,354)
(5,170,369)
(3,097,336)
(716,354)
Revenue from Continuing Operations excluding Capital Grants & Contributions
112,639,060 116,850,997 121,417,644 123,944,184 128,041,317 132,247,611 136,632,328 141,488,324 146,521,102 152,040,190
Office of Local Government Benchmark >= 0.00%
59.18%
Own Source Operating Revenue Ratio
66.20%
76.60%
80.51%
82.84%
83.04%
83.48%
83.78%
84.12%
84.42%
84.72%
Office of Local Government Benchmark >= 60.00%
3.08
Revenue from Continuing Operations excluding all Grants & Contributions
98,744,071 102,806,593 107,123,665 109,351,283 113,244,195 117,191,240 121,255,632 125,880,350 130,621,537 135,811,390
Revenue from Continuing Operations
149,156,350 134,218,981 133,049,549 132,005,006 136,377,992 140,377,466 144,731,333 149,641,584 154,730,118 160,306,503
Unrestricted Current Ratio
2.77
3.54
3.83
4.28
4.75
4.90
5.32
5.92
6.87
7.67
Current Assets less all External Restrictions
56,899,107
60,763,263
65,229,998
70,879,026
76,838,555
82,269,081
89,457,400
98,287,033 106,815,188 116,374,973
Current Liabilities less Specific Purpose Liabilities
20,530,639
17,172,639
17,025,823
16,559,588
16,170,963
16,785,172
16,801,410
16,602,091
15,553,152
15,180,618
3.39
3.74
3.81
3.81
3.90
4.27
4.58
5.33
5.56
7.73
23,343,016
27,931,309
29,463,913
29,566,352
30,936,164
31,983,197
33,004,056
35,888,056
37,735,039
39,891,455
6,882,358
7,472,892
7,734,808
7,760,823
7,929,658
7,482,275
7,202,256
6,730,926
6,784,347
5,158,507
Office of Local Government Benchmark >= 1.50
5.37
Debt Service Cover Ratio Office of Local Government Benchmark >= 2.00 Operating Result before Capital excluding Interest and Depreciation Principal Repayments plus Borrowing Costs
WAGGA WAGGA CITY COUNCIL LONG TERM FINANCIAL PLAN
39
Appendix 4 - Financial Sustainability Indicators continued ACTUALS 2016/17 5.10%
BUDGET 2018/19 Rates, Annual Charges, Interest & Extra Charges Outstanding Percentage
BUDGET 2019/20
6.20%
BUDGET 2020/21
BUDGET 2021/22
BUDGET 2022/23
BUDGET 2023/24
BUDGET 2024/25
BUDGET 2025/26
BUDGET 2026/27
BUDGET 2027/28
6.20%
6.20%
6.18%
6.19%
6.19%
6.19%
6.19%
6.19%
6.19%
4,373,509
4,529,681
4,692,446
4,717,888
4,855,858
4,998,102
5,144,757
5,295,969
5,451,885
5,612,659
70,546,091
73,112,080
75,741,705
76,306,405
78,432,726
80,736,900
83,112,812
85,561,857
88,087,337
90,691,761
117.24%
70.69%
64.59%
42.27%
45.29%
53.69%
46.90%
49.12%
50.57%
52.62%
Wagga Wagga City Council Organisational Target <= 5.00% Rates, Annual & Extra Charges Outstanding Rates, Annual & Extra Charges Collectible 39.74%
Infrastructure Renewals Ratio
Office of Local Government Benchmark >= 100.00% Asset Renewals (Building & Infrastructure Assets)
34,343,569
21,004,754
19,464,842
12,861,349
13,845,262
16,455,976
14,463,020
15,162,050
15,622,678
16,262,638
Depreciation of Building and Infrastructure Assets
29,294,188
29,711,876
30,136,506
30,425,554
30,570,577
30,649,664
30,834,714
30,869,309
30,895,090
30,907,500
Appendix 5 - Budgeted External Restrictions RESERVE NAME
ESTIMATED CLOSING BALANCE 2017/18
CLOSING BALANCE 2018/19
CLOSING BALANCE 2019/20
CLOSING BALANCE 2020/21
CLOSING BALANCE 2021/22
CLOSING BALANCE 2022/23
CLOSING BALANCE 2023/24
CLOSING BALANCE 2024/25
CLOSING BALANCE 2025/26
CLOSING BALANCE 2026/27
CLOSING BALANCE 2027/28
Sewer Reserve
23,616,552
19,349,188
22,640,971
25,088,530
28,015,967
33,476,098
39,250,625
46,747,586
54,872,000
63,540,623
73,067,015
Solid Waste Reserve
16,904,789
7,304,424
4,597,483
5,908,960
7,872,777
10,236,533
12,254,222
8,934,167
12,389,632
16,033,490
19,859,976
3,076,184
2,914,153
0
0
0
0
0
0
0
0
0
15,405,700
8,121,854
4,883,677
50,356
453,616
3,532,690
4,821,285
6,715,712
8,586,318
11,159,246
13,994,234
S94A Developer Contributions
404,956
46,456
98,956
51,456
3,956
56,456
8,956
61,456
113,956
166,456
218,956
S94 (Old Plan 1993-2004) Developer Contributions
245,932
124,094
124,094
124,094
124,094
124,094
124,094
124,094
124,094
124,094
124,094
4,725,413
4,225,413
4,725,413
3,821,402
3,821,402
3,821,402
3,821,402
3,821,402
3,821,402
3,821,402
3,821,402
64,379,526
42,085,583
37,070,595
35,044,799
40,291,812
51,247,274
60,280,585
66,404,417
79,907,402
94,845,312
111,085,677
Stormwater Levy Reserve S94 Developer Contributions
S64 Developer Contributions (Stormwater) TOTAL
* Unexpended Grants are also classified as externally restricted funds - however these are not shown in this table 40
Appendix 6 - Budgeted Internal Restrictions RESERVE NAME Airport Reserve
ESTIMATED CLOSING BALANCE 2017/18
CLOSING BALANCE 2018/19
CLOSING BALANCE 2019/20
CLOSING BALANCE 2020/21
CLOSING BALANCE 2021/22
CLOSING BALANCE 2022/23
CLOSING BALANCE 2023/24
CLOSING BALANCE 2024/25
CLOSING BALANCE 2025/26
CLOSING BALANCE 2026/27
CLOSING BALANCE 2027/28
527,798
686,250
715,875
698,507
677,782
584,603
589,973
284,508
697,454
1,076,867
2,188,087
51,990
38,728
42,228
45,728
49,228
52,728
56,228
59,728
63,228
66,728
70,228
Ashmont Community Facility Reserve
6,000
7,500
9,000
10,500
12,000
13,500
15,000
16,500
18,000
19,500
21,000
Bridge Replacement Reserve
186,667
286,667
386,667
486,667
586,667
686,667
786,667
886,667
986,667
1,086,667
1,186,667
CBD Carparking Facilities Reserve
873,094
712,792
712,792
712,792
712,792
712,792
712,792
712,792
712,792
712,792
712,792
74,476
84,476
66,476
48,476
30,476
12,476
0
0
0
0
0
Cemetery Perpetual Reserve
138,667
268,046
401,777
539,979
682,778
840,693
1,052,052
1,318,671
1,585,291
1,851,911
2,118,530
Cemetery Reserve
254,446
254,026
367,291
494,500
664,243
696,154
694,195
656,938
139,482
144,972
200,013
Civic Theatre Operating Reserve
50,000
105,000
8,500
63,500
118,500
173,500
228,500
283,500
338,500
393,500
448,500
Civic Theatre Technical Infrastructure Reserve
98,350
148,350
198,350
248,350
298,350
348,350
398,350
448,350
498,350
548,350
598,350
Civil Projects Reserve
155,883
155,883
155,883
103,083
103,083
103,083
103,083
103,083
103,083
103,083
103,083
5,685
5,685
5,685
5,685
5,685
5,685
5,685
5,685
5,685
5,685
5,685
62,869
122,589
154,806
188,146
228,575
294,655
372,744
418,531
543,180
593,387
593,387
Council Election Reserve
239,871
316,204
392,368
158,356
234,163
309,785
385,216
150,450
225,480
300,302
374,908
Emergency Events Reserve
191,160
191,160
191,160
191,160
191,160
191,160
191,160
191,160
191,160
191,160
191,160
3,184,451
3,184,451
3,184,451
3,184,451
3,184,451
3,184,451
3,184,451
3,184,451
3,184,451
3,184,451
3,184,451
Estella Community Centre Reserve
230,992
52,473
52,473
52,473
52,473
52,473
52,473
52,473
52,473
52,473
52,473
Family Day Care Reserve
293,300
217,935
143,462
70,032
(2,190)
(73,026)
(142,281)
(209,746)
(275,194)
(338,297)
(399,859)
Fit for the Future Reserve
4,541,757
97,743
97,743
97,743
97,743
97,743
97,743
97,743
97,743
97,743
97,743
Generic Projects Reserve
926,883
776,883
776,883
451,782
65,576
12,772
12,772
12,772
12,772
12,772
12,772
19,704
21,704
23,704
25,704
27,704
29,704
31,704
33,704
35,704
37,704
39,704
Art Gallery Reserve
CCTV Reserve
Community Amenities Reserve Community Works Reserve
Employee Leave Entitlements Gen Fund Reserve
Glenfield Community Centre Reserve
WAGGA WAGGA CITY COUNCIL LONG TERM FINANCIAL PLAN
41
Appendix 6 - Budgeted Internal Restrictions continued RESERVE NAME Grassroots Cricket Reserve
ESTIMATED CLOSING BALANCE 2017/18
CLOSING BALANCE 2018/19
CLOSING BALANCE 2019/20
CLOSING BALANCE 2020/21
CLOSING BALANCE 2021/22
CLOSING BALANCE 2022/23
CLOSING BALANCE 2023/24
CLOSING BALANCE 2024/25
CLOSING BALANCE 2025/26
CLOSING BALANCE 2026/27
CLOSING BALANCE 2027/28
70,992
70,992
70,992
70,992
70,992
70,992
70,992
70,992
70,992
70,992
70,992
736,422
736,422
736,422
736,422
736,422
736,422
736,422
736,422
736,422
736,422
736,422
50,454
50,454
50,454
50,454
50,454
50,454
50,454
50,454
50,454
50,454
50,454
Information Services / E-Business Reserve
120,713
42,856
265,648
362,493
317,189
643,732
960,120
1,308,353
1,109,428
1,116,628
1,373,763
Infrastructure Replacement Reserve
183,215
251,324
81,516
100,238
113,217
96,340
70,328
59,808
59,808
59,808
59,808
28,644
28,644
28,644
28,644
28,644
28,644
28,644
28,644
28,644
28,644
28,644
905,986
1,537,456
2,434,510
3,351,395
4,134,979
4,858,746
5,561,015
6,250,280
6,574,213
6,652,552
6,730,891
Lake Albert Improvements Reserve
47,789
69,352
90,867
112,333
133,749
155,115
116,738
137,999
159,205
180,357
201,838
LEP Preparation Reserve
2,545
2,545
2,545
2,545
2,545
2,545
2,545
2,545
2,545
2,545
2,545
Livestock Marketing Centre Reserve
4,394,024
5,540,787
7,125,371
8,937,900
10,999,631
10,349,663
9,212,338
11,661,546
14,231,757
16,928,323
19,756,158
Environmental Conservation Reserve
131,351
111,056
111,056
111,056
111,056
111,056
111,056
111,056
111,056
111,056
111,056
39,378
39,378
39,378
39,378
39,378
39,378
39,378
39,378
39,378
39,378
39,378
204,147
289,526
309,226
309,226
309,226
348,126
398,126
448,126
498,126
548,126
598,126
1,139,577
749,577
659,577
434,577
544,577
654,577
569,577
679,577
789,577
899,577
1,009,577
Parks & Recreation Projects Reserve
54,788
5,288
5,288
5,288
5,288
5,288
5,288
5,288
5,288
5,288
5,288
Plant Replacement Reserve
3,029,223
2,775,265
3,426,740
2,023,913
896,329
1,646,030
1,096,109
3,366
219,216
449,995
1,339,209
Playground Equipment Replacement Reserve
164,860
95,367
261,093
377,449
624,859
903,765
1,134,627
1,277,924
1,274,153
1,342,831
1,406,496
Project Carryovers Reserve
402,808
0
0
0
0
0
0
0
0
0
0
Public Art Reserve
142,983
112,682
82,382
(1)
(1)
(0)
(0)
(1)
(0)
(0)
(0)
Gravel Pit Restoration Reserve Gurwood Street Property Reserve
Insurance Variations Reserve Internal Loans Reserve
Museum Acquisitions Reserve Oasis Building Renewal Reserve Oasis Plant Reserve
42
Appendix 6 - Budgeted Internal Restrictions continued
RESERVE NAME Robertson Oval Redevelopment Reserve
