Rocio Nieto_Portfolio

Page 1

ROCIO NIETO VENTAJA

ARCHITECTURAL PORTFOLIO



“Accustomed to working with teams under high demands. I am determined to success by looking for the most innovative solutions in order to get the highest quality on my projects.”


R o ci o

Nieto Ventaja ARB Architect

CONTACT ronietve@gmail.com +44 7564151263 www.linkedin.com/in/rocio-nieto ACADEMIC BACKGROUND ETSAV - University Polytechnic of Catalonia Master in Architecture (Licenced in Spain) 02.2016-02.2017. Barcelona, Spain

Università degli Studi Roma Tre Exchange program. Master in Architecture 09.2013-07.2014. Rome, Italy

ETSAG - University of Granada Degree in Architecture studies 09.2010-09.2015. Granada, Spain

LANGUAGES Spanish

Mother tongue

English

B2-FIRST Cambridge

OTHER ACTIVI TIES Course-Revit Advanced Architecture Official Autodesk Certificate. MSI Autodesk 10.2018-12.2018- 60 hours. Barcelona, Spain

First Own Project completed Transforming a store into an italian restaurant. 07.2018. Barcelona, Spain

Italian B2-int.IT Roma Tre


Resume WORK EXPERIENCE ARB Architect HCL Architects 03.2019-Currently. London, UK

Architect and Interior Designer Eli G. Cruz Architecture and Interior Design 09.2018-01.2019. Barcelona, Spain

Junior Architect DATAAE 05.2017-09.2018. Barcelona, Spain

Project Collaborator Jofre Roca Arquitectes 03.2017-05.2017. Barcelona, Spain

Project Collaborator a(r+t) arquitectos 12.2015-02.2016. Granada, Spain

Project Collaborator Studio Architettura Gianluca Centuriani 09.2013-01.2014. Rome, Italy

DESIGN SKILLS Autocad Revit 3DS max

Rhinoceros Lumion Sketchup

Photoshop Illustrator Indesign


Public Courtyard

Residential

Hotel

I ndex

Residential

1 Arundel Great Court, London HCLA-2019

8-11

5 Nekane, Barcelona. Eli G.-2018

22-25

2 Cashmirino, London. HCLA-2019

12-13

6 AMB, Barcelona DATAAE-2018

26-29

3 Viceroy Court, London, HCLA-2020

14-17

7 Flat Refurbishment, Barcelona DATAAE-2017

30-33

4 La Galindeta, Barcelona Own project-2018

18-21

8 Library Competition, Barcelona DATAAE-2017

34-37

6


PRO F E S S I O N A L PROJECTS


Arundel

Great Court

1 Division of the existing building in two different buildings. South site turns into AGC,a mixed use building

Public Courtyard

Residential

Hotel

2 Palace-like to enhance the setting of the Grade I listed Somerset House - Asymmetric façade consisting of three vertical elements.

Residential

3 Grid. Layout carefully integrated into the structural grid and circulation diagram.

8


HCL Architects - 2019/2020

Arundel Great Court from The River Side

Public Courtyard

London from an Apartment Balcony

Façade to The River Thames

9


Arundel Great Court. Mixed use building Arundel Great Court is a residential and hotel building with retail, spa, and parking which overlooks the river Thames in Westminster. This important and sensitive site required extensive historic research and townscape analysis. The masterp§lan creates a new ‘palace-like’ court plan with a permeable public realm consisting of a new east west street, arcades, colonnades and a new public courtyard. The riverside elevation has been designed to enhance the setting of the Grade I listed Somerset House by creating

an asymmetric façade consisting of three vertical elements.The residential apartments and hotel layout have been carefully integrated into the structural grid and circulation diagram. I have been extensively involved in this project during stages 4 and 5, including on-site experience and direct interaction with clients and consultants. Internal works have been my main task, including partitions, doors, floors and ceilings.

Level 01 (Hotel Meeting) FFL 11.810

Level 00 (Retail Max/ Hotel Rest.) FFL 8.610

Ent.)

REY REY STREET STREET 10

ARUNDEL ST South Elevation ARUNDEL ST


170

Dry lining LT-A to be part of fit out works. Lining required to achieve both fire and acoustics.

achieve acoustic performance) achieve acoustic performance)

Apartment

2

2-09 Metal cladding

WT-03-02 USL 48.215

04-05 Brise Soleil

30

100

Full height Firetherm Intubatt 1 with Firetherm Intumastic each side Party wall to be separated from external cladding to allow for deflection/movement. Joint to be sealed with fire rated sealant to maintain fire requirements to main wall. Structural Slab Structural Slab

3-5mm resilient layer GenieMat 3-5mm resilient layer GenieMat RST or similar approved. RST or similar approved.

WT-03-02

Gypframe 48 S 50 "C" Stud

15-20mm perimeter 15-20mmstrip perimeter strip Geniemat PMI or similar Geniemat PMI or similar approved. approved.

Gypframe 48 S 50 "C" Stud

50mm mineral wool

1-02 Clear glass panel

50mm mineral wool Fit out Dry lining LT-A

LT-A

2-01 Aluminium extrusion FHL 45.910

Full height Rockwool packed into void.

