Rohit Tak_Portfolio_2022

Page 1

Existing Street Level

第三季度

第四季度

第一季度

第二季度

第四季度 第一季度

第三季度

销售额

第二季度

1.24 Acre Acre Acre Acre

Retail Commercial

第一季度

0.15 Acre 0.16 Acre

第三季度

销售额

第二季度

Open space

Total Population: 86 Density: 117 Units/Acre 358 People/Acre Affordability: 35%

Project Location

PROJECT TITLE

Underground floor 1:30 Underground floor 1:30

Typical floor 1:50

Retail Commercial

Total Population: 612 Density: 156 Units/Acre 494 People/Acre Affordability: 35%

第一

Second floor

592 140 Units/Acre

15200 sq. ft

248 20 100 88 40

49000 sq. ft 21720 sq.ft 2780 sq.ft

BLOCK AREA = 1.64 Acres

第四季度

Built up Open Space Streets

Total Unites Studio 1 Bedroom 2 Bedroom 3 Bedroom

Retail Space

Total Population Density

A

Figure ground : Proposed

First Floor

Heights regulation and Massing: Block Typical floor 1:50 Second floor 1:50 Typical floor 1:50 Second floor 31:50

BLOCK TYPOLOGY

Section at BB

销售额

第二季度

Total Floor Area Build up Open Space Street

Numbers 194 26 39 58

Urban Design + Architecture + Urban Mobility Fulbright Scholar (USA) + FNF Fellow (Germany)

Scale 1” = 20’

Land Use 1.24Mix AcreUse Acre Residential Acre Commercial Acre

.24 Acre) acel A (0.24 Acre)Pacel B (1.24 PacelAcre) B (1.24 Acre)

第四季度 第一季度

PAGE DESCRIPTION

第三季度

0.24 Acre 0.24 Acre 0 Acre 0 Acre

Total Units Studio 1 Bedroom 2 Bedroom

Rohit Tak

Numbers 194 26 39 58 71 7.254 Acre 0.186 Acre 0Ground Acre Floor

销售额

第二季度

Figure ground : Existing

第一季度

MONTH, DD YYYY

Broadway Plaza Section 1In=50 Ft

Numbers 25 28 4 7 7

Pacel B (1.24 Acre)

第三季度

销售额

Parcel Number & Size a 0.24 Acre Total Floor Area 1.24 Acre tal Floor Area 0.24 Acre Total Floor Area 0.24 Acre Build up Acre 0.24 ildA up Acre Build up 0 Acre Acre 0Open Space pen Space Acre Open Space 0.24 Acre 0 Acre Acre 0Street eet Acre Street Numbers Numbers Numbers Total 25 28 194 tal Units 25 Units Total Units 28 Studio 26 udio Studio 4 Ferry Building Perspective Section 4 1 7Bedroom 1 Bedroom 39 7 Bedroom B 58 2 7Bedroom 2 Bedroom 7 Bedroom 1.24 Acre 71 3 7Bedroom 3 Bedroom 7 Bedroom 0.65 Acre Plaza 7.254 Residential 0.65 sidential AcreSection Residential Ferry Building 1In=50 FtAcre 0.15 Acre 0.186 Acre Retail 0.15 tail Acre Retail 0 Acre Acre Size Commercial 0.16 mmercial 0.16Block Acre Commercial Parcels Height Control 85 Feet 65 Feet 45 Feet

Select Professional and Academic Works

acel A (0.24 Acre)

tal Floor Area ild up pen Space reet

tal Units udio Bedroom Bedroom

第四季度

on: Total Population: tal 86 Population: 86 Total 612 Population: 612 Street Heirarchy Density: ensity: Density: 156 Units/Acre Embarcadero 7 Units/Acre 156 Units/Acre e8 People/Acre 494 People/Acre Connection Street 494 People/Acre 5% Affordability: 35% ffordability: 35% 35% 16 Ft Inner LaneAffordability:

Portfolio


• school locations, • school characteristics such as school type and enrollment data • locations of crashes between 2018-2020, • crash characteristics such as crash severity, time of crashes, 02 numbe of fatalities and injuries Pilot Project: Christ Church School Zone Design For the World Resources Institute • victim profile including age, gender and mode of travel

Safer Access to Schools Program, Mumbai

Cities interest me. Developing Cities challenge me. The potential in recreating, reinventing and renewing cities and their spaces inspires me. Over the last ten years, my focus has been on the urban scale. Academically, I have pursued a Bachelor of Architecture from Pune University, India (2010), and Master of Urban Design from U. C . Berkeley (2015) as a Fulbright Scholar from India. In 2019, I completed a diploma in Road Safety Leadership from Johns Hopkins University in Baltimore as a Bloomberg Fellow. This portfolio represents a glimpse of my journey through urbanism and mobility design, from setting off with my first work experience with the pritzker prize awardee Dr. B.V.Doshi in redeveloping Wadaj slum in Ahmedabad, through working on the Visioning plan in the town of Windsor, California, working on restructuring urban roads in India, and my recent research on the Tactical Urbanism to introduce child-friendly street design strategies in Indian cities. I have evolved from a creative individual to a responsible built-environment professional, who focuses in the potential of regenerating existing city spaces.

Mobility Design Projects

I am Rohit Tak, an architect, urban designer, and urban mobility expert, with ten years of professional experience of working in India, United States & SouthEast Asia.

contribution: City Level Risk-analysis of Schools in Personal As access to education is the right of every child, so is safer access to Mumbai: As a part of the Safer Access to • Cleaned schools!and Withcoded this program, Bloomberg for government Global Road websit schoolunder data the obtained fromInitiative national Schools program, a methodology to assess Safety and the 3M partnership, WRI has partnered with the Municipal Cora consolidated road network of Mumbai from dataresearch extracted from road safety risk of schools in Mumbai was • Created poration of Greater Mumbai, to conduct qualitative and quantitative Street MapsMumbai’s first school zone. The two parts of the project developed and tested out. It is based on his- Open and has proposed toric crash data within the school’s pedestriinclude a city-level riskfor analysis of using schools in Mumbai and pilot imple• Developed ped-shed schools network analysis on ArcGIS an shed to visualize and analyze risk. mentation of a school zone to inform the school zone design practice.

1. Safer Access to Schools Program, Mumbai 2. HP Intersection Re-design, Bandra, Mumbai 3. Tender SURE, Street Redesign Project 4. Broadway Street Redesign, Sacramento

Layer 1:

Mapping of the street network and school campuses of Mumbai

Layer 2:

Mapping of 500m pedestrian shed around school campuses

Layer 3:

Mapping of road safety crash locations in Mumbai

Layer 4:

Overlaying school locations, crash locations, and pedestrian shed to visualize road safety risk around schools in Mumbai

Layer 5:

Identification and prioritization of schools that require immediate attention for road safety interventions

Risk analysis map of schools in Mumbai Risk-analysis of schools in Mumbai


Street Vegetation

Signage

Shop Fronts

Boundary Walls

Vending adds to the economic vitality of the street while bringing “eyes on the streets”

They create visual edge to footpath, improve air quality, and make walking comfortable.

They inform drivers that they are within a SAZ while maintaining a distinct identity of SAZ.

They help generate a dialogue between the building facade and the footpath

Murals can transform dead walls into vibrant ones, while conveying messages and creating character of the SAZ

Inte rs

D

Channelized Movements

atial

n

Sch

ool

Ent ran c

“Children are a kind of indicator species. If we can build a successful city for children, we will have a successful city for all people.” Enrique Peñalosa, Former Mayor of Bogotá

04

Illustration of existing School Access Zone and Vignettes showing application of School Zone Design principles

e

Vibrant raised crossing makes it easy to slow down while children cross.

Its so much safer for my child to cross this street.

100 the m from nea res schoo t tra l nsi entran t st op ce till /int e rs ect ion

I feel safe even at night, as the footpath is very well lit.

My kid will enjoy playing on the street. This wall art is very informative

I can walk to school unassisted

Tra ns

it S top

Allocated Footpath Spaces

Active & Vibrant School Zone

Regulated Speeds & User Behavior

This street is so colorful! This is so much fun!

I can comfortably walk to school with my friend.

Wide & even footpaths make my commute easier.

Understanding children and their needs: Children at varied heights can see, relate & identify different things, & have varied cognitive skills. This qualiUNDERSTANDING CHILDREN tative information can inform design decisions. 2. CHILDREN’S ANATOMY

Children at varied heights can see, relate and identify different things, and this qualitative information can inform design decisions.

ESSION 2:VISUALIZATION VISUALIZATIONEXERCISE EXERCISE SSION 2:

-9AGE AGE -9

and what tand whatchange change want wantto tosee seeon on ol street. ool street.

Tactical Urbanism Trial + Target User Surveys Existing Intersection within the School Zone

N 1 PHOTOVOICE TOOL

ge d to hildren el and ike.

ike ike

Contribution:

Working with the Christ Church School Children

Proposed Intersection Design within School Zone

As a manager in the integrated urban transport team at WRI, I am responsible to lead a team of experts to develop data analysis methodology, and school zone design proposal which could be scaled up to other .

As a lead for this project, I am responsible to create buy-in from the city agencies & key stakeholders, working with a team of consultants, urban designers, and contractors to get the proposal sanctioned.

Safer Access to School Program

1. Channelization: of vehicular movements 2. Regulization: of vehicular speeds & user behaviour 3. Organization: of street side edges and uses 4. Allocation: of footpath spaces for walking 5. Activation: at all 3 planes of school street to create an envelope of a vibrant school zone

Safer Access to School Program

ontext.

A R ctio

13

Five School Zone Design Principles: Tool for Designing School Zone

gies

Pilot Project: Christ Church School ZoneSCHOOL Design ACCESS ZONE

Organized Street Edges

nd afety of

school an

ect ion

100 the m from nea res schoo t tra l nsi entran t st op ce till /int e rs e

d then y of moother

T F

Vending Zones


HP Intersection Re-design, Bandra, Mumbai For the World Resources Institute

From Temporary to Permanent

06

As a part of the Bloomberg Initiative for Global Road Safety, this project was envisioned to reclaim residual spaces from the large intersections and convert them into safer, pedestrian public spaces. The success of the transformation of HP intersection lies in the methodology of using “tactical urbanism” to demonstrate the change and then support it with the analogy of data collected before and after the temporary trial. The data focused on the pedestrian crossing time, near misses (crash occurrence missed by seconds), and turning speed of vehicles.

HP Intersection Now...

HP Intersection Before Temporary Implementation

Existing Configuration

HP Intersection During Temporary Implementation

Proposed Design This temporary trial was kept for 30 days and observed in detail. Its iterative nature helped us rearrange the barricades and cones whenever necessary. Its public participatory nature helped us include the local community in the design process.

