“Music is liquid Architecture & Architecture is frozen Music”
-Johann Wolfgang Von Goethe
• NEW 130 BED HOSPITAL WITH 11 FLOORS INCLUDING MECHANICAL FLOOR.
• HIGH END HOSPITAL FOR MEDICAL TOURISM FIRST OF ITS KIND IN PUNE, INDIA.
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/0935c29c7ced53a784a881c479fd2290.jpeg)
• INVOLVED IN MEDICAL PLANNING, DESIGN DEVELOPMENT AND INTERIOR DESIGN
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/9d07c1c9e3d7f348e7aed649be95a145.jpeg)
• ALSO WORKED ON INITIAL CONCEPT DOCUMENTS AND CONSTRUCTION DOCUMENTS.
• PROJECT COMPLETED IN 2012.
RUBY HALL CLINIC HOSPITAL WANOWRIE, PUNE, INDIA
• NEW 80 BED HOSPITAL WITH 6 FLOORS AT 90,000 SF.
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/51c9e80043f213edee3e063a2a3119e0.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/56f1a91719f143778097b2767d9f3e4a.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/674522a4d13f26a93f1fe5642b67276a.jpeg)
• WORKED ON THE PRELIMINARY DESIGN, SITE PLANNING AND MEDICAL PLANNING.
• SUCCESSFUL PROJECT AT THAT TIME FOR UPCOMING AREA OF HINJEWADI AN I.T. HUB IN PUNE,INDIA
• ALSO WORKED ON SCHEMATIC DESIGN FOR INTERIOR PART OF THE PROJECT
• PROJECT COMPLETED IN 2014
• PRIVATE RESIDENCE FOR A JOINT FAMILY IN PUNE.
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/bbbdaf0b3970a126d6fdac89b9f27f96.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/a34939d592ac7dfcab1cf045c948c972.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/f5a8f7fdab72beecf70970525ec7c4e4.jpeg)
• CLIENTS WERE OWNERS OF AN ELECTRONICS BUSINESS.
• WORKED ON CONCEPT DESIGN AND DESIGN DEVELOPMENT ESPECIALLY EXTERNAL DESIGN AND THE LATTICE WORK INSPIRED BY THE PCB BOARDS.
• BUILT IN 2015.
PRIVATE RESIDENCES, PUNE, INDIA
• LOCATED IN LOS ANGELES, CALIFORNIA BEHIND THE DODGERS STADIUM.
• PROJECT SCOPE INCLUDED REDESIGNING AND ENTITLEMENTS STUDY FOR THE EXISTING BARLOW RESPIRATORY HOSPITAL AND 45 ACRES OF LAND OWNED BY THE HOSPITAL.
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/84a6c53b7519bc69491cdb56c3af73be.jpeg)
• THE SCOPE ALSO INCLUDED TOWNHOUSES AND MULTI FAMILY LIVING APARTMENTS.
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/3ce922aba849c7cd2a05e0284cda93b4.jpeg)
• PART OF TEAM WHO DID ON MASTER PLANNING AND CONCEPT DESIGN.
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/11573a5e78a4bae1c59fa60665af45c9.jpeg)
BARLOW RESPIRATORY HOSPITAL & ENTITLEMENTS, LOS ANGELES, CA
• PROJECT SCOPE INCLUDED MASTER PLANING FOR EXISTING DOWNTOWN DENVER HEALTH CAMPUS.
• MAIN TASK WAS RE-PLANNING OF 4 EXISTING CAMPUS BUILDINGS, ADDITION OF A 5 STORIED MEDICAL OFFICE BUILDING AND LOGISTICS RE-PLANNING.
• WORKED ON THE MASTER PLANNING, EXTERIOR DESIGN AND CONCEPT DEVELOPMENT.
• WORKED ON MEDICAL PLANNING FOR THE MEDICAL OFFICE BUILDING.
