Project elements
6
7
8
9
10
11
Summary • Sporting grounds • • • • • •
Resurfacing – earthworks and new turf New field drainage New irrigation sprinkler heads New field lighting Long jump upgrade New storage building replacing two shipping containers
• Carpark • • • • •
New pavement surface Improved layout, better pedestrian safety New stormwater drainage New lighting New landscaping 12