Community Participation and “seeing is believing”

“Seeing is believing!”, and the way people used this space helped us support our design with evidence and make case for permanent implementation.

Permanent Implementation:

Contribution:

The trial was a major success and a learning experience for the city. Given the success of the trial, city authorities decided to permanently implement WRI’s recommended design in December 2018, and there has not been a single major crash at the HP intersection since.

Developing design alternatives, analyzing trial data, lining out the new street geometry.

The success of this project at such a major interchange will not only affect more than 100,000 people every day, but it has also prompted the city to look at 30 more high-risk intersections for transformations.

Conducting capacity building and knowledge sharing sessions with the city engineers and officials and providing implementation support.


Tender SURE, Street Redesign Project For JanaUSP, Bangalore

Contribution:

08

Working out the travel lanes as per the traffic flow and designing the street section as an integrated one. Detailing the surface design, services, construction details, and Professional Work - Jana Urban Space Foundation generating the good for construction drawings.

Tender S.U.R.E

Execution of the St. Mark’s Road as per the construction drawings. Section through St. Mart’s Road

St. Marks Road During Implementation

St. Mar

k’s Roa

d

Tender SURE is the first of a kind project happening in India where according to the guidelines set up by Swati Ramanathan, the inner city streets are being redesigned and rejuvenated as integrated and inclusive streets.

St. Mark’s Road Design: Engineering Drawing Detailed Drawing: Surface 14

Key features of the project: 1. Provision of designated and continuous sidewalks, cycle tracks. 2. Inclusive and integrated streets: reduction of travel lanes, reworking traffic routes 3. Provision of continuous planters and percolation pipers at strategic locations 4. Creating public realm along with street network: plazas and squares design Tender SURE roads are not just revamped at surface level but designed and technically detailed out at Below Grade level, Grade level, and Above Grade Level. Tender SURE Road Network

St. Mark’s Road Sidewalk in July. 2017 (Post Execution)


URBAN D ESIGN T YPOLOGIES RBAN ESIGN YPOLOGIES URBAN DESIGN GUIDELINES

Broadway Street Redesign, Sacramento FIGURE 4

CORRIDOR-WIDE ROAD DIET

For WRTWHAT Design, WE HEARD San Francisco While the right of way dimensions and lane configurations vary across the Broadway corridor, the typical cross section includes a sidewalk and Priorities forside, improvements: parking lane on each two travel lanes in each direction, and a painted median, illustrated in Figure » 4. Pedestrian and bicycle safety

TYPICAL CROSS SECTION - EXISTING

Character Zones

URBAN DESIGN GUIDELINES U RBAN D ESIGN GUIDELINES TYPOLOGIES U RBAN DESIGN URBAN DESIGN TYPOLOGIES URBAN DESIGN TYPOLOGIES

» Lane reduction, traffic calming DEFINITION/DESCRIPTION A road»diet reduces the total number of vehicle Streetscape improvements lanes from four, with two in each direction, to three, with one in each and a center Responses to direction concepts left-turn pocket. Roads with average daily traffic (ADT) volumes of less than 25,000 can usually » Full-length road diet enjoys great support accommodate this lane reduction, with some dueatto safety and accessibility modifications key locations to ensure access to improvements local businesses, maintain traffic flow, and and maintain Support for pedestrian bicycle or enhance transit performance. Figure 3 illustrates enhancements the typical configuration for the road diet with buffered bike lanes.

» Support for overall road diet concept

» Focus on benefits: FIGURE 5 TYPICAL CROSS SECTION – PROPOSED FIGURE 4 TYPICAL CROSS SECTION - EXISTING Proposed Zones: To Create and maintain street character The Street proposedCharacter road diet allows

» Potential conflict between bikes and right turningthe vehicles Figure 5 illustrates proposed corridor-wide improvement and locations of key intersections » Traffic delay and diversions where specific recommendations vary.

manageable)

Existing FIGURE 5

(minimal or

» Possible reductions in parking access (manageable) Cross Section Resolution 2016-0277

» Access to/impacts TYPICAL CROSS SECTION – PROPOSED corridor

on businesses along the

11

sacramentobroadway.com

sacramentobroadway.com

6’

68’ Foot 8’ 8’ Sidewalk 8’

6’ 6’

Resolution 2016-0277

August 4, 2016 Page 18 of 127 11

BROADWAY STREET IMPROVEMENTS

Awning

Awning

6 Foot Sidewalk 8-10 Foot Sidewalk

Street Light

Bicycle Parking

6’

2% Likes Road Diet Concept

3%

Likes Improved Safety

Street Tree

6% 4’ 4’

6’ 6’

Likes Turning Lane 6’ Improvements 6’

8’

Street Light Street Light Street Street Light Light

8’ 8’

4’ 6’ 5’ 8’

4’ 6’

46% Outdoor Flexible

5’ 8’

Likes Bike & Pedestrian Seating Enhancements

5’ 5’

5’ 5’

8’ 8’ 8’ 8’

Street Tree Street Tree Bicycle Parking Street Street Tree Outdoor Flexible Street Tree Tree Tree Grate Outdoor Flexible Outdoor Flexible Seating and Planting Outdoor Flexible Seating Outdoor Flexible Seating Seating SeatingParkingBicycle Parking Bicycle Street Light Bicycle Parking Bicycle Parking Grate Tree Grate Bicycle ParkingTree and Planting Tree Grate and Planting TreePlanting Grate and Tree Grate Street Tree and Planting Planting 7’ and 7’

Tree Grate and Planting

Tree Grate and Planting

8’

10’ 10’

8’

8’ 8’ 8’

Street Tree Street Light Parklet Outdoor Flexible Street Light Seating

8’

8’

10’ 10’

8’

Tree Grate and Planting 10’

Street Light Bicycle Parking

8’

Street Light Street Light Street Tree Street Light

Street Tree Bicycle Parking Street Tree Street Tree Street Outdoor Flexible Street Tree Tree Tree Grate Outdoor Flexible Outdoor Flexible Seating and Planting Outdoor Seating Seating Outdoor Flexible Flexible Seating SeatingParking Bicycle Bicycle Parking Street Light Bicycle Parking Tree Grate Bicycle Parking Tree Grate Bicycle Parking and Planting Tree Grate and Planting TreePlanting Grate and Tree Grate Street Tree and Planting Planting and 10’

8’

7’

7’

4’

4’

4’ 8’

7’

4’

Street Light

8’

12’- 15’ Sidewalk Width

7’

4’

4’

4’ 8’

4’

4’ 4’ 4’ 4’ 4’

Street Light Street Light Street Street Light Light

Street Light

Street Outdoor Light TreeFlexible Grate and Planting Seating

4’

Outdoor Flexible Seating

8’

8’ 8’

Tree Grate and Planting 4’ 8’

11

7’ 7’ 7’ 7’

Bicycle Parking11

8’ 8’

4’ 8’

Bicycle Parking

10’

Street Light

8’

7’ 5’

8’- 10’ Sidewalk Width

Tree Grate

8’

4’

Bicycle Parking

8’

Grate Street TreeTree Planting Tree Grate and TreePlanting Grate and Tree Grate and Planting Outdoor Flexible and Planting Seating and Planting

Parklet

8’

Outdoor Flexible 7’ 4’ Seating 7’

Bicycle Parking Bicycle Parking Bicycle Bicycle Parking Parking

6’

Seating

8’

Tree Grate Street Tree and Planting Street Light Outdoor Flexible Bicycle Parking Seating

Bicycle Parking

6’

30

Street Light Street Tree Outdoor Flexible Seating

Bench

4’

August 4, 2016

8’

Street Tree Street Tree Parklet Street Tree Parklet Street Tree Outdoor Flexible Parklet Outdoor Flexible Parklet Seating Street Tree Outdoor Flexible Flexible Street Light Seating Outdoor Parklet Seating Outdoor Flexible Seating

8’

8’

Green Wall or Graphic

6’

Bicycle Parking8’

Tree Grate and Planting

4’

Street Light

Planter Street Light

8’

8’ Tree Grate 8’ 8’ and Planting 8’ 8’

8’

Seating and Planting

4’

Light Street Light Street Street Light Light

8’

8’

SidewalkOutdoor Flexible Tree Grate

15+ Foot SidewalkBench

8’

Street Street Light

8’

Seating

Tree Grate and Planting

Bench Street Tree Tree Grate Outdoor Flexible and Planting Seating

Green Wall or Graphic 6’

6’

Bicycle Parking

6’

8’

6’ Sidewalk Width

8’ 8’

Planter

Street Tree Street Tree Awning Street Outdoor Flexible Street Tree Tree Outdoor FlexibleBicycle Seating Outdoor Flexible Street Tree Seating Outdoor Flexible Parking Seating Tree Grate Outdoor Flexible Seating Tree Grate Seating and Planting Tree Grate and TreePlanting Grate Tree Grate and and Planting and Planting Planting Street Tree Bicycle Parking Bicycle Parking Outdoor Flexible Bicycle Parking Bicycle Parking Parking Bicycle

Page 36 of 127

Street Tree Street Tree Street Outdoor Flexible Street Tree Tree Outdoor Flexible Seating Outdoor Seating Outdoor Flexible Flexible Seating Seating Bench Bench Bench Tree Grate Bench Tree Grate and Planting TreePlanting Grate and Tree Grate and Planting Planting and

8’

8’

Bicycle Parking

Green Wall or Green Graphic Wall or Green Wall GreenGraphic Wall or or Graphic Graphic

Green Wall or Graphic Street Light

8’

6’ 6’

6’

Bicycle Parking Street Tree Tree Grate Outdoor Flexible and Planting Seating

15+ Foot 29 15+ Foot Foot BROADWAY STREET IMPROVEMENTS Sidewalk Street Tree 15+ 15+ Foot Outdoor Flexible 15+ Foot Sidewalk Seating Sidewalk Sidewalk 15+ FootStreet Sidewalk Bicycle TreeParking 43%

8’

Planter

8’

Outdoor Flexible Seating

6’

Planter Street Light

8’

6’ 6’

6’

8-10 Foot Sidewalk Street Tree

8-10 Foot

6’

6’

6’

Street Light Street Light Street Street Light Light

Street Light

Street Light

Awning

6’

Awning

8’ 8’ 8’ 8’

Planter Planter Planter Planter

Awning8’

8’

8’ 8’ 8’ SURVEY RESULTS – SUMMARY OF COMMENTS ON THE ROAD DIET CONCEPT 8’

Likes Overall Concept

Resolution 2016-0277 FINAL RECOMMENDATIONS

Awning Awning Awning Awning Bicycle StreetBicycle Light Parking Bicycle Parking Bicycle Parking Parking

Planter Street Light

Community Engagement Sidewalk Workshop and Feedback

Proposed Broadway Street Plan at the Tower District

Street Light Street Light Street Light Light Street

Planter

8-10 Foot Foot 8-10 8-10 Foot 8-10 Foot Sidewalk Sidewalk Sidewalk Proposed Cross Section August 4, 2016 Page 18 of 127Sidewalk 11 BROADWAY STREET IMPROVEMENTS Street Tree Street Tree Street Tree Tree Outdoor Flexible Street Outdoor Flexible Seating Outdoor Seating Outdoor Flexible Flexible Seating SeatingParking Bicycle Bicycle Parking Bicycle Parking Tree Grate Bicycle Parking Tree Grate and Planting Tree Grate and TreePlanting Grate and and Planting Planting

August 4, 2016

6 Foot Sidewalk

6’

FIGURE 19

Street Light Street Light Street Street Light Light

Planter Planter Planter Planter

Awning Awning Awning Awning

» Shorter pedestrian crossings

for a buffered bike lane through » Dedicated bike lanes with buffer the entire corridor, and presents » Slower, calmer traffic opportunities for pedestrian » Concerns identified: new crossing improvements, » Safetycrossings, at pedestrian pedestrian andcrossings and bikevehicle mixing zones sidewalk enhancements.

