ARCHITECTURAL D E S I G N 18 PORTFOLIO 22
20
RIZA ZAIB.F
/ COMPETENCIES
Riza Zaib
RHINO TSPLINE GRASSHOPPER AUTODESK AUTOCAD SKETCH UP AODBE PHOTOSHOP ADOBE ILLUSTRATOR ADOBE INDESIGN LUMION VRAY
Hi, i am Riza. I am currently pursuing my bachelors of architecture degree at AMS academy of architecture, Chennai. I am looking for an internship position in a reputed firm for my 9th sem period. My strentghs include project developemnt from concept stage with emphasis on creativity with visualization to construction drawings.
/ E D U C AT I O N
/ LANGUAGES
BACHELORS OF ARCHITECTURE (ONGOING) AMS ACADEMY OF ARCHITECTURE, CHENNAI,TN.
ENGLISH I TAMIL I HINDI I URDU
HIGHER SECONDARY 2018 C.SI. BAINS MATRICULATION AND HIGHER SECONDARY SCHOOL, CHENNAI, TN
PAINTING I SKETCHING
SINDHI VIDHYALAYA, COIMBATORE,TN.
CHENNAI METROPOLITAN DEVELOPMENT AUTHORITY
/ INTERESTS
/ INTERNSHIPS
riza.zaib1@gmail.com +91 9884437444 177, Lakshmi Apts, vardammal garden 2nd st, kilpauk , Ch -10.
NID CAMPUS DESIGN
4 -1 1
SEM 7 ACADEMIC
T H E F L O AT I N G PAV I L L I O N
1 2 -1 5
C O M P E T T I T I O N E N T R Y ( 2022 )
FRAGARA
1 6 -2 3
SEM 6 ACADEMIC
PERAMBUR URBAN HOUSING
2 4 -2 7
SEM 5 ACADEMIC
T H E WA N D E R E R S B R I D G E
2 8 -2 9
N A S A - A N D C S H O R T L I S T E D ( 2020 )
W O R K I N G D R AW I N G S A R T, E T C E T E R A
3 0 -3 3 3 4 -3 5
01
NID CAMPUS DESIGN, PERUNGUDI, CHENNAI.
The NID ( national institute of design ) campus is located in Perungudi, Chennai. It comprises of three departments ,communication design,textile and apparel design and industrial design. This campus is designed with the concept of minimal surface- helecoid with the contemporary process topological methodology. This design showcases the use of minimal surfaces in architecture.
M I N I M A L S U R FAC E - H E L E C O I D C OM P R ESSI ON
1
FOLD 1
FOLD 2
A R T I C U L AT I O N O F H E L E C O I DA L S U R FAC E
2
The idea behind using a helecoid is to study how a minimal surface influences an architectural space apart from its regular usage in architecture. A helicoid has the following parametric equation x = ucosv, y = usinv , z = cv . 1 - The helecoid is cropped into a linear polygon from the plan view and front view to form this staircase. 2 - An undefromed, true helecoid used as staircase.
ID -
2
MIRROR
TOPOLOGICAL METHODOLOGY
2D ID WITH HELECO TE END IN F IN AT PLANES
ID WITH RE HELECO T CENT E N A SA 2D- PL
ID IN HELECO E A CIRCL
HELECOID
AC A D E M I C B LO C K
IN HELECOID A SQUARE
ID IN HELECO RE A SQUA
HELECO
.
MIRROR1
1 MIRROR
Topology is an abstract term deigsnating a continuity of surface. It is usually implied in the field of mathematics ro describe an entity of organised spatial relationships andproximities within surface structures.
SECTION A-A
STR ETC H
IN HELECOID A CIRCLE
WITH 2D HELECOID NTE END INFI T A PLANES
WITH HELECOID T CENTRE SA 2D- PLANE
MASTERPLAN All the blocks ( 3 departments) are connected by a helecoid.The whole mass is deformed by (topological operations) compression and stretching on the exterior and interior in directions that balance out eachother
(CO M M U NI C AT I O N A N D T E X T I LE B LOC K )
(I ND U S TR I AL BLOC K )
Experimental spaces are the most used spaces in Similar zones are placed diagonal to nid. Here the expermiental spaces are verticaly zo- eachother to create intresting interacned with reference to the infinite ends of a helecoid. tiong and movement in the built Space.