LT-A

Fit out Dry lining LT-A

Apartment

Apartments party wall interface. Apartments partyand wallscreed and screed interface. Fire Fitout Fitout lining on toprated ofSealant screed. lining on top of screed.

Apartment

1-05 Glazed balustrade

Fire rated Sealant

2-09 Metal cladding

3-02 Stone cladding

50mm Thermal andThermal Acousticand Acoustic 50mm Insulation zone. Thermal Insulation zone. Thermal 2 Resistance (min): 1.65 (m K/W) Resistance (min): 1.65 (m2K/W)

100

Party wall to be separated from external cladding to allow for deflection/movement. Joint to be sealed with fire rated sealant to maintain fire requirements to main wall.

FRL 48.960

47mm Screed (including 47mm Screed10mm (including 10mm concrete slab tolerance). concrete slab tolerance). 16mm UFH 16mm pipes UFH pipes

1

250

Full height Firetherm Intubatt 1 with Firetherm Intumastic each side

ol packed

nized steel beam

158 300 370

1500

5

Lining required to ensure 6400 fire break between partywall is maintained

6400

Fit out Dry lining LT-A

30

179

Full height Rockwool packed into void.

4

Arundel Great Court. Mixed use building 30mm Floor30mm Finish zone Finish Floor zone

1

C" Stud

3

Lining required to ensure fire break between partywall is maintained6400

3000

Fit out Dry lining LT-A

Shell & CoreShell Partywall & Core Partywall projection projection

250

1

LT-A

Apartment

arated from allow for nt. Joint to ated sealant uirements to

Dry lining LT-A to be part of fit out works. Lining required to achieve both fire and acoustics.Fit out LiningFit(required to (required to out Lining

LT-A

m Intubatt 1 mastic each

FFL 44.810

01 - Dry base detail sectionsection 01 Lining - Dry Lining base detail

Party wall and Cladding junction - Screed Level 03 - Typical plan detail

Party wall and Cladding junction.Scale 1:5 Scale 1:5 04 - Typical plan detail

Scale 1:5

Scale 1:5

FCL 44.010

Penthouse Section

Section Apartment AApartment A

le 1:50

Apartment BApartment B

FFL.

100

T 6400

107

30

47mm Screed (including 47mm Screed10mm (including 10mm concrete slab tolerance). concrete slab tolerance). 16mm UFH 16mm pipes UFH pipes

1500

50mm Thermal andThermal Acousticand Acoustic 50mm Insulation zone. Thermal Insulation zone. Thermal 2 Resistance (min): 1.65 (m K/W) Resistance (min): 1.65 (m2K/W)

Fire Break 48.755

160

250x160mm 12mm thick 48.520 cement board mechanically fixed to concrete for additional fixing support to dry lining return to cladding.

100

Structural Slab

263 158 300

100

158 300 370

250

879

V Floor 30mm Floor30mm Finish zone Finish zone

4800

30

S

175 6400

EN-02-09 Metal cladding

3-5mm resilient layer GenieMat 3-5mm resilient layer GenieMat RST or similar approved. RST or similar approved. 15-20mm perimeter 15-20mmstrip perimeter strip Geniemat PMI or similar Geniemat PMI or similar approved. approved.

Galvanized steel beam EN-04-05 Brise Soleil

250

P

250

130

Fit out LiningFit(required to (required to out Lining

Cement board boxing at low levelachieve acoustic performance) achieve acoustic performance) to enclose movement connection for cladding mechanically fixed to Partywall & Core Partywall concrete. Void to be packed withShell & CoreShell projection projection Rockwool.

StructuralClear Slab Structural Slab glass panel EN-01-02

70mm timber base timber base 70mm suitably fixedsuitably to slabfixed to slab

175

Partywall and Cladding Lining and Cladding junction over support bracket. junction-Section 06 - Typical section detail

Revisions: Party wall to be separated from external cladding to allow for deflection/movement. Joint to be sealed with fire rated sealant to maintain fire 06.08.20 44.860 to main wall. requirements

detail

balustrade EN-01-05 Glazed Partywall and Screed interface-Section detail

Apartments party wall screed interface. Apartments partyand wall and screed interface. EN-02-09 Metal cladding 1. Lining and cladding junction detail updated Fitout Fitout lining on topon of top timber base. lining of timber base. Stone cladding EN-03-01

44.810

Scale 1:5

03 - Dry base detail sectionsection 03 Lining - Dry Lining base detail Project

Company Code

Drawing

Fitout&Finishes - Partition Details External Fabric Connections Drawn

HCL

Section

Checked

JL

Approved

SG

Date

15.05.20

x5.5

x5.5 06

50

50

Scale 1:5 Scale 1:5HCL

Arundel Great Court 5.5x

5.5x

SC1 Scope This is an SC1 category drawing, refer title block. SC1 refers to the scope of work included as part of the 'Shell Contract'. Refer to the OS1 category drawings for information relating to the 'Overall Scheme'.