Urban Design Typologies: Considering varying sidewalk widths on the street, the following urban design typologies were proposed with recommendations to activate the street’s edge and enhance user experience. At wider sidewalks, the opportunity to contribute and vitalize local economy was explored by suggesting a change in land use at corners.

As per the complete street design principles, an urban infrastructure project was envisioned to redesign Broadway street to make 6 Foot an inclusive entity catering to 66itFoot Foot 6 Foot Sidewalk all street users and not just car Sidewalk Sidewalk users. Sidewalk

and comfort

10

7’ 4’

4’ 8’

4’ 4’

4’

4’ 4’ 4’ 4’ 4’

8’ 8’

sacramentobroadway.com

8’ 8’

sacramentobroadway.com

Page 37 of 127

Contribution: Developing urban design typologies for sidewalk redesign and activation.

11

sacram sacram

sacram sacramentobroadway.com sacramentobroadway.com sacramentobroadway.com

Creating Proposed views for street corridor redesign, aimed to exhibit in the community outreach. Coordinating with project partners, including the Transportation and project lead Nelson-Nygaard.

11 11 11

sacramentobroadway.com Existing condition at 18TH AND BWY Intersection

sacram sacram sacram

Proposed Improvements at 18TH AND BWY Intersection


78

Windsor Civic Center Visioning Plan

Chapter 4: Concept Plan

Windsor Civic Center Visioning Plan, CA

Block A (continued)

79

12

For WRT Design, San Francisco

Building Massing and Height

The buildings in this block will be a minimum of two stories or 25’ tall and a maximum of 4 stories or 57’ tall (Windsor Station Area/Downtown Plan, 2013; P. 3-19). More than two stories are encouraged to complete the Town Green in terms of scale.

In case of approved rooftop uses, the maximum building height could be 65’.

The footprint of the rooftop should be no larger than 25% of the total floor area or 3000 sq. ft, whichever is less. Outdoor dining as part of the restaurant could be considered on the rooftop.

Rooftop uses will be exempt from F.A.R. calculations.

The rooftop structure will be setback a minimum of 15’ from the building edge on all sides.

inn

20

CivicCivic Center Visioning Plan Plan 20Windsor Windsor Center Visioning

Urban Design Projects

Ground Floor Use

The minimum height of the ground floor will be 15’.

The ground floor of the buildings will be visually permeable with large non-reflective glass windows.

The retail/commercial frontage will have a consistent overhead projection in the form of awnings or other architectural features.

The ground floor will be well-lit on the interiors and exterior to create a lively pedestrian environment.

30

Artist’s Impression of the Proposed Active Frontage at the Town Green

Windsor Civic Center Visioning Plan

F. PLANNING PROCESS AND COMMUNITY ENGAGEMENT F. PLANNING PROCESS AND COMMUNITY ENGAGEMENT

The feedback fromfrom the interviews is categorized under In March 2016,2016, the Town of Windsor initiated the the In March the Town of Windsor initiated The feedback the interviews is categorized under themes: Visioning Plan for Center area, area, as a part theof the threethree Visioning Planthe forCivic the Civic Center as a of part themes: General Plan Update process. The Civic Center Visioning General Plan Update process. The Civic Center Visioning à Program and Uses à Program and Uses Plan will direction for the form,form, public Planprovide will provide direction forurban the urban public à Unique Community Attributes amenities, and economic viability of future development amenities, and economic viability of future development à Unique Community Attributes in theinCivic Center StudyStudy Area Area that builds uponupon the the the Civic Center that builds à Enhancements à Enhancements ongoing success of downtown Windsor. Ultimately guided ongoing success of downtown Windsor. Ultimately guided by thebyTown’s General Plan,Plan, an Urban Design Framework the Town’s General an Urban Design FrameworkProgram and and UsesUses Program and aand Design Guidance document is theisfinal outcome a Design Guidance document the final outcome à Complete the Town Green on itsonnorthern edgeedge à Complete the Town Green its northern of thisofstudy. The Visioning Plan Plan will be thebeguiding this study. The Visioning will the guiding à Mixed-use Development à Mixed-use Development document for implementation of theofvision. document for implementation the vision. à Diversity of Retail UsesUses à Diversity of Retail

12

2121 Chapter 1: Introduction Chapter Introduction Intending to provide an in-depth of the potential use showing of thetheCivic and surrounding areas by comFigure 4.4: analysis Artist’s impression of the northern edge offuture the Town Green, westernCenter portion of the mixed-use project proposed for 1: block A with an active retail and restaurant frontage on the ground floor and café seating, an expanded sidewalk, additional on-street parking and a strong relationship to the Town Green. pleting the Town Green, informing the General Plan Updates & working with the community to envision the development, this study put forth an analysis of existing conditions, urban design framework, the preferred concept, & implementation strategies in the form of the “Windsor Civic Center Visioning Plan”. The success of the project has led to winning APA’s GROUND B. PROJECT GOALSTREE CANOPY C. PURPOSE OF THE DOCUMENT North-CaliforniaFIGURE chapter’s Merit Award. This diagram illustrates the building footprints and shows The study area has a number of trees that form a fairly

Windsor Windsor Civic Center34 Visioning Plan Civic Center Visioning Plan

A. STUDY AREA

Enhancements Enhancements

The planning process involved analysis of existing à Stacked CivicCivic Center UsesUses The planning process involved analysis of existing à Stacked Center conditions and aand stakeholder and community visioning conditions a stakeholder and community visioning à Boutique HotelHotel à Boutique charrette to define the community visionvision and outline charrette to define the community and outline à Performing Arts Arts Venue à Performing Venue guiding principles that subsequently informed the Urban guiding principles that subsequently informed the Urban à Enhanced Library MMUNITY ENGAGEMENT à Enhanced Library Design Framework and the Design Framework andland the use landconcept. use concept. à Enhancements Live-work UnitsUnits à Live-work The feedback from the interviews is categorized under à Incubator Spaces three themes: f the à àIncubator Evening Spaces Activation around the Town Green Stakeholder Interviews Stakeholder Interviews ioning à Healthcare Services à àHealthcare Services Cultural, Entertainment & Commercial àteam Program and Uses lic The project conducted in-person and telephone The project team conducted in-person and telephone à Diverse events on Town Green à àDiverse events on Town Green & Residents Amenities for Local Workers à May, Unique Community Attributes ment interviews in 2016 to gather input fromfrom community interviews in May, 2016 to gather input community of All Ages leaders and àkey stakeholders such such as theasdowntown leaders and key stakeholders the downtown Enhancements Unique Community Attributes Unique Community Attributes à Public Restrooms on and around Town Green guided merchants group, the library owners/managers merchants group, the library staff, staff, owners/managers à Iconic, Landmark Nature of Town Green à Iconic, Landmark Nature of Town Green à Innovative Parking Solutions ework ofProgram properties in downtown and developers to gain of properties in downtown and developers to gain and Uses à Historic Oak Groves à Historic Oak Groves meunderstanding à Pedestrian & Bicycle Infrastructure understanding of market feasibility. of market feasibility. à Complete the Town Green on its northern edge g à àFamily-Oriented Community à Family-Oriented Community Synergy between Civic Center & Civic Activities à Mixed-use Development The interviews focused ontopics the topics below: The interviews focused on the below: à àUnpretentious Character à Unpretentious Character Rebalance Tourism Oriented & Family Activities à Diversity of Retail Uses à àTransition from Rural Urban Living Restrictions à Transition from Rural to Urban Living Evaluate and Updateto Current Zoning à àWhat the significance ofcurrent the current Center à What isStacked theissignificance of the CivicCivic Center Civic Center Uses Environment Environment and Town for Windsor Community? and Town GreenGreen for Windsor Community? ning à Boutique Hotel à Part the Global Country Brand à Part of theofGlobal WineWine Country Brand à What aspects the Civic Center are working à What aspects of theofCivic Center are working well?well? ne à Performing Arts Venue à Wine Country is Accessible and Affordable à Wine Country is Accessible and Affordable Urban à What à What aspects the Civic Center aspects of theofCivic Center needneed à Enhanced Library à Access to Agriculture/Artisan Movement à Access to Agriculture/Artisan FoodFood Movement improvement? improvement? à Live-work Units

The Civic Center Visioning Plan builds upon the success Figure 1.1: Study Area Context Map of Windsor Town Green. The study area (Figure 1.1) begins at the northern edge of the Town Green and extends northward to the point where Old Redwood Highway and Windsor Road meet, encompassing all the property between the two roads as they converge. The Study area includes the existing library site as well as the Huerta Gymnasium, existing Town offices, Police Department and Windsor Unified School District building and the Telfer property containing the Windsor Fuel business.

à Evening Activation around the Town Green à Evening Activation around the Town Green à Cultural, Entertainment & Commercial à Cultural, Entertainment & Commercial

à Amenities for Local Workers & Residents à Amenities for Local Workers & Residents of All ofAges All Ages à Public Restrooms on and around Town Green à Public Restrooms on and around Town Green à Innovative Parking Solutions à Innovative Parking Solutions à Pedestrian & Bicycle Infrastructure à Pedestrian & Bicycle Infrastructure

Chapter 2: Existing Conditions Analysis

the sizes of the buildings in relation to each other and the intensity and extent of development based on the ground they cover. It is evident from the diagram that the study area is not extensively built-up, and has large amount of surface parking. While most of the area on the west and south of the study area is fully developed, there is still a large potential for development on the east and southeast side. The footprint of the proposed Vintage Oaks residential development is indicated in gray, and suggests a dense pattern of development on that site. The smaller building footprints in the adjacent blocks indicate single family homes, while larger footprints indicate either multi-family residential development or commercial uses.