SECTION B-B
AC A D E M I C B LO C K
TOTAL SITE AREA60702.82 SQ.M OSR- 10% 6005.45 SQ.M FSI - 0.54 PLOT COVERAGE 20.5%
F R O N T
R E A R
L I B R A RY
E L E V A
E L E V A
SECOND FLOOR PLAN
SECOND FLOOR PLAN
SECOND FLOOR PLAN
SECOND FLOOR PLAN
FLOOR AREA: 5189 SQ.M.
FLOOR AREA: 5322 SQ.M.
FLOOR AREA: 5189 SQ.M.
FLOOR AREA: 1320 SQ.M.
COMMUNICATION DESIGN DEPARTMENT
A T I O N
INDUSTRIAL DESIGN DEPARTMENT TEXTILE DESIGN DEPARTMENT
T I O N
The three departments of nid are placed in one block, the arrangemnt of spaces are linear ensuring privacy and also is an intorverted design due to the courtyard. The central courtyard design is inspired by the elevation of a helecoid. It has an intresting blend of greenery and plazas.
Helecoid is taken as a design language, it is applied all over the design. Every helecoid contains a helix , a helix travels along the exterior of the academic block. Apertures are Punchured on the exterior of the mass For outer connectivty on which a parametric pattern is used.Parametric facade pattern is applied to the academic block, cafe, auditorium and the canteen.To break the monotony the admin and hostel blocks facade is a conbination of white and brown palette. The open air theatre also follows this Style.
cafe S
I
T
E
E
L
E
cafe V
A
T
I
O
N
S
02
F L OAT I N G PAV I L L I O N D R AVA L A K E , M A R I B O R , S L O V E N I A .
LOCATION: It is located in the city of maribor which is marked by the great drava river, which visibly divides the city into two riverbanks, connected by several bridges. AIM : To design a floating pavilion on the drava river, which would serve as a small stage and a place for contemplation by the river. The pavilion is primarily intended to serve as a venue for smaller events and shows (small bands, discussions with notable guests, wine tasting, etc.), But also as a relaxation site, offering views of the river and the historic city centre. PLAN
ZONING
SECTION A-A
SECTION B-B
AXONOMETRIC VIEW
C O N C E P T : The pavilion highlights the existing qualities of the area, the concept is inspired by the visual image of the lake which resulted in giving it a fluid structure. it ensures a better connection between the elevated lent riverbank and the river and, consequently, invite people closer to the river.
The structure is derived from the zoning. the backstage is private and has a seperate entry, privacy is ensured by the curved plane. the parametic design pattern in the pavillion is of two layers, these two layers allow natural light to enter durig the day time. the innermost layer of the pavillion is illuminated during the night with lighting fixtures.
03
FRAGARA T H U R A I PA K K A M , C H E N N A I .
This 5 start hotel is located in Thuraipakkam ,Chennai. In front of the Pallikaranai marshland. Being located in the IT corridor of tamilnadu Old Mahabalipuram Road, this has the potential to attract a wide range of users.
F
R
A
G
G
M
E
N
T
A
T
I
O
N
The ground floor consists of the lounge , cafe, multispeciality restaurant, banquet hall, staff rooms and kitchens for banquet and restaurant. The first floor connects the users to a rooftop garden and an informal gathering place. The room typologies include executive - (2 )and suite (3)
GROUND FLOOR
C G
H 1 GOODS RECEIVING OFFICE
ENGINEERING STORE, BMS ROOM , CHIEF ENGINEER ROOM.