06

4.860

EN-02-01 Aluminium extrusion

45.910

Stage

Type

Scale

HCLA Project No.

Level

SC1

Stage E 1:5@A1 1:10@A3

580

-

Drawing No.

5714

Revision

C

T 020 7495 4119 F 020 7493 7162 E info@hcla.co.uk

Check all dimensions on site Do not scale drawing All dimensions in millimetres

Date

25.01.19 17.01.20 15.04.20 08.06.20

Drawn HCL HCL HCL HCL

350

Checked JL JL JL JL

Approved JL JL JL JL

Revision Note For Information For Information For Information For Information Dry lining LT-A to be part of fit out works. Lining required to achieve both fire and acoustics.

Apartment

Cement board boxing to enclose movement for cladding mechanic concrete. Void to be p Rockwool. Arundel Great Court Drawing Slab Edge Project

170

Rev A B C

170

Cement board boxing at low level to enclose movement connection for cladding mechanically fixed to concrete. Void be packed with • ••• • •• •• •• ••• • •••to••••••••••••••••••••••••••••••••••••••••• Rockwool.

170

le 1:50

LT-A

OS1 Scope This is an OS1 category drawing, refer title block. OS1 refers to 'Overall Scheme' at completion. Refer to the SC1 category GA plan drawings to ascertain what is included in the shell contract. Dry lining LT-A to be part of fit out

LT-A

works. Lining required to achieve both fire and acoustics.

350 Fit out Dry lining LT-A

Fit out Dry lining LT-A

Envelope - Roof - EWS 740 Sections 350

Drawn

HCL

Apartment

WT-03-02

Party wall and Cladding junction North Elevation - Screed level 01 - Typical plan detaill - (For section detail refer to HCL drawing 5714) Scale 1:5

Full height Rockwool packed into void.

11

mineral wool Partywall50mmand Cladding junction-Plan detail

Cement board boxing at low level to enclose movement connection for cladding mechanically fixed to concrete. Void to be packed with Rockwool.

Gypframe 48 S 50 "C" Stud

Checked

JL

Approved

JL

Date

04.01.19


Cashmirino Specialist retailer of luxury cashmere apparel for children

1 Consistency with the shop scale and its historic architectural character

2 Timber bays to organise the internal space and Cashmirino clothes. Timber fins height=top edge of the window display.

3 Lighting Scheme. Pendant linear light focused on displayed goods.

12


HCL Architects - 2019/2020

• • •• • • •• • • ••• •• • • •• •• • ••• • •• •• •• ••• • ••• •••••••••••••••••••••••••••••••••••••••••

36-38 Berkeley Square London W1J 5AE

T 020 7495 4119 F 020 7493 7162 E info@hcla.co.uk

Check all dimensions on site Do not scale drawing All dimensions in milimetres

-

Rev

21.08.19

Date

By HCL

Revision Note For Information

A

11.11.19

HCL

For Information

B

05.12.19

HCL

For information

C

05.02.20

HCL

For Information

Notes

Ground floor Elevation Notes Date By Revision Note

Rev

First Floor Company Code

Project

Onsite measurement advised prior to installation.

Cashmirino - Burlington Arcade Drawing

General Arrangement Proposed elevations-Ground Floor Drawn

AGI

Checked

BL

Date

18/03/2019

HCL

Stage

Category Code

2

A

Scale

HCLA Project No.

1:25@A3

Zone

-

Level

00

636

Shopfront in Burlington Arcade, London.

Ground floor plan

• •••••••••••••••••••••••••••••••••••••••••

Check all dimensions on site Do not scale drawing All dimensions in milimetres

-

Rev

Date 21.08.19

By HCL

Revision Note For Information

A

11.11.19

HCL

For Information

B

05.12.19

HCL

For Information

C

05.02.20

HCL

For Information

Rev

Date

By

Revision Note

Notes

Onsite measurement advised prior to installation.

Burlington Arcade

13

Project

Cashmirino - Burlington Arcade Drawing

General Arrangement Proposed plans-Ground Floor Drawn

AGI

Checked

BL

Date

18/03/2019

Company Code Stage

2

Scale

1:25@A3

A

Category Code

A

HCLA Project No.

636

Zone

-

Level

00

Drawing No.

2201 Revision

C

Drawing No.

2301 Revision

C


Viceroy

Court

49-50

1 Convert two adjoining flats into one residence

2 Link bridge hallway

for

improved circulation

3 Louvred screens concealing air conditioning units within existing recessed niches

14


NOTES: General Drawing Status:

STAGE 4

HCL Architects - 2020 GAS IN

Discrepancies: Any discrepancies, errors or omissions etc. are to be reported to the architect immediately before proceeding.

GAS IN

Measured survey conducted by ELB Surveys.

BH 2.37

GAS MTR

C 1.10 H 2.27

PLINTH 1.05H

C 1.06 H 2.26

BH 2.45

Dimensions: Do not scale from drawings. All dimensions are metric and in millimeters. All dimensions are to be checked on site.