ESTIMATED CLOSING BALANCE 2017/18
CLOSING BALANCE 2018/19
CLOSING BALANCE 2019/20
CLOSING BALANCE 2020/21
CLOSING BALANCE 2021/22
CLOSING BALANCE 2022/23
CLOSING BALANCE 2023/24
CLOSING BALANCE 2024/25
CLOSING BALANCE 2025/26
CLOSING BALANCE 2026/27
CLOSING BALANCE 2027/28
86,697
86,697
86,697
86,697
86,697
86,697
86,697
86,697
86,697
86,697
86,697
Senior Citizens Centre Reserve
15,627
17,627
19,627
21,627
23,627
25,627
27,627
29,627
31,627
33,627
35,627
Sister Cities Reserve
46,527
56,527
66,527
76,527
86,527
96,527
106,527
116,527
126,527
136,527
146,527
1,807,667
0
0
0
0
0
0
0
0
0
0
158,242
158,242
158,242
128,642
128,642
128,642
128,642
128,642
128,642
128,642
128,642
1,082,792
681,487
681,487
681,487
681,487
681,487
681,487
681,487
681,487
681,487
681,487
Street Lighting Replacement Reserve
104,755
104,755
104,755
104,755
104,755
104,755
104,755
104,755
104,755
104,755
104,755
Subdivision Tree Planting Reserve
292,621
252,621
272,621
232,621
252,621
272,621
292,621
312,621
332,621
352,621
372,621
Sustainable Energy Reserve
550,442
455,442
487,842
522,834
550,442
550,442
550,442
550,442
550,442
550,442
550,442
40,000
40,000
40,000
40,000
40,000
40,000
40,000
40,000
40,000
40,000
40,000
28,149,312
22,096,913
25,787,079
26,827,105
29,094,569
31,017,618
31,011,060
33,630,514
37,259,361
41,479,523
47,467,115
SRV Levee Reserve Stormwater Drainage Reserve Strategic Real Property Reserve
Traffic Committee Reserve TOTAL
WAGGA WAGGA CITY COUNCIL LONG TERM FINANCIAL PLAN
43
Appendix 7 - External Loan Projects and Debt Servicing BORROW YEAR
CAPITAL PROJECT
Amount Borrowed
2017/18
2018/19
2019/20
2020/21
2021/22
2022/23
2023/24
2024/25
2025/26
2026/27
2027/28
TOTALS
General Fund Debt Servicing 2011/12
2011/12
2011/12
2011/12
2011/12
44
Wiradjuri Boat Ramp - 6.44% - 15 years
Replace Substation Jubilee Park - 6.44% - 15 years
Replace Bridge Over Model Railway at Botanic Gardens 6.44% - 15 years
Upgrade Docker Street Pedestrian Rail Crossing 6.44% - 15 years
Upgrade Tarcutta Main Street 6.44% - 15 Years
421,603 Interest
20,350
18,616
16,986
15,203
13,298
11,268
9,163
6,781
4,341
1,718
0
117,724
Principal
23,723
25,457
27,087
28,870
30,774
32,805
34,910
37,292
39,732
42,355
0
323,004
44,073
44,073
44,073
44,073
44,073
44,073
44,073
44,073
44,073
44,073
0
440,728
Interest
16,122
14,748
13,457
12,044
10,535
8,927
7,259
5,372
3,439
1,361
0
93,262
Principal
18,794
20,167
21,459
22,871
24,380
25,988
27,656
29,543
31,476
33,554
0
255,889
34,915
34,915
34,915
34,915
34,915
34,915
34,915
34,915
34,915
34,915
0
349,151
Interest
2,559
2,341
2,136
1,912
1,673
1,417
1,152
853
546
216
0
14,806
Principal
2,984
3,202
3,407
3,631
3,871
4,126
4,391
4,690
4,997
5,327
0
40,624
5,543
5,543
5,543
5,543
5,543
5,543
5,543
5,543
5,543
5,543
0
55,430
Interest
19,584
17,915
16,346
14,630
12,798
10,844
8,818
6,525
4,177
1,653
0
113,290
Principal
22,829
24,498
26,067
27,783
29,615
31,569
33,595
35,888
38,236
40,760
0
310,841
42,413
42,413
42,413
42,413
42,413
42,413
42,413
42,413
42,413
42,413
0
424,131
Interest
14,480
13,247
12,087
10,818
9,463
8,018
6,520
4,825
3,089
1,222
0
83,769
Principal
16,880
18,114
19,274
20,543
21,898
23,343
24,841
26,536
28,272
30,139
0
229,840
31,361
31,361
31,361
31,361
31,361
31,361
31,361
31,361
31,361
31,361
0
313,609
334,000
51,306
400,000
300,000
Appendix 7 - External Loan Projects and Debt Servicing continued BORROW YEAR
CAPITAL PROJECT
2011/12
Upgrade Civic Theatre Sound Systems - 6.44% - 15 years
2011/12
Australian Carbon Trust Project - 5% - 4 years
Amount Borrowed
2012/13
2011/12
2012/13
Robertson Oval - 5.42% - 10 years
Develop Botanic Gardens & Zoo - 6.44% - 15 years
Develop Botanic Gardens & Zoo - 5.42% - 10 years
2019/20
2020/21
2021/22
2022/23
2023/24
2024/25
2025/26
2026/27
2027/28
TOTALS
Interest
8,302
7,595
6,930
6,202
5,425
4,597
3,738
2,766
1,771
701
0
48,027
Principal
9,678
10,386
11,051
11,778
12,555
13,383
14,242
15,214
16,209
17,280
0
131,775
17,980
17,980
17,980
17,980
17,980
17,980
17,980
17,980
17,980
17,980
0
179,802
377
0
0
0
0
0
0
0
0
0
0
377
20,030
0
0
0
0
0
0
0
0
0
0
20,030
20,407
0
0
0
0
0
0
0
0
0
0
20,407
Interest
161,362
147,612
134,688
120,550
105,448
89,349
72,657
53,767
34,419
13,619
0
933,470
Principal
188,106
201,856
214,780
228,918
244,021
260,119
276,811
295,701
315,049
335,849
0
2,561,211
Interest
6,902
5,875
4,818
3,661
2,451
1,192
0
0
0
0
0
24,899
Principal
18,617
19,644
20,701
21,859
23,068
30,707
0
0
0
0
0
134,595
374,987
374,987
374,987
374,987
374,987
381,367
349,468
349,468
349,468
349,468
0
3,654,175
Interest
4,827
4,416
4,029
3,606
3,154
2,673
2,173
1,608
1,030
407
0
27,923
Principal
5,627
6,038
6,425
6,848
7,299
7,781
8,280
8,845
9,424
10,046
0
76,613
Interest
6,902
5,875
4,818
3,661
2,451
1,192
0
0
0
0
0
24,899
Principal
18,617
19,644
20,701
21,859
23,068
30,707
0
0
0
0
0
134,595
35,973
35,973
35,973
35,973
35,973
42,352
10,454
10,454
10,454
10,454
0
264,031
211,909
Principal
Robertson Oval - 6.44% - 15 years
2018/19
172,000
Interest
2011/12
2017/18
3,343,032
200,000
97,581
200,000
WAGGA WAGGA CITY COUNCIL LONG TERM FINANCIAL PLAN
45
Appendix 7 - External Loan Projects and Debt Servicing continued BORROW YEAR
CAPITAL PROJECT
2011/12
Equestrian Audit Recommendations - 6.44% 15 years
2013/14
2012/13
2012/13
2012/13
46
Equestrian Audit Recommendations - 4.84% 5 years + 4% 5 years
Jubilee Park Amenities Building - 5.42% - 10 years
Higgins Avenue Rehabilitation (LIRS) - 5.42% - 10 years
Reinstate Road Failures (LIRS) - 5.42% - 10 years
Amount Borrowed
2017/18
2018/19
2019/20
2020/21
2021/22
2022/23
2023/24
2024/25
2025/26
2026/27
2027/28
TOTALS
250,000 Interest
12,067
11,039
10,072
9,015
7,886
6,682
5,433
4,021
2,574
1,018
0
69,807
Principal
14,067
15,095
16,062
17,119
18,248
19,452
20,701
22,113
23,560
25,116
0
191,534
Interest
8,639
7,466
5,430
4,428
3,385
2,301
1,173
0
0
0
0
32,822
Principal
23,940
25,114
25,065
26,068
27,111
28,195
29,323
0
0
0
0
184,816
58,714
58,714
56,630
56,630
56,630
56,630
56,630
26,134
26,134
26,134
0
478,979
Interest
10,353
8,813
7,228
5,491
3,677
1,788
0
0
0
0
0
37,349
Principal
27,926
29,466
31,051
32,788
34,601
46,061
0
0
0
0
0
201,893
38,279
38,279
38,279
38,279
38,279
47,848
0
0
0
0
0
239,242
Interest
9,490
8,078
6,625
5,033
3,371
1,639
0
0
0
0
0
34,236
Principal
25,599
27,011
28,463
30,056
31,718
42,222
0
0
0
0
0
185,068
35,089
35,089
35,089
35,089
35,089
43,861
0
0
0
0
0
219,305
Interest
20,326
17,302
14,190
10,780
7,220
3,510
0
0
0
0
0
73,328
Principal
54,828
57,852
60,963
64,373
67,934
90,433
0
0
0
0
0
396,383
75,154
75,154
75,154
75,154
75,154
93,942
0
0
0
0
0
469,711
250,000
300,000
275,000
589,000
Appendix 7 - External Loan Projects and Debt Servicing continued BORROW YEAR
CAPITAL PROJECT
2012/13
Building Infrastructure - 6.45% - 15 years
2012/13
2013/14
2012/13
Implement Tarcutta Street Gasworks Remediation 5.42% - 10 years (transferred from RIFL)
Implement Tarcutta Street Gasworks Remediation 4.84% 5 years + 4% 5 years
New Amenities Building - Duke Kent Oval - 5.42% - 10 years
Amount Borrowed
2019/20
2020/21
2021/22
2022/23
2023/24
2024/25
2025/26
2026/27
2027/28
TOTALS
Interest
121,816
112,695
103,531
92,863
81,757
70,311
57,141
43,863
29,519
14,179
0
727,675
Principal
138,095
147,227
156,156
167,661
178,720
190,320
202,792
216,343
230,552
310,818
0
1,938,683
259,911
259,922
259,687
260,524
260,477
260,631
259,933
260,206
260,071
324,997
0
2,666,359
Interest
26,227
22,325
18,310
13,910
9,316
4,528
0
0
0
0
0
94,617
Principal
70,745
74,647
78,662
83,063
87,657
116,687
0
0
0
0
0
511,462
Interest
64,437
55,682
40,503
33,025
25,248
17,160
8,748
0
0
0
0
244,803
Principal
178,557
187,312
186,949
194,427
202,204
210,292
218,704
0
0
0
0
1,378,446
339,966
339,966
324,425
324,425
324,425
348,668
227,452
0
0
0
0
2,229,327
759
646
530
403
270
131
0
0
0
0
0
2,739
2,048
2,161
2,277
2,404
2,537
3,378
0
0
0
0
0
14,805
Interest
1,095
946
688
561
429
291
149
0
0
0
0
4,158
Principal
3,033
3,182
3,176
3,303
3,435
3,572
3,715
0
0
0
0
23,415
6,935
6,935
6,671
6,671
6,671
7,373
3,864
0
0
0
0
45,118
760,000
1,864,610
22,000
Principal New Amenities Building - Duke Kent Oval - 4.84% 5 years + 4% 5 years
2018/19
2,500,000
Interest
2013/14
2017/18
31,680
WAGGA WAGGA CITY COUNCIL LONG TERM FINANCIAL PLAN
47
Appendix 7 - External Loan Projects and Debt Servicing continued BORROW YEAR
CAPITAL PROJECT
2012/13
Soccer Development City Wide Strategy (LIRS) - 5.42% - 10 years
2013/14
2014/15
2012/13
2012/13
2017/18
48
Soccer Development City Wide Strategy (LIRS) - 5.39% - 10 years
Soccer Development City Wide Strategy (LIRS) - 4.19% - 10 years
Multi Purpose Stadium Facilities - 5.42% - 10 years
Multi Purpose Stadium Facilities - 5.42% - 10 years
Equex Multi Purpose Stadium Facility - 3.8% - 15 years
Amount Borrowed
2017/18
2018/19
2019/20
2020/21
2021/22
2022/23
2023/24
2024/25
2025/26
2026/27
2027/28
TOTALS
180,000 Interest
6,212
5,288
4,337
3,294
2,206
1,073
0
0
0
0
0
22,409
Principal
16,755
17,680
18,631
19,673
20,761
27,636
0
0
0
0
0
121,136
Interest
18,345
15,973
13,576
10,809
8,033
5,117
2,021
0
0
0
0
73,874
Principal
43,207
45,579
47,976
50,743
53,519
56,435
59,531
0
0
0
0
356,990
Interest
12,023
10,684
9,279
7,767
6,246
4,577
2,898
1,145
0
0
0
54,619
Principal
32,263
33,602
35,008
36,520
38,041
39,710
41,389
43,142
0
0
0
299,675
128,806
128,806
128,806
128,806
128,806
134,548
105,839
44,287
0
0
0
928,703
Interest
2,105
1,792
1,470
1,116
748
363
0
0
0
0
0
7,594
Principal
5,678
5,991
6,314
6,667
7,036
9,366
0
0
0
0
0
41,052
Interest
3,451
2,938
2,409
1,830
1,226
596
0
0
0
0
0
12,450
Principal
9,309
9,822
10,350
10,929
11,534
15,354
0
0
0
0
0
67,298
Interest
0
62,195
59,042
55,770
52,373
48,847
45,188
41,389
37,446
33,353
29,104
464,707
Principal