Legend

à Synergy between CivicCivic Center & Civic Activities à Synergy between Center & Civic Activities à Rebalance Tourism Oriented & Family Activities à Rebalance Tourism Oriented & Family Activities

Legend

à Evaluate and and Update Current Zoning Restrictions à Evaluate Update Current Zoning Restrictions

the Town Green

EXISTING TREE CANOPY

Site Context Study

Chapter 2: Existing 13 Conditions Analysis Chapter 1: Introduction

Figure 2.5: Tree Canopy Complement the Facilities

dense canopy in certain parts. The Civic Center has two Programming Study The Town Green has evolved into a center for civic life oak groves with heritage Oaks that are an important in Windsor. After its completion in 1999, the properties Concurrent to the General Plan Update and, the Town feature of the Civic Center. Although some trees are not to the south and west were redeveloped into mixed use has commissioned a Facilities Programming Study for very healthy, there are many that are in good health and residential and office with ground floor retail serving Town facilities currently in the Civic Center area. The collectively they represent a valuable resource in the Civic the Town Green’s southern edge. The Green itself has Facilities Programming study will assess sizes, functional Center area. In addition to the Heritage Oaks there are benefitted from very successful programming of concerts, relationships, and locational requirements for these other species that form the overall tree canopy. festivals, events and farmers markets making it an active facilities in order to meet the needs of existing and future center of the community. The northern edge however has growth. The results of this study will provide specific data remained as it was before the Town Green was built and on each use, including required square footage, proximity, with this Civic Center Visioning Plan, hereby referred to functional needs and expansion requirements over time. as “Visioning Plan”, the Town’s goal of “completing the While some of these uses may be appropriate on the Town Green” can be realized whereby the northern edge Town Green, they are not a given. Their final location of the Green can be activated with uses that create a more will be evaluated with and focus on what uses best help cohesive town center. to activate the Town Green and complete the downtown, while also providing the best access to public services to members of the community.01 The Visioning Plan will be Inform the General Plan Update informed by the findings of this study and also provide Simultaneous to the Visioning Plan, the Town is guidance to the study as to the location of civic uses that completing a General Plan Update in which growth best accomplish goals for the Civic Center area as a whole. Legend and change for the Town is determined in keeping with community goals. The vision outlined in the Civic Center Visioning Plan has been incorporated in the General Plan, and thus the Visioning Plan will serve as the guiding document for its implementation. These outcomes will be guided by an understanding of economic and market context as well as stakeholder and community desires.

Chapter 1: Introduction

5. Windsor Civic Center Visioning Plan, Twon of Windsor, CA URBAN FORM: AROUND CIVIC CENTER AREA- BUILDINGS OF VARYING HEIGHTS & SCALE

Figure 2.3: Figure Ground Complete

31

Figure Ground

WALKING TOUR WALKING TOUR

21

Provide Guidance for Future Growth and Urban Form

The purpose of the Visioning Plan is to provide guidance for future growth of the Civic Center area. This guidance will define a public space framework that establishes natural resources and public access as fixed elements which frame development parcels that accommodate recommended land use program. The document will define further detail about the form, mix and quality of public and privately developed uses to achieve a Civic Center that reflects community values, as well as cultural and ecological context. The document will serve as a tool to guide the Town in the development of public improvements and to evaluate and guide developer or public/private partnership proposals for built uses whether they be civic, commercial, cultural or residential.

Provide recommendations for Fiscal Implementation The Visioning Plan suggests potential tools for implementation of development. The Town will undertake a more detailed study to explore financing models for how private sector components of the Plan may help fund portion of public sector elements.

Green Canopy and Natural Features

VISIONING SESSION VISIONING SESSION

01 Windsor Town Green Civic Center - Site Programming, and Urban Source: WRTVisioning LLC, 2016 Structure Plan RFP, 2015

6. Brisbane Baylands Specific Plan, Brisbane, CA 7. Millbrae Station Area Specific Plan, Millbrae, CA 8. Blackstone Corridor, Fresno, CA 9. Sabarmati Riverfront Development Project, Ahmedabad, India

à Incubator Spaces à Healthcare Services

Community Engagement Charrette: Site Visit, FGDs, and Hands-on Design Development Session

WALKING TOUR

CONCEPTS EXPLORATION SESSION VISIONING SESSIONSESSION CONCEPTS EXPLORATION

CONCEPTS EXPLORATION SESSION CONCEPTS EXPLORATION SESSION

35


76

Urban Design Framework:

Block A Building Use and Design

ablishing as key for ithin the

Block A is designated as mixed use to encourage

• Block A is designated as mixed to encourage continued activity in the evenings weekend This framework illustrates the future physical form ofuseand the continued activity in the evenings and weekend activities on the Town Green. activities on the Town Green. study area organized around key elements which form the • This block is recommended to include a variety of blockasis retail, recommended to includespaces, a variety of uses such offices/co-working hotel, basis for location, form, and scale •ofThis various land uses and Pedestrian uses as retail,facility, offices/co-working spaces,Easement hotel, 20’ residential smallsuch conference compact use small conference facility, compact residential use such as millennial studios, and business incubation programs concerning each other andsuchthe existing context. as millennial studios, and business incubation

spaces. There could be a restaurant or public use spaces. There could be a restaurant or public use amenities on the rooftop , for instance. amenities on the rooftop , for instance. • While the uses on the upper floors can be flexible, the • While uses ononly the upper cancreate be flexible, the groundthe floor will house floors uses that an active ground floor will houseuses usesthat thatare create an active use frontage. Thatonly includes accessible use frontage. That includes uses that are accessible to public, contribute to a high-level of pedestrian to public, contribute high-level of pedestrian activity and enhance to thea pedestrian experience along activity and enhance the Town pedestrian experience along the northern edge of the Green. 24’ the northern edge of the Town Green. • Such uses may include, but are not limited to, stores, • Such uses may include, but are not limited to, stores, restaurants, markets, café’s, galleries, hotel lobbies, restaurants, markets, café’s, galleries, hotel lobbies, and commercial recreation. PLAN SHOWING BUILDING FOOTPRINT ON BLOCK A and commercial recreation. • Refer to Retail implementation strategy (pg. 95) for • Refer Retail implementation strategy (pg. 95) for furthertodetail. further detail. • Block A will have a 1-level basement parking • Block A will have aparking 1-level requirements basement parking structure to fulfill structure to fulfill requirements Roof top predominantly forparking the residential uses and some cafe predominantly for the residential usesPlan and some67 4: Concept retail needs. Chapter retail needs.

Block A is designated as mixed use to encourage continued activity in the evenings and weekend The activities on the Town Green.

purpose of the Urban Design framework is to ensure that the Civic Center becomes the hub of civic and cultural This block is recommended to include a variety of activities of the community and demonstrates an exemplary uses such as retail, offices/co-working spaces, hotel, small conference facility, compact residential use approach to embracing ecological, social, and economic such as millennial studios, and business incubation sustainability. spaces. There could be a restaurant or public use amenities on the rooftop , for instance.

While the uses on the upper floors can be flexible, the Key elements of the framework: ground floor will only house uses that create an active use frontage. That includes uses that are accessible to public, contribute to a high-level61 of pedestrian 1. Heritage Oak Groves 5. Block Pattern Chapter 3: Urban Design Framework activity and enhance the pedestrian experience along 6. The Proposed the northern edge of the Town Green. 2. Open Space Network

Axes Such uses may include, but are not limited3. to, Critical stores, restaurants, markets, café’s, galleries, hotel4. lobbies, Circulation Network and commercial recreation.

Critical Axes: Connecting study areabewith existing fabricinof Figure 3.5: New Blocks emblematic of a “Pavilion the the Park”town where the 96

Open e HERITAGE OAKS nter. ern of WINDSOR CIVIC CENTER VISIONING STUDY at will s as well.

Figure 4.2: Visioning Recommended Windsor Civic Center Plan

• Green Refer to Retail implementation strategy (pg. 95) for Town extends all Legend the way to Old Redwood detail. becomes a landmark for Highway further and the building the Town of Windsor, to enablebasement views of parking • Block A willoriented have a 1-level D. LINKED SEQUENCES the Town Green from Old Redwood Highway.

Blocks and 7.Hotel Existing Land Ownership 8. Active Frontage, Defined Edges

structure to fulfill parking requirements The full realization of the preferred concept is dependent à As the name suggests the Multi-purpose Events on a sequential development predominantly for the residential uses and some of various components Center will serve as a venue for a wide range of the plan. Development of uses on the new blocks is retail needs. H

Basement Sequence 3 and 4 (Figures 5.4 Parking and 5.5)

Sequence 1 (Figure 5.2)

c

à Since this is a mixed use district with diverse uses, 2 (Figure 5.3) the parking ratio assumptions conform toSequence the guidelines set forth by Institute of Transportation If the police facility is located off-site to a place that Engineers (ITE) for shared parking after better serves their purposes, the functions of the Town Hall can expand within the existing building, until the considering peak time demands for various uses is ready to build a new Town Hall. This is especially within the district. All residential uses willTown be selfimportant, because per the preferred concept, a new Town parked in the same block, while non-residential Hall building is proposed on the land partly owned by the uses will share on-street and off-street parking inSchool District and the Telfer-owned property. Windsor Civic Center area. 66 the Windsor Civic Center Visioning Plan The town will 63 need to work an arrangement with the

Block Pattern:

hould size a WINDSOR CIVIC CENTER VISIONING STUDY uildings to

Retail Retail Basement Parking Basement Parking

Residential Studios

Pedestrian Easement Pedestrian Easement

à Mixed use development with ground floor retail and other public uses, on Block A, to activate the northern edge of Town Green and complete the notion of “Town Square”. The uses allowed under this designation are retail, offices/co-working spaces, hotel, small conference facility, compact residential use such as millennial studios and business incubation spaces. Active ground floor

Active Frontage, Defined Building Edges:

à The Multi-purpose Events Center on the uses around Town Green & defined building edge to emphasize critical axis.

20’

Active Street Frontage

Potential Uses on Block A

Two way Street

8’ 8’

Parking Parking

18’ 18’

Side walk Side walk

O O

22’ Existing Parking

Two way Street

Basement Garage

8’

18’

6’-8’

Parking

Side walk

Outdoor Dining

Conceptual Section through Mixed-Use Block Figure 4.6: Section through Town Green and Proposed Mixed-Use Development

Retail

Hotel Hotel Retail Retail

Figure 4.5: Conceptual Section through Mixed-Use Block

EXISTING CONFIGURATION Figure 4.3: Potential Uses on Block A

OPPO OPP

Figure 4.6: THE Section through Town Proposed Mixed-Use Development REDEVELOP TELFER FUEL COMPANY SITE INTO AGreen COMPACT and RESIDENTIAL DEVELOPEMNT.