BH 2.27

NOTES: References

GAS MTR

DH 1.96 BH 2.27

DH 1.96 BH 2.26

This drawing should be read in conjunction with the relevant consultant documents · Refer to Barrett Mahoney documents for structural information · Refer to Judd Consulting documents for MEP services information

+2.72

+9.93

Bedroom 02

BH 5.14

Kitchen

BH 2.29

BH 2.63

Kitchen

PULLEY CAGE

+10.00

C 1.06 H 2.24

+2.48

+10.00 +10.00

+2.45

4

C 1.08 H 2.23

C 1.08 H 2.25

Utility +10.00

CUPBD

BH 2.25

Bedroom 02

DH 2.14

+9.06

+2.47

WC

+2.37

+2.45

4145

+2.31

+2.38

Ensuite 2

DH 2.16 DH 2.16

BH 2.29

DH 2.21

+4.10

WC

C 0.78 H 2.26

C 0.99 H 2.16

+2.68

+10.98 +2.43

Ensuite 2

DH 2.21

Ensuite

C 1.07 H 2.24

+2.63

DH 2.21 +2.40

+2.40

BH 2.32

WARDROBE

BH 2.29

C 1.04 H 2.21

1825

DH 2.20

C 1.06 H 2.23

FUSES

Utility

+2.45

C 1.06 H 2.21

3

+2.49

+10.87

+8.79

+2.59

Ensuite +2.62

CUPBD

+2.31

+10.00 DH 2.14

BH 2.33

BH 2.46 CUPBD

NO ACCESS DH 2.20 DH 1.96

+2.63

+2.62

+2.47 DH 2.12

CUPBD

+2.32

DH 2.20

CUPBD

BH 2.31 CUPBD

Cupboard 0.83h

DH 2.21

Airing Cupboard

+2.45

BH 0.92

BH 2.30

BH 2.26

5910

Lounge Dining Room

BH 2.27

+0.71

+10.00

BH 2.27

Master Bedroom

Stone hearth 0.01h

Hearth

Wardrobe

Hallway BH 2.31

Entrance

DH 2.28

DH 2.45

+10.00

+2.65 +2.39

BH 2.31

11875

+2.60

BH 2.32

Entrance

DH 1.96 BH 2.41

Hallway

+2.27 DH 2.20

2

DH 1.96

+2.59

Current state

Dining Room

Lounge

Master Bedroom +0.83

+10.00

+2.60

+2.60

+2.61

+2.60

+2.61

BH 2.30

C 0.66 H 2.27

BH 2.30

1

+10.00

+10.05

Cupboard 0.83h

+2.59

+10.00

10.10

+2.28

C 0.65 H 2.27

BH 2.31

10.07 DH 1.90

BH 2.24

DH 1.90

+2.29

C 0.65 H 2.28 C 0.67 H 2.29 BH 2.36

DECKING

Balcony +2.37

Bench

Balcony +2.52

+10.07

+10.05

BH 1.66 I/R 0.32H

Wall 0.54h

Wall 0.52h

BH 1.66

NOTES: General

I/R 0.32H

Drawing Status:

STAGE 4 4255

4660

8320

4660

4255

Dimensions: Do not scale from drawings. All dimensions are metric and in millimeters. All dimensions are to be checked on site.

26150

FLAT 49

A

FLAT 50

B

Extractor

FLAT 49

Boiler flue outlet positioned C minimum of 300mm from window opening

Position of future combination boiler to provide independent back up hot water. Landlords hot water and heating supplies to be retained and used also.

D

E

F

Discrepancies: Any discrepancies, errors or omissions etc. are to be reported to the architect immediately before proceeding.

FLAT 50

300 min

Measured survey conducted by ELB Surveys. NOTES: References +9.93

Horden Cherry Lee Architects Limited ©

36-38 Berkeley Square London W1J 5AE

T 020 7495 4119 F 020 7493 7162 E info@hcla.co.uk

Rev T1

Date 22.10.19 20.12.19

Drawn AP AP

Checked AP AP

Approved BL BL

Revision Note For Information For Contract

Project

49-50 Viceroy Court

DN 16

FF

4

+8.79

1825

FF

AP

Checked

AP

Approved

AP

A

Date

05 MAR 19

Services to be provided to allow a freestanding bath to be installed at a later date

DN 12

+9.06

+10.98

DN 10

UTILITY

4145

LEGEND - Floor Finishes DN 02

DN 18

FFL 10.00

11875

2

SERVICE ENTRANCE

FCU

DN 08

AIRING CUPBD

DN 17

MAIN ENTRANCE

DN 01

FFL 10.00

DN 04

Engineered Timber (FT-01)

DN 03

Low level access hatch required

MASTER STUDY

Communal service pipes to be relocated into joinery unit. Adequate access to be provided for maintenance.

Manifold

FCU

Manifold

DN 05

5910

DN 06

DINING

GUEST BEDROOM NO.1

LIVING

MASTER BEDROOM

FFL 10.00

1

CONDENSER

4255

BALCONY

FFL 10.06

BALCONY

CONDENSER

15

4660

8320

4660

4255

26150

FLAT 49

A

B

FLAT 50

C

Wall Type Reference Number Spot Level

MASTER ENSUITE

MASTER DRESSING NO ACCESS

Proposal

Door Reference Number

DN 01-19

WT - xx

AV / COMMS

DN 07

615

2101 Revision

T1

If in doubt, Contractor to comply with Building Regulations and to adhere to the conditions set out within the Reinstatement Licence schedule authored by the Landlords Surveyor.