0
82,961
86,113
89,386
92,782
96,308
99,968
103,766
107,710
111,803
116,051
986,847
473,500
360,155
61,000
100,000
1,636,700
Appendix 7 - External Loan Projects and Debt Servicing continued BORROW YEAR
CAPITAL PROJECT
2018/19
Equex Multi Purpose Stadium Facility - 4.5% - 15 years
2018/19
2023/24
2013/14
2013/14
PCYC Contribution - 4.5% - 15 years
Bolton Park Multi Purpose Stadium Facility - 6% - 10 years
Equestrian Audit Recommendations - 4.84% 5 years + 4% - 5 years
RRL Headquarters - $12K per year for 10 years
Amount Borrowed
City Levee Project - 4.84% - 5 years + 4% - 5 years
2018/19
2019/20
2020/21
2021/22
2022/23
2023/24
2024/25
2025/26
2026/27
2027/28
TOTALS
1,691,321 Interest
0
0
76,109
72,448
68,621
64,622
60,443
56,076
51,513
46,744
41,761
538,336
Principal
0
0
81,376
85,038
88,865
92,863
97,042
101,409
105,973
110,741
115,725
879,032
Interest
0
0
106,391
101,272
95,923
90,333
84,492
78,387
72,008
65,342
58,376
752,524
Principal
0
0
113,753
118,872
124,221
129,811
135,652
141,757
148,136
154,802
161,768
1,228,772
Interest
0
0
0
0
0
0
0
110,862
102,451
93,535
84,085
390,932
Principal
0
0
0
0
0
0
0
140,181
148,592
157,507
166,957
613,237
20,543
165,698
385,842
385,842
385,842
390,978
365,299
616,342
616,342
616,342
616,342
4,565,412
Interest
3,456
2,986
2,172
1,771
1,354
920
469
0
0
0
0
13,129
Principal
9,576
10,046
10,026
10,427
10,844
11,278
11,729
0
0
0
0
73,927
13,032
13,032
12,198
12,198
12,198
12,198
12,198
0
0
0
0
87,055
12,000
12,000
12,000
12,000
12,000
12,000
12,000
0
0
0
0
84,000
12,000
12,000
12,000
12,000
12,000
12,000
12,000
0
0
0
0
84,000
Interest
6,903
5,965
4,339
3,538
2,705
1,838
937
0
0
0
0
26,225
Principal
19,128
20,066
20,027
20,828
21,662
22,528
23,429
0
0
0
0
147,669
26,031
26,031
24,366
24,366
24,366
24,366
24,366
0
0
0
0
173,894
2,364,247
1,847,693
100,000
120,000 Principal
2013/14
2017/18
199,750
WAGGA WAGGA CITY COUNCIL LONG TERM FINANCIAL PLAN
49
Appendix 7 - External Loan Projects and Debt Servicing continued BORROW YEAR
CAPITAL PROJECT
2013/14
Implement Animal Shelter Expansion (LIRS) - 5.39% - 10 years
2014/15
2013/14
2014/15
2017/18
2017/18
50
Implement Animal Shelter Expansion (LIRS) - 4.19% - 10 years
Rehabilitation Lakeside Drive (LIRS) - 5.39% - 10 years
Rehabilitation Lakeside Drive (LIRS) - 4.19% - 10 years
RIFL Stage 1 - 3.8% - 15 years
Footpath Construction Program - 3.5% - 10 years
Amount Borrowed
2017/18
2018/19
2019/20
2020/21
2021/22
2022/23
2023/24
2024/25
2025/26
2026/27
2027/28
TOTALS
117,870 Interest
4,567
3,976
3,380
2,691
2,000
1,274
503
0
0
0
0
18,390
Principal
10,756
11,346
11,943
12,632
13,323
14,049
14,819
0
0
0
0
88,867
Interest
18,098
16,083
13,968
11,691
9,401
6,890
4,362
1,724
0
0
0
82,216
Principal
48,565
50,581
52,696
54,973
57,262
59,774
62,302
64,940
0
0
0
451,092
81,986
81,986
81,986
81,986
81,986
81,986
81,986
66,664
0
0
0
640,565
Interest
20,287
17,665
15,014
11,953
8,883
5,658
2,235
0
0
0
0
81,695
Principal
47,781
50,404
53,055
56,116
59,185
62,410
65,834
0
0
0
0
394,785
Interest
3,751
3,334
2,895
2,423
1,949
1,428
904
357
0
0
0
17,041
Principal
10,066
10,484
10,923
11,394
11,869
12,390
12,914
13,460
0
0
0
93,500
81,886
81,886
81,886
81,886
81,886
81,886
81,886
13,818
0
0
0
587,021
Interest
0
110,807
105,191
99,361
93,309
87,028
80,507
73,739
66,714
59,422
51,853
827,931
Principal
0
147,805
153,421
159,251
165,303
171,584
178,105
184,873
191,898
199,190
206,759
1,758,188
0
258,612
258,612
258,612
258,612
258,612
258,612
258,612
258,612
258,612
258,612
2,586,119
Interest
0
35,000
32,017
28,929
25,733
22,425
19,001
15,458
11,791
7,995
4,066
202,414
Principal
0
85,241
88,225
91,313
94,509
97,816
101,240
104,783
108,451
112,247
116,175
1,000,000
0
120,241
120,241
120,241
120,241
120,241
120,241
120,241
120,241
120,241
120,241
1,202,414
542,130
523,630
112,370
2,915,980
1,000,000
Appendix 7 - External Loan Projects and Debt Servicing continued BORROW YEAR
CAPITAL PROJECT
2018/19
Northern Sporting Precinct 4% - 10 years
2018/19
2019/20
2019/20
2021/22
Exhibition Centre Kooringal Road Exit - 4% - 10 years
Exhibition Centre Kooringal Road Exit - 5% - 10 years
Jubilee Park Synthetic Hockey Fields Replace - 5% - 10 years
Lawn Cemetery Master Plan Works - 6% - 10 years
Amount Borrowed
2017/18
2018/19
2019/20
2020/21
2021/22
2022/23
2023/24
2024/25
2025/26
2026/27
2027/28
TOTALS
100,000 Interest
0
0
4,000
3,667
3,320
2,960
2,585
2,195
1,790
1,369
930
22,817
Principal
0
0
8,329
8,662
9,009
9,369
9,744
10,134
10,539
10,961
11,399
88,145
0
0
12,329
12,329
12,329
12,329
12,329
12,329
12,329
12,329
12,329
110,962
Interest
0
0
7,080
6,490
5,877
5,239
4,576
3,886
3,169
2,422
1,646
40,386
Principal
0
0
14,743
15,332
15,945
16,583
17,247
17,937
18,654
19,400
20,176
156,017
0
0
21,823
21,823
21,822
21,822
21,823
21,823
21,823
21,823
21,823
196,402
Interest
0
0
0
79,908
73,555
66,884
59,880
52,525
44,803
36,695
28,181
442,432
Principal
0
0
0
127,061
133,414
140,085
147,089
154,443
162,165
170,274
178,787
1,213,317
0
0
0
206,969
206,969
206,969
206,969
206,969
206,969
206,969
206,969
1,655,749
Interest
0
0
0
11,250
10,356
9,416
8,430
7,395
6,308
5,166
3,968
62,289
Principal
0
0
0
17,889
18,783
19,722
20,708
21,744
22,831
23,972
25,171
170,820
0
0
0
29,139
29,139
29,139
29,139
29,139
29,139
29,139
29,139
233,108
Interest
0
0
0
0
0
45,000
41,586
37,967
34,131
30,065
25,755
214,503
Principal
0
0
0
0
0
56,901
60,315
63,934
67,770
71,836
76,146
396,902
0
0
0
0
0
101,901
101,901
101,901
101,901
101,901
101,901
611,406
177,000
1,598,157
225,000
750,000
WAGGA WAGGA CITY COUNCIL LONG TERM FINANCIAL PLAN
51
Appendix 7 - External Loan Projects and Debt Servicing continued BORROW YEAR
CAPITAL PROJECT
Amount Borrowed
TOTAL GENERAL DEBT SERVICING
29,770,223 Interest
2017/18
2018/19
2019/20
2020/21
2021/22
2022/23
2023/24
2024/25
2025/26
2026/27
2027/28
TOTALS
636,176
777,917
886,072
885,772
783,071
720,304
605,142
613,487
517,026
418,202
1,149,807
1,511,679
1,794,682
2,031,926
2,134,580
2,385,113
2,071,017
1,858,668
1,830,226
1,993,976
1,195,115 19,956,789
1,785,984
2,289,596
2,680,754
2,917,698
2,917,651
3,105,418
2,676,158
2,472,155
2,347,252
2,412,178
1,524,840 27.129.684
Interest
173,457
154,800
136,257
113,620
90,565
65,868
39,269
11,208
0
0
0
785,044
Principal
263,848
282,505
301,048
323,685
346,740
371,437
398,036
316,770
0
0
0
2,604,069
437,305
437,305
437,305
437,305
437,305
437,305
437,305
327,979
0
0
0
3,389,113
Interest
290,363
265,621
242,364
216,923
189,747
160,779
130,742
96,751
61,935
24,507
0
1,679,731
Principal
338,487
363,229
386,486
411,927
439,102
468,071
498,108
532,099
566,915
604,343
0
4,608,767
628,850
628,850
628,850
628,850
628,850
628,850
628,850
628,850
628,850
628,850
0
6,288,499
Interest
0
81,068
74,158
67,005
59,603
51,941
44,012
35,804
27,310
18,518
9,418
468,837
Principal
0
197,439
204,349
211,501
218,904
226,565
234,495
242,703
251,197
259,989
269,089
2,316,230
0
278,507
278,507
278,507
278,507
278,507
278,507
278,507
278,507
278,507
278,507
2,785,067
Interest
0
0
71,044
65,127
58,973
52,573
45,916
38,994
31,795
24,307
16,520
405,249
Principal
0
0
147,933
153,851
160,005
166,405
173,061
179,984
187,183
194,670
202,457
1,565,548
0
0
218,977
218,977
218,977
218,977
218,977
218,977
218,977
218,977
218,977
1,970,797
Principal
329,725
7,172,895
Airport Debt Servicing 2009/10
2011/12
2017/18
2018/19
52
Airport Pavement Upgrade 6.94% - 10 years (refinanced in 2014/15)
Develop Precinct 2A - 6.44% 15 years
Airport Masterplan - 3.5% - 10 years
Airport Masterplan - 4% - 10 years
3,133,340
6,015,614
2,316,230
1,776,104
Appendix 7 - External Loan Projects and Debt Servicing continued BORROW YEAR
CAPITAL PROJECT
2019/20
Airport - Bays 1-3 Upgrade 5% - 10 years
2020/21
2023/24
Airport - Carpark System Replacement - 5% - 10 years
Airport Taxiways Enrichment 6% - 10 years
TOTAL AIRPORT DEBT SERVICING
Amount Borrowed
2017/18
2018/19
2019/20
2020/21
2021/22
2022/23
2023/24
2024/25
2025/26
2026/27
2027/28
TOTALS
380,000 Interest
0
0
0
19,000
17,489
15,903
14,238
12,489
10,653
8,725
6,701
105,199
Principal
0
0
0
30,212
31,722
33,308
34,974
36,723
38,559
40,487
42,511
288,495
0
0
0
49,212
49,212
49,212
49,212
49,212
49,212
49,212
49,212
393,694
Interest
0
0
0
0
19,250
17,720
16,113
14,425
12,654
10,793
8,840
99,794
Principal
0
0
0
0
30,609
32,140
33,747
35,434
37,206
39,066
41,019
249,221
0
0
0
0
49,859
49,859
49,859
49,859
49,859
49,859
49,859
349,015
Interest
0
0
0
0
0
0
0
22,800
21,070
19,237
17,293
80,400
Principal
0
0
0
0
0
0
0
28,830
30,560
32,393
34,337
126,119
0
0
0
0
0
0
0
51,630
51,630
51,630
51,630
206,519
Interest
463,820
501,489
523,822
481,676
435,628
364,784
290,289
232,472
165,416
106,087
58,772
3,624,254
Principal
602,335
843,172
1,039,817
1,131,175
1,227,082
1,297,926
1,372,421
1,372,542
1,111,619
1,170,948
589,413 11,758,450
1,066,155
1,344,661
1,563,639
1,612,851
1,662,710
1,662,710
1,662,710
1,605,014
1,277,035
1,277,035
648,185 15,382,704
Interest
48,510
44,376
40,491
36,240
31,700
26,861
21,842
16,164
10,347
4,094
0
280,625
Principal
56,549
60,683
64,568
68,819
73,359
78,198
83,217
88,895
94,712
100,965
0
769,965
105,059
105,059
105,059
105,059
105,059
105,059
105,059
105,059
105,059
105,059
0
1,050,590
385,000
380,000
14,386,288
Stormwater Levy Debt Servicing 2011/12
Remediate Wollundry Lagoon 6.44% - 15 years
TOTAL STORMWATER LEVY DEBT SERVICING
1,005,000
WAGGA WAGGA CITY COUNCIL LONG TERM FINANCIAL PLAN
53
Appendix 7 - External Loan Projects and Debt Servicing continued BORROW YEAR
CAPITAL PROJECT
Amount Borrowed
2017/18
2018/19
2019/20
2020/21
2021/22
2022/23
2023/24
2024/25
2025/26
2026/27
2027/28
TOTALS
2,319,305
2,269,721
2,216,438
2,159,180
2,097,651
2,031,531
1,960,479
1,884,127
1,802,078
1,713,909
1,619,162 22,073,582