Figure 4.3: Potential Uses on Block A

Existing Buildings

Sequence 5: Redevelop the Telfer Property into a Compact Residential Development. Police Facility

Futu

Town Offices

Windsor Fuel Company

Library Huerta Gymnasium

Windsor Fuel Company

School District Building

Hotel Existing Mixed Use Retail

Figure 4.6: Section through Town Green and Proposed Mixed-Use Development

Figure 5.1: Existing Buildings Isometric Diagram

B

à Since this is a mixed use district with diverse uses, the parking ratio assumptions conform to the Town Hall + Council guidelines set forth by Institute of Transportation Chambers 29,727 5 E Engineers (ITE) for shared parking after considering peak time demands for various uses within the district. All residential uses will be selfTownhomes 18,040 F parked6in the same block, while non-residential uses will share on-street and off-street parking in the Civic Center area. 7

existing library site: This site is a gateway to the Civic Center district, the Town Green and the downtown. The building for the Events Center will

New Multi-purpose Events Center

New Library

67 New Mixed Use Development

Shared Surface Parking

New Town Hall

Residential Development

Proposed Redevelopment and transformation in the study area

42,540 à Blocks 3F, G & HC are designated for residentialHeritage Oak Grove development that conforms to the density of 12-32 du/acre, allowed by the Downtown/Station Library, Area Open Space and Specific4 Plan. D 79,705 Surface Parking

D

Preferred Land Use Diagram

Chapter 4: Concept Plan

Figure 5.6: Dependent Sequence For Compact Residential Development

à The Library will be rebuilt as a two story structure on the site north of its current location, nestled Multi-purpose Events 2 to oneBof the Heritage 38,415 adjacent Oak groves, along Center Redwood Highway.

E

A

Windsor Civic Center Visioning Plan

AREA à As theNO. nameBLOCK suggests thePARCEL Multi-purpose Events LAND USE Center will serve as a venue for Sq.aFtwide range of events such as performances, music recitals, wedding receptions, large community gatherings, community classes and some of the programs that Civic Center Mixed Use are currently hosted in the Huerta Gymnasium. 1 A 28,088

G

à This location makes the Town Hall easily accessible from Old Redwood Highway as well as from streets within the Civic Center mixed-use district.

à Existing Town Hall buildings are replaced with a shared surface parking area. this allows shared use between offices during business hours and retail to the south during evenings and weekends. This new parking area is central to both.

22’ 22’

Two way Street Hotel

Figure 4.5: Conceptual Section through Mixed-Use Block Figure 4.5: Conceptual Section through Mixed-Use Block

Existing Mixed Use TownCivic Green 97 Existing Use 102 Mixed Windsor Center Visioning Plan Chapter 5: Implementation Strategies

ISOMETRIC VIEW OF BUILDING ON BLOCK A ISOMETRIC VIEW OF BUILDING ON BLOCK A

Existing Parking Existing Parking

Town Green Town Green

There is a 20’ wide easement on Block A to provide visual and pedestrian connection from the Town Green to the future Town Hall. This reinforces the key axis, established in the urban design framework. Therefore development on block A should be in the form of two separate buildings rather than one long structure.

Active Street Frontage Active Street Frontage

50’

Land Use Program for the Preferred Alternative

HERITAGE OAKS

c

Residential Studios It is recommended that in the case of restaurants; the ground floor is set further back by 6’- 8’ so as to accommodate outdoor dining facing Town Green.

be emblematic of a “Pavilion in the Park” where the Figure 4.2: Recommended Conceptual Building Layout TownLand Green extends all the way to Old Redwood Use Program Highway and the building becomes a landmark for the Town of 4.1: Windsor, to enable views of Table Landoriented Use Program for Preferred Alternative the Town Green from Old Redwood Highway.

Key Features of the Visioning Plan:

HERITAGE OAKS

Min 15’ Min 15’

68

The preferred concept explores the idea of relocating the Town Hall to Block E, in a new building and replaces the WINDSOR CIVIC CENTER VISIONING STUDY existing Town Hall buildings with shared surface parking area. (Figure 4.1) H

à A direct visual and pedestrian connection is provided from the downtown, through the Town Green (in the form of circulation easement in blocks A and D).

The ground floor will be setback from the property line by 6’ to get a minimum of 18’ wide sidewalk. Residential Studios

the ground floor is set further byTown 6’- 8’ Green. so as to accommodate outdoor dining back facing accommodate outdoor dining facing Town Green. There is a 20’ wide easement on Block A to provide There a 20’ wide easement on Block to Town provide visual is and pedestrian connection fromAthe visual pedestrian connection from the Town Green and to the future Town Hall. This reinforces the Green to the future Town Hall. This reinforces the key axis, established in the urban design framework. key axis, established in the urbanAdesign framework. Therefore development on block should be in the Therefore development on block A should the form of two separate buildings rather than be oneinlong form of two separate buildings rather than one long structure. structure.

In addition to the Civic Center improvements and D redevelopment opportunities described in the five linked sequences above, other important opportunity sites exist outside the Civic Center Visioning Plan area but still very A B downtown area. integral to the Town green and broader These sites can be instrumental in furthering the goal of “completing the Town Green” and adding additional activity and vibrancy to the downtown and should be given priority consideration as the Town progresses on its downtown improvements strategies.

Figure 4.1: Preferred Land Use Diagram

F

Hotel Hotel

Figure 4.3: Potential Uses on Block A

Recommended Conceptual Building Layout

à Town Hall is relocated to Block E, where the current school district building is located.

Future Opportunity Sites (Figure 5.7)

organizing componentLegend of the plan and informs how land uses are located within the study area.

HERITAGE OAKS

Setback Line for Ground Floor

14

The buildings oncreate this block should be builtedge to the property line, to a consistent street along

with the Town to implement the proposed residential development.

property owners, to implement this project.

à The land use diagram designates land uses within the Civic Center study area, overlaid on the urban design framework. It establishes clear guidance for locating various uses, including open space, within A. CONCEPT PLAN Organizing the development blocks around the mixed use district and calls out critical easements for circulation pedestrian axes, open space network and circulation network. Figure 3.7: Active Frontage and Defined Building Edges The Urban Designand Framework is connection. the fundamental

• •

property line, to create a consistent street edge along the Town Green.

Construction of a new and expanded library in the new location (per the preferred concept) will allow for the demolishing of the existing library building to construct the new Multi-purpose Events Center.

Chapter 3: Urban Design Framework

g Edges

PLAN SHOWING BUILDING FOOTPRINT ON BLOCK A PLAN SHOWING BUILDING FOOTPRINT ON BLOCK A

related to relocation of certain uses that are currently of events such as performances, music recitals, situated in the place. Figures 5.2 to 5.6 illustrate the wedding receptions, large community gatherings, relationship of the sequence of actions. It should be noted Pedestrian community classes and some of the programs that Easement that this is not a phasing plan tied to a specific time frame. are currently hosted in the Huerta Gymnasium. But these diagrams illustrate what the logical sequence Sequence 5 (Figure 5.6) G might be for developing various uses, when the town F à The Library will be rebuilt as a two story structure Construction of a new Town Hall is linked with the decides to implement those projects based on funding, relocation of the Windsor Unified School District offices on the site north of its current location, nestled partnerships or other factors of consideration. and acquisition of a small portion of the Telfer-owned ISOMETRIC VIEW OF BUILDING ON BLOCK A adjacent to one of the Heritage Oak groves, along E property. Owners of the Telfer property will need to work Redwood Highway.

à Blocks F, G & H are designated for residential The current programs in the Huerta Gymnasium will development that conforms to the densityneed of 12-32 to be relocated to another venue, so that the existing du/acre, allowed by the Downtown/Stationbuilding Area is replaced by the new mixed-use development Specific Plan. along the northern edge of the Town Green.

line, to createline, a consistent street edgeaalong the Town Green. Built toproperty the property to create consistent street edge along the Town Green. the Town Green. • The groundSetback floor will be setback from the property Ground floor by 6’ to get a minimum of 18’ wide sidewalk. • line The by ground floor will be setback property 6’ to get a minimum of 18’from widethe sidewalk. In the case restaurants; line by 6’of to get a minimum of 18’the wideground sidewalk. floor is set back 8’ for outdoor dining. • It is recommended that in the case of restaurants; • It recommended that inBlock the case 20’ wide on Arestaurants; to8’provide visual and pedestrian connection. theiseasement ground floor is set further backof by 6’so as to

Proposed Footprint onon Block A be built to the • The buildings this block should

Conceptual Building Layout Min 15’ Retail

• • • •

Setback Line for Ground Floor Setback Line for Ground Floor

24’ 24’

Setbacks and Easements

Roof top cafe top Roof cafe

77

Chapter 4: Concept Plan Setbacks and Easements

Setbacks and Easements Guidelines foron this Development • The buildings block should be built to theon Block A

G

12,180

Residential Apartments

à The land use diagram designates land uses within the Civic Center study area, overlaid on theResidential urban Development 23,335 design 8framework. clear guidance for H It establishes 5,700 Residential Development locating various uses, including open space, within 5,700 Retail / C the mixed use district and calls out easements for circulation and pedestrian connection.

# FLOORS

FAR

FAR

Recommended

per Station Area Specific Plan

ON STREET

OFF STREET

2.500

42

65

H

4

4.000 F

G

107 0.500

1

PARKING PROVIDED

E

2

2.500

0 2

42

0

0 42

2

1.500 c

--

61

124

D

Economic Feasibility: The Windsor Civic Center and Town Green Visioning Framework include a number of private sectors development opportunities as well as public facilities and amenities. As per a preliminary analysis, the private sector components of the plan can help fund portions of the public sector elements.

185 2

0.850 A

--

B

27

16 43

3

18

16 34

3

16

21 37

3 2 1

HERITAGE OAKS

HERITAGE OAKS

WINDSOR CIVIC CENTER VISIONING STUDY

WINDSOR CIVIC CENTER VISIONING STUDY

19

56 75

525

Contribution: As a core team member for this project, I was responsible to provide support at all the stages of urban design framework development, community engagement, and preparing the visioning plan document, including report writing, preparing graphics

WINDSOR CIVIC CENTER VISIONING STUDY

closely and ace and nectivity physically

Pedestrian Easement Pedestrian Easement

20’ 20’

Building Use and Design Building Use and Design

n and the

e active that

Block A Block A

Windsor Legend Civic Center Visioning Plan

WINDSOR CIVIC CENTER VISIONING STUDY

76

Chapter 4:

EXISTING CONFIGURATION

Figure 3.3: Critical Axes

isual,

Windsor Civic Center Visioning Plan

Figur


LAND USE PLAN

LEGEND REVISED LAND USE PLAN LEGEND RESIDENTIAL Flats (High Density) Flats (Medium Density) Townhomes (High Density) Townhomes (Medium Density)

ulev ard re Bo

4th St.