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/6e0d4dac02304d9ac0acfcbed12419ca.jpeg)
DENVER HEALTH CAMPUS & ENTITLEMENTS, DENVER CO
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/bdc490d4220a9115861c1005fa0c606b.jpeg)
• SCOPE INCLUDED NEW 5,600 SF.ADDITION TO EXISTING HOAG IRVINE EMERGENCY DEPARTMENT.
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/fbab59cb70d6cc8b629b0c7b5c1622d8.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/5f14c977fe00dfb11cdc17918824fba1.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/f5431b0ab4118bff081677164201f9df.jpeg)
• WORKED ON CONSTRUCTION DOCUMENTS, CONSTRUCTION ADMINISTRATION AND DESIGN FOR EXTERNAL FACADE AND CANOPY.
• INTENSIVE CLIENT CO-ORDINATION AND INTERACTION INVOLVED.
• BUILT IN 2018.
HOAG IRVINE EMERGENCY DEPARTMENT EXPANSION , IRVINE ,CA
• PROPOSAL FOR EXPANSION TOWER FOR EXISTING HOAG IRVINE HOSPITAL CAMPUS THAT WOULD INCLUDE 180 BEDS WITH
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/24108a363bae39a312d5e1e5ca922182.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/d62e446dcedfa1abc18b8fc7926fd6c8.jpeg)
14 FLOORS TO INCLUDE INPATIENT AND OUTPATIENT CARE.
• INVOLVED IN PRELIMINARY, SCHEMATIC DESIGN AND DESIGN DEVELOPMENT.
• WORKED EXTENSIVELY WITH THE MEDICAL PLANNING TEAM, CONSULTANTS AND DESIGN TEAM TO CREATE PROPOSAL THAT INCLUDED VIEWS AND WALK THROUGH VIDEOS.
HOAG IRVINE EXPANSION HOSPITAL, IRVINE, CA
NOTFOR CONSTRUCTION
• THE PROJECT IS A REPLACEMENT BUILDING FOR EXISTING CAMPUS FOR SCRIPPS HEALTHCARE IN ENCINITAS,CA.
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/3f49b874e606bd630e7d5950a9184eb9.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/553d33569817cdd7de1f7d9b4e9d9367.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/808a459136223ccadef32749e87a4788.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/32e628d95b28a54ae206cd9a980ca8bf.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/47d6a4a803b3b9e6e1c69e3625f8e239.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/f64c6dc03d51ce00f943b979fa5c9f38.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/c7931de7a207e807c8eed54e2d2ac561.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/cbb8fa5cabb9f25210434c677b0675af.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/4549ccfa4fbac3c892418e746b028f4a.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/dcfe7500132b1ff47f585d7d83d1a32a.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/14e1f4d6bb0f85c7b846c0c85de0bf4b.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/8d047ee91846280e80a2d9f96c312610.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/719374abd3807082ad4ebb451f326b9b.jpeg)
• DEMOLITION OF EXISTING 180,000 SF BUILDING IN 5 PHASES AND CONSTRUCTION OF NEW 120 BED HOSPITAL TOWER WITH AREA OF 226,000 SF. IN 7 PHASES.
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/b1c0b508ac563c11000fc8793becc285.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/429f67d32495fae08d56ef49d1176d40.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/b2676271118a170839ddfda58933f615.jpeg)
• WORKED ON THE INITIAL PROPOSAL, SCHEMATIC DESIGN, DESIGN DEVELOPMENT THROUGH THE CONSTRUCTION DOCUMENTS AS A PROJECT DESIGNER.
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/03b43efae44f337bf755b682d57efb98.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/9a178a3e65b5bf98d97c83895ff87988.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/d3e0be6805868cca09b42c2e935dd00c.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/d3220ae974a175a622e8d7842822e3b8.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/d073c867e75c0551249ef8d77bf14b38.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/7100666c8b3c7bf80e694b1764d84d75.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/46f0f7dbca11d061fce70404dea56284.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/a6594ae549fde5c4de611490b128f064.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/e42d6b4f126bcc962053c447c2fc052b.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/fb0ab76e2417ad4a40d95874558a369d.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/69c4a2a18bfa57a6cbaa59ec1711d221.jpeg)
• INVOLVED IN EXTERNAL DESIGN, LANDSCAPE DESIGN AND BASIC MEDICAL PLANNING.