664,659
714,243
767,526
824,784
886,313
952,433
1,023,485
1,099,837
1,181,886
1,270,055
1,364,802 10,750,022
2,983,964
2,983,964
2,983,964
2,983,964
2,983,964
2,983,964
2,983,964
2,983,964
2,983,964
2,983,964
2,983,964 32,823,604
Interest
3,467,811
3,593,503
3,666,823
3,562,868
3,348,050
3,143,480
2,877,752
2,746,250
2,494,867
2,242,292
2,007,659 33,151,355
Principal
2,473,350
3,129,777
3,666,593
4,056,703
4,321,334
4,713,671
4,550,139
4,419,942
4,218,443
4,535,944
3,149,330 43,235,227
5,941,161
6,723,280
7,333,416
7,619,572
7,669,384
7,857,151
7,427,891
7,166,192
6,713,310
6,778,236
5,156,989 76,386,582
Sewer Fund Debt Servicing 2007/08
Sewer 2010 - 7.1% - 30 years
36,000,000 Interest Principal
TOTAL SEWER DEBT SERVICING CONSOLIDATED DEBT SERVICING
54
81,161,511
Appendix 8a - One-Off Capital Projects 2018/19 - 2027/28 Ref
Project Title
Funding Source
2018/19
2019/20
2020/21
2021/22
1,324,500
1,246,000
2022/23
2023/24
2024/25
2025/26
2026/27
2027/28
Financial Sector 1
South Estella Park - Embellishment of S94* (New Plan still to open space be adopted) (OS28)
2
Estella - Neighbourhood Open Space S94* Works - Walking Path
3
Jubilee Park - Replace existing synthetic surfaces at the Jubilee Park Hockey Complex
Hockey Assoc Contrib $200,000 + Infrastructure Reserve $200,000 + Borrowings $225,000
4
Replace Softfall - Botanic Gardens Adventure Playground
GPR
5
Exhibition Centre - Kooringal Road Exit
Borrowings (GPR Future Years Loan Repayments)
6
Active Transport Plan - 5 corridors totalling 45 kilometres
Grant Funding
7
Lineal Park Boorooma (Promenade - Amundsen) - Corridor Recreation Improvements
S94*
245,000
8
Construction of Mt Austin Neighbourhood Park (Harris Park OS10)
S94A*
161,000
9
Remediate Lake Albert Foreshore, Eastlake Dr Reserve
GPR $28,000 (Tfrd from Renew Rec Facilities budget) + $83,835 RMS Grant Funds
111,835
10
Riverside - Hampden Bridge Legacy Project
Grant Funding $75,067 + GPR Carryover Reserve $259,933
335,000
GPR Carryover Reserve $495 + Grant $20,000 + Parks & Rec Reserve $49,500
69,995
11 Uranquinty Skate Park
31,816
625,000
84,840 177,000
1,598,157
5,676,300
5,676,300
WAGGA WAGGA CITY COUNCIL LONG TERM FINANCIAL PLAN
55
Appendix 8a - One-Off Capital Projects 2018/19 - 2027/28 continued Ref
Project Title
12 Video Conferencing Hardware
Funding Source Information Services Reserve
Total Capital Works - Financial Sector
2018/19
2019/20
2020/21
2021/22
2022/23
2023/24
2024/25
2025/26
2026/27
2027/28
7,984,297
1,324,500
1,246,000
0
0
0
0
0
0
0
0
0
0
0
0
0
10,000 6,817,946
Community Sector Art Gallery Customer Service 13 Infrastructure - Upgrade Customer Service Desk
Art Gallery Reserve
11,110
GPR
30,097
15 Public Art - Living Spaces
Public Art Reserve
35,000
35,000
35,000
16 Public Art - Living Communities
Public Art Reserve
10,000
10,000
10,000
17 Public Art - Living Lights - Nightlights
Public Art Reserve
20,200
20,200
20,200
Public Art - Living Lights - Brightlights Public Art Reserve - Youth based projection program
10,100
10,100
10,100
14
18
Art Gallery Lighting Stopgap - 30 spotlights
19 Public Art - River Life
Public Art Reserve
Contrib (Riv Water/ Birramal Conservation Area Lookout - Origin Energy) $60K 20 Walking Track + Env Conservation Reserve $20K Marrambidya Wetland Walking Track 21 Extension
Contrib (Origin Energy) $30K + GPR $14K (tfrd from Biodiversity Project)
Total Capital Works - Community Sector
52,083 80,295
44,440 241,242
75,300
127,383
Commercial Operations Sector Lawn Cemetery Master Plan Stage 22 2A Works - New burial area, outdoor chapel and water feature 23
56
Wagga Wagga Lawn Cemetery & Crematorium Office Refurbishment
Borrowings (Cemetery Capital Reserve Future Years Loan Repayments) Cemetery Capital Reserve
750,000
500,000
Appendix 8a - One-Off Capital Projects 2018/19 - 2027/28 continued Ref 24
Project Title Wagga Wagga Lawn Cemetery & Crematorium Furnace Reline
Parks Smart Irrigation Pilot - To 25 assess the water saving capabilities of the irrigation system 26
Amundsen Bridge - Boorooma East to Boorooma
Sewer - Pump Station - SPS02 27 Forsyth Street - Renewals Refurbishment of current wells
Funding Source Cemetery Capital Reserve Internal Loans Reserve (Water savings payback - 2 Year Loan Repayments) S94*
2018/19
2019/20
2020/21
2021/22
Sewer - Pump Station - SPS06 Shaw Sewer Reserve Street - Renewals
29
Sewer - Pump Station - SPS09 Cartwrights Hill - Renewals
Sewer Reserve
Sewer - Pump Station - SPS23 30 Ashmont - New Assets - New pump station and rising main
Sewer Reserve
Sewer - Pump Station - SPS24 31 Lakehaven West - New Assets Pump replacement and upsizing
Sewer Reserve
Sewer - Pump Station - SPS39 32 Copland Street - New Assets - New pump station
Sewer Reserve
Sewer - Pump Station - SPS41 33 Glenfield East - New Assets - New pump station
Sewer Reserve
Sewer Treatment Works - Forest Hill Plant - New Assets
Sewer Reserve
36
Sewer - Pump Station - SPS31 Uranquinty - Renewals
Sewer Reserve
2024/25
2025/26
2026/27
2027/28
50,500
505,000 600,000 280,000 50,000 1,270,543
200,000
822,870
61,421
414,910
100,000
Sewer - Pump Station - SPS49 34 Springvale - New Assets - New pump Sewer Reserve station 35
2023/24
100,000
Sewer Reserve
28
2022/23
1,710,893
1,076,386
15,352
581,105
1,193,677 520,000
WAGGA WAGGA CITY COUNCIL LONG TERM FINANCIAL PLAN
57
Appendix 8a - One-Off Capital Projects 2018/19 - 2027/28 continued Ref
Project Title
37
Sewer - Pump Station - SPS 08 Boorooma - Increase Pump Capacity
Funding Source
2018/19
Sewer Reserve
76,689
Sewer - Pump Station - SPS 08 38 Boorooma - Emergency/Wet Weather Sewer Reserve Detention STG
254,414
39
Sewer - Ashmont SPS, Rising Main & Sewer Reserve Gravity Main Upgrade
Re-use Water - Additional 40 infrastructure to meet quality requirements 41
Automation of Pump Stations Variable Speed Drive Installation
100,000
2021/22
554,671 1,224,096
150,000
Sewer - Pump Station - SPS22 42 Elizabeth Avenue, Forest Hill - New Assets
Sewer Reserve
700,000
Sewer - Pump Station - SPS01 + 43 SPS02 Sewer Rising Main Network Diversion
Sewer Reserve
801,984
44
Sewer - Pump Station - SPS30 Bomen - New Assets
Sewer Reserve
1,830,000
45
Sewer - Pump Station - SPS15 Hammond Avenue - Renewals
Sewer Reserve
1,580,000
46
Upgrade Airconditioning - Civic Centre
S94* Civic Building Recoupment
990,599
47
Civic Building Energy Efficiency Project - Civic Building Solar Panels
Sustainable Energy Reserve
125,000
48
Buildings - Civic Theatre - AirConditioning Upgrade
Civic Theatre Operating Reserve $151,500 + GPR $151,500
49
Accessible Adult Changeroom Stage 2
GPR
191,891
Civic Centre S94 Recoupment (CR2)
115,988
58
2020/21
Sewer Reserve Sewer Reserve
Civic Centre Entrance Canopy - To 50 protect from weather and better identify the building entrance
2019/20
150,000
250,000
303,000
250,000
2022/23
2023/24
2024/25
2025/26
2026/27
2027/28
Appendix 8a - One-Off Capital Projects 2018/19 - 2027/28 continued Ref
Project Title
Funding Source
2018/19
51 Survey Equipment
Plant Reserve
52 Lake Albert Control Gates
Internal Loans Reserve
230,000
53 New Footpaths
GPR Carryover Reserve
100,000
54 Equex Multi Purpose Stadium
NSRF Grant $2,681,359 + Borrowings $1,691,321 + Netball Contribution $125,000
4,497,680
55 Eunony Bridge Replacement
Grant $9,813,000 + GPR Carryover Reserve $42,380
9,855,380
56
Upgrade Main City (1 in 100) + North Wagga (1 in 20) Levee Systems
Special Rate Variation (SRV) $6.5M + Grant $13.4M + GPR $0.1M
Total Capital Works - Commercial Operations Sector
2019/20
2020/21
2021/22
2022/23
2023/24
2024/25
2025/26
50,000
10,062,609
4,871,590
5,115,169
34,681,954
6,647,460
7,880,734
2026/27
2027/28
50,000
3,391,903
1,030,262
1,101,105
0
550,000
0
0
Commercial Development Sector 57 GWMC - Road Rehabilitation
Solid Waste Reserve
300,000
58
GWMC - Progressive Site Rehabilitation
Solid Waste Reserve
230,000
59
GWMC - Purchase of Large Cardboard Compactor
Solid Waste Reserve
250,000
Solid Waste Reserve
1,493,270
Solid Waste Reserve
200,000
60 GWMC - Additional Leachate Pond 61
GWMC - Hard Stand for Landfill Sorting
62 LMC CCTV & security (partial)
LMC Reserve
63 LMC new sheep drafts
LMC Reserve
461,298
64 LMC new sheep stacking pens
LMC Reserve
83,467
65 LMC new sheep delivery pens
LMC Reserve
2,274,496
LMC Light Vehicle Traffic Management
LMC Reserve
66
41,734
1,307,660 WAGGA WAGGA CITY COUNCIL LONG TERM FINANCIAL PLAN
59
Appendix 8a - One-Off Capital Projects 2018/19 - 2027/28 continued Ref
Project Title
67 LMC new circulating road (partial) 68
Funding Source
Implement a Wifi Network throughout LMC Reserve the LMC Operational Area
69 Airport - Bays 1-3 Upgrade
Airport - Car park system 70 replacement
External Borrowings (Airport Reserve Future Years Loan Repayments)
Airport - Reseal Don Kendell and 71 Welsh Drives
External Borrowings (Airport Reserve Future Years Loan Repayments)
Borrowings (Airport Airport - Redevelop terminal - Internal Reserve - Future Years Baggage Claim and Retail Section Loan Repayments)
222,200
380,000
385,000
216,645
1,000,000
Grant
74 Airport - Lighting Cabinet Upgrade
Borrowings (Airport Reserve - Future Years Loan Repayments)
98,909
75 Airport - Runway Lighting Upgrade
Borrowings (Airport Reserve - Future Years Loan Repayments)
416,000
Borrowings (Airport 76 Airport - Carpark Equipment Upgrade Reserve - Future Years Loan Repayments)
44,550
77 Airport - Taxiway C shoulders
36,000
60
Oasis - Tile Repairs & Floor Resurfacing
2020/21
Airport Reserve Oasis Building Renewal Reserve $121,000 + Grant $169,000
2021/22
2022/23
2023/24 2,086,693
Airport - Design + Construct 73 Upgrade to Code C: Taxiways A, B, D, E
78
2019/20
LMC Reserve
External Borrowings (Airport Reserve Future Years Loan Repayments)
72
2018/19
2,350,000
290,000