LAUNDRY AND LINEN STORE
LOADING / UNLOADING AREA
149 sq.m
DRIVERS RESTROOM
2
149 sq.m
DN 12 13
11
14
10
15
9
16
BAKERY
GENERAL STORE
GARBAGE 54 sq.m
172.5 sq.m
43 sq.m
8
18 19 20
SERVICE LIFTS
7
17
6
UP
5 4
21
3
22
2
FIRE EXIT STAIRCASE 23
TRAINING ROOM
GARBAGE CHUTE AND LAUNDRY CHUTE COLLECTION PIT
EXECUTIVE MALE LOCKERS AND TOILETS
50 sq.m
138.4 sq.m
1
24
21Ch 21Ch
DISH WASH 38 sq.m
COLD STORAGE
HOUSE KEEPING
EXECUTIVE FEMALE LOCKERS AND TOILETS
STAFF KITCHEN AND CAFETARIA
117.2 sq.m
158 sq.m
3
21Ch
200 sq.m
21Ch
MAIN KITCHEN PREPARATION
COLD PREPARATION 50 sq.m
160.2 sq.m
MANAGERS OFFICE (HR MANAGER, TRAINING MANAGER
SERVING/ ORDER COUNTER AREA
RETIRING ROOM
DIRECTOR OF HUMAN RESOURCES
15.5 sq.m
37 sq.m
JUNIOR STAFF LOCKERS AND TOILETS
FIRST-AID ROOM
35 sq.m
110 sq.m
13.3 sq.m
GENERAL STORE 110 sq.m
DN
11
15
14
13
12
19
18
17
16
4
UP
TIME OFFICE
TOILETS 39 sq.m
BALL ROOM - 01
MULTICUISINE RESTAURANT
145 sq.m
410 sq.m
TOILETS 39 sq.m
SERVICE CORRIDOR
5
BACK OFFICE 130 sq.m
BALL ROOM - 02 200 sq.m
PRE-FUNCTION LOBBY
FRONT OFFICE 231.52 sq.m
FIRE EXIT STAIRCASE
DN 10 11
9
12
8
13
7
14
4
16 17
6
6 5
15
UP
3
18
2
19
1
BALL ROOM - 03 210 sq.m
DN
BUSINESS 19
18
17
16
15
14
13
12
11
7
UP 1
2
3
4
5
6
7
8
9
10
FIRE EXIT STAIRCASE
LIFT
LEFT LUGGAGE ROOM
CAFE
DISPLAY KITCHEN
RECEPTION
PUBLIC TOILETS
BANQUET KITCHEN PREPARATION
LOUNGE
TOILETS CONCIERGE DESK
BOUTIQUE AND RETAIL SHOPS
RECESSED ENTRANCE PORTICO
9
10,39
H
12,21
G
The fragara means a garden, the deformed central garden creates pleasant views to rooms facing it. The rooftop pool and restaurant is placed facing the pallikaranai marshland for views.
S SHEET NO. - 01
KEY PLAN WITH NORTH POINT
E
F
12 11
B
C
D
RCC WORK
BRICK WORK
BRICK WORK
POROTHERM WALL
POROTHERM WALL
SOLID CONCRETE BLOCK WORK
SOLID CONCRETE BLOCK WORK
AAC BLOCK WORK
AAC BLOCK WORK
AREA STATEMENT
AREA STATEMENT
: XXXX.XXX F SQM FSI AREA NON FSI
SITE AREA
10
14
16
8 7
17 18 19 20 21 22 23 24
6
UP
5 4
8 7
17 18 19 20 21
First Floor
9
16
GARBAGE CHUTE AND LAUNDRY CHUTE
2
6
UP
5
SERVICE LIFTS
4
GARBAGE CHUTE AND LAUNDRY CHUTE
3
22
2
23
1
HOUSE KEEPING
E
HOUSE KEEPING
ELECTRICAL ROOM
C
D
B
A
10 11
9
12
8
13
7
14
4
16 17
UP
3
18
2
19
1
SERVICE LIFTS
GARBAGE CHUTE AND LAUNDRY CHUTE
Total Area FSI
PLOT COVERAGE (%)
2
MD
2
13,28
OUTDOOR DINING
3 2
19
1
FIRE EXIT STAIRCASE
SERVICE LIFTS
GARBAGE CHUTE AND LAUNDRY CHUTE
FSI
1
PLOT COVERAGE (
HOUSE KEEPING
2
SWIMMING POOL
JOIN
TYPE DESCRIPTIO MD
SILL LINTEL SPECIALITY RESTAURANT
-
SIZE
3
2400 1200 X 2400
4
Main Door
2 KW
Kitchen Wind
11
17
16
15
14
13
12
19
18
UP
2400 1500 X 1350
3
KW
Kitchen Window 1050
15,05 FIRE EXIT STAIRCASE
11 12 13 14 15 16
UP
DN
11 12
4
4
SUITE ROOM - c 85sq.m
FOR SPECIAL NOTES
FIRE EXIT STAIRCASE
13 14 15 16 17
18
SUITE ROOM - b 145.6 sqm
UP
DN
18
19
13 14
16,76
LUGGAGE LIFT
TOTAL NUMBER OF ROOMS IN THIS FLOOR- 25
5
1 R.NO
6
6
15,97
7
11,69
F
13,47
E
11,94
D
12,38
C
7
13,57
B
A
: RIZA ZAIB F
REG. NO.
: 110218251053
CLASS
: 3B
F
PROJECT NAME : BUSINESS CLASS HOTEL LOCATION
: THURAIPAKKAM, OMR.