00.00

DN 09

06

HCLA Project No.

1:50 @A1

LEGEND - References

WC

DN 11

Scale

1:100 @A3 Structural engineer to provide information regarding existing building structure and ensure proposed works will not harm the existing building and will be designed to meet Building Regulations.

Contractor to check all hot water, cold water and heating services can be isolated via isolation valves fitted to the branch service adjacent to the communal riser. DN 15

FFL 10.00

Manifold

DN 13

Drawn

GUEST BEDROOM NO.2

+10.87

FT-03

DN 14

3

General Arrangement Existing Floor Plan

ENSUITE

FF

KITCHEN

ENSUITE

Drawing

N

Check all dimensions on site Do not scale drawing All dimensions in milimetres

This drawing should be read in conjunction with the relevant consultant documents · Refer to Barrett Mahoney documents for structural information Company Code · Refer to Judd Consulting HCL documents for MEP Stageservices informationCategory Level Drawing No. 4 NOTES:

D

E

F

Porcelain Tiles (FT-02) External Porcelain Tiles (FT-04)


Viceroy Court 49-50. Flat Refurbishment NOTES: General Drawing Status:

STAGE

2536

1647

6718

1647

Dimensions: Do not scale from drawings. All d in millimeters. All dimensions are

4604

Discrepancies: Any discrepancies, errors or omis reported to the architect immedia

FCL

Measured survey conducted by E

2300

NOTES: References

This drawing should be read in co relevant consultant documents · Refer to Barrett Mahoney d information · Refer to Judd Consulting d services information

C4 30

450

2

TV/SAT

TV

30

2

DATA

30

TV/SAT

TV

30

NOTES: General Legend: Small Power & Electric Drawing Status:

DATA

FFL

95

Twin Data

2

30

150

2430

150

STAGE

5A Unswitched Lighting

5A 1150

Dimensions: Lighting Control Panel ( Do not scale from drawings. All d inC4millimeters. All 4dimensions are Control Touchscreen

01 Elevation 1:25

Discrepancies: 13A Double Switched S Any discrepancies, errors or omi reported to theVoltage architect immedia Dual Shaver so

MeasuredDoor survey conducted Entry System by E Fire Alarm Panel NOTES: References FAP

Intruder Alarm Keypad drawing should be read in c relevant consultant documents TV Point · Refer to Barrett Mahoney d (combined with twin dat information TH Aircon Thermostat Pan · Refer to Judd Consulting d services information 13A Double Switched S

IAK This 3910

1350

2410

1720

2410

1320

1060

2830

TV/SAT

FCL

CL

DATA

Low Level Washlight Legend: Small Power & Electric

CL

FCU

Manifold

150

TV

PIR Sensor Twin Data

PIR

2

Wall Recessed Washlig 5A Unswitched Lighting

2300

5A

General Guidance Lighting Control Panel

Touchscreen ·C4 LightControl switch 4setting out, at a Hudevad Radiator

Hudevad Radiator

1100mm above FFL from c 13A Double Switched S Sockets to be at a height o Dual Voltage Shaver measured from bottom of so p

· ·

125

FFL

FAP 2000

200

540

540

530

530

1280

220

2000

·

02 Elevation

TV/SAT

TV

DATA

·

1:25

Door Entry System Banks of sockets and switc spacing between face plate Fire Alarm Panel

Internal door handle height Intruder Alarm Keypad from centre TV Point Locations of timber fl (combined with inlaid twin da with Client and Architect pr Aircon Thermostat Pan

IAK

1280

TH

·

Locations of switched fuseS 13A Double Switched agreed with wardrobe supp

Low Level Washlight Wardrobes to have concea incorporated into the desig PIR Sensor transformers, and compone fromGeneral view. Transformers ar NOTES: Wall Recessed Washli removable matching solid t Drawing Status: located inside General Guidance the wardrobe

·

PIR

01 5108

3169

650

1100

04 5108

610

FCL

CL

1647

1100

02 5108

2290

2536

03 5108

3169

650

STAGE

2280

6718

CL

1647

CL

Guidance - Bathrooms · Light switch setting out, at 1100mm above FFL from c · Towel rails @ FFL +1125 t Dimensions: · notSockets to be at a height Do scale from drawings. All o · millimeters. Hand heldAllshower @ FFL + measured from bottom of p in dimensions are

4604

CL

·· Control valves @FFL Banks of sockets and+112 swit Discrepancies: spacing between face Any discrepancies, errors orplat om · Shower head @ FFL +215 reported to the architect immedi