2024/25
2025/26
2026/27
2027/28
Appendix 8a - One-Off Capital Projects 2018/19 - 2027/28 continued Ref
Project Title
Funding Source
2018/19
2019/20
2020/21
79 Oasis - Diving Board Replacements
Oasis Building Renewal Reserve
80 Oasis - Filter Sand for All Pools
Oasis Plant Reserve
81
Oasis - Chemical Controller Equipment (All Pools)
Oasis Plant Reserve
130,000
82
Oasis - Circulation pumps (All Pools) Oasis Plant Reserve Replacement
145,000
83
Oasis - Chlorine & Acid pumps (All Pools) - Replacement
Oasis Plant Reserve
84
Oasis - Pool Heating Systems (All Pools)
Oasis Plant Reserve
Total Capital Works - Commercial Development Sector TOTAL LTFP CAPITAL PROGRAM
2021/22
2022/23
2023/24
2024/25
2025/26
2026/27
2027/28
30,300 195,000
60,000 200,000 6,847,574
610,300
720,000
0
2,819,261
3,931,087
0
0
0
0
48,588,716 15,317,357 10,052,617
4,637,903
3,849,523
5,032,192
0
550,000
0
0
* Timing of project is subject to receipt of sufficient Section 94, Section 94A and DSP funds
WAGGA WAGGA CITY COUNCIL LONG TERM FINANCIAL PLAN
61
Appendix 8b - Recurrent Capital Projects 2018/19 - 2027/28 Ref
Project Title
Funding Source
2018/19
2019/20
2020/21
2021/22
2022/23
2023/24
2024/25
2025/26
2026/27
2027/28
Financial Sector 1
Implement Sportsgrounds Lighting Program Anderson Oval (Mt Austin)
GPR $180,000 + Contrib $144,500
2
Implement Sportsgrounds Lighting Program - Frenchs Field (Mt Austin)
GPR $180,000 + Contrib $122,500
3
Implement Sportsgrounds Lighting Program Estella
GPR $180,000 + Contrib $150,000
4
Implement Sportsgrounds Lighting Program Jack Misson Oval (Ashmont)
GPR $180,000 + Contrib $144,500
5
Renew Recreational GPR Assets
6
Renew Parks Facilities
7
Renew Playground Equipment
324,500
302,500
330,000
324,500
22,497
23,397
24,333
25,306
26,319
27,371
28,466
29,605
30,789
32,021
GPR
122,533
127,434
132,532
137,833
143,346
149,080
155,043
161,245
167,695
174,403
GPR
325,000
100,000
160,000
40,000
20,000
80,000
180,000
340,000
281,000
300,000
8
Renew Recreational GPR Facilities
116,383
150,158
156,164
162,411
168,907
175,664
182,690
189,998
197,598
205,502
9
Replace Plant and Equipment
Plant Reserve $2.43M + Plant Sales $0.93M (amounts vary each fin yr)
3,378,500
2,427,600
4,549,000
4,946,500
2,503,000
4,121,100
5,420,200
3,645,200
3,871,000
2,684,600
10
18/19 - GPR $695,000 Corporate Hardware + Information Services Purchases Reserve $100,000, 19/20 onwards - GPR
795,000
433,000
645,000
757,000
415,000
395,000
393,000
910,000
732,000
450,000
4,759,913
3,564,090
5,991,529
6,399,050
3,601,072
4,948,215
6,359,400
5,276,048
5,280,082
3,846,525
Total Capital Works - Financial Sector 62
Appendix 8b - Recurrent Capital Projects 2018/19 - 2027/28 continued Ref
Project Title
Funding Source
2018/19
2019/20
2020/21
2021/22
2022/23
2023/24
2024/25
2025/26
2026/27
2027/28
Community Sector 11
Upgrade of Backstage Equipment - Civic Theatre
GPR
11,249
11,699
12,167
12,653
13,159
13,686
14,233
14,802
15,394
16,010
12
Acquire pieces for the Australian Print Collection
GPR
8,874
9,189
9,517
9,857
10,212
10,580
10,963
11,362
11,776
12,207
13
Acquire pieces for the National Art Glass Collection
GPR
22,185
22,973
23,791
24,643
25,529
26,450
27,408
28,404
29,440
30,518
42,308
43,860
45,475
47,154
48,900
50,716
52,604
54,568
56,611
58,735
Total Capital Works - Community Sector Commercial Operations Sector 14
Upgrade Existing Bus Shelters
15
Implement unfunded Traffic Committee GPR resolutions as adopted by Council
50,000
50,000
50,000
50,000
50,000
50,000
50,000
50,000
50,000
50,000
16
Implement Street Lighting Improvements Program - Roads and Traffic Facilities (as per schedule)
GPR
50,000
50,000
50,000
50,000
50,000
50,000
50,000
50,000
50,000
50,000
17
Capital renewal reseal program
GPR + Regional Roads Block Grant $313,892 (incrementing 3% each yr)
1,656,715
1,729,233
1,807,233
1,891,210
1,981,709
2,076,539
2,176,212
2,274,142
2,376,478
2,471,538
18
Conduct Urban Asphalt Program
GPR
786,313
818,440
851,852
886,599
922,737
960,320
999,406
1,040,041
1,082,297
1,125,589
GPR
20,000
20,000
20,000
20,000
20,000
WAGGA WAGGA CITY COUNCIL LONG TERM FINANCIAL PLAN
63
Appendix 8b - Recurrent Capital Projects 2018/19 - 2027/28 continued Ref
Project Title
Funding Source
2018/19
2019/20
2020/21
2021/22
2022/23
2023/24
2024/25
2025/26
2026/27
2027/28
3,181,543
3,326,060
3,481,553
3,649,011
3,829,525
4,018,713
4,209,302
4,381,282
4,560,126
4,742,531
19
Pavement Rehabilitation Program
2018/19 -R2R Grant $841,526 + Regional Roads Block Grant $571,298 + GPR Balance, 2019/20 onwards -R2R + Regional Roads Block Grants (R2R 3% + Block 2% increment each year) + GPR Balance
20
Replace Kerb and Gutter
GPR
455,215
474,038
493,614
513,973
535,147
557,167
580,067
603,870
628,622
653,767
21
Gravel Resheets
GPR
1,548,264
1,614,079
1,682,525
1,753,709
1,827,738
1,904,728
1,984,797
2,067,981
2,154,476
2,240,655
22
Renew and Replace GPR Culverts
551,650
575,261
599,816
625,353
651,911
679,531
708,256
738,094
769,119
799,884
23
Eliminate Sewer Joint Connections
Sewer Reserve
50,750
51,511
52,284
53,068
53,864
54,672
55,492
56,325
57,169
58,027
24
Implement renewal program for Gravity Sewer
Sewer Reserve
137,917
142,055
146,316
150,706
155,227
159,884
164,680
169,621
174,709
179,950
25
Implement Sewer Mains Rehabilitation Sewer Reserve Program
1,236,000
1,273,080
1,311,272
1,350,611
1,391,129
1,432,863
1,475,849
1,520,124
1,565,728
1,612,700
26
Replacement and Renewal of Sewer Plant
51,511
52,284
53,068
53,864
54,672
55,492
56,325
57,169
58,027
58,897
27
Renew Community Amenities - Frenchs GPR Fields
28
Renew Community Amenities Anderson Oval
GPR
29
Norman Duck Amenities Upgrade
GPR
64
Sewer Reserve
208,668
214,928 137,360
Appendix 8b - Recurrent Capital Projects 2018/19 - 2027/28 continued Ref
Project Title
Funding Source
30
Renew Community Amenities - Kessler Park
GPR
31
Renew Community Amenities - Forest Hill Oval
GPR
32
Renew Community Amenities Uranquinty Sports Ground
GPR
33
Renew Community Amenities - Jubilee/ Connolly Park
GPR
34
Renew Community Amenities - Gissing Oval
GPR
35
Renew Community Amenities - Tarcutta GPR Public Convenience
36
Renew Community Amenities - Apex Park
2018/19
2019/20
2020/21
2021/22
2022/23
2023/24
2024/25
2025/26
2026/27
2027/28
221,375
228,016
234,856
241,901
249,158
256,633
GPR
264,332
Total Capital Works - Commercial Operations Sector
9,964,548
10,390,969
10,716,894
11,269,480
11,731,675
12,254,764
12,752,287
13,277,807
13,783,386
14,327,871
TOTAL LTFP CAPITAL PROGRAM
14,766,768
13,998,919
16,753,898
17,715,683
15,381,647
17,253,695
19,164,291
18,608,423
19,120,078
18,233,131
* Timing of project is subject to receipt of sufficient Section 94, Section 94A and DSP funds
WAGGA WAGGA CITY COUNCIL LONG TERM FINANCIAL PLAN
65
Appendix 8c - Capital Program Potential Projects List 2018/19 - 2027/28 The principles established to determine the treatment and categorisation of capital works projects into the potential projects list includes any projects that are pending development; unclear project description; projects that have not yet commenced; or projects where joint funding has not yet been confirmed. Projects can be transferred from the potential projects list to the capital works delivery program during the 2018/19 financial year via budget variations presented to Council monthly for adoption. Ref
Project Title
Funding Source
2018/19
2019/20
2020/21
2021/22
2022/23
2023/24
2024/25
2025/26
2026/27
2027/28
Financial Sector 1
Riverside Wagga - Wagga Beach S94* (New Plan still to be Landscape Upgrade Stage 2 adopted)
841,753
2
Riverside - Wagga Beach Car Park upgrade including CCTV and lighting
CBD Carparking Reserve $110,302 + Grant funding $224,165
334,466
3
Constuct a Multisport Cycling Complex at Pomingalarna Reserve
S94* (New Plan still to be adopted)
400,000
800,000
800,000
4
Northern Sporting Precinct - Sports grounds and play equipment
S94* Plan $5,979,000 (New Plan still to be adopted) + GPR $199,643 + S94 (Old Plan) $121,838 + Estella Community Centre Reserve $178,519 + Borrowings $100,000 (GPR - Future Years Loan Repayments)
1,800,000
3,200,000
1,579,000
5
Implement Sportsgrounds Lighting Program - McPherson Oval (Nth Wagga)
GPR $180,000 + Contrib $177,000
6
Implement Sportsgrounds Lighting Program - Harris Park (Mt Austin)
GPR $180,000 + Contrib $282,000
Total Potential Projects - Financial Sector
841,753
357,000
462,000 3,376,219
5,303,753
2,736,000
0
0
0
0
0
0
0
45,000
45,000
45,000
45,000
45,000
45,000
45,000
45,000
45,000
45,000
45,000
45,000
45,000
45,000
Community Sector 7
Public Art Projects - TBA
Public Art Reserve
Total Potential Projects - Community Sector
66
0
0
0
Appendix 8c - Capital Program Potential Projects List 2018/19 - 2027/28 continued Ref
Project Title
Funding Source
2018/19
2019/20
2020/21
2021/22
1,408,775
1,408,775
2022/23
2023/24
2024/25
2025/26
2026/27
2027/28
Commercial Operations Sector 8
Glenfield Road Corridor – Works to improve traffic flow (RT16)
S94*
390,000
9
Glenfield Road/Pearson St - Red Hill Rd to Dobney Ave Widening S94* to 4 lanes (Full length-3 km)
90,000
150,000
1,144,272
Bakers Lane Widening + 10 Intersection Upgrades Sturt Hwy S94* & Inglewood Rd)
341,945
11
Kooringal Road - Works to improve traffic flow (RT30)
S94*
90,000
12
Old Narrandera Road - Second Carriageway for 600m
2018/19 - S94* $90,000 + 2020/21 - S94* $637,428 + 2021/22 - S94A* $100,000
90,000
637,428
13
Old Narrandera Road/Olympic Highway Intersection
2018/19 - S94* $90,000 + 2020/21 - S94A* $100,000 + S94* $477,886
90,000
577,886
14 Pine Gully Road Roundabout
S94*
15 Pine Gully Road - Bike Track
S94*
30,000 90,000
16
Pine Gully Road - Second Carriageway for 1.2km
2018/19 - S94 $90,000 + 2023/24 - S94A* $100,000 + S94* $1,740,965