13 14 15 16
UP
18 19
5
1 R.NO 1 R.NO
Entrance gate relocated 7 DESCRIPTION
23-05 DATE
7
E
D
C
B
A
Entranc D
R
7
LUGGAGE LIFT
REVISIONS
8
8
LANDSCAPE FROM ACCOMODATION LEVEL
SIGN & SEAL WITH7 MARKS NAME
11 12
17
6
LANDSCAPE FROM ACCOMODATION LEVEL
6 FIRE EXIT STAIRCASE
5
LUGGAGE LIFT
23-05 DATE
FOR S NO
4
UP
19
Entrance gate relocated DESCRIPTION
6
3
FOR SPECIAL 6 NOTES
16
REVISIONS
LANDSCAPE FROM ACCOMODATION LEVEL
REFUGE AREA
5
15
18
TOTAL NUMBER OF ROOMS IN THIS FLOOR- 30
5
LUGGAGE LIFT
11 12
17
19
5
FIRE EXIT STAIRCASE
2400 1500 X 1350
5 91,76
91,76
4 13,22
91,76
4
UP
18
DN
SUITE ROOM - b 145.6 sqm
DN
17
5
16 17
Total Area
6
15
4
UP
FIRE EXIT STAIRCASE
TOTAL NUMBER OF ROOMS IN THIS FLOOR- 44
9 8 7
14
3
SUITE ROOM TYPES
4 SUITE ROOM -a (87 SQ.M) HOLLYWOOD GLAM STY;E
First Floor 10 11
13
Main Door
11
12
19
18
17
16
Kitchen Window3 1050
SUITE ROOM -a (87 SQ.M) HOLLYWOOD GLAM STY;E
NO OF ROOMS - 10
TYPE- 03
Ground Floor
1 12
TYPE DESCRIPTION MD
15
4
3
9
8
7
6
5
2
1
11
10
KW
3
SUITE ROOM TYPES TYPE- 02
ARE DESCRIPTION
12
2
4
9
8
7
3
6
5
1
11
10
12
3
EXECUTIVE ROOM TYPES
TYPE- 01
2 AHU ROOM
SUITE ROOM-b
14
UP
UP
TYPE- 03
SIZE
2400 1200 X 2400
13
21
20
24
23
22
13
19
18
17
16
15
14
24
23
22
21
20
16
15
14
13
19
18
17
TYPE- 01
-
AAC
JOINERY SCHEDULE
DN
DN
DN
SUITE ROOM - c 85sq.m
NO OF ROOMS- 15
Main Door
SOL
PLOT COVERAGE (%)
ELECTRICAL ROOM
TYPE DESCRIPTION 2 SILL LINTEL
2 AHU ROOM
EXECUTIVE ROOM TYPES
POR
A
DN
SERVING/ ORDER COUNTER AREA
JOINERY SCHEDULE AHU ROOM
B
C
D
(IN SQM)
First Floor
HOUSE KEEPING
FSI
ELECTRICAL ROOM
(IN SQM)
Ground Floor 1
6 5
15
FIRE EXIT STAIRCASE
E
: XXXX.XXX SQM FSI AREA NON FSI
DESCRIPTION
1
DN
BRIC
SITE AREA
F
SITE AREA
(IN SQM)
Total Area
24
FIRE EXIT STAIRCASE
(IN SQM)
1
Ground Floor
10
15
SERVICE LIFTS
3
1
FIRE EXIT STAIRCASE
11
14
9
15
1
12 13
RCC
N
N
A
DN
16,46
13
COLUMN LAYOUT AMENITIES FLOOR PLAN (LEVEL -11)
RCC WORK
DESCRIPTION
1
DN
KEY PLAN WITH NORTH POINT
COLUMN FLOOR LAYOUTPLAN ACCOMODATION (LEVEL 9-10)
COLUMN LAYOUT ACCOMODATION FLOOR PLAN (LEVEL 8)
ACCOMODATION FLOOR PLAN (LEVEL 3-6)
KEY W NORT
SHEET NO. - 01
SIGN & SEAL 9 WITH MARKS
GYM
HEALTH CLUB
9
10
NAME
: RIZA ZAIB F
REG. NO.
: 110218251053 F
CLASS
: 3B
E
PROJECT NAME : BUSINESS CLASS HOTEL
10
D
C
B
A
6
SIGN WITH
7
NAME
:
REG. NO.