2300

FCL

·

eq eq

eq

eq

eq

eq

Internal door handle heigh · Flush plate @conducted FFL +660by to Measured from survey centre

eq

eq

·· Toilet roll holder @ FFL +6f Locations of timber inlaid NOTES: References with Client and Architect p · Low levelshould light @ This drawing beFFL read+225 in c · Locations of switched fuse relevant consultant documents Towel ring @wardrobe FFL +800sup agreed with ·· Refer to Barrett Mahoney information Wardrobes to Consulting have concea ·· Refer to Judd incorporated into the desig services information transformers, and compon from view. Transformers a Legend: Small Power & Electri removable matching solid located inside the wardrob Twin Data 2

650

2300

5A

5A

Client to confirm removal of fireplace and infill

30

5A

30 30

2

TV/SAT

TV

2

DATA

TV/SAT

TV

DATA

04 Elevation

450

03 Elevation 30

1:25

95

5A Client to confirm removal of fireplace and infill

C4 30

FFL

30

30

1:25

30

Guidance - Bathrooms 5A Unswitched Lightin 5A

FFL

1150

150

2430

150

·

Horden Cherry Lee Architects Limited © 1:25

Rev T1

Date 20.12.19

Drawn AP

Checked

Approved

AP

BL

Revision Note For Contract

Project

T 020 7495 4119 F 020 7493 7162 E info@hcla.co.uk

Company Cod Control +112 13Avalves Double@FFL Switched HCL

·

49-50 Viceroy Court

Stage

Drawing 36-38 Berkeley Square London W1J 5AE

Towel rails @ FFL +1125 Lighting Control Panel

·C4 Hand held shower @ FFL Control 4 Touchscreen

01 Elevation

Category

Interiors 4· Lounge and Dining Room Elevations Approved Date Drawn Checked Scale ·

Check all dimensions on site Do not scale drawing All dimensions in milimetres

AP

3910

1350

2410

1720

2410

1320

1060

AP

BL

13 DEC 19

615

· FAP

Fire Panel Toilet rollAlarm holder @ FFL +6

IAK ·

Alarm Keypad LowIntruder level light @ FFL +22

2830

· TV/SAT

FCL

Shower @ FFL +215 Dualhead Voltage s AShaver

HCLA Projectto Flush plate @ FFL +660 Door Entry System

1:25 @A1 1:50 @A3

TV

DATA

TH

TV Point Towel ring @ FFL +800 (combined with twin da

Aircon Thermostat Pa 13A Double Switched Low Level Washlight

CL

CL

PIR

150

PIR Sensor

2300

Wall Recessed Washl General Guidance

· Horden Cherry Lee Architects Limited ©

Rev T1

Hudevad Radiator

FFL

T 020 7495 4119 F 020 7493 7162 E info@hcla.co.uk

125

36-38 Berkeley Square London W1J 5AE

Date 20.12.19

Drawn AP

Checked AP

Approved BL

Revision Note For Contract

Project

Drawing

Interiors Living and Dining Plan

Check all dimensions on site Do not scale drawing All dimensions in milimetres

Drawn

AP

2000

200

540

540

530

530

1280

220

Checked

AP

Approved

BL

· Stage

HCL Sockets to be at Category a height measured from bottom of

Scale

·

Banks of socketsHCLA andProject swit

·

Internal door handle heigh from centre

·

Locations of timber inlaid with Client and Architect p

·

Locations of switched fuse agreed with wardrobe sup

·

Wardrobes to have conce incorporated into the desig transformers, and compon from view. Transformers a removable matching solid located inside the wardrob

4

Date

13 DEC 19

2000

1:25

Living and Dining room 16 650

3169

1100

610

1100 2290

2280

3169

A

1:25 @A1 615 spacing between face pla 1:50 @A3

1280

02 Elevation

FCL

Light switch setting out, at 1100mm above FFL from

Company Cod

49-50 Viceroy Court

Hudevad Radiator

650

Guidance - Bathrooms

·

Towel rails @ FFL +1125


Viceroy Court 49-50. Flat Refurbishment Proposed Link Bridge

01 01

230

02 02 56035603

230

56035603

+2250 FCL FCL +2250

or metal Frosted or metal glassglass Frosted of window to rear of window to rear panelpanel double Homelight Crittal double Plus Plus Homelight Crittal glazed unit unit glazed fire resistant beresistant unit Window betofire unit to Window to protect minutes) (minimum to protect minutes) thirtythirty (minimum applies requirement the stair. applies requirement This This the stair. and glazed the frame to both unit. unit. and glazed the frame to both

Proposed Link Link Proposed

04 04

04 04

FFL FFL

- Proposed Link Bridge long section 0101 - Proposed Link Bridge long section Scale 1:20 Scale 1:20

56035603

295

295

56035603

Proposed Link Link Proposed

Short section

Long section

- Proposed Link Bridge short section 0202 - Proposed Link Bridge short section 17

Scale 1:20 Scale 1:20


La

Galindeta

1 Extending

the existing space

2 Relationship inside-outside, with the main pedestrian Street

3 Wood. Using natural texture to design the different areas

18


Rocío Nieto - 2018

Restaurant entrace

Dining room tables

Bar entrance

Dining room bench

19


La Galindeta.Restaurant design

La Galindeta is born by a dreamy young couple to open their first business on the main street of Cerdanyola. The establishment was previously a hairdresser; a dark space due to its deep and rectangular dimension. Altough, both the structure and the services were in optimal state. The object of this project was refurbishing it from an old hairdresser to an italian restaurant. We focused on extending the tight existing place and encouraged the relationship between the internal area and the dynamics of the street. The wood was the protagonist of this project; a material which designed the different areas of the restaurant by adjusting itself to the required dimensions of the locale. In addition, the use of clear and warm colour tones as well as the selected punctual lighting provide a greater scale to this place.