17
Pine Gully Road/Old Narrandera Road - Intersection Upgrade
S94*
Red Hill Rd – Widen to 4 lanes Plumpton Rd to Glenfield Plus 18 widening at Dalman & Yentoo 2.7km
1,079,768
200,000
180,000
100,000
1,300,000 96,510 1,840,965
877,439
S94*
144,790
19
Red Hill Road and Hudson Drive – Intersection improvements
S94*
10,000
20
Boorooma Street Slip Lane into Boorooma West
S94*
297,000
21
Bourke Street and Bourkelands Drive Intersection Upgrade
S94*
100,000
620,475
100,000
91,164
WAGGA WAGGA CITY COUNCIL LONG TERM FINANCIAL PLAN
67
Appendix 8c - Capital Program Potential Projects List 2018/19 - 2027/28 continued Ref
Project Title
Funding Source
2018/19
Red Hill Rd â&#x20AC;&#x201C; Widen to 4 lanes Plumpton Rd to Glenfield Plus 22 widening at Dalman & Yentoo 2.7km
S94*
90,000
Harris Road/Pine Gully Road Dual Lane Roundabout
S94*
1,201,000
Fit for the Future Reserve $4,392,066 + S94 $1,620,000 + Infrastructure Reserve $107,934
6,120,000
23
24 Farrer Road Improvements
2019/20
2020/21
2021/22
2022/23
2023/24
2024/25
2025/26
2026/27
2027/28
25
Supplementary Regional Roads Block Grant - project TBA
Block Grant -Supp
199,000
199,000
199,000
199,000
199,000
199,000
199,000
199,000
199,000
199,000
26
Regional Roads Repair Block Grant - project TBA
Repair Block Grant
400,000
400,000
400,000
400,000
400,000
400,000
400,000
400,000
400,000
400,000
27
Implement Pedestrian Access and Mobility Program (PAMP)
Grant $42,000 + GPR $42,000
84,000
84,000
84,000
84,000
84,000
84,000
84,000
84,000
84,000
84,000
Grant $30,000 + GPR $30,000
60,000
60,000
60,000
60,000
60,000
60,000
60,000
60,000
60,000
60,000
100,000
597,803
265,494
28 Implement Cycleways 29
Sewer - Gravity Network Extension - New Assets
Sewer Reserve
195,000
30
Sewer - Pump Station - SPS15 Sewer Reserve Hammond Avenue - New Assets
130,000
31
Renew Sewage Treatment Works Sewer Reserve - Tarcutta
95,000
Implement Stormwater Drainage Improvements - Jubilee Oval to 32 Red Hill Rd - Wagga West DSP Area
Stormwater DSP * $265,580 + Civil Projects Reserve $24,000
289,580
Undertake Stormwater Drainage Stormwater DSP * $119,102 Upgrade - Contour Ridge (Lloyd) 33 + Stormwater Drainage approx 5 km - Wagga West DSP Reserve $9,600 Area
128,702
Undertake Stormwater Drainage Stormwater DSP * $248,129 34 Upgrade - Day, Higgins, Tarcutta + Stormwater Drainage St - Wagga West DSP Area Reserve $20,000
268,129
68
Appendix 8c - Capital Program Potential Projects List 2018/19 - 2027/28 continued Ref
Project Title
Improve Stormwater drainage - Kincaid St end to Flowerdale 35 pumping station - Wagga West DSP Area 36
Stormwater DSP Project Allocation - TBA
Funding Source
2018/19
2019/20
Stormwater DSP * $771,200 + Civil Projects $28,800
2020/21
2022/23
2023/24
2024/25
2025/26
2026/27
2027/28
800,000
Stormwater DSP*
500,000
Glenfield Road Drainage 37 Remediation (North of Fernleigh Rd)
Stormwater DSP* $1,000,000 + Stormwater Levy $500,000
38 Murray St Stormwater Project
Stormwater Levy
200,000
500,000
500,000
500,000
500,000
500,000
500,000
216,350
2,000,000
1,459,350
5,083,965
2,472,768
2,532,062
1,863,475
1,684,945
200,000
6,000,000
1,500,000
39
Tarcutta Drainage Upgrade & Supplementary Levee
RMS Contrib- ution
406,000
40
Civic Building Energy Efficiency Project - Library Lights
S94* Civic Building Recoupment
28,000
Civic Building Energy Efficiency 41 Project - Historic Council Chambers Lights
S94* Civic Building Recoupment
88,809
Civic Building Energy Efficiency 42 Project - Art Gallery & Glass Gallery Lights
S94* Civic Building Recoupment
399,278
43 Bolton Park Stadium Upgrade
Borrowings $1,847,693 + S94* $68,657 + Royal Lifesaving NSW Contrib $300,000
Total Potential Projects - Commercial Ops Sector
2021/22
3,000,000
12,653,088
5,011,603
150,000
4,242,000
6,847,813
3,017,269
Commercial Development Sector GWMC - Construction of a 44 new Waste Cell (Design + Construction)
Solid Waste Reserve
45 GWMC - Weighbridge Relocation Solid Waste Reserve GWMC - Asset Renewals 46 (Transfer Stations, Leachate systems) 47
GWMC - Renewal of the Rural Transfer
500,000
Solid Waste Reserve Solid Waste Reserve
200,000 400,000 WAGGA WAGGA CITY COUNCIL LONG TERM FINANCIAL PLAN
69
Appendix 8c - Capital Program Potential Projects List 2018/19 - 2027/28 continued Ref 48
Project Title GWMC - Alternate Waste Treatment Facility
Funding Source
2018/19
Solid Waste Reserve
1,735,000
49 GWMC - Constuct RRC
Solid Waste Reserve
1,700,000
50 GWMC - Solar Panels
Solid Waste Reserve
30,000
51
GWMC - Gas Flare Extension Mini Station
Solid Waste Reserve
40,000
52
GWMC - Organic Processing Plant
Solid Waste Reserve
3,000,000
53
GWMC - Transfer Station Asphalting
Solid Waste Reserve
125,000
Solid Waste Reserve
50,000
54 GWMC - Office Space 55
Solid Waste Reserve GWMC - Establish a Community $73,514 + Grant funding Recycling Centre (CRC) $200,000
273,514
56
GWMC - Establish an Automated Solid Waste Reserve Partner Site for CDS
273,267
57
GWMC - Benevap Leachate Evaporation Unit
Solid Waste Reserve
GWMC - Purchase the gas flare 58 and assets from AGL and extend Solid Waste Reserve the gas capture infrastructure
2019/20
2021/22
2022/23
2023/24
2024/25
2025/26
2026/27
2027/28
221,217 450,000
59
Airport - Taxiways A, B, D, E, F enrichment
2022/23 - External Borrowings (Airport Reserve - Future Years Loan Repayments) + 2023/24 Airport Reserve
60
Oasis Initiatives from the Energy Audit Review
Oasis Plant Reserve
500,000
61 Oasis Water Slide
S94* - Oasis Recoupment
850,000
62 Oasis Splash Pad water feature
S94* - Oasis Recoupment
680,000 4,463,217
380,000
380,000
0
0
Total Potential Projects - Commercial Dev Sector
10,256,781
500,000
200,000
0
580,000
6,380,000
0
0
0
TOTAL LTFP POTENTIAL PROJECTS
26,286,088 14,778,573 10,083,813
3,262,269
1,504,350
5,708,965
8,897,768
2,577,062
1,908,475
1,729,945
* Timing of project is subject to receipt of sufficient Section 94, Section 94A and DSP funds 70
2020/21
Appendix 9 - Wagga Wagga Regional Airport Ten Year Financial Plan BUDGET 2018/19
Estimated Reserve Balance at start of the year
BUDGET 2019/20
BUDGET 2020/21
BUDGET 2021/22
BUDGET 2022/23
BUDGET 2023/24
BUDGET 2024/25
BUDGET 2025/26
BUDGET 2026/27
BUDGET 2027/28
527,798
686,250
715,875
698,507
677,782
584,603
589,973
284,508
697,454 1,076,867
(4,195,128)
(4,299,653)
(4,407,104)
(4,517,584)
(4,631,200)
(4,748,068)
(4,868,304)
(4,992,036)
(5,145,306)
(5,277,280)
(260,664)
(267,166)
(273,134)
(279,945)
(286,926)
(294,080)
(301,413)
(308,934)
(321,467)
(331,735)
Grants & Contributions provided for Capital Purposes
(2,350,000)
0
0
0
0
0
0
0
0
0
Revenue From Continuing Operations
(6,805,792) (4,566,819) (4,680,238) (4,797,529) (4,918,126) (5,042,148) (5,169,717) (5,300,970) (5,466,773) (5,609,015)
Revenue From Continuing Operations User Charges & Fees Other Revenues
Expenses From Continuing Operations Employee Benefits & On-Costs
494,524
514,070
534,394
555,529
577,506
600,359
624,124
648,835
671,469
697,848
Borrowing Costs
504,087
526,174
483,778
437,477
366,376
291,621
233,539
166,214
106,613
59,021
Materials & Contracts
2,080,555
2,115,390
2,184,402
2,210,731
2,356,922
2,332,994
2,397,008
2,462,897
2,607,357
2,585,860
Depreciation & Amortisation
2,895,151
2,895,151
2,895,151
2,895,151
2,895,151
2,895,151
2,895,151
2,895,151
2,895,151
2,895,151
321,002
341,743
363,857
387,434
412,575
439,382
467,970
498,458
530,973
565,654
6,295,318
6,392,527
6,461,582
6,486,322
6,608,530
6,559,507
6,617,791
6,671,555
6,811,562
6,803,534
(510,474)
1,825,708
1,781,344
1,688,794
1,690,403
1,517,359
1,448,074
1,370,585
1,344,789
1,194,518
1,839,526
1,825,708
1,781,344
1,688,794
1,690,403
1,517,359
1,448,074
1,370,585
1,344,789
1,194,518
4,162,104
380,000
385,000
0
0
0
0
0
0
0
0
0
0
0
0
380,000
380,000
0
0
0
843,172
1,039,817
1,131,175
1,227,082
1,297,926
1,372,421
1,372,542
1,111,619
1,170,948
589,413
(1,776,104)
(380,000)
(385,000)
0
0
(380,000)
0
0
0
0
176,452
29,626
(17,368)
(20,725)
(93,179)
5,370
(305,466)
412,947
379,413
1,111,220
Total Capital and Reserve Movements
3,405,625
1,069,443
1,113,807
1,206,357
1,204,747
1,377,791
1,447,076
1,524,566
1,550,361
1,700,632
Net Result
2,895,151
2,895,151
2,895,151
2,895,151
2,895,151
2,895,151
2,895,151
2,895,151
2,895,151
2,895,151
Other Expenses Expenses From Continuing Operations Net Operating (Profit)/Loss Net Operating Result before Grants and Contributions provided for Capital Purposes Capital and Reserve Movements Capital Expenditure - Renewals Capital Expenditure - Project Concepts Loan Repayments New Loan Borrowings Net Movements to/(from) Reserves
WAGGA WAGGA CITY COUNCIL LONG TERM FINANCIAL PLAN
71
Appendix 9 - Wagga Wagga Regional Airport Ten Year Financial Plan continued BUDGET 2018/19 Add back Depreciation Expense (non-cash)
BUDGET 2020/21
BUDGET 2021/22
BUDGET 2022/23
BUDGET 2023/24
BUDGET 2024/25
BUDGET 2025/26
BUDGET 2026/27
BUDGET 2027/28
2,895,151
2,895,151
2,895,151
2,895,151
2,895,151
2,895,151
2,895,151
2,895,151
2,895,151
2,895,151
0
0
0
0
0
0
0
0
0
0
686,250
715,875
698,507
677,782
584,603
589,973
284,508
697,454
1,076,867
2,188,087
Cash Budget (Surplus)/Deficit Estimated Reserve Balance at end of the year
BUDGET 2019/20
Appendix 10 - Livestock Marketing Centre Ten Year Financial Plan BUDGET 2018/19 Estimated Reserve Balance at start of the year
BUDGET 2019/20
BUDGET 2020/21
BUDGET 2021/22
BUDGET 2022/23
BUDGET 2023/24
BUDGET 2024/25
8,937,900 10,999,631 10,349,663
BUDGET 2025/26
BUDGET 2026/27
BUDGET 2027/28
4,394,024
5,540,787
7,125,371
9,212,338 11,661,546 14,231,757 16,928,323
0
0
0
0
0
0
0
0
0
0
(5,494,270)
(5,876,425)
(6,286,316)
(6,726,009)
(6,980,981)
(7,245,972)
(7,521,379)
(7,807,617)
(8,105,070)
(8,414,224)
0
0
0
0
0
0
0
0
0
0
(42,535)
(41,648)
(40,724)
(42,360)