2nd St 2nd . (Wes St. (E t) ast)

Bays ho 1st St.

5th St.

3rd St

d

4th St.

5th St.

3rd St

151’65,100 SF 30,000 SF

151’

2015 Draft Report - Density Transfer Study l 3 Kinder

Morgan Energy Tank BAY MEADOWS Farm STATION BAY1MEADOWS STATION 1

e alup

Guad

ard ulev re Bo

k Cree

Park

on Pk Cany

on Pk Cany

C St.

A St.

Lagoon Way

32,815 34,076 SF SF

BAY MEADOWS BAY MEADOWS STATION STATION 3 3

20,200 SF

32,815 SF

20,20020,200 SF SF

SF SF 34,07634,076 SF SF 32,81532,815

BAY2MEADOWS STATION 2 BAY MEADOWS STATION

450 CONCAR

450 CONCAR

25,800 SF SF Proposed Office Building North25,800 Proposed Office Building South PROPOSED OFFICE BUILDING NORTH OF GENEVA PROPOSED OFFICE BUILDING SOUTH OF GENEVA of Geneva of Geneva

STATION 4 - COMPARABLE

450 CONCAR 450 CONCAR

25,80025,800 SF SF

54,984 SF

54,984 SF 25,500 SF 35,000 SF

25,500 SF

25,50025,500 SF SF

CROSSING 900

CROSSING 900

Proposed Building Footprints: Same Scale CROSSING CROSSING 900 900

Contribution: 15,000 SF 15,000 SF 2015 Draft Report Study l 12 As a part of the urban design team, I carried out- Density the Transfer density study and provided land-use and form-based code revisions 15,00015,000 SF SF to accommodate land uses including commercial, retail and R&D uses. I was also responsible for preparing 3D structures of the proposed development and coordination with the rendering consultant. PROPOSED BUILDINGSPROPOSED BUILDINGS 2015 Draft Report - Density 2015 Draft Transfer Report Study - Density l 11 Transfer Study l 11

B St.

Kinder Morgan Energy Tank Farm

20,200 SF

BRISBANE LAGOON

35,00035,000 SF SF

. way

. way

Transit Orientation

34,076 SF

BAY MEADOWS STATION BAY3MEADOWS STATION 3 -650,000 SF

Ice House Hill

60,399 SF

SF

way

25,800 SF

25,80025,800 SF SF Lagoon Way

Specific Plan Boundary

U.S. 101

. E St

25,800 SF

BAY MEADOWS STATION BAY4MEADOWS STATION 4

35,000 SF

Space OPENOpen SPACE 54,984 SF Open Space 54,984 UPC Ownership

way

st)

E St.

e

ho Bays

U.S. 101

E St.

t)

F St.

Tunnel Avenu

G St

7th St. (We

G St.

G St.

7th St. (Eas

4th St.

R ou n

ulev ard re Bo

2nd St 2nd . (Wes St. (E t) ast)

Bays ho 1st St. d

R ou n

2015 Draft Report - Density Transfer Study l 10

151’ 151’

Institutional INSTITUTIONAL OPENInstitutional SPACE

t Park Sierra Poin

-348 DU

H St.

A St.

PROPOSED PROPOSED BUILDINGS BUILDINGS 20152015 Draft Draft Report Report - Density - Density Transfer Transfer StudyStudy l 11 l 11 Lagoon Way

Valley Dr.

BRISBANE LAGOON

Universal Paragon Corporation

Brisbane Baylands Specific Plan

Parks & Open Spaces

0

350

700

1400 feet February 2011

Universal Paragon Corporation

4.2A LAND USE - BASE VARIANT

350

700

N

0

350

700

1400 feet February 2011

N

1400 feet

4.2A LAND USE - BASE VARIANT

Recommended Density Changes 2015 Draft Report - Density Transfer Study l 2

Brisbane Baylands Specific Plan

N

N Universal Paragon Corporation 0

4.2A LAND USE - BASE VARIANT

4.2A LAND USE - BASE VARIANT

65,100SFSF 30,000

Wastewater Treatment/ Recycling INSTITUTIONAL

(J St.)

se Arc

Specific Plan Boundary

Historic Alignments

Universal Paragon Corporation

Form and Massing Study Post Density Revisions 369’

INDUSTRIAL

INDUSTRIAL Light Industrial Light Industrial Renewable Energy Generation(R.E.G.) Renewable Energy Generation(R.E.G.) R.E.G. / Open Space Reserve Wastewater Treatment/ Recycling R.E.G. / Open Space Reserve

Specific Plan Boundary

U.S. 101

L St.

Roundhou

I St

Brisbane Baylands Specific Plan

Brisbane Baylands Specific Plan

Parkway

K St.

M St.

J St.

BRISBANE LAGOON

Key Features of the Specific Plan

int Sierra Po

use Circ

St. 2nd

way

st)

t)

e

e alup

Guad Valley Dr.

t)

St.

Space OPENOpen SPACE Open Space UPC Ownership

B St.

Kinder Morgan Energy Tank Farm

t)

M St .

7th St.

in

ho

N St.

8th St

Ma

C St.

Land Forms & Drainage

es 7th St. (W

P St.

L St .

60,399 SF

BAY MEADOWS BAY MEADOWS STATION STATION 2 2

-256 DU

eva Ave.

St

UPC Ownership

SAME SCALE

Valley Dr.

COMMERCIAL COMMERCIAL Retail Retail High-Rise Office High-Rise Office Mid-Rise Office Mid-Rise Office Office R & D - 1 Office R & D - 1 Office R & D - 2 Office R&D-2 Hotels & Conference Hotels Conference Ground&Floor Retail Below Other Use Ground Floor Retail Below Other Use

Beatty Road

Gen

k Pa Cree

Ice House Hill

as 7th St. (E

O St .

va Av enue

Institutional INSTITUTIONAL OPENInstitutional SPACE

t Park Sierra Poin

E St.

Gene

ay rkw

. E St

ard ulev re Bo

ho Bays

E St.

7th St. (We

F St.

Tunnel Avenu

G St

7th St. (Eas

St. 2nd

G St. G St.

S St .

R St .

Q St .

P St .

Districts

Wastewater Treatment/ Recycling INSTITUTIONAL

(J St.)

se Arc

Roundhou H St.

e Av e

6th St.

K St.

J St.

Sunn ydal

San Francisco San Mateo County

le

Key Alignments I St

INDUSTRIAL

INDUSTRIAL Light Industrial Light Industrial Renewable Energy Generation(R.E.G.) Renewable Energy Generation(R.E.G.) R.E.G. / Open Space Reserve Wastewater Treatment/ Recycling R.E.G. / Open Space Reserve

7th St.

L St.

ue Tunnel Aven

N St.

8th St

St.

6th St.

in

use Circ

le

Ma

ho

M St.

LEGEND

RESIDENTIAL Flats (High Density) Flats (Medium Density) Townhomes (High (High Density) Density) Townhomes Townhomes (Medium (Medium Density) Townhomes Density)

va

ne

Ge

BAY MEADOWS BAY MEADOWS STATION STATION 4 4

60,39960,399 SF SF

LEGEND

St.

St.

M St . L St .

Ice House Hill

65,100 65,100 SF SFSF 30,000 30,000 SF

A St.

OPEN SPACE Open Space

way Park

369’

369’ 369’ 25,000 SF

25,000 SF

INSTITUTIONAL Institutional

2015 Draft Report - Density Transfer Study l 9

OFFICE BUILDING DIAGRAMS

rd

8th

P St.

ek Cre

leva

B St.

Kinder Morgan Energy Tank 25,00025,000 SF SF Farm

RESIDENTIAL Flats (High Density) Flats (Medium Density) Townhomes (High (High Density) Density) Townhomes Townhomes (Medium (Medium Density) Density) Townhomes

COMMERCIAL COMMERCIAL Retail Retail High-Rise Office High-Rise Office Mid-Rise Office Mid-Rise Office Office R & D - 1 Office R & D - 1 Office R & D - 2 Office R&D-2 Hotels & Conference Hotels Conference Ground&Floor Retail Below Other Use Ground Floor Retail Below Other Use

Beatty Road

eva Ave.

. E St

OFFICE OFFICE BUILDING BUILDING FOOTPRINTS FOOTPRINTS - SAME - SAME SCALE SCALE

8th

O St .

Bou

y. kwa on P any pe C

dalu

y. kwa

S St .

R St .

Gen

E St.

BAY MEADOWS BAY MEADOWS STATION STATION 1 1

e Av e

va Av enue

UPC Ownership

BAY5MEADOWS STATION 5 BAY MEADOWS STATION

Sunn ydal

Gene

St.

Gua

C St.

BAY MEADOWS BAY MEADOWS STATION STATION 5 5 New Brisbane is a 548-acre brownfield development adjoining San Francisco’s southern border. As a former landfill and Lagoon Way Valley Dr. rail yard, the site poses significant challenges in terms of geotechnical and contamination issues, while unique features such as regional transportation facilities, wetlands, bay views, a tidal channel and lagoon, and historic structures shaped the community design. WRT Design had prepared its Specific Plan with a developer-led consultant team. BRISBANE LAGOON

P St .

G St.

OFFICE BUILDING OFFICE Proposed BUILDING FOOTPRINTS FOOTPRINTS - SAME SCALE Land Use Changes

Rendering of the Proposed 5th Street View

Q St .

re sho Bay

U.S. 101

on P any pe C

dalu

ard ulev

Gua

o re B

sho

ay

(J St.)

se Arc

Roundhou

Specific Plan Boundary

Cre

Ice House Hill

San Francisco San Mateo County

INSTITUTIONAL Institutional

G St

arkw ek P

.

E St

K St

OPEN SPACE Open Space

Parkway

t)

t)

Bay

E St.

E St.

es 7th St. (W

ue Tunnel Aven

F St.

as 7th St. (E

St .

G St. G St

I St

INDUSTRIAL

AERIAL VIEW - PROPOSED Light Industrial Renewable Energy Generation(R.E.G.) R.E.G. / Open Space Reserve Wastewater Treatment/ Recycling

. Wastewater Treatment/ Recycling

2nd

2nd

H St.