Entrance and bar section

Dining room section

Storage Working area

Corridor

Dining-room

Entrance Toilet

Restaurant ground floor

20


La Galindeta.Restaurant design

21


Nekane

1 Focusing on static and dynamic zones to balance the extended narrrow and deep space.

2 Design style from Ibiza according to their apparel. Selection and manufacture of furniture.

22


Eli G. Cruz 2018-2019

Finished Project Photos

23


Nekane Barcellona. Retail

Baúl mimbre Mesa 160x80

Baúl mimbre

Baúl mimbre

NEKANE The Things We Love

The Things We Love

Lace

Lace

Planta zona 2

SL1 Sección longitudinal

Planta zona 3

SL2 Sección longitudinal SL1 Sección longitudinal

The Things We Love

Lace

ST1 Sección transversal SL1 Sección longitudinal

SL2 Sección lo

NEKANE The Things We Love

Baúl mimbre

Lace

ST1

Escalera

ST2

ST3

ST1

ST4

SL1

SL1

SL2

SL2

AE NK EA N E N E KN AE NK EN The Things We Love

Lace

PROYECTO DE DISEÑO INTERIOR DE LA TIENDA "NEKANE-NKN" Rambla de Catalunya 113 Barcelona

Escalera

PROMOTOR: Montse Garrido

ARQUITECTA Isabel M. García Cruz

SL2 Sección longitudinal SL1 Sección longitudinal

SL2 Sección longitudinal SL1 Sección longitudinal

DIN A3 ENERO.2019

1/50

FASE: Estudio previo

PROPUESTA PLANTA Z1

06

SL2 Sección longitudinal

24

ARQUITECTA Isabel M. García Cruz


e

Baúl mimbre

Estantería 190x37

NEKANE

Estantería 190x37

Nekane Barcelona. Retail

NEKANE

Mesa 60x60

NEKANE

NEKANE Mostrador/Caja

Escalera

Escalera

Planta zona 5 SL1 Sección longitudinal

SL1 Sección longitudinal SL2 Sección longitudinal

Planta zona 6

SL2 Sección longitudinal SL1 Sección longitudinal

ST1

ST2

ST3

SL2 Secc

ST4

erbmim lúaB 08x061 aseM

erbmim lúaB

SL1

SL1

SL2

SL2

Escalera

The Things We Love

sgnihT ehT evoL eW

Lace

ecaL

PROYECTO DE DISEÑO INTERIOR DE LA TIENDA "NEKANE-NKN" Rambla de Catalunya 113 Barcelona PROMOTOR: Montse Garrido

SL2 Sección longitudinal

ST3 Sección transversal

longitudinalDIN A3 lanidutignoARQUITECTA l nóicceSL2 S 1LSección S

lasrevsSL1 nart Sección nóicceS longitudinal 1TS

Isabel M. García Cruz

ST4 Sección transversal

FASE: Estudio previo

1/50 zona Planta 4 PROPUESTA PLANTA Z4

ENERO.2019

ARQU Isabe

09

2 anoz atnal

25

1TS

ST1

ST2

ST3

ST4


AMB

1 Retaining

2 Removing

the existing structure

limits at ground floor

3 Permeable

public realm

26


DATAAE Practice - 2018

Garden façade

Diaphanous space

27


AMB. Functional and energy efficiency renovation of the ground floor

The project consisted of refurbishing the ground floor in the Metropolitan Area of Barcelona building. The main use, the structure and the architectural volume were sensitively kept. On one hand, a proposal for a new entrance where citizen services are managed. On the other hand, another proposal based on developing a new layout for the ground floor to turn it out to a mixed-use space. This includes an exhibition area, waiting rooms, meeting rooms and a coffee bar. The new ground floor meeting rooms are designed to avoid heavy transit around the offices. The mixeduse room takes up the majority of the floor and it is equipped with great lighting and services for exhibitions and events. The new coffee bar is connected to the garden. Façade Construction Design

28


AMB. Functional and energy efficiency renovation of the ground floor

Current state

Proposal

29


Housing

refurbishment

1 Open space entrance dining room - kitchen

2 Extension and wooden floor finish for the existing stairs

3 Link Bridge.New access to the laundry room through a solid timber bridge

30


Architecture studio DATAAE - 2017

Current state

Proposal

Ground floor

Ground floor

First floor

First floor

31


Housing refurbishment in Sant Feliu de Llobregat, Barcelona

Sections proposal This project was an apartment refurbishment for a family. The flat was left half-built. There were the structure and the facade. The Client were looking for a simple appearance, light colours and wood. Therefore, we chose white painted plasterboard for dividing walls, timber flooring, timber windows and doors and bespoke furniture also made out of wood. It was designed a combined kitchen and dining-room in order to get extra daylight and a feeling of greater scale seen from the entrance door. The existing stairs were extended and covered with same material as the floors. We also built a small solid timber link bridge to get a suitable access to the laundry room.