(44,062)
(45,832)
(47,674)
(49,589)
(51,572)
(53,635)
Grants & Contributions provided for Operating Purposes
0
0
0
0
0
0
0
0
0
0
Grants & Contributions provided for Capital Purposes
0
0
0
0
0
0
0
0
0
0
Revenue From Continuing Operations Rates & Annual Charges User Charges & Fees Interest & Investment Revenue Other Revenues
Revenue From Continuing Operations
(5,536,805) (5,918,073) (6,327,040) (6,768,369) (7,025,043) (7,291,804) (7,569,053) (7,857,206) (8,156,642) (8,467,859)
Expenses From Continuing Operations Employee Benefits & On-Costs
1,121,635
1,166,308
1,212,767
1,261,082
1,311,327
1,363,579
1,417,920
1,474,431
1,532,756
1,593,410
0
0
0
0
0
0
0
0
0
0
2,836,784
2,944,909
3,065,803
3,195,075
3,278,467
3,347,041
3,401,980
3,493,970
3,588,875
3,687,039
Depreciation & Amortisation
634,857
657,077
657,077
657,077
657,077
727,558
864,167
864,167
864,167
864,167
Other Expenses
209,424
222,272
235,940
250,483
265,956
282,422
299,944
318,594
338,445
359,576
4,802,700
4,990,566
5,171,587
5,363,716
5,512,827
5,720,600
5,984,011
6,151,162
6,324,243
6,504,192
Net Operating (Profit)/Loss
(734,106)
(927,507)
(1,155,453)
(1,404,653)
(1,512,216)
(1,571,204)
(1,585,041)
(1,706,044)
(1,832,399)
(1,963,667)
Net Operating Result before Grants and Contributions provided for Capital Purposes
(734,106)
(927,507) (1,155,453) (1,404,653) (1,512,216) (1,571,204) (1,585,041) (1,706,044) (1,832,399) (1,963,667)
Borrowing Costs Materials & Contracts
Expenses From Continuing Operations
72
Appendix 10 - Livestock Marketing Centre Ten Year Financial Plan continued BUDGET 2018/19
BUDGET 2019/20
BUDGET 2020/21
BUDGET 2021/22
BUDGET 2022/23
BUDGET 2023/24
BUDGET 2024/25
BUDGET 2025/26
BUDGET 2026/27
BUDGET 2027/28
Capital and Reserve Movements Capital Expenditure - Renewals
0
0
0
0
0
83,467
0
0
0
0
Capital Expenditure - New Projects
222,200
0
0
0
2,819,261
3,352,620
0
0
0
0
Net Movements to/(from) Reserves
1,146,762
1,584,584
1,812,530
2,061,730
(649,968)
(1,137,325)
2,449,209
2,570,211
2,696,566
2,827,834
Total Capital and Reserve Movements
1,368,962
1,584,584
1,812,530
2,061,730
2,169,293
2,298,762
2,449,209
2,570,211
2,696,566
2,827,834
Net Result
634,857
657,077
657,077
657,077
657,077
727,558
864,167
864,167
864,167
864,167
Add back Depreciation Expense (non-cash)
634,857
657,077
657,077
657,077
657,077
727,558
864,167
864,167
864,167
864,167
0
0
0
0
0
0
0
0
0
0
5,540,787
7,125,371
Cash Budget (Surplus)/Deficit Estimated Reserve Balance at end of the year
8,937,900 10,999,631 10,349,663
9,212,338 11,661,546 14,231,757 16,928,323 19,756,158
Appendix 11 - Sewerage Services Ten Year Financial Plan Estimated Reserve Balance at start of the year
BUDGET 2018/19
BUDGET 2019/20
BUDGET 2020/21
BUDGET 2021/22
BUDGET 2022/23
BUDGET 2023/24
BUDGET 2024/25
BUDGET 2025/26
BUDGET 2026/27
BUDGET 2027/28
23,616,552
19,349,188
22,640,971
25,088,530
28,015,967
33,476,098
39,250,626
46,747,586
54,872,000
63,540,623
Revenue From Continuing Operations Rates & Annual Charges User Charges & Fees
(13,753,360)
(14,571,045) (15,437,416) (16,046,626) (16,679,956) (17,338,363) (18,022,843) (18,734,430) (19,474,201) (20,243,275)
(4,824,583)
(5,060,581)
(5,308,372)
(5,464,747)
(5,625,821)
(5,791,733)
(5,962,631)
(6,138,662)
(6,319,983)
(6,506,752)
Interest & Investment Revenue
(330,650)
(350,702)
(446,676)
(543,594)
(676,475)
(759,778)
(882,321)
(1,090,505)
(1,240,815)
(1,606,841)
Grants & Contributions provided for Operating Purposes
(152,860)
(162,032)
(171,754)
(178,624)
(185,769)
(193,200)
(200,928)
(208,965)
(217,323)
(226,016)
(1,305,000)
(1,319,000)
(1,301,000)
(1,315,000)
(1,330,000)
(1,349,000)
(1,349,000)
(1,349,000)
(1,349,000)
(1,349,000)
Grants & Contributions provided for Capital Purposes Revenue From Continuing Operations
(20,366,453)
(21,463,360) (22,665,218) (23,548,592) (24,498,021) (25,432,074) (26,417,722) (27,521,562) (28,601,323) (29,931,884)
Expenses From Continuing Operations Employee Benefits & On-Costs
2,236,064
2,324,638
2,416,749
2,512,539
2,612,154
2,715,748
2,823,479
2,935,513
3,052,021
3,173,183
Borrowing Costs
2,269,721
2,216,438
2,159,180
2,097,651
2,031,531
1,960,479
1,884,127
1,802,078
1,713,909
1,619,162
WAGGA WAGGA CITY COUNCIL LONG TERM FINANCIAL PLAN
73
Appendix 11 - Sewerage Services Ten Year Financial Plan continued BUDGET 2018/19
BUDGET 2019/20
BUDGET 2020/21
BUDGET 2021/22
BUDGET 2022/23
BUDGET 2023/24
BUDGET 2024/25
BUDGET 2025/26
BUDGET 2026/27
BUDGET 2027/28
Materials & Contracts
9,192,304
9,525,999
9,666,596
10,054,300
10,169,331
10,531,910
10,702,269
10,976,616
11,301,687
11,555,170
Depreciation & Amortisation
5,258,733
5,315,946
5,339,403
5,385,577
5,438,125
5,446,730
5,458,352
5,458,352
5,458,352
5,458,352
468,000
495,176
524,042
554,707
587,288
621,909
658,705
697,816
739,394
783,601
19,424,821
19,878,197
20,105,970
20,604,774
20,838,429
21,276,777
21,526,932
21,870,376
22,265,364
22,589,468
(941,631)
(1,585,163)
(2,559,248)
(2,943,819)
(3,659,593)
(4,155,298)
(4,890,791)
(5,651,186)
(6,335,960)
(7,342,415)
363,369
(266,163)
(1,258,248)
(1,628,819)
(2,329,593)
(2,806,298)
(3,541,791)
(4,302,186)
(4,986,960)
(5,993,415)
Capital Expenditure - Renewals
3,832,867
1,668,930
2,317,612
1,888,249
2,254,892
2,222,911
1,752,346
1,803,239
1,855,633
1,909,575
Capital Expenditure - New Projects
5,500,618
1,072,870
1,710,893
2,361,903
430,262
581,105
0
0
0
0
Capital Expenditure - Project Concepts
420,000
100,000
597,803
265,494
0
0
0
0
0
0
Loan Repayments
714,243
767,526
824,784
886,313
952,433
1,023,485
1,099,837
1,181,886
1,270,055
1,364,802
(4,267,364)
3,291,783
2,447,560
2,927,437
5,460,131
5,774,527
7,496,960
8,124,414
8,668,623
9,526,391
Total Capital and Reserve Movements
6,200,364
6,901,109
7,898,652
8,329,396
9,097,718
9,602,028
10,349,143
11,109,539
11,794,312
12,800,768
Net Result
5,258,733
5,315,946
5,339,403
5,385,577
5,438,125
5,446,730
5,458,352
5,458,352
5,458,352
5,458,352
Add back Depreciation Expense (non-cash)
5,258,733
5,315,946
5,339,403
5,385,577
5,438,125
5,446,730
5,458,352
5,458,352
5,458,352
5,458,352
0
0
0
0
0
0
0
0
0
0
19,349,188
22,640,971
25,088,530
28,015,967
33,476,098
39,250,626
46,747,586
54,872,000
63,540,623
73,067,015
Other Expenses Expenses From Continuing Operations Net Operating (Profit)/Loss Net Operating Result before Grants and Contributions provided for Capital Purposes Capital and Reserve Movements
Net Movements to/(from) Reserves
Cash Budget (Surplus)/Deficit Estimated Reserve Balance at end of the year
74
Appendix 12 - Solid Waste Services Ten Year Financial Plan BUDGET 2018/19 Estimated Reserve Balance at start of the year
BUDGET 2019/20
BUDGET 2020/21
BUDGET 2021/22
BUDGET 2022/23
5,908,960
7,872,777
BUDGET 2023/24
BUDGET 2024/25
BUDGET 2025/26
10,236,533
12,254,222
8,934,167
BUDGET 2026/27
BUDGET 2027/28
12,389,632
16,033,490
16,904,789
7,304,424
4,597,483
Rates & Annual Charges
(8,595,336)
(9,025,102)
(9,476,358)
(9,760,648) (10,053,468) (10,355,072) (10,665,724) (10,985,696) (11,315,266) (11,654,724)
User Charges & Fees
(3,965,407)
(4,113,547)
(4,267,298)
(4,426,876)
(4,592,504)
(4,764,233)
(4,942,845)
(5,140,858)
(5,346,416)
(5,547,002)
Interest & Investment Revenue
(79,836)
(91,300)
(108,292)
(124,307)
(143,437)
(161,156)
(184,432)
(215,391)
(245,080)
(278,401)
Other Revenues
(86,587)
(88,626)
(90,717)
(92,860)
(95,056)
(97,307)
(99,616)
(101,981)
(104,405)
(106,890)
Grants & Contributions provided for Operating Purposes
(114,100)
(119,805)
(125,795)
(129,569)
(133,456)
(137,460)
(141,584)
(145,831)
(150,206)
(154,712)
Grants & Contributions provided for Capital Purposes
(200,000)
0
0
0
0
0
0
0
0
0
Revenue From Continuing Operations
Revenue From Continuing Operations
(13,041,265) (13,438,381) (14,068,460) (14,534,260) (15,017,921) (15,515,228) (16,034,200) (16,589,757) (17,161,373) (17,741,730)
Expenses From Continuing Operations Employee Benefits & On-Costs
1,255,964
1,306,106
1,358,253
1,412,487
1,468,889
1,527,548
1,588,553
1,651,998
1,717,981
1,786,603
10,937,608
10,351,703
10,873,067
10,930,842
11,156,623
11,439,708
11,733,690
11,448,445
11,763,738
12,090,779
775,424
886,484
1,742,258
1,742,258
1,742,258
1,742,258
903,858
2,103,858
2,103,858
2,103,858
23,006
24,296
25,664
27,114
28,652
30,283
32,013
33,849
35,796
37,863
12,992,002
12,568,589
13,999,242
14,112,700
14,396,422
14,739,797
14,258,113
15,238,149
15,621,373
16,019,102
Net Operating (Profit)/Loss
(49,262)
(869,792)
(69,218)
(421,559)
(621,499)
(775,431)
(1,776,087)
(1,351,607)
(1,540,000)
(1,722,628)
Net Operating Result before Grants and Contributions provided for Capital Purposes
150,738
(869,792)
(69,218)
(421,559)
(621,499)
(775,431)
(1,776,087)
(1,351,607)
(1,540,000)
(1,722,628)
230,000
0
0
0
0
300,000
0
0
0
0
Capital Expenditure - New Projects
1,943,270
0
0
0
0
0
0
0
0
0
Capital Expenditure - Project Concepts
8,226,781
4,463,217
500,000
200,000
0
200,000
6,000,000
0
0
0
(9,575,364)
(2,706,941)
1,311,476
1,963,817
2,363,757
2,017,689
(3,320,055)
3,455,465
3,643,858
3,826,486
824,687
1,756,276
1,811,476
2,163,817
2,363,757
2,517,689
2,679,945
3,455,465
3,643,858
3,826,486
Materials & Contracts Depreciation & Amortisation Other Expenses Expenses From Continuing Operations
Capital and Reserve Movements Capital Expenditure - Renewals
Net Movements to/(from) Reserves Total Capital and Reserve Movements
WAGGA WAGGA CITY COUNCIL LONG TERM FINANCIAL PLAN
75
Appendix 12 - Solid Waste Services Ten Year Financial Plan continued BUDGET 2018/19
BUDGET 2019/20
BUDGET 2020/21
BUDGET 2021/22
BUDGET 2022/23
BUDGET 2023/24
BUDGET 2024/25
BUDGET 2025/26
BUDGET 2026/27
BUDGET 2027/28
Net Result
775,424
886,484
1,742,258
1,742,258
1,742,258
1,742,258
903,858
2,103,858
2,103,858
2,103,858
Add back Depreciation Expense (non-cash)