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/cfeea697cd0be7823d4d02bcc1d922f4.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/d14f48a01a2719a4194f7e54cb7ac570.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/261bd421ce97cf47dfd3e37a45a6d96e.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/1efa8229b85a37884705c97a744f6023.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/205d99b01758453401dd58ac736bc40a.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/3ac0527256acdab7bd47f34f6f343faa.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/012f64d5d0a6f022322779e5e2bc28c1.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/153bb94884f28a7ce1e27f99726ed029.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/8eada5d47029291d2394b16528d64bbd.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/b3664bb50a4e3c4c20ed85689273c78e.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/a417b2323df0174b292b35e9535dc0da.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/fddab60a7ce18b3cce7bdee3ca0a3c04.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/ab4e4c8e0eafb388a7be57ef56b6ab5b.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/5b60ffca2c39ef1db5f10b0948c6416b.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/713287b79fcfcbb7b149f6b67916d360.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/cd38d41232c2aeee8ff9994670bf2199.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/0cb4384adcdeb0d4589d2288591e2f74.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/0b663422c5cee8cd6e335f1e330019be.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/01b0569ce5f35ae497247554961d242a.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/3e1fa831706797929a5ff21ad86a3577.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/829d4a27a24b67ee5a55a8dde230c7d3.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/d5f70b1b21e3b71689129769d6b9b475.jpeg)
• POINT OF CONTACT ON FIRM’S SIDE AS A DESIGNER IN INTERACTION WITH CLIENT AND CONSULTANTS INCLUDING DA SUBS.
• PROJECT UNDER CONSTRUCTION.
SCRIPPS ENCINITAS ACUTE CARE HOSPITAL, ENCINITAS, CA
• CONSTRUCTION DETAILING FOR SCRIPPS ENCINITAS ACUTE CARE HOSPITAL.
• CREATED THE UNIQUE CONSTRUCTION DETAILS WITH EXTENSIVE CO-ORDINATION FROM STRUCTURAL, MEP CONSULTANTS AND MANUFACTURER REPRESENTATIVES.
• DETAILS WERE SUCCESSFULLY APPROVED BY HCAI READY FOR CONSTRUCTION.
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/949688cc49189dff9ac8686419abf799.jpeg)
CONSTRUCTION DETAILING FOR SCRIPPS ENCINITAS ACH, ENCINITAS, CA
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/4d2da80507b364ff0ad01e1da5c4fb03.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/ca976b802515b09c0d7c1ac3d928d1bd.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/56a835fc32c0862725228cf6abd7fe05.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/d325ba4b02a4257d77435ee655983be1.jpeg)
• PROPOSAL FOR NEW 64,625 SF.MEDICAL OFFICE BUILDING.
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/e8b46ad4e70f07a7be4ea2259a4e0c8f.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/b7a064ddb639c5ef2fee3be2d068358b.jpeg)
• PLANNED TO BE AN ADDITION TO AN EXISTING 67,000 SF. ADJACENT MEDICAL OFFICE BUILDING
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/e4648036207ca964edf29ca28a2ac615.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/a1d15d631c7a765c437c49e686335294.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/f0a53fd172f688e04082b21029a7d30a.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/f578fa536c12f96dfe713638ad7d896c.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/57f5e6163c6ca1ac69d7081047d7cd64.jpeg)
• INVOLVED AS THE PROJECT DESIGNER IN EXTERIOR DESIGN, MEDICAL PLANING AND CREATION OF PROPOSAL.
• HEAVY CONSULTANT CO-ORDINATION INCLUDING MEP, CIVIL AND LANDSCAPE.
• THE CONSTRUCTION DID NOT GO FORWARD DUE TO FINANCIAL CHALLENGES POST COVID.
