rodolpho furtado portfolio
Graduated in Architecture and Urban
01
Curriculum
Design at Universidade Federal de Goiás.
WORK EXPERIENCE LUCIANA MESSALA ARCHITECTURE AND INTERIOR DESIGN
PERSONAL INFORMATION
2012
14/07/1989
Date of Birth: Birth Place:
Goiânia – Goiás
Civil Status:
Single
INSTITUTE OF HISTORICAL AND ARTISTIC HERITAGE (IPHAN) 2013
2015 2016 2017
CONTACT (55 62) 98163-9455
- Intern Responsible for meeting clients, production of digital models, rendering and presentations. Production of plan and section drawings, building and furniture design detailing; Required high levels of teamwork, ability to work effectively under pressure and developed time management skills to work within a deadline.
- Intern Responsible for the visual comunication design, production of digital models, rendering and presentation. Cataloging les, lling records of historic information, survey and preservation. Required time management, responsibility and professionalism.
ANDRÉ BRANDÃO + MÁRCIA VARIZO ARCHITECTURE AND INTERIOR DESIGN - Intern Responsible for meeting clients, production of digital models, rendering and presentations. Production of plan and section drawings, building and furniture design detailing; Required high levels of teamwork, ability to work effectively under pressure and developed time management skills to work within a deadline.
rodolphoteixeira@msn.com Rua P-13-A, nº30 Setor dos funcionários P.O. BOX: 74543-270 Goiânia-Goiás-Brazil
RESEARCH SCIENTIFIC & PROJECTS PRODUCTIONS
EDUCATION
Author of research project under the name “Rebuilding documentation: narratives and pathways of modern design in Goiania - The Jao Yacht Club: A study of virtual architectural modeling”.
CCBEU – CENTRO CULTURAL BRASILESTADOS UNIDOS Av. T-5, nº 441 – Setor Bueno Course: English
INTERESTS AND HOBBIES
coffee photography design
UNIVERSIDADE FEDERAL DE GOIÁS Campus Samambaia, FAV – Faculdade de Artes Visuais Goiânia – GO Course: Architecture and Urbanism Term: 2011 - 2016
Co-author on article for book publication: CRISTINE, E. ; LIMA, F. F. ; AMARAL, C. ; OLIVEIRA, A. M. V. ; MARÚ, A. F. M.; FURTADO, R. T.; Creative processes in architecture course. In: Erika Cristine Kneib. (Org.). Project and City: academic essays. 1ed. 2013.
cinema
DE MONTFORT UNIVERSITY
reading
drawing
traveling
music
The Gateway, LE1 9BH Leicester – Leicestershire – Inglaterra Course: Architecture Scholarship program (2013-2014)
ADDITIONAL INFORMATION softwares
SOCIAL MEDIA
languages
corel draw
microsoft ofce
portuguese
english
photoshop
sketchup
french
spanish
autocad
vray
illustrator
revit
3D Max
rhino
facebook.com/rodolpho.furtado.7
instagram.com/dodofurtado
ickr.com/photos/rodfurtado/
Internships
Digital models designed to present to clients in Architecture 02 and Interior Design ofď€ ces I worked as an intern.
03
International experience - De Montfort University
The proposal was for religious library in Orvieto, Italy, a city on the top of a cliff with many underground connections. The idea was to bring those connections to the surface, creating all kinds of paths while the user go up the library. Meanwhile, in this search for knowlegde (or enlightenment) the user would enter from the lower ground at the social area, with closed walls and few light, going up where the books are. And as you aproach the rare section, the library will open up for the light.
Roof Detail
Drawn Section
Detail Sectional Model
04
05
2,5m
design projects student housing and sports center
Privado
Privado
Coletivo
Centro Esportivo
Located next to the Federal Univerisity of Goiรกs Campus, this proposal for a student housing and sports center aims to help students with financial difficulties as well as to provide physical activity for all and encourage the social interaction.
A central arena filled with green spaces was made for gatherings and to converge all the three areas of the complex: housing, social area (under the housing blocks) and sports center.
The students housing is divided in three parts: two private blocks with bedrooms, study rooms, bathrooms etc, and a social block connecting the private ones, located under them, in front of the sports center, where the staircase steps of the arena were used as sun blocks.
06
07
design projects restaurant
This restaurant is located in the central area of Goiânia (Brazil). The idea was to make the ground floor as a free passway from the restaurant to the historical Art DÊco buildings across the street. Sun blockers with volume variations were used to make the light more dramatic as the user go up the access ramp. The shape of the building in a continuous strip help to guide the direction of the pedestrian.The restaurant is actually on the upper floor, so that the user can make meals with a great view of the avenue but far from the noise and traffic.