J St.

St.

5th St.

5th St.

3rd St

1st

St. 1st d R ou n

d

(J St.)

se Arc

Roundhou

G St.

in

Specific Plan Boundary

N St.

7th St.

Ma

6th St.

L St.

int Sierra Po

I St

MS INDUSTRIAL t. M St. Industrial LLight St. Renewable Energy Generation(R.E.G.) e us Circ L St. ho R.E.G. / Open Space Reserve

le

J St.

St.

K St.

M St.

7th St.

6th St.

in

le

Ma

use Circ

OPEN SPACE Open Space

8th St

t.

.

Wastewater Treatment/ Recycling

INSTITUTIONAL Institutional

. St

MS L St

ho

N St. 8th St

Ave .

Ave nu

e

Specific Plan Boundary

. St

eva

16

COMMERCIAL Retail High-Rise Office Mid-Rise Office Office R & D - 1 Office R & D - 2 Hotels & Conference Ground Floor Retail Below Other Use

INDUSTRIAL Light Industrial Renewable Energy Generation(R.E.G.) R.E.G. / Open Space Reserve

h

h

Gen

eva

*

8t

P St.

e

Gen

OPEN SPACE Open Space

8t

Ave nu

ulev ard

Wastewater Treatment/ Recycling

INSTITUTIONAL Institutional

t.

3rd St

OS

Beatty Road

COMMERCIAL Retail High-Rise Office Mid-Rise Office Office R & D - 1 Office R & D - 2 Hotels & Conference Ground Floor Retail Below Other Use

St.

.

eva

re B o

2nd S 2nd t. ( Wes t) St. ( Eas t)

Bay sho

.

RESIDENTIAL Flats (High Density) Flats (Medium Density) Townhomes (High Density) Townhomes (Medium Density)

LEGEND RESIDENTIAL Flats (High Density) Flats (Medium Density) Townhomes (High Density) Townhomes (Medium Density)

R St COMMERCIAL . Retail Q St Beatty Road . High-Rise Office P St . Mid-Rise Office OS t. Office R & D - 1 P St. Office R & D - 2 Hotels & Conference Ground Floor Retail Below Other Use

INDUSTRIAL Light Industrial Renewable Energy Generation(R.E.G.) R.E.G. / Open Space Reserve

R ou n

ulev ard

.

Q St

P St

Gen

San Francisco San Mateo County

COMMERCIAL Retail High-Rise Office Mid-Rise Office Office R & D - 1 Office R & D - 2 Hotels & Conference Ground Floor Retail Below Other Use

.

R St

re B o

For WRT Design, San Francisco

Ave

S St

Bay sho

nyd ale

San Francisco San Mateo County

2nd S 2nd t. ( Wes t) St. ( Eas t)

Brisbane Baylands Specific Plan, Brisbane, CA Sun

AERIAL VIEWLEGEND - EXISTING

RESIDENTIAL Flats (High Density) SuFlats nny (Medium Density) dale Ave Townhomes (High Density) S St Townhomes (Medium Density) .

Proposed R & D campus

0 February 2011

350

700

1400 feet February 2011

Bird’s Eye View of the Proposed Development


Millbrae Priority Development Area Specific Plan,CA

Focus Series Area Study: 3 Workshop Overview For WRT Design, San Francisco

Concept Diagram

Open Space and Public Realm 18

. North El Camino Real Neighborhood

Millbrae Priority Development Area (PDA) Specific Plan was one of the three planning efforts parallelly ongoing in Millbrae, the other two being the Active Transportation Plan and General Plan Update. The outcome of the PDA Specific Plan feeds into other two projects.

November 1-7, 2016

Potential Infill Development in the PDA

Purpose of the workshop series was to:

• Inform the community about the project objectives, Series Overview • Collect information on existing conditions within the project area, • Discuss the community’s vision for the area, and op series was to: • Begin to develop a plan to achieve that vision.

District Character Planning Commission Study Session|February 22, 2017 | Millbrae PDA Specific Plan|21

Focus Area Studies

Planning Commission Study Session|February 22, 2017 | Millbrae PDA Specific Plan|27

unity about the project objectives,

n on existing conditions within the project area, view Community Engagement Workshop:

Planning Commission Study Session|February 22, 2017 | Millbrae PDA Specific Plan|31 Millbrae PDA Specific Plan started with study area analysis and had a community engagement workshop as an important part of the planning process. The workshop included a series of interactions as shown in the adjacent images. The workshop was planned to:

unity’s vision for the area, and • • • •

Inform the community about the project objectives, Collect information on existing conditions within the project area, Discuss the community’s vision for the area, and Begin to develop a plan to achieve that vision.

a plan to achieve that vision. objectives,

Walking Tour ns within the project area,

rea, and

Land Use Intensity and Form

Planning Commission Study Session|February 22, 2017 | Millbrae PDA Specific Plan|22

Focus Area Study: 1. Hillcrest and El Camino Focus Area Study: 1. Hillcrest and El Camino

Planning Commission Study Session|February 22, 2017 | Millbrae PDA Specific Plan|28

Some of the main feedback from the community was to propose a spacious pedestrian realm on El Camino Real and Broadway, balanced parking demand in the priority area, scaled infill development, and more retail and restaurant choices.

Planning Commission Study Session|February 22, 2017 | Millbrae PDA Specific Plan|8

vision. Circulation Netwrok

Planning Commission Study Session|February 22, 2017 | Millbrae PDA Specific Plan|29

Planning Commission Study Session|February 22, 2017 | Millbrae PDA Specific Plan|23

Visioning Session

Planning Commission Study Session|February 22, 2017 | Millbrae PDA Specific Plan|8

Contribution:

Concepts Exploration

|February 22, 2017 | Millbrae PDA Specific Plan|8

As a part of the core urban design team, I was responsible to: • carry out study area analysis, • develop graphics for the various stages of project development, • develop the urban design strategies • provide support in conducting community engagement • co-ordinating with the project partners

Outcome of the Community Engagement Workshop Planning Commission Study Session|February 22, 2017 | Millbrae PDA Specific Plan|18 Planning Commission Study Session|February 22, 2017 | Millbrae PDA Specific Plan|25


Improved Public Realm and enhanced intersection at Blackstone and Weldon Avenues

Blackstone Corridor Housing Study, Fresno, CA

Increment 1: Leverage Catalytic Sites

This focuses on public realm improvements that further catalyze private development along the corridor. Mobility, safety, and beautification are critical for encouraging private investment.

FIGURE 14: INCREMENT 1

For WRT Design, San Francisco

C

E OL

LG

EA

VE

1 DE

6

3

Increment 2: Focus on Public Realm Improvements

This includes actions that are already conceived, in planning, and that are necessary as an early phase, to build the foundation of future investment.

LM

AS

AV

CO

E

3

GL

EN

NA

LE

LG

EA

VE

DE

VE

BL

AC

KS

TO

NE

AV

LM

AS

AV

E

E

GL

EN

NA

VE

BL

EFF

2 TE

1

5

CL VA YA

2

LE

AV

CA

4

7

WE

CATALYTIC SITES HOUSING

NO

ACADEMIC

UN

RETAIL GARAGE

PE

ADAPTIVE REUSE REHABILITATION TACTICAL URBANISM

HO

ME

AV

E

C LA

FCC PROPERTY BOUNDARY

S RK

MC

T

K IN

LE

YA

RA

LT

AW

IV E

RS

IT Y

AV

RM

AL

AV

LD

ON

AV

SS

AR

AV

IN

TO

NA

RR

IE S

EA

RV

AR

DA

TO

NE

AV

E

EFF

IE S

VE

CL

VE

VA

E

YA

LE

AV

GE

WE

HOUSING

E

NO

ACADEMIC E

UN

RETAIL GARAGE

E

PE

ADAPTIVE REUSE

AY

HO

REHABILITATION TACTICAL URBANISM

VE

ME

AV

MC

E

K IN

LE

FCC PROPERTY BOUNDARY

YA

RA

LT

AW

IV E

RS

IT Y

AV

RM

AL

AV

LD

ON

AV

SS

AR

AV

IN

TO

NA

HA

T TE

CA R ID

KS

VE

E

MB

AC

T

HA

AC

20

FIGURE 16: INCREMENT 2

RR

AC

EA

RV

AR

DA

VE

VE

C LA

VE

RK

ST

E

E

MB

R ID

GE

E

E

E

AY

VE

BRT BUS STOP

BRT BUS STOP

Increment 3: Promote Land Assembly for Infill Development

Improved Connectivity to Blackstone Avenue

4. Implementation Strategies /// 57

4. Implementation Strategies /// 49

The third increment shows the potential private development opportunities after increments one and two are realized. Development catalyst clusters and larger parcels inform opportunities.

FIGURE 17: CONCEPTUAL RECOMMENDATIONS FOR IMPROVED CONNECTIVITY TO BLACKSTONE AVENUE

FIGURE 21: INCREMENT 3

CO

LE

LG

EA

3

VE CO

5 DE

LM

AS

LE

LG

EA

VE

E AV

DE

LM

AS

AV

E

4 GL

EN

NA

VE

GL

BL

A

S CK

TO

NE

AV

EN

NA

VE

E

1

BL

AC

KS

TO

NE

AV

E

2

1 1.

CORNER BULBOUT

EFF

NEW BRT STOP

3 3.

FUTURE FCC BUILDING

4 4.

EXTENDED AND ENHANCED SIDEWALK

5 5.

NEW PEDESTRIAN CROSSWALK

6 6.

NEW BIKE LANE

7 7.

FCC BUILDING SETBACK TO PROVIDE EXPANDED SIDEWAK

CL VA YA

CA WE

FIGURE 11: OPPORTUNITY SITES SOURCE: VISUAL ANALYSIS

New Math and Science Building on FCC Campus: Locating the Math and Sciences Building on FCC’s existing property on Blackstone could help improve the cohesiveness of the campus by effectively linking Ratcliffe Stadium with the rest of FCC’s facilities, while also encouraging the campus community to take advantage of BRT service and other amenities and services that locate on Blackstone Avenue in the future. This intervention on Blackstone Avenue will not only establish a vibrant institutional presence on Blackstone, but also encourage other studentoriented active uses to come in the future, such as food services, retail or incubation spaces. In order to free up this location for an active, academic use, FCC will need to relocate the existing Campus Maintenance Facility. However, the Facilities Master Plan already calls for consolidating and streamlining maintenance and operations facilities into one building, and reducing parking needs could help free up other land on campus for this use.

Most of the parcels on Blackstone Avenue within study area have small frontage. and are surrounded by large surface parking Frequently occurring curbcuts create a conflict between pedestrians and vehicles.