32


Housing refurbishment in Sant Feliu de Llobregat, Barcelona

D2

D3

33


Library

of Sant Cugat

1 Demolition

of the existing small constructions

2 Placement of the roof at the same level as the existing topography

3 Merge of the proposed building with the topography-100% green roof and olive trees retained

34


Achitecture studio DATAAE - 2017

35


Gabriel Ferrater Library, Sant Cugat del Vallès (Barcelona)

Proposal Building and Public Realm

Existing vegetation Reading outside area

36


Gabriel Ferrater Library, Sant Cugat del Vallès (Barcelona)

Proposal Ground floor

Detail section

37


I ndex

1 Nature between infrastructure. Master Thesis.Barcelona 2016/2017

40-59

3 Dynamic pathway. Università Roma Tre-2014

60-63

38


ACADEMIC PROJECTS


Nature

between infrastructure

1 Working on the existing underground

passages

2 Path-axis

circular connector

3 Park-Natural

40

extension


Master Thesis - ETSAV 2016/2017

41


Pedestrian and natural connection. Rubí-Sant Cugat - Context

The Project area is located in a context of territorial infrastructures. The Site is in between two towns, Rubi and Sant Cugat. From a Nature’s point of view, this area would take part into a future Green Corridor from Sant Llorenç de Munt i l’Obac park to Collserola. The railway, the electricity supply lines and, especially the highway, are the infrastructures that have a major impact on the zone. This infrastructures’junction has created a detached space between both towns over the years. As a result, there is an open natural area, known as “Alous area”, which citizens are not able to enjoy due to non-existing connection.

42


Current state site photos

43


Current state. Demands and avalaibility

Alous natural area

Infrastructures’junction

Passages

Underground passage Cycle network Pedestrian network Unsuitable road for walking

Disused areas

Pedestrian and cycle lanes detached

44


Targets

Bringing disused areas up

Re-connection between natural parks

Cycle lane connection Pedestrian connection Pedestrian network

Integrating territorial infrastructure

Pedestrian connection

45

Cycle network

Connection Sant Cugat-Alous


Proposed plan

Underground passages

+

Path

+

Park

46


- aggregate - árido

Path. Axis-connector

1 Guideline The path connects, organises leads pedestrian flow through Nature.

and the

2 Topography

+ árido aggregate +

The path section encloses itself into the land topography where there’s a infrastructure junction.

3 Continuity

The material of the path degrades itself from the most solid concrete to just compacted soil according to the location. The strategy consists of increasing the aggregate’s percentage while decreasing the cement’s percentage.

The path’s width is always 2.5m but not at the passages, where it turns into the full width. Also, the pavement is related to its materiality along its all lenght. 47


Path. Axis-connector

48


Path. Axis-connector

Current state

Proposal

49


Renaturalization

Proposed Vegetation 1.To Re-open the river. 2.Riverside vegetation for phytodepuration of polluted water. 3.Phytoremedation for land restoration. 4.Minor topography modifications. 5.Disused road turns into a natural pedestrian way. 6.To remove reed diffuser and new planting of particular species for the phytodegradation. 7.Local vegetation (white poplar) to provide shade along the path.

Retaining walls

50


Underground passages

car

Pedestrian

car

1 Recirculation

2 Wraparound

Underpass 3

3 Green continuity

Underpass 4

4 Natural slope

51


Underpass 4-highway. Current state

52


Underpass 4-highway. Proposal

53


Underpass 4-highway. Proposal

Short section

Long section

54


Underpass 4-highway. Proposal

Concrete link bridge details

55


Underpass 3-Railway. Current state

56


Underpass 3-Railway. Proposal

57


Underpass 3-Railway. Proposal

Short section

Long section

58


Underpass 3-Railway. Proposal

Constructions Details

59


Dynamic

pathway

1

Vertical Itinerary Integrated ramp into the building

2 Conecction

of common areas

3 Continuity with adjacent building and the main road

60


Academic project. Università Roma Tre - 2014

61


Mixed use building The

project’s

starting

point

is

an empty lot at the main street of Ostiense, next to an existing building where squatters currently live in. The project objective is a mixed use building (housing, co-housing, auditorium, cafe) which adjusts to the lot’s geometry. The proposal consists of designing a simple volume which contains multiple uses and connects all the common areas through a dynamic itinerary. This itinerary is a ramp which gives access to each floor; internal and external areas. The public and private spaces are never connected straightaway one to the other.

Visual from the main road

Façade

Long section 62


Mix-use building

Short section

Axonometry

Visual of the courtyard 63



MISC E L L A N E O U S


66


67


68


69



Contact me, Rocio Nieto Ventaja.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.