:
CLASS
:
PROJECT NAME : LOCATION
:
INTERIOR STYLE : MODERN URBAN - EXECUTIVE ROOM URBAN INTERIOR DESIGN BLENDS ELEMENTS OF CONTEMPORARY,MODERN, AND INDUSTRIAL DESIGNS TO CREATE A UNIQUE STYLE THAT’S PERFECT FOR INNER-CITY LIVING. HAVING A SOFTER,MORE COMFORTABLE LOOK THAN INDUSTRIAL DESIGN STYLES, URBAN DESIGN EMBRACES WAREHOUSE CONVERSIONS AND LOFT ENVIRONMENTS AS ITS FOUNDATION. IT MAKES THE MOST OF SMALL SPACES TO CREATE FUNCTIONAL AND PRACTICAL LIVING AREAS. CHARACTERISED BY CLEAR OPEN SPACE, LIGHT COLOURS AND CLEAN FINISHES, URBAN DESIGN ELEMENTS INCLUDE MINIMALISTIC AND LARGE PIECES OF FURNITURE WITH SLEEK LINES, VINTAGE DECOR, GEOMETRIC DESIGNS, AND A COLOUR PALETTE CONSISTING OF A NEUTRAL BASE COMBINED WITH COLOURS REMINISCENT OF NATURE.
A NEUTRAL BASE CO TH
OMBINED WITH COLOURS REMINISCENT OF NATURE HAT IS USE OF SHADES OF BROWN
04
PERAMBUR URBAN HOUSING PERAMBUR,CHENNAI.
The aim was to design a social housing according to income groups in chennai. The project is located in perambur . The concept is inspired by the characteristics of the perambur settlement pattern. The emergence of perambur Loco works, which was the hotspot for british and their activities. This led to emergence of anglo indian people’s population as workers. This design showcases the a social housing project with peramburs traditional housing characteristics , some characteristics are low rise buildings, linearity. Anglo indian characteristics community halls, baconies, outdoor gardens , red bricks and architectural teracotta.
SCULPTURE
SERVICE ENTRY TO THE RESIDENTIAL ZONE
There are a total of 9 blocks in whi (b3 and b4), 3 blocks for mig (b6, b7 connected with a linear street like pa
ENTRY TO THE RESIDENTIAL ZONE THROUGH THE COMMERCIAL ZONE
15M FRONTAGE FOR FUTURE ROAD EXPANSION
ich two blocks are for ews (b1 and b2), two blocks for lig 7 and b9), 2 blocks for hig (b5 and b8). All the blocks are 160 attern resembling the housing characteristics of the locality.
SITE SECTION A-A
05
THE WANDERERS BRIDGE NASA- ANDC (SHORTLISTED)
06
WORKING DRAWINGS
PLAN C
D E
F
G
H
I
A
J B
C
KD E
F L
G MH
I
N
K
J
O
L
M
COLUMN LAYOUT
N
26,4
O
STILT FLOOR PLAN
26,4
3 2
1,62
1,4
1,61
1,57
1,81
3,55
14
2,85
1,4
1,62 3,55 1,61
1,81 1,57
1,57 1,81
1,61 3,55 3,02
2,85
3,55
1,81
1,57
1,61
3,02
14
14
14
12
11
11
13
13 C
2,97
B
2,23
11
2,23
11 DN
10 9
10
10
9
11
9
11
12
8
12
8
12
13
7
13
7
13
14
6
14
6
14
5
15
5
15
5
15
4
16
4
16
4
16
15
UP
UP
9 8 7 6 5 4
UP
3
17
3
17
3
17
18
2
18
2
18
2
18
2
19
1
19
1
19
1
19
1
17
1,97
10
11
8 7 6
8
3
8
7
7
7
7
6
6
6
6
5
5
4
4
3
3
2
2
1
1
3,24 3,83
3,24
30,28
8
30,28