FIGURE 8: EXCESSIVE SURFACE PARKING SOURCE: CITY OF FRESNO, GIS DATA, GOOGLE EARTH IMAGE AND VISUAL ANALYSIS

New Math and Science Building on FCC Campus: Locating the Math and Sciences Building on FCC’s existing property on Blackstone could help improve the cohesiveness of the campus by effectively linking Ratcliffe Stadium with the rest of FCC’s facilities, while also encouraging the campus community to take advantage of BRT service and other amenities and services that locate on Blackstone Avenue in the future. This intervention on Blackstone Avenue will not only establish a vibrant institutional presence on Blackstone, but also encourage other studentoriented active uses to come in the future, such as food services, retail or incubation spaces. In order to free up this location for an active, academic use, FCC will need to relocate the existing Campus Maintenance Facility. However, the Facilities Master Plan already calls for consolidating and streamlining maintenance and operations facilities into one building, and reducing parking needs could help free up other land on campus for this use.

NO

POTENTIAL INFILL SITES HOUSING

UN

ACADEMIC

Proposed Public Realm Improvement, Enhanced Intersection and Built-form at Blackstone and Weldon Avenues FIGURE 8: EXCESSIVE SURFACE PARKING

LE

RETAIL COMMERCIAL-OFFICE ADAPTIVE REUSE GARAGE

PE HO

ME

AV

MC

E

FCC PROPERTY BOUNDARY

The City of Fresno partnered with the Fresno Council of Gov4. Implementation Strategies /// 53 ernments to initiate the BlackFIGURE 11: OPPORTUNITY SITES SOURCE: VISUAL ANALYSIS stone Corridor Transportation and Housing Study with the objective of making Blackstone Avenue revitalization as a prototype for the region, responding to the Sustainable Communities Strategy goals of integrated land use and transportation planning.

K IN

LE

YA

RA

LT

AW

IV E

RS

IT Y

AV

RM

AL

AV

LD

ON

AV

AV

SS

AR

AV

IN

TO

NA

HA

T

TE

2 2.

SOURCE: CITY OF FRESNO, GIS DATA, GOOGLE EARTH IMAGE AND VISUAL ANALYSIS

IE S

RR

AC

EA

RV

AR

DA

EFF

VE C LA

VE

RK

CL

ST VA

E

YA

CA

R ID

FIGURE 23: INCREMENT 4 ELDON AV W

GE

NO

E

E

UN

ENHANCE EXISTING BIKE PED CORRIDORS IMPROVE EXISTING RAILWAY CROSSING

E

PE

RECOMMENDED NEW BIKE-PED CORRIDORS

HO

FUTURE POTENTIAL UNDERPASS

AY

CATALYTIC SITES FCC PROPERTY BOUNDARY STUDY AREA BOUNDARY SURFACE PARKING FCC PROPERTY BOUNDARY STUDY AREA BOUNDARY

Figure Ground Vs Surface Parking Study 2. Existing Conditions /// 29

RETROFIT POTENTIAL AUGMENTATION POTENTIAL REDEVELOPMENT POTENTIAL CATALYTIC SITES FCC PROPERTY BOUNDARY STUDY AREA BOUNDARY

The study provided incremental implementation strategies and Opportunity Sites along tools for consideration by the Blackstone Corridor 3. Emerging Opportunities City /// 37 of Fresno and other key stakeholders. 2. Existing Conditions /// 29

MC

E

K IN

LE

RA

LT

AW

IV E

RS

IT Y

AV

RM

AL

AV

AV

AR

AV

TO

NA

VE

RR

AC

EA

RV

AR

DA

VE

VE

C LA

RK

ST

E

E

MB

R ID

GE

E

E

E

AY

AV E INCREMENT 4 FIGURE 23: Y

BRT BUS STOP

BRT BUS STOP

GE

AV

E

L LE Increment 4: Achieve Full Potential of the Corridor CO

4. Implementation Strategies /// 61

4. Implementation Strategies /// 71

The fourth increment illustrates the desired outcome of the prior strategies. The corridor is now a well-functioning neighborhood centered on local businesses, college, density, urbanity and transit.

CO

L LE

GE

AV

E DE

LM

L DE

AS

MA

AV

SA

E

VE

GL

GL

EN

EN

NA

NA

VE

VE

BL

B

A

S CK

C LA

VA YA

LE

AV

E

VA

YAC L EA M A VB ER I D WE NO

HOUSING

UN

ACADEMIC RETAIL

GARAGE HOUSING ADAPTIVE REUSE ACADEMIC COMMERCIAL-OFFICE 3. Emerging RETAILOpportunities /// 37 FCC PROPERTY BOUNDARY GARAGE BRT BUS STOP

AV

FCC CAMPUS BOUNDARY

AUGMENTATION POTENTIAL REDEVELOPMENT POTENTIAL

ME

PEDESTRIAN PRIORITY INTERSECTIONS

VE

With this study, we established a long-term vision for Blackstone Avenue as a vibrant and active multi-modal corridor by highlighting the potential for revitalization and laying a framework for guiding the imminent transformation.

RETROFIT POTENTIAL

LE

SS

IN

HA

T TE

E

MB

IE S

VE

PE HO

H

ME

AV

E

MC

KIN

LE

YA

VE

PE

RA

RA

LT

LT

AW

AW

AY

AY

UN

IVE

IVE

RS

RS

ITY

ITY

AV E NO

AV

E

RM

RM

AL

AL

AV

AV

E

E

WE

LD

LD

ON

ON

AV

AV

E

E

CA

MB

RID

KS

GE

GE

TO

AV

NE

NE

AV

E

E

HA Contribution: T RV A AsT a part ofRD Athe urban design VE ER RA C E I provided support in team, AV E ST HA CL RK I N study area idenR V assessment, T OF I E S T AR CLA N F DA E AV VE E tification of the opportunity TE RR AC E Aand development of sites, VE ST CL RK IN T O implementation strategies. CLA NA EFF

SS

SS

TO

AR

AV

E

IE S

VE

AR

AV

E

For making Blackstone Corridor a complete street catering to the needs of all street users, I also helped re-imagine it with the BRT corridor, bicycle lane, and active pedestrian environment.


Sabarmati Riverfront Development Project

22

For HCP DPM, Ahmedabad

Sabarmati Riverfront Development is an urban infrastructure project, envisioned to renew and rejuvenate the city of Ahmedabad. It aims to reclaim river edge as a public asset, improve its spatial and habitat conditions and restore the city’s relationship with the river. Contribution: Detailing the general development on stretches, supervising work on sample stretch, mapping activities and behavioral pattern on sample stretch. According to this generating layouts, working drawings and detail drawings for all the stretches.

Detail at A

Section at AA’ Working drawing for stone risers

Section at BB’ Handrail Detail

Executing on-site Construction

Upper Promenade

Lower Promenade

River

Overall Master plan

Surface Development of the Upper Promenade: Sample Stretch

Upper Promenade

Lower Promenade

River

Site Photo Post Execution of Drawings

Construction Details Stairs and Handrail










Existing Street Level

第二季度

第三季度

第四季度

第一季度

第三季度

销售额

第二季度

第二季度

第三季度

销售额

Numbers 194 26 39 58 71

第四季度 第一季度

1.24 Acre Acre Acre Acre

Retail Commercial

第一季度

0.15 Acre 0.16 Acre

第三季度

销售额

第二季度

Open space

Total Population: 86 Density: 117 Units/Acre 358 People/Acre Affordability: 35%

Project Location

PROJECT TITLE

Underground floor 1:30 Underground floor 1:30

Typical floor 1:50

Retail Commercial

Total Population: 612 Density: 156 Units/Acre 494 People/Acre Affordability: 35%

49000 sq. ft 21720 sq.ft 2780 sq.ft

BLOCK AREA = 1.64 Acres

第四季度

Built up Open Space Streets

248 20 100 88 40

15200 sq. ft

Total Unites Studio 1 Bedroom 2 Bedroom 3 Bedroom

Retail Space

592 140 Units/Acre

第一

Second floor

Total Population Density

A

Figure ground : Proposed

First Floor

Heights regulation and Massing: Block Typical floor 1:50 Second floor 1:50 Typical floor 1:50 Second floor 31:50

BLOCK TYPOLOGY

Section at BB

Scale 1” = 20’

第四季度 第一季度

PAGE DESCRIPTION

第三季度

Land Use 1.24Mix AcreUse Acre Residential Acre Commercial Acre

.24 Acre) acel A (0.24 Acre)Pacel B (1.24 PacelAcre) B (1.24 Acre)

销售额

7.254 Acre 0.186 Acre 0Ground Acre Floor

第二季度

Figure ground : Existing

销售额

Parcel Number & Size a 0.24 Acre Total Floor Area 1.24 Acre tal Floor Area 0.24 Acre Total Floor Area 0.24 Acre Build up Acre 0.24 ildA up Acre Build up 0 Acre Acre 0Open Space pen Space Acre Open Space 0.24 Acre 0 Acre Acre 0Street eet Acre Street Numbers Numbers Numbers Total 25 28 194 tal Units 25 Units Total Units 28 Studio 26 udio Studio 4 Ferry Building Perspective Section 4 1 7Bedroom 1 Bedroom 39 7 Bedroom B 58 2 7Bedroom 2 Bedroom 7 Bedroom 1.24 Acre 71 3 7Bedroom 3 Bedroom 7 Bedroom 0.65 Acre Plaza 7.254 Residential 0.65 sidential AcreSection Residential Ferry Building 1In=50 FtAcre 0.15 Acre 0.186 Acre Retail 0.15 tail Acre Retail 0 Acre Acre Size Commercial 0.16 mmercial 0.16Block Acre Commercial Parcels Height Control 85 Feet 65 Feet 45 Feet

第一季度

MONTH, DD YYYY

Total Floor Area Build up Open Space Street

Numbers 194 26 39 58

第四季度

on: Total Population: tal 86 Population: 86 Total 612 Population: 612 Street Heirarchy Density: ensity: Density: 156 Units/Acre Embarcadero 7 Units/Acre 156 Units/Acre e8 People/Acre 494 People/Acre Connection Street 494 People/Acre 5% Affordability: 35% ffordability: 35% 35% 16 Ft Inner LaneAffordability:

Broadway Plaza Section 1In=50 Ft 0.24 Acre 0.24 Acre 0 Acre 0 Acre

Total Units Studio 1 Bedroom 2 Bedroom

Pacel B (1.24 Acre)

tal Floor Area ild up pen Space reet

Numbers 25 28 4 7 7

acel A (0.24 Acre)

tal Units udio Bedroom Bedroom

rohit.tak@fulbrightmail.org +91 9146572145

Rohit Tak


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.