08
09
ade
Unid e idad
ade
Un
Unid ade
ade
Unid
Unid ade
Unid
-3,0
ade
Unid
de
a Unid
e idad
Un
ade
Unid
ade
Unid
r
edo
Corr
ade
ade
Unid
0,0
ade
ade
Unid
Unid
de
a Unid
de nida
U
ade
Unid
de
a Unid
1,0
dor
e Corr
ade
Unid ial
Unid
merc
a co
Ă re
ade
U
de nida
Unid
design projects
10
serial housing
“(…) habitation – the human ‘’habitat’’, as it were – is what architecture is all about” (Lefebvre)
Ÿ
To integrate city, human being and nature.
Ÿ
To connect the surrounding parks to the interior of the neighbourhood, creating green paths equipped with drugstores, markets, health center and comercial gallery.
Ÿ
To create different types of residences to accommodate people from different social classes.
gathering shared space
quality of life
integration
11
design projects multifunctional complex
This Multifunctional Complex, combining housing buildings, comercial and cultural areas, was designed to be placed in a brazilian neighbourhood famous for its concept of ‘garden city’. Therefore one of the criterias followed was to use the vegetation not only as an option of environmental comfort, but also as a main component of the facades of the buildings, which were placed thinking on the best way to frame great views for the residents. The entire complex is organized in linear parks, creating a huge square in the middle of the block, conecting the exterior with the interior. Each oor has its own garden, and the different shapes of the paviments make possible to have a better insolation for the plants and shaded spots for the resisdents. All comercial and cultural areas are on the lower levels, so that they can be easily approachable for everyone.
AGENCIAMENTO DOS PAVIMENTOS
12
13
14
nal project memorial pathway 1 - Antonio Accioly Stadium 2 - Old Bahia Avenue 3 - Campinas Market 4 - Old Campinas Cinema 5 - Joaquim Lúcio Square 6 - Mother Church Square
scale 1/2000
- The AntĂ´nio Accioly Stadium is considered as the gateway of the neighborhood
Area 1 - AntĂ´nio Accioly Stadium
15
- The proposal is to build elements that mark portals in two directions: in the longitudinal axis of the terrain, with a focal point on the main avenue and on the stadium; On the transverse axis, which marks the passage of pedestrians.
collective
gateway of the neighbourhood events
- Areas of permanence and relaxation would be established, with an area of bleachers that would form an arena for events and presentations, and a socializing place with food court.
N
Planta baixa 1m
Av.
24 d
eO
utu
bro
5m
10m
. Av l
ra et
rim
Pe
ď€ nal project memorial pathway
16
section - esc.1/300
- Bahia Avenue was the center of bohemia, parties and nightlife.
Area 2 - Old Bahia Avenue
17 - Prejudice directed to the women of campinas due to the pole of prostitution.
events
socialization meeting
- Exploration of the ludic character of the area. A proposal of support regions for the night life and encourage meeting between different groups (families, young people, children, skaters, lovers ); - Elements that refer to playfulness and sensory exploration; - Food court; -Division of the area into three squares: 'empowerment' square, 'prejudice' square and 'difference' square’. -Underground parking lot.
N
plan 1m
5m
10m
ď€ nal project memorial pathway
18
00,0
-3,50
-6,70
section - esc.1/300
Area 3 - Campinas Market - Campinas market holds a variety of handcraft products and it has been a landmark for the neighborhood for decades.
19
handcrafts meeting
- Is the place where to nd homemade and everyday products - The proposal is to create places of interaction, like tables for board games, and giant chess games on the oor;
exchange relations
- sun loungers for rest; - urban garden; -An urban gallery for local artists and grafti artists.
N
Planta baixa 1m
5m
10m
ď€ nal project memorial pathway
20
0,00
section - esc.1/300
- The old Campinas Cinema was where people used to meet on sunday nights for poetry, music and movies.
Area 4 - Old Campinas Cinema
21
- The land right in front of it was a ď€ eld used for kiosk and where children used to play soccer..
exchange relations
playful matinee
-The proposal would be for a structure for meetings and games during the day, and exhibitions at night. - Bleachers for games and movies; - Illuminated cubes on the structure.
N
plan 1m
5m
10m
ď€ nal project memorial pathway
0,00
section - esc.1/200
22
- On this square used to happen the ‘footing’ ritual, where couples would walk in circles around the gazebo to woo.
Area 5 - Joaquim Lúcio Square
23 exchange relations
- Was the old political, commercial and social center of the city. meetings
- The proposal would be to turn the streets around the square into shared streets, giving preference to the pedestrian;
events
- Great information totens as a reference to the power center the square once were. - Circular arrangement of the square to refer to the ‘footing’ ritual.
N
Plan 1m
5m
10m
ď€ nal project memorial pathway
+0,40
0,00
section - esc.1/300 -4,00 -6,90
24
- The Mother Church of Campinas hosts many religious events every week.
Area 6 - Mother Church Square
25
tradition
socialization events
- Right next to the square there’s a cultural center, which was an old monastery connected to the church. - The proposal would follow a concept of order and standardization, as a reference of the monastery life; - Great courtyard to recieve events; - Public furniture organized to frame the main buildings around the square.
N
plan 1m
mother church
5m
10m
ď€ nal project memorial pathway
26
0,00
-3,00
section - esc.1/200