8
3,83
DN
10
9
14
9UP
DN
10
13
16
1,97
9
DN
11 12
1,71
10
9
A
12
2,97
12
1,71
10
FLOATING COLUMN
1,58
13
12
1,58
13
1
3,43
3,43
TING COLUMN
4 B
A
1,72
5
1,72
5
2,39
4
2,39
4
3 1,44
1,44
3
2
3,39
3,39
2
1
1
FLOATING COLUMN
A
B
C
D E
F
G
H
I
A
J B
C
KD E
L F
G MH
N
I
O
J
SECTION A-A
K
L
M
N
O
SECTION B-B
FRONT ELEVATION
+19.2m PARAPET LEVEL +18.3m TERACCE FLOOR LEVEL
+19.2m PARAPET LEVEL +18.3m TERACCE FLOOR LEVEL
+19.2m PARAPET LEVEL +18.3m TERACCE FLOOR LEVEL
+19.2m PARAPET LEVEL +18.3m TERACCE FLOOR LEVEL
+15.3m
+15.3m
+15.3m
+15.3m
FIFTH FLOOR LEVEL
FIFTH FLOOR LEVEL
FIFTH FLOOR LEVEL
FIFTH FLOOR LEVEL
+12.3m
+12.3m
+12.3m
+12.3m
FOURTH FLOOR LEVEL
FOURTH FLOOR LEVEL
FOURTH FLOOR LEVEL
FOURTH FLOOR LEVEL
+9.3m
+9.3m
+9.3m
+9.3m
THIRD FLOOR LEVEL
THIRD FLOOR LEVEL
THIRD FLOOR LEVEL
THIRD FLOOR LEVEL
+6.3m
+6.3m
+6.3m
+6.3m
SECOND FLOOR LEVEL
SECOND FLOOR LEVEL
SECOND FLOOR LEVEL
SECOND FLOOR LEVEL
+3.3m FIRST FLOOR LEVEL
+3.3m FIRST FLOOR LEVEL
+3.3m FIRST FLOOR LEVEL
+3.3m FIRST FLOOR LEVEL
+0.3m PLINTH LEVEL
+0.3m PLINTH LEVEL
+0.3m PLINTH LEVEL
+0.3m PLINTH LEVEL
1,
1,
4
4 2,39
2,39
TERACCE FLOOR PLAN 3
1,44
1,44
3
1
KD E
FL
H G M
N
I
O
2
3,39
3,39
2
J
1
K
L
M
N
O
LEVEL
-
+19.2m PARAPET LEVEL +18.3m TERACCE FLOOR LEVEL
+19.2m PARAPET LEVEL +18.3m TERACCE FLOOR LEVEL
+19.2m PARAPET LEVEL +18.3m TERACCE FLOOR LEVEL
+15.3m
+15.3m
+15.3m
FIFTH FLOOR LEVEL
FIFTH FLOOR LEVEL
FIFTH FLOOR LEVEL
+12.3m
+12.3m
+12.3m
FOURTH FLOOR LEVEL
FOURTH FLOOR LEVEL
FOURTH FLOOR LEVEL
+9.3m
+9.3m
+9.3m
THIRD FLOOR LEVEL
THIRD FLOOR LEVEL
THIRD FLOOR LEVEL
+6.3m
+6.3m
+6.3m
SECOND FLOOR LEVEL
SECOND FLOOR LEVEL
SECOND FLOOR LEVEL
+3.3m FIRST FLOOR LEVEL
+3.3m FIRST FLOOR LEVEL
+3.3m FIRST FLOOR LEVEL
+0.3m PLINTH LEVEL
+0.3m PLINTH LEVEL
+0.3m PLINTH LEVEL
+19.2m PARAPET LEVEL +18.3m TERACCE FLOOR LEVEL
+19.2m PARAPET LEVEL +18.3m TERACCE FLOOR LEVEL
+19.2m PARAPET LEVEL +18.3m TERACCE FLOOR LEVEL
+15.3m
+15.3m
+15.3m
FIFTH FLOOR LEVEL
FIFTH FLOOR LEVEL
FIFTH FLOOR LEVEL
+12.3m
+12.3m
+12.3m
FOURTH FLOOR LEVEL
FOURTH FLOOR LEVEL
FOURTH FLOOR LEVEL
+9.3m
+9.3m
+9.3m
THIRD FLOOR LEVEL
THIRD FLOOR LEVEL
THIRD FLOOR LEVEL
+6.3m
+6.3m
+6.3m
SECOND FLOOR LEVEL
SECOND FLOOR LEVEL
SECOND FLOOR LEVEL
REAR ELEVATION
STILT BEAM
+3.3m FIRST FLOOR LEVEL
STILT BEAM 5
GROUND LEVEL
+0.3m PLINTH LEVEL
GROUND LEVEL
+3.3m FIRST FLOOR LEVEL
STILT BEAM
+3.3m FIRST FLOOR LEVEL
5
+0.3m PLINTH LEVEL
+0.3m PLINTH LEVEL
8
PLAN
07
ART, ETCETERA.
Check out my art page.
RIZA ZAIB.F riza.zaib1@gmail.com +91 9884437444
THER E A R E 3 6 0 D E G R E E S, S O W HY S T I CK TO ONE ? - Z A H A H A D I D.