1 minute read
Figure 21: Building Placement
3.3.3.Achievements
• 40% savings in energy • Zero electricity billing • 55% savings in water • Zero net discharge • Largest roof top solar power system in any multi-storeyed building(930KWP) • First in government sector targeted for both ratings of green buildings.
Advertisement
3.3.4.Measures for site
• Wider front setback (22m) to protect front tree line. • Preserve the integrity of the green street. • Preservation of the local ecology, tree cutting approvals for 46, but only 19 were cut. • 11 trees transplanted. • Excavated soil reutilised at other construction sites and the zoo. • The ipb office building for the ministry of environment and forests has been planned in 2 parallel blocks facing the north south direction, with a large linear open court in the centre.
Figure 21: Building Placement