MEDICAL OFFICE BUILDING, SAN DIEGO, CA
• PROPOSAL FOR A NEW MEDICAL OFFICE BUILDING WITH BUILT AREA 35,000 SF.
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/0bae168ec00e3b65378892d5f4d070e6.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/a6e6b3110b308fd277ef10a6635af6e9.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/d413e12fb783ca55169c557ae70ca3c6.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/b6b9e0537baccb3e3c972f0139f935a5.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/0e1ebac78356c677f20c4cd86a03fab2.jpeg)
• SPECIAL CONSIDERATIONS FOR POST COVID DESIGN AND ADJACENCY TO EXISTING TRAIN STATION RESULTED IN STREAMLINED MEDICAL PLANNING.
• INVOLVED CONCEPT DESIGN, MEDICAL PLANNING.
• GLENDORA BEING THE CITRUS CAPITAL OF UNITED STATES, THAT SERVED AS A CENTRAL CONCEPT CREATING COMMUNITY AREAS AND GARDENS.
MEDICAL OFFICE BUILDING, GLENDORA, CA
• SCOPE INCLUDED CONVERSION OF EXISTING 4,300 SF. CHURCH CAMPUS TO A 5,400 SF. WELLNESS CENTER.
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/9bcd07456473ab56a4b5877d72dae674.jpeg)
• PROJECT DESIGNER FOR THE PROJECT AND RESPONSIBLE IN ACQUIRING THE PROJECT.
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/b3b6f6b7b2b5184770cac0d708e34bb7.jpeg)
• PROJECT INCLUDED GATHERING AND ACTIVITY SPACES, AND COMMUNITY KITCHEN.
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/2ce6e20a4069b7478d45ecf2fb45723d.jpeg)
• INVOLVED IN DESIGN, PROJECT MANAGEMENT AND CONSULTANT CO-ORDINATION.
• CREATED BUSINESS MODEL FOR CLIENT TO CREATE REVENUE GENERATION.
• CONSTRUCTION TO BE STARTED IN EARLY 2023.
FALLBROOK WELLNESS CENTER, SAN DIEGO, CA
• SCOPE INCLUDED NEW 98,000 SF 120 BED HOSPITAL TO HOUSE BEHAVIORAL AND PHYSICAL HEALTH REHABILITATION.
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/11ca4dd0190f5779077b14f326597e47.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/295e209c8e7fb98946a3345b091b3f2f.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/c31160d8db575bd621b34d64497058ab.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/580009fb0bc75d104234d8ada5369ad7.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/24c34089dd13d017b1144518f754afbc.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/a4337c79585185c355f410b6a858e131.jpeg)
• EMPHASIS ON SAFETY CONCERNS FOR PATIENTS, STAFF AND VISITORS.
• FIRST OF ITS KIND IN THE U.S. THAT HOUSES BOTH TYPE OF REHABILITATION.
• WORKED FROM THE ENTITLEMENTS PACKAGE, FEASIBILITY STUDY, SITE DEVELOPMENT THROUGH DESIGN DEVELOPMENT
• CO-PROJECT DESIGNER DOING EXTERNAL DESIGN, PRELIMINARY PLANNING, SITE AND CONCEPT DESIGN.
• ESTIMATED DATE OF COMPLETION LATE 2025
• NEW PHYSICAL REHABILITATION HOSPITAL WITH INPATIENT AND OUTPATIENT REHABILITATION SERVICES.
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/16680cbc679b1963b468034436374eb0.jpeg)
• TOTAL AREA OF CONSTRUCTION 63,000 SF. HOUSING 52 BEDS AND 6 OUTPATIENT SERVICES.
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/9919b7583a0a361a56de8a130bf8bf13.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/eb8d7b1426a7ae1638d968978cda9836.jpeg)
• INVOLVED IN ENTITLEMENT STUDY, CITY SUBMITTAL PACKAGE, CONCEPT DESIGN AND DESIGN DEVELOPMENT.