775,424
886,484
1,742,258
1,742,258
1,742,258
1,742,258
903,858
2,103,858
2,103,858
2,103,858
0
0
0
0
0
0
0
0
0
0
7,304,424
4,597,486
5,908,960
7,872,777
10,236,533
12,254,222
8,934,167
12,389,632
16,033,490
19,859,976
BUDGET 2025/26
BUDGET 2026/27
BUDGET 2027/28
Cash Budget (Surplus)/Deficit Estimated Reserve Balance at end of the year
Appendix 13 - Stormwater Levy Ten Year Financial Plan BUDGET 2018/19 Estimated Reserve Balance at start of the year
BUDGET 2019/20
BUDGET 2020/21
BUDGET 2021/22
BUDGET 2022/23
BUDGET 2023/24
BUDGET 2024/25
3,076,184
2,914,153
0
0
0
0
0
0
0
0
Rates & Annual Charges
(693,027)
(700,527)
(708,027)
(715,527)
(723,027)
(730,527)
(738,027)
(745,527)
(753,027)
(760,527)
Revenue From Continuing Operations
(693,027)
(700,527)
(708,027)
(715,527)
(723,027)
(730,527)
(738,027)
(745,527)
(753,027)
(760,527)
0
0
0
0
0
0
0
0
0
0
Borrowing Costs
44,376
40,491
36,240
31,700
26,861
21,842
16,164
10,347
4,094
0
Materials & Contracts
50,000
509,621
602,968
610,468
617,968
625,468
632,968
640,468
647,968
760,527
Depreciation & Amortisation
0
0
0
0
0
0
0
0
0
0
Other Expenses
0
0
0
0
0
0
0
0
0
0
94,376
550,111
639,209
642,168
644,829
647,311
649,132
650,815
652,063
760,527
Net Operating (Profit)/Loss
(598,651)
(150,416)
(68,819)
(73,359)
(78,198)
(83,217)
(88,895)
(94,712)
(100,965)
0
Net Operating Result before Grants and Contributions provided for Capital Purposes
(598,651)
(150,416)
(68,819)
(73,359)
(78,198)
(83,217)
(88,895)
(94,712)
(100,965)
0
Capital Expenditure - Renewals
0
0
0
0
0
0
0
0
0
0
Capital Expenditure - New Projects
0
0
0
0
0
0
0
0
0
0
Revenue From Continuing Operations
Expenses From Continuing Operations Employee Benefits & On-Costs
Expenses From Continuing Operations
Capital and Reserve Movements
76
Appendix 13 - Stormwater Levy Ten Year Financial Plan continued BUDGET 2018/19 Capital Expenditure - Project Concepts
BUDGET 2019/20
BUDGET 2020/21
BUDGET 2021/22
BUDGET 2022/23
BUDGET 2023/24
BUDGET 2024/25
BUDGET 2025/26
BUDGET 2026/27
BUDGET 2027/28
200,000
3,000,000
0
0
0
0
0
0
0
0
60,683
64,568
68,819
73,359
78,198
83,217
88,895
94,712
100,965
0
New Loan Borrowings
0
0
0
0
0
0
0
0
0
0
Proceeds from Sale of intangible & tangible Assets
0
0
0
0
0
0
0
0
0
0
Net Movements to/(from) Reserves
337,968
(2,914,153)
0
0
0
0
0
0
0
0
Total Capital and Reserve Movements
598,651
150,416
68,819
73,359
78,198
83,217
88,895
94,712
100,965
0
Net Result
0
0
0
0
0
0
0
0
0
0
Add back Depreciation Expense (non-cash)
0
0
0
0
0
0
0
0
0
0
Cash Budget (Surplus)/Deficit
0
0
0
0
0
0
0
0
0
0
2,914,153
0
0
0
0
0
0
0
0
0
Loan Repayments
Estimated Reserve Balance at end of the year
Appendix 14 - Budgeted Income Statement by Function BUDGET 2018/19
BUDGET 2019/20
BUDGET 2020/21
BUDGET 2021/22
BUDGET 2022/23
BUDGET 2023/24
BUDGET 2024/25
BUDGET 2025/26
BUDGET 2026/27
BUDGET 2027/28
Revenue From Continuing Operations Governance
0
0
0
0
0
0
0
0
0
0
Administration
(1,182,106)
(1,153,741)
(1,152,582)
(1,151,129)
(1,149,579)
(1,147,809)
(1,150,204)
(1,155,379)
(1,161,369)
(1,167,539)
Public Order & Safety
(1,323,655)
(1,360,417)
(1,398,207)
(1,437,150)
(1,477,312)
(1,518,623)
(1,561,331)
(1,605,811)
(1,653,453)
(1,702,571)
(200,580)
(207,943)
(215,592)
(222,668)
(231,703)
(240,213)
(249,041)
(258,247)
(267,807)
(277,736)
(20,955,497)
(17,549,886)
(18,385,365)
(15,400,587)
(15,896,049)
(16,405,297)
(16,936,354)
(17,504,143)
(18,088,147)
(18,681,051)
Community Services & Education
(1,648,410)
(1,665,159)
(1,682,701)
(1,701,075)
(1,720,322)
(1,740,487)
(1,761,614)
(1,783,754)
(1,806,955)
(1,830,201)
Housing & Community Amenities
(6,443,027)
(6,100,470)
(6,218,734)
(6,339,829)
(6,469,066)
(6,600,952)
(6,744,422)
(6,901,791)
(7,062,595)
(7,278,598)
(20,366,453)
(21,463,360)
(22,665,218)
(23,548,592)
(24,498,021)
(25,432,074)
(26,417,722)
(27,521,562)
(28,601,323)
(29,931,884)
Recreation & Culture
(6,941,398)
(4,522,016)
(4,331,708)
(4,256,717)
(4,568,234)
(4,395,227)
(4,421,547)
(4,539,034)
(4,664,204)
(4,793,759)
Mining, Manufacturing & Construction
(1,492,704)
(1,566,522)
(1,644,007)
(1,725,343)
(1,810,721)
(1,900,343)
(1,994,420)
(2,091,207)
(2,198,322)
(2,312,881)
Health Environment
Sewerage Services
WAGGA WAGGA CITY COUNCIL LONG TERM FINANCIAL PLAN
77
Appendix 14 - Budgeted Income Statement by Function continued BUDGET 2018/19
BUDGET 2019/20
(25,706,333)
(13,694,855)
(8,204,414)
(8,396,149)
(8,593,251)
(8,795,898)
(9,004,272)
(9,218,574)
(9,469,733)
(9,680,949)
(6,566,214)
(6,902,218)
(7,320,316)
(7,826,394)
(8,055,722)
(8,345,714)
(8,696,802)
(8,958,300)
(9,286,754)
(9,673,765)
Revenue From Continuing Operations
(92,826,376)
(76,186,586)
(73,218,844)
(72,005,633)
(74,469,981)
(76,522,637)
(78,937,730)
(81,537,801)
(84,260,662)
(87,330,933)
General Purpose Income
(56,329,973)
(58,032,395)
(59,830,705)
(59,999,373)
(61,908,011)
(63,854,829)
(65,793,603)
(68,103,783)
(70,469,456)
(72,975,571)
Transport & Communication Economic Affairs
Total Revenue From Continuing Operations
BUDGET 2020/21
BUDGET 2021/22
BUDGET 2022/23
BUDGET 2023/24
BUDGET 2024/25
BUDGET 2025/26
BUDGET 2026/27
BUDGET 2027/28
(149,156,350) (134,218,981) (133,049,549) (132,005,006) (136,377,992) (140,377,466) (144,731,333) (149,641,584) (154,730,118) (160,306,503)
Expenses From Continuing Operations Governance
2,239,369
2,113,195
2,489,195
2,247,632
2,318,600
2,392,196
2,778,520
2,541,840
2,617,927
2,696,890
Administration
7,836,599
8,620,131
9,055,454
9,551,074
9,935,861
10,307,332
10,689,727
11,066,070
11,453,215
11,919,974
Public Order & Safety
2,990,251
3,030,285
3,114,584
3,193,355
3,279,059
3,367,803
3,464,120
3,559,953
3,661,879
3,767,367
Health
1,475,618
1,498,520
1,529,161
1,560,926
1,593,864
1,628,483
1,669,105
1,554,568
1,607,779
1,663,022
18,059,875
18,151,960
19,736,887
19,920,902
20,277,397
20,695,984
20,291,575
21,351,898
21,817,936
22,408,741
Community Services & Education
2,584,964
2,633,602
2,674,296
2,716,107
2,760,088
2,806,009
2,853,748
2,903,131
2,954,392
3,007,689
Housing & Community Amenities
6,728,061
7,011,125
7,145,444
7,424,640
7,771,100
8,103,855
8,391,932
8,756,164
9,074,729
9,445,093
Sewerage Services
19,424,821
19,878,197
20,105,970
20,604,774
20,838,429
21,276,777
21,526,932
21,870,376
22,265,364
22,589,468
Recreation & Culture
23,832,747
22,490,599
23,195,228
23,837,628
24,476,849
25,222,188
25,989,582
26,675,088
27,354,159
28,105,609
1,410,188
1,457,527
1,492,276
1,542,271
1,594,185
1,648,097
1,704,085
1,762,233
1,822,628
1,885,360
33,280,191
33,410,454
33,876,576
33,997,464
34,286,411
34,377,581
34,625,223
34,765,451
35,085,399
35,228,026
8,604,936
8,456,313
8,598,008
8,922,954
9,067,174
9,342,441
9,745,135
9,851,919
9,903,031
10,039,305
Expenses From Continuing Operations
128,467,620
128,751,908
133,013,079
135,519,726
138,199,019
141,168,745
143,729,682
146,658,692
149,618,439
152,756,544
Net Operating (Profit)/Loss
(20,688,730)
(5,467,073)
(36,470)
3,514,721
1,821,028
791,279
(1,001,650)
(2,982,892)
(5,111,680)
(7,549,959)
0
0
0
0
0
0
0
0
0
0
4,415,764
3,093,823
5,492,981
5,968,049
3,198,919
4,814,443
6,106,200
4,917,062
5,000,111
3,150,610
Environment
Mining, Manufacturing & Construction Transport & Communication Economic Affairs
Capital and Reserve Movements Governance Administration
78
Appendix 14 - Budgeted Income Statement by Function continued BUDGET 2018/19 Public Order & Safety
BUDGET 2019/20
BUDGET 2020/21
BUDGET 2021/22
BUDGET 2022/23
BUDGET 2023/24
BUDGET 2024/25
BUDGET 2025/26
BUDGET 2026/27
BUDGET 2027/28
61,927
64,639
67,604
70,585
73,822
77,121
64,940
0
0
0
261,959
265,611
277,490
289,861
326,980
218,704
0
0
0
0
10,660,734
7,527,785
568,819
273,359
78,198
583,217
6,088,895
94,712
100,965
0
Community Services & Education
0
0
0
0
0
0
0
0
0
0
Housing & Community Amenities
0
0
0
0
56,901
60,315
63,934
67,770
71,836
76,146
10,467,728
3,609,326
5,451,092
5,401,959
3,637,587
3,827,500
2,852,183
2,985,124
3,125,688
3,274,376
6,240,562
2,487,911
5,558,018
2,712,466
1,550,789
1,708,902
1,704,016
1,896,056
1,916,496
1,518,664
0
0
0
0
0
0
0
0
0
0
60,292,671
27,558,925
23,371,775
15,055,610
13,535,149
17,640,599
15,416,961
15,801,305
15,150,211
14,885,850
370,005
3,153,421
159,251
165,303
2,990,845
3,614,192
184,873
191,898
199,190
206,759
(6,108,672)
(2,203,157)
(385,000)
(750,000)
0
(2,227,693)
0
0
0
0
Proceeds from Sale of intangible & tangible Assets
(952,795)
(822,182)
(835,808)
(1,383,000)
(739,100)
(977,700)
(1,651,850)
(1,148,900)
(1,250,650)
(631,200)
Net Movements to/(from) Reserves
(29,602,157)
(2,248,066)
(1,910,137)
6,690,899
12,050,018
8,196,465
7,958,234
16,633,250
18,979,525
22,099,618
Total Capital and Reserve Movements
56,107,727
42,488,037
37,816,086
34,495,089
36,760,108
37,536,063
38,788,385
41,438,278
43,293,372
44,580,824
Net Result after Depreciation
35,418,997
37,020,964
37,779,616
38,009,809
38,581,136
38,327,342
37,786,735
38,455,386
38,181,692
37,030,864
Add back Depreciation Expense (noncash)
35,418,997
36,025,921
37,381,243
37,702,405
37,877,879
37,972,195
37,319,096
38,545,941
38,583,972
38,598,632
0
995,043
398,372
307,404
703,257
355,147
467,639
(90,555)
(402,280)
(1,567,767)
Health Environment
Sewerage Services Recreation & Culture Mining, Manufacturing & Construction Transport & Communication Economic Affairs New Loan Borrowings
Cash Budget (Surplus)/Deficit
WAGGA WAGGA CITY COUNCIL LONG TERM FINANCIAL PLAN
79
questions? comments? contact us. Wagga Wagga City Council PO Box 20 Cnr Baylis & Morrow Sts Wagga Wagga NSW Ph: 1300 292 442 Fax: (02) 6926 9199 Email: council@wagga.nsw.gov.au
Wagga Wagga City Council Long Term Financial Plan
Follow @WaggaCouncil on Twitter to get the news, events and emergency information straight from the source.
www.wagga.nsw.gov.au