• ALSO INVOLVED IN CONSULTANT AND CLIENT CO-ORDINATION AND PROJECT MANAGEMENT TILL SUBMISSION TO HCAI(OSHPD).
• OTHER DUTIES INVOLVED INTERACTION AND COORDINATION WITH MEDICAL PLANNER AND INTERIOR DESIGNER TO CREATE A ‘MODEL FACILITY’ FOR THE CLIENT
• ESTIMATED DATE OF COMPLETION MID 2026
• SCOPE INCLUDED PROPOSAL FOR REPLACEMENT OF EXISTING 17,000 SF. MEDICAL OFFICE BUILDING IN TWO PHASES AS PHASE 1 AND PHASE 2 WITH 62,000 SF. IN TOTAL.
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/d88ad19897b268624b76e8238fa754fc.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/e074660be788edbb9a62eab58b32963b.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/706aeaba3f04be960e7521522b5ffab0.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/6c44aecd858d2a1597718d1f3ec90a0b.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/b32cda2242f42d000a137f0f51e23741.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/cbdbf2aaaecff3411930e8f3a2c97737.jpeg)
• WORKED ON SCHEMATIC AND CONCEPT DESIGN.
• WORKED WITH DESIGN AND MEDICAL PLANNING TEAM TO CREATE PRELIMINARY PROGRAMMING PLANS AND CONCEPT DESIGN.
• THE SKETCHES WERE DONE FOR A PROPOSAL FOR A MEDICAL OFFICE BUILDING FOR A CLIENT.
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/39e03ed674fd7eafa559c9ca9c0555da.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/74dcc3f2522c1cc1c6214bc36bb82921.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/0d62d913fbeae513714472b688607bc5.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/b85ef64850de5563dddfb1a0cfb8f5ed.jpeg)
• THE PROPOSAL BRIEF NEEDED SOME ‘NAPKIN SKETCHES’ FOR THE 45,000 SF. BUILDING.
• THIS LEAD TO DISCUSSIONS WITH CLIENT AND ACQUIRING OF FUTURE WORK FOR TWO OTHER PROJECTS.
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/dab1102969d25d71852d3241521f60b4.jpeg)
CONCEPT SKETCHES FOR MEDICAL OFFICE BUILDING, SACRAMENTO,CA
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/0a81cf3f835856ab375e7ffe5f0ddda4.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/02dd1e88b97b65592d855daba855b34e.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/5d0c6ed693d11ef6d9cdc8d4c8d27052.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/76aa6a4261ef43eec566a5515bd88785.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/0016ef2ee65e34973eab8dd223430024.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/c6f58d0b9eb660100d1c0b35e73b7dbd.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/67e723a4e57fe19177acb1909f85d187.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/027fd5707595eb29170d2600060fcb2a.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/94964ac834b75fc637dc327acde822b2.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/646e309f6f319bf2b6b8d22fc171707b.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/06bc6fddc2e703aae9e502c3c09d5047.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/890a16ce86e670b89bec1a4a9395a5d4.jpeg)
• ARCHITECTURAL INSTALLATIONS DONE DURING MASTER OF ARCHITECTURE PROGRAM AT SOUTHERN CALIFORNIA INSTITUTE OF ARCHITECTURE.
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/01086dc22e7770aac4fc4c12e0925831.jpeg)
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/5ceb796dab23b2b1c27ce082e6c9799b.jpeg)
• IN CLOCKWISE DIRECTION:
1. COMFO-VEG: SIR PETER COOK’S CRAB STUDIO.
2. AQUEOTROPE: MARCELYN GOW’S STUDIO.
3. PLEATED STRUCTURES: ZAHA HADID STUDIO
ARCHITECTURAL INSTALLATIONS DURING SCI-ARC COURSEWORK
![](https://assets.isu.pub/document-structure/230327023704-336de7407e4a5e74601b3f2efa58ad78/v1/2f642cc4146a26165b3aa17d3ec95d3a